DE2538663A1 - PROCEDURE AND EQUIPMENT FOR THE MINING OF OIL SHALE, TAR SANDS AND OTHER MINERALS - Google Patents

PROCEDURE AND EQUIPMENT FOR THE MINING OF OIL SHALE, TAR SANDS AND OTHER MINERALS

Info

Publication number
DE2538663A1
DE2538663A1 DE19752538663 DE2538663A DE2538663A1 DE 2538663 A1 DE2538663 A1 DE 2538663A1 DE 19752538663 DE19752538663 DE 19752538663 DE 2538663 A DE2538663 A DE 2538663A DE 2538663 A1 DE2538663 A1 DE 2538663A1
Authority
DE
Germany
Prior art keywords
mining
ore
tunnels
floor
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19752538663
Other languages
German (de)
Inventor
Robert W Johns
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of DE2538663A1 publication Critical patent/DE2538663A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/24Methods of underground mining; Layouts therefor for oil-bearing deposits

Description

Erz sammeln und es Schichten zuführen, von wo es an ein unteres Endniveau transportiert wird; von diesem Niveau wird das Erz aus der Grube entfernt. Nach vorliegender Erfindung wird ein aktiver Grubenabbau durch die bekannte Bogenschildtechnik mit eingespannten Bögen auf nur einem Niveau durchgeführt, wobei die einzigen anderen Niveaus, Erzsammei- und transportniveaus sind. Es gibt keine Niveaus oder Grubenabbaueinrichtungen über dem ersten Abbauniveau nur Zugangs- und Ventilationsschächte. Durch Verwendung dieses Abbauverfahrens und der bevorzugten Grubenkonfiguration kann ein vollständiges Erzvorkommen mit minimaler Oberflächenveränderung abgebaut und es kann ein Absenken durch Verteilen von Abbau in einer Weise, die vom ästhetischen Standpunkt aus vertretbar ist, kompensiert werden.Collect ore and feed it into layers from where it goes to lower final level is transported; from this level the ore is removed from the pit. According to the present invention is an active mining through the well-known arch shield technology with clamped arches on only one Level, with the only other levels, ore collection and transport levels are. There are no levels or mining facilities above the first mining level access and ventilation shafts only. By using this mining method and the preferred pit configuration, you can A complete ore deposit is mined with minimal surface change and subsidence can occur through dispersal be compensated for by degradation in a way that is aesthetically justifiable.

Die Erfindung bezieht sich auf den Abbau von "Ölschiefern", wie sie beispielsweise in Colorado, Wyoming und Utah, U.S.A. gefunden werden, und auf ähnliche Vorkommen von Kohle, ölschiefer, ölsand und anderen Mineralien, die an anderen Stellen gefunden werden.The invention relates to the mining of "oil shales", as found, for example, in Colorado, Wyoming and Utah, U.S.A., and for similar deposits of coal, oil shale, oil sands and other minerals in other places being found.

Der Abbau von Ölschiefern erscheint der wichtigste Anwendungsfall des vorliegenden erfindungsgemäßen Verfahrens und vorliegende Beschreibung ist auf ölschiefer abgestellt. Anstelle von "ölschiefer" können jedoch in der Beschreibung auch, im Hahmen vorliegender Erfindung andere Mineralien gesetzt werden.The mining of oil shale appears to be the most important application of the present method and the present invention Description is based on oil shale. Instead of "oil shale", however, in the description, im Other minerals can be set within the scope of the present invention.

Der Ausdruck "ölschiefer" bezieht sich auf sedimentäre Vorkommen von organisch reiehen lehmigen Dolomiten und Mergel. Die organisch abgeleitete Komponente ist ein Kohlenwasserstoff, der als "Kerogen" bezeichnet wird, ein Mineral, das in eine Form von Eohöl umgewandelt wird, wenn es auf eine ausreichend hohe Temperatur erhitzt wird. Vorkommen von ölschiefer, das hauptsächlich ie Staate von Colorado, Utah und Wyoming, U.S.A. vorkommt, enthält Milliarden von Barrels von Rohölreserven.The term "oil shale" refers to sedimentary deposits of organic, loamy Dolomites and marl. The organically derived component is a hydrocarbon, which is referred to as "kerogen", a mineral that is in a form is converted by Eohöl when it is at a sufficiently high level Temperature is heated. Oil shale deposits, mainly in the states of Colorado, Utah and Wyoming, U.S.A. contains billions of barrels of crude oil reserves.

60 9-811/033560 9-811 / 0335

Die U. S.-Abbaubehörde schätzt, daß 81 Milliarden Barrel flüssige Brennstoffe für den Verbrauch in unmittelbarer Zukunft erforderlich sind. Dies ist mehr, als in den Vereinigten Staaten in den letzten 100 Jahren, seit im Jahre 1859 öl entdeckt wurde, produziert worden ist. Deshalb sind ölschiefer eine logische Quelle eines wesentlichen Teils dieses Bedarfes.The U.S. Mining Authority estimates that 81 billion barrels of liquid fuels are available for immediate consumption Future are required. This is more than in the United States for the past 100 years or more years In 1859 oil was discovered has been produced. That is why oil shale is a logical source of an essential part this need.

