DE828082C - Chamber line construction - Google Patents
Chamber line constructionInfo
- Publication number
- DE828082C DE828082C DER1522A DER0001522A DE828082C DE 828082 C DE828082 C DE 828082C DE R1522 A DER1522 A DE R1522A DE R0001522 A DER0001522 A DE R0001522A DE 828082 C DE828082 C DE 828082C
- Authority
- DE
- Germany
- Prior art keywords
- chamber
- mining
- extraction
- arches
- expansion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000010276 construction Methods 0.000 title claims description 7
- 238000005065 mining Methods 0.000 claims description 25
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 12
- 229910052742 iron Inorganic materials 0.000 claims description 6
- 238000000605 extraction Methods 0.000 description 18
- 238000009412 basement excavation Methods 0.000 description 7
- 239000003245 coal Substances 0.000 description 7
- 239000003077 lignite Substances 0.000 description 7
- 238000000034 method Methods 0.000 description 4
- 238000006731 degradation reaction Methods 0.000 description 3
- 229910052500 inorganic mineral Inorganic materials 0.000 description 3
- 239000011707 mineral Substances 0.000 description 3
- 230000015556 catabolic process Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- WURBVZBTWMNKQT-UHFFFAOYSA-N 1-(4-chlorophenoxy)-3,3-dimethyl-1-(1,2,4-triazol-1-yl)butan-2-one Chemical compound C1=NC=NN1C(C(=O)C(C)(C)C)OC1=CC=C(Cl)C=C1 WURBVZBTWMNKQT-UHFFFAOYSA-N 0.000 description 1
- 241000217446 Calystegia sepium Species 0.000 description 1
- 241000196324 Embryophyta Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000002028 premature Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D19/00—Provisional protective covers for working space
- E21D19/02—Provisional protective covers for working space for use in longwall working
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Description
Kammerstrossenbau [)er Kammerstro@ssenbau hat den zweck, die im unterirdischen Bergbau beim Abbau mächtiger Flöze, insbesondere im Braunkohlentiefbau auftretenden erheblichen Abbauverluste zu verringern, den Grubenholzverbrauch zu mindern und die Voraussetzungen zu schaffen für den Einsatz leistungssteigernder maschineller Gewinnung, bei gleichzeitiger Schonung der menschlichen Arbeitskraft.Kammerstrossenbau [) er Kammerstrossenbau has the purpose of working in the underground Mining in the extraction of thick seams, especially those occurring in lignite underground mining to reduce significant mining losses, to reduce the consumption of pit wood and to create the conditions for the use of performance-enhancing machines Extraction, while at the same time saving human labor.
Beim Abbau mächtiger Flöze ist der Pfeilerbruc'hbau, mit wenigen Abweichungen, die allgemein übliche Abbauweise, die eine Reihe erheblicher Nachteile aufweist. So beträgt im Braunkohlentiefbau der Abbauverlust durch die Notwendigkeit, genügend starke Sicherheitspfeiler gegen den alten Abbau und das Hangende stehenzulasgsen, 4o bis 50°/0. In den kleinen Abbauräumen der Brüche von etwa 25 bis 35 qm Grundfläche wird die Arbeit durch den erforderlichen Stempelausbau sehr behindert. Es ist bisher noch nicht gelungen, dort die maschinelle Kohlengewinnung wirtschaftlich einzuführen. So erfolgt daher heute noch, wie vor hundert Jahren, im Braunkohlentiefbau überwiegend die Gewinnung der Kohle durch die schwere und teuere menschliche Keilhauenarbeit, mit ihrer begrenzten Leistungsmöglichkeit. Der Holzverbrauch ist bei diesem Abbauverfahren beträchtlich, infolge des starken Gebirgsdruckes, des oft vorzeitigen Zubruchegehens der Abbauräume und der Notwendigkeit, ein ausgedehntes Streckensystem aufzufahren und zu unterhalten. Er belastet in entscheidender Weise, zusammen mit dem hohen Lohnaufkommen, die Gestehungskosten. So kämpft der Braunkohlentiefbau fast überall, mit wenigen Zechenausnahmen, um sein wirtschaftliches Dasein. Der Aufschluß mächtiger und reicher, aber tief liegender Kohlenflöze, die nicht im Tagebau gewonnen werden können, findet nicht zuletzt große Bedenken, weil Abbauverfahren