EP0063911A2 - Flow line for use in the transfer of fluid to or from under water sites - Google Patents
Flow line for use in the transfer of fluid to or from under water sites Download PDFInfo
- Publication number
- EP0063911A2 EP0063911A2 EP82302009A EP82302009A EP0063911A2 EP 0063911 A2 EP0063911 A2 EP 0063911A2 EP 82302009 A EP82302009 A EP 82302009A EP 82302009 A EP82302009 A EP 82302009A EP 0063911 A2 EP0063911 A2 EP 0063911A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- flow line
- column
- arrangement
- line arrangement
- connections
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 25
- 239000012530 fluid Substances 0.000 title claims abstract description 7
- 238000009434 installation Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 description 14
- 230000000694 effects Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/01—Risers
- E21B17/015—Non-vertical risers, e.g. articulated or catenary-type
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B22/00—Buoys
- B63B22/02—Buoys specially adapted for mooring a vessel
- B63B22/021—Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
Definitions
- This invention relates to a flow line system for use in the transfer of fluid to or from under water sites.
- a flow line system for use in the transfer of fluid to or from an under water site, the system comprising a first, flow line arrangement to be installed so as to extend from the water bed to near, but below, the surface, this arrangement being carried by a buoyant support column that is for articulated connection to the water bed and that consists of rigid sections that are connected in series at articulated connections so that the first flow line arrangement is rigidly supported by - each section but can articulate at the base of the column and at the connections between the rigid sections; and a second, flexible, flow line arrangement releasably connectable to the first arrangement, where the first arrangement terminates near the surface, so as to extend the first arrangement.
- Such a system can be installed between a wall head, manifold or other convenient location at the water bed and production facilities at the surface with the advantage that the connection between the first and second flow line arrangements is near the surface and hence readily accessible.
- the articulated connections at the water bed and between the rigid sections, with the otherwise rigidly supported first flow line arrangement able to articulate with the support column at these connections enables the system as a whole to cope with extensive movement of floating facilities at the surface so that the system is suitable for use at considerable depths (extent of surface movement increases with water depth).
- the suitability for use at considerable depth is enhanced by the provision of articulation of the column and the first flow line arrangement as this gives to the column and the flow line arrangement it supports good ability to absorb lateral loads and impacts.
- the column can be made slim which facilitates its handling during installation and removal.
- Figure 1 a flow line system between a sea bed well head and production facilities provided on a semi-submersible production platform.
- Figure 2 shows on a larger scale the detail ringed at II in Figure 1.
- the semi-submersible production platform 1 is shown in position over the sea bed well head 2 with workover guidelines 3 extending between the platform and the well head.
- a sea bed anchorage structure 4 to which is anchored, by an articulated connection 5, a series of buoyed rigid column sections 6.
- the column sections 6 are connected to one another in series at articulated connections 5A, and each section incorporates a buoy 13 at its upper end.
- the articulated connections can be of any suitable construction as known in the art giving freedom of movement about two mutually perpendicular axes.
- the column made-up by the sections 6 rigidly supports between the connections 5A a first flow line arrangement 7. One part of this first flow line arrangement 7 is connected to flow lines 8 from the well head 2.
- connection 5A there is an articulated connection 12 in the flow line arrangement 7 and this arrangement can also articulate at the base of the column.
- the flow line arrangement 7 is rigidly supported by the buoyed column sections 6 but can articulate at the base of the column and at the connections between the column sections.
- the articulated connections in the flow line arrangement 7 are effected by flexible flow line portions 12A interconnecting the otherwise rigid runs of the flow line.
- the column terminates near, but below, the surface of the sea, and at this termination the first articulated flow line arrangement 7 is releasably connected to a second, flexible, flow line arrangement 10.
- This second flow line arrangement 10 extends to the production platform 1, to which it is releasably connected, and serves for supply to, and export from, the production facilities.
