EP0250069A2 - A deepwater floating drilling and production facility incorporating flexible production risers - Google Patents
A deepwater floating drilling and production facility incorporating flexible production risers Download PDFInfo
- Publication number
- EP0250069A2 EP0250069A2 EP87303005A EP87303005A EP0250069A2 EP 0250069 A2 EP0250069 A2 EP 0250069A2 EP 87303005 A EP87303005 A EP 87303005A EP 87303005 A EP87303005 A EP 87303005A EP 0250069 A2 EP0250069 A2 EP 0250069A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- platform
- template
- production
- wells
- well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 52
- 238000005553 drilling Methods 0.000 title claims abstract description 26
- 238000000034 method Methods 0.000 claims abstract description 29
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 16
- 238000012423 maintenance Methods 0.000 claims description 7
- 238000007689 inspection Methods 0.000 claims description 4
- 230000008901 benefit Effects 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 238000005188 flotation Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000002311 subsequent effect Effects 0.000 description 1
- 230000004083 survival effect Effects 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B1/00—Hydrodynamic or hydrostatic features of hulls or of hydrofoils
- B63B1/02—Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
- B63B1/10—Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls
- B63B1/107—Semi-submersibles; Small waterline area multiple hull vessels and the like, e.g. SWATH
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4413—Floating drilling platforms, e.g. carrying water-oil separating devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/08—Underwater guide bases, e.g. drilling templates; Levelling thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/12—Underwater drilling
- E21B7/128—Underwater drilling from floating support with independent underwater anchored guide base
Definitions
- the present invention relates to a method of utilizing a floating platform in deep water as a combination drilling/workover and production platform. More particularly, the present invention is directed to the use of a floating platform (preferably, a semisubmersible) in 1000 feet (305m) to 3000 feet (915m) of water, which is interconnected to completed wells of a template by flexible risers using a reverse loop configuration, by adjusting the mooring of the platform to position it directly over a template to permit additional drilling or workover without curtailing production from wells of other templates.
- a floating platform preferably, a semisubmersible
- the invention provides a method of performing drilling or workover operations in relation to and production from a plurality of well templates, in deep water, the method involving mooring a floating platform in a position which is generally above said templates, the platform being interconnected with one or more completed wells of at least a first well template by one or more looped flexible risers, adjusting the mooring of said platform to position it directly above a further said well template, and performing drilling or workover of one or more wells of such further template without the need to interrupt production from said one or more completed well(s) via said looped flexible user(s).
- the invention provides a method of using a floating platform in water of the order of from 1000 to 3000 feet deep, said method comprising: mooring said platform in a position that is generally centered above a plurality of well templates; adjusting the mooring of said platform so as to position said platform directly above a first one of said templates; drilling one or more wells through said first template; interconnecting said completed well(s) to said platform using one or more looped flexible riser(s); adjusting the mooring of said platform so as to position said platform directly above a second one of said templates; drilling one or more wells in said second template without interrupting production from said first template.
- the invention provides a method of simultaneously using a semisubmersible platform that is moored in water on the order of from 1000 to 3000 feet deep and interconnected to at least a first and second well template by looped flexible production risers as a production and a workover platform, said method comprising: adjusting the mooring of said platform so as to position said platform directly above a first one of said templates; curtailing production from said first template; conducting a workover of the wells of said first template without interrupting production from the wells of said other template(s); restoring the wells of said first template to production.
- the method of the present invention provides reduction in costs by eliminating the need for a separate drilling platform. Further, this method takes advantage of the lower costs associated with floating platforms and enables early initial production from a first well template while additional drilling is performed on a second or subsequent template.
- the same floating platform is used for workovers to reduce maintenance costs without interrupting production from wells of other templates.
- the floating platform can be deballasted for maintenance without curtailing production.
- the present invention incorporates the "benefit" of the mobility of the platform resulting from mooring in deep water (normally considered a drawback), to enable the platform to perform the additional drilling and workover functions.