fehlen, mit denen sich wirtschaftlich große Mengen Kohlen maschinell gewinnen lassen.When mining thick seams, pillar construction, with a few deviations, is the generally accepted method of mining, which has a number of significant disadvantages. In deep lignite mining, for example, the mining loss due to the need to leave sufficiently strong safety pillars against the old mining and the hanging wall is 40 to 50 per cent. In the small mining areas of the quarries of around 25 to 35 square meters, the work is very much hindered by the necessary punch expansion. So far it has not yet been possible to economically introduce mechanical coal extraction there. So today, as it was a hundred years ago, in civil lignite mining, coal is mainly extracted through heavy and expensive human wedge-cutting work, with its limited potential. The wood consumption in this mining process is considerable, due to the strong rock pressure, the often premature collapse of the mining areas and the need to drive and maintain an extensive system of roads. Together with the high wages, it has a decisive impact on the production costs. So almost everywhere, with a few exceptions in the mining industry, civil lignite mining is fighting for its economic existence. The opening up of mighty and rich, but deep-lying coal seams, which cannot be extracted in open-cast mining, is a matter of great concern, not least because there is a lack of mining processes with which large amounts of coal can be extracted economically by machine.
Diese Mängel zu einem erheblichen Teil zu beheben, ist der Zweck des zum Patent angemeldeten Kammerstrossenbaues. T In den Abb. i bis V ist das Abbauverfahren, um die Erläuterungen zu erleichtern, zeichnerisch dargestellt.The purpose of the patent pending chamber wall construction. T In Figs. I to V the degradation process is in order to facilitate the explanations, shown graphically.
Ausgehend von unter dem Hangenden des Flözes aufgefahrenen Hangendstrecken i wird rechtwinklig dazu eine breite langgestreckte Kammer 2 mit Eisenausbau und Vollverzug durch Rundhölzer aufgefahren. An den Enden der Kammer angelegte, mit Fahr- und Fördertrum versehene Rollöcher 3 münden in Förderstrecken 4. Diese stehen am Liegenden des Flözes oder in einer gewählten, möglichst hohen Bauscheibe und laufen parallel zu den oberen Hangendstrecken i.Starting from the hanging wall sections driven under the hanging wall of the seam i becomes at right angles to a wide elongated chamber 2 with iron construction and Full delay driven up by round timber. At the ends of the chamber, with Roll holes 3 provided with driving and conveying strands open into conveying paths 4. These are standing at the level of the seam or in a chosen building slab that is as high as possible and run parallel to the upper slopes of the slope i.
Der Ausbau der Abbaukammer erfolgt mit geteilten eisernen Bögen 5 aus Breitflanschträgern, die durch Keilschlösser 6 starr zusammengehalten werden. Wo sie auf der Sohle stehen, sind sie angespitzt, 7. In regelmäßigen Abständen gestellt, sind sie in der Kammerlängsrichtung oben durch eiserne Haken 8 und unten durch Träger 9 miteinander gelenkartig verbunden. Zwischen die Breitflanschträgerwerden Rundhölzer io als Verzug eingelegt und durch die Flansche sowie die unteren Längsträger 9 festgehalten. Die Stirnseiten der Abbaukammer sind durch eiserne Platten verzogen, i i (vgl. Abb. i bis 3).The excavation chamber is expanded with split iron arches 5 made of wide flange girders that are rigidly held together by wedge locks 6. Wherever they stand on the sole, they are sharpened, 7.Posed at regular intervals, they are in the longitudinal direction of the chamber at the top by iron hooks 8 and at the bottom by girders 9 connected to one another in an articulated manner. Round timbers are placed between the wide flange beams io inserted as a delay and held in place by the flanges and the lower longitudinal members 9. The front sides of the excavation chamber are warped by iron plates, i i (see Fig. i to 3).