Während die ölschiefer eine Hilfsquelle darstellen, stehen sie so lange nicht zur Verfügung, bis Mittel gefunden worden sind, die eine sichere und wirtschaftliche Auswertung ermöglichen. Die Vorkommen von ölschiefer sind enorm groß, sie sind jedoch von geringer Qualität und enthalten nur einen sehr geringen Anteil an öl pro Tonne, was bedeutet, daß die Abbaukosten pro Tonne Rohschiefererz verhältnismäßig gering sein müssen, damit der Abbau wirtschaftlich vertretbar ist.While the oil shale are a source of help, stand they are not available until means have been found that enable a safe and economical evaluation. The deposits of oil shale are enormous, but they are of poor quality and contain only a very small amount Proportion of oil per ton, which means that the mining costs per ton of raw shale ore are relatively low must so that the dismantling is economically justifiable.

Forschungen haben bisher nur auf einer Versuchsbasis stattgefunden. Diese schließen Arbeiten der Union Oil Company, des U.S. Büro of Mines, der Colony Development Company usw., ein, ein wirtschaftlich brauchbares Verfahren ist jedoch bis jetzt nicht entwickelt bzw. durchgeführt worden.Research has so far only taken place on an experimental basis. These include work by the Union Oil Company, U.S. Bureau of Mines, the Colony Development Company, etc., a, a however, an economically viable process has not yet been developed or carried out.

Es gibt eine Vielfalt von Publikationen zum Abbau von Ölschiefern, von denen nur einige nachstehend genannt werden:There are a variety of publications on the mining of oil shale, only a few of which are mentioned below:

(1) "Methods for Mining Deep, Thick Oil Shale Deposits;1 US-Patent Nr. 3 588 175 vom 28.6.1971(1) "Methods for Mining Deep, Thick Oil Shale Deposits; 1 U.S. Patent No. 3,588,175 dated June 28, 1971

(2) Proposed for Oil Shale Development, Colorado, Utah and Wyoming, U.S. Department of the Interior, Washington* D.C, May, 1968;(2) Proposed for Oil Shale Development, Colorado, Utah and Wyoming, U.S. Department of the Interior, Washington * D.C, May, 1968;

(3) Allsman, P. T., "A Simultaneous Caving and Surface Restoration System For Oil Shale Mining", ■ Quarterly of the Colorado School of Mines, Golden, Colo. Vol. 63» No. 4-, Oct. 1968, pp. 113-126, und(3) Allsman, P. T., "A Simultaneous Caving and Surface Restoration System For Oil Shale Mining ", Quarterly of the Colorado School of Mines, Golden, Colo. Vol. 63" No. 4-, Oct. 1968, pp. 113-126, and

(4-) Cameron and Jones, Inc. "Comments and Suggestions on the Department of Interior Oil Shale Policy Statement of May, 1968" Synthetic Fuels Quarterly Report, Cameron and Jones, Inc., Denver, Colo.(4-) Cameron and Jones, Inc. "Comments and Suggestions on the Department of Interior Oil Shale Policy Statement of May, 1968" Synthetic Fuels Quarterly Report, Cameron and Jones, Inc., Denver, Colo.

1/033S1 / 033S

Die neuesten Versuche zum Abbauen von Ölschiefern sind nach dem herkömmlichen Kammer-Pfeiler-Bau in verhältnismäßig dünnen Schichten durchgeführt worden. Dieses Verfahren ist bei oberflächennahen Ölschiefervorkommen mit einer Mächtigkeit von 6 bis 30 m anwendbar, Über eine Mächtigkeit von 30 m hinaus werden die "Kammern" so hoch, daß nicht mehr mit normalen "Kammer-Pfeiler-Verfahren" gearbeitet werden kann, das Verfahren wird außerordentlich gefährlich und nahezu 50 % des Ölschiefers muß in Pfeilern belassen werden. Die ölschiefervorkommen sind sehr mächtig und das Entfernen von 30 m Mächtigkeit von einem Teil dieser Mächtigkeit ohne Zerstörung des übrigen Teiles für den praktischen Abbau ist nicht vertretbar.The latest attempts to mine oil shale are after the conventional chamber-pillar construction has been carried out in relatively thin layers. This procedure is Applicable for near-surface oil shale deposits with a thickness of 6 to 30 m, over a thickness of 30 m In addition, the "chambers" are so high that they can no longer be used as normal "Chamber-pillar method" can be worked on, the method becomes extremely dangerous and nearly 50% of the oil shale has to be left in pillars. The oil shale deposits are very powerful and removing 30 m of thickness from part of that thickness without destroying the the remaining part for the practical dismantling is not justifiable.

Es wurde vorgeschlagen, daß die mächtigen Ölschieferschichten erfolgreich im Tageabbauverfahren abgebaut werden. Dies ist technisch zwar möglich. Die Größe des Tagebaus und die enorme Halde an Abfallerz sind jedoch ökologisch nicht vertretbar, obgleich der Tagebau möglicherweise eingefüllt und vom ästhetischen Standpunkt aus akzeptabel wäre.It has been suggested that the thick layers of oil shale can be successfully mined using the daily mining process. This is technically possible. However, the size of the open pit and the enormous pile of waste ore are not ecologically justifiable, although the open pit mine might be filled and aesthetically acceptable.

