EP0082926A1 - Device for moving sliver cans - Google Patents

Device for moving sliver cans Download PDF

Info

Publication number
EP0082926A1
EP0082926A1 EP82109075A EP82109075A EP0082926A1 EP 0082926 A1 EP0082926 A1 EP 0082926A1 EP 82109075 A EP82109075 A EP 82109075A EP 82109075 A EP82109075 A EP 82109075A EP 0082926 A1 EP0082926 A1 EP 0082926A1
Authority
EP
European Patent Office
Prior art keywords
cans
empty
carriage
arm
full
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP82109075A
Other languages
German (de)
French (fr)
Inventor
Andreas Maurer
Gerhard Mandl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maschinenfabrik Rieter AG
Original Assignee
Maschinenfabrik Rieter AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maschinenfabrik Rieter AG filed Critical Maschinenfabrik Rieter AG
Publication of EP0082926A1 publication Critical patent/EP0082926A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins
    • D01H9/185Transporting cans

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Abstract

In a can exchanging device (1), empty cans (2) are delivered to a reserve position (A) and full cans (3) are removed from a collection position (C) to a discharge position (G) by means of a device (4) for displacing sliver cans. The device (4) for displacing sliver cans comprises a drive means (5) having rails (9), and a trolley (18), which can move along these rails and is provided with arms (20, 21) pivotably arranged on said trolley. The trolley is displaced back and forth by means of a toothed belt (10) between a deflection head (7) and a drive head (8), between the positions H and L respectively. The arms are arranged on the trolley (18) so as to be pivotable into a horizontal position for seizing and displacing the empty cans, and also into the opposing horizontal position for seizing and displacing the full cans. During operation, the can exchanging device (1) itself displaces the filled can from the position B to the position C and the empty can from the position A to the position B. The device (4) for displacing the sliver cans then displaces the full can from the position C to the position G, after which the arms (20, 21) are pivoted into the vertical position and the trolley (18) is displaced into the position L. In this position, the arms pivot against the empty can (2) which is in position F, and then displace this can to the position M while a preceding empty can (2) is being simultaneously displaced from the position M into the position A. If there are a plurality of cans between the position M and the position F, the trolley (18) keeps moving until the forwardmost empty can has reached the position A. Then, after the arms (20, 21) have been pivoted back into the vertical position, the trolley moves into its starting position I. The empty cans are guided, between the guide rails (25 and 26) and the full cans are guided between the guide rails (27 and 28) to prevent lateral deviation. <IMAGE>

Description

Die Erfindung bezieht sich auf eine Vorrichtung zum Verschieben von Spinnkannen mit einem durch ein Antriebsmittel schwenkbar und linear verschiebbaren Arm zum Erfassen und Verschieben der Kannen entlang des Antriebsmittels.The invention relates to a device for displacing spinning cans with an arm which can be pivoted and linearly displaced by a drive means for grasping and displacing the cans along the drive means.

Solche Vorrichtungen werden hauptsächlich als Zubringervorrichtungen von leeren Kannen an Spinnereivorbereitungsmaschinen, insbesondere an Strecken verwendet. Das Wegtransportieren der an der Strecke gefüllten Kannen kann ebenfalls mit gleichen Vorrichtungen ausgeführt werden.Such devices are mainly used as feeders for empty cans on spinning preparation machines, especially on draw frames. The cans filled along the route can also be transported away using the same devices.

Um diese beiden Funktionen durchzuführen, sind in der Regel je eine Zufuhr- und eine Wegfuhrvorrichtung notwendig.In order to carry out these two functions, one feed device and one removal device are generally required.

Aus dem deutschen Gebrauchsmuster Nr. 6918312 ist eine Vorrichtung bekannt, bei der zwei leere Spinnkannen mit einem durch ein Antriebsmittel schwenkbar und linear verschiebbaren Arm aus einem leeren Kannenmagazin erfasst und gemeinsam in eine Füllstellung einer Strecke verschoben werden. Das Verschieben der vollen Kannen geschieht durch eine zweite Vorrichtung in einem rechten Winkel zur Verschieberichtung der leeren Kannen.A device is known from German utility model no. 6918312 in which two empty spinning cans are gripped from an empty can magazine with an arm which can be pivoted and linearly displaced by a drive means and are moved together into a filling position of a draw frame. The full cans are moved by a second device at a right angle to the direction of displacement of the empty cans.

Der Nachteil dieser Vorrichtung besteht im grossen Platzbedarf, bedingt durch die Hublänge der zweiten die vollen Kannen entfernenden Vorrichtung, sowie in der eingeschränkten Verschiebelänge der vollen Kannen infolge einer eingeschränkten Hublänge.The disadvantage of this device is the large space requirement, due to the stroke length of the second device that removes the full cans, and the limited displacement length of the full cans due to a restricted stroke length.