Der Abbau geht in folgender Weise vor sich: In der vom Ausbau freien Sohle A der Abbaukammer wird die Kohle oder das sonst anstehende Mineral B schichtweise hereingewonnen und durch ein geeignetes Fördermittel den Rollöchern 3 und der unteren Förderstrecke 4 zugeführt. Mit der schichtweisen Gewinnung wird auch der auf der Sohle der Abbaukammer stehende Ausbau freigelegt und sinkt, mit ihm die über dem Aasbau anstehenden und ihrer Unterstützung entzogenen hangenden Gebirgsschichten C. Der dabei auftretende Gebirgsdruck bewirkt ein selbsttätiges Einpressen des Ausbaues in die Ränder der Sohle D, das durch die angespitzten Stahlbögen 7 erleichtert wird. So sinkt mit fortschreitender Gewinnung der Ausbau tiefer, bis er schließlich die Sohle der unteren Förderstrecke E erreicht hat. Mit Einstellung der Gewinnung verlangsamt sich das Absinken des Ausbaues, um schließlich zu enden, wenn die unteren Längsträger 9 zwischen den Bögen des Ausbaues auf der Sohle sitzen. Der starke Ausbau nimmt den Gebirgsdruck auf. Nunmehr wird der Ausbau geraubt. Dies geschieht mit einer Raubwinde. Die Schlösser 6 der dreiteiligen Ausbaubögen werden hierbei gelöst, so daß die Gewinnung der Bögen erleichtert und die Arbeit beschleunigt wird. Der Ausbau findet Wiederverwendung in der nächsten Abbaukammer, die unter Stehenlassen eines schmalen Sicherheitspfeilers F neben der abgebauten Kammer angelegt wird, G. In dieser Weise wird Kammer neben Kammer abgebaut. Es sind Gehäuse bekannt, dem Erfindungsgegenstand ähnlieh, jedoch zur Abschirmung des Abbauraumes gegen den Alten Mann als Rückenschild mit Horizontalvorschub.The dismantling takes place in the following way: In the one free of expansion Sole A of the mining chamber is the coal or the otherwise pending mineral B in layers won in and the roller holes 3 and the lower one by a suitable funding Conveyor line 4 supplied. With the layer-by-layer extraction, the The floor of the excavation chamber is exposed and sinks, with it the above Carcassing pending mountain layers that have been deprived of their support C. The resulting rock pressure causes the expansion to be pressed in automatically into the edges of the sole D, which is made easier by the pointed steel arches 7. So the expansion sinks deeper as the extraction progresses until it finally reaches the Has reached the bottom of the lower conveyor line E. With cessation of extraction slowed down the subsidence of the expansion, to finally end when the lower side members 9 sit on the sole between the arches of the extension. The strong expansion takes the mountain pressure. Now the expansion is stolen. This is done with a Bindweed. The locks 6 of the three-part expansion arches are solved here, see above that the extraction of the arches is facilitated and the work is accelerated. The expansion finds reuse in the next excavation chamber, which leaves one narrow safety pillar F next to the dismantled chamber, G. In In this way, chamber by chamber is dismantled. There are known housings, the subject of the invention similar, but to shield the mining area from the old man as a back shield with horizontal feed.
Durch die langgestreckte Abbaukammer mit freier Sohlenfläche ist die Voraussetzung geschaffen zum Einsatz einer Gewinnungsmaschine. In den Anlagen sind Schrapperförderungen eingezeichnet, die nach beiden Seiten arbeiten. Die Schrapperkästen H gewinnen die Kohle und fördern sie gleichzeitig nach den Rollöchern 3, aus denen sie mit geeigneten Fördermitteln, als Bandförderung K gezeichnet, weitertransportiert wird. Der Schrapperhaspel .1 steht in der unteren Förderstrecke, und die Seile sind über Rollen durch die Rollöcher in die Abbaukammer geführt. Durch einfaches Umhängen der Rollen ist es möglich, die Sohle in ganzer Breite zu bearbeiten. Gleichzeitig gestattet die Eigenart der Schrapperförderung die längere oder kürzere Gewinnung an jedem beliebigen Punkt der Sohle, so daß eine gleichmäßige Bearbeitung dieser im Interesse regelmäßigen Absinkens des Ausbaues erzielt wird.Due to the elongated excavation chamber with free sole surface, the Conditions created for the use of an extraction machine. In the attachments are Scraper conveyors are shown that work on both sides. The scraper boxes H win the coal and promote it at the same time after the roller holes 3, from which they are transported further with suitable conveyors, shown as belt conveyor K will. The scraper reel .1 is in the lower conveyor line and the ropes are guided on rollers through the roller holes into the excavation chamber. Simply put it on your neck Thanks to the rollers, it is possible to process the entire width of the sole. Simultaneously The peculiarity of the scraper conveyance allows longer or shorter extraction at any point on the sole, so that this can be processed evenly in the interest of regular lowering of the expansion is achieved.