Eine Änderung des Pfeiler-Bruch-Verfahrens ist zum Fördern von tiefen mächtigen Gesteinsschichten aus Ölschiefer vorgeschlagen worden ("Allsman, P. T. A Simultaneous Caving and Surface Restoration System IOr Oil Shale Mining", Ibid.). Die Hauptschwierigkeit ist hierbei der Nachteil, daß das Nachfallen des Gutes nicht bzw. nicht in ausreichendem Maße gesteuert werden kann.A change in the pier fracture method has been proposed for the extraction of deep, thick rock layers from oil shale ("Allsman, P. T. A Simultaneous Caving and Surface Restoration System IOr Oil Shale Mining", Ibid.). The main difficulty here is the disadvantage that the falling down of the goods does not or not to a sufficient extent can be controlled.

Ein weiteres mögliches Abbauverfahren, das als "Einschnitt-Verfahren" bezeichnet wird, ist ebenfalls vorgeschlagen worden; es stellt-die Grundlage für das vorstehend erwähnte US-Patent 3 588 175 dar.Another possible mining method known as the "cutting method" has also been suggested; it forms the basis for the above-mentioned US patent 3,588,175.

Alle diese Verfahren sind einer eingehenden Betrachtung unterzogen und ausführlich untersucht worden, jedoch als zu gefährlich oder zu aufwendig befunden worden. In vielen Fällen sind sie sowohl gefährlich als auch aufwendig. Möglicherweise von gleicher Wichtigkeit ist, daß sie vom ästhetischen Standpunkt aus für Ökologen und Natur schützer nicht in Frage kommen,All of these procedures are under scrutiny and extensively investigated, but found to be too dangerous or too costly. In many cases they are they are both dangerous and costly. Perhaps equally important is that they are from an aesthetic point of view out of the question for ecologists and nature conservationists,

Ö.0Ö81 1 /033$Ö.0Ö81 1/033 $

die gegen die Hügel ankämpfen, in denen die Ablagerungen .auftreten.fighting against the mounds where the debris occurs.

Somit ist es ein wesentliches Ziel der vorliegenden Erfindung,It is therefore an essential aim of the present invention to

a) den ölschiefer mit Kosten abzubauen, die kommerziell für die Gewinnung von Kohöl annehmbar sind,a) Mining the oil shale at a cost that is commercial are acceptable for the extraction of coal,

b) die Sicherheit für die Grubenarbeiter zu erhöhen, die den ölschiefer schürfen,b) to increase the safety of the miners who dig the oil shale,

c) das Schürfen und das Entfernen des Abfalls so durchzuführen, daß er unschädlich ist und kaum von jemandem wahrgenommen wird.c) to carry out the prospecting and removal of waste in such a way that that it is harmless and hardly noticed by anyone.

In der dt. Patentanmeldung P 25 11 416.3 vom 15-3.1975 hat der Anmelder der Fachwelt ein Verfahren und eine Einrichtung vorgestellt, die als Bogenschildtechnik mit eingespannten Bögen zum Abbau von ölschiefer und Teersanden bezeichnet ist.In the German patent application P 25 11 416.3 from 15-3.1975 the applicant presented to the professional world a method and a device that was clamped as an arc shield technology Arches for the mining of oil shale and tar sands is designated.

Diese Technik sieht ein Abbauverfahren vor, das nur einen aktiven Abbau auf einem einzigen Niveau an der Basis eines Erzblockes erforderlich macht, um nahezu 100 % des Mineralblockes zu entfernen.This technique provides a mining process that requires only a single level of active mining from the base of an ore block to remove nearly 100% of the mineral block.

Diese Technik sieht eine seitlich verlaufende Uhtergrundabbauflache von etwa 300 m in der Breite und von J - 3,6 m in der Höhe vor, gegen die ein seitlich verlaufendes Abbauschild eingestellt wird? das Schild dient der teilweisen Aufnahme der Abbaugeräte, wie der seitlichen Abscherpflüge, der Drehschneideinrichtungen oder dergleichen, die im Eohle-Untertage-Abbau üblich sindj die Schneideinrichtung arbeitet über die volle Breite der Abbauwand. Das abgebaute Material fällt, nachdem es von der Abbaufläche-gelöst worden ist, auf einen seitlichen Förderer, der innerhalb des Abbauschildes arbeitet, wird dann von der Stirnseite zu einer Sammelvorrichtung gefördert, die an den Enden der Stirnseite arbeitet und letztlich über einen Schacht zur Erdoberfläche transportiert wird.This technique sees a laterally running Uhtergrund mining area of about 300 m in width and from J - 3.6 m in the Height in front of which a laterally running mining sign is set will? the shield is used to partially accommodate the mining equipment, such as the side plows and the rotary cutting devices or the like, which are common in coal mining, the cutting device works over the full Width of the dismantling wall. The mined material, after it has been released from the mining surface, falls onto a side Conveyor working inside the excavation shield is then conveyed from the front to a collecting device which works at the ends of the face and is ultimately transported to the surface of the earth via a shaft.