- moored in water on the order of from 1000 to 3000 feet (305 to 915 meters) deep, there is sufficient flexibility in the moorings to permit the position of the floating platform to be adjusted to lie directly above any of several well templates positioned on the ocean floor for drilling or workover.
- Templates may be spaced apart by 300 feet (91.5m) without causing the riser to deviate from vertical by more than 17° (in 1000 ft water depth, 6° in 3000 ft), an angle easily accomodated by flexible risers. By configuring the flexible risers in a reverse loop, even these relatively small angles will be substantially reduced. This combined flexibility in moorings and production riser capability also permits the floating platform to be deballasted to permit certain portions that normally occupy subsurface positions to extend above the surface for inspection and maintenance, without curtailing production.
- the Figure is a schematic side elevational view of a floating production platform utilizing a method in accordance with the invention, the drilling/workover position being shown in solid line, the normal production position being shown in phantom.
- the method in accordance with the invention is adaptable for usage with any floating production facility. It is preferred that a semisubmersible platform 12 be utilized in this method.
- a plurality of mooring lines 14 (typically eight or more, only two have been shown to simplify the drawing) secure platform 12 in position above templates 16 and 18 by virtue of attachments 20 to the ocean floor.
- Flexible production riser(s) 26 interconnect template 16 to platform 12.
- a rigid production riser section 28 traverses the zone (typically 20 to 30 feet) that is subjected to wave battering to extend riser life.
- the flexible riser 26 is depicted in the Figure in a reverse loop configuration that enhances the flexibility of the system.
- the use of a flexible riser obviates the need for motion compensation devices typically required with rigid risers and a floating production platform.
- the reverse loop configuration increases the amount of both lateral and vertical movement of which the platform is capable.
- the flexible riser 26 may be a single conduit carrying the consolidated flow from a manifold located in proximity to the template 16 if subsea wellheads are used; or the flexible riser may be a bundle of conduits carrying production from the individual wells to wellheads located on the platform 12.
- Platform 12 is ghosted into its normal position generally centered above its well templates 16 and 18.
- the position of the platform may be adjusted to bring it directly above one of the well templates 18 as shown in the Figure.
- This mooring adjustment might be accomplished, for example, by coiling and uncoiling the mooring lines to and from winding drums (not shown).
- the flotation columns of platform 12 can be deballasted in calm weather to enable portions of the platform normally occupying subsurface positions to be raised above the level of the water for inspection and maintenance, as necessary.
- the flexibility of the mooring system and production risers enables this maintenance to occur without disengaging the risers or curtailing production. Further, should it be necessary to deballast from the operational to the survival mode for a hundred year storm or the like, no adjustment or disconnection of the production risers is necessary to accomodate the change of platform position.
- the present method can accomodate four (or more) separate well templates with associated satellite wells. If four templates are used, it is preferred that they be generally positioned at the corners of a square. Such a combination drilling/workover and production platform could accomodate on the order of 32 wells with a combined production of about 80,000 barrels of oil per day.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Combustion & Propulsion (AREA)
- Chemical & Material Sciences (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
Abstract
Description
- The present invention relates to a method of utilizing a floating platform in deep water as a combination drilling/workover and production platform. More particularly, the present invention is directed to the use of a floating platform (preferably, a semisubmersible) in 1000 feet (305m) to 3000 feet (915m) of water, which is interconnected to completed wells of a template by flexible risers using a reverse loop configuration, by adjusting the mooring of the platform to position it directly over a template to permit additional drilling or workover without curtailing production from wells of other templates.
- As the search for offshore oil moves into deeper water, the costs associated with producing that oil also increase. In fact, costs typically increase at a faster rate than the linear increase in water depth. This is especially true for conventional fixed platforms. These increasing costs require an increase in the size of proven oil reserves in order to justify proceeding beyond the initial exploration phase. Costs associated with operating an offshore drilling platform typically can exceed $100,000 per day. Unless ways can be developed to reduce drilling costs and accelerate return by offering early production, an increasing number of offshore fields with marginal reserves will not be produced. This problem has been exacerbated by the recent slide in oil prices.
- Viewed from one aspect, the invention provides a method of performing drilling or workover operations in relation to and production from a plurality of well templates, in deep water, the method involving mooring a floating platform in a position which is generally above said templates, the platform being interconnected with one or more completed wells of at least a first well template by one or more looped flexible risers, adjusting the mooring of said platform to position it directly above a further said well template, and performing drilling or workover of one or more wells of such further template without the need to interrupt production from said one or more completed well(s) via said looped flexible user(s).
- Viewed from a further aspect, the invention provides a method of using a floating platform in water of the order of from 1000 to 3000 feet deep, said method comprising:
mooring said platform in a position that is generally centered above a plurality of well templates;
adjusting the mooring of said platform so as to position said platform directly above a first one of said templates;
drilling one or more wells through said first template;
interconnecting said completed well(s) to said platform using one or more looped flexible riser(s);
adjusting the mooring of said platform so as to position said platform directly above a second one of said templates;
drilling one or more wells in said second template without interrupting production from said first template. - Viewed from a still further aspect, the invention provides a method of simultaneously using a semisubmersible platform that is moored in water on the order of from 1000 to 3000 feet deep and interconnected to at least a first and second well template by looped flexible production risers as a production and a workover platform, said method comprising:
adjusting the mooring of said platform so as to position said platform directly above a first one of said templates;
curtailing production from said first template;
conducting a workover of the wells of said first template without interrupting production from the wells of said other template(s);
restoring the wells of said first template to production. - The method of the present invention provides reduction in costs by eliminating the need for a separate drilling platform. Further, this method takes advantage of the lower costs associated with floating platforms and enables early initial production from a first well template while additional drilling is performed on a second or subsequent template. In addition, the same floating platform is used for workovers to reduce maintenance costs without interrupting production from wells of other templates. Preferably, the floating platform can be deballasted for maintenance without curtailing production.
- While the use of flexible risers to interconnect subsea wells to floating production platforms is becoming conventional, the present invention incorporates the "benefit" of the mobility of the platform resulting from mooring in deep water (normally considered a drawback), to enable the platform to perform the additional drilling and workover functions. When moored in water on the order of from 1000 to 3000 feet (305 to 915 meters) deep, there is sufficient flexibility in the moorings to permit the position of the floating platform to be adjusted to lie directly above any of several well templates positioned on the ocean floor for drilling or workover. Templates may be spaced apart by 300 feet (91.5m) without causing the riser to deviate from vertical by more than 17° (in 1000 ft water depth, 6° in 3000 ft), an angle easily accomodated by flexible risers. By configuring the flexible risers in a reverse loop, even these relatively small angles will be substantially reduced. This combined flexibility in moorings and production riser capability also permits the floating platform to be deballasted to permit certain portions that normally occupy subsurface positions to extend above the surface for inspection and maintenance, without curtailing production.
- An embodiment of the invention will now be described, by way of example only, with reference to the accompanying drawing, wherein:
- The Figure is a schematic side elevational view of a floating production platform utilizing a method in accordance with the invention, the drilling/workover position being shown in solid line, the normal production position being shown in phantom.
- The method in accordance with the invention is adaptable for usage with any floating production facility. It is preferred that a
semisubmersible platform 12 be utilized in this method. A plurality of mooring lines 14 (typically eight or more, only two have been shown to simplify the drawing)secure platform 12 in position abovetemplates attachments 20 to the ocean floor. - Flexible production riser(s) 26
interconnect template 16 toplatform 12. A rigidproduction riser section 28 traverses the zone (typically 20 to 30 feet) that is subjected to wave battering to extend riser life. Theflexible riser 26 is depicted in the Figure in a reverse loop configuration that enhances the flexibility of the system. The use of a flexible riser obviates the need for motion compensation devices typically required with rigid risers and a floating production platform. The reverse loop configuration increases the amount of both lateral and vertical movement of which the platform is capable. The utilization of the flexibility afforded in the moorings in 1000 to 3000 feet water depths (normally considered a problem to be overcome), with the flexible risers affords a platform that can be utilized simultaneously as a production facility and a drilling/workover rig. Theflexible riser 26 may be a single conduit carrying the consolidated flow from a manifold located in proximity to thetemplate 16 if subsea wellheads are used; or the flexible riser may be a bundle of conduits carrying production from the individual wells to wellheads located on theplatform 12. -
Platform 12 is ghosted into its normal position generally centered above itswell templates mooring lines 14, that is, tightening some while slackening others, the position of the platform may be adjusted to bring it directly above one of thewell templates 18 as shown in the Figure. This enables drilling or workover equipment to be lowered into a well bore through a vertically positionedcasing 22 from derrick 24. This mooring adjustment might be accomplished, for example, by coiling and uncoiling the mooring lines to and from winding drums (not shown). - While it is preferred that simultaneous production and drilling/workover not be accomplished on a single template (for safety reasons), there is no reason a platform could not be used to drill/workover one template while simultaneously producing from another, particularly if production is to a location outboard of the drilling derrick axis. By adjusting the moorings and continuing production from other templates as described, several economic benefits are obtained: a) only a portion of production need be curtailed during workover and, b) a separate workover unit (with the aforementioned cost of $100,000 per day) is not needed.
- The flotation columns of
platform 12 can be deballasted in calm weather to enable portions of the platform normally occupying subsurface positions to be raised above the level of the water for inspection and maintenance, as necessary. The flexibility of the mooring system and production risers enables this maintenance to occur without disengaging the risers or curtailing production. Further, should it be necessary to deballast from the operational to the survival mode for a hundred year storm or the like, no adjustment or disconnection of the production risers is necessary to accomodate the change of platform position. - Although in describing the method of the present invention, lateral displacement of the platform in only one plane has been discussed, it will of course be understood that displacement in the second plane (into and out of the plane of the Figure) is also possible. Accordingly, the present method can accomodate four (or more) separate well templates with associated satellite wells. If four templates are used, it is preferred that they be generally positioned at the corners of a square. Such a combination drilling/workover and production platform could accomodate on the order of 32 wells with a combined production of about 80,000 barrels of oil per day.
- Various changes, modifications and alternatives will become apparent to one of ordinary skill in the art following a reading of the foregoing specification. It is intended that all such changes, modifications and alternatives as come within the scope of the appended claims be considered part of this invention.
Claims (11)
mooring said platform in a position that is generally centered above a plurality of well templates;
adjusting the mooring of said platform so as to position said platform directly above a first one of said templates;
drilling one or more wells through said first template;
interconnecting said completed well(s) to said platform using one or more looped flexible riser(s);
adjusting the mooring of said platform so as to position said platform directly above a second one of said templates;
drilling one or more wells in said second template without interrupting production from said first template.
adjusting the mooring of said platform so as to position said platform directly above a first one of said templates;
curtailing production from said template;
conducting a workover of the wells of said first template without interrupting production from the wells of said other template(s);
restoring the wells of said first template to production.
adjusting the mooring of said platform so as to position said platform directly above said second template;
curtailing production on the wells of said second template;
conducting a workover of the wells of said second template without interrupting production from the wells of said other template(s);
restoring the wells of said second template to production.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US87657686A | 1986-06-20 | 1986-06-20 | |
US876576 | 1986-06-20 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP0250069A2 true EP0250069A2 (en) | 1987-12-23 |
EP0250069A3 EP0250069A3 (en) | 1989-03-29 |
EP0250069B1 EP0250069B1 (en) | 1993-06-30 |
Family
ID=25368056
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP87303005A Expired - Lifetime EP0250069B1 (en) | 1986-06-20 | 1987-04-07 | A deepwater floating drilling and production facility incorporating flexible production risers |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP0250069B1 (en) |
JP (1) | JPS634193A (en) |
CA (1) | CA1294495C (en) |
DE (1) | DE3786374D1 (en) |
DK (1) | DK312487A (en) |
NO (1) | NO872588L (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2207936A (en) * | 1987-07-24 | 1989-02-15 | Forex Neptune Sa | Development drilling system |
WO1998023846A1 (en) * | 1996-11-27 | 1998-06-04 | Den Norske Stats Oljeselskap A.S | System, vessel, seabed installation and method for producing oil or gas |
WO1998030438A1 (en) * | 1997-01-07 | 1998-07-16 | Lmg Marin As | Arrangement of drilling and production ship |
WO2003033863A1 (en) * | 2001-10-12 | 2003-04-24 | Alpha Thames Ltd | Early hydrocarbon production system |
WO2012152278A1 (en) * | 2011-05-06 | 2012-11-15 | National Oilwell Varco Denmark I/S | An offshore system |
CN109072877A (en) * | 2015-11-30 | 2018-12-21 | 奈普顿科技有限责任公司 | renewable energy barge |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3327780A (en) * | 1965-03-15 | 1967-06-27 | Exxon Production Research Co | Connection of underwater wells |
EP0063911A2 (en) * | 1981-04-29 | 1982-11-03 | Taylor Woodrow Construction Limited | Flow line for use in the transfer of fluid to or from under water sites |
GB2182083A (en) * | 1985-10-24 | 1987-05-07 | Shell Int Research | Method of conducting well operations from an offshore platform |
-
1987
- 1987-04-07 EP EP87303005A patent/EP0250069B1/en not_active Expired - Lifetime
- 1987-04-07 DE DE8787303005T patent/DE3786374D1/en not_active Expired - Lifetime
- 1987-04-08 JP JP62084904A patent/JPS634193A/en active Pending
- 1987-05-21 CA CA000537593A patent/CA1294495C/en not_active Expired - Lifetime
- 1987-06-19 NO NO872588A patent/NO872588L/en unknown
- 1987-06-19 DK DK312487A patent/DK312487A/en unknown
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3327780A (en) * | 1965-03-15 | 1967-06-27 | Exxon Production Research Co | Connection of underwater wells |
EP0063911A2 (en) * | 1981-04-29 | 1982-11-03 | Taylor Woodrow Construction Limited | Flow line for use in the transfer of fluid to or from under water sites |
GB2182083A (en) * | 1985-10-24 | 1987-05-07 | Shell Int Research | Method of conducting well operations from an offshore platform |
Non-Patent Citations (2)
Title |
---|
L'INDUSTRIE DU PETROLE, vol. 46, no. 490, January/February 1978, pages 37-43, Edition Oliver Lesourd, Paris, FR; R. VIVIER et al.: "A new design of concrete floatting platforms" * |
PETROLEUM ENGINEER INTERNATIONAL, vol. 57, no. 6, June 1985, pages 58-67, Petroleum Engineer Publishing Co., Dallas, Texas, US; N.N. PANICKER: "Flexible pipes in production risers" * |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2207936B (en) * | 1987-07-24 | 1991-05-29 | Forex Neptune Sa | Development drilling system |
GB2207936A (en) * | 1987-07-24 | 1989-02-15 | Forex Neptune Sa | Development drilling system |
GB2337282B (en) * | 1996-11-27 | 2001-07-04 | Norske Stats Oljeselskap | System,vessel,seabed installation and method for producing oil or gas |
WO1998023846A1 (en) * | 1996-11-27 | 1998-06-04 | Den Norske Stats Oljeselskap A.S | System, vessel, seabed installation and method for producing oil or gas |
CN1092279C (en) * | 1996-11-27 | 2002-10-09 | 挪威国家石油公司 | System, vessel, seabed installation and method for producing oil or gas |
