EP0059910B1 - Verfahren zur Erschliessung sehr tief liegender Kohleflöze - Google Patents

Verfahren zur Erschliessung sehr tief liegender Kohleflöze Download PDF

Info

Publication number
EP0059910B1
EP0059910B1 EP82101531A EP82101531A EP0059910B1 EP 0059910 B1 EP0059910 B1 EP 0059910B1 EP 82101531 A EP82101531 A EP 82101531A EP 82101531 A EP82101531 A EP 82101531A EP 0059910 B1 EP0059910 B1 EP 0059910B1
Authority
EP
European Patent Office
Prior art keywords
coal
liquid
explosive
seam
hose
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
EP82101531A
Other languages
German (de)
English (en)
French (fr)
Other versions
EP0059910A2 (de
EP0059910A3 (en
Inventor
Karl Dr. Wisseroth
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BASF SE
Original Assignee
BASF SE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BASF SE filed Critical BASF SE
Publication of EP0059910A2 publication Critical patent/EP0059910A2/de
Publication of EP0059910A3 publication Critical patent/EP0059910A3/de
Application granted granted Critical
Publication of EP0059910B1 publication Critical patent/EP0059910B1/de
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/263Methods for stimulating production by forming crevices or fractures using explosives
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/29Obtaining a slurry of minerals, e.g. by using nozzles
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/29Obtaining a slurry of minerals, e.g. by using nozzles
    • E21B43/292Obtaining a slurry of minerals, e.g. by using nozzles using steerable or laterally extendable nozzles

