EA201800603A2 - INSTALLATION FOR THE MANUFACTURE OF VOLUME BLOCKS - Google Patents

INSTALLATION FOR THE MANUFACTURE OF VOLUME BLOCKS

Info

Publication number
EA201800603A2
EA201800603A2 EA201800603A EA201800603A EA201800603A2 EA 201800603 A2 EA201800603 A2 EA 201800603A2 EA 201800603 A EA201800603 A EA 201800603A EA 201800603 A EA201800603 A EA 201800603A EA 201800603 A2 EA201800603 A2 EA 201800603A2
Authority
EA
Eurasian Patent Office
Prior art keywords
shield
hydraulic jacks
core
longitudinal
locking system
Prior art date
Application number
EA201800603A
Other languages
Russian (ru)
Other versions
EA201800603A3 (en
EA037395B1 (en
Inventor
Александр Иванович ЦЫБАНЬ
Original Assignee
Общество с ограниченной ответственностью "Выбор ОБД"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью "Выбор ОБД" filed Critical Общество с ограниченной ответственностью "Выбор ОБД"
Publication of EA201800603A2 publication Critical patent/EA201800603A2/en
Publication of EA201800603A3 publication Critical patent/EA201800603A3/en
Publication of EA037395B1 publication Critical patent/EA037395B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/02Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • Automatic Assembly (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Glass To Other Materials (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

Устройство относится к производству железобетонных изделий, в частности монолитных объемных блоков типа стакан. Направлено на повышение производительности установки, это достигается за счет того, что устройство состоит из следующих элементов: рама (1), сердечник (2), пара продольных щитов (3), торцевой щит (4), балконный щит (5), замочная система (6), гидравлические домкраты подъема-опускания сердечника (7), гидравлические домкраты щитов (8), каретки (9), вибраторы (10), гидравлические домкраты замочной системы (11), юбка (основание изделия) (12), рельсовый путь (13). Рама (1) имеет ровную площадку, на которой через гидравлические домкраты (7) закреплен сердечник (2). На этой же раме (1) болтовыми соединениями закреплена юбка (12), которая является основанием будущей блок-комнаты. Щит балкона (5), щит торцевой (4) и два щита продольных (3) оснащены вибраторами (10), а также имеют паровые рубахи, находящиеся внутри полости каждого щита (3, 4, 5) и сердечника (2), которые обеспечивают прогрев и набор прочности изделия до 75% за 6 ч. При помощи гидравлических домкратов (8) по рельсовому пути (13) щит балкона (5), щит торцевой (4) и два щита продольных (3) отодвигаются от сердечника (2). Пара продольных щитов (3) оснащена замочной системой (6), которая работает при помощи гидравлических домкратов (11). Замочная система (6) обеспечивает фиксации скрепления торцевого щита (4) с продольными щитами (3).The device relates to the production of reinforced concrete products, in particular monolithic volumetric blocks such as glass. It is aimed at improving the performance of the installation, this is achieved due to the fact that the device consists of the following elements: frame (1), core (2), a pair of longitudinal shields (3), end shield (4), balcony shield (5), locking system (6), hydraulic jacks for lifting and lowering the core (7), hydraulic jacks for shields (8), carriages (9), vibrators (10), hydraulic jacks for locking system (11), skirt (base of the product) (12), rail track (13). The frame (1) has a flat platform on which a core (2) is fixed through hydraulic jacks (7). On the same frame (1), the skirt (12) is fixed by bolted joints, which is the basis of the future block-room. The balcony shield (5), the face shield (4) and two longitudinal boards (3) are equipped with vibrators (10), and also have steam shirts inside the cavity of each shield (3, 4, 5) and core (2), which provide heating and strength of the product up to 75% in 6 hours. Using hydraulic jacks (8) along the track (13) the balcony shield (5), the face shield (4) and two longitudinal boards (3) move away from the core (2). A pair of longitudinal shields (3) is equipped with a locking system (6), which operates with the help of hydraulic jacks (11). The locking system (6) fixes the fastening of the end shield (4) with the longitudinal shields (3).

EA201800603A 2017-12-25 2018-12-11 Installation for making box units EA037395B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2017145706 2017-12-25

Publications (3)

Publication Number Publication Date
EA201800603A2 true EA201800603A2 (en) 2019-06-28
EA201800603A3 EA201800603A3 (en) 2019-07-31
EA037395B1 EA037395B1 (en) 2021-03-24

Family

ID=66998673

Family Applications (1)

Application Number Title Priority Date Filing Date
EA201800603A EA037395B1 (en) 2017-12-25 2018-12-11 Installation for making box units

Country Status (7)

Country Link
EA (1) EA037395B1 (en)
MA (1) MA47892B1 (en)
MD (1) MD4839B1 (en)
PL (1) PL245282B1 (en)
SA (1) SA521420987B1 (en)
SE (1) SE545726C2 (en)
WO (1) WO2019132722A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112589957B (en) * 2020-12-10 2022-05-06 滁州市悦鹏设备有限公司 Concrete prefabricated balcony production mould

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2026778C1 (en) * 1991-10-11 1995-01-20 Борис Константинович Минкин Moulding post for manufacturing spatial blocks
AU658179B2 (en) * 1992-05-08 1995-04-06 Quickcell Technology Pty Ltd Method of manufacturing precast concrete units
RU2106962C1 (en) * 1993-04-14 1998-03-20 Артем Саркисович Зурабян Three-dimensional block forming unit
US5524861A (en) * 1994-04-22 1996-06-11 Modal Systems, Inc. Reusable mold for constructing housing units and method of use thereof
UA6500A (en) * 1994-05-31 1994-12-29 Акціонерне Товариство "Ясна Поляна - 2" Casing
US5643488A (en) * 1994-12-16 1997-07-01 Daewoo Hawaii Corporation Multi-room modular construction system
FR2746128B1 (en) * 1996-03-15 1998-04-30 FORMWORK FOR THE CONSTRUCTION OF PREFABRICATED SECTIONS OF BUILDINGS, AND BUILDINGS BUILT BY MEANS OF SUCH SECTIONS
KR100463032B1 (en) * 2002-08-30 2004-12-23 주식회사 토암건설 Movable Steel Form for Constructing Culvert and Continuous Constructing Method of Culvert Using the Same
RU2330148C2 (en) * 2006-07-24 2008-07-27 Закрытое акционерное общество "Трансформер" Device and method of producing of monolithic reinforced concrete modules
RU2540371C2 (en) * 2012-07-17 2015-02-10 Сергей Михайлович Васильев Fabrication of 3d blocks
CN106088577A (en) * 2016-08-17 2016-11-09 南阳市互联易家实业有限公司 Energy-conserving and environment-protective armored concrete one house makes mould

Also Published As

Publication number Publication date
MA47892B1 (en) 2021-07-29
WO2019132722A1 (en) 2019-07-04
PL433560A1 (en) 2021-06-28
SA521420987B1 (en) 2023-03-01
MD20200060A2 (en) 2020-12-31
PL245282B1 (en) 2024-06-17
SE2050482A1 (en) 2020-04-28
SE545726C2 (en) 2023-12-19
EA201800603A3 (en) 2019-07-31
EA037395B1 (en) 2021-03-24
MA47892A1 (en) 2020-12-31
MD4839B1 (en) 2022-12-31

Similar Documents

Publication Publication Date Title
MX2018013093A (en) Climbing shoe for fixing a climbing scaffold to a concrete section of a building under construction.
PH12015500267A1 (en) A wall assembly and a building structure including the wall assembly
MY192685A (en) Building frame structure having edge beam and construction method thereof
CN103603678B (en) Desert secret tunnel one-time-concreting formula steel form carrier and casting method
PH12015500136A1 (en) A cable pipe rack
EA201600669A1 (en) METHOD OF UPDATING THE RAILWAY
EA201800603A2 (en) INSTALLATION FOR THE MANUFACTURE OF VOLUME BLOCKS
EA201992086A1 (en) DRAINAGE BLOCK AND INTERMEDIATE PANEL
CN205062678U (en) Be applied to construction of case roof beam of wave form steel web structure and hang basket
PH12018501358A1 (en) Supporting framework
MY193440A (en) Prefabricated construction mold panel
RU178918U1 (en) Installation for manufacturing volumetric blocks
RU2012130361A (en) METHOD FOR PRODUCING A VOLUME BLOCK
CN105587132A (en) Building guardrail for civil engineering
CN203626850U (en) One-time casting type steel mould trolley for covered way in desert
RU2012143743A (en) METAL TRIANGULAR FARM
RU2016116932A (en) ROPE SPAN WITH FOLDING SHIELDS OF INTERLOCK INTERIOR INTERIOR BOARD
CN104481163A (en) L beam construction device and method for building structure reinforcement
PL418828A1 (en) Double-joint prefabricated structural pole
CN204040301U (en) The building block of a kind of loop beam forms
CN204298734U (en) A kind of bridge apparatus for examination and repair
CN203462737U (en) Telescopic safe construction hanging basket for housing building
CN203768916U (en) Displacement adjusting device for steel mould trolley
MD1107Y (en) Mobile telescopic bridge
RU2015145382A (en) ANTI-BARRIER BARRIER