DE386801C - Dismantling process - Google Patents
Dismantling processInfo
- Publication number
- DE386801C DE386801C DEST35838D DEST035838D DE386801C DE 386801 C DE386801 C DE 386801C DE ST35838 D DEST35838 D DE ST35838D DE ST035838 D DEST035838 D DE ST035838D DE 386801 C DE386801 C DE 386801C
- Authority
- DE
- Germany
- Prior art keywords
- pillar
- attack
- chambers
- pillars
- points
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000000034 method Methods 0.000 title claims description 21
- 238000005065 mining Methods 0.000 claims description 19
- 239000003245 coal Substances 0.000 claims description 7
- 238000006073 displacement reaction Methods 0.000 claims description 5
- 238000010276 construction Methods 0.000 claims description 4
- 239000011435 rock Substances 0.000 claims description 4
- 239000002360 explosive Substances 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 claims description 2
- 238000000605 extraction Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 claims description 2
- 230000009897 systematic effect Effects 0.000 claims description 2
- 238000006731 degradation reaction Methods 0.000 claims 5
- 230000015556 catabolic process Effects 0.000 claims 4
- 230000003247 decreasing effect Effects 0.000 claims 2
- 238000009412 basement excavation Methods 0.000 claims 1
- 230000006835 compression Effects 0.000 claims 1
- 238000007906 compression Methods 0.000 claims 1
- 238000001035 drying Methods 0.000 claims 1
- 230000008030 elimination Effects 0.000 claims 1
- 238000003379 elimination reaction Methods 0.000 claims 1
- 238000005192 partition Methods 0.000 claims 1
- 230000001960 triggered effect Effects 0.000 claims 1
- 239000002023 wood Substances 0.000 claims 1
- 230000000694 effects Effects 0.000 description 3
- 238000011010 flushing procedure Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 210000000056 organ Anatomy 0.000 description 1
- 239000008237 rinsing water Substances 0.000 description 1
- 238000010408 sweeping Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Remote Sensing (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Working Measures On Existing Buildindgs (AREA)
Description
Den bekannten Vorteilen des Strebbaues mit breitem Blick unter Nachführung von
Bergeversatz steht eine Reihe von Nachteilen gegenüber, welche zum größten Teil durch die
vorliegende Erfindung behoben werden.
Die Nachteile sind u. a. folgende:
i. die Notwendigkeit der Beschaffung von Bergen in ausreichender Menge, mit den damit
verknüpften Unkosten und Nachteilen;
ίο 2. die mangelnde Möglichkeit innerhalb des Abbaufeldes die Zahl der Ansatzpunkte zu erhöhen
und dadurch die Förderleistung zu steigern; The well-known advantages of longwall mining with a broad view with tracking of mountain displacement are offset by a number of disadvantages, which are for the most part remedied by the present invention.
The disadvantages include the following:
i. the need to procure mountains in sufficient quantities, with the associated costs and disadvantages;
ίο 2. the lack of opportunity within the mining area to increase the number of starting points and thereby increase the output;
3. geringer Schutz gegen zu Bruchegehen des Hangenden mit seinen Folgen: Förderausfall, Materialverlust, Gefährdung der Arbeiter, ungleichmäßiges Niedergehen des Deckgebirges und dadurch vermehrte Bergschäden;3.Low protection against breaking of the hanging wall with its consequences: production failure, Loss of material, endangerment of workers, uneven fall of the overburden and thereby increased mountain damage;
4. Gefährdung der Schüttelrinnen durch die seitlich wirkenden Sprengschüsse;4. Endangerment of the vibrating chutes from the explosive shots acting from the side;
5. ungünstigeBeeinflussung der regelrechten Führung des Ortsstoßes infolge von Verdrükkungen usw. und beim Anfahren von mit Spülversatz abgebauten Flözteilen.5. unfavorable influence on the regular guidance of the local impact as a result of displacement etc. and when approaching seam parts dismantled with flushing offset.
