DER0001522MA - Chamber ropes construction - Google Patents
Chamber ropes constructionInfo
- Publication number
- DER0001522MA DER0001522MA DER0001522MA DE R0001522M A DER0001522M A DE R0001522MA DE R0001522M A DER0001522M A DE R0001522MA
- Authority
- DE
- Germany
- Prior art keywords
- chamber
- mining
- construction
- arches
- kammerstrossenbau
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000010276 construction Methods 0.000 title description 6
- 238000005065 mining Methods 0.000 claims description 23
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 12
- 229910052742 iron Inorganic materials 0.000 claims description 6
- 238000000605 extraction Methods 0.000 description 12
- 239000003245 coal Substances 0.000 description 8
- 239000003077 lignite Substances 0.000 description 5
- 239000011435 rock Substances 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 3
- 230000015556 catabolic process Effects 0.000 description 3
- 229910052500 inorganic mineral Inorganic materials 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000011707 mineral Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- WURBVZBTWMNKQT-UHFFFAOYSA-N 1-(4-chlorophenoxy)-3,3-dimethyl-1-(1,2,4-triazol-1-yl)butan-2-one Chemical compound C1=NC=NN1C(C(=O)C(C)(C)C)OC1=CC=C(Cl)C=C1 WURBVZBTWMNKQT-UHFFFAOYSA-N 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 235000013601 eggs Nutrition 0.000 description 1
- 230000002028 premature Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Description
Willy Röhler, Bergwerksdirektor
GroßalmerodeWilly Röhler, mine director
Großalmerode
Beschreibung der Patentanmeldung mit der Bezeichnung " Kammerstfossenbau ".Description of the patent application with the designation "Kammerstfossenbau".
Der Kammerstrossenbau hat den Zweck, die im unterirdischen Bergbau beim Abbau mächtiger Flöze, insbesondere im Braun= kohlentiefbau auftretenden erheblichen Abbauverluste zu ver= ringern, den Grubenholzverbrauch zu mindern und die Yoraus= Setzungen zu schaffen für den Einsatz leistungssteigernder maschinellen Gewinnung, bei gleichzeitiger Schonung der menschlichen Arbeitskraft.The purpose of the chamber line construction is that of underground mining when mining thick seams, especially in the brown = to reduce the considerable mining losses that occur in deep coal mining, to reduce the consumption of pit wood and to reduce the To create subsidence for the use of performance-enhancing mechanical extraction, while at the same time protecting the human labor.
Beim Abbau mächtiger Flöze ist der Pfeilerbruchbau, mit we= nigen Aby/eichungen, die allgemein übliche Abbauweise, die eine Reihe erheblicher Kachteile aufweist. So beträgt im Braunkohlentiefbau der Abbauverlust durch die Notwendigkeit, genügend starke Sicherheitspfeiler gegen den alten Abbau und das Hangende stehen zu lassen, 4o bis 5o$. In den kleinen Abbauräumen der Brüche von etwa 25 bis 35 qm Grundfläche wird die Arbeit durch den erforderlichen Stempelausbau sehr behin= dert. Es ist bisher noch nicht gelungen, dort die maschinelle Kohlengewinnung wirtschaftlich einzuführen. So erfolgt daher heute noch, wie vor hundert Jahren, im Braunkohlentiefbau überwiegend die Gewinnung der Kohle durch die schwere und teuere menschliche Keilhauenarbeit, mit ihrer begrenzten Leistungsmöglichkeit. Der Holzverbrauch ist bei diesem Abbau= verfahren beträchtlich infolge des starken Gebirgsdruckes, des oft vorzeitigen Zubruchegehens der Abbauräume und der IJot= wendigkeit, ein ausgedehntes Streckensystem aufzufahren und zu unterhalten. Er belastet in entscheidender V/eise, zusammen mit dem hohen Lohnaufkommen, die Gestehungskosten. So kämpft der Braunlcohlentiefbau fast überall, mit wenigen Zechenausnali= men, um sein wirtschaftliches Lasein. Der Aufschluß mächtiger und reicher, aber tief liegender Kohlenflöze, die nicht im Tagebau gewonnen werden können, findet nicht zuletzt große Bedenken, weil Abbauverfahren fehlen, mit denen sich wirt= schaftlich große Mengen Kohlen maschinell gewinnen lassen. Diese Mängel zu einem erheblichen Teil zu beheben, ist der Zweck des zum Patent angemeldeten "Kammerstrossenbaues".When digging thick seams, piling, with few checks, is the most common method of mining has a number of significant Kachteile. In deep lignite mining, for example, the mining loss is due to the need to To leave enough strong safety pillars against the old breakdown and the hanging wall, $ 40 to $ 50. In the small ones Clearing the quarries from around 25 to 35 square meters, the work becomes very difficult due to the necessary punch expansion changes. It has not yet been possible to economically introduce mechanical coal production there. So it is done today, as it was a hundred years ago, in civil lignite mining predominantly the extraction of coal through the heavy and expensive human chopping work, with its limited potential. The wood consumption in this dismantling is = move considerably as a result of the strong rock pressure, the often premature collapse of the mining areas and the IJot = agility to drive and maintain an extensive route system. He burdened in a decisive way, together with the high wages, the prime costs. So the Braunlcohlentiefbau is fighting almost everywhere, with a few collieries men to be economical. The exposure of mighty and rich, but deep-lying coal seams that are not in the Last but not least, there is great concern because there are no mining methods that can be used for open-cast mining Obtain economically large amounts of coal mechanically. To remedy a significant part of these deficiencies is what Purpose of the patent pending "Kammerstrossenbau".
In Jio^pc^^^^nist das Abbauverfahren, um die Erläuterungen zu erleichtern, zeichnerisch dargestellt.In Jio ^ pc ^^^^ n i st the dismantling process is shown graphically in order to facilitate the explanations.
Ausgehend von unter dem Hangenden des Flözes aufgefahrenen Hängen:· strecken (1) wird rechtwinklig dazu eine breite lang= gestreckte Kammer (2) mit Eisenausbau und Vollverzug durch Rundhölzer aufgefahren. An den Enden der Kammer angelegte, mit Fahr- und Fördertrum versehene Roilöcher (3) münden in Förder= strecken (4)· Diese stehen am liegenden des Flözes oder in einer gewählten, möglichst hohen Bauscheibe und laufen paral= Iel zu den oberen Hangendstrecken (1).Starting from slopes driven under the hanging wall of the seam: · stretch (1) becomes a wide long = at right angles to it elongated chamber (2) with iron construction and full warping through round timbers. At the ends of the chamber, with Roil holes (3) provided with driving and conveying strands lead into conveying stretches (4) · These are on the lying of the seam or in a chosen building slab that is as high as possible and run parallel to the upper slope sections (1).
Der Ausbau der Abbaukammer Anlage 2 erfolgt mit geteilten eisernen Bögen (5) aus Breitflanschträgern, die durch Keil=
Schlösser (6) starr zusammengehalten werden. Wo sie auf der Sohle stehen, sind eie angespitzt (7). In regelmäßigen Ab=
ständen gestellt sind sie in der Kammerlängsrichtung oben durch eiserne Haken (8) und unten durch Träger (9) mitein=
ander gelenkartig Verbunden9 Zwischen die Breitflanschträger werden Rundhölzer (1o) als Verzug eingelegt und durch die
Flanschen sowie die unteren Längsträger (9) festgehalten. Die Stirnseiten der Abbaukamiaer sind durch eiserne Platten verzo=
gen, &3äöeS9ack( 11) ^ (vgl. Abb; 3.-3).
Der Abbau geht in folgender Weise vor sichs In der vom Ausbau freien Sohle (A) der Abbaukammer wird die
Kohle oder das sonst anstehende Mineral(B) schichtweise herein= gewonnen und durch ein geeignetes Fördermittel den Roilöchern
(3) und der unteren Förderstrecke (4) zugeführt. Mit der schichtweisen Gewinnung wird auch der auf der Sohle der Abbau=
kammer stehende Ausbau freigelegt und sinkt, mit ihm die über dem Ausbau anstehenden und ihrer Unterstützung entzogenen
hangenden Gebirgsschichten(O). Der dabei auftretende Gebirgs= druck bewirkt ein selbsttätiges Einpressen des Ausbaues in die
Ränder der Sohle (D), das durch die angespitzten Stahlbögen (7) erleichtert wird. So sinkt mit fortschreitender Gewinnung der
Ausbau tiefer, bis er schließlich die Sohle der unteren For= derstrecke (E) erreicht hat. Mit Einstellung der Gewinnung
verlangsamt sich das^inken des Ausbaues, um schließlich zu enden, wenn die unteren längSg6jf9) zwischen den
Bögen des Ausbaues auf der Sohle sitzen. Der starke Ausbau nimmt den Gebirgsdruck auf. Iunmehr wird der Ausbau geraubt.
