DE733963C - Device for breaking down powerful floeze with a broad view - Google Patents

Device for breaking down powerful floeze with a broad view

Info

Publication number
DE733963C
DE733963C DEH164018D DEH0164018D DE733963C DE 733963 C DE733963 C DE 733963C DE H164018 D DEH164018 D DE H164018D DE H0164018 D DEH0164018 D DE H0164018D DE 733963 C DE733963 C DE 733963C
Authority
DE
Germany
Prior art keywords
segments
offset
hollow
punch
stamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEH164018D
Other languages
German (de)
Inventor
Dr-Ing Hans Joachim Von Hippel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANS JOACHIM VON HIPPEL DR ING
Original Assignee
HANS JOACHIM VON HIPPEL DR ING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANS JOACHIM VON HIPPEL DR ING filed Critical HANS JOACHIM VON HIPPEL DR ING
Priority to DEH164018D priority Critical patent/DE733963C/en
Application granted granted Critical
Publication of DE733963C publication Critical patent/DE733963C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • E21D19/02Provisional protective covers for working space for use in longwall working

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Description

Vorrichtung zum Abbau mächtiger Flöze mit breitem Blick Der Abbau mächtiger Flöze hat bisher auf große Schwierigkeiten ,gestoßen, da ,es noch keine Einrichtung gibt, die den Gebirgsdruck mit Stempeln von io und mehr Meter Länge abzufangen erlaubt. , Man hat bisher deshalb stets nur kurze Frontlängen am Hangenden freigelegt, d. h. im Kammerbruchbau gearbeitet. Die dabei entstehenden. großen Abbauverluste waren und sind heute weniger als je zuvor vertretbax.Device for mining thick seams with a broad view The mining thick seams has so far encountered great difficulties, since, there have not yet been any There is a facility that shows the mountain pressure with stamps of io and more meters in length intercept allowed. 'So far, there have only been short front lengths on the hanging wall exposed, d. H. worked in broken chamber construction. The resulting. large degradation losses were and are less represented today than ever before.

Man hat bereits versucht, derart mächtige Flöze im Schildverfahren abzubauen, d. h. man hat nach dem Stoß offene, im übrigen mehr oder weniger allseitig geschlossene stählerne Hohlräume gesetzt, in deren Schutz die Mannschaft gegen den Stoß vorging und die mit fortschreitendem Abbau weiter zu Felde geschoben wurden. Mit solchen Abbauschilden läßt sich im allgemeinen der Abbauverlust sehr gering halten.Attempts have already been made to create such thick seams using the shield method dismantle, d. H. after the thrust one has open ones, otherwise more or less on all sides closed steel cavities set, in whose protection the crew against the Thrust proceeded and which were pushed further into the field as the mining progressed. With such degradation shields, the degradation loss can generally be very small keep.

Nicht allein aber, daß man einen Verlust im Abbau vermeiden mu_ß, noch vielwichtiger ist es, je Abbaubetriebspunkt und Schicht eine größere Kohlenmenge herauszuholen. Dies trifft sowohl für Steinkohlenwie Braunkohlenflöze im Untertagebetrieb zu. Der Langfrontbau in Streben kleiner und mittlerer Mächtigkeit mit seinem gleichmäßigen täglichen Vorschreiten ins Feld hat erfahrungsmäßig ganz bedeutende Leistungen ergeben. Es ist also damit zu rechnen, daß bei Einführung des Langfrontbaues in mächtigen Flözen besonders hohe Leistungen auftreten werden, die mit denen im Braunkohlentagebau erzielten z. B. vergleichbar sind. Eine grundlegende Voraussetzung dabei ist es jedoch, Stempel zu finden, die trotz großer Länge nicht allein .den Gebirgsdruck aushalten, sondern sich auch rauben und wiederverwenden lassen und das auch, wenn Vollversafz eingebracht wird.But not only that you have to avoid a loss in mining, It is even more important to have a larger amount of coal per mining operating point and shift to get out. This applies to both hard coal and lignite seams in underground operations to. The long-front building in struts of small and medium thickness with its uniform Daily advancement into the field has shown experience to show very significant achievements. It is therefore to be expected that with the introduction of the long-front building in mighty Seams particularly high performances will occur, which with those in brown coal opencast mining achieved z. B. are comparable. It is a basic requirement However, to find stamps that, despite their great length, are not alone in the mountain pressure endure, but also allow themselves to be stolen and reused and that too, if Vollversafz is introduced.