Die vorbezeichneten Nachteile werden vermieden oder wenigstens stark vermindert, wenn man folgendes durch beiliegende Skizze erläuterte Verfahren zur Anwendung bringt: Das zwischen zwei Sohlen der Grundstrecke A und B liegende Abbaufeld wird von einem Bremsberge C aus durch zweigleisige, streichende Abbaustrecken E in Streifen von 60, 80, 100, 120 m schwebender Höhe zerlegt. Von diesen Abbaustrecken E, die mit dem Abbau ins Feld rücken, werden schwebende 2 m breite Örter, auf der Skizze 1 bis 15 bezeichnet, angesetzt, welche unter Anstehenlassen von Stützpfeilern F von 4 bis 6 m Breite als Kammern von 4 bis 6 m Breite bis zum Durchschlag mit der oberen Abbaustrecke £ vorgetrieben werden. Die Vortriebe der Kammern, welche genau nach Stunde gefahren werden können, folgen einander unter sich parallel in Abständen von 10 bis 15 m. Die Kammern werden aus Rücksicht auf die Wetterführung und die Sicherheit der Leute miteinander alle 20 bis 25 m durch schmale Durchhiebe verbunden. Sind zwei Kammern nach der nächsthöheren Abbaustrecke durchschlägig, so wird mit dem Verhieb des ersten Stützpfeilers F begonnen, und zwar von oben her in einzelnen Abschnitten nach unten. Die Förderung kann mittels Rutschen erfolgen, welche beim Auffahren der Kammer vorgezogen, beim Verhieb des Beines zurückgebaut wird. Am festen Stoß können Orgelstempel gestellt werden. Die Wetter treten durch die letzte angehauene Kammer ein, passieren die Durchhiebe und die vorhergehenden Örter und treten durch die letzte durchschlägige Kammer in die nächsthöhere Abbaustrecke E aus.The above-mentioned disadvantages are avoided or at least greatly reduced if the following procedure, explained by the accompanying sketch, is used: The mining field located between two levels of the basic section A and B is broken down from a braking hill C by double-track, sweeping mining sections E in strips of 60, 80, 100, 120 m floating height disassembled. From these mining stretches E, which move into the field with the mining, floating 2 m wide locations, indicated on the sketch 1 to 15, are set, which, with supporting pillars F 4 to 6 m wide, are placed as chambers 4 to 6 m wide be driven to the point of breakthrough with the upper mining section £. The drives of the chambers, which can be driven exactly after one hour, follow each other in parallel at intervals of 10 to 15 m. The chambers are connected to each other every 20 to 25 m by narrow cuts out of consideration for the weather conditions and the safety of the people. If two chambers are penetrable after the next higher mining section, the first support pillar F is moved from above in individual sections downwards. The conveyance can take place by means of slides, which are brought forward when the chamber is opened and dismantled when the leg is pushed. Organ stamps can be placed on the fixed joint. The weather enters through the last excavated chamber, passes through the cuts and the previous locations and exits through the last penetrable chamber into the next higher mining section E.
Der Gang des Abbaues ist aus der Zeichnung ohne weiteres zu entnehmen. Danach können.im Abbaufeld I die Orte 10 bis 15, imThe course of dismantling can be seen from the drawing without further ado. Thereafter in the dismantling field I the places 10 to 15, in the
Abbaufeld II die Orte 7 bis 12, im Abbaufeld III die Orte 3 bis 9 gleichzeitig belegt sein.Digging field II occupies places 7 to 12, in dismantling field III places 3 to 9 at the same time be.
Die in Vorschlag gebrachte Abbaumethode nimmt alle Vorteile des Strebbaues mit breitem Blick in erhöhtem Maße für sich in Anspruch, vermeidet aber dessen Nachteile.The mining method proposed takes all the advantages of longwall mining with wide Look to a greater extent for itself, but avoids its disadvantages.
Es kann auf jeglichen Versatz verzichtet werden, damit entfallen alle Nachteile des Versatzes.There is no need for any offset, so all the disadvantages of the Offset.
Die Angriffspunkte können vermehrt, und somit kann die Leistung erhöht werden. Die Belegschaft vor jedem Angriffspunkt fördert für sich; es fallen die Nachteile des gemeinsamen Gedinges und der gemeinsamen Rutsche fort, die Leute können streng nach der Leistung bezahlt werden.The points of attack can be increased, and thus the performance can be increased. the Workforce in front of each point of attack promotes for itself; it drops the disadvantages of the common Thing and the common slide, people can strictly according to the performance get paid.
Die zunächst belassenen Stützpfeiler werden durch das niedergehende Gebirge zermürbt, so daß etwa 40 bis 50 Prozent: der insgesamt anstehenden Kohlenmengen ohne Schießarbeit gewonnen werden können.The pillars that were initially left are being worn down by the falling mountains, see above that about 40 to 50 percent: of the total amount of coal available without shooting can be won.
Das Niedergehen des Gebirgskörpers wird nicht wie beim Strebbau früherer Durchführung an einer Kante, sondern durch Belassung der Stützpfeiler auf breiter Fläche eingeleitet. Ein Abreißen des Gebirges am Abbaustoß ist daher ausgeschlossen. Die Senkung des Gebirges tritt erst nach der Hereingewinnung der hierdurch gelockerten Stützpfeiler im alten Mann vollständig ein. Durch richtige Bemessung der vorläufig stehen belassenen Pfeiler hinsichtlich ihrer Breite ist man in der Lage, die durch das »Sichsetzen« des überlagerten Gebirges hervorgerufene Druckwelle in ihrer Auswirkung zu beeinflussen. Da man nicht auf das Einbringen des Versatzes angewiesen ist und die Minderleistung durch Mehrbelegung, z. B. auf drei Schichten, ausgeglichen werden kann, wird die günstige Einwirkung des schnellen Verhiebes sichergestellt.The sinking of the mountain body will not be carried out as in the case of longwall mining in earlier times at one edge, but rather by leaving the supporting pillars on a wide area. A demolition of the rock at the working face is therefore impossible. The subsidence of the mountains occurs only after the support pillars, which have been loosened as a result, have been won in the old one Man completely one. By correctly dimensioning the pillars that have been left standing for the time being with regard to its breadth, one is able to overcome that by the "sitting down" of the superimposed To influence the impact of the pressure wave caused by the mountains. Because you don't is dependent on the introduction of the offset and the underperformance due to increased occupancy, z. B. on three layers, can be balanced, the beneficial effect of quick removal ensured.
Störungen i'ii Gebirge können sehmal durchfahren werden, wodurch die Gefahr von Brüchen auch an fliesen Stellen stark gemindert wird.Disturbances in the mountains can drive through sehmal which greatly reduces the risk of breaks even in tiled areas.
Flözverdrückungen können durch Ausheben von Gräben im Liegenden ohne wesentliche Kosten durchquert werden.Seam contraction can be avoided by digging trenches in the lying area without any significant effects Costs to be traversed.
Dadurch, dafi die Auswirkung der Sprengschiisse parallel zu den Rutschensträngen erfolgt, wird eine Beschädigung derselben weitgehend vermieden.Thereby, the effect of the explosives takes place parallel to the slide strands, damage to the same is largely avoided.
Bei einmaliger Verlegung der Rutschentour wird im gleichen Abbaufeld die doppelte bis dreifache Kohlenmengc gefördert wie beim Strebbau.If the slide tour is relocated once, the double to three times the amount of coal mined as in longwall mining.
Durch das Belassen von Stützpfeilern fühlt sich der Arbeiter sicherer; er ist vor den Einwirkungen des niedergehenden Gebirges geschützt. Leaving support pillars in place makes the worker feel safer; he is before the effects the falling mountains protected.
Die einzelnen Kammern können nach Stunde gefahren werden, stellen demnach an die Aufmerksamkeit der Belegschaft nicht diejenigen Anforderungen wie ein hundert und mehr Meter hoher Strebstoß.The individual chambers can be opened by the hour therefore do not attract the attention of the workforce Requirements like a hundred and more meters high butt.
Nähert sich der Verhieb einem Sicherheitspfeiler, der aus irgendwelchen Gründen mit Spülversatz a! gebaut werden soll, so ist man in der Lage, diesen ohne Änderung des Abbauplanes einzubringen. Die Kammern werden durch Verschlage geschlossen und verspült; der Abfluß der Spülwasser erfolgt durch die Durchhiebe nach der Nachbarkammer.If the displacement approaches a safety pillar, which for whatever reasons Flushing offset a! is to be built, one is able to do so without changing the dismantling plan bring in. The chambers are closed by shutters and flushed; the drainage of the rinsing water takes place through the blows to the neighboring chamber.
Beim vereinigten Streb- und Pfeilerbau ist die Breite der Strebs durch die Menge der in diesen fallenden Berge gegeben; im neuen Verfahren richtet sich die Breite der Kammern nach der Gewinnbarkeit der Kohle, hervorgerufen und begünstigt durch die erzeugte Druckwelle.In the case of the combined longwall and pillar construction is the breadth of the struts given by the number of mountains falling into them; in the new process the width of the chambers depends on the recoverability of the coal, caused and promoted by the generated pressure wave.
Beim vereinigten Streb- und Pfeilerbau wird die Stärke der zwischen den Strebs belassenen Pfeiler der besten Fördermöglichkeit angepaßt und vorher bestimmt, während sie beim Kammerbau für jeden einzelnen Fall zu erproben ist, d. h. sie wird je nach Festigkeit der Kohle und Mächtigkeit des Flözes und der vorhandenen Teufe verschieden ausfallen müssen.In the case of the combined longwall and pillar construction, the strength becomes that which is left between the longwall Pillars adapted to the best funding opportunity and determined in advance while they are being built in the chamber is to be tested for each individual case, d. H. it will depend on the strength of the coal and thickness of the seam and the existing depth must be different.
Beim bekannten Verfahren wird das Verbrechen der Strebs durch Einbringen von Ver- go satz, bei dem neuen Verfahren das Verbrechen der Kammern durch nachgiebig gestaltete .Stützpfeiler wirksam verhindert.In the known method, the crime of the Strebs is carried out by introducing vergo sentence, in the new procedure the crime of the chambers by yielding . Support pillars effectively prevented.
Die Strebs beim bekannten Verfahren stellen einen Teil der Vorrichtung dar und erreichen fast gleichzeitig die Baugrenze (H eise-H e r b s t. Lehrbuch der Bergbaukunde, 2. Aufl., Band I, S. 375). Erst dann beginnt der Verhieb der Pfeiler (Abb. 366, S. 375). Bei dem vorliegenden Verfahren bildet der Vortrieb der gleichmäßig auf den ganzen Stoß verteilten Angriffspunkte und die Gewinnung der Stützpfeiler den stetigen, lückenlosen Verhieb des Flözes. Ein systematisches »Abrollen des Gebirges auf breiter Basis« wird, wie aus S. 380, Heise-Herbst, hervorgeht, bei den bisher bekannten Verfahren nicht herbeigeführt und auch nicht beabsichtigt.The struts in the known method represent and achieve part of the device almost at the same time the building limit (Heise-H e r b s t. Textbook of Mining Studies, 2nd ed., Volume I, p. 375). Only then does it begin the displacement of the pillars (Fig. 366, p. 375). In the present process, the Propulsion of the points of attack evenly distributed over the entire joint and extraction the supporting pillar ensures the steady, complete cutting of the seam. A systematic »unrolling of the mountains on a broad basis ", as can be seen from p. 380, Heise-Herbst, not brought about in the previously known methods and also not intended.
Beim »room and pillar«-System wird das abzubauende Feld durch Strecken, meist mit Parallelbetrieb, vorgefahren, in Gevierte oder Blocks geteilt; bei dem neuen \rerfahren wird der Abbau nach Art des Strebbaues mit breitem Blick in breiter Front zwischen zwei Sohlen zu Felde geführt.With the “room and pillar” system, the field to be mined is driven up by stretches, usually with parallel operation, and divided into squares or blocks; With the new \ r experienced, mining is carried out in the manner of longwall mining with a broad view in a broad front between two levels of the field.
Die »pillars« werden für gewöhnlich, abgesehen von dem Falle, daß sie zum Schütze der Tagesoberfläche stehen gelassen werden müssen, fortgenommen, sobald die »rooms«, die sich entweder teilweise oder im ganzen von einer Strecke abzweigen, bis zur vollen Länge aufgefahren sind, während die Stützpfeiler beiThe "pillars" usually become, except in the event that they are the shooters of the Surface must be left standing, as soon as the "rooms" that branch off either partially or entirely from a section, up to the full length are driven up while the supporting pillars at
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEST35838D DE386801C (en) | 1922-06-10 | 1922-06-10 | Dismantling process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEST35838D DE386801C (en) | 1922-06-10 | 1922-06-10 | Dismantling process |
Publications (1)
Publication Number | Publication Date |
---|---|
DE386801C true DE386801C (en) | 1923-12-17 |
Family
ID=7462458
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEST35838D Expired DE386801C (en) | 1922-06-10 | 1922-06-10 | Dismantling process |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE386801C (en) |
-
1922
- 1922-06-10 DE DEST35838D patent/DE386801C/en not_active Expired
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0002877B1 (en) | Method for the removal of methane | |
DE3110198A1 (en) | "DRILL HOLE FOR MINING OR MINING" | |
DE10393535T5 (en) | mining system | |
DE2538663A1 (en) | PROCEDURE AND EQUIPMENT FOR THE MINING OF OIL SHALE, TAR SANDS AND OTHER MINERALS | |
DE2307413C2 (en) | Device for the extraction of a floz-like deposit in longwall mining | |
DE970540C (en) | Framework for progressive expansion in brown coal longwall mining | |
DE386801C (en) | Dismantling process | |
DE1658751A1 (en) | Method and device for creating tunnels, tunnels or the like in mountains with changing stability in zones | |
EP0257652B1 (en) | Method of and device for driving a coal winning gallery partly in the footwall of a seam | |
EP2758633B1 (en) | Shield driving device | |
DE487101C (en) | Equipment for backing up during dismantling without offset underground | |
DE2802943A1 (en) | RADIAL MINING PROCESS FOR THE EXTRACTION OF MINERALS | |
DE2161291A1 (en) | Movable ceiling support, especially for mining | |
DE1088898B (en) | Process for the device and for the mining of coal layers | |
DE3232906C2 (en) | ||
DE739032C (en) | Procedure for lowering compressed air caisson | |
DE2057498C (en) | Process for the fully mechanical extraction of coal or similar, floz-like formed minerals of the storage of 50 to 100 high g and Einnch device to carry out the process | |
DE4037921C2 (en) | Process for removing rock obstacles in shallow bores, earth slots, construction pits and similar structures | |
DE2533904C3 (en) | Shield driving device for driving a trench and laying a pipe string in the trench | |
DE2808114C2 (en) | Process for the extraction of thick, shallowly plunging useful mineral seams by hydraulic extraction | |
DE83677C (en) | ||
DE828082C (en) | Chamber line construction | |
DE745117C (en) | Process and device for extracting coal in quarrying piers, namely in civil lignite mining | |
DE865290C (en) | Method for driving up stretches in steep storage | |
DE974152C (en) | Device for the dismantling of powerful floeze |