WO2003033863A1 - Early hydrocarbon production system - Google Patents

Early hydrocarbon production system Download PDF

Info

Publication number
WO2003033863A1
WO2003033863A1 PCT/GB2002/004624 GB0204624W WO03033863A1 WO 2003033863 A1 WO2003033863 A1 WO 2003033863A1 GB 0204624 W GB0204624 W GB 0204624W WO 03033863 A1 WO03033863 A1 WO 03033863A1
Authority
WO
WIPO (PCT)
Prior art keywords
well
drilling
production
vessel
production fluid
Prior art date
Application number
PCT/GB2002/004624
Other languages
French (fr)
Inventor
David Eric Appleford
Brian William Lane
Original Assignee
Alpha Thames Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alpha Thames Ltd filed Critical Alpha Thames Ltd
Priority to BR0213618-0A priority Critical patent/BR0213618A/en
Priority to EP02801381A priority patent/EP1446550A1/en
Priority to US10/491,866 priority patent/US20040238176A1/en
Publication of WO2003033863A1 publication Critical patent/WO2003033863A1/en
Priority to NO20041932A priority patent/NO20041932L/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B22/02Buoys specially adapted for mooring a vessel
    • B63B22/021Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • B63B27/34Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/12Underwater drilling
    • E21B7/128Underwater drilling from floating support with independent underwater anchored guide base

Definitions

  • the present invention relates to the development of a hydrocarbon extraction system and more particularly to the early stages of extraction of hydrocarbons from a subsea hydrocarbon deposit.
  • a tree connecting manifold is installed on the sea bed which is linked to a pipeline for conveying production fluid from the wells to a floating or shore-based processing or storage facility for example. Since it commonly takes around a month to drill a well and install a tree on it, and a single drilling ship is used for this purpose, wells capped with a tree often remain unproductive for some months while the drilling ship drills other wells. Furthermore, the installation of a manifold while drilling is in progress may present severe operational conflict problems. Such a manifold could be installed before or after drilling operations or while drilling a well some distance from the location of the manifold.
  • An object of the invention is to overcome the above problem.
  • a method of exploiting a subsea hydrocarbon reserve comprising the steps of: (i) drilling a first well from a floating drilling vessel;
  • the production riser is sufficiently flexible to permit local excursions of the drilling vessel while it is drilling one of the further wells. More preferably, the production riser is of sufficient flexibility and length to permit the drilling vessel to move between appropriate locations for drilling plural further wells in order that output from two or more wells can be exploited while well drilling is still in progress.
  • the method includes the step of establishing at least one further well and transferring production fluid from the first well and the at least one further well to the vessel or the production fluid reception means while drilling at least one additional well. Fluid may be conveyed from the further well;
  • the method may include processing the production fluid with processing means installed on the vessel.
  • the method may also include the step of subsequently installing the processing means on the sea bed and carrying out subsea processing of production fluid from the wells by using the processing means.
  • the method may include conveying the production fluid to an off-loading buoy possibly by means of an off-loading hose extending from the drilling vessel to the buoy.
  • Production fluid reaching the buoy may be conveyed to a floating storage unit such as a tanker and may be stored for a period of time in the buoy while one such floating storage unit is removed for replacement by another.
  • the buoy may be connected to a pipeline (e.g. a seabed pipeline) leading to a remote location such as a floating or shore-based storage or production facility.
  • Figure 1 shows a first stage of the method according to the invention.
  • Figure 2 shows a second stage of the method according to the invention.
  • Figure 1 shows a drilling vessel 2 drilling a first well 4 in the seabed 6 with a drill string 7.
  • a first tree 8 is installed on the well as shown in Figure 2.
  • Such trees are well known in the art and include valves for controlling the flow of production fluid from a hydrocarbon reservoir tapped by the well 4.
  • a first flexible production riser 10 is installed between the first tree 8 and the vessel 2.
  • the first flexible riser 10 may include buoyant means 11 for supporting at least a part of the weight of the flexible riser 10.
  • Such flexible risers, including buoyancy means are well known in the art.
  • An off-loading buoy 12 is moored in the vicinity of the first well 4 by means of mooring lines 14 connected to the sea bed 6.
  • An off-loading hose 16 is installed for conveying production fluid etc. from the drilling vessel 2 to the off-loading buoy 12 and a floating storage unit, for example a tanker 18, is connected to the buoy 12 for receiving and storing production fluid etc.
  • Production fluid may alternatively be routed from the buoy 12 to a sea bed pipeline for conveyance to a remote location.
  • the drilling vessel 2 then moves to an appropriate location as shown in Figure 2 for drilling a second well 20.
  • a second tree 22 (shown in broken lines) is installed thereon.
  • plural wells 4, 4' may be connected to the drilling vessel 2 while the drilling vessel is drilling a further well
  • well 4' and any subsequent well may be "daisy chained" to well 4 so that the combined production flow from both wells is conveyed to the vessel 2 by the flexible production riser 10.
  • a manifold may be installed to which wells 4' and 4 and any subsequent wells are connected and the combined production flow routed to the vessel 2 either by the flexible riser 10, or by an additional flexible riser.
  • the drilling vessel 2 may have processing equipment 24 mounted thereon such as a processing module forming part of the modular system designed by Alpha Thames Limited of Essex, United Kingdom and named AlphaPRIME.
  • the processing equipment may effect separation of different components of the production fluid from each other for separate conveyance to a remote location.
  • the processing equipment 24 may be in the form of a module for installation as part of a sea bed processing system such as that designed by Alpha Thames Limited.
  • the invention provides a method of exploiting output from one or more wells in a field prior to or while other wells are being drilled and other infrastructure fabricated or manufactured. This will enable early exploitation of the well to occur and assist cash flow by generating revenue at an earlier stage than has hitherto been possible.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Ocean & Marine Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

