RU2404359C2
(ru)
*
|
2006-01-27 |
2010-11-20 |
Шлюмберже Текнолоджи Б.В. |
Способ гидроразрыва подземного пласта (варианты)
|
US8082994B2
(en)
*
|
2006-12-05 |
2011-12-27 |
Halliburton Energy Services, Inc. |
Methods for enhancing fracture conductivity in subterranean formations
|
US9085727B2
(en)
|
2006-12-08 |
2015-07-21 |
Schlumberger Technology Corporation |
Heterogeneous proppant placement in a fracture with removable extrametrical material fill
|
US8757259B2
(en)
|
2006-12-08 |
2014-06-24 |
Schlumberger Technology Corporation |
Heterogeneous proppant placement in a fracture with removable channelant fill
|
US8763699B2
(en)
|
2006-12-08 |
2014-07-01 |
Schlumberger Technology Corporation |
Heterogeneous proppant placement in a fracture with removable channelant fill
|
US7581590B2
(en)
|
2006-12-08 |
2009-09-01 |
Schlumberger Technology Corporation |
Heterogeneous proppant placement in a fracture with removable channelant fill
|
WO2008143544A1
(en)
|
2007-05-22 |
2008-11-27 |
Schlumberger Canada Limited |
Method of improving the conductivity of a fracture in the space between proppant pillars
|
RU2484243C2
(ru)
*
|
2007-07-03 |
2013-06-10 |
Шлюмберже Текнолоджи Б.В. |
Способ гетерогенного размещения расклинивающего наполнителя в трещине гидроразрыва разрываемого слоя
|
US9040468B2
(en)
|
2007-07-25 |
2015-05-26 |
Schlumberger Technology Corporation |
Hydrolyzable particle compositions, treatment fluids and methods
|
US10011763B2
(en)
|
2007-07-25 |
2018-07-03 |
Schlumberger Technology Corporation |
Methods to deliver fluids on a well site with variable solids concentration from solid slurries
|
US8490698B2
(en)
|
2007-07-25 |
2013-07-23 |
Schlumberger Technology Corporation |
High solids content methods and slurries
|
US9080440B2
(en)
*
|
2007-07-25 |
2015-07-14 |
Schlumberger Technology Corporation |
Proppant pillar placement in a fracture with high solid content fluid
|
US8936082B2
(en)
|
2007-07-25 |
2015-01-20 |
Schlumberger Technology Corporation |
High solids content slurry systems and methods
|
US8490699B2
(en)
|
2007-07-25 |
2013-07-23 |
Schlumberger Technology Corporation |
High solids content slurry methods
|
US10920494B2
(en)
|
2007-12-11 |
2021-02-16 |
Aquasmart Enterprises, Llc |
Hydraulic fracture composition and method
|
US9856415B1
(en)
|
2007-12-11 |
2018-01-02 |
Superior Silica Sands, LLC |
Hydraulic fracture composition and method
|
US9057014B2
(en)
|
2007-12-11 |
2015-06-16 |
Aquasmart Enterprises, Llc |
Hydraulic fracture composition and method
|
US20170137703A1
(en)
|
2007-12-11 |
2017-05-18 |
Superior Silica Sands, LLC |
Hydraulic fracture composition and method
|
US8839865B2
(en)
|
2008-02-27 |
2014-09-23 |
Schlumberger Technology Corporation |
Slip-layer fluid placement
|
EP2172533A1
(en)
*
|
2008-09-26 |
2010-04-07 |
Services Pétroliers Schlumberger |
Composition for borehole treatment
|
US8205675B2
(en)
*
|
2008-10-09 |
2012-06-26 |
Baker Hughes Incorporated |
Method of enhancing fracture conductivity
|
RU2402679C2
(ru)
|
2008-10-14 |
2010-10-27 |
Шлюмберже Текнолоджи Б.В. |
Способ гидроразрыва малопроницаемого подземного пласта
|
GB2482839B
(en)
*
|
2009-05-27 |
2014-01-15 |
Optasense Holdings Ltd |
Well monitoring
|
US8141637B2
(en)
|
2009-08-11 |
2012-03-27 |
Schlumberger Technology Corporation |
Manipulation of flow underground
|
EP2305767A1
(en)
*
|
2009-10-02 |
2011-04-06 |
Services Pétroliers Schlumberger |
Method and compositon to prevent fluid mixing in pipe
|
EP2305450A1
(en)
|
2009-10-02 |
2011-04-06 |
Services Pétroliers Schlumberger |
Apparatus and methods for preparing curved fibers
|
US9097077B2
(en)
|
2009-10-30 |
2015-08-04 |
Schlumberger Technology Corporation |
Downhole chemical delivery system and method
|
MX2012007645A
(es)
|
2009-12-30 |
2012-09-07 |
Schlumberger Technology Bv |
Un método de consolidacion de tapón de fluidos dentro de un sistema de fluidos en aplicaciones en el fondo del pozo.
