GB2393169A - Mooring apparatus incorporating a semi-submersible floating dock - Google Patents

Mooring apparatus incorporating a semi-submersible floating dock Download PDF

Info

Publication number
GB2393169A
GB2393169A GB0221698A GB0221698A GB2393169A GB 2393169 A GB2393169 A GB 2393169A GB 0221698 A GB0221698 A GB 0221698A GB 0221698 A GB0221698 A GB 0221698A GB 2393169 A GB2393169 A GB 2393169A
Authority
GB
United Kingdom
Prior art keywords
dock
vessel
single point
loading
floating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB0221698A
Other versions
GB2393169B (en
GB0221698D0 (en
Inventor
Jacob De Baan
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bluewater Energy Services BV
Original Assignee
Bluewater Terminal Systems NV
Bluewater Energy Services BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bluewater Terminal Systems NV, Bluewater Energy Services BV filed Critical Bluewater Terminal Systems NV
Priority to GB0221698A priority Critical patent/GB2393169B/en
Publication of GB0221698D0 publication Critical patent/GB0221698D0/en
Priority to EP03255544A priority patent/EP1400442B1/en
Priority to US10/662,490 priority patent/US7426897B2/en
Publication of GB2393169A publication Critical patent/GB2393169A/en
Application granted granted Critical
Publication of GB2393169B publication Critical patent/GB2393169B/en
Priority to CY20071100099T priority patent/CY1105952T1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B22/02Buoys specially adapted for mooring a vessel
    • B63B22/021Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
    • B63B22/026Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids and with means to rotate the vessel around the anchored buoy
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C1/00Dry-docking of vessels or flying-boats
    • B63C1/02Floating docks

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention relates to apparatus for mooring a floating vessel in open sea, using a semi submersible floating dock. The apparatus is particularly suitable for tankers carrying liquid natural gas in cryogenic form which can be a dangerous substance to handle and hence offshore terminals are preferred. The apparatus comprises a semi-submersible floating dock (1) for receiving a vessel (10) and a single point mooring system (5), with a rigid arm (3) between the two. The dock (1) is pivotally connected to the arm (3). The single point mooring system (5) may comprise a mooring buoy (17) secured to the seabed by a compliant anchoring system such as a number of catenary anchor legs (15). This allows vertical movement of the mooring buoy (17) but constrains the movement to a relatively small column of water.