GB2337282A (en) * | 1996-11-27 | 1999-11-17 | Norske Stats Oljeselskap | System,vessel,seabed installation and method for producing oil or gas |
US6213215B1 (en) | 1996-11-27 | 2001-04-10 | Den Norske Stats Oljeselskap A. S | System, vessel, seabed installation and method for producing oil or gas |
GB2335170A (en) * | 1997-01-07 | 1999-09-15 | Lmg Marin As | Arrangement of drilling and production ship |
GB2335170B (en) * | 1997-01-07 | 2001-05-09 | Lmg Marin As | Arrangement of drilling and production ship |
WO1998030438A1 (en) * | 1997-01-07 | 1998-07-16 | Lmg Marin As | Arrangement of drilling and production ship |
WO2003033863A1 (en) * | 2001-10-12 | 2003-04-24 | Alpha Thames Ltd | Early hydrocarbon production system |
WO2012152278A1 (en) * | 2011-05-06 | 2012-11-15 | National Oilwell Varco Denmark I/S | An offshore system |
CN103987621A (en) * | 2011-05-06 | 2014-08-13 | 国民油井华高丹麦公司 | Offshore system |
US9315245B2 (en) | 2011-05-06 | 2016-04-19 | National Oilwell Varco Denmark I/S | Offshore system |
AU2012252921B2 (en) * | 2011-05-06 | 2016-09-15 | National Oilwell Varco Denmark I/S | An offshore system |
CN109072877A (en) * | 2015-11-30 | 2018-12-21 | 奈普顿科技有限责任公司 | renewable energy barge |
Also Published As
Publication number | Publication date |
---|---|
NO872588L (en) | 1987-12-21 |
DK312487D0 (en) | 1987-06-19 |
NO872588D0 (en) | 1987-06-19 |
CA1294495C (en) | 1992-01-21 |
DE3786374D1 (en) | 1993-08-05 |
EP0250069B1 (en) | 1993-06-30 |
JPS634193A (en) | 1988-01-09 |
EP0250069A3 (en) | 1989-03-29 |
DK312487A (en) | 1987-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5439321A (en) | Interruptive mobile production system | |
US4762180A (en) | Modular near-surface completion system | |
US5342148A (en) | Method and system for developing offshore hydrocarbon reserves | |
US4701143A (en) | Vessel mooring system and method for its installation | |
EP1277913B1 (en) | Drillship or semi-submersible and multi-activity drilling assembly | |
AU575205B2 (en) | Vessel mooring system and method for its installation | |
US5150987A (en) | Method for installing riser/tendon for heave-restrained platform | |
US5190411A (en) | Tension leg well jacket | |
US5207534A (en) | Method for conducting offshore well operations | |
CA2439963C (en) | Offshore floating production method | |
US20100326667A1 (en) | Production of hydrocarbons | |
GB2256620A (en) | Heave restrained platform and drilling system | |
US5199821A (en) | Method for conducting offshore well operations | |
AU2002307189A1 (en) | Offshore floating production method | |
US5135327A (en) | Sluice method to take TLP to heave-restrained mode | |
US5486070A (en) | Method for conducting offshore well operations | |
US4470721A (en) | Crane assembly for floatable oil/gas production platforms | |
EP0250069A2 (en) | A deepwater floating drilling and production facility incorporating flexible production risers | |
EP0063911A2 (en) | Flow line for use in the transfer of fluid to or from under water sites | |
GB2180809A (en) | Tethered buoyant system | |
Abbott et al. | Evaluating deepwater development concepts | |
IE48134B1 (en) | Vertically moored platform anchoring | |
EP0716011A1 (en) | Tension leg platform production system | |
GB2085051A (en) | Crane assembly for floatable oil/gas production platforms | |
Nygard et al. | The Marginal Field Semisubmersible-Complete with SCRs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): DE FR GB IT NL |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): DE FR GB IT NL |
|
17P | Request for examination filed |
Effective date: 19890621 |
|
17Q | First examination report despatched |
Effective date: 19900904 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE FR GB IT NL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT Effective date: 19930630 Ref country code: NL Effective date: 19930630 Ref country code: FR Effective date: 19930630 Ref country code: DE Effective date: 19930630 |
|
REF | Corresponds to: |
Ref document number: 3786374 Country of ref document: DE Date of ref document: 19930805 |
|
EN | Fr: translation not filed | ||
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 19950317 Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Effective date: 19960407 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 19960407 |