Definitions

  • the invention relates to a method for developing and conveying coal from deep-lying seams, in which a cavern in the seam or in the layer guiding the seam is traversed by a liquid through at least one borehole, the area of the cavern through which the liquid flows and explosives and agents for the same Ignition are supplied and the pieces of coal detached from the seam during the blasting are conveyed to the surface of the earth with the aid of the liquid.
  • Coal both as lignite and hard coal, is mined in the open pit or mined from more or less large depths. In the latter case, the temperature increasing with the depth (on average an increase of approx. 3 ° C per hundred meters depth) limits the penetration into greater depths. Mountain temperatures of 50 ° C and higher no longer allow mining work. Changed weather conditions or the use of very complex cooling units on site let the depths drift down a little further, but the access limit in Ruhr mining, for example, is currently around 1,200 m.
  • the explosive in a method of the type described above, is conveyed with the aid of a propellant, which is ignited after reaching the cavern and carries the explosive up to the site in the coal seam to be mined, and the density of the conveying liquid at least equal to that of the coal, but smaller than that of the loosened rock.
  • the mode of operation of coal extraction according to the invention with the continuous loss of coal is advantageously distinguished from the conventional technology in mine mining by avoiding cavities in the mountain.
  • the latter require - not least to prevent or limit possible damage to the mountain by subsidence on the earth's surface - an intensive bracing technique in the tunnel.
  • all sections of the mine i. H. Holes for the supply of the conveying liquid and for the coal discharge with the conveying liquid as well as the cavern in the seam, in which the crushing work takes place by blasting, are consistently filled with material.
  • Coal from very deep seams can be brought to the surface of the earth by means of a conveying liquid if it is in an underground, an explosion is triggered in the coal-bearing layer by the liquid flowing through the cavern, by means of which the coal is split off and comminuted. Because of its lower density, the coal is discharged with it to the surface of the earth compared to the liquid being pumped. During the flowing transport, a separation of blasted and crushed rock occurs due to the higher density of the latter compared to coal. Above ground, the usually finely divided coal is separated from the production liquid by sieving, which is then returned to the underground for reuse.
  • the flow of the conveying liquid which is fed back to the coal-bearing layers serves at the same time to transport the explosives to be ignited on site and also to supply filler materials into the mined layers in order to fill the cavities again.
  • the coal separated from the flow by sieving adheres to a certain amount - about 1 to 2 percent by weight - of substances that are added to the liquid to adjust its density. These can either be easily removed by washing with water or left on the coal after partial evaporation of the solvent, which is usually water, whereby the reactivity is increased when calcium chloride is used in a later coal gasification.
  • other substances such as. B. sodium sulfate, magnesium chloride or zinc sulfate are suitable for adjusting concentrated aqueous solutions of the required specific weight.
  • the weight of the liquid to be pumped is roughly equal to the amount of coal to be pumped.
  • the generally high density of the deep layers of the earth limits the loss of production fluid as a result of occasional seepage to an acceptable level.
  • the usual weather explosives in mining such.
  • B. ammonites or explosive explosives, such as hexogen, dynamite, or explosive gelatin can be used, since they lead to smaller explosives compared to the slow-reacting ammonites.
  • the usual weather hazard in conventional mining does not exist with this type of mining, since the explosions are carried out without exception under water or in aqueous solutions.
  • the liquid is used to transmit a shock wave to the coal to be crushed.
  • coal can be shredded more easily than the accompanying rock under comparable blasting conditions.
  • the mechanical shock correlates completely with the thermal shock that can be generated by forcing a suitably high temperature gradient in a coal or rock sample.
  • the amount of explosives required to detonate and crush the coal is relatively small. As was found in tests, depending on the explosive nature of the explosive, the need is around 1 to 5 kg of explosive per ton of coal.
  • the ignition of the explosive supplied to the caverns in the seams with the conveying liquid can be effected by time detonators or by overpressure, possibly with a delay.
  • a weighting ballast may be required for the explosive to be transported with the liquid.
  • thermosiphon effect will take effect between two holes that connect the underground cavern to the surface of the earth. This effect means a reduction in the performance of the mechanical pumping devices for the circulation flow of the liquid flowing through the underground cavern.
  • additional energy can be drawn from the liquid / coal stream on the surface of the earth by cooling. With a conveying capacity of, for example, 100 to / h coal, an additional heat output of around 5 megawatts is obtained by heating the fluid flow in the deep layers - but at a relatively low temperature (around 100 ° C).
  • the range of mining by blasting can be increased significantly if the explosive charges are carried to the seam to be mined with the help of additional propellant charges - a type of underwater rocket.
  • this explosive device is automatically brought into the position of its direction of propulsion, which determines the angle of inclination, by means of its keel arrangement during or after reaching its working sole, which takes place via the supply of the transport liquid. This will mostly be within an almost horizontal level.
  • the propellant charge is ignited and the explosive charge carried on site by means of a pressure detonator, possibly with a delay.
  • an initial ignition e.g. B. lead azide, mercury, aluminum / barium peroxide mixture, which finally detonates the explosive charge.
  • the explosive charge can be ignited particularly advantageously by a detonator which can be arranged at the head of the propellant charge.
  • the underwater rocket is equipped with axial fins to stabilize the orbit. Their weight is also carefully balanced to approximate the state of suspension in the transport liquid.
  • the mining front in the seam can now be reached immediately. Because of the relatively low weight of the hose materials, the hose floats in the liquid-filled cavern. The circulating flow of means of transport can be fed through the hose or loaded with detached coal and returned to the surface of the earth. It is generally sufficient if only the section penetrating the seam is made of highly flexible material. The portion remaining in the borehole can be a rigid material - possibly even metal - which facilitates the mobility of this additional line.
  • Hoses of about 30 cm in length made of normal red soft rubber, foam rubber, plasticized polyvinyl chloride, high-pressure polyethylene and polytetrafluoroethylene under water in a 12 liter hobbock exposed to the explosive effect of 60 grams of ammonium nitrate explosive. The steel container was completely destroyed by the explosion, while all the hoses remained undamaged.
  • the liquid can also be brought directly to the site when the liquid is supplied via a hose line. In this case there is no need to use an additional rocket-like propellant.
  • the risk of premature detonation of the explosive device, which would lead to the destruction of the hose, can be countered by adequately delaying the detonator charge.
  • the two functions are separated, i. H. Removing the shredded coal through the hose and bringing the explosive charge to the site, for example using an additional propellant charge, the risk of hose damage is low.
  • the location of the explosion and the location of the hose are usually noticeably separate from each other. The position of the hose will in no way remain constant, but will change more or less strongly from blasting to blasting.
  • Another way to protect the hose from damage is to take the measure that the hose is pulled back a few meters immediately after the explosive has been supplied and only after the explosion, which is observed above ground via pressure pulse registration, until before Place for the removal of the shredded coal or for the supply of further transport liquid and possibly also explosives is advanced.
  • the liquid can also be used to supply fillers to fill the mountain sections cleared of coal.
  • the drawing shows a vertical section of seam deposits in geologically solid forma tions, e.g. B. the Upper Carboniferous or Perm and Zechstein, as they are found in the Palatinate-Saarland coal mountains.
  • the coal is e.g. T. penetrated by mountain inclusions, which has since affected their economic extraction according to conventional technology. Deep drilling up to 3000 meters and 300 millimeters in diameter penetrates a larger number of seams, the individual thickness of which is a few to many meters, with a total thickness of several hundred meters.
  • the mining of the deposit which begins at the bottom, has progressed to a depth of 2,000 meters, and the deepened cleared deposit has been replenished with mountain offset 10.
  • the reference number 11 designates the seam that is being mined, the excavation range being driven approximately symmetrically to the central borehole 12 up to a width of approximately 25 meters.
  • a flexible hose 13 made of plasticized polyvinyl chloride with a clear width of approximately 150 millimeters and a wall thickness of 6 millimeters connects the mining front in the region of the cleared seam to a pipe 14 arranged in the borehole.
  • the direction of flow of the transport liquid can also be reversed, i. H. the liquid to be fed is passed through the hose line together with the explosives - to the site. Coal production then takes place in the borehole outside the hose or pipeline. 835 grams of explosive 17 are added to the backflow at intervals of about half a minute.
  • a propellant charge 100 grams of black powder in a propellant charge 20 equipped with axial fins 18 and a keel 19, which is ignited by an overpressure detonator delayed by three seconds, the explosive charge is carried to the site. for example from a barium peroxide-aluminum powder mixture, is detonated and leads to renewed blasting and crushing of coal.
  • the detonation does not take place in its immediate vicinity.
  • the distance between the blasting site and the hose position can be further increased in order to avoid damage to the hose due to the blasting effect.
  • the explosive supplied is ignited in the borehole at the seam level by means of a time-delayed pressure detonator, the end of the hose line remaining a few meters from the point of detonation. In this case, no additional propellant charge is necessary.
  • the end of the hose is inserted into the seam in order to ensure thorough flushing and thus extensive removal of the shredded coal.