Description

Moorina Apparatus The present invention relates to apparatus for mooring a
floating vessel in open sea, using a semi 5 submersible floating dock.
There is a fast growing demand for Liquid Natural Gas (LNG) in developed countries and as a result there is an increased need to import LNG into these 10 countries. Unfortunately, due to the nature of LNG as a cryogenic fluid, i.e. a gas in a cooled liquid form, it is perceived that there are a number of risks 15 associated with its handling. For this reason, it is often difficult to obtain permission for the construction and operation of LNG receiving terminals, particularly in areas that may be densely populated, either at the shore or in harbours.
Alternatively the LNG receiving terminals can be located offshore, away from any populated areas.
However, transferring LNG between two offshore structures can pose a number of significant technical 25 difficulties due to the large relative motions that may result between the vessels as a result of wave action acting upon them. Current offloading apparatus does little to reduce the effects of wave action upon two offshore vessels and consequently there is a need 30 for improved fluid transfer apparatus.
It is known to use a submersible dock to transfer fluid from a first vessel to a receiving terminal.
Typical arrangements of this sort are disclosed in 35 patent documents GB 2,056,391, US 3,841,501 and FR 1,421,700. However, such arrangements invariably suffer from operational disadvantages.
- 2 GB 2,056,391 discloses a submersible dock comprising a frame which is connected via a rigid articulated arm to an anchoring member on the seabed.
Being rigidly connected to the sea bed the frame has 5 limited movement in a vertical direction.
Consequently, it would be unsuitable for mooring a tanker in heavy seas.
Conversely, US 3,841,501 discloses a submersible 10 dock having a range of movement limited only by the length of the fluid supply line. There are no integral means for mooring the tanker, other than to the submersible dock itself, and so the tanker must instead be moored by attachment to a separate buoy or 15 submerged buoyant body.
There is therefore a need for a loading dock which can overcome these disadvantages and which is able to rigidly moor a vessel yet permit sufficient 20 motion of the mooring means such that fluid transfer between the vessel and the receiving terminal can occur in heavy seas.
The present invention provides apparatus for 25 mooring a partly submerged floating vessel, comprising a floating dock, a single point mooring system and a rigid connecting member connecting the dock to the single point mooring system, wherein the dock is pivotally attached to the connecting member and the 30 single point mooring system is attached to the seabed by a compliant mooring system.
Preferably, the rigid connecting member is pivotally attached to the dock for movement about two 35 mutually perpendicular axes.
Advantageously, the apparatus further comprises
/ - 3 at least one thrust producing device mounted to the dock to facilitate movement of the dock relative to the single point mooring system or the stationary earth. In addition, the floating dock may further comprise variable buoyancy means to raise and lower the level of dock in the water.
10 Typically, the variable buoyancy means comprises at least one tank, means to admit water to the tank to reduce buoyancy and means to supply gas to the tank to expel water therein in order to increase buoyancy.
15 The dock may comprise a floor structure engageable against the hull of a vessel and a plurality of columns projecting upwardly from the floor structure, the columns arranged on either side of the axis to allow a vessel to enter and exit the 20 dock in the same direction.
Preferably, the single point mooring system comprises a floating buoy attached to the seabed by three equi-spaced anchor leg groups to prevent 25 excessive drift of the buoy.
A swivel mechanism may be fitted between the buoy and the anchor leg groups.
30 Each anchor leg group typically comprises two or more generally parallel anchor legs to provide redundancy. A winch mechanism is preferably mounted on the 35 single point mooring system, having a winch line attachable to a vessel and operable to facilitate entry of the vessel into the dock.
- 4 The apparatus usually further comprises loading means on the dock for loading or unloading contents of a vessel moored in the dock.
In particular, a riser may connect the single point mooring system to a seabed structure, such as a pipeline, and fluid conduits extend from the riser to the dock for transmission of fluid to the loading 10 means.
The present invention also provides a method for mooring a vessel in an offshore environment, utilising apparatus of the type described above, comprising the 15 steps of aligning the floating dock with the direction of approach of a floating vessel, positioning the vessel within the dock, increasing the buoyancy of the dock to raise the level of the dock in the water until it engages against the underside of the hull of the 20 vessel to suppress differential motion between the vessel and the dock, and loading or unloading material onto or from the vessel.
The present invention will now be described in 25 detail, by way of example only, with reference to the accompanying drawings in which: Figure 1 is a schematic plan view of an embodiment of the present invention illustrating a 30 means for positioning a tanker in a semi- submersible loading dock; Figure 2 illustrates in more detail the semi-
submersible loading dock of Fig. 1 and a single point 35 mooring system; and Figure 3 illustrates a tanker positioned within a
- 5 - semi-submersible loading dock.
A schematic view of the preferred embodiment of the apparatus according to the present invention can 5 be seen in Fig. 1. A loading dock, shown generally at 1, is attached by a rigid arm 3 to a single point mooring system, shown generally at 5, and a winch line 21 is attached between the single point mooring system 5 and a docking vessel 10.