- the semi-submersible platform 1 can be held on station by a conventional mooring system or by an automatic jack mooring system, the inclusion of the flexible flow line arrangement allowing movement of the platform to take place within a predetermined range.
- the automatic jack mooring system can utilise the top of the column as a reference point for locating the platform.
- a flexible flow line arrangement is required to accommodate motion of the floating platform, but to have the flexible flow line arrangement extending, for example, all the way to the water bed could result in a flexible flow line arrangement of such considerable length and consequent weight as to introduce problems in, for example, recovery thereof after disconnection from the well head.
- an articulated but otherwise rigidly supported flow line arrangement terminating below surface level adverse effects of wave action, lateral loads and impacts on this arrangement and its support (the column) are avoided or readily absorbed.
- connection 5 at the base of the column is releasable, along with flow line connections to the flow lines 8 and 9, but in the system shown all the connections 5A and 12 are releasable as well.
- the flexible flow line arrangement 10 is provided with buoyancy 11 to cushion the movement of the flexible flow line, especially when it is disconnected in an emergency.
- the flexible flow line arrangement 10 also avoids a need for providing tensioning equipment on the floating platform, as is necessary in constructions where a tensioned riser flow line arrangement is provided between a well head and a floating production platform. Also loading on the production platform is reduced as compared with a tensioned flow line arrangement.
- the illustrated form also has the advantage that the flow line arrangements are disposed to one end of the floating platform, leaving the central moonpool of the platform free for working over the well head. Workover relative to the flow line arrangements is via a separate derrick mounted over the flow line arrangements.
- the flexible flow line arrangement 10 need not necessarily be connected to floating facilities, and the facilities to which it is connected could be other than production facilities.
- the buoyancy for the column sections 6 can be built-in along the length of each section, rather than provided by the buoys 13.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Geology (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ocean & Marine Engineering (AREA)
- Combustion & Propulsion (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
- Loading And Unloading Of Fuel Tanks Or Ships (AREA)
- Hydraulic Turbines (AREA)
Abstract
A flow line system for use in the transfer of fluid to or from an under water site comprises a first flow line arrangement (7) installed so as to extend from the water bed to near, but below, the surface, this arrangement (7) being carried by a buoyant support column that is connected to the water bed at an articulated connection (5) and that consists of rigid sections (6) that are connected in series at articulated connections (5A) so that the first flow line arrangement (7) is rigidly supported by each section (6) but can articulate at the base of the column and at the connections (5A) between the rigid sections (6); and a second, flexible, flow line arrangement (10) releasably connected to the first arrangement (7), where the first arrangement terminates near the surface, so as to extend the first arrangement. As the first flow line arrangement and the column can articulate they have good ability to absorb lateral loads and impacts, and to cope with extensive movement at the surface end of the second flow line arrangement. The system is therefore well-suited for use in considerable water depths, and as it can articulate the column can be made slim which facilitates its handling during installation and removal.
Description
- This invention relates to a flow line system for use in the transfer of fluid to or from under water sites.
- In the transfer of fluid to or from an under water site, for example in the extraction of oil or gas, it is necessary to provide a flow line or lines between the water bed and production facilities which may be on a fixed, tensioned or moored floating production platform. Advantageously such flow lines should be easily disconnectable from, and re-connectable to, the subwater well heads or manifold, particularly in potentially rough water areas. The problems in providing ease of connection and disconnection are greater at deep water sites, or where icebergs are a problem and/or if the production facilities are on a floating production platform. However, whilst disconnection and connection, when required, should be easy to accomplish, it is also important that the need to effect such manoeuvres should be minimised.
- In United Kingdom published Patent Application No. 2 024 766 A there is disclosed a marine production riser system in which a rigid column that extends from a rigid connection at the water bed to near but below the surface supports a flow line arrangement that is rigidly supported over the whole length of the column. From the top of the column the flow line arrangement is flexible as it passes to a vessel floating on the surface. As the column is rigidly connected to the water bed and is rigid throughout its length it is unable to absorb anything more than very minor lateral loads and impacts because such loads of any size would cause excessive stress at the rigid connection at the water bed. Furthermore, the depth to which such a system can be installed is limited as an unduly long rigid column is difficult to handle during installation (and subsequent removal), and if made slim to facilitate such handling would, in situ, be subjected to excessive deflections and stresses over its length.