|
CA2786023A1
(en)
|
2009-12-31 |
2011-07-07 |
Schlumberger Canada Limited |
Hydraulic fracturing system
|
US8662172B2
(en)
|
2010-04-12 |
2014-03-04 |
Schlumberger Technology Corporation |
Methods to gravel pack a well using expanding materials
|
CN103003521B
(zh)
|
2010-05-17 |
2016-10-12 |
普拉德研究及开发股份有限公司 |
用于在压裂处理中提供支撑剂段塞的方法
|
US8365827B2
(en)
*
|
2010-06-16 |
2013-02-05 |
Baker Hughes Incorporated |
Fracturing method to reduce tortuosity
|
US8511381B2
(en)
|
2010-06-30 |
2013-08-20 |
Schlumberger Technology Corporation |
High solids content slurry methods and systems
|
US8505628B2
(en)
|
2010-06-30 |
2013-08-13 |
Schlumberger Technology Corporation |
High solids content slurries, systems and methods
|
US8297358B2
(en)
|
2010-07-16 |
2012-10-30 |
Baker Hughes Incorporated |
Auto-production frac tool
|
US9234415B2
(en)
|
2010-08-25 |
2016-01-12 |
Schlumberger Technology Corporation |
Delivery of particulate material below ground
|
US8714248B2
(en)
|
2010-08-25 |
2014-05-06 |
Schlumberger Technology Corporation |
Method of gravel packing
|
US8459353B2
(en)
|
2010-08-25 |
2013-06-11 |
Schlumberger Technology Corporation |
Delivery of particulate material below ground
|
US8448706B2
(en)
|
2010-08-25 |
2013-05-28 |
Schlumberger Technology Corporation |
Delivery of particulate material below ground
|
CN101968348B
(zh)
*
|
2010-09-07 |
2012-05-02 |
中国石油大学(北京) |
对压裂裂缝进行可视化监测的方法
|
US8613314B2
(en)
*
|
2010-11-08 |
2013-12-24 |
Schlumberger Technology Corporation |
Methods to enhance the productivity of a well
|
WO2012064213A1
(en)
*
|
2010-11-12 |
2012-05-18 |
Schlumberger Canada Limited |
Method to enhance fiber bridging
|
MX336479B
(es)
|
2010-11-12 |
2016-01-21 |
Schlumberger Technology Bv |
Metodos para dar mantenimiento a pozos subterraneos.
|
US8607870B2
(en)
|
2010-11-19 |
2013-12-17 |
Schlumberger Technology Corporation |
Methods to create high conductivity fractures that connect hydraulic fracture networks in a well
|
CN103299031B
(zh)
*
|
2010-12-22 |
2017-05-03 |
莫里斯·B·杜西奥尔特 |
用于提高页岩资源产量的多阶段裂缝灌注法
|
EP2469020A1
(en)
|
2010-12-23 |
2012-06-27 |
Claude Vercaemer |
Process of hydraulic fracturing to create a layered proppant pack structure alongside the faces of the fracture to prevent formation fines to damage fracture conductivity
|
WO2015003028A1
(en)
|
2011-03-11 |
2015-01-08 |
Schlumberger Canada Limited |
Method of calibrating fracture geometry to microseismic events
|
US9618652B2
(en)
*
|
2011-11-04 |
2017-04-11 |
Schlumberger Technology Corporation |
Method of calibrating fracture geometry to microseismic events
|
FR2972757B1
(fr)
|
2011-03-14 |
2014-01-31 |
Total Sa |
Fracturation electrique et statique d'un reservoir
|
FR2972756B1
(fr)
|
2011-03-14 |
2014-01-31 |
Total Sa |
Fracturation electrique d'un reservoir
|
US8672023B2
(en)
*
|
2011-03-29 |
2014-03-18 |
Baker Hughes Incorporated |
Apparatus and method for completing wells using slurry containing a shape-memory material particles
|
RU2460876C1
(ru)
*
|
2011-04-26 |
2012-09-10 |
Открытое акционерное общество "Татнефть" имени В.Д. Шашина |
Способ осуществления импульсного гидроразрыва карбонатного пласта
|
US8869898B2
(en)
|
2011-05-17 |
2014-10-28 |
Baker Hughes Incorporated |
System and method for pinpoint fracturing initiation using acids in open hole wellbores
|
US9133387B2
(en)
|