In cross-section the semi-submersible loading dock 1 is arranged in a U configuration having a generally horizontal loading dock floor 7 supporting generally vertical and perpendicular uprights 9. In 15 order to accommodate relatively slender vessels, and yet provide a large enough floor area to prevent pitching of the vessel 10 within the loading dock 1, it is preferred that the loading dock floor 7 is rectangular in shape, with each of the longer sides 20 oriented in a direction that is generally parallel to the sides of a docking vessel 10.
To provide entry and exit routes for a docking vessel 10 the uprights 9 are located along the long 25 sides of the dock 1 such that the ends of the dock 1 are left open. A typical configuration of the loading dock 1 comprises a plurality of uprights 9 along a long side and a single upright 9a located on the opposite long side. Structural members linked between 30 the plurality of uprights 9 provide support for any operational equipment. The single upright 9a acts as a guide when manoeuvring the vessel 10 into the dock 1.
In order to restrain the movement of the loading 35 dock 1 it is attached via a rigid arm 3 to a single point mooring system 5. The rigid arm 3 is rotatably attached to the loading dock floor 7 at the apex of a
al - 6 triangular section 13 which is in turn attached to the short side of the loading dock floor 7 on the exit side of the loading dock 1.
5 The single point mooring system 5 consists of a mooring buoy 17 secured to the sea bed by a compliant anchoring system, such as a number of catenary anchor legs 15, such that movement of the buoy 17 is restricted within known parameters. This mooring 10 system 5 allows vertical movement of the mooring buoy 17 but constrains this movement to a relatively small column of water.
The rigid arm 3 is attached to the mooring buoy 15 17 and acts to position the loading dock 1 at a sufficient distance from the single point mooring 5 such that a vessel 10 may be positioned within the loading dock 1 without colliding with the mooring buoy 17. The arm 3 typically has two axes of movement at its point of attachment to the loading dock 1, best seen in Figure 2. The first axis 28 is a substantially vertical axis, generally perpendicular to the loading 25 dock floor 7, enabling the loading dock 1 to rotate relative to the arm 3 in a generally horizontal plane in response to relative movements between the loading dock 1 and the mooring buoy 17, particularly for alignment purposes on the approach of a vessel 10. The 30 second axis 30 is a substantially horizontal axis enabling the arm 3 to pivot in a substantially vertical plane in response to relative displacements between a vessel 10 and the mooring buoy 17.
35 To aid with the docking of a vessel 10 the apparatus of the present invention is equipped with a plurality of motion inducing devices. For example,
/, - 7 - thrusters 19, typically attached to the long sides of the loading dock, are used in the preliminary stages to align the long axis of the loading dock 1 with the line of approach of the vessel 10 and during the final 5 stages of docking, to position the loading dock 1 such that contact between the sides of the vessel 10 and the uprights 9 is limited. A winch (not shown) and winch line 21, typically integral to the mooring buoy 17, are provided for attachment to an approaching 10 vessel 10 to further control progress of the vessel 10 into the loading dock.
The apparatus of the present invention will now be described in more detail in reference to Fig.2.
The loading dock floor 7 is typically constructed from steel box section girders permanently attached together in a single plane in a ladder type configuration. For example, the loading dock floor 7 20 may have two side beams spaced apart by transverse members. In a preferred embodiment the loading dock floor 7 is constructed from two side beams 8 and three main transverse members 12 and two smaller cross section tubular bracing members 11. In addition, two 25 further members extend from one end of the frame 7 to form a triangular section 13, at the apex of which the arm 3 is attached.
Within these transverse members 12 are contained 30 floatation chambers 23 which enable the buoyancy of the loading dock 1 to be increased or decreased and hence facilitate raising or lowering of the loading dock 1. To decrease buoyancy the floatation chambers 23 are vented to allow egress of air and ingress of 35 water. To increase buoyancy the floatation chambers 23 are vented to permit expulsion of water under the pressure of air supplied to the floatation chambers 23
--> - 8 - from a compressed air supply.
When transferring fluid, and in particular cryogenic fluid such as LNG, between two floating 5 structures in an offshore environment it is important that any relative motion between the floating structures is reduced to a minimum. Mooring the structures together in a conventional manner may decrease the relative motion but will not reduce it 10 sufficiently. To achieve the desired reduction in the motion between the vessels it is required that a positive engagement is made between the two floating structures. The apparatus of the present invention achieves positive engagement of the floating 15 structures by using the adjustable buoyancy floatation chambers 23 which are able to force the loading dock floor 7 into contact with the bottom of the hull of the vessel 10 with sufficient upthrust that the loading dock 1 and vessel 10 move in unison.
The uprights 9,9a are preferably cylindrical and extend perpendicularly upwards from the loading dock floor 7 so that they protrude above the surface of the water. Along one of the long sides of the loading dock 25 floor 7 three uprights 9, a horizontal beam 14 and two diagonal braces 16 form a structure which acts as a support for the operational equipment of the loading dock 1. In addition to the features already described the loading dock 1 also comprises fluid transfer means 30 25, typically LNG loading/unloading equipment, processing equipment, for example a LNG re-
gasification plant 20, and operational facilities, for example personnel living quarters and/or a helideck 18. To prevent damage to the bottom and sides of a docking vessel 10, the loading dock floor 7 and