Dies geschieht mit einer Raubwinde. Die Schlösser (6) der drei= geteilten Ausbaubögen werden hierbei gelöst, sodaß die Ge=
winimng der Bögen erleichtert und die Arbeit beschleunigt wird.The extraction chamber Annex 2 is expanded with split iron arches (5) made of wide flange girders, which are rigidly held together by wedge = locks (6). Where they stand on the sole, they are pointed (7). Provided at regular intervals = stalls they are inserted into the chamber longitudinally above by iron hooks (8) and below by support (9) mitein = other articulated Connected 9 are between the wide flange beams logs (1o) as a default and through the flanges and the lower longitudinal carrier (9) recorded. The front sides of the Abbaukamiaer are warped by iron plates, & 3äöeS9ack ( 11) ^ (see Fig; 3.-3).
The mining takes place in the following way: In the floor (A) of the mining chamber that is free from expansion, the coal or the otherwise pending mineral (B) is extracted in layers and through a suitable conveying means the roil holes (3) and the lower conveyor line (4 ) supplied. With the layer-by-layer extraction, the expansion standing on the bottom of the mining chamber is also exposed and sinks, with it the hanging rock layers pending above the expansion and deprived of their support (O). The resulting rock pressure causes the extension to be automatically pressed into the edges of the base (D), which is made easier by the pointed steel arches (7). As the extraction progresses, the expansion sinks deeper until it has finally reached the bottom of the lower haulage section (E). With the cessation of the extraction, the inking of the extension slows down to finally end when the lower ones along Sg6 jf9) sit on the floor between the arches of the extension. The strong expansion takes up the mountain pressure. The expansion is now being stolen. This is done with a predatory winch. The locks (6) of the three = divided extension arches are released so that the winching of the arches is made easier and work is accelerated.
•°er Ausbau findet Wiederverwendung in der nächsten Abbaukam= mer, die unter Stehenlassen^ eines schmalen Sicherheitspfeiler (F) neben der abgebauten Kammer angelegt wird(G).Jn dieser „ Weise wird Kammer neben Kammer abgebaut»• The expansion is reused in the next dismantling chamber, leaving behind a narrow safety pillar (F) is placed next to the dismantled chamber (G). In this "way, chamber is dismantled next to chamber"
Durch die langgestreckte Abbaukammer mit freier Sohlenfläche ist die Voraussetzung geschaffen zum Einsatz einer Gewinnungs= maschine. In den Anlagen sind Schrapperfö'rderungen eingezeich= net, die nach beiden Seiten arbeiten. Die Schrapperkästen(H) gewinnen die Kohle und fördern sie gleichzeitig nach den Rol= löchern (3), aus denen sie mit geeigneten Fördermitteln, in der Anlage 1 als Bandförderung (K) gezeichnet, weiter trans= portiert wird» Der Schrapperhaspel (J) steht in der unteren Förderstrecke und die Seile sind über Rollen durch die Rol= löcher in die Abbaukammer geführt« Durch einfaches Umhängen der Rollen ist es möglich, die Sohle in ganzer Breite zu be= arbeiten. Gleichzeitig gestattet die Eigenart der Schrapper= förderung die längere oder kürzere Gewinnung an jedem belie= bigen Punkt der Sohle, sodaß eine gleichmäßige Bearbeitung dieser im Interesse regelmäßigen Absinkens des Ausbaues er= zielt wird»The elongated excavation chamber with free floor area creates the conditions for the use of an extraction machine. Scraper conveyors that work on both sides are shown in the systems. The scraper boxes (H) extract the coal and at the same time convey it to the roller holes (3) from which it is transported further with suitable conveying means, shown in Appendix 1 as belt conveyor (K) »The scraper reel (J) stands in the lower conveyor line and the ropes are guided over rollers through the roller holes into the excavation chamber. «By simply hanging the rollers around, it is possible to work the entire width of the sole. At the same time, the peculiarity of the scraper conveyance allows longer or shorter extraction at any point on the floor, so that this is achieved evenly in the interest of regular lowering of the extension »
Um das gleichmäßige Absinken des Ausbaues zu erreichen und zu regeln, ist längs der Bogenfüße (7) und auf d^ru.verstehen= den Längsträgern (9) gleitend ein nach beiden Bdbe&äKHageaac ar= beitender Schrämpflug (12) angeordnet, der durch Seilzug be= tätigt Wirde Der Seilzug kann mittels des Schrapperseiles er= folgen, damit kann die Unterschrämung an jeder beliebigen Stelle des Ausbaues ,jv^genommen χκχέκχι und die Absenkung ge= regelt werden. In ii ist die Anordnung einer Abbaukammer in einem weniger mächtigen Flöz dargestellt. Eier erfolgt das Auffahren von nur einer Sohlenstrecke (4) aus mit einseitiger Gewinnung und Förderung. Diese Anlage gestattet die Gewinnung eines Teiles der Kohle mit hoher Gewinnungs= leistung.To achieve the uniform decrease in the Ausbaues and regulate is along the arc feet (7) and slidably beitender by two BDBe & äKHageaac ar = Schrämpflug (12) disposed on d ^ ru.verstehen = the longitudinal beams (9) extending through cable be = activated e The cable pull can be followed by means of the scraper rope, so that the undercutting can be taken at any point in the expansion, jv ^ χκχέκχι and the lowering can be regulated. In ii the arrangement of a mining chamber in a less thick seam is shown. Eggs are driven up from only one floor section (4) with one-sided extraction and conveyance. This system allows the extraction of part of the coal with a high extraction rate.