2011-06-06 |
2015-09-15 |
Schlumberger Technology Corporation |
Methods to improve stability of high solid content fluid
|
US20120305247A1
(en)
*
|
2011-06-06 |
2012-12-06 |
Yiyan Chen |
Proppant pillar placement in a fracture with high solid content fluid
|
US9863230B2
(en)
*
|
2011-06-15 |
2018-01-09 |
Schlumberger Technology Corporation |
Heterogeneous proppant placement in a fracture with removable extrametrical material fill
|
PL408174A1
(pl)
*
|
2011-07-11 |
2014-12-22 |
Schlumberger Technology B.V. |
Układ i sposób przeprowadzania operacji stymulacji odwiertu
|
US9315719B2
(en)
*
|
2011-07-13 |
2016-04-19 |
Halliburton Energy Services, Inc. |
Low surface friction proppants
|
CA2778157A1
(en)
*
|
2011-07-20 |
2013-01-20 |
Thor's Oil Products, Inc. |
Method and apparatus for bulk transport of proppant
|
RU2453695C1
(ru)
*
|
2011-09-06 |
2012-06-20 |
Открытое акционерное общество "Татнефть" им. В.Д. Шашина |
Способ гидроразрыва продуктивного пласта
|
RU2453694C1
(ru)
*
|
2011-09-06 |
2012-06-20 |
Открытое акционерное общество "Татнефть" им. В.Д. Шашина |
Способ гидроразрыва пласта
|
RU2459947C1
(ru)
*
|
2011-10-20 |
2012-08-27 |
Открытое акционерное общество "Татнефть" им. В.Д. Шашина |
Способ гидроразрыва пласта
|
US10544667B2
(en)
|
2011-11-04 |
2020-01-28 |
Schlumberger Technology Corporation |
Modeling of interaction of hydraulic fractures in complex fracture networks
|
US10422208B2
(en)
|
2011-11-04 |
2019-09-24 |
Schlumberger Technology Corporation |
Stacked height growth fracture modeling
|
US9920610B2
(en)
|
2012-06-26 |
2018-03-20 |
Baker Hughes, A Ge Company, Llc |
Method of using diverter and proppant mixture
|
US10041327B2
(en)
|
2012-06-26 |
2018-08-07 |
Baker Hughes, A Ge Company, Llc |
Diverting systems for use in low temperature well treatment operations
|
WO2013085410A1
(en)
*
|
2011-12-09 |
2013-06-13 |
Schlumberger Canada Limited |
Well treatment
|
US20130157074A1
(en)
*
|
2011-12-15 |
2013-06-20 |
GM Global Technology Operations LLC |
Hollow superelastic shape memory alloy particles
|
US9863228B2
(en)
|
2012-03-08 |
2018-01-09 |
Schlumberger Technology Corporation |
System and method for delivering treatment fluid
|
US9803457B2
(en)
|
2012-03-08 |
2017-10-31 |
Schlumberger Technology Corporation |
System and method for delivering treatment fluid
|
US20130274149A1
(en)
*
|
2012-04-13 |
2013-10-17 |
Schlumberger Technology Corporation |
Fluids and methods including nanocellulose
|
US9201157B2
(en)
*
|
2012-04-26 |
2015-12-01 |
Farrokh Mohamadi |
Monitoring of wells to detect the composition of matter in boreholes and propped fractures
|
FR2991371B1
(fr)
|
2012-06-01 |
2014-06-13 |
Total Sa |
Fracturation electrique amelioree d'un reservoir
|
US10988678B2
(en)
|
2012-06-26 |
2021-04-27 |
Baker Hughes, A Ge Company, Llc |
Well treatment operations using diverting system
|
US11111766B2
(en)
|
2012-06-26 |
2021-09-07 |
Baker Hughes Holdings Llc |
Methods of improving hydraulic fracture network
|
PL2864442T3
(pl)
|
2012-06-26 |
2019-03-29 |
Baker Hughes, A Ge Company, Llc |
Sposoby ulepszania sieci szczelin hydraulicznych
|
WO2014004689A2
(en)
|
2012-06-26 |
2014-01-03 |
Baker Hughes Incorporated |
Method of using phthalic and terephthalic acids and derivatives thereof in well treatment operations
|
RU2583466C1
(ru)
|
2012-07-10 |
2016-05-10 |
Куреха Корпорейшн |
Элемент скважинного инструмента для извлечения углеводородных ресурсов
|
US9309454B2
(en)
*
|
2012-07-20 |
2016-04-12 |
Halliburton Energy Services, Inc. |
Use of expandable self-removing filler material in fracturing operations
|
US8985213B2
(en)
*
|
2012-08-02 |
2015-03-24 |
Halliburton Energy Services, Inc. |
Micro proppants for far field stimulation
|
US20150204174A1
(en)
*
|
2012-08-24 |
2015-07-23 |
Schlumberger Technology Corporation |
System and method for performing stimulation operations
|
US9540561B2
(en)
*
|
2012-08-29 |
2017-01-10 |
Halliburton Energy Services, Inc. |
Methods for forming highly conductive propped fractures
|
US9938452B2
(en)
|
2012-10-24 |
2018-04-10 |
Halliburton Energy Services, Inc. |
Immobile proppants
|
US20140131042A1
(en)
*
|
2012-11-13 |
2014-05-15 |
Halliburton Energy Services, Inc. |
Methods for Generating Highly Conductive Channels in Propped Fractures
|
US9528354B2
(en)
|
2012-11-14 |
2016-12-27 |
Schlumberger Technology Corporation |
Downhole tool positioning system and method
|
US9657558B2
(en)
|
2012-12-28 |
2017-05-23 |
Schlumberger Technology Corporation |
Method for treating and measuring subterranean formations
|
CN103967470B
(zh)
*
|
2013-01-25 |
2017-07-25 |
中国石油化工股份有限公司 |
一种水平井泥岩穿层压裂方法
|
RU2516626C1
(ru)
*
|
2013-02-04 |
2014-05-20 |
Открытое акционерное общество "Татнефть" имени В.Д. Шашина |
Способ гидроразрыва нефтяного или газового пласта
|
CN103077556B
(zh)
*
|
2013-02-04 |
2016-07-06 |
重庆大学 |
油井出砂的三维数值模型设计方法
|
WO2014130448A1
(en)
*
|
2013-02-22 |
2014-08-28 |
Chevron U.S.A. Inc. |
Methods for altering fluid rheology
|
WO2014129924A1
(en)
*
|
2013-02-22 |
2014-08-28 |
Schlumberger Canada Limited |
Methods for heterogeneous proppant placement and reduced fluids loss during fracturing
|
US9494025B2
(en)
|
2013-03-01 |
2016-11-15 |
Vincent Artus |
Control fracturing in unconventional reservoirs
|
US9429006B2
(en)
|
2013-03-01 |
2016-08-30 |
Baker Hughes Incorporated |
Method of enhancing fracture conductivity
|
US10526531B2
(en)
*
|
2013-03-15 |
2020-01-07 |
Schlumberger Technology Corporation |
Compositions and methods for increasing fracture conductivity
|
US20140290943A1
(en)
*
|
2013-03-29 |
2014-10-02 |
Schlumberger Technology Corporation |
Stabilized Fluids In Well Treatment
|
CN103244097B
(zh)
*
|
2013-05-16 |
2016-04-20 |
中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 |
中深煤层控制多裂缝压裂方法
|
US9896923B2
(en)
|
2013-05-28 |
2018-02-20 |
Schlumberger Technology Corporation |
Synchronizing pulses in heterogeneous fracturing placement
|
US9388335B2
(en)
|
2013-07-25 |
2016-07-12 |
Schlumberger Technology Corporation |
Pickering emulsion treatment fluid
|
US9677393B2
(en)
|
2013-08-28 |
2017-06-13 |
Schlumberger Technology Corporation |
Method for performing a stimulation operation with proppant placement at a wellsite
|
US10081762B2
(en)
|
2013-09-17 |
2018-09-25 |
Baker Hughes, A Ge Company, Llc |
Well treatment methods and fluids containing synthetic polymer
|
WO2015048021A2
(en)
|
2013-09-26 |
2015-04-02 |
Baker Hughes Incorporated |
Method of optimizing conductivity in a hydraulic fracturing operation
|
CA2927007A1
(en)
|
2013-10-17 |
2015-04-23 |
Signa Chemistry, Inc. |
Alkali metal silicides for high temperature wettability improvement in carbonate reservoirs
|
US20160215203A1
(en)
*
|
2013-10-23 |
2016-07-28 |
Schlumberger Technology Corporation |
Development and characterization of degradable cross-linking in polyvinyl alcohol
|
US20150114641A1
(en)
*
|
2013-10-30 |
2015-04-30 |
Baker Hughes Incorporated |
Proppants with improved flow back capacity
|
RO131506A2
(ro)
*
|
2013-11-06 |
2016-11-29 |
Schlumberger Technology B.V. |
Modelarea interacţiunilor de fracturare hidraulică în reţelele de fracturare complexe
|
WO2015073197A1
(en)
|
2013-11-13 |
2015-05-21 |
Baker Hughes Incorporated |
Method of treating produced or flowback water with nucleophilic agent to deactivate breaker
|
FR3013055B1
(fr)
*
|
2013-11-14 |
2020-05-15 |
Arkema France |
Composition fluide pour la stimulation dans le domaine de la production de petrole et de gaz
|
US10266755B2
(en)
|
2013-11-19 |
2019-04-23 |
Schlumberger Technology Corporation |
Ceramic particles formed from perforated membranes
|
CN104727799A
(zh)
*
|
2013-12-19 |
2015-06-24 |
中国石油天然气股份有限公司 |
一种实现裂缝高导流能力的脉冲加砂压裂方法
|
GB201322756D0
(en)
*
|
2013-12-20 |
2014-02-05 |
Maersk Olie & Gas |
Consolidation of proppant sand in hydraulic fractures
|
US20160340573A1
(en)
*
|
2014-01-17 |
2016-11-24 |
Sergey Vladimirovich Semenov |
System and methodology for well treatment
|
US10106728B2
(en)
*
|
2014-01-22 |
2018-10-23 |
Halliburton Energy Services, Inc. |
Clusters of micron- and nano-sized proppant for use in subterranean operations
|
US10557335B2
(en)
|
2014-01-24 |
2020-02-11 |
Schlumberger Technology Corporation |
Gas fracturing method and system
|
US20150211346A1
(en)
*
|
2014-01-24 |
2015-07-30 |
Schlumberger Technology Corporation |
Fracturing methods and systems
|
US20160230082A1
(en)
*
|
2014-01-24 |
2016-08-11 |
Schlumberger Technology Corporation |
Method of Reusing Untreated Produced Water in Hydraulic Fracturing
|
CN103821491B
(zh)
*
|
2014-03-05 |
2016-05-11 |
中国石油化工股份有限公司 |
一种加砂压裂工艺
|
US20150275644A1
(en)
*
|
2014-03-28 |
2015-10-01 |
Schlumberger Technology Corporation |
Well treatment
|
RU2641681C1
(ru)
*
|
2014-03-28 |
2018-01-19 |
ЭмБиДжей ВОТЕР ПАРТНЕРС |
Использование ионизированного флюида при гидравлическом разрыве пласта
|
CA2941681A1
(en)
|
2014-03-31 |
2015-10-08 |
Schlumberger Canada Limited |
Method for modification and delivery of proppant during well operations, method for hydraulic fracturing and method for gravel packing
|
US9797212B2
(en)
|
2014-03-31 |
2017-10-24 |
Schlumberger Technology Corporation |
Method of treating subterranean formation using shrinkable fibers
|
AU2014391162B2
(en)
|
2014-04-15 |
2019-05-02 |
Schlumberger, Technology B.V. |
Treatment fluid
|
US10287865B2
(en)
|
2014-05-19 |
2019-05-14 |
Baker Hughes, A Ge Company, Llc |
Use of an acid soluble or degradable solid particulate and an acid liberating or acid generating composite in the stimulation of a subterranean formation
|
EP3152392B1
(en)
|
2014-06-05 |
2023-08-02 |
Services Pétroliers Schlumberger |
Method for improved design of hydraulic fracture height in a subterranean laminated rock formation
|
US20150369028A1
(en)
*
|
2014-06-24 |
2015-12-24 |
Schlumberger Technology Corporation |
Compound cluster placement in fractures
|
MX2016016569A
(es)
*
|
2014-06-30 |
2017-04-25 |
Schlumberger Technology Bv |
Metodo para el diseño de pozos de produccion y pozos de inyeccion.
|
AU2014402367B2
(en)
*
|
2014-07-31 |
2017-10-05 |
Halliburton Energy Services, Inc. |
Methods to place fluid loss materials
|
AU2015301423B2
(en)
|
2014-08-15 |
2019-01-17 |
Baker Hughes, A Ge Company, Llc |
Diverting systems for use in well treatment operations
|
US20160053164A1
(en)
*
|
2014-08-22 |
2016-02-25 |
Baker Hughes Incorporated |
Hydraulic fracturing applications employing microenergetic particles
|
WO2016032513A1
(en)
*
|
2014-08-29 |
2016-03-03 |
Halliburton Energy Services, Inc. |
Reticulated materials for the formation of proppant-free channels
|
WO2016036363A1
(en)
|
2014-09-03 |
2016-03-10 |
Halliburton Energy Services, Inc. |
Methods of forming variable strength proppant packs
|
WO2016056934A1
(en)
|
2014-10-06 |
2016-04-14 |
Schlumberger Canada Limited |
Methods of zonal isolation and treatment diversion with shaped particles
|
WO2016072877A1
(en)
|
2014-11-06 |
2016-05-12 |
Schlumberger Canada Limited |
Fractures treatment
|
US9683166B2
(en)
|
2014-12-01 |
2017-06-20 |
Baker Hughes Incorporated |
Hydrocarbon well treatment methods and fluids
|
US9783732B2
(en)
|
2014-12-11 |
2017-10-10 |
Schlumberger Technology Corporation |
Compositions and methods for treating a subterranean formation
|
CN104727800B
(zh)
*
|
2015-01-22 |
2017-07-25 |
中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 |
一种基于表面改性后聚乙烯醇纤维的暂堵转向压裂方法
|
US20160222772A1
(en)
*
|
2015-02-04 |
2016-08-04 |
Aramco Services Company |
Pseudoelastic Materials as Additives to Enhance Hydraulic Fracturing
|
CN104612752A
(zh)
*
|
2015-02-09 |
2015-05-13 |
德惠同利(北京)石油技术服务有限公司 |
防砂充填装置
|
US9976390B2
(en)
*
|
2015-03-30 |
2018-05-22 |
Baker Hughes, A Ge Company, Llc |
Drilling fluids with leakoff control and drill cuttings removal sweeps
|
WO2016163983A1
(en)
|
2015-04-06 |
2016-10-13 |
Halliburton Energy Services, Inc. |
Forming proppant packs having proppant-free channels therein in subterranean formation fractures
|
WO2016175765A1
(en)
|
2015-04-28 |
2016-11-03 |
Halliburton Energy Services, Inc. |
Forming conductive arch channels in subterranean formation fractures
|
US10577536B2
(en)
|
2015-06-30 |
2020-03-03 |
Halliburton Energy Services, Inc. |
Vertical proppant suspension in hydraulic fractures
|
WO2017022681A1
(ja)
*
|
2015-07-31 |
2017-02-09 |
株式会社Adeka |
カプセル剤及びその製造方法、並びに粘度可変流体
|
CN105086987B
(zh)
*
|
2015-08-31 |
2018-06-01 |
中国石油天然气股份有限公司 |
纤维表面处理剂及其制备方法和使用方法与压裂液用纤维
|
WO2017040824A1
(en)
|
2015-09-03 |
2017-03-09 |
Saudi Arabian Oil Company |
Treatment of kerogen in subterranean formations
|
CN106545324A
(zh)
*
|
2015-09-18 |
2017-03-29 |
中国石油化工股份有限公司 |
一种用于压开页岩气多个水平层理缝的方法
|
WO2017095407A1
(en)
|
2015-12-02 |
2017-06-08 |
Halliburton Energy Services, Inc. |
Method of fracturing a formation
|
RU2608380C1
(ru)
*
|
2015-12-25 |
2017-01-18 |
Шлюмберже Текнолоджи Б.В. |
Способ гидроразрыва подземного пласта
|
CA3005325A1
(en)
|
2016-02-03 |
2017-08-10 |
Halliburton Energy Services, Inc. |
Enhancing propped complex fracture networks
|
WO2017135840A1
(en)
*
|
2016-02-04 |
2017-08-10 |
Schlumberger Canada Limited |
Polymer fiber additive for proppant flowback prevention
|
CN105971579B
(zh)
|
2016-07-07 |
2018-05-08 |
赵立强 |
一种相变水力压裂工艺
|
US10240449B1
(en)
|
2016-08-11 |
2019-03-26 |
Keane Frac, Lp |
Methods and materials for hydraulic fracturing
|
CA3035215A1
(en)
|
2016-09-01 |
2018-03-08 |
Saudi Arabian Oil Company |
Treatment of sulfide scales
|
EP3526305A4
(en)
|
2016-10-11 |
2020-05-27 |
Eastman Chemical Company |
FIBER CONFIGURATIONS FOR WELLBORE TREATMENT COMPOSITIONS
|
CN106223923B
(zh)
*
|
2016-10-17 |
2019-03-19 |
平安煤炭开采工程技术研究院有限责任公司 |
煤层压裂方法
|
CN108315005B
(zh)
*
|
2017-01-18 |
2020-05-22 |
北京大学 |
一种具有高导流能力的无砂压裂液、其制备方法及压裂工艺与应用
|
US10415358B2
(en)
|
2017-02-17 |
2019-09-17 |
Saudi Arabian Oil Company |
Conditioning a subterranean formation
|
US20180291260A1
(en)
*
|
2017-04-11 |
2018-10-11 |
Baker Hughes, A Ge Company, Llc |
Crosslinker modified filament and fabric for placement of proppant anti-settling agents in hydraulic fractures
|
US10100245B1
(en)
|
2017-05-15 |
2018-10-16 |
Saudi Arabian Oil Company |
Enhancing acid fracture conductivity
|
US11753582B2
(en)
|
2017-07-31 |
2023-09-12 |
Chevron U.S.A. Inc. |
Injection fluids comprising an anionic surfactant for treating unconventional formations
|
CN109519159A
(zh)
*
|
2017-09-19 |
2019-03-26 |
中国石油化工股份有限公司 |
一种采用磁性滑溜水的页岩气压裂方法
|
US10655443B2
(en)
|
2017-09-21 |
2020-05-19 |
Saudi Arabian Oil Company |
Pulsed hydraulic fracturing with geopolymer precursor fluids
|
US10113406B1
(en)
*
|
2017-09-21 |
2018-10-30 |
Saudi Arabian Oil Company |
Pulsed hydraulic fracturing with nanosilica carrier fluid
|
CN107880862B
(zh)
*
|
2017-11-07 |
2018-08-10 |
西南石油大学 |
一种提高承压能力的封堵剂及其制备方法
|
US11341298B2
(en)
|
2017-12-05 |
2022-05-24 |
Schlumberger Technology Corporation |
Method for reservoir stimulation analysis and design based on lagrangian approach
|
US11248160B2
(en)
|
2018-01-30 |
2022-02-15 |
Chevron U.S.A. Inc. |
Compositions for use in oil and gas operations
|
CN108397184B
(zh)
*
|
2018-05-18 |
2021-04-20 |
西南石油大学 |
一种自支撑裂缝导流能力的数值计算方法
|
US11377586B2
(en)
|
2018-07-31 |
2022-07-05 |
Chevron U.S.A. Inc. |
Use of a borate-acid buffer in oil and gas operations
|
CN110305652A
(zh)
*
|
2018-09-13 |
2019-10-08 |
中海石油(中国)有限公司上海分公司 |
压裂用复合暂堵剂及其制备方法
|
RU2703572C1
(ru)
*
|
2019-01-23 |
2019-10-21 |
федеральное государственное автономное образовательное учреждение высшего образования "Северо-Кавказский федеральный университет" |
Способ гидроразрыва нефтяного или газового пласта
|
US10900339B2
(en)
*
|
2019-04-23 |
2021-01-26 |
Saudi Arabian Oil Company |
Forming mineral in fractures in a geological formation
|
US10753190B1
(en)
*
|
2019-04-29 |
2020-08-25 |
Saudi Arabian Oil Company |
Forming mineral in fractures in a geological formation
|
RU2719874C1
(ru)
*
|
2019-05-24 |
2020-04-23 |
федеральное государственное автономное образовательное учреждение высшего образования "Северо-Кавказский федеральный университет" |
Способ получения гранул проппанта
|
US11319478B2
(en)
|
2019-07-24 |
2022-05-03 |
Saudi Arabian Oil Company |
Oxidizing gasses for carbon dioxide-based fracturing fluids
|
US11492541B2
(en)
|
2019-07-24 |
2022-11-08 |
Saudi Arabian Oil Company |
Organic salts of oxidizing anions as energetic materials
|
CA3153304A1
(en)
|
2019-09-05 |
2021-03-11 |
Saudi Arabian Oil Company |
Propping open hydraulic fractures
|
RU2737455C1
(ru)
*
|
2019-10-03 |
2020-11-30 |
Публичное акционерное общество "Нефтяная компания "Роснефть" (ПАО "НК "Роснефть") |
Способ гидроразрыва пласта в условиях высокорасчлененного высокопроводимого коллектора с низким контрастом напряжений перемычек
|
CA3158943A1
(en)
|
2019-10-31 |
2021-05-06 |
Chevron U.S.A. Inc. |
Olefin sulfonates
|
CA3158945A1
(en)
|
2019-10-31 |
2021-05-06 |
Chevron U.S.A. Inc. |
Olefin sulfonates
|
EP4051755B1
(en)
|
2019-10-31 |
2024-03-13 |
Chevron Oronite Company LLC |
Olefin sulfonates
|
WO2021138355A1
(en)
|
2019-12-31 |
2021-07-08 |
Saudi Arabian Oil Company |
Viscoelastic-surfactant fracturing fluids having oxidizer
|
US11352548B2
(en)
|
2019-12-31 |
2022-06-07 |
Saudi Arabian Oil Company |
Viscoelastic-surfactant treatment fluids having oxidizer
|
CN111196920B
(zh)
*
|
2020-01-20 |
2021-04-27 |
中国石油大学(北京) |
一种燃爆暂堵支撑剂及其制备方法
|
US11578263B2
(en)
|
2020-05-12 |
2023-02-14 |
Saudi Arabian Oil Company |
Ceramic-coated proppant
|
CN111876143B
(zh)
*
|
2020-07-20 |
2021-08-20 |
中国石油大学(北京) |
一种支撑剂及其应用
|
US11643924B2
(en)
|
2020-08-20 |
2023-05-09 |
Saudi Arabian Oil Company |
Determining matrix permeability of subsurface formations
|
US11326092B2
(en)
|
2020-08-24 |
2022-05-10 |
Saudi Arabian Oil Company |
High temperature cross-linked fracturing fluids with reduced friction
|
US11401458B2
(en)
|
2020-08-31 |
2022-08-02 |
Saudi Arabian Oil Company |
Friction reducer compositions
|
US11542815B2
(en)
|
2020-11-30 |
2023-01-03 |
Saudi Arabian Oil Company |
Determining effect of oxidative hydraulic fracturing
|
US11584889B2
(en)
|
2021-01-04 |
2023-02-21 |
Saudi Arabian Oil Company |
Synthetic source rock with tea
|
US11867028B2
(en)
|
2021-01-06 |
2024-01-09 |
Saudi Arabian Oil Company |
Gauge cutter and sampler apparatus
|
US11585176B2
(en)
|
2021-03-23 |
2023-02-21 |
Saudi Arabian Oil Company |
Sealing cracked cement in a wellbore casing
|
CN115199249A
(zh)
*
|
2021-04-13 |
2022-10-18 |
中石化石油工程技术服务有限公司 |
一种页岩油压裂形成复杂缝网的方法
|
US11525935B1
(en)
|
2021-08-31 |
2022-12-13 |
Saudi Arabian Oil Company |
Determining hydrogen sulfide (H2S) concentration and distribution in carbonate reservoirs using geomechanical properties
|
US12071589B2
(en)
|
2021-10-07 |
2024-08-27 |
Saudi Arabian Oil Company |
Water-soluble graphene oxide nanosheet assisted high temperature fracturing fluid
|
US11680887B1
(en)
|
2021-12-01 |
2023-06-20 |
Saudi Arabian Oil Company |
Determining rock properties
|
US12025589B2
(en)
|
2021-12-06 |
2024-07-02 |
Saudi Arabian Oil Company |
Indentation method to measure multiple rock properties
|
US11867012B2
(en)
|
2021-12-06 |
2024-01-09 |
Saudi Arabian Oil Company |
Gauge cutter and sampler apparatus
|
US11649398B1
(en)
|
2021-12-09 |
2023-05-16 |
Saudi Arabian Oil Company |
Composition and method of using date palm fibers in hydraulic fracturing
|
US12012550B2
(en)
|
2021-12-13 |
2024-06-18 |
Saudi Arabian Oil Company |
Attenuated acid formulations for acid stimulation
|
US11885790B2
(en)
|
2021-12-13 |
2024-01-30 |
Saudi Arabian Oil Company |
Source productivity assay integrating pyrolysis data and X-ray diffraction data
|
US11921250B2
(en)
|
2022-03-09 |
2024-03-05 |
Saudi Arabian Oil Company |
Geo-mechanical based determination of sweet spot intervals for hydraulic fracturing stimulation
|
US11905804B2
(en)
|
2022-06-01 |
2024-02-20 |
Saudi Arabian Oil Company |
Stimulating hydrocarbon reservoirs
|