EP0063911A2 - Flow line for use in the transfer of fluid to or from under water sites - Google Patents

Flow line for use in the transfer of fluid to or from under water sites Download PDF

Info

Publication number
EP0063911A2
EP0063911A2 EP82302009A EP82302009A EP0063911A2 EP 0063911 A2 EP0063911 A2 EP 0063911A2 EP 82302009 A EP82302009 A EP 82302009A EP 82302009 A EP82302009 A EP 82302009A EP 0063911 A2 EP0063911 A2 EP 0063911A2
Authority
EP
European Patent Office
Prior art keywords
flow line
column
arrangement
line arrangement
connections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP82302009A
Other languages
German (de)
French (fr)
Other versions
EP0063911A3 (en
Inventor
Stanley Jared Derby
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taylor Woodrow Construction Ltd
Original Assignee
Taylor Woodrow Construction Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taylor Woodrow Construction Ltd filed Critical Taylor Woodrow Construction Ltd
Publication of EP0063911A2 publication Critical patent/EP0063911A2/en
Publication of EP0063911A3 publication Critical patent/EP0063911A3/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • E21B17/015Non-vertical risers, e.g. articulated or catenary-type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B22/02Buoys specially adapted for mooring a vessel
    • B63B22/021Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids

Definitions

  • This invention relates to a flow line system for use in the transfer of fluid to or from under water sites.
  • a flow line system for use in the transfer of fluid to or from an under water site, the system comprising a first, flow line arrangement to be installed so as to extend from the water bed to near, but below, the surface, this arrangement being carried by a buoyant support column that is for articulated connection to the water bed and that consists of rigid sections that are connected in series at articulated connections so that the first flow line arrangement is rigidly supported by - each section but can articulate at the base of the column and at the connections between the rigid sections; and a second, flexible, flow line arrangement releasably connectable to the first arrangement, where the first arrangement terminates near the surface, so as to extend the first arrangement.
  • Such a system can be installed between a wall head, manifold or other convenient location at the water bed and production facilities at the surface with the advantage that the connection between the first and second flow line arrangements is near the surface and hence readily accessible.
  • the articulated connections at the water bed and between the rigid sections, with the otherwise rigidly supported first flow line arrangement able to articulate with the support column at these connections enables the system as a whole to cope with extensive movement of floating facilities at the surface so that the system is suitable for use at considerable depths (extent of surface movement increases with water depth).
  • the suitability for use at considerable depth is enhanced by the provision of articulation of the column and the first flow line arrangement as this gives to the column and the flow line arrangement it supports good ability to absorb lateral loads and impacts.
  • the column can be made slim which facilitates its handling during installation and removal.
  • Figure 1 a flow line system between a sea bed well head and production facilities provided on a semi-submersible production platform.
  • Figure 2 shows on a larger scale the detail ringed at II in Figure 1.
  • the semi-submersible production platform 1 is shown in position over the sea bed well head 2 with workover guidelines 3 extending between the platform and the well head.
  • a sea bed anchorage structure 4 to which is anchored, by an articulated connection 5, a series of buoyed rigid column sections 6.
  • the column sections 6 are connected to one another in series at articulated connections 5A, and each section incorporates a buoy 13 at its upper end.
  • the articulated connections can be of any suitable construction as known in the art giving freedom of movement about two mutually perpendicular axes.
  • the column made-up by the sections 6 rigidly supports between the connections 5A a first flow line arrangement 7. One part of this first flow line arrangement 7 is connected to flow lines 8 from the well head 2.
  • connection 5A there is an articulated connection 12 in the flow line arrangement 7 and this arrangement can also articulate at the base of the column.
  • the flow line arrangement 7 is rigidly supported by the buoyed column sections 6 but can articulate at the base of the column and at the connections between the column sections.
  • the articulated connections in the flow line arrangement 7 are effected by flexible flow line portions 12A interconnecting the otherwise rigid runs of the flow line.
  • the column terminates near, but below, the surface of the sea, and at this termination the first articulated flow line arrangement 7 is releasably connected to a second, flexible, flow line arrangement 10.
  • This second flow line arrangement 10 extends to the production platform 1, to which it is releasably connected, and serves for supply to, and export from, the production facilities.
  • the semi-submersible platform 1 can be held on station by a conventional mooring system or by an automatic jack mooring system, the inclusion of the flexible flow line arrangement allowing movement of the platform to take place within a predetermined range.
  • the automatic jack mooring system can utilise the top of the column as a reference point for locating the platform.
  • a flexible flow line arrangement is required to accommodate motion of the floating platform, but to have the flexible flow line arrangement extending, for example, all the way to the water bed could result in a flexible flow line arrangement of such considerable length and consequent weight as to introduce problems in, for example, recovery thereof after disconnection from the well head.
  • an articulated but otherwise rigidly supported flow line arrangement terminating below surface level adverse effects of wave action, lateral loads and impacts on this arrangement and its support (the column) are avoided or readily absorbed.
  • connection 5 at the base of the column is releasable, along with flow line connections to the flow lines 8 and 9, but in the system shown all the connections 5A and 12 are releasable as well.
  • the flexible flow line arrangement 10 is provided with buoyancy 11 to cushion the movement of the flexible flow line, especially when it is disconnected in an emergency.
  • the flexible flow line arrangement 10 also avoids a need for providing tensioning equipment on the floating platform, as is necessary in constructions where a tensioned riser flow line arrangement is provided between a well head and a floating production platform. Also loading on the production platform is reduced as compared with a tensioned flow line arrangement.
  • the illustrated form also has the advantage that the flow line arrangements are disposed to one end of the floating platform, leaving the central moonpool of the platform free for working over the well head. Workover relative to the flow line arrangements is via a separate derrick mounted over the flow line arrangements.
  • the flexible flow line arrangement 10 need not necessarily be connected to floating facilities, and the facilities to which it is connected could be other than production facilities.
  • the buoyancy for the column sections 6 can be built-in along the length of each section, rather than provided by the buoys 13.