Es ist die Aufgabe der Erfindung diese Nachteile zu beheben.It is the object of the invention to overcome these disadvantages.

Erfindungsgemäss wird diese Aufgabe dadurch gelöst, dass der Arm im wesentlichen um einen Winkel von 180° schwenkbar ist, zum Erfassen und Verschieben von Kannen beiderseits des Antriebsmittels.According to the invention, this object is achieved in that the arm can be pivoted essentially by an angle of 180 °, for grasping and moving cans on both sides of the drive means.

Die durch die Erfindung erreichten Vorteile sind im wesentlichen darin zu sehen, dass die leeren und die vollen Kannen unter optimaler Platzausnutzung einer Strecke zu- respektive weggeführt werden können.The advantages achieved by the invention are essentially to be seen in the fact that the empty and full cans can be guided towards or away from a route while making optimal use of space.

Im folgenden wird die Erfindung anhand von lediglich Ausführungswege darstellenden Zeichnungen näher erläutert.In the following, the invention is explained in more detail with the aid of drawings showing only execution routes.

Es zeigt:

  • Fig. 1 einen Grundriss der erfindungsgemässen Vorrichtung in Kombination mit einer Kannenwechselvorrichtung, halbschematisch dargestellt
  • Fig. 2 die Vorrichtung von Fig. 1 in Seitenansicht, in Richtung II (Fig. l) gesehen, vergrössert und halbschematisch dargestellt
  • Fig. 3 die Vorrichtung von Fig. 1 in Frontansicht, in Richtung III (Fig. 1) gesehen, im gleichen Massstab wie Fig. 1 und halbschematisch dargestellt
  • Fig. 4+5 je die Vorrichtung von Fig. 1 in je einer Verwendungsvariante
  • Fig. 6 Funktionsschema zum Betrieb der erfindungsgemässen Vorrichtung
  • Fig. 7 Schema des Funktionsablaufs zum Schema nach Fig. 6.
It shows:
  • F ig. 1 shows a plan view of the device according to the invention in combination with a can changing device, shown semi-schematically
  • Fig. 2 shows the device of Fig. 1 in side view, seen in the direction II (Fig. L), enlarged and shown semi-schematically
  • Fig. 3 shows the device of Fig. 1 in front view, in the direction III (Fig. 1), on the same scale as Fig. 1 and shown semi-schematically
  • Fig. 4 + 5 each the device of Fig. 1 in one use variant
  • Fig. 6 functional diagram for operating the device according to the invention
  • FIG. 7 diagram of the functional sequence for the diagram according to FIG. 6.

In einer nicht näher beschriebenen Kannenwechselvorrichtung 1 wird eine leere Kanne 2 aus einer Reserveposition A in eine Position B zum Füllen der Kanne und anschliessend als gefüllte Kanne 3 in eine Abholposition C durch die Kannenwechselvorrichtung selbst befördert.In a can changing device 1 not described in detail, an empty can 2 is conveyed from a reserve position A into a position B for filling the can and then as a filled can 3 into a pick-up position C by the can changing device itself.

Eine Verschiebevorrichtung 4 zum Verschieben von Spinnkannen umfasst ein Antriebsmittel 5 mit einer Basis 6 auf der ein Umlenkkopf 7 und ein Antriebskopf 8 mit dazwischenliegenden fest angeordneten Schienen 9 (in Fig. 2 nur eine gezeigt). Im weiteren gehört zum Antriebsmittel 5 ein Zahnriemen 10, welcher im Umlenkkopf 7 durch Umlenkrollen 11 und 12 und im Antriebskopf 8 durch eine Umlenkrolle 13 und eine Antriebsrolle 14 geführt ist. Die Antriebsrolle 14 wird mittels einem Uebertrieb 15 durch einen Motor 16 angetrieben. Im weiteren gehört zum Antriebsmittel 5 eine im Umlenkkopf 7 und Antriebskopf 8 drehbar gelagerte Vierkantwelle 17, welche ausserdem im Antriebskopf 8 mittels einem Pneumatikzylinder mit einer Zahnstange, welche mit einem auf der Vierkantwelle 17 aufgezogenen Zahnrad für den Antrieb der Vierkantwelle 17 im Eingriff steht (Pneumatikzylinder, Zahnstange und Zahnrad sind in Fig. 2 im Antriebskopf 8 und in der Basis 6 mit strichlierten Linien andeutungsweise gezeigt).A displacement device 4 for displacing spinning cans comprises a drive means 5 with a base 6 on which a deflection head 7 and a drive head 8 with fixed rails 9 in between (only one shown in FIG. 2). Furthermore, the drive means 5 includes a toothed belt 10 which is guided in the deflection head 7 by deflection rollers 11 and 12 and in the drive head 8 by a deflection roller 13 and a drive roller 14. The drive roller 14 is driven by a motor 16 by means of an overdrive 15. In addition, the drive means 5 include one in the deflection head 7 and drive head 8 rotatably mounted square shaft 17, which is also in the drive head 8 by means of a pneumatic cylinder with a rack which is in engagement with a gear mounted on the square shaft 17 for driving the square shaft 17 (pneumatic cylinder, rack and gear are in Fig. 2 in the drive head 8 and shown in the base 6 with dashed lines).