Das Abbauschild weist eine Vielzahl von individuellen Gewölbeabschnitten auf, deren jeder gegen die Abbauwand vorschiebbar ist, wenn die Abbauwand zurückgeht, wodurch ein leerer KaumThe mining shield has a plurality of individual vault sections each of which can be advanced against the breakout wall when the breakout wall goes back, creating an empty bar

609011/0336609011/0336

hinter dem Abbauschild entsteht, der den "Rücken" unabgestützt läßt, so daß dieser zusammenfallen kann. Normalerweise gibt der Rücken einige Stunden nach dem Vorschub des Schildes aufgrund der "halb plastischen" Natur des Sandes und des eingeschlossenen viskosen Bitumen nicht nach. Unter normalen Abbaubedingungen fällt der Rücken allmählich 6 - 12 in hinter dem sich "bewegenden Abbauschild zusammen, wenn dieses sich in den bituminösen Sandkörper hinein vorschiebt.behind the demolition shield arises, which unsupported the "back" leaves so that this can coincide. Usually the back gives due a few hours after the shield is advanced the "semi-plastic" nature of the sand and the enclosed viscous bitumen. Under normal degradation conditions, the back gradually falls 6-12 in behind the "moving demolition shield" when this advances into the bituminous sand body.

Der Arbeitsvorgang wird über einen optimalen Abstand der Vorwärtsbewegung durchgeführt und dann wiederholt, damit in der vorherigen Weise auf das zusammengefallene Material eingewirkt wird. Der gesarate Arbeitsvorgang wird auf dem Untergrundgestein oder in der Nähe des Untergrundgesteines durchgeführt, wobei der Arbeitsvorgang fortschreitet, bis der gewünschte Abschnitt des bituminösen Materials abgebaut worden ist.The operation is carried out over an optimal distance of forward movement and then repeated so that in acted on the collapsed material in the previous manner will. The entire work process is carried out on or in the vicinity of the underground rock, the operation continuing until the desired section of bituminous material has been mined is.

Die Schneideinrichtung arbeitet unbemannt, das Schneidgerät führt dabei eine Bewegung zwischen zwei Bedienungspersonen aus, und zwar 4eweils eine an jedem Ende des zusammengesetzten beweglichen Vortriebsschildes, und jede Bedienungsperson ist in einer S*euerkanzel oder dergleichen in dauernd abgestützten Fahr strecken untergebracht.The cutting device works unmanned, the cutting device performs a movement between two operators, one at each end of the compound movable shield, and every operator is housed in a cockpit or the like in permanently supported driving routes.

Bei dieser älteren Anmeldung wird eine Einrichtung in Verbindung mit der Abbaumaschine vorgeschlagen, um sie den speziellen Anforderungen des Untertageabbaus von bituminösen Sanden anzupassen, wobei vorzugsweise zwei Reinigungspflüge zurückziehbar mit der Abbaumaschine an jedem ihrer Enden befestigt sind, um eine Wechselwirkung zu erzielen, nämlich einen Nachlauf zur Abbaumaschine und einen Vorlauf zur Vorschiebeinrichtung für die Abbaugewölbeabschnitte} der Zweck besteht darin, zerkleinertes Gesteinsgeröll von dem frischen Schnitt zu entfernen, der sonst die Vorwärtsbewegung der Abbaugewölbeabschnitte behindern würde.In this older application, a device in connection with the mining machine is proposed to them to adapt to the special requirements of underground mining of bituminous sands, preferably with two cleaning plows retractably attached to the mining machine at each of its ends are to achieve an interaction, namely an after-run to the mining machine and a lead to the advancing device for the removal vault sections} the purpose exists in it, crushed rock from the fresh cut to remove, which would otherwise prevent the forward movement of the abutment vault sections would hinder.

Ferner wird bei diesem älteren Vorschlag eine Einrichtung zum Schalten des Mechanismus für den Vorschub der Abbaugewölbeabschnitte angegeben.Further, in this older proposal, a device for switching the mechanism for advancing the excavation vault sections specified.

Das Verfahren nach vorliegender Erfindung ist eine Kombination eines Strebbaues, der charakteristisch für den Kohleabbau ist, und eines "Pfeiler-Bruch-Verfahrens" (Block-Bruchbau), der charakteristisch für den Hartgestein-Abbau ist, in welchen der bituminöse Sandkörper fortlaufend im Blockbruchbau hinter der Vorschub-Hinterschneidung des Strebausbaus abgebaut wird, bis der bituminöse Sandkörper vollständig abgebaut ist, wobei die Rücken nicht abgestützt werden.The method according to the present invention is a combination of longwall mining, which is characteristic of coal mining, and a "pier fracture method" (block fracture construction), which is characteristic of hard rock mining, in which the bituminous sand body is continuously broken into blocks h inter the feed undercut of the longwall mining is dismantled until the bituminous sand body is completely dismantled, whereby the ridges are not supported.

Wesentliches Ziel vorliegender Erfindung ist somit eine Abbauanordnung und ein Abbausystem, das auf einfache Weise der Anwendung der Bogenschildtechnik mit eingespannten Bögen beim Abbau von unter der Oberfläche liegenden Erzvorkommen angepaßt werden kann.An essential aim of the present invention is therefore a dismantling arrangement and a dismantling system that makes it easy to use the arched shield technique with clamped arches Mining of subsurface ore deposits can be adapted.