- According to the present invention there is provided a flow line system for use in the transfer of fluid to or from an under water site, the system comprising a first, flow line arrangement to be installed so as to extend from the water bed to near, but below, the surface, this arrangement being carried by a buoyant support column that is for articulated connection to the water bed and that consists of rigid sections that are connected in series at articulated connections so that the first flow line arrangement is rigidly supported by - each section but can articulate at the base of the column and at the connections between the rigid sections; and a second, flexible, flow line arrangement releasably connectable to the first arrangement, where the first arrangement terminates near the surface, so as to extend the first arrangement. Such a system can be installed between a wall head, manifold or other convenient location at the water bed and production facilities at the surface with the advantage that the connection between the first and second flow line arrangements is near the surface and hence readily accessible. The articulated connections at the water bed and between the rigid sections, with the otherwise rigidly supported first flow line arrangement able to articulate with the support column at these connections, enables the system as a whole to cope with extensive movement of floating facilities at the surface so that the system is suitable for use at considerable depths (extent of surface movement increases with water depth). The suitability for use at considerable depth is enhanced by the provision of articulation of the column and the first flow line arrangement as this gives to the column and the flow line arrangement it supports good ability to absorb lateral loads and impacts. Also as this is achieved by the provision of the articulated connections, the column can be made slim which facilitates its handling during installation and removal.
- For a better understanding of the invention and to show how the same may be carried into effect, reference will now be made, by way of example, to the accompanying drawing, in which there is illustrated, in Figure 1, a flow line system between a sea bed well head and production facilities provided on a semi-submersible production platform. Figure 2 shows on a larger scale the detail ringed at II in Figure 1.
- Referring to the drawing, the semi-submersible production platform 1 is shown in position over the sea bed well
head 2 withworkover guidelines 3 extending between the platform and the well head. To one side of the platform and well head there is a sea bed anchorage structure 4 to which is anchored, by an articulatedconnection 5, a series of buoyedrigid column sections 6. Thecolumn sections 6 are connected to one another in series at articulatedconnections 5A, and each section incorporates abuoy 13 at its upper end. The articulated connections can be of any suitable construction as known in the art giving freedom of movement about two mutually perpendicular axes. The column made-up by thesections 6 rigidly supports between theconnections 5A a first flow line arrangement 7. One part of this first flow line arrangement 7 is connected toflow lines 8 from thewell head 2. Another part is connected toexport flow lines 9. At eachconnection 5A there is an articulatedconnection 12 in the flow line arrangement 7 and this arrangement can also articulate at the base of the column. Thus the flow line arrangement 7 is rigidly supported by thebuoyed column sections 6 but can articulate at the base of the column and at the connections between the column sections. The articulated connections in the flow line arrangement 7 are effected by flexibleflow line portions 12A interconnecting the otherwise rigid runs of the flow line. - The column terminates near, but below, the surface of the sea, and at this termination the first articulated flow line arrangement 7 is releasably connected to a second, flexible,
flow line arrangement 10. This secondflow line arrangement 10 extends to the production platform 1, to which it is releasably connected, and serves for supply to, and export from, the production facilities. - The semi-submersible platform 1 can be held on station by a conventional mooring system or by an automatic jack mooring system, the inclusion of the flexible flow line arrangement allowing movement of the platform to take place within a predetermined range. Conveniently the automatic jack mooring system can utilise the top of the column as a reference point for locating the platform.