Vorteile des Kammerstrossenbaues gegenüber dem bisherigen Pfeilerbruchbau sind die langgestreckten druckgünstigen Abbau= räume. Damit ist auch der Abbau gebrächiger Gebirgsschichten in großen Abbauräumen möglich.Advantages of the building of the chamber ropes compared to the previous broken pillar construction are the elongated, low-pressure dismantling = rooms. This also enables the mining of fragile rock layers in large mining areas.
Durch die Eigenart der Strossengewinnung ist eine große aus= baufreie Abbaufläche geschaffen, die den Einsatz von Gewin= nungsmaschinen gestattet.Due to the peculiarity of mining a bench, a large excavation area is created that does not require any construction , which allows the use of mining machines.
Der Abbauverlust wird erheblich vermindert» Ein Beispiel soll dies erläutern. (siehe A»äa@e«&*uä&. Abb7)The degradation loss is considerably reduced »An example should explain this. (see A »äa @ e« & * uä &. Fig7)
ArigenoiiLTiens Kamaerlänge 1oo m, Kammerbreite 4 m. ArigenoiiLTiens Kamaerlänge 1oo m, chamber width 4 m.
Bauscheibenhöhe Io m, Siciierheitspfeiler nach demafÖ-ten i^lsenc und gegen das Hangende o,5 mBausch yew height Io m, o Siciierheitspfeiler according demafÖ i-th ^ lsenc and against the hanging wall, 5 m
Anstehendes LIineralsUpcoming linerals
1oo,5 c 1o,5 χ 4,5 = 4 748,6 cbm Gewinnbares Minerals 1oo, 5 c 1o, χ 5 = 4 4.5 748.6 cbm recoverable Minerals
1oo,o χ 1o,o χ 4»o = 4 ooo cbm 1oo, o χ 1o, o χ 4 »o = 4 ooo cbm
Abbauverlusts 748,6 cbm oder 15,8 $Breakdown loss 748.6 cbm or $ 15.8
An-On-
Im Braunkohlentiefbau beträgt der Abbauverlust bei 3§fee?wendung des Pfeilerbruchbaues 4o bis 5o$. Das ergibt in diesem Falle eine Ersparnis oder zusätzliche Mehrgewinnung von 24 bis 36$. Die Leistung wird gesteigert, auch dafür ein Beispiels Angenommen in einer Kammer von 1oo m Länge und 4 m Breite wird in einer 7 V2-stündigen Schichtjein Streifen von o,5 m Höhe gewonnen. Das ergibt eine Schichtleistung von 1oo χ 4 χ o,5 = 2oo cbm. Zur Bedienung sind auf ^eder Kammer= seite 3 Mann oder zusammen 6 Mann erforderlich. Das ergibt eine Gewinnungsleistung von 2oo s 6 = 33»3 cbm oder 33»3 t Braunkohle. Zum Vergleich diene, daß zur Zeit im Braunkohlen= tiefbau die Gewinnungsleistung nur 12 bis 16t beträgt. Unfallmäßig besteht eine größere Sicherheit, da die Abbau= kammer frei von Menschen ist und nur ein Beobachtungsmann über dem Rolloch steht, das ihm als Fluchtweg dient.In civil lignite mining, the mining loss for 3- fee use of the broken pier construction is $ 4o to $ 5o. In this case, that results in a saving or additional gain of $ 24 to $ 36. The performance is improved even for an example adopted in a chamber of 1oo m in length and 4 m in width is obtained in a 7 V2 -stündigen Schichtjein strip of o, 5 m height. This results in a layer of performance 1oo 4 χ χ o, 5 = 2oo cbm. To operate each chamber 3 men or a total of 6 men are required. This results in a production capacity of 2oo s 6 = 33 »3 cbm or 33» 3 t of lignite. For comparison, the fact that at the moment in lignite = civil engineering the extraction rate is only 12 to 16t. In the event of an accident, there is greater safety, as the dismantling chamber is free from people and only one observer stands over the blind hole, which serves as an escape route for him.