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Paper (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)
EP82101531A 1981-03-06 1982-02-27 Verfahren zur Erschliessung sehr tief liegender Kohleflöze Expired EP0059910B1 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19813108425 DE3108425A1 (de) 1981-03-06 1981-03-06 Verfahren zur erschliessung sehr tief liegender kohlefloeze
DE3108425 1981-03-06

Publications (3)

Publication Number Publication Date
EP0059910A2 EP0059910A2 (de) 1982-09-15
EP0059910A3 EP0059910A3 (en) 1984-04-04
EP0059910B1 true EP0059910B1 (de) 1986-05-07

Family

ID=6126449

Family Applications (1)

Application Number Title Priority Date Filing Date
EP82101531A Expired EP0059910B1 (de) 1981-03-06 1982-02-27 Verfahren zur Erschliessung sehr tief liegender Kohleflöze

Country Status (8)

Country Link
US (1) US4451088A (enrdf_load_html_response)
EP (1) EP0059910B1 (enrdf_load_html_response)
AU (1) AU543253B2 (enrdf_load_html_response)
DE (2) DE3108425A1 (enrdf_load_html_response)
DK (1) DK96782A (enrdf_load_html_response)
IN (1) IN156662B (enrdf_load_html_response)
NO (1) NO158516C (enrdf_load_html_response)
ZA (1) ZA821463B (enrdf_load_html_response)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3125108A1 (de) * 1981-06-26 1983-01-13 Basf Ag, 6700 Ludwigshafen "anordnung zur kursausrichtung von in fluessigkeiten bewegten raketen"
DE3211459A1 (de) * 1982-03-27 1983-10-13 Basf Ag, 6700 Ludwigshafen Foerderfluessigkeit zum transport von kohle aus grossen tiefen
US4648450A (en) * 1985-11-27 1987-03-10 Amoco Corporation Method of producing synthesis gas by underground gasification of coal using specific well configuration
US4903772A (en) * 1987-11-16 1990-02-27 Johnson James O Method of fracturing a geological formation
US5139312A (en) * 1991-04-09 1992-08-18 Jackson Daryl L Method and apparatus removing a mineable product from an underground seam
US5531507A (en) * 1995-05-09 1996-07-02 Jackson; Daryl L. Method of removing a minable product from an underground seam and bottom hole tool
US8261820B2 (en) 2006-01-12 2012-09-11 Jimni Development LLC Drilling and opening reservoirs using an oriented fissure
US7647967B2 (en) * 2006-01-12 2010-01-19 Jimni Development LLC Drilling and opening reservoir using an oriented fissure to enhance hydrocarbon flow and method of making
AU2010227086B2 (en) * 2010-10-11 2012-09-13 Crc Ore Ltd A Method of Beneficiating Minerals
CN103797136B (zh) * 2011-01-24 2016-09-07 C·恩克博德 矿物燃料选矿方法及随后通过管线运输输送至用户
AU2015205856B2 (en) * 2014-07-21 2019-08-15 Aj Lucas Pty Ltd Improvements to recovery of hydrocarbons
CN106869897A (zh) * 2017-01-20 2017-06-20 徐斌 煤层地下松动方法及装置
CN113153297B (zh) * 2021-04-27 2023-06-30 中国地质大学(武汉) 一种深煤层开采覆岩非爆破预裂卸压防控动力灾害的方法
PE20241928A1 (es) * 2021-12-22 2024-09-20 Daniel B Palmer Metodos de mineria subterranea a traves de sondeos y barrenos multilaterales