Abstract

A flow line system for use in the transfer of fluid to or from an under water site comprises a first flow line arrangement (7) installed so as to extend from the water bed to near, but below, the surface, this arrangement (7) being carried by a buoyant support column that is connected to the water bed at an articulated connection (5) and that consists of rigid sections (6) that are connected in series at articulated connections (5A) so that the first flow line arrangement (7) is rigidly supported by each section (6) but can articulate at the base of the column and at the connections (5A) between the rigid sections (6); and a second, flexible, flow line arrangement (10) releasably connected to the first arrangement (7), where the first arrangement terminates near the surface, so as to extend the first arrangement. As the first flow line arrangement and the column can articulate they have good ability to absorb lateral loads and impacts, and to cope with extensive movement at the surface end of the second flow line arrangement. The system is therefore well-suited for use in considerable water depths, and as it can articulate the column can be made slim which facilitates its handling during installation and removal.

Description

  • This invention relates to a flow line system for use in the transfer of fluid to or from under water sites.
  • In the transfer of fluid to or from an under water site, for example in the extraction of oil or gas, it is necessary to provide a flow line or lines between the water bed and production facilities which may be on a fixed, tensioned or moored floating production platform. Advantageously such flow lines should be easily disconnectable from, and re-connectable to, the subwater well heads or manifold, particularly in potentially rough water areas. The problems in providing ease of connection and disconnection are greater at deep water sites, or where icebergs are a problem and/or if the production facilities are on a floating production platform. However, whilst disconnection and connection, when required, should be easy to accomplish, it is also important that the need to effect such manoeuvres should be minimised.
  • In United Kingdom published Patent Application No. 2 024 766 A there is disclosed a marine production riser system in which a rigid column that extends from a rigid connection at the water bed to near but below the surface supports a flow line arrangement that is rigidly supported over the whole length of the column. From the top of the column the flow line arrangement is flexible as it passes to a vessel floating on the surface. As the column is rigidly connected to the water bed and is rigid throughout its length it is unable to absorb anything more than very minor lateral loads and impacts because such loads of any size would cause excessive stress at the rigid connection at the water bed. Furthermore, the depth to which such a system can be installed is limited as an unduly long rigid column is difficult to handle during installation (and subsequent removal), and if made slim to facilitate such handling would, in situ, be subjected to excessive deflections and stresses over its length.
  • According to the present invention there is provided a flow line system for use in the transfer of fluid to or from an under water site, the system comprising a first, flow line arrangement to be installed so as to extend from the water bed to near, but below, the surface, this arrangement being carried by a buoyant support column that is for articulated connection to the water bed and that consists of rigid sections that are connected in series at articulated connections so that the first flow line arrangement is rigidly supported by - each section but can articulate at the base of the column and at the connections between the rigid sections; and a second, flexible, flow line arrangement releasably connectable to the first arrangement, where the first arrangement terminates near the surface, so as to extend the first arrangement. Such a system can be installed between a wall head, manifold or other convenient location at the water bed and production facilities at the surface with the advantage that the connection between the first and second flow line arrangements is near the surface and hence readily accessible. The articulated connections at the water bed and between the rigid sections, with the otherwise rigidly supported first flow line arrangement able to articulate with the support column at these connections, enables the system as a whole to cope with extensive movement of floating facilities at the surface so that the system is suitable for use at considerable depths (extent of surface movement increases with water depth). The suitability for use at considerable depth is enhanced by the provision of articulation of the column and the first flow line arrangement as this gives to the column and the flow line arrangement it supports good ability to absorb lateral loads and impacts. Also as this is achieved by the provision of the articulated connections, the column can be made slim which facilitates its handling during installation and removal.
  • For a better understanding of the invention and to show how the same may be carried into effect, reference will now be made, by way of example, to the accompanying drawing, in which there is illustrated, in Figure 1, a flow line system between a sea bed well head and production facilities provided on a semi-submersible production platform. Figure 2 shows on a larger scale the detail ringed at II in Figure 1.
  • Referring to the drawing, the semi-submersible production platform 1 is shown in position over the sea bed well head 2 with workover guidelines 3 extending between the platform and the well head. To one side of the platform and well head there is a sea bed anchorage structure 4 to which is anchored, by an articulated connection 5, a series of buoyed rigid column sections 6. The column sections 6 are connected to one another in series at articulated connections 5A, and each section incorporates a buoy 13 at its upper end. The articulated connections can be of any suitable construction as known in the art giving freedom of movement about two mutually perpendicular axes. The column made-up by the sections 6 rigidly supports between the connections 5A a first flow line arrangement 7. One part of this first flow line arrangement 7 is connected to flow lines 8 from the well head 2. Another part is connected to export flow lines 9. At each connection 5A there is an articulated connection 12 in the flow line arrangement 7 and this arrangement can also articulate at the base of the column. Thus the flow line arrangement 7 is rigidly supported by the buoyed column sections 6 but can articulate at the base of the column and at the connections between the column sections. The articulated connections in the flow line arrangement 7 are effected by flexible flow line portions 12A interconnecting the otherwise rigid runs of the flow line.
  • The column terminates near, but below, the surface of the sea, and at this termination the first articulated flow line arrangement 7 is releasably connected to a second, flexible, flow line arrangement 10. This second flow line arrangement 10 extends to the production platform 1, to which it is releasably connected, and serves for supply to, and export from, the production facilities.
  • The semi-submersible platform 1 can be held on station by a conventional mooring system or by an automatic jack mooring system, the inclusion of the flexible flow line arrangement allowing movement of the platform to take place within a predetermined range. Conveniently the automatic jack mooring system can utilise the top of the column as a reference point for locating the platform.
  • Should weather conditions become such that platform movement cannot be constrained within the allowable range, or should it be desired to move the platform off-station, disconnection from the well head and export facilities is'facilitated by the provision of the releasable connections at the platform and at the top of the column. The latter connection is near the surface and can be of a form not requiring operation by a diver. It is to be noted here that not only is it advantageous to have this connection near the surface from the point of view of ease of actuation, but also by so positioning the connection the length of the flexible flow line arrangement is kept to a minimum. A flexible flow line arrangement is required to accommodate motion of the floating platform, but to have the flexible flow line arrangement extending, for example, all the way to the water bed could result in a flexible flow line arrangement of such considerable length and consequent weight as to introduce problems in, for example, recovery thereof after disconnection from the well head. On the other hand, by having an articulated but otherwise rigidly supported flow line arrangement terminating below surface level, adverse effects of wave action, lateral loads and impacts on this arrangement and its support (the column) are avoided or readily absorbed.
  • Preferably at least the connection 5 at the base of the column is releasable, along with flow line connections to the flow lines 8 and 9, but in the system shown all the connections 5A and 12 are releasable as well.
  • In the illustrated form, the flexible flow line arrangement 10 is provided with buoyancy 11 to cushion the movement of the flexible flow line, especially when it is disconnected in an emergency. The flexible flow line arrangement 10 also avoids a need for providing tensioning equipment on the floating platform, as is necessary in constructions where a tensioned riser flow line arrangement is provided between a well head and a floating production platform. Also loading on the production platform is reduced as compared with a tensioned flow line arrangement. The illustrated form also has the advantage that the flow line arrangements are disposed to one end of the floating platform, leaving the central moonpool of the platform free for working over the well head. Workover relative to the flow line arrangements is via a separate derrick mounted over the flow line arrangements.
  • It may not always be necessary to provide buoyancy for the flexible flow line arrangement 10. Also the flexible flow line arrangement 10 need not necessarily be connected to floating facilities, and the facilities to which it is connected could be other than production facilities.
  • The buoyancy for the column sections 6 can be built-in along the length of each section, rather than provided by the buoys 13.

Claims (4)

1. A flow line system for use in the transfer of fluid to or from an under water site, the system comprising a flow line arrangement (7,12) to be installed so as to extend from the water bed to near, but below, the surface, and in flexible manner from the termination of the column near the surface to the surface; characterised in that the column is for articulated connection to the water bed and consists of rigid sections (6) that are connected in series at articulated connections (5A) so that a first part (7) of the flow line arrangement is rigidly supported by each section (6) but can articulate at the base of the column and at the connections between the rigid sections (6); and in that a second part (12) of the flow line arrangement, which is flexible, is releasably connectable to the first part so as to extend the first part.
2. A flow line system as claimed in claim 1, wherein the first part (7). of the flow line arrangement consists of rigid runs supported by corresponding rigid column sections (6), and articulated connections (12) between these runs and corresponding to the articulated connections (5A) between the rigid column sections (6).
3. A flow line system as claimed in claim 1 or 2, wherein the articulated connection (5) of the column to the water bed is releasable, and wherein the first part (7) of the flow line arrangement is releasably connected, at the water bed, to fluid flow lines (8,9).
4. A flow line system as claimed in claim 2 or claims 2 and 3, wherein each articulated connection (5A), (12) between column sections (6) and the runs of the first part (7) of the arrangement is releasable.
EP82302009A 1981-04-29 1982-04-20 Flow line for use in the transfer of fluid to or from under water sites Withdrawn EP0063911A3 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB8113224 1981-04-29
GB8113224 1981-04-29

Publications (2)

Publication Number Publication Date
EP0063911A2 true EP0063911A2 (en) 1982-11-03
EP0063911A3 EP0063911A3 (en) 1983-09-21

Family

ID=10521479

Family Applications (1)

Application Number Title Priority Date Filing Date
EP82302009A Withdrawn EP0063911A3 (en) 1981-04-29 1982-04-20 Flow line for use in the transfer of fluid to or from under water sites

Country Status (3)

Country Link
EP (1) EP0063911A3 (en)
JP (1) JPS57195000A (en)
GB (1) GB2097358A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0250069A2 (en) * 1986-06-20 1987-12-23 Conoco Inc. A deepwater floating drilling and production facility incorporating flexible production risers
GB2254063A (en) * 1991-03-25 1992-09-30 British Petroleum Co Plc Method for transporting fluids.
US5427046A (en) * 1994-01-18 1995-06-27 Single Buoy Moorings Inc. Subsea conduit structure
WO1998030438A1 (en) * 1997-01-07 1998-07-16 Lmg Marin As Arrangement of drilling and production ship
WO2003031765A1 (en) * 2001-10-10 2003-04-17 Rockwater Limited A riser and method of installing same
FR2929638A1 (en) * 2008-04-08 2009-10-09 Technip France Sa DEVICE FOR EXTRACTING A MATERIAL LOCATED AT THE BOTTOM OF A WATER EXTENSION, EXTRACTION PLANT, AND ASSOCIATED METHOD

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60158100A (en) * 1984-01-28 1985-08-19 株式会社モデック Sea-bottom feed-hose mooring arrangement
US4972907A (en) * 1985-10-24 1990-11-27 Shell Offshore Inc. Method of conducting well operations from a moveable floating platform
US4762180A (en) * 1987-02-05 1988-08-09 Conoco Inc. Modular near-surface completion system
US5615977A (en) * 1993-09-07 1997-04-01 Continental Emsco Company Flexible/rigid riser system
US6142708A (en) * 1999-05-19 2000-11-07 Oil States Industries Inc. Rotating porch for subsea branch and termination pipeline connections
CN103397871B (en) * 2013-08-14 2015-10-28 大连理工大学 A kind of ultra-deep-water oil and gas development system based on dry type tree and mounting method thereof
US20150096760A1 (en) * 2013-10-03 2015-04-09 Atlantis Offshore Holding Ltd. Modular Exploration and Production System Including an Extended Well Testing Service Vessel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4089333A (en) * 1972-10-28 1978-05-16 Nippi, Incorporated Method of treating a wound or burn
FR2386758A1 (en) * 1977-04-08 1978-11-03 Petroles Cie Francaise Flexible pipe support column made from connected tubes - for extraction or filling of petroleum prods. from or into s submerged tank
FR2396154A1 (en) * 1977-07-01 1979-01-26 Emh IMPROVEMENTS MADE TO AN ARTICULATED COLUMN, FOR THE EXPLOITATION OF THE SEA BOTTOM, INCLUDING CONNECTING PIPES BETWEEN THE COLUMN AND ITS BASE
GB2024766A (en) * 1978-07-10 1980-01-16 Mobil Oil Corp Marine production riser system and method of installing sae