- Should weather conditions become such that platform movement cannot be constrained within the allowable range, or should it be desired to move the platform off-station, disconnection from the well head and export facilities is'facilitated by the provision of the releasable connections at the platform and at the top of the column. The latter connection is near the surface and can be of a form not requiring operation by a diver. It is to be noted here that not only is it advantageous to have this connection near the surface from the point of view of ease of actuation, but also by so positioning the connection the length of the flexible flow line arrangement is kept to a minimum. A flexible flow line arrangement is required to accommodate motion of the floating platform, but to have the flexible flow line arrangement extending, for example, all the way to the water bed could result in a flexible flow line arrangement of such considerable length and consequent weight as to introduce problems in, for example, recovery thereof after disconnection from the well head. On the other hand, by having an articulated but otherwise rigidly supported flow line arrangement terminating below surface level, adverse effects of wave action, lateral loads and impacts on this arrangement and its support (the column) are avoided or readily absorbed.
- Preferably at least the
connection 5 at the base of the column is releasable, along with flow line connections to theflow lines connections - In the illustrated form, the flexible
flow line arrangement 10 is provided with buoyancy 11 to cushion the movement of the flexible flow line, especially when it is disconnected in an emergency. The flexibleflow line arrangement 10 also avoids a need for providing tensioning equipment on the floating platform, as is necessary in constructions where a tensioned riser flow line arrangement is provided between a well head and a floating production platform. Also loading on the production platform is reduced as compared with a tensioned flow line arrangement. The illustrated form also has the advantage that the flow line arrangements are disposed to one end of the floating platform, leaving the central moonpool of the platform free for working over the well head. Workover relative to the flow line arrangements is via a separate derrick mounted over the flow line arrangements. - It may not always be necessary to provide buoyancy for the flexible
flow line arrangement 10. Also the flexibleflow line arrangement 10 need not necessarily be connected to floating facilities, and the facilities to which it is connected could be other than production facilities. - The buoyancy for the
column sections 6 can be built-in along the length of each section, rather than provided by thebuoys 13.
Claims (4)
1. A flow line system for use in the transfer of fluid to or from an under water site, the system comprising a flow line arrangement (7,12) to be installed so as to extend from the water bed to near, but below, the surface, and in flexible manner from the termination of the column near the surface to the surface; characterised in that the column is for articulated connection to the water bed and consists of rigid sections (6) that are connected in series at articulated connections (5A) so that a first part (7) of the flow line arrangement is rigidly supported by each section (6) but can articulate at the base of the column and at the connections between the rigid sections (6); and in that a second part (12) of the flow line arrangement, which is flexible, is releasably connectable to the first part so as to extend the first part.
2. A flow line system as claimed in claim 1, wherein the first part (7). of the flow line arrangement consists of rigid runs supported by corresponding rigid column sections (6), and articulated connections (12) between these runs and corresponding to the articulated connections (5A) between the rigid column sections (6).
3. A flow line system as claimed in claim 1 or 2, wherein the articulated connection (5) of the column to the water bed is releasable, and wherein the first part (7) of the flow line arrangement is releasably connected, at the water bed, to fluid flow lines (8,9).
4. A flow line system as claimed in claim 2 or claims 2 and 3, wherein each articulated connection (5A), (12) between column sections (6) and the runs of the first part (7) of the arrangement is releasable.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB8113224 | 1981-04-29 | ||
GB8113224 | 1981-04-29 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0063911A2 true EP0063911A2 (en) | 1982-11-03 |
EP0063911A3 EP0063911A3 (en) | 1983-09-21 |
Family
ID=10521479
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP82302009A Withdrawn EP0063911A3 (en) | 1981-04-29 | 1982-04-20 | Flow line for use in the transfer of fluid to or from under water sites |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0063911A3 (en) |
JP (1) | JPS57195000A (en) |
GB (1) | GB2097358A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0250069A2 (en) * | 1986-06-20 | 1987-12-23 | Conoco Inc. | A deepwater floating drilling and production facility incorporating flexible production risers |
GB2254063A (en) * | 1991-03-25 | 1992-09-30 | British Petroleum Co Plc | Method for transporting fluids. |
US5427046A (en) * | 1994-01-18 | 1995-06-27 | Single Buoy Moorings Inc. | Subsea conduit structure |
WO1998030438A1 (en) * | 1997-01-07 | 1998-07-16 | Lmg Marin As | Arrangement of drilling and production ship |
WO2003031765A1 (en) * | 2001-10-10 | 2003-04-17 | Rockwater Limited | A riser and method of installing same |
FR2929638A1 (en) * | 2008-04-08 | 2009-10-09 | Technip France Sa | DEVICE FOR EXTRACTING A MATERIAL LOCATED AT THE BOTTOM OF A WATER EXTENSION, EXTRACTION PLANT, AND ASSOCIATED METHOD |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60158100A (en) * | 1984-01-28 | 1985-08-19 | 株式会社モデック | Sea-bottom feed-hose mooring arrangement |
US4972907A (en) * | 1985-10-24 | 1990-11-27 | Shell Offshore Inc. | Method of conducting well operations from a moveable floating platform |
US4762180A (en) * | 1987-02-05 | 1988-08-09 | Conoco Inc. | Modular near-surface completion system |
US5615977A (en) * | 1993-09-07 | 1997-04-01 | Continental Emsco Company | Flexible/rigid riser system |
US6142708A (en) * | 1999-05-19 | 2000-11-07 | Oil States Industries Inc. | Rotating porch for subsea branch and termination pipeline connections |
CN103397871B (en) * | 2013-08-14 | 2015-10-28 | 大连理工大学 | A kind of ultra-deep-water oil and gas development system based on dry type tree and mounting method thereof |
US20150096760A1 (en) * | 2013-10-03 | 2015-04-09 | Atlantis Offshore Holding Ltd. | Modular Exploration and Production System Including an Extended Well Testing Service Vessel |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4089333A (en) * | 1972-10-28 | 1978-05-16 | Nippi, Incorporated | Method of treating a wound or burn |
FR2386758A1 (en) * | 1977-04-08 | 1978-11-03 | Petroles Cie Francaise | Flexible pipe support column made from connected tubes - for extraction or filling of petroleum prods. from or into s submerged tank |
FR2396154A1 (en) * | 1977-07-01 | 1979-01-26 | Emh | IMPROVEMENTS MADE TO AN ARTICULATED COLUMN, FOR THE EXPLOITATION OF THE SEA BOTTOM, INCLUDING CONNECTING PIPES BETWEEN THE COLUMN AND ITS BASE |
GB2024766A (en) * | 1978-07-10 | 1980-01-16 | Mobil Oil Corp | Marine production riser system and method of installing sae |
-
1982
- 1982-04-20 EP EP82302009A patent/EP0063911A3/en not_active Withdrawn
- 1982-04-20 GB GB8211376A patent/GB2097358A/en not_active Withdrawn
- 1982-04-30 JP JP57074443A patent/JPS57195000A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4089333A (en) * | 1972-10-28 | 1978-05-16 | Nippi, Incorporated | Method of treating a wound or burn |
FR2386758A1 (en) * | 1977-04-08 | 1978-11-03 | Petroles Cie Francaise | Flexible pipe support column made from connected tubes - for extraction or filling of petroleum prods. from or into s submerged tank |
FR2396154A1 (en) * | 1977-07-01 | 1979-01-26 | Emh | IMPROVEMENTS MADE TO AN ARTICULATED COLUMN, FOR THE EXPLOITATION OF THE SEA BOTTOM, INCLUDING CONNECTING PIPES BETWEEN THE COLUMN AND ITS BASE |
GB2024766A (en) * | 1978-07-10 | 1980-01-16 | Mobil Oil Corp | Marine production riser system and method of installing sae |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0250069A2 (en) * | 1986-06-20 | 1987-12-23 | Conoco Inc. | A deepwater floating drilling and production facility incorporating flexible production risers |
EP0250069A3 (en) * | 1986-06-20 | 1989-03-29 | Conoco Inc. | A deepwater floating drilling and production facility incorporating flexible production risers |
GB2254063A (en) * | 1991-03-25 | 1992-09-30 | British Petroleum Co Plc | Method for transporting fluids. |
FR2674608A1 (en) * | 1991-03-25 | 1992-10-02 | British Petroleum Co Plc | METHOD OF TRANSPORTING FLUIDS |
US5427046A (en) * | 1994-01-18 | 1995-06-27 | Single Buoy Moorings Inc. | Subsea conduit structure |
WO1998030438A1 (en) * | 1997-01-07 | 1998-07-16 | Lmg Marin As | Arrangement of drilling and production ship |
GB2335170A (en) * | 1997-01-07 | 1999-09-15 | Lmg Marin As | Arrangement of drilling and production ship |
GB2335170B (en) * | 1997-01-07 | 2001-05-09 | Lmg Marin As | Arrangement of drilling and production ship |
WO2003031765A1 (en) * | 2001-10-10 | 2003-04-17 | Rockwater Limited | A riser and method of installing same |
GB2400622A (en) * | 2001-10-10 | 2004-10-20 | Rockwater Ltd | A riser and method of installing same |
GB2400622B (en) * | 2001-10-10 | 2005-11-09 | Rockwater Ltd | A riser and method of installing same |
FR2929638A1 (en) * | 2008-04-08 | 2009-10-09 | Technip France Sa | DEVICE FOR EXTRACTING A MATERIAL LOCATED AT THE BOTTOM OF A WATER EXTENSION, EXTRACTION PLANT, AND ASSOCIATED METHOD |
WO2009136064A1 (en) * | 2008-04-08 | 2009-11-12 | Technip France | Device for extracting a material situated at the bottom of an expanse of water, extraction installation and associated method |
Also Published As
Publication number | Publication date |
---|---|
JPS57195000A (en) | 1982-11-30 |
GB2097358A (en) | 1982-11-03 |
EP0063911A3 (en) | 1983-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5823131A (en) | Method and apparatus for disconnecting and retrieving multiple risers attached to a floating vessel | |
US5439321A (en) | Interruptive mobile production system | |
EP2156004B1 (en) | Disconnectable riser-mooring system | |
US4768984A (en) | Buoy having minimal motion characteristics | |
US6210075B1 (en) | Spar system | |
US6453838B1 (en) | Turret-less floating production ship | |
US6915753B1 (en) | Mooring apparatus | |
EP0063911A2 (en) | Flow line for use in the transfer of fluid to or from under water sites | |
US20060056918A1 (en) | Riser system connecting two fixed underwater installations to a floating surface unit | |
US20040182297A1 (en) | Riser pipe support system and method | |
US6394154B1 (en) | Transfer pipe system | |
WO2000027692A1 (en) | Device for positioning of vessels | |
US6763862B2 (en) | Submerged flowline termination at a single point mooring buoy | |
GB2180809A (en) | Tethered buoyant system | |
EP0079404B2 (en) | A single point mooring buoy with rigid arm | |
EP0941200B1 (en) | Method and apparatus for disconnecting and retrieving multiple risers attached to a floating vessel | |
US7426897B2 (en) | Mooring apparatus | |
GB2046199A (en) | Offshore terminal | |
GB2393169A (en) | Mooring apparatus incorporating a semi-submersible floating dock | |
EP0134313A1 (en) | A mooring system | |
RU2773250C2 (en) | Floating system and method with floating extension and guide pipe | |
GB2153747A (en) | An offshore production vessel | |
EP0960810A1 (en) | Transfer pipe system | |
EP0716011A1 (en) | Tension leg platform production system | |
GB2459739A (en) | A counterbalanced cantilever connector assembly for a vessel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH DE FR IT LU NL SE |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH DE FR IT LI LU NL SE |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 19840522 |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: DERBY, STANLEY JARED |