l 9 - uprights 9 of the loading dock 1 are equipped with fenders 22. The fenders 22 attached to the loading dock floor 7 are also intended to provide additional grip between the loading dock floor 7 and the bottom 5 of the hull and to prevent damage caused by movement between the loading dock floor 7 and the hull of the vessel. The arm 3 is constructed in a similar way to the 10 loading dock floor 7 having two side beams 24 between which cross members and bracing are positioned. Due to its relatively slender nature it is desirable that the overall mass be kept to a minimum to decrease flexure of the arm 3. At its proximal end the arm 3 is fixed 15 to the apex of the triangular section 13 of loading dock floor 7 by a coupling 27 which allows the arm 3 to rotate about the vertical axis 28 and pivot about the horizontal axis 30 and at its distal end the arm 3 is fixed to the mooring buoy 17.
The mooring buoy 17 is the surface component of the single point mooring system 5 and is attached to the sea bed by anchor legs 15. To further facilitate the movement of the loading dock 1 the mooring buoy 17 25 is rotatably attached to these anchor legs 15.
Attached beneath the anchor legs 15 are attached to this. In the preferred embodiment, there are three anchor legs 15 spaced at approximately 120 degrees from each other. The use of three anchor legs 15, each 30 supplying approximately the same degree of tethering force, helps to limit movement of the buoy 17 within a vertical column of water. Each of the three anchor legs 15 may comprise three individual, and generally parallel, anchor lines. Each of the anchor lines, 35 which are typically anchor chains, are capable of supporting the loads applied to the mooring buoy 17, the additional anchor lines acting as redundant
members in case of failure of one or more of the anchor lines.
It is further envisaged that the mooring buoy 17 5 may support a flexible riser 31 in order to transfer fluid between a subsea pipeline connected to a shoreline and the vessel 10. To connect the fluid transfer means 25 of the loading dock 1 with the flexible riser 31, a further pipeline, which may 10 either be a flexible pipeline or a rigid pipeline having flexible joints, may be run via the arm 3.
Figure 3 shows a vessel 10, in this case a LNG tanker, in a docked configuration with the loading 15 dock 1. The uprights 9 protrude above the surface of the water to an appropriate height such that fluid transfer means 25 can be extended between the loading dock 1 and the docked vessel 10. The preferred location for the vessel 10 is equidistant the two rows 20 of uprights 9, to reduce any pitching moments. This prevents unnecessary damage being caused by contact between the sides of the hull and the uprights 9 and provides sufficient room in which to manoeuvre the fluid transfer means 25.
In reference to the plan view of the apparatus shown in Fig.1 the method of docking a vessel 10 within the loading dock 1 will now be explained.
30 When the loading dock 1 is empty the floatation tanks are flooded to position it in a semi-submerged state. This serves two purposes. Firstly, it prepares the loading dock 1 to receive a new vessel 10 and secondly it lowers the centre of gravity of the 35 loading dock 1 with respect to the surface of the water and consequently increases its stability.
/ On the approach of a vessel 10 the loading dock 1 must be manoeuvred into a position in which its longitudinal axis is substantially aligned with the longitudinal axis of the vessel 10. In addition, the 5 loading dock 1, the arm 3 and the vessel 10 should be aligned in such a way that once fluid transfer is complete the vessel 10 may exit from the dock in a forwards direction without colliding with the mooring buoy 17. This is shown in Figure 1 by the angular 10 offset between the arm 3 and the longitudinal axis of the loading dock 1.
Movement of the loading dock 1 is induced by the thrusters 19 located along the sides of the loading 15 dock 1. Control of these thrusters 19 is effected by crew members located upon the loading dock 1. Approach of the vessel 10 to the loading dock 1 is made by the vessel 10 under its own power, however, once the vessel 10 is close to the loading dock 1 a winch line 20 21 is attached to the bow of the vessel 10 so that the ship can be guided into the loading dock 1 under greater control. The winch line 21 is attached to a winch which is integral with the mooring buoy 17.
Connection between the mooring buoy 17 and the docking 25 vessel 10 is achieved using known techniques.
Once the vessel 10 has proceeded through the loading dock 1 to such an extent that the loading dock 1 is positioned approximately midships and the 30 loading/unloading points on the ships are adjacent to the fluid transfer means 25, further progress of the vessel 10 is halted. At this point it is envisaged that securing lines may be attached between the vessel 10 and one or more of the uprights 9 to maintain the 35 position of the vessel 10 within the loading dock 1.
Once any such lines have been secured the buoyancy of the floatation tanks is increased, by the addition of
compressed air, and the loading dock 1 rises in the water until the hull of the vessel 10 contacts the loading dock floor 7. A measured further increase in the buoyancy of the tanks then acts to ensure contact 5 between the vessel 10 and the loading dock 1 for all sea conditions, thus suppressing differential motion between the dock 1 and the vessel 10. The vertical movement of the loading dock 1 is enabled by pivoting of the arm 3 around the horizontal axis 30. Once the 10 vessel 10 has been docked loading/unloading can be carried out by any conventional and appropriate means.
Once the transfer of fluid is complete and the fluid transfer means 25 has been detached from the 15 vessel 10 the floatation tanks 23 can be flooded and the loading dock floor 7 can be lowered away from the vessel 10 to its default empty position. Any securing lines may now be removed and with the assistance of the mooring buoy 17 winch the vessel 10 may leave the 20 loading dock 1. Use of the thrusters 19 may additionally be required to ensure that contact is not made between the hull and the uprights 9.
The reader will realise that various 25 modifications and variations to the specific embodiments described are also possible without departing from the scope of the claims.