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3072054A (en) * 1958-05-20 1963-01-08 Gun Products Co Oil well shooting projectile and method
US3070361A (en) * 1960-09-02 1962-12-25 Gen Crude Oil Company Fluid mining of underground ore deposits
US4044563A (en) * 1973-01-26 1977-08-30 The Dow Chemical Company Subsidence control
US3874733A (en) * 1973-08-29 1975-04-01 Continental Oil Co Hydraulic method of mining and conveying coal in substantially vertical seams
US3993146A (en) * 1973-08-29 1976-11-23 Continental Oil Company Apparatus for mining coal using vertical bore hole and fluid
US3964792A (en) * 1975-01-28 1976-06-22 The United States Of America As Represented By The United States Energy Research And Development Administration Explosive fluid transmitted shock method for mining deeply buried coal

Also Published As

Publication number Publication date
EP0059910A2 (de) 1982-09-15
DE3270947D1 (en) 1986-06-12
US4451088A (en) 1984-05-29
DE3108425A1 (de) 1982-09-23
NO158516B (no) 1988-06-13
NO158516C (no) 1988-09-21
ZA821463B (en) 1983-02-23
NO820684L (no) 1982-09-07
DK96782A (da) 1982-09-07
AU8115782A (en) 1982-09-09
EP0059910A3 (en) 1984-04-04
AU543253B2 (en) 1985-04-04
IN156662B (enrdf_load_html_response) 1985-10-12

Similar Documents

Publication Publication Date Title
EP0059910B1 (de) Verfahren zur Erschliessung sehr tief liegender Kohleflöze
DE69125010T2 (de) Verfahren und gerät zum kontrollierten zerbrechen von hartem kompakten gestein und von betonmaterialien
EP0002877B1 (de) Verfahren zur Gewinnung von Methan
DE3873407T2 (de) Verfahren zum zementieren eines foerderrohres in einem unterirdischen gekruemmten bohrloch.
CN109209472A (zh) 一种冲孔、爆破、注水相互耦合的煤层卸压防突方法
DE2641426A1 (de) Verfahren und vorrichtung zum brechen von hartem material, wie z.b. gestein
DE1758885B1 (de) Vorrichtung zum Fuellen von Bohrloechern
CN105737699B (zh) 一种双线隧道ⅳ~ⅴ级围岩上台阶深孔二次爆破快速开挖方法
DE3110198A1 (de) "bohrloch fuer den abbau- bzw. bergbau"
DE10245394C1 (de) Schrämförderwalze für ein kontinuierliches Tagebaugewinnungsgerät
DE10393535T5 (de) Bergbausystem
CN105333779A (zh) 一种硬岩巷道不同阶微差掏槽爆破技术
US3070010A (en) Drilling boreholes with explosive charges
DE2630979A1 (de) Abbauverfahren
DE69615912T2 (de) Verfahren und Vorrichtung zum Gewinnen eines Bodenschatzes aus einer Lagerstätte
US3130797A (en) Methods and apparatus for drilling bore holes
DE2226367C3 (de) Zerkleinerungsvorrichtung für Festkörper
DE851488C (de) Verfahren und Vorrichtung zur Gewinnung und Foerderung von Mineralien
CN113669064A (zh) 自然崩落采矿法
CN114060088A (zh) 一种矿井煤层顶板的离层水害的防治方法
DE3037807C2 (de) Verfahren zur Erweiterung eines Gebirgshohlraumes
DE4226324A1 (de) Verfahren und einrichtung zum abbau eines untertage-vorkommens
EP0273441B1 (de) Verfahren zur Beseitigung von Abraum
DE935781C (de) Verfahren zum Abbau maechtiger Lagerstaetten, z. B. von Braunkohle od. dgl.
AT522402B1 (de) Verfahren und Vorrichtung zum Bohren von Löchern in Boden- oder Gesteinsmaterial

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): BE DE FR GB NL

17P Request for examination filed

Effective date: 19821211

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Designated state(s): BE DE FR GB NL

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE DE FR GB NL

REF Corresponds to:

Ref document number: 3270947

Country of ref document: DE

Date of ref document: 19860612

ET Fr: translation filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19890117

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19890123

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19890228

Year of fee payment: 8

Ref country code: GB

Payment date: 19890228

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19890303

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19900221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19900227

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Effective date: 19900228

BERE Be: lapsed

Owner name: BASF A.G.

Effective date: 19900228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19900901

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee
GBPC Gb: european patent ceased through non-payment of renewal fee
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19901031

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST