DK1552997T3 - Driftsledelsessystem til skinnebundet transportmiddel med skiftning af togstyresystemets art - Google Patents

Driftsledelsessystem til skinnebundet transportmiddel med skiftning af togstyresystemets art

Info

Publication number
DK1552997T3
DK1552997T3 DK04090482T DK04090482T DK1552997T3 DK 1552997 T3 DK1552997 T3 DK 1552997T3 DK 04090482 T DK04090482 T DK 04090482T DK 04090482 T DK04090482 T DK 04090482T DK 1552997 T3 DK1552997 T3 DK 1552997T3
Authority
DK
Denmark
Prior art keywords
rail
management
nature
transport
balise
Prior art date
Application number
DK04090482T
Other languages
Danish (da)
English (en)
Inventor
Sven Adomeit
Original Assignee
Siemens Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Ag filed Critical Siemens Ag
Application granted granted Critical
Publication of DK1552997T3 publication Critical patent/DK1552997T3/da

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L3/00Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal
    • B61L3/02Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control
    • B61L3/08Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control controlling electrically
    • B61L3/12Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control controlling electrically using magnetic or electrostatic induction; using radio waves
    • B61L3/121Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control controlling electrically using magnetic or electrostatic induction; using radio waves using magnetic induction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/30Trackside multiple control systems, e.g. switch-over between different systems
    • B61L27/33Backup systems, e.g. switching when failures occur
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/30Trackside multiple control systems, e.g. switch-over between different systems
    • B61L27/37Migration, e.g. parallel installations running simultaneously
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L3/00Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal
    • B61L3/16Continuous control along the route
    • B61L3/22Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation
    • B61L3/227Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation using electromagnetic radiation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
    • B61L2027/202Trackside control of safe travel of vehicle or train, e.g. braking curve calculation using European Train Control System [ETCS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Control Of Position, Course, Altitude, Or Attitude Of Moving Bodies (AREA)
DK04090482T 2004-01-07 2004-12-09 Driftsledelsessystem til skinnebundet transportmiddel med skiftning af togstyresystemets art DK1552997T3 (da)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102004001818A DE102004001818B3 (de) 2004-01-07 2004-01-07 Betriebsführungssystem für schienengebundene Verkehrsmittel

Publications (1)

Publication Number Publication Date
DK1552997T3 true DK1552997T3 (da) 2008-08-11

Family

ID=34585406

Family Applications (1)

Application Number Title Priority Date Filing Date
DK04090482T DK1552997T3 (da) 2004-01-07 2004-12-09 Driftsledelsessystem til skinnebundet transportmiddel med skiftning af togstyresystemets art

Country Status (6)

Country Link
EP (1) EP1552997B1 (de)
AT (1) ATE391654T1 (de)
DE (2) DE102004001818B3 (de)
DK (1) DK1552997T3 (de)
ES (1) ES2301933T3 (de)
PT (1) PT1552997E (de)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1783274B1 (de) * 2005-08-30 2011-01-05 Siemens Schweiz AG Abschirmblech für Zugbeeinflussungskomponenten im Gleisbereich
ATE377541T1 (de) * 2005-08-31 2007-11-15 Siemens Schweiz Ag Balisen-anschaltung für die auswahl eines etcs- telegramms an ein relaisstellwerk
DK2114746T3 (da) 2007-02-07 2010-10-11 Siemens Transportation Systems System til kontrol af anti-kollision til et køretøj
CN101293527B (zh) * 2007-10-29 2010-09-08 北京佳讯飞鸿电气股份有限公司 防止应答器监测系统对应答器造成干扰的方法及装置
CN101174921B (zh) * 2007-10-29 2011-04-20 北京佳讯飞鸿电气股份有限公司 列车控制系统动态报文编码方法
CN101934807B (zh) * 2010-08-24 2011-09-28 北京交大资产经营有限公司 基于列车控制系统的移动授权计算方法
US8843419B2 (en) * 2010-10-12 2014-09-23 General Electric Company Method and system for rail vehicle reconfiguration
DE102012217817A1 (de) * 2012-09-28 2014-04-03 Siemens Aktiengesellschaft Steuerung eines Schienenfahrzeugs
DE102013226728A1 (de) * 2013-12-19 2015-06-25 Siemens Aktiengesellschaft Steuerung eines Schienenfahrzeugs
CN103746972A (zh) * 2013-12-26 2014-04-23 北京交控科技有限公司 一种数据传输方法及应答设备
US9731732B2 (en) 2014-03-09 2017-08-15 General Electric Company Systems and methods for vehicle control
NO2777285T3 (de) * 2014-04-04 2018-01-13
CN105354217A (zh) * 2015-09-28 2016-02-24 国电南瑞科技股份有限公司 一种轨道交通指挥系统事件推理模块实现方法
CN106184289B (zh) * 2016-07-01 2018-03-23 北京全路通信信号研究设计院集团有限公司 一种基于多个rbc实现的列车ma移交方法和装置
HUE054817T2 (hu) 2017-08-08 2021-10-28 Siemens Mobility GmbH Rendszer és eljárás egy jármû régiók közötti üzemeltetéséhez
CN111976790B (zh) * 2019-05-24 2022-04-15 比亚迪股份有限公司 应答器仿真的方法及系统
EP3925851A1 (de) * 2020-06-19 2021-12-22 Siemens Mobility AG System und verfahren zur durchführung einer einfahrkontrolle für ein schienenfahrzeug
CN112960018A (zh) * 2021-04-06 2021-06-15 卡斯柯信号有限公司 一种城市轨道交通融合信号系统及使用方法
DE102021117366A1 (de) 2021-07-06 2023-01-12 Thales Management & Services Deutschland Gmbh Verfahren zum Betreiben eines Zugbeeinflussungssystems