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4089333A (en) * 1972-10-28 1978-05-16 Nippi, Incorporated Method of treating a wound or burn
FR2386758A1 (en) * 1977-04-08 1978-11-03 Petroles Cie Francaise Flexible pipe support column made from connected tubes - for extraction or filling of petroleum prods. from or into s submerged tank
FR2396154A1 (en) * 1977-07-01 1979-01-26 Emh IMPROVEMENTS MADE TO AN ARTICULATED COLUMN, FOR THE EXPLOITATION OF THE SEA BOTTOM, INCLUDING CONNECTING PIPES BETWEEN THE COLUMN AND ITS BASE
GB2024766A (en) * 1978-07-10 1980-01-16 Mobil Oil Corp Marine production riser system and method of installing sae

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0250069A2 (en) * 1986-06-20 1987-12-23 Conoco Inc. A deepwater floating drilling and production facility incorporating flexible production risers
EP0250069A3 (en) * 1986-06-20 1989-03-29 Conoco Inc. A deepwater floating drilling and production facility incorporating flexible production risers
GB2254063A (en) * 1991-03-25 1992-09-30 British Petroleum Co Plc Method for transporting fluids.
FR2674608A1 (en) * 1991-03-25 1992-10-02 British Petroleum Co Plc METHOD OF TRANSPORTING FLUIDS
US5427046A (en) * 1994-01-18 1995-06-27 Single Buoy Moorings Inc. Subsea conduit structure
WO1998030438A1 (en) * 1997-01-07 1998-07-16 Lmg Marin As Arrangement of drilling and production ship
GB2335170A (en) * 1997-01-07 1999-09-15 Lmg Marin As Arrangement of drilling and production ship
GB2335170B (en) * 1997-01-07 2001-05-09 Lmg Marin As Arrangement of drilling and production ship
WO2003031765A1 (en) * 2001-10-10 2003-04-17 Rockwater Limited A riser and method of installing same
GB2400622A (en) * 2001-10-10 2004-10-20 Rockwater Ltd A riser and method of installing same
GB2400622B (en) * 2001-10-10 2005-11-09 Rockwater Ltd A riser and method of installing same
FR2929638A1 (en) * 2008-04-08 2009-10-09 Technip France Sa DEVICE FOR EXTRACTING A MATERIAL LOCATED AT THE BOTTOM OF A WATER EXTENSION, EXTRACTION PLANT, AND ASSOCIATED METHOD
WO2009136064A1 (en) * 2008-04-08 2009-11-12 Technip France Device for extracting a material situated at the bottom of an expanse of water, extraction installation and associated method

Also Published As

Publication number Publication date
JPS57195000A (en) 1982-11-30
EP0063911A3 (en) 1983-09-21
GB2097358A (en) 1982-11-03

Similar Documents

Publication Publication Date Title
US5823131A (en) Method and apparatus for disconnecting and retrieving multiple risers attached to a floating vessel
US5439321A (en) Interruptive mobile production system
EP2156004B1 (en) Disconnectable riser-mooring system
US4768984A (en) Buoy having minimal motion characteristics
US6210075B1 (en) Spar system
US6453838B1 (en) Turret-less floating production ship
US6915753B1 (en) Mooring apparatus
EP0063911A2 (en) Flow line for use in the transfer of fluid to or from under water sites
US20060056918A1 (en) Riser system connecting two fixed underwater installations to a floating surface unit
US20040182297A1 (en) Riser pipe support system and method
US6394154B1 (en) Transfer pipe system
WO2000027692A1 (en) Device for positioning of vessels
US6763862B2 (en) Submerged flowline termination at a single point mooring buoy
GB2180809A (en) Tethered buoyant system
EP0079404B2 (en) A single point mooring buoy with rigid arm
EP0941200B1 (en) Method and apparatus for disconnecting and retrieving multiple risers attached to a floating vessel
US7426897B2 (en) Mooring apparatus
GB2046199A (en) Offshore terminal
EP0134313B1 (en) A mooring system
GB2393169A (en) Mooring apparatus incorporating a semi-submersible floating dock
GB2153747A (en) An offshore production vessel
EP0960810A1 (en) Transfer pipe system
EP0716011A1 (en) Tension leg platform production system
GB2459739A (en) A counterbalanced cantilever connector assembly for a vessel
MXPA97007382A (en) Perforation structure / production in maradentro floating low-profo

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT BE CH DE FR IT LU NL SE

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Designated state(s): AT BE CH DE FR IT LI LU NL SE

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19840522

RIN1 Information on inventor provided before grant (corrected)

Inventor name: DERBY, STANLEY JARED