Man hat zu diesem Zweck bereits versucht, die Höhe der Abbauschilde verstellbar einzurichten, tun sich so in etwa der Flözmächtigkeit anpassen zu können. Wenn aber die Flözmächtigkeit 5 m und mehr beträgt, stößt das auf große Schwierigkeiten. Dabei ist es besonders schwierig, den Forderungen der Bergpolizeibehörde gerecht- zu werden, die eine absolute Sicherheit des Hauers fordern.For this purpose, attempts have already been made to determine the height of the mining shields to set up adjustable, so to be able to adapt to the seam thickness. But if the seam thickness is 5 m and more, this runs into great difficulties. It is particularly difficult to meet the demands of the mountain police authority. to become, who demand an absolute security of the tusker.

Es muß weiter darauf Bedacht genommen werden, daß ein Stempel geschaffen wird, der trotz seiner Höhe und Stabilität ohne allzu große Mühe nach Untertage zu bringen ist und überdies so be_chaffen ist, da.ß er durch Aneinanderreihen enen I.angfrantbau armö-- -licht, der auch bei Vollversatz die Arbeitsstelle gegen Hereinbrechen des Versatzes sichert.Care must also be taken to ensure that a stamp is created will that despite its height and stability without too much effort is to be brought underground and, moreover, is so designed that it can be lined up The first part of the building is poorly lit, which also counteracts the work place in the case of full offset Breaking in the offset secures.

Die Zeichnung zeigt eine beispielsweivc Ausführung. Wesentlich ist, daß die Stempel, die als Hohlkörper ausgebildet sind, aus denen heraus der Abbau (Versatz) erfolgt, aus einzelnen Segmenten aufgebaut sind, die für Einbau und Unterhaltung bequem zu hantieren sind.The drawing shows an exemplary embodiment. What is essential is that the stamp, which are designed as a hollow body, from which the degradation (Offset) takes place, are made up of individual segments that are used for installation and maintenance are easy to use.

- Es ist bekannt, daß Hohlkörper gegen Knicken besonders standfest sind. Der Stempel a stützt sich mit Gleitkufen b auf das Liegende. Er ist am Kopf durch eine Platte verschlossen. Zwischen dieser Platte c und dem Hangenden können Wanderraubstempel angebracht sein, die bei geringer eigener Höhe leicht gelöst und mit fortschreitendem Abbau mitgenanimen werden. Am Kopf ist gleicherweise ein Versatzförderer untergebracht.- It is known that hollow bodies are particularly stable against kinking. The stamp a is supported with skids b on the lying. It is closed at the head by a plate. Wanderer robbery stamps can be attached between this plate c and the hanging wall, which can be easily loosened if the height of the wall is low and then can be machined as the dismantling progresses. An offset conveyor is also housed at the head.

Am Liegenden ;:-ird zwechmäl'sig kurz vorlaufend eine Scheibe in gleicher Frontlänge abgebaut mittels irgendeiner der belkannten Einrichtungen. Das Hangende dieser Scheibe wird durch kurze Wand°rraub,stempeI abgestützt (d).On the lying person; Front length dismantled by means of any of the known facilities. The hanging wall this disc is supported by a short wall screw, stud (d).

Die Front kann nun je nach Ausbildung der Stempel a durch. mehrere Abbaumaschinene fortgema@mmen werden.The front can now, depending on the training of the stamp a through. several Dismantling machines are removed.

Die Stempel, die aus den einzelnen Segmentena aufgebaut und nach dem Kohlenstoß zu offen sind (Bild i), stützen sich mit ihren scharfen Kanten (Bild 2 und 3) gegen den Kohlenstofa, wodurch gleichzeitig der vom Versatz her -wirkende Druck streichend aufgenommen wird. Beien Abbau bleibt dann an dieser Stelle zunächst eine Rippe stehen; diese kann jedesmal beim Wenden der Abbaumaschine fartgeriss°n werden. Der Versatz drückt dann den Hohlstempel an die nette Abbaufront heran, nachdem am Stempelkopf die Druckverbindung mit dem Hangenden vorübergehend gelöst worden ist.The stamps, which are built up from the individual segments and after the Coal face are too open (Fig. I), are supported by their sharp edges (Fig 2 and 3) against the carbon, whereby at the same time the effect from the offset Pressure is added across the board. When dismantling, it remains at this point for the time being stand a rib; this can crack every time the mining machine is turned will. The offset then presses the hollow punch against the nice dismantling front after the pressure connection with the hanging wall at the punch head has been temporarily loosened is.

Sollte der Versatzdruck zum Vorschreiten des Stempels nicht ausreichen, so kann am Liegenden durch eine Zugeinrichtung- zwischen den Gleitkufenb und den Hilfsstempelnd eine zusätzliche Vorschubkraft ausgeübt werden. Das gleiche ist ebenso, falls notwendig, am Hangenden oder an irgendeinem Teil zwischen Liegendem und Hangenden durchführbar, indem man eine D,ruckeinrichtumg gegen den Versatz zu beispielsweise einbaut oder leinen Sylvester, den man am Kohlenstoß verankert, z. B. in einem Bohrloch.If the offset pressure is not sufficient for the stamp to advance, so can on the lying by a pulling device between the Gleitkufenb and the Auxiliary punching an additional feed force can be exerted. The same is also if necessary, on the hanging wall or on any part between the lying and the hanging wall feasible by adding a D, ruckeinrichtumg against the offset to for example built in or linen New Year's Eve, which is anchored to the coal face, z. B. in a borehole.

Die Form des Stempels kann ganz verschieden sein und sich weitgehend von einer runden Form entfernen. Wenn es die Verhältnisse zulassen, würde man eine ovale Form nehmen, einseitig offen, so daß durch die ovale Form sowohl der Druck in senkrechter als in -,vaagerechter Richtung gut abgefangen wird. Innerhalb der ovalen Form können Führungen angebracht sein für eine Abbaumaschinee, die in senkrechter Richtung, in etwa ganzer Breite, gleichzeitig den Stoß bearbeitet.The shape of the stamp can be very different and to a large extent remove from a round shape. If the circumstances allow, you would Take an oval shape, open on one side, so that both the pressure and the oval shape is well intercepted in the vertical than in the horizontal direction. Within the oval shape, guides can be attached for a mining machine, which in vertical Direction, in approximately the entire width, processed the joint at the same time.

Diese Maschine kann au Seilen oder kettcii hängen, wobei ,eine Umkehrrolle im Kopf des Stempels angebracht ist, während die Winde f am Fuß untergebracht ist. Es kann auf diese Weise erreicht werden, daß der Bedienungsmann die Abbaumaschine von unten aus dirigiert, und zwar ein Bedienungsmann gleichzeitig mehrere Maschinen. Da. die Wetter von unten zugeführt und oben abstreichen. steht der Mann stets im frischen Wetterstro@ni, kann seine Arbeit also unter den besten Bedingungen verrichten.This machine can hang on ropes or chains, with a reversing pulley is mounted in the head of the stamp, while the winch f is housed on the foot. It can be achieved in this way that the operator controls the mining machine from below, one operator directs several machines at the same time. There. the weather fed in from below and wiped off above. the man always stands in fresh weather storm, so it can do its job under the best conditions.

Bei größeren Flözmächtigkeiten würde dabei ein unerwünschter Sturz der Kohle eintreten. Dem kann man dadurch vorbeugen, daß man beispielsweise in den hohlen Stempei eine Schachtwendel .einbaut mit mehreren Einläufen übereinander, die durch die vorbeifahrende Abbaumaschine gestottert werden. Will man keine Schachtwendel einbauen, ist es auch möglich, einen hasten mitzunebnien, in dem die bei einem Zug anfallende Kolilenmenge aufgefangen wird und der vor dem Ansetzen des nächsten Zuges unten entleert ,vird. Dies Problem kann dadurch Variationen erfahren, daß der Hohlstempel nicht senkrecht, sondern geneigt steht, entweder mit der Oberseite in Abbauvorrichtung vorlaufend, also gewisserinafien auf dem Stoß liegend, oder nachbleibend, 1.h. auf dem Versatz liegend.With greater seam thicknesses, this would result in an undesirable fall enter the coal. This can be prevented by, for example, in the hollow stamp a manhole helix .einstalled with several inlets on top of each other, which are stuttered by the passing mining machine. You don't want a shaft helix build in, it is also possible to hurry along by taking a train accumulating amount of Kolilen is collected and before the start of the next train emptied below, vird. This problem can experience variations that the hollow punch not vertical, but inclined, either with the upper side in the dismantling device leading, i.e. lying on top of the pile, or lingering, 1.h. on lying at the offset.

Es ist nun keineswegs notwendig. den flolilstempel vollwandig auszubilden, sondern er kann aus einem Gerüst von Gitterträgern bestehen. Bei Sandversatz indessen wird man ihn ganz umkleiden.It is now by no means necessary. to form the full-walled foil stamp, but it can consist of a framework of lattice girders. In the case of sand offset, however one will dress him completely.

Wenn nun nach der Erfindung mehrere Stempel nebeneinander angeordnet sind, deren offene Seiten zum Kohlenstoß zu liegen, werden sich am Kohlenstoß dicht anliegend Stempel und Stempel berühren, so daß auch Sand, wenn er fließt, niemals in den Abbauraum hineingelangen kann. Diese Anordnung ist auch dadurch noch sehr vorteilhaft, daß infolge der Unabhängigkeit der Stempel voneinander die Front im Tempo. des Vorrückens und in der Wahl der geeigneten Länge beweglich bleibt.If now, according to the invention, several stamps are arranged side by side are whose open sides are facing the coal face, become close to the coal face touch the stamp and stamp next to them, so that even sand never flows when it flows can get into the dismantling space. This arrangement is still very much advantageous that due to the independence of the stamp from each other the front in Tempo. the advancement and in the choice of the appropriate length remains movable.

Hierbei muß auf die Wetterführung Bedacht genommen werden. Wenn man beispIelsweise zweiflügelig arbeitet, indem eine mittlere Strecke am Hangenden den Verssatz niführt, wird man an den- äußeren Flügelenden die Hohlstempel oben offen ausbilden und dadurch die Wetter zwingen, sowohl am Liegenden wie am Hangenden die ganze Frontlänge zu durchstreichen. Sollten in der I%olile schlagende Wetter enthalten sein, so würdc man in jedem Stempel am Kopf Öffnungen. beispielsweise regnäerbaxen Querschnitts, anbringen, so, daß ein Teil Wetterstrom durch jeden Hohlstempel streicht.Here, the weather management must be taken into account. If For example, it works with two wings, with a middle one route If the offset is carried out on the hanging wall, one becomes the hollow temple on the outer wing ends train at the top open and thereby force the weather, both on the lying as on the Cross out hanging walls along the entire length of the front. Should be beating in the I% olile If it were to contain weather, there would be openings in each stamp on the head. for example rainbows cross-section, so that a part of the weather flow through each hollow punch deletes.

Der große Vorteil der beschriebenen Vorrichtung, der durch den Einsatz des Stempels nach der Erfindung sich ergibt, ist, daß die Frontlänge keinerlei Begrenzung von der maschinentechnischen Seite erfährt. Lediglich die Leistung der Bänder für Kohle und Versatz geben eine Begrenzung, die man jedoch dadurch umgehen kann, daß man mehrere Strecken auffährt, z. B. zwei in gegenseitigem Abstand von 300m für eine Gesamtfrontlänge von 6oo m. Es ist dabei gleichgültig, ob Rückbau betrieben wird oder ins Feld vorschreitend gearbeitet wird. Im letzteren Falle ruß natürlich Grund- und Ha:ngeendstrecke gut verbaut werden und am Hangenden der oberste . Versatz durch etwas Zementzugabe verfestigt werden.The great advantage of the device described, through the use of the stamp according to the invention is that the front length has no limit learns from the mechanical engineering side. Only the performance of the bands for Coal and offset give a limitation, but one can work around it that you drive up several routes, z. B. two at a mutual distance of 300m for a total front length of 600 m. It does not matter whether dismantling was carried out being worked or advancing into the field. In the latter case, of course, soot Ground and slope end sections are well built and the top one on the hanging wall. Offset solidified by adding a little cement.

Ein großer Vorzug ist, daß bei Vollversatz auf Blasen oder Spülen verzichtet werden kann. Die Berge werden durch die Hangendstrecke zugeführt und durch Querbänder an den Stempelköpfen in Streblängsrichtung durch obstreifer oder Abwurfwagen -verteilt. ' Beim Vorrücken der Front würde sich ein Absinken des Versatzes in einigen Metern hinter Front ergeben. Dies zu vermeiden, können an den Stempeln Versatzschächte angebracht werden (Bild 5), welche, vom Liegenden aus gesehen, in verschiedenen Höhen gestaffelt enden. Diese Schächte werden von oben mit Sa,pd voll gehaRen. Beim Vorrücken der Stempel füllt dieser Sand den entstehenden Hohlraum auf, so daß der Spiegel des Versatzes weiter rückwärts nicht wesentlich absinkt.A great advantage is that with a full offset on blowing or rinsing can be dispensed with. The mountains are fed through the slope slope and by transverse straps on the punch heads in the longitudinal direction by obstreifer or Drop trolley -distributed. 'As the front advances, the offset will decrease surrendered in a few meters behind the front. You can avoid this on the stamps Offset shafts are attached (Fig. 5), which, as seen from the horizontal, are in end at different heights. These shafts are filled with Sa, pd from above belong. As the ram advances, this sand fills the cavity that is created so that the level of the offset does not decrease significantly further backwards.

In jedem Falle ist der Stempel aus kurzen, transportablen Segmenten zusammengesetzt, deren Aufeinandersetzen ein Anpassen an die Flözmächtigkeit erlaubt.In any case, the stamp is made up of short, transportable segments composed, the stacking of which allows an adjustment to the seam thickness.

Claims (1)

PATENTANSPRÜCHE i. Vorrichtung zum Abbau mächtiger Flöze mit breitem Blick mittels nebeneinander angeordneter Gehäuse, die den Arbeitsraum vom Versatz trennen, wobei der Förderer für die gewonnene Kohle quer zur Verhiebrichtung verläuft, dadurch geltennzeichnet. dafa die als Hohlstempel ausgebildeten, einseitig offenen Gehäuse auseinzelnen Segmenten von untereinander etwa gleicher Höhe aufgebaut sind, die sich mit ihren die a,bbaufrontseitige Öffnung jedes Hohlstempels seitlich begrenzenden Längskanten gegen Elie Abbaufront abstützen. z. Vorrichtung nach. Anspruch i, dadurch gekennzeichnet, daß die Oberseite des obersten Steinpelkopfsegments geschlassen ausgebildet ist und wahlweise üffnungen für den Wetterstrom aufweist. 3. Vorrichtung nach Anspruch i, gekennzeichnet -durch die Anordnung vorn Hilfsstempeln mit Druchlöseeinrichtung zwischen oberstem Stempelkopfsegment und Hangender. .. Vorrichtung nach Anspruch i, .gekennzeichnet durch die Anordnung *eines Fußstückes zwischen dem aus Segmenten bestehenden Stempelteil und dem Liegenden, auf dem sich der Stempel unabhängig vorbewegen kann und zu dem er wahlweise auch eine verschiedene Neigung annehmen kann. 5. Vorrichtung nach Anspruch i bis 4., gekennzeichnet durch die Anordnung cirnes quer zur Verhiebrichtung verlaufenden Versatzzubringeförder-ers über bzw. an den Kopfenden der Stempel. 6. Vorrichtung nach Anspruch i bzw. i bis 5, dadurch gekennzeichnet, daß auf der Versatzseite der Segmente Kanäle zur Versatzzufuhr der Axt angeardn@et sind, daß sie im gestaffelten abstand vom Liegenden aufhören. Vorriclitung nach Anspruch i bzw. i bis 6, gekennzeichnet durch die Zusammensetzung der Hohlstempelsegmente aus Mehrgelenkbögen, wobei die Gelenkachsen im wesentlichen in Stempellängsrichtung liegen. B. Vorrichtung nach Anspruch i bzw. i bis 7, dadurch gekennzeichnet, daß in den Segmenten Führtunge'n für eine in senkrechter Richtung im Hohlstempel verfahrbare Abbaumaschine ,angeordnet sind. 9. Vorrichtung nach Anspruch i bzw. i bis 8, gekennzeichnet durch die Anordnung von Schachtwendeln innerhalb des Hohlstempels. io. Verrichtung nach Anspruch i bzw. i bis 8, dadurch gekennzeichnet, da.ß im Innern des Hohlstempels ,ein vierfahrbares Fördergefäß zum Auffangen undAbsenken der gewonnenen Kohle angeordnet ist.PATENT CLAIMS i. Device for mining thick seams with a broad view by means of housings arranged next to one another, which separate the working area from the offset, whereby the conveyor for the extracted coal runs transversely to the direction of excavation. dafa, the housings, which are designed as hollow punches and open on one side, are made up of individual segments of approximately the same height, which are supported against Elie mining front with their longitudinal edges delimiting the opening of each hollow punch on the side. z. Device according to. Claim i, characterized in that the upper side of the uppermost Steinpelkopfsegegment is designed to be closed and optionally has openings for the weather flow. 3. Apparatus according to claim i, characterized by the arrangement in front of auxiliary punches with release device between the uppermost punch head segment and hanging wall. .. Device according to claim i, characterized by the arrangement * of a foot piece between the stamp part consisting of segments and the lying on which the stamp can advance independently and to which it can optionally assume a different inclination. 5. Apparatus according to claim i to 4, characterized by the arrangement cirnes transversely to the direction of prevention running Versatzzufringeförder-ers over or at the head ends of the stamp. 6. Apparatus according to claim i or i to 5, characterized in that on the offset side of the segments channels for the offset supply of the ax are angeardn @ et that they stop at a staggered distance from the lying person. Device according to claims i or i to 6, characterized by the composition of the hollow punch segments from multi-hinge arcs, the hinge axes lying essentially in the longitudinal direction of the punch. B. Apparatus according to claim i or i to 7, characterized in that guides are arranged in the segments for a mining machine which can be moved in the vertical direction in the hollow punch. 9. Apparatus according to claim i or i to 8, characterized by the arrangement of shaft spirals within the hollow punch. ok Device according to claims i or i to 8, characterized in that a four-wheeled conveying vessel for collecting and lowering the extracted coal is arranged in the interior of the hollow plunger.
DEH164018D 1940-12-11 1940-12-11 Device for breaking down powerful floeze with a broad view Expired DE733963C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEH164018D DE733963C (en) 1940-12-11 1940-12-11 Device for breaking down powerful floeze with a broad view

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEH164018D DE733963C (en) 1940-12-11 1940-12-11 Device for breaking down powerful floeze with a broad view

Publications (1)

Publication Number Publication Date
DE733963C true DE733963C (en) 1943-04-06

Family

ID=7183927

Family Applications (1)

Application Number Title Priority Date Filing Date
DEH164018D Expired DE733963C (en) 1940-12-11 1940-12-11 Device for breaking down powerful floeze with a broad view

Country Status (1)

Country Link
DE (1) DE733963C (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE828082C (en) * 1950-04-18 1952-01-14 Willy Roehler Chamber line construction
DE945441C (en) * 1944-08-18 1956-07-12 Gerhard Werner Method and device for dismantling and removing steep camp sites
DE965811C (en) * 1949-04-15 1957-06-19 Carbo Strebbau Ges Dr Ing Von Longwall construction formed from covering shields placed one above the other
DE1034569B (en) * 1953-08-27 1958-07-24 Bukowsky & Fischer Arched longwall construction for steep storage
DE970540C (en) * 1949-03-10 1958-10-02 Dipl Berging Curt Boie Framework for progressive expansion in brown coal longwall mining
DE974152C (en) * 1941-06-28 1960-09-29 Hans Walter Dr Flemming Device for the dismantling of powerful floeze
DE974547C (en) * 1944-07-08 1961-02-02 Alexander Dr-Ing Schmidt Steel longwall mining
DE974669C (en) * 1952-06-14 1961-03-23 Konrad Grebe Method and device for the extraction of coal and other minerals
DE974979C (en) * 1944-03-08 1961-06-22 Albert Hamel Method and device for the mining of hard coal layers at steep inclines
DE1146019B (en) * 1954-10-28 1963-03-28 Bergwerksverband Ges Mit Besch Procedure for advancing and introducing the offset following the progressive mining when mining steep and semi-steep camps with straight joints arranged in the collapse
DE1166123B (en) * 1960-03-24 1964-03-26 Gewerk Eisenhuette Westfalia Expansion of a coal extraction company in steep storage
DE1174728B (en) * 1958-11-27 1964-07-30 Gewerk Eisenhuette Westfalia Guide a coal plane
DE1176089B (en) * 1953-04-01 1964-08-20 Rudolf Weistroffer Offset covering for steep storage
FR2498678A1 (en) * 1981-01-29 1982-07-30 Inst Gornogo Dela Sibirskogo O Resilient mobile mine support system - has cellular structure formed by flexible partitions and elastic fluid inflated chambers

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE974152C (en) * 1941-06-28 1960-09-29 Hans Walter Dr Flemming Device for the dismantling of powerful floeze
DE974979C (en) * 1944-03-08 1961-06-22 Albert Hamel Method and device for the mining of hard coal layers at steep inclines
DE974547C (en) * 1944-07-08 1961-02-02 Alexander Dr-Ing Schmidt Steel longwall mining
DE945441C (en) * 1944-08-18 1956-07-12 Gerhard Werner Method and device for dismantling and removing steep camp sites
DE970540C (en) * 1949-03-10 1958-10-02 Dipl Berging Curt Boie Framework for progressive expansion in brown coal longwall mining
DE965811C (en) * 1949-04-15 1957-06-19 Carbo Strebbau Ges Dr Ing Von Longwall construction formed from covering shields placed one above the other
DE828082C (en) * 1950-04-18 1952-01-14 Willy Roehler Chamber line construction
DE974669C (en) * 1952-06-14 1961-03-23 Konrad Grebe Method and device for the extraction of coal and other minerals
DE1176089B (en) * 1953-04-01 1964-08-20 Rudolf Weistroffer Offset covering for steep storage
DE1034569B (en) * 1953-08-27 1958-07-24 Bukowsky & Fischer Arched longwall construction for steep storage
DE1146019B (en) * 1954-10-28 1963-03-28 Bergwerksverband Ges Mit Besch Procedure for advancing and introducing the offset following the progressive mining when mining steep and semi-steep camps with straight joints arranged in the collapse
DE1174728B (en) * 1958-11-27 1964-07-30 Gewerk Eisenhuette Westfalia Guide a coal plane
DE1166123B (en) * 1960-03-24 1964-03-26 Gewerk Eisenhuette Westfalia Expansion of a coal extraction company in steep storage
FR2498678A1 (en) * 1981-01-29 1982-07-30 Inst Gornogo Dela Sibirskogo O Resilient mobile mine support system - has cellular structure formed by flexible partitions and elastic fluid inflated chambers

Similar Documents

Publication Publication Date Title
DE733963C (en) Device for breaking down powerful floeze with a broad view
DE278881C (en)
DE970540C (en) Framework for progressive expansion in brown coal longwall mining
DE1009136B (en) Extension frame for traveling longwall mining
DE827789C (en) Device for the extraction of semi-steep to steeply stored flakes using a coal plane
DE487101C (en) Equipment for backing up during dismantling without offset underground
DE850882C (en) Wedge process in hard coal extraction
DE502329C (en) Mechanical device for coal extraction in longwall mining with a broad view
DE728577C (en) Wandering expansion to secure the hanging wall
DE831832C (en) Coal plane with stepped cutters in front of the main knife
DE678589C (en) Procedure for dismantling camps
DE2161291A1 (en) Movable ceiling support, especially for mining
DE2539149C3 (en) Shield wall for blow offset
DE422357C (en) Equipment for the dismantling of camps by means of an automatically advancing protective chamber
DE599097C (en) Device for the lateral displacement of conveying means in the mine
DE977137C (en) Guide and conveyor device for peeling extraction devices
DE588689C (en) Device for introducing the mountain offset with the interposition of a rocker slide or a conveyor belt as an auxiliary conveyor
DE812063C (en) Schraemmaschine
DE1074479B (en) Extrusion molding for brickworks
DE1534620A1 (en) Driving shield equipped with presses
DE428579C (en) Method and device for introducing rock backfilling
DE976347C (en) Longwall construction with backing machine
DE19750484B4 (en) Extraction device, in particular for the coal production in unterertätigen extraction struts
DE1037990B (en) Wandering longwall mining
DE917121C (en) Method and device for intercepting and securing the hanging wall in the longwall