A subsea hydrocarbon reserve is exploited by intially drilling a first well (4) from a floating drilling vessel (2). A tree (8) is then installed on the well (4) and a production riser (10) is established between the well and the vessel for transferring production fluid from the first well (4) to the vessel (2) from where an off-loading hose (12) conveys the production fluid to a tanker (18). Production fluid is then extracted from the first well (4) via the production riser (10) which is of sufficient flexibility and length to permit the drilling vessel (2) to move between appropriate locations to drill further wells (4', 20).

Description

EARLY HYDROCARBON PRODUCTION SYSTEM
The present invention relates to the development of a hydrocarbon extraction system and more particularly to the early stages of extraction of hydrocarbons from a subsea hydrocarbon deposit.
When a subsea hydrocarbon deposit is to be tapped, it is customary to drill a number of wells into the deposit, each of which is capped by a so-called "Christmas tree" or "tree". Once a number of wells with associated trees have been established, a tree connecting manifold is installed on the sea bed which is linked to a pipeline for conveying production fluid from the wells to a floating or shore-based processing or storage facility for example. Since it commonly takes around a month to drill a well and install a tree on it, and a single drilling ship is used for this purpose, wells capped with a tree often remain unproductive for some months while the drilling ship drills other wells. Furthermore, the installation of a manifold while drilling is in progress may present severe operational conflict problems. Such a manifold could be installed before or after drilling operations or while drilling a well some distance from the location of the manifold.
An object of the invention is to overcome the above problem. Thus, according to the invention, there is provided a method of exploiting a subsea hydrocarbon reserve comprising the steps of: (i) drilling a first well from a floating drilling vessel;
(ii) establishing a production riser for transferring production fluid from the first well to the vessel or production fluid reception means closely associated with the vessel; and (iii) extracting production fluid from the first well while drilling one or more further wells from the drilling vessel.
With such an arrangement, exploitation of the first well need not wait until all associated wells have been drilled. The consequent early production from the well can be used to generate revenue at an early stage, thus assisting cash flow. Preferably, the production riser is sufficiently flexible to permit local excursions of the drilling vessel while it is drilling one of the further wells. More preferably, the production riser is of sufficient flexibility and length to permit the drilling vessel to move between appropriate locations for drilling plural further wells in order that output from two or more wells can be exploited while well drilling is still in progress.
Advantageously the method includes the step of establishing at least one further well and transferring production fluid from the first well and the at least one further well to the vessel or the production fluid reception means while drilling at least one additional well. Fluid may be conveyed from the further well;
(i) by an additional production riser to the vessel etc; (ii) by 'daisy chaining' or interconnecting it with at least one other well so that the combined production flow from a number of wells is conveyed via common production riser; or (iii) by installing a manifold to which the further well or wells is/are attached and the combined production flow is conveyed to the vessel etc... via the production riser.
The method may include processing the production fluid with processing means installed on the vessel. The method may also include the step of subsequently installing the processing means on the sea bed and carrying out subsea processing of production fluid from the wells by using the processing means.
The method may include conveying the production fluid to an off-loading buoy possibly by means of an off-loading hose extending from the drilling vessel to the buoy.
Production fluid reaching the buoy may be conveyed to a floating storage unit such as a tanker and may be stored for a period of time in the buoy while one such floating storage unit is removed for replacement by another. Alternatively, the buoy may be connected to a pipeline (e.g. a seabed pipeline) leading to a remote location such as a floating or shore-based storage or production facility.
The invention will now be described by way of example only with reference to the accompanying figures in which:-
Figure 1 shows a first stage of the method according to the invention; and
Figure 2 shows a second stage of the method according to the invention. Figure 1 shows a drilling vessel 2 drilling a first well 4 in the seabed 6 with a drill string 7. Once the well 4 has been completed, a first tree 8 is installed on the well as shown in Figure 2. Such trees are well known in the art and include valves for controlling the flow of production fluid from a hydrocarbon reservoir tapped by the well 4. A first flexible production riser 10 is installed between the first tree 8 and the vessel 2. The first flexible riser 10 may include buoyant means 11 for supporting at least a part of the weight of the flexible riser 10. Such flexible risers, including buoyancy means, are well known in the art.
An off-loading buoy 12 is moored in the vicinity of the first well 4 by means of mooring lines 14 connected to the sea bed 6. An off-loading hose 16 is installed for conveying production fluid etc. from the drilling vessel 2 to the off-loading buoy 12 and a floating storage unit, for example a tanker 18, is connected to the buoy 12 for receiving and storing production fluid etc. Production fluid may alternatively be routed from the buoy 12 to a sea bed pipeline for conveyance to a remote location.
The drilling vessel 2 then moves to an appropriate location as shown in Figure 2 for drilling a second well 20. When this has been drilled, a second tree 22 (shown in broken lines) is installed thereon.
As indicated in Figure 2 with broken lines, plural wells 4, 4' may be connected to the drilling vessel 2 while the drilling vessel is drilling a further well
20. With such an arrangement, it is possible to exploit the production from two or more wells through the flexible production risers 10, 10' while the further well 20 is being drilled. Alternatively, well 4' and any subsequent well may be "daisy chained" to well 4 so that the combined production flow from both wells is conveyed to the vessel 2 by the flexible production riser 10. Alternatively, and not shown, a manifold may be installed to which wells 4' and 4 and any subsequent wells are connected and the combined production flow routed to the vessel 2 either by the flexible riser 10, or by an additional flexible riser.
The drilling vessel 2 may have processing equipment 24 mounted thereon such as a processing module forming part of the modular system designed by Alpha Thames Limited of Essex, United Kingdom and named AlphaPRIME. The processing equipment may effect separation of different components of the production fluid from each other for separate conveyance to a remote location. The processing equipment 24 may be in the form of a module for installation as part of a sea bed processing system such as that designed by Alpha Thames Limited. Once drilling of all associated wells has been completed, production fluid from the wells will be routed to a remote location (before or after processing) via an alternative route, i.e. not via the flexible risers 10, 10' and the drilling vessel 2. Production fluid may for example be routed to a sea bed processing unit which separates different constituents of the production fluid for conveyance through sea bed pipelines to a remote location.
The invention provides a method of exploiting output from one or more wells in a field prior to or while other wells are being drilled and other infrastructure fabricated or manufactured. This will enable early exploitation of the well to occur and assist cash flow by generating revenue at an earlier stage than has hitherto been possible.

Claims

1. A method of exploiting a subsea hydrocarbon reserve, comprising the steps of: (i) drilling a first well (4) from a floating drilling vessel (2);
(ii) establishing a production riser (10) for transferring production fluid from the first well (4) to the drilling vessel or production fluid reception means (18) closely associated with the vessel; and
(iii) extracting production fluid from the first well (4) while drilling one or more further wells (20) from the drilling vessel (2).
2. A method as claimed in claim 1 , wherein the production riser (10) is sufficiently flexible to permit local excursions of the drilling vessel (2) while it is drilling a said further well (20).
3. A method as claimed in claim 1 , wherein the production riser (10) is of sufficient flexibility and length to permit the drilling vessel (2) to move between appropriate locations for drilling plural further wells (20) in order that output from two or more wells (4,4') can be exploited while well drilling is still in progress.
4. A method as claimed in claim 1 , 2 or 3, including the step of establishing at least one further well (4') and transferring production fluid from the first well (4) and the at least one further well (4') to the drilling vessel (2) or the production fluid reception means (18) closely associated with the vessel while drilling at least one additional well (20).
5. A method as claimed in any preceding claim, including conveying the production fluid from the drilling vessel (2) to an off-loading buoy (12) for onward conveyance.
6. A method as claimed in claim 5, wherein said production fluid reception means comprises a floating storage unit (18), and the method includes storing production fluid for a period of time in the buoy (12) while a said floating storage unit (18) is removed for replacement by another floating storage unit.
7. A method as claimed in any one of claims 1 to 4, including conveying the production fluid from the drilling vessel (2) to a pipeline leading to a remote location via an off-loading buoy (12).
8. A method as claimed in claim 5, 6 or 7, wherein production fluid is conveyed from the drilling vessel (2) to the buoy (12) by means of an offloading hose (16) extending from the drilling vessel (2) to the buoy (12).
9. A method as claimed in any preceding claim, wherein fluid is conveyed from a said further well (4') by an additional production riser (10') to the drilling vessel (2) or production fluid reception means (18).
10. A method as claimed in any preceding claim, wherein fluid is conveyed from a said further well (4') by interconnecting said further well (4') with at least one other well (4) so that the combined production flow from a number of wells (4,4') is conveyed via a common production riser (10).
11. A method as claimed in any one of claims 1 to 9, wherein fluid is conveyed from a said further well (4') by installing a manifold to which the further well or wells is/are attached and the combined production flow is conveyed to the drilling vessel (2) or production fluid reception means (18) via the production riser (10).
12. A method as claimed in any preceding claim, including processing the production fluid with processing means (24) installed on the drilling vessel (2).
13. A method as claimed in claim 12, including the steps of subsequently installing the processing means (24) on the seabed (6), and carrying out subsea processing of production fluid from the wells (4,4',20) by using the processing means (24).
PCT/GB2002/004624 2001-10-12 2002-10-11 Early hydrocarbon production system WO2003033863A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
BR0213618-0A BR0213618A (en) 2001-10-12 2002-10-11 Hydrocarbon Early Production System
EP02801381A EP1446550A1 (en) 2001-10-12 2002-10-11 Early hydrocarbon production system
US10/491,866 US20040238176A1 (en) 2001-10-12 2002-10-11 Early hydrocarbon production system
NO20041932A NO20041932L (en) 2001-10-12 2004-05-11 Process for producing hydrocarbons from a subsea well

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB0124610.7 2001-10-12
GBGB0124610.7A GB0124610D0 (en) 2001-10-12 2001-10-12 Early hydrocarbon extraction system

Publications (1)

Publication Number Publication Date
WO2003033863A1 true WO2003033863A1 (en) 2003-04-24

Family

ID=9923771

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2002/004624 WO2003033863A1 (en) 2001-10-12 2002-10-11 Early hydrocarbon production system

Country Status (6)

Country Link
US (1) US20040238176A1 (en)
EP (1) EP1446550A1 (en)
BR (1) BR0213618A (en)
GB (1) GB0124610D0 (en)
NO (1) NO20041932L (en)
WO (1) WO2003033863A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007029999A2 (en) * 2005-09-06 2007-03-15 Alpha Perisai Sdn. Bhd. Containerised modular processing system
WO2015104026A1 (en) * 2014-01-10 2015-07-16 C-Bed Holding B.V. Method to access an offshore construction in rough waters
GB2570403A (en) * 2018-12-21 2019-07-24 Future Marine Services Ltd Ship-to-ship transfer of hydrocarbon liquids

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005090152A1 (en) * 2004-03-23 2005-09-29 Single Buoy Moorings Inc. Field development with centralised power generation unit
WO2006036325A1 (en) * 2004-09-28 2006-04-06 Exxonmobil Upstream Research Company Combined riser, offloading and mooring system
US7793723B2 (en) * 2006-01-19 2010-09-14 Single Buoy Moorings, Inc. Submerged loading system
US8122965B2 (en) * 2006-12-08 2012-02-28 Horton Wison Deepwater, Inc. Methods for development of an offshore oil and gas field
CN101688433A (en) * 2007-03-26 2010-03-31 泰克尼普法国公司 Parallel drilling and completion for a dry tree floating production facility
US7628224B2 (en) * 2007-04-30 2009-12-08 Kellogg Brown & Root Llc Shallow/intermediate water multipurpose floating platform for arctic environments
US8919449B2 (en) * 2008-06-03 2014-12-30 Shell Oil Company Offshore drilling and production systems and methods
US8141645B2 (en) * 2009-01-15 2012-03-27 Single Buoy Moorings, Inc. Offshore gas recovery
US20120037376A1 (en) * 2009-02-09 2012-02-16 Schlumberger Technology Corporation System and Method For Well Clean-Up
CN102388200A (en) * 2009-04-06 2012-03-21 瑞士单浮筒系泊公司 Use of underground gas storage to provide a flow assurance buffer between interlinked processing units
US8800607B2 (en) * 2010-06-04 2014-08-12 Chevron U.S.A. Inc. Method and system for offshore export and offloading of LPG
US8162063B2 (en) * 2010-09-03 2012-04-24 Stena Drilling Ltd. Dual gradient drilling ship
AU2014275022B2 (en) * 2013-06-06 2017-03-09 Shell Internationale Research Maatschappij B.V. Deepwater low-rate appraisal production systems
DK3230159T3 (en) * 2014-12-08 2020-04-20 HiLoad LNG AS Method and system for the transfer of floating cargo on the high seas
US10160524B2 (en) * 2015-02-19 2018-12-25 Bluewater Energy Services B.V. Method and assembly for transferring fluids between a first vessel and a second vessel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0250069A2 (en) * 1986-06-20 1987-12-23 Conoco Inc. A deepwater floating drilling and production facility incorporating flexible production risers
US4972907A (en) * 1985-10-24 1990-11-27 Shell Offshore Inc. Method of conducting well operations from a moveable floating platform
WO1998023846A1 (en) * 1996-11-27 1998-06-04 Den Norske Stats Oljeselskap A.S System, vessel, seabed installation and method for producing oil or gas
US5803779A (en) * 1997-02-26 1998-09-08 Deep Oil Technology, Incorporated Dynamically positioned loading buoy
US5899637A (en) * 1996-12-11 1999-05-04 American Oilfield Divers, Inc. Offshore production and storage facility and method of installing the same
GB2354219A (en) * 1999-09-15 2001-03-21 Kvaerner Oil & Gas As Turret mooring system for a drilling or production vessel

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3504741A (en) * 1968-06-27 1970-04-07 Mobil Oil Corp Underwater production satellite

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4972907A (en) * 1985-10-24 1990-11-27 Shell Offshore Inc. Method of conducting well operations from a moveable floating platform
EP0250069A2 (en) * 1986-06-20 1987-12-23 Conoco Inc. A deepwater floating drilling and production facility incorporating flexible production risers
WO1998023846A1 (en) * 1996-11-27 1998-06-04 Den Norske Stats Oljeselskap A.S System, vessel, seabed installation and method for producing oil or gas
US5899637A (en) * 1996-12-11 1999-05-04 American Oilfield Divers, Inc. Offshore production and storage facility and method of installing the same
US5803779A (en) * 1997-02-26 1998-09-08 Deep Oil Technology, Incorporated Dynamically positioned loading buoy
GB2354219A (en) * 1999-09-15 2001-03-21 Kvaerner Oil & Gas As Turret mooring system for a drilling or production vessel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007029999A2 (en) * 2005-09-06 2007-03-15 Alpha Perisai Sdn. Bhd. Containerised modular processing system
WO2007029999A3 (en) * 2005-09-06 2007-05-31 Alpha Perisai Sdn Bhd Containerised modular processing system
WO2015104026A1 (en) * 2014-01-10 2015-07-16 C-Bed Holding B.V. Method to access an offshore construction in rough waters
GB2570403A (en) * 2018-12-21 2019-07-24 Future Marine Services Ltd Ship-to-ship transfer of hydrocarbon liquids
GB2570403B (en) * 2018-12-21 2019-12-25 Future Marine Services Ltd Ship-to-ship transfer of hydrocarbon liquids

Also Published As

Publication number Publication date
GB0124610D0 (en) 2001-12-05
US20040238176A1 (en) 2004-12-02
NO20041932L (en) 2004-05-11
EP1446550A1 (en) 2004-08-18
BR0213618A (en) 2004-09-14

Similar Documents

Publication Publication Date Title
US20040238176A1 (en) Early hydrocarbon production system
RU2330154C1 (en) System and vessel for technical servicing of offshore deposits
US7793724B2 (en) Subsea manifold system
US6021848A (en) Method of loading and treatment of hydrocarbons
US5582252A (en) Hydrocarbon transport system
US9458700B2 (en) Use of underground gas storage to provide a flow assurance buffer between interlinked processing units
CN101068711B (en) Dispositif de liaison superieure entre deux conduites sous marines de transport de fluide
US20070227740A1 (en) Flying Lead Connector and Method for Making Subsea Connections
US20080096448A1 (en) Combined Riser, Offloading and Mooring System
US9316066B2 (en) Redeployable subsea manifold-riser system
EP1444415A1 (en) Single well development system
CN101939215A (en) Be used to operate from fixedly the docking station and the boring of marine riser are stood
CN101258302A (en) Containerised modular processing system
EP1077869A1 (en) Submerged pipeline manifold for offloading mooring buoy and method of installation
US20150128840A1 (en) Frontier Field Development System for Large Riser Count and High Pressures for Harsh Environments
US20120037376A1 (en) System and Method For Well Clean-Up
US6012530A (en) Method and apparatus for producing and shipping hydrocarbons offshore
CA2887345C (en) System and method for obstacle avoidance during hydrocarbon operations
EP0336492A1 (en) A method of drilling and/or production of oil and/or gas
US20230374870A1 (en) Polyvalent riser balcony
Awad Albacora field FPS: another deepwater development offshore Brazil
US20150129237A1 (en) FPSO Field Development System for Large Riser Count and High Pressures for Harsh Environments
GB2173532A (en) Subsea tool launching equipment
Hadfield et al. EVOLUTION OF SUBSEA PRODUCTION SYSTEMS (FIG. 1)
CA3158906A1 (en) Operation of an unmanned production platform

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BY BZ CA CH CN CO CR CU CZ DE DM DZ EC EE ES FI GB GD GE GH HR HU ID IL IN IS JP KE KG KP KR LC LK LR LS LT LU LV MA MD MG MN MW MX MZ NO NZ OM PH PL PT RU SD SE SG SI SK SL TJ TM TN TR TZ UA UG US UZ VC VN YU ZA ZM

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ UG ZM ZW AM AZ BY KG KZ RU TJ TM AT BE BG CH CY CZ DK EE ES FI FR GB GR IE IT LU MC PT SE SK TR BF BJ CF CG CI GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
WWE Wipo information: entry into national phase

Ref document number: 10491866

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2002801381

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 2002801381

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: JP

WWW Wipo information: withdrawn in national office

Country of ref document: JP

WWW Wipo information: withdrawn in national office

Ref document number: 2002801381

Country of ref document: EP