Claims (14)

lo - 13 CLAIMS
1. Apparatus for mooring a floating vessel, comprising a partly submerged floating dock, a single 5 point mooring system and a rigid connecting member connecting the dock to the single point mooring system, wherein the dock is pivotally attached to the connecting member and the single point mooring system is attached to the seabed by a compliant anchoring 10 system.
2. Apparatus as claimed in claim 1, wherein the rigid connecting member is pivotally attached to the dock for movement about two mutually perpendicular 15 axes.
3. Apparatus as claimed in claim 1 or claim 2, further comprising at least one thrust producing device mounted to the dock to facilitate movement of 20 the dock relative to the single point mooring system or the stationary earth.
4. Apparatus as claimed in any preceding claim, wherein the floating dock further comprises variable 25 buoyancy means to raise and lower the level of the dock in the water.
5. Apparatus as claimed in claim 4, wherein the variable buoyancy means comprises at least one tank, 30 means to admit water to the tank to reduce buoyancy and means to supply gas to the tank to expel water therein in order to increase buoyancy.
6. Apparatus as claimed in claim 4 or claim 5, 35 wherein the dock comprises a floor structure engageable against the hull of a vessel and a plurality of columns projecting upwardly from the
IN floor structure, the columns arranged to allow a vessel to enter and exit the dock in the same direction. 5
7. Apparatus as claimed in any preceding claim, wherein the single point mooring system comprises a floating buoy attached to the seabed by three equi-
spaced anchor leg groups.
10
8. Apparatus as claimed in claim 7, further comprising a swivel mechanism between the buoy and the anchor leg groups.
9. Apparatus as claimed in claim 7 or claim 8, 15 wherein each anchor leg group comprises two or more generally parallel anchor legs.
10. Apparatus as claimed in any preceding claim, further comprising a winch mechanism mounted on the 20 single point mooring system, having a winch line attachable to a vessel and operable to facilitate entry of the vessel into the dock.
11. Apparatus as claimed in any preceding claim, 25 further comprising loading means on the dock for loading or unloading contents to or from a vessel moored in the dock.
12. Apparatus as claimed in claim 11, further 30 comprising a riser for connecting the single point mooring system to a seabed structure and fluid conduits extending from the riser to the dock for transmission of fluid to the loading means.
35
13. A method for mooring a vessel in an offshore environment, utilising the apparatus as claimed in claim 1, comprising the steps of aligning the floating
I-> À 15 dock with the direction of approach of a floating vessel, positioning the vessel within the dock, increasing the buoyancy of the dock to raise the level of the dock in the water until it engages against the 5 underside of the hull of the vessel to suppress differential motion between the vessel and the dock, and loading or unloading material onto or from the vessel. 10
14. Apparatus substantially as hereinbefore described, and with reference to the accompanying drawings.
GB0221698A 2002-09-18 2002-09-18 Mooring apparatus incorporating a partly submerged floating dock Expired - Fee Related GB2393169B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
GB0221698A GB2393169B (en) 2002-09-18 2002-09-18 Mooring apparatus incorporating a partly submerged floating dock
EP03255544A EP1400442B1 (en) 2002-09-18 2003-09-05 Mooring apparatus
US10/662,490 US7426897B2 (en) 2002-09-18 2003-09-15 Mooring apparatus
CY20071100099T CY1105952T1 (en) 2002-09-18 2007-01-25 ATTACHMENT SYSTEM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB0221698A GB2393169B (en) 2002-09-18 2002-09-18 Mooring apparatus incorporating a partly submerged floating dock