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2704143C2 (de) * 1977-02-02 1984-05-17 Standard Elektrik Lorenz Ag, 7000 Stuttgart Einrichtung zur Steuerung und Sicherung von trassengebundenen Fahrzeugen

Also Published As

Publication number Publication date
ATE391654T1 (de) 2008-04-15
PT1552997E (pt) 2008-05-15
ES2301933T3 (es) 2008-07-01
EP1552997A3 (de) 2006-08-23
EP1552997A2 (de) 2005-07-13
DE102004001818B3 (de) 2005-08-25
EP1552997B1 (de) 2008-04-09
DE502004006765D1 (de) 2008-05-21

Similar Documents

Publication Publication Date Title
DK1552997T3 (da) Driftsledelsessystem til skinnebundet transportmiddel med skiftning af togstyresystemets art
DK1897781T3 (da) Anlæg til styring og kontrol af tog
BRPI0907312A2 (pt) sistema de controle de trem, método para controlar pelo menos um trem percorrendo uma linha ferroviária em uma rede de ferrovias e sistema de controle de trem.
EA201290198A1 (ru) Способ и система независимого управления транспортным средством
DK1769996T3 (da) Styre- og beskyttelsessytsem til jernbaner
BR112013016308A2 (pt) método para produzir uma via férrea com laje
NO20080095L (no) Fast kjorebane for skinnekjoretoy
ATE496813T1 (de) Verfahren und anordnung zum betreiben einer eisenbahnstrecke
DE60224688D1 (de) Gleiskonstruktion für den schnelltransit auf der schiene
NO20034973D0 (no) Fremgangsmåte for innbygging av sporveksler i jernbanespor samt en sporveksel for gjennomföring av denne fremgangsmåten
LT2011060A (en) System for the controlled transmission of train numbers for the support of railway traffic control and the manner in which this system operates
DE502007003081D1 (de) Einrichtung zur anschaltung und überwachung einer lichtsignalanlage im eisenbahnverkehr
NO20083430L (no) Fremgangsmate og innretning for togsekvenssikring
CN107858879A (zh) 一种平移型小线间距单渡线单轨道岔
ATE375314T1 (de) Sortier- und verteilsystem sowie ein verfahren zur energie- und datenübertragung
CL2008003051A1 (es) Recubrimiento de via ferrea que comprende elementos de recubrimiento en forma de placas dispuestos entre los carriles de la via ferrea, a nivel del carril y de preferencia, elementos de recubrimiento que comprende cuerpos de soporte en sus bordes orientados hacia los carriles y a traves de dichos cuperos de soporte los elementos de recubrimiento descansan.
ATE363562T1 (de) Lagerung der betonfertigteilplatten des fahrweges einer magnetschwebebahn
ATE380733T1 (de) Verschlusssystem für weichen
Montigel Operations control system in the lotschberg base tunnel
RU2391242C1 (ru) Способ создания транспортных коридоров на однопутной железной дороге с двухпутными вставками
UA129905U (uk) Спосіб автоматичного управління рухом на станції
ITTO20020302A1 (it) Sistema adatto a realizzare pista carrabile su binario ferroviario.
GB202211375D0 (en) Rail network management system, and train for operation on a rail network
DE502006005152D1 (de) Austauschbare Befestigung der Fahrwegplatten einer Magnetschwebebahn auf einem Fahrwegträger
Kim et al. A Field test of an Integrated Electronic Block System for verification of the suitability