K^s sHi m e r s t r ο S-Ngti e η b a X"' zum AbbatNvon Mineralien und Ge"-&teinen, dadurch gekennzeichnet, daß in ein«K ^ s s Hi merstr ο S - Ng ti e η ba X "'zum AbbatNvon minerals and stones, characterized in that in a«
■'^Ab Ό auk amme r bei absinkendem Ausbau die Gewifiaaung in d«'r Sohle "e"rfolgt. ■ '^ Ab Ό auk amme r with sinking expansion the certification in the sole "e" takes place.
Aktenzeichen: R 1522 VIb/5c Y/illy Röhler, Bergwerksdirektor
G-rossalmerode.File number: R 1522 VIb / 5c Y / illy Röhler, mine director
G-rossalmerode.
Nachtrag zur Beschreibung der Patentanmeldung mit der Bezeichnung "Kammerstrossenbau".
£. Am Ende der 4ten Zeile auf Seite 3 ist einzufügen; ^"üi*" sind Gehäuse bekannt, dem Anmeldungsgegenstand ähnlich^Addendum to the description of the patent application with the designation "Kammerstrossenbau".
£. Insert at the end of the 4th line on page 3; ^ "üi *" are known housings, similar to the subject of the application ^
jedoch zur Abschirmung des Abbauraumes gegen den Alten Mannbut to shield the mining area from the old man
als Rückenschild mit Horizontalvorschub." y>as spine label with horizontal feed. " y >
Claims (2)
Family
ID=
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE112016005692B4 (en) | A method for designing support parameters of the transition support of the excavation joint in the fully mechanical mixed offset reduction | |
| DE112015000180T5 (en) | mining methods | |
| DE3110198C2 (en) | ||
| DE2307413C2 (en) | Device for the extraction of a floz-like deposit in longwall mining | |
| DE970540C (en) | Framework for progressive expansion in brown coal longwall mining | |
| DE3115293A1 (en) | METHOD FOR DEGRADING CARBONES | |
| AT511199B1 (en) | SHIELD TUNNELING DEVICE | |
| DER0001522MA (en) | Chamber ropes construction | |
| DE828082C (en) | Chamber line construction | |
| DE2161291A1 (en) | Movable ceiling support, especially for mining | |
| DE3605062A1 (en) | Sealing of landfill sites | |
| DE713960C (en) | Underground mining processes for large deposits | |
| DE678589C (en) | Procedure for dismantling camps | |
| DE2802943A1 (en) | RADIAL MINING PROCESS FOR THE EXTRACTION OF MINERALS | |
| DE3634195A1 (en) | METHOD AND EQUIPMENT FOR CARRYING OUT A ROPE ANCHOR | |
| DE386801C (en) | Dismantling process | |
| DE596715C (en) | Procedure for breaking piles | |
| DE1118120B (en) | Fully automatic face wall extension with support elements made of elastic, gas or liquid-filled, cushion-like rubber or plastic bodies | |
| DE3232906C2 (en) | ||
| DE3531183A1 (en) | Nocturnal landfill sealing | |
| EP0233979B1 (en) | Sealing of dumps | |
| DE3309381C1 (en) | Method and device for securing the wall of gate roads in mining by means of an accompanying dam of hydraulically setting dam construction material | |
| Daller et al. | New Semmering Base Tunnel–the current state of tunnel design taking the newest investigation results into account | |
| DE83677C (en) | ||
| DE2450819A1 (en) | Hydraulic mining of coal - using at least one upward entry at five degree slope |