Um das gleichmäßige Absinken des Ausbaues zu erreichen und zu regeln, ist längs der Bogenfüße 7 und auf den vorstehenden Längsträgern 9 gleitend ein nach beiden Seiten arbeitender bchrämpilug 12 angeordnet, der durch Seilzug betätigt wird. 1Jer 'Seilzug kann mittels des Schrapperseiles erfolgen, damit kann die Unterschrämung an jeder beliebigen Stelle des Ausbaues vorgenommen und die Absenkung geregelt werden. In Abb. 5 ist die Anordnung einer Abbaukammer in einem weniger mächtigen Flöz dargestellt. Hier erfolgt das Auffahren von nur einer Sohlenstrecke 4 aus mit einseitiger Gewinnung und Förderung. Diese Anlage gestattet die Gewinnung eines Teiles der Kohle mit noher Gewinnungsleistung.In order to achieve and regulate the even lowering of the expansion, is along the arch feet 7 and on the protruding longitudinal beams 9 a sliding arranged on both sides working bchrämpilug 12, which is operated by a cable will. 1Jer 'cable pull can be done by means of the scraper rope, so that the undercutting made at any point of the expansion and the lowering can be regulated. Fig. 5 shows the arrangement of a mining chamber in a less thick seam. Here the driving takes place from only one floor section 4 with unilateral extraction and promotion. This plant allows the extraction of a part of the coal with noher Extraction performance.
Vorteile des lianimerstrossenb,#ues gegenüber dem bisherigen Pfeilerbruchbau sind die ianggestreckten druckgünstigen Abbauräume. Damit ist auch der Abbau gebrachiger Gebirgsschichten in großen Abbauräumen möglich.Advantages of the lianimerstrossenb, # ues compared to the previous broken pier construction are the elongated, low-pressure extraction spaces. This means that mining is also more fragile Mountain layers possible in large mining areas.
Durch die Eigenart der Strossengewinnung ist eine große ausbaufreie Abbaufläche geschaffen, ui,# den Einsatz von Gewinnungsmaschinen gestattet.Due to the peculiarity of the bench extraction, there is a large amount of development-free Extraction area created, ui, # the use of extraction machines permitted.
Der Abbauverlust wird erheblich vermindert. Ein Beispiel soll dies erläutern (s. Abb..7). Angenommen: Kammerlänge ioo m, Kammerbreite 4 m, Bauscheibenhöhe io m, Sicherheitspfeiler nach dem Alten Mann und gegen das Hangende o,5 m.The degradation loss is considerably reduced. Let me give an example explain (see Fig. 7). Assuming: Chamber length 100 m, chamber width 4 m, building pane height io m, safety pillar after the old man and against the hanging wall o.5 m.
Anstehendes Mineral: 100,5 X 10,5 X 4,5 = 47486 cbm Gewinnbares Mineral: 100,0 X 10,0 X 4,0 = 4000 cbm Abbauverlust: . . . 748,6 cbm oder 15,8%. Im Braunkohlentiefbau beträgt der Abbauverlust bei Anwendung des Pfeilerbruchbaues 4o bis 50%. Das ergibt in diesem Fall eine Ersparnis oder zusätzliche Mehrgewinnung von 24 bis 36%.Imminent Mineral: 1 00.5 X 10.5 X 4.5 = 47486 cbm recoverable Mineral: 100.0 X 10 0 X 4,0 = 0 400 cbm degradation loss. . . 748.6 cbm or 15.8%. In civil lignite mining, the mining loss when using broken piers is 4o to 50%. In this case, this results in a saving or additional gain of 24 to 36%.