Ein Wagen 18 ist mittels vier Rädern 19 (in Fig. 2 nur zwei gezeigt) auf den Schienen 9 fahrbar und in Fahrtrichtung gegen Ausscheeren (nicht gezeigt) abgestützt. Der Zahnriemen 10 ist an den Stellen D und E mit dem Wagen 18 fest verbunden. Das untere Trum 101 des Zahnriemens 10 ist unter dem Wagen 18 und zwischen den vier Rädern 19 hindurchgeführt.A carriage 18 can be moved on the rails 9 by means of four wheels 19 (only two are shown in FIG. 2) and is supported in the direction of travel against shearings (not shown). The toothed belt 10 is firmly connected to the carriage 18 at points D and E. The lower run 10 1 of the toothed belt 10 is passed under the carriage 18 and between the four wheels 19.

Zum Wagen 18 gehört im weiteren ein Arm 20 sowie ein Arm 21, welche beide mittels einer Welle 22 schwenkbar am Wagen 18 angeordnet sind. Die Schwenkbarkeit reicht, wie in Fig. 3 gezeigt, im wesentlichen um einen Winkel α von 180°, d.h. aus der einen horizontalen in die gegenüberliegende horizontale Lage.The carriage 18 further includes an arm 20 and an arm 21, both of which are pivotably arranged on the carriage 18 by means of a shaft 22. The pivotability, as shown in Fig. 3, extends essentially by an angle α of 180 °, i.e. from one horizontal to the opposite horizontal position.

Dem Antrieb der Welle 22 dient ein im Wagen 18 drehbar gelagertes, auf der Vierkantwelle 17 verschiebbar aufgezogenes Zahnrad 23, sowie ein in dieses Zahnrad greifendes mit der Welle 22 fest verbundenes Zahnrad 24 (beide Zahnräder in Fig. 2 mit gestrichelten Linien dargestellt).The shaft 22 is driven by a gear 23 rotatably mounted in the carriage 18, slidably mounted on the square shaft 17, and a gear 24 which engages in this gear and is firmly connected to the shaft 22 (both gear wheels are shown in broken lines in FIG. 2).

Zur Führung der leeren, respektive vollen Kannen, sind Leitschienen 25 und 26, respektive 27 und 28, am Boden befestigt.To guide the empty or full cans, guide rails 25 and 26, respectively 27 and 28, are attached to the floor.

Fig. 1 zeigt die Verwendung der erfindungsgemässen Vorrichtung, falls nur noch eine leere Kanne 2 aus einer Bereitschaftsposition F in eine Zwischenposition M und dabei eine vorangehende leere Kanne 2 aus der Zwischenposition M in die Reserveposition A, sowie eine volle Kanne 3 aus der Abholposition C in eine Abgabeposition G verschoben werden soll.Fig. 1 shows the use of the device according to the invention, if only an empty can 2 from a standby position F to an intermediate position M and a preceding empty can 2 from the intermediate position M to the reserve position A, and a full can 3 from the pick-up position C. to be moved to a delivery position G.

Einem solchen Ablauf geht die Verschiebung einer vollen Kanne 3 aus der Position B in die Position C sowie einer leeren Kanne 2 aus der Position A in die Position B durch die Kannenwechselvorrichtung 1 voraus.Such a sequence is preceded by the displacement of a full can 3 from position B to position C and an empty can 2 from position A to position B by the can changing device 1.