Publications (3)

Publication Number Publication Date
GB0221698D0 GB0221698D0 (en) 2002-10-30
GB2393169A true GB2393169A (en) 2004-03-24
GB2393169B GB2393169B (en) 2004-12-22

Family

ID=9944341

Family Applications (1)

Application Number Title Priority Date Filing Date
GB0221698A Expired - Fee Related GB2393169B (en) 2002-09-18 2002-09-18 Mooring apparatus incorporating a partly submerged floating dock

Country Status (3)

Country Link
EP (1) EP1400442B1 (en)
CY (1) CY1105952T1 (en)
GB (1) GB2393169B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2399329B (en) 2003-03-13 2005-02-02 Bluewater Energy Services Bv Mooring apparatus
US7287484B2 (en) * 2003-05-01 2007-10-30 David Charles Landry Berthing method and system
FR2874589B1 (en) * 2004-09-01 2006-11-03 Technip France Sa METHOD AND INSTALLATION FOR LOADING AND UNLOADING COMPRESSED NATURAL GAS
WO2007071647A2 (en) * 2005-12-22 2007-06-28 Bluewater Energy Services B.V. Mooring system
SG193028A1 (en) 2012-02-07 2013-09-30 Keppel Offshore & Marine Ltd
WO2014031074A1 (en) * 2012-08-23 2014-02-27 Keppel Offshore & Marine Ltd Semi-submersible integrated port

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59179486A (en) * 1983-03-31 1984-10-12 Akira Seo One-point mooring device
GB2328196A (en) * 1997-08-12 1999-02-17 Bluewater Terminal Systems Nv Fluid transfer system
WO2000027692A1 (en) * 1998-10-26 2000-05-18 Lund, Mohr & Giæver-Enger Marin As Device for positioning of vessels

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1421700A (en) 1964-12-16 1965-12-17 Fmc Corp Installation of mooring of a vessel and transfer of a fluid
FR1465759A (en) * 1965-12-16 1967-01-13 Shell Int Research Mooring buoy for loading and unloading ships
DE1938018A1 (en) * 1969-07-23 1971-01-28 Mannesmann Ag System for loading and unloading tankers
NL7115916A (en) 1971-11-18 1973-05-22
IT1122786B (en) 1979-08-17 1986-04-23 Magnanini Umberto TEMPORARY OR PERMANENT ROTATING MOORING STRUCTURE FOR SHIPS OR VESSELS
EP0064997A1 (en) * 1980-11-24 1982-11-24 GEORGE BROWN & COMPANY (MARINE) LIMITED Azimuthal mooring material handling terminal and tower

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59179486A (en) * 1983-03-31 1984-10-12 Akira Seo One-point mooring device
GB2328196A (en) * 1997-08-12 1999-02-17 Bluewater Terminal Systems Nv Fluid transfer system
WO2000027692A1 (en) * 1998-10-26 2000-05-18 Lund, Mohr & Giæver-Enger Marin As Device for positioning of vessels

Also Published As

Publication number Publication date
GB2393169B (en) 2004-12-22
EP1400442B1 (en) 2006-11-22
CY1105952T1 (en) 2011-04-06
EP1400442A1 (en) 2004-03-24
GB0221698D0 (en) 2002-10-30

Similar Documents

Publication Publication Date Title
US6915753B1 (en) Mooring apparatus
US7107925B2 (en) Weathervaning LNG offloading system
EP1428748B1 (en) Offshore mooring and fluid transfer system
US6435773B1 (en) Articulated multiple buoy marine platform apparatus and method of installation
US6688248B2 (en) Submersible catamaran
US3774253A (en) Floating systems, especially mooring buoys, for anchoring to the sea-bed
US6453838B1 (en) Turret-less floating production ship
BRPI0808590A2 (en) ELEVATORY SUPPORT VESSEL AND ITS USE "
US6719495B2 (en) Articulated multiple buoy marine platform apparatus and method of installation
US6485343B1 (en) Dynamic positioning dock-loading buoy (DPDL-buoy) and method for use of such a DPDL-buoy
AU2006249255B2 (en) Offshore fluid transfer system
US3765463A (en) Offshore terminal
JP4052406B2 (en) Offshore transfer equipment
KR100420296B1 (en) Loading / unloading device for loading or unloading petroleum products
US7426897B2 (en) Mooring apparatus
EP1400442B1 (en) Mooring apparatus
GB2328197A (en) Fluid transfer system
EP0079404B1 (en) A single point mooring buoy with rigid arm
US4441448A (en) Controlled mooring
US6901977B2 (en) System for loading and unloading fluid products
US10994812B2 (en) Device for coupling two boats
GB2399320A (en) Semi-submersible jetty for transferring LNG from a production vessel to a transport vessel
US7182660B2 (en) Offshore fluid transfer system
AU2001288897B2 (en) Articulated multiple buoy marine platform apparatus and method of installing same
US3964423A (en) Offshore terminal

Legal Events

Date Code Title Description
COOA Change in applicant's name or ownership of the application

Owner name: BLUEWATER ENERGY SERVICES B.V.

Free format text: FORMER APPLICANT(S): BLUEWATER TERMINAL SYSTEMS N.V.

PCNP Patent ceased through non-payment of renewal fee

Effective date: 20120918