Die Leistung wird gesteigert, auch dafür ein Beispiel: Angenommen in einer Kammer von ioo m Länge und .4 m Breite wird in einer 7'/2stündigen Schicht ein Streifen von o,5 m Höhe gewonnen. Das ergibt eine Schichtleistung von ioo X 40,5 = 200 cbm. Zur Bedienung sind auf jeder Kammerseite drei Mann oder zusammen sechs Mann erforderlich. Das ergibt eine Gewinnungsleistung von Zoo : 6 = 33,3 cbm oder 33,3 t Braunkohle. Zum Vergleich diene, daß zur Zeit im Braunkohlentiefbau die Gewinnungsleistung nur 12 bis 16 t beträgt.The performance is increased, here is another example: Assumed in a chamber of 100 m Length and .4 m width will be in a 7 '/ 2 hour Layer won a strip 0.5 m high. This results in a shift performance of 100 X 40.5 = 200 cbm. There are three men or together on each side of the chamber to operate six men required. This results in Zoo's extraction rate: 6 = 33.3 cbm or 33.3 t of lignite. For comparison, the fact that it is currently used in civil lignite mining the extraction capacity is only 12 to 16 t.
Unfallmäßig besteht eine größere Sicherheit, da die Abbaukammer frei von Menschen ist und nur ein Beobachtungsmann über dem Rolloch steht,-das ihm als Fluchtweg dient:There is greater safety in the event of an accident, since the excavation chamber is free of people and only one observer stands over the Rolloch - that as Escape route serves:
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DER1522A DE828082C (en) | 1950-04-18 | 1950-04-18 | Chamber line construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DER1522A DE828082C (en) | 1950-04-18 | 1950-04-18 | Chamber line construction |
Publications (1)
Publication Number | Publication Date |
---|---|
DE828082C true DE828082C (en) | 1952-01-14 |
Family
ID=7395581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DER1522A Expired DE828082C (en) | 1950-04-18 | 1950-04-18 | Chamber line construction |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE828082C (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE733963C (en) * | 1940-12-11 | 1943-04-06 | Hans Joachim Von Hippel Dr Ing | Device for breaking down powerful floeze with a broad view |
-
1950
- 1950-04-18 DE DER1522A patent/DE828082C/en not_active Expired
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE733963C (en) * | 1940-12-11 | 1943-04-06 | Hans Joachim Von Hippel Dr Ing | Device for breaking down powerful floeze with a broad view |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE635532C (en) | Extraction device for coal and similar minerals | |
DE3246544C2 (en) | ||
DE2407584A1 (en) | METHOD OF DRIVING TUNNELS | |
DE970540C (en) | Framework for progressive expansion in brown coal longwall mining | |
DE2307413C2 (en) | Device for the extraction of a floz-like deposit in longwall mining | |
DE3115293A1 (en) | METHOD FOR DEGRADING CARBONES | |
DE828082C (en) | Chamber line construction | |
DE713960C (en) | Underground mining processes for large deposits | |
DER0001522MA (en) | Chamber ropes construction | |
DE2161291A1 (en) | Movable ceiling support, especially for mining | |
DE562878C (en) | Open pit mine for the extraction and relocation of mountain layers | |
DE2802943A1 (en) | RADIAL MINING PROCESS FOR THE EXTRACTION OF MINERALS | |
DE866485C (en) | Extraction chamber with extraction devices | |
DE829437C (en) | Longwall mining in coal mining | |
DE596715C (en) | Procedure for breaking piles | |
DE83677C (en) | ||
DE3232906C2 (en) | ||
DE745117C (en) | Process and device for extracting coal in quarrying piers, namely in civil lignite mining | |
DE812063C (en) | Schraemmaschine | |
DE725078C (en) | Mobile conveyor shaft | |
DE624924C (en) | Dewatering wells in layers that are to be removed by machine | |
DE679635C (en) | Long-front mining process for powerful coal layers | |
DE2450819B2 (en) | Process for the hydraulic mining of coal | |
DE817872C (en) | Procedure for abstraction of groundwater | |
DE3134975C2 (en) |