Gemäß der Erfindung wird eine Grubenanordnung mit wenigstens zwei, vorzugsweise aber drei Niveaus bzw. StollensdtLen vorgeschlagen. Das obere Abbauniveau, das an oder in der Nähe der Basis des Erzvorkommens ausgebildet ist, weist ein Tunnelsystem mit peripheren Bedienungstunnels auf, die die Abbauzone begrenzen, ferner einen zentrieschen Zugangstunnel und eine Vielzahl von in Querrichtung verlaufenden Tunnels, die von dem zentrischen Zugangstunnel zu benachbarten Bedienungstunnels führen. Die Quertunnels verlaufen vorzugsweise parallel zueinander und unterteilen das Abbauniveau in eine horizontale Reihe von angrenzenden Abbaublöcken. Jeder Block wird in der Weise angebaut, wie dies nachstehend in Verbindung mit der Bogenschildtechnik mit eingespannten Bögen beschrieben ist, das Erz wird von der Stirnseite des Blockes in die Quertunnel gefördert, von wo es in vertikale Schächte oder Verladerinnen transportiert wird, die mit einem unteren Niveau der Grube in Verbindung stehen.According to the invention, a pit arrangement with at least two, but preferably three levels or tunnels is proposed. The upper mining level, formed at or near the base of the ore deposit, has a tunnel system with peripheral service tunnels that delimit the mining zone, as well as a central access tunnel and a Multiple transverse tunnels leading from the central access tunnel to adjacent service tunnels. The cross tunnels run preferentially parallel to each other and divide the mining level into a horizontal row of adjacent mining blocks. Every block is grown in the manner described below in connection with the arched shield technique with clamped arches is, the ore is conveyed from the front of the block into the transverse tunnel, from where it is fed into vertical shafts or shippers is transported, which are in communication with a lower level of the pit.

609 81 1 /033B609 81 1 / 033B

J/p 8260 . - 8 -J / p 8260. - 8th -

Zusätzlich zu dem einzigen Abbauniveau sind vorzugsweise im Falle vorliegender Erfindung zwei tiefere Betriebsniveaus vorgesehen. Ob eine Doppel- oder Dreifach-Grube vorgesehen wird, hängt weitgehend von der !Topographie des Gebietes, der Größe und der Tiefe des Erzvorkommens oder der Art des abzubauenden Minerals ab. Alle diese Faktoren stehen in Zusammenhang mit den Gesamtkosten für den Betrieb und haben infolgedeseen einen direkten Einfluß auf die endgültige Grubenanordnung.In addition to the single degradation level, in the case of the present invention there are preferably two lower operating levels intended. Whether a double or triple pit is planned depends largely on the topography of the area, the size and depth of the ore deposit or the type of ore minerals to be mined. All of these factors are related to the total cost of running and having consequently a direct influence on the final pit arrangement.

Im Falle einer Grube mit zwei Niveaus bzw» SoÜLen bzw. Schichten ist das untere, zweite Betriebsniveau in der Lage, Erz zu sammeln, das von dem Abbauniveau über vertikale Erzförderkanäle oder Verladerinnen nach abwärts geführt wird und das Erf an die Oberfläche transportieren.In the case of a pit with two levels or »SOLES or Layers, the lower, second operating level is able to collect ore from the mining level via vertical ore production channels or shippers are guided downwards and transport the Erf to the surface.

Darüberhinaus jedoch sieht die Erfindung eine Grubenanordnung mit drei Niveaus bzw. Schichten bzw. Sdlen vor, die ein Abbauniveau in der vorbeschriebenen Weise, ein zweites unteres Betriebsniveau, das ausschließlich als Sammel- bzw. Förderniveau betrieben wird, und ein drittes, noch weiter unten liegendes Betriebsniveau aufweist, das für den Transport und die Abführung dee Erzes aus der Grube in großem Umfange geeignet ist. Jedes Niveau ist über Belüftungsschächte und VersorgungssGhachte, die Oberflächentransporteinrichtungen aufweisen, sowie die genannten Verladerinnen und Erzförderwege, die auf allen Ifiveaus ausgebildet sind, an Stellen, die durch die Auslegung des Tunnelsystems vorbestimmt sind, und ferner ErzfÖ3?derer miteinander verbunden sind.In addition, however, the invention contemplates a pit arrangement with three levels or layers or Sdlen, which represent a degradation level in the manner described above, a second lower operating level, which is used exclusively as a collection or conveying level is operated, and has a third, still further below operating level, which is for the transport and the discharge of the ore from the mine is suitable to a large extent. Each level is via ventilation shafts and Supply warehouses, the surface transport facilities as well as the named shippers and ore conveying routes, who are trained at all I levels, at locations that are predetermined by the design of the tunnel system, and also ore conveyors are connected to one another.

Nachstehend wird die Erfindung in Verbindung mit der Zeichnung anhand eines bevorzugten Ausführungsbeispieles einer Anorng mit drei unterschiedlichen Niveaus erläutert. Es zeigen: Fig. 1 eine schematische Aufsicht auf ein drittes, unteres Niveau, aus welchem die Auslegung von Förderwegen, Verladerinnen, Versorgungs- und Ventilationsschächten sichtbar ist,The invention is described below in conjunction with the drawing using a preferred exemplary embodiment of an arrangement explained with three different levels. They show: FIG. 1 a schematic plan view of a third, lower one Level from which the design of conveyor routes, shippers, supply and ventilation shafts is visible

6ödiH7ö33fi6ödiH7ö33fi

eine schematische Aufsicht auf ein zweites Transport- und Sammelniveau, das die Auslegung der größeren Sammeltunnels zeigt, die dazu dienen, das herausgearbeitete Erz an die Verladerinnen zu fördern,a schematic plan view of a second transport and collection level, which shows the layout of the larger collection tunnels that serve the worked out To convey ore to the shippers,

Fig. 3 eine schematische Aufsieht auf ein erstes oberes oder Abbauniveau mit einem zentrischen Zugriffstunnel und peripheren Bedienungstunnels, die auf die ■Versorgungsund Ventilationsschächte bezogen sind,Fig. 3 is a schematic view of a first upper or Dismantling level with a central access tunnel and peripheral service tunnels related to the ■ supply and ventilation shafts,

."Fig. 4- eine Schnittansicht längs der Linie B-B der S1Ig. 1 und der Linie A-A der Fig. 3 in vergrößertem Maßstab, wobei die drei Niveaus, Verladerinnen, Erzpfade, ölschiefer und Abraum dargestellt sind,. "Fig. 4- is a sectional view along the line BB of S 1 Ig. 1 and the line AA of Fig. 3 on an enlarged scale, the three levels, loaders, ore paths, oil shale and spoil are shown,

.'Pig. 5 eine schematische Aufsicht auf einen Quertunnel auf dem Abbauniveau zwischen Produktionsblocks, dem zentrischen Zugangstunnel und den peripheren Bedienungstunnels, eine schematische Ansicht eines Teiles der Fig. 5 in vergrößertem Maßstab, wobei Produktionsblocks zwischen Quertunnels von den zentrischen Zugangstunnels ausgehen , eine schematische Ansicht der gleichen Fläche wie in Fig. 6 in vergrößertem Maßstab, wobei erste Abbauschnitte dargestellt sind, die von den zentrischen Zugangstunnels in sechs Produktionsblocks fortschreiten,.'Pig. 5 is a schematic plan view of a transverse tunnel on top of the Dismantling level between production blocks, the central access tunnel and the peripheral service tunnels, a schematic view of part of FIG. 5 in enlarged scale, with production blocks between transverse tunnels starting from the central access tunnels, a schematic view of the same area as in FIG. 6 on an enlarged scale, with first dismantling sections are shown advancing from the central access tunnels in six production blocks,

Fig. 8 eine Schnittansicht längs der Linie C-G, und stellt dar, wie der ölschiefer in den Kaum hinter den sich vorschiebenden Produktionsflächen sinkt, und das Senken des Abraumes an der Oberfläche, gefüllt mit Abfall,Fig. 8 is a sectional view along the line C-G, and shows how the oil shale in the barely behind the advancing Production area is sinking, and the lowering of the overburden on the surface, filled with waste,

Fig. 9 eine schematische Aufsicht der gleichen Fläche wie Fig. in vergrößertem Maßstab, aus der sich anschließende Schnitte ergeben, die längs der Produktionsblocks von den zentrischen Zugangstunnels folgen,FIG. 9 is a schematic plan view of the same area as FIG. on a larger scale, from which subsequent sections result, which are along the production blocks of follow the central access tunnel,

Fig. 10 eine Schnittansicht längs der Linie D-D der Fig. 9j wobei der erste Schnitt vorgeschoben wird und ein zweiter Schnitt dem ersten folgt,Fig. 10 is a sectional view taken along line D-D of Fig. 9j where the first cut is advanced and a second cut follows the first,

Fig. 11 eine schematischeAnsicht der gleichen Fläche wie in den Fig. 5» It 9» wobei die Produktionsflächen weit vorgeschoben sind und ein fünfter Schnitt früheren Schnitten folgt,Fig. 11 is a schematic view of the same area as in Fig. 5 »It 9 'wherein the production space are far advanced, and a fifth section earlier sections following

609811/033 S609811/033 p

J/p 8260 - 10 -J / p 8260 - 10 -

Fig. 12 eine Schnittansicht längs der Linie E-E der Fig. 11 mit fünf aufeinanderfolgenden, begonnenen Schnitten, die früheren Schnitten folgen,FIG. 12 is a sectional view taken along line E-E of FIG. 11 with five consecutive cuts that have begun, which follow earlier cuts,

Pig. 13 eine Schnittansicht längs der Linie E-E der Fig. 11 mit zwanzig begonnenen Schnitten, die vorausgehenden Schnitten folgen, wobei der Ölschiefer sich in Räume hinter den vorschiebenden Produktionsflächen absenkt und das Absenken des Abraumes an der Oberfläche mit Abfall gefüllt ist,Pig. 13 is a sectional view along the line EE of FIG. 11 with twenty commenced cuts that follow previous cuts, the oil shale sinking into spaces behind the advancing production areas and the sinking of the overburden on the surface being filled with waste,

Pig. 14 eine Schnittansicht längs der Linie F - F der Fig. 11 und rechtwinklig zu der Fig. 13 mit mehr als 20 aufeinanderfolgenden, begonnenen Schnitten,Pig. 14 is a sectional view along the line F-F of FIG. 11 and at right angles to FIG. 13 with more than 20 successive cuts begun,

Fig. 15 eine perspektivische Ansicht der Auskleidung, die in Quertunnels verwindet wird, und die Gewölbe aus Stahl oder anderem Material besitzt, und15 is a perspective view of the liner shown in FIG Cross tunnel is twisted, and the vaults made of steel or other material, and

Fig. 16 eine perspektivische Ansicht, die die Beziehung der Tunnels in drei Niveaus und die miteinander in Verbindung stehenden Erzpfade und Verladerinnen aufzeigt.Fig. 16 is a perspective view showing the relationship of the Shows tunnels in three levels and the connected ore paths and shippers.

Wie weiter oben bereits angedeutet, bezieht sich die Erfindung hauptsächlich auf den Abbau von tiefen, mächtigen Mineralvorkommen, z.B. Ölschiefern, Kohle und anderen Mineralien. Demgemäß sollen ausreichend große Erzreserven innerhalb eines einzelnen rechteckförmigen tetragonalen Blockes oder Prismas vorgesehen werden, obgleich auch unregelmäßige Blöcke geeignet sind.As indicated above, the invention relates primarily to the mining of deep, powerful mineral deposits, e.g. oil shale, coal and other minerals. Accordingly, sufficiently large ore reserves should be within a single rectangular tetragonal block or prism can be provided, although irregular blocks are also suitable.

Wegen der Unterschiedlichkeit des Zuganges und der Topographie der vielen Vorkommen von ölschiefer im Westen der Vereinigten Staaten wird hier kein Versuch gemacht, um den Zugang zu zeigen. Der Zugang zu den unterirdischen Anlagen kann über Schächte, Senken, Forderstollen oder eine Kombination dieser Möglichkeiten geschehen.Because of the diversity of access and topography of the many deposits of oil shale in the western United States No attempt is made here to show access to states. Access to the underground facilities can be via Shafts, sinks, conveyor tunnels or a combination of these Opportunities happen.

Aufgrund der sehr hohen, anfallenden Tonnagen werden als Transportmittel der Transport über Eisenbahn oder über große Bandförderer angegeben.Due to the very high, accruing tonnages are used as a means of transport, the transport by rail or over large Belt conveyor specified.

£99811/0335£ 99811/0335

Der Zugang zur Basis des Ölschiefers erfolgt über an sich bekannte Mittel.Access to the base of the oil shale is via means known per se.

Der Abbau beginnt so nahe wie möglich an der Basis des Ölschiefer, er wird in der Mitte und ausgehend von der Mitte des Grundstückes begonnen und von der Mitte weg in allen Richtungen fortgesetzt.The mining starts as close as possible to the base of the oil shale, it will be in the middle and starting from the middle of the property and continued from the center in all directions.

Mit die wichtigsten Gesichtspunkte für vorliegende Erfindung sind die Steuerung der Position und der Oberflächensenkung, die Steuerung der Anzeige der Senkung an der Oberfläche und die Erzielung einer sicheren Arbeitsumgebung. Die Abbaumaschinen in dem Abbauvortriebsschild werden von dem Bedienenden ferngesteuert, der stets durch massive Stahlgerüste geschützt und entfernt von der jeweiligen Abbaustelle positioniert ist, und der zu keinem Zeitpunkt mit dem Erz in Berührung zu kommen braucht.One of the most important aspects for the present invention is the control of the position and the surface subsidence, controlling the display of subsidence on the surface and creating a safe working environment. The mining machines in the excavation shield are remote-controlled by the operator, who is always protected by massive steel scaffolding and is positioned away from the respective mining site and is not in contact with the ore at any time needs to come.

Das Abbauvortriebsschild nach vorliegender Erfindung istThe mining shield of the present invention is

Gegenstand des Patentes (P 25 11 416.3) und besteht ausSubject of the patent (P 25 11 416.3) and consists of

einer Vielzahl von Gewölbeabschnitten, wie sie in Fig. 15 seitlich nebeneinander angeordnet sind. Zur Klarstellung sei erwähnt, daß der Ausdruck "Gewölbeabschnittw in vorliegender Beschreibung so zu verstehen ist, daß es sich um einen Baukörper mit einem Basis- oder Bodenteil und einer in einem spitzen Winkel von dem Basisteil in Form eines Halbbogens nach oben verlaufenden Seitenwand handelt. Es besteht keine dauernde Zwischenverbindung zwischen den Gewölbeabschnitten, und das vollständige Abbauvortriebsschild wird so verwendet, daß die offene Seite der abzubauenden Wand zugeordnet ist. Das Vortriebsschild ist so aufgebaut, daß jeder Gewölbeabschnitt in Abbaurichtung unabhängig nach vorwärts verschiebbar ist, wobei die Vorwärtsbewegung durch die Abbaumaschine erzielt wird, wenn sie die Querstrecke durchfährt bzw. einen Querschneidevorgang ausführt.a plurality of vault sections, as they are arranged in Fig. 15 side by side. To clarify, it should be mentioned that the expression "vault section w in the present description is to be understood as a structure with a base or floor part and a side wall running upwards at an acute angle from the base part in the form of a semicircle. There is no permanent interconnection between the vault sections and the full excavation shield is used so that the open side is associated with the wall to be excavated. The excavation shield is constructed so that each vault section is independently displaceable forwards in the excavation direction with the forward movement through the mining machine is achieved when it travels through the transverse section or performs a cross-cutting process.

Ein Senken bzw. Einstürzen des Ölschiefers und des Abraumes folgt auf die Vorwärtsbewegung der Abbaueinrichtung und schreite von der Mitte des Grundstückes aus fort. Das Maß des AbsenkensA lowering or collapse of the oil shale and the spoil follows the forward movement of the mining equipment and strides away from the center of the property. The amount of subsidence

1/033S1 / 033S

J/p 8260 - 12 -J / p 8260 - 12 -

bzw. Einstürzens hat keinen Einfluß auf den Abbau aus dem umgebenden Grundstück. Die unterirdischen Arbeiten können in der geforderten Weise vorangetrieben werden oder es kann ein vollständig getrennter Arbeitsvorgang genau dort begonnen werden, wo der Abbau des ersten Arbeitsvorganges aufgehört hat.or collapse has no influence on the breakdown from the surrounding property. The underground works may or may be advanced in the manner required a completely separate work process can be started exactly where the dismantling of the first work process left off Has.

Die Gewinnung des Ölschiefers, d.h. der Erzgüte soll so nahe wie möglich bei 100 % liegen.The extraction of the oil shale, ie the ore grade, should be as close as possible to 100 % .

Nachstehend wird auf die Zeichnungen im einzelnen Bezug genommen:Reference is made below to the drawings in detail:

Ventilationsschächte 36 sind an den vier Ecken des Grundstückes eingebaut. Beispielsweise können die Abstände so ausgelegt sein, daß die angezeigten Dimensionen T 9 km betragen.Ventilation shafts 36 are at the four corners of the property built-in. For example, the distances can be designed so that the displayed dimensions T 9 km be.

Die "Abbauzone" ist zentrisch innerhalb des Rechteckes von Ventilationsschächten 36 angeordnet. Die Abbauzone ist dabei das Volumen von ölschiefervorkommen innerhalb des Grundstückes, das abgebaut wird. Beispielsweise können die Dimensionen 9 km mal 9 km im Ausmaß betragen. Die Abbauzone kann z.B. 7» 2 mal 7,2 km betragen, wobei z.B. 0,9 km um die Seiten herum als "fender" gegen die seitliche Ausbreitung von Absenkungen gegenüber dem Untertageabbau innerhalb der Abbauzone reserviert ist,The "mining zone" is centered within the rectangle of Ventilation shafts 36 arranged. The mining zone is there the volume of oil shale deposits within the property that is being mined. For example, the dimensions can be 9 km times 9 km in extent. The degradation zone can e.g. 7 »2 times 7.2 km, e.g. 0.9 km around the sides as a "fender" against the lateral spread of subsidence is reserved for underground mining within the mining zone,

In einem die Abbauzone in zwei Teile trennenden Abschnitt sind an der äußeren Begrenzung des Grundstückes ein Paar von Zugangs- und Versorgungsschächten 26 vorgesehen.In a section dividing the mining zone into two parts are a pair of Access and supply shafts 26 are provided.

iig. 1 ist eine Aufsicht auf eine Haupttransportsoke 20 (Haupttransportniveau)? die unterhalb der Abbauzone ausgebildet ist. Diese Solle wird in bekannter Weise an der Basis des Ölschiefers oder vorzugsweise unterhalb der Erzzone gelegt. Die Tunnels, die die Transportsoke 20 darstellen, werden von dem zentrischen Zugangstunnel 35» der als Ventilationstunnel dient, nach außen getrieben und sind um einen Abstand W versetzt«iig. 1 is a supervision of a main transport rod 20 (main transport level) ? which is formed below the mining zone. This quarry is placed in a known manner at the base of the oil shale or preferably below the ore zone. The tunnels that represent the transport smoke 20 are driven outwards from the central access tunnel 35 "which serves as a ventilation tunnel and are offset by a distance W"

60981 1 /033560981 1/0335

J/p 8260 - 13 -J / p 8260 - 13 -

25386832538683

Beispielsweise kann ¥ 2,25 km "betragen, obwohl der Abstand so gewählt wird, daß eine maximale Wartung bei minimalen Kosten erreicht wird. In regelmäßigen Abständen, die nach den vorteilhaftesten Ladebedingungen ausgelegt sind, sind Verladerinnen 22 in den Transporttunnels 20 installiert.For example, ¥ 2.25 km ”may be, although the distance is chosen so that maximum maintenance is achieved at minimum cost. Periodically following are designed for the most advantageous loading conditions, loaders 22 are installed in the transport tunnels 20.

Die Transportsohle 20 ist mit allen anderen Sohlen zusammen mit den Schächten 26 und 36 über entsprechende Gänge für Notfälle verbunden sind, für Ventilationszwecke sind jedoch die Schächte 26 für die Zuluft und die Schächte 36 für die Abluft bestimmt.The transport sole 20 is with all other soles together with the shafts 26 and 36 via corresponding passages for Emergencies are connected, for ventilation purposes, however, the ducts 26 for the supply air and the ducts 36 for the Exhaust air determined.

Fig. 2 zeigt eine Sammelsohle 21, die oberhalb der Haupttransportsohle betrieben wird. Dieser zweite Tunnelkomplex ist mit der Haupttransportsohle 20 durch die vertikalen Verladerinnen 22 verbunden. Die Sammelsohle 21 besteht aus einem Netzwerk von Tunnels 23» die Bandförderer