Im Betrieb wird durch eine später beschriebene Steuerung veranlasst, dass die senkrecht gestellten Arme 20 und 21 (Fig. 3) des sich in einer Wartestellung I befindlichen Wagens 18, aus der Blickrichtung III gesehen, nach rechts schwenken, um die sich in Position C befindliche Kanne 3 zu erfassen und anschliessend unter Verschiebung des Wagens 18 aus der Position C in die Abgabeposition G zu bewegen. In dieser Position hat der Wagen 18 die Stellung K erreicht, in der die Arme 20 und 21 wieder in die senkrechte Lage zurückgeschwenkt werden. Anschliessend fährt der Wagen 18 weiter in eine äussere Endstellung L, um durch Schwenken der Arme 20 und 21 nach links eine in der Position F bereitgestellte leere Kanne 2 zu erfassen und anschliessend unter Rückwärtsverschiebung des Wagens 18 in die Position M zu bewegen. Gleichzeitig wird eine leere Kanne 2 aus der Position M mittels Arm 20 in die Position A verschoben.In operation, a control described later causes the vertically positioned arms 20 and 21 (FIG. 3) of the carriage 18 which is in a waiting position I to pivot to the right, as seen from the direction of view III, around the one in position C. Detect can 3 and then move it from position C to delivery position G by moving carriage 18. In this position, the carriage 18 has reached position K, in which the arms 20 and 21 are pivoted back into the vertical position. The carriage 18 then moves on to an outer end position L in order to grasp an empty can 2 provided in the position F by pivoting the arms 20 and 21 to the left and then to move it to the position M by moving the carriage 18 backwards. At the same time, an empty can 2 is moved from position M to position A by means of arm 20.

Durch dieses Manöver wurde einerseits die Reserveposition A wieder mit einer leeren Kanne versehen, und die Abholposition C wieder für den Nachschub einer vollen Kanne freigemacht.As a result of this maneuver, reserve position A was again provided with an empty can, and the pickup position C cleared again for the replenishment of a full can.

Die erwähnten Manöver erfolgen während der Zeit, in der eine Kanne in der Position B gefüllt wird.The maneuvers mentioned take place during the time in which a can is filled in position B.

Fig. 4 zeigt die Variante, in welcher sich mehr als zwei leere Kannen 2 zwischen den Positionen A und F befinden.Fig. 4 shows the variant in which there are more than two empty cans 2 between positions A and F.

In dieser Arbeitsvariante entsprechen die Verschiebevorgänge für die vollen Kannen 3 sowie das Verschieben des Wagens 18 in die Position L und das Schwenken der Arme 20 und 21 nach links zum Erfassen einer leeren Kanne in der Position F den vorgängig beschriebenen Verschiebemanövern. Der Unterschied im Verschieben der leeren Kannen zur vorgängig beschriebenen Variante besteht lediglich darin, dass beim Verschieben der leeren Kanne aus der Position F mittels Arm 21 die übrigen Kannen mittels Arm 20 gemeinsam solange verschoben werden, bis die vorderste leere Kanne, in Richtung Reserveposition A gesehen, die Position A erreicht hat. Bei diesem Verschiebevorgang werden die beispielsweise in Fig. 4 gezeigten drei Kannen durch den Arm 20 aneinanderliegend und gleichzeitig verschoben. Nachdem eine Kanne die Position A erreicht hat, werden die Arme 20, 21 wieder in die vertikale Stellung geschwenkt und der Wagen 18 wieder in die Stellung I zurückgestellt.In this working variant, the displacement processes for the full cans 3 and the displacement of the carriage 18 into the position L and the pivoting of the arms 20 and 21 to the left to detect an empty can in the position F correspond to the displacement maneuvers described above. The only difference in moving the empty cans to the previously described variant is that when the empty cans are moved from position F by means of arm 21, the other cans are moved together by arm 20 until the foremost empty can, viewed in the direction of reserve position A. has reached position A. In this shifting process, the three cans shown, for example, in FIG. 4 are shifted by the arm 20 against one another and simultaneously. After a can has reached position A, the arms 20, 21 are pivoted back into the vertical position and the carriage 18 is returned to position I.

Fig. 5 zeigt eine Variante, in welcher in einer Vorrichtung 41 zum Verschieben der leeren und vollen Spinnkannen nur der Arm 20 verwendet wird. Dabei muss die erste leere Kanne, in Fahrtrichtung der leeren Kanne 2 gesehen, aus einer Position F' in Richtung Position A verschoben werden. Die mit dieser Figur gezeigte Variante entspricht in allen Elementen der mit den Figuren 1 bis 4 gezeigten Vorrichtung.FIG. 5 shows a variant in which only the arm 20 is used in a device 41 for moving the empty and full spinning cans. The first empty can, seen in the direction of travel of empty can 2, must move from position F 'towards position A. be moved. The variant shown with this figure corresponds in all elements to the device shown with Figures 1 to 4.

Die vorerwähnte Steuerung zum Betrieb der Vorrichtung 4(Fig. 1 und 4), respektive 41 (Fig. 5), ist eine im wesentlichen durch kontaktfreie Initiatoren gesteuerte Folgesteuerung.The above-mentioned control for operating the device 4 (FIGS. 1 and 4) or 41 (FIG. 5) is a sequence control which is essentially controlled by contact-free initiators.

Mit den Figuren 6 und 7 sind die Funktionsabläufe sowie die Positionen der Initiatoren schematisch dargestellt. Die Initiatoren bl, b2, b3 und b4 signalisieren die Stellungen des Wagens 18 an den Stellungen H,I,K bzw. L. Ein Initiator b5 signalisiert die vertikale Lage der Arme 20 und 21, ein Initiator b6 das Erreichen der Position A durch eine leere Kanne 2 und ein Initiator b7 das Erreichen der Position C durch eine volle Kanne 3. Die linksseitige Lage der Arme 20 und 21 wird mit Y, die rechtsseitige Lage mit Z und die vertikale Lage mit X bezeichnet. Im weiteren ist die Vorwärtsbewegung des Wagens 18 mit V und die Rückwärtsbewegung, d.h. in Richtung Kannenwechselvorrichtung, mit W bezeichnet.The functional sequences and the positions of the initiators are shown schematically with FIGS. 6 and 7. The initiators bl, b2, b3 and b4 signal the positions of the carriage 18 at the positions H, I, K and L , respectively. An initiator b5 signals the vertical position of the arms 20 and 21, an initiator b6 the reaching of position A by an empty can 2 and an initiator b7 the reaching of position C by a full can 3. The left-hand position of the arms 20 and 21 becomes with Y, the right-hand position with Z and the vertical position with X. Furthermore, the forward movement of the carriage 18 is denoted by V and the backward movement, ie in the direction of the can changing device, by W.

Aus Fig. 7 ist ersichtlich, dass der Initiator b7 durch eine auf die Position C verschobene volle Kanne den Verschiebevorgang auslöst, indem der sich in Stellung I befindliche Wagen die Arme in die Lage Z ausschwenkt und nach einer Verzögerungszeit τ in Richtung V in die Stellung K verschoben wird, in welcher der Initiator b3 das Zurückschwenken der Arme in die senkrechte Lage, d.h. in Richtung X, verursacht. In dieser Lage X steuert der Initiator b5 das Verschieben des Wagens 18 in Richtung V bis zum Erreichen der Stellung L, in welcher der Initiator b4 das Schwenken der Arme in die Lage Y und anschliessend nach einer weiteren Zeitverzögerung τ das Verschieben des Wagens 18 bis die erfasste Kanne die Zwischenposition (M, M', M") und eine dieser vorangehende leere Kanne die Position A erreicht hat. Durch das Erreichen dieser Position A steuert der Initiator b6 das Schwenken der Arme 20, 21 in die Lage X. Der diese Lage anzeigende Initiator b5 verursacht anschliessend das Verschieben des Wagens in die Stellung I, und zwar je nach Position in Richtung V oder in Richtung W. Die Verschiebung in Richtung V erfolgt nur dann, wenn der Initiator bl (Fig.6) das Vorhandensein des Wagens 18 in der Stellung H angezeigt hat. Aus allen anderen Stellungen fährt der Wagen 18 in Richtung W bis der Initiator b2 das Erreichen des Wagens in der Stellung I meldet.From Fig. 7 it can be seen that the initiator b7 triggers the shifting process by a full can moved to position C, in that the car located in position I swings the arms into position Z and after a delay time τ in direction V into the position K is shifted, in which the initiator b3 causes the arms to pivot back into the vertical position, ie in the X direction. In this situation, the initiator X b5 controls the displacement of the W agens 18 in direction V until it reaches the position L, in which the initiator b4 swivels the arms into position Y and then, after a further time delay τ, moves the carriage 18 until the detected can reaches the intermediate position (M, M ', M ") and an empty can preceding it reaches position A. When this position A is reached, the initiator b6 controls the pivoting of the arms 20, 21 into the position X. The initiator b5 indicating this position then causes the carriage to be moved into the position I, depending on the position in the direction V or in the direction of W. The shift in the direction of V occurs only when the initiator bl (FIG. 6) has indicated the presence of the carriage 18 in the position H. From all other positions, the carriage 18 travels in the direction of W until the initiator b2 does so Reaches the car in position I reports.

Claims (11)

1. Vorrichtung zum Verschieben von Spinnkannen (2,3) mit einem durch ein Antriebsmittel (5) schwenkbar und linear verschiebbaren Arm (20,21) zum Erfassen und Verschieben der Kannen (2,3) entlang des Antriebsmittels (5), dadurch gekennzeichnet, dass der Arm (20,21) im wesentlichen um einen Winkel 0( von 1800 schwenkbar ist, zum Erfassen und Verschieben der Kannen (2,3) beidseits des Antriebsmittels (5).1. Device for displacing spinning cans (2, 3) with an arm (20, 21) which can be pivoted and linearly displaced by a drive means (5) for detecting and displacing the cans (2, 3) along the drive means (5), characterized that the arm (20, 21) can be pivoted essentially by an angle 0 (of 180 °) for grasping and moving the cans ( 2 , 3) on both sides of the drive means (5). 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass das Antriebsmittel (5) Schienen (9) und einen darauf fahrbaren Wagen (18) zur schwenkbaren Aufnahme des Armes (20,21) umfasst.2. Device according to claim 1, characterized in that the drive means (5) comprises rails (9) and a carriage (18) movable thereon for pivotally receiving the arm (20, 21). 3. Vorrichtung nach Anspruch 1 und 2, dadurch gekennzeichnet, dass das Antriebsmittel (5) einen sich mindestens über die ganze Verschiebelänge des Wagens erstreckenden Zahnriemen (10) für das Verschieben des Wagens (18) umfasst.3. Device according to claim 1 and 2, characterized in that the drive means (5) comprises a toothed belt (10) extending at least over the entire displacement length of the carriage for displacing the carriage (18). 4. Vorrichtung nach Anspruch 1 und 2, dadurch gekennzeichnet, dass das Antriebsmittel (5) eine sich .mindestens über die Verschiebelänge des Wagens (18) erstreckende, von einem stationären Antrieb angetriebene Vierkantwelle (17) als Antrieb für das Schwenken des Armes (20,21) umfasst.4. The device according to claim 1 and 2, characterized in that the drive means (5) a. At least over the displacement length of the carriage (18) extending, driven by a stationary drive square shaft (17) as a drive for pivoting the arm (20 , 21). 5. Vorrichtung nach Anspruch 3, dadurch gekennzeichnet, dass der Zahnriemen (10) durch einen stationären Antrieb (13 bis 16) antreibbar mit dem Wagen (18) verbunden ist.5. The device according to claim 3, characterized in that the toothed belt (10) by a stationary drive (13 to 16) drivable with the carriage (18) connected is. 6. Verwendung der Vorrichtung (4) nach Anspruch 1, dadurch gekennzeichnet, dass die Vorrichtung (4) derart mit einer Kannenwechselvorrichtung (1) kombiniert wird, dass auf der einen Seite des Antriebsmittels (5) leere Kannen (2) der Wechselvorrichtung (1) zuund auf der anderen Seite volle Kannen (3) weggeführt werden.6. Use of the device (4) according to claim 1, characterized in that the device (4) is combined with a can changing device (1) in such a way that on one side of the drive means (5) empty cans (2) of the changing device (1 ) and full cans (3) are carried away on the other side. 7. Verfahren zum Betrieb der Vorrichtung (4) nach den Ansprüchen 1 bis 5, dadurch gekennzeichnet, dass der Wagen (18) zuerst eine volle Kanne (3) aus einer Abholposition (C) in eine Abgabeposition (G) und anschliessend eine leere Kanne (2) aus einer Bereitschaftsposition (F) in eine Zwischenposition (M, M', M") und anschliessend in eine Reserveposition (A) verschiebt, und dass der Wagen (18) an zur Durchführung der vorgenannten Verschiebeschritte entsprechenden Wagenstellungen (I,K,L,H) stillgesetzt wird, sowie dass der Arm (20,21) aus einer vertikalen Position, zum Erfassen und Verschieben der vollen Kannen (3) auf die eine und zum Erfassen und Verschieben der leeren Kannen (2) auf die gegenüberliegende Seite des Antriebsmittels (5) geschwenkt wird.7. The method for operating the device (4) according to claims 1 to 5, characterized in that the carriage (18) first a full can (3) from a pick-up position (C) to a delivery position (G) and then an empty can (2) from a standby position (F) to an intermediate position (M, M ', M ") and then to a reserve position (A), and that the carriage (18) to the carriage positions corresponding to the aforementioned shifting steps (I, K , L, H) and the arm (20, 21) from a vertical position, for grasping and shifting the full cans (3) to one side and for grasping and shifting the empty cans (2) to the opposite side the drive means (5) is pivoted. 8. Verfahren nach Anspruch 7, dadurch gekennzeichnet, dass der Wagen (18) zuerst eine volle Kanne (3) aus einer Abholposition (C) in eine Abgabeposition (G) und anschliessend eine leere Kanne (2) aus einer Bereitschaftsposition (F) in eine Zwischenposition (M,M',M") und gleichzeitig eine leere Kanne (2) in eine Reserveposition (A) verschiebt, und dass der Wagen (18) an zur Durchführung der vorgenannten Verschiebeschritte entsprechenden Wagenstellungen (I,K,L,H) stillgesetzt wird, sowie dass der Arm (20,21) aus einer vertikalen Position zum Erfassen und Verschieben der vollen Kannen (3) auf die eine und zum Erfassen und Verschieben der leeren Kannen (2) auf die gegenüberliegende Seite des Antriebsmittels geschwenkt wird.8. The method according to claim 7, characterized in that the carriage (18) first a full can (3) from a pick-up position (C) in a delivery position (G) and then an empty can (2) from a standby position (F) in an intermediate position (M, M ', M ") and an empty position at the same time Jug (2) moves to a reserve position (A), and that the carriage (18) is stopped at carriage positions (I, K, L, H) corresponding to the aforementioned shifting steps, and that the arm (20, 21) from one vertical position for gripping and moving the full cans (3) on one and for grasping and moving the empty cans (2) is pivoted to the opposite side of the drive means. 9. Verfahren nach Anspruch 7 und 8, gekennzeichnet durch folgende Verfahrensschritte: 1. Der Wagen (18) steht in einer Ausgangsstellung (I), schwenkt den Arm (20,21) aus einer im wesentlichen vertikalen Lage in eine im wesentlichen horizontale Lage und erfasst dabei die volle Kanne (3) in der Abholposition (C), fährt anschliessend nach einer zeitlichen Verzögerung in eine Zwischenstellung (K) und schiebt dabei die volle Kanne (3) in die Abgabeposition (G). 2. Der Arm (20,21) wird wieder in die im wesentlichen senkrechte Stellung geschwenkt. 3. Der Wagen fährt in eine äussere Endstellung (L). 4. Der Arm (20,21) schwenkt in einer der vorangehenden entgegengesetzten Richtung, in eine im wesentlichen horizontale Lage, in der eine sich in Bereitschaftsstellung befindliche leere Kanne erfasst wird. Anschliessend fährt der Wagen nach einer zeitlichen Verzögerung in entgegengesetzter Richtung gegen eine innere Endstellung (H,H') und verschiebt dabei die leere Kanne in die Zwischenposition (M' bis M, M") und gleichzeitig eine vorangehende leere Kanne in die Reserveposition (A). 9. The method according to claim 7 and 8, characterized by the following process steps: 1. The carriage (18) is in a starting position (I), swivels the arm (20, 21) from a substantially vertical position into a substantially horizontal position and thereby detects the full can (3) in the collection position (C) , then moves to an intermediate position (K) after a time delay and pushes the full can (3) into the dispensing position (G). 2. The arm (20, 21) is pivoted back into the substantially vertical position. 3. The carriage moves to an outer end position (L). 4. The arm (20, 21) pivots in one of the preceding opposite directions, into a substantially horizontal position in which an empty jug which is in the ready position is gripped. Then drives the carriage after a time delay in the opposite direction towards an inner end position (H, H ') and thereby moves the empty can to the intermediate position (M' to M, M ") and at the same time a preceding empty can to the reserve position (A). 5. Der Arm wird wieder in die senkrechte Lage geschwenkt.5. The arm is pivoted back into the vertical position. 6. Der Wagen fährt wieder in die Ausgangsstellung (I).6. The car moves back to the starting position (I).
EP82109075A 1981-12-22 1982-10-01 Device for moving sliver cans Withdrawn EP0082926A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CH8218/81 1981-12-22
CH821881 1981-12-22

Publications (1)

Publication Number Publication Date
EP0082926A1 true EP0082926A1 (en) 1983-07-06

Family

ID=4336968

Family Applications (1)

Application Number Title Priority Date Filing Date
EP82109075A Withdrawn EP0082926A1 (en) 1981-12-22 1982-10-01 Device for moving sliver cans

Country Status (3)

Country Link
EP (1) EP0082926A1 (en)
JP (1) JPS58109367A (en)
BR (1) BR8207415A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3626494A1 (en) * 1986-08-05 1988-02-18 Zinser Textilmaschinen Gmbh Device for displacing spinning cans in a spinning preparation machine, especially a drafting frame
DE3713264A1 (en) * 1987-04-18 1988-11-03 Truetzschler & Co DEVICE FOR TRANSPORTING SPIDER CAN WITH A CONTINUOUS CONVEYOR
DE4428247A1 (en) * 1994-08-10 1996-02-15 Schlafhorst & Co W Sliver can transport system
DE102019116609A1 (en) * 2019-06-19 2020-12-24 TRüTZSCHLER GMBH & CO. KG Can shifting device, can changer and textile machine
CN113896030A (en) * 2020-06-22 2022-01-07 东华大学 Spinning cake processing system and spinning cake processing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1207739A (en) * 1957-07-11 1960-02-18 Hanseatische Motoren Ges M B H Device for automatic exchange of spinning pots in textile machines, in particular stretching benches
DE1923018A1 (en) * 1969-05-06 1970-11-12 Schubert & Salzer Maschinen Can changing device and method for changing cans
FR2443993A1 (en) * 1978-12-15 1980-07-11 Rossi Mario AUTOMATIC POT CHANGER DEVICE FOR CARDS
GB2062026A (en) * 1979-09-10 1981-05-20 Toyoda Automatic Loom Works Apparatus for automatically changing cans of a spinning machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1207739A (en) * 1957-07-11 1960-02-18 Hanseatische Motoren Ges M B H Device for automatic exchange of spinning pots in textile machines, in particular stretching benches
DE1923018A1 (en) * 1969-05-06 1970-11-12 Schubert & Salzer Maschinen Can changing device and method for changing cans
FR2443993A1 (en) * 1978-12-15 1980-07-11 Rossi Mario AUTOMATIC POT CHANGER DEVICE FOR CARDS
GB2062026A (en) * 1979-09-10 1981-05-20 Toyoda Automatic Loom Works Apparatus for automatically changing cans of a spinning machine

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3626494A1 (en) * 1986-08-05 1988-02-18 Zinser Textilmaschinen Gmbh Device for displacing spinning cans in a spinning preparation machine, especially a drafting frame
DE3713264A1 (en) * 1987-04-18 1988-11-03 Truetzschler & Co DEVICE FOR TRANSPORTING SPIDER CAN WITH A CONTINUOUS CONVEYOR
US5052546A (en) * 1987-04-18 1991-10-01 Truzschler GmbH & Co. KG Conveyor having a circulating article carrier element
DE4428247A1 (en) * 1994-08-10 1996-02-15 Schlafhorst & Co W Sliver can transport system
DE102019116609A1 (en) * 2019-06-19 2020-12-24 TRüTZSCHLER GMBH & CO. KG Can shifting device, can changer and textile machine
CN113896030A (en) * 2020-06-22 2022-01-07 东华大学 Spinning cake processing system and spinning cake processing method

Also Published As

Publication number Publication date
JPS58109367A (en) 1983-06-29
BR8207415A (en) 1983-10-18

Similar Documents

Publication Publication Date Title
DE2646313C2 (en) Method and device for replacing sliver cans
DE3348031C2 (en)
DE2138926C3 (en) Device for the automatic transport and storage of cops in groups
DE102006028796A1 (en) Apparatus for treating flexible hose-like structures with at least one opening
CH679591A5 (en)
CH662586A5 (en) SPINNING MACHINE FOR THE PRODUCTION OF YARN FROM ROVING YARN.
DE4013066C2 (en) Bobbin changing device
EP0427005B1 (en) Method and apparatus for exchanging sliver cans in textile machines
DE3928648A1 (en) SYSTEM WITH ONE OR MORE SPINNING MACHINES AND WITH AT LEAST ONE CHANGING CARRIAGE TO CHANGE CAN
DE19628556A1 (en) Device to feed and remove mouldings, especially on sheet=metal presses
DE2833273B2 (en) Method and device for supplying an automatic winder with cops
EP0901848B1 (en) Transfer presses with automatic tool change
DE2119075C2 (en) Method and device for exchanging bobbins for sleeves in ring spinning and ring twisting machines
CH674026A5 (en)
DE4323726A1 (en) Transport vehicle for sliver cans
EP0082938A1 (en) Device for moving sliver cans
DE19953202A1 (en) Spinning can transporter
EP0082926A1 (en) Device for moving sliver cans
DE8321639U1 (en) Device for storing coils or the like.
EP0033983B1 (en) Machine tool with a column for a working spindle, a tool holder and a tool exchanger arranged thereat
DE202006009825U1 (en) Pouch handling apparatus, has leader gripper and follower gripper connected to different guide belts or chains which can move relative to each other
CH667677A5 (en) METHOD FOR REPLACING COILS IN A SPINDING MACHINE.
DE2521370A1 (en) Ring spinning of twisting machine bobbin changing device - with mobile service carriage associated with mobile bobbin storage carriage
CH688145A5 (en) Device for interrupting the sliver in the filling station of a textile machine.
EP0505715A1 (en) Device for exchanging travellers on spinning or twisting machines

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT CH DE FR GB IT LI NL

17P Request for examination filed

Effective date: 19831202

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19850501

RIN1 Information on inventor provided before grant (corrected)

Inventor name: MAURER, ANDREAS

Inventor name: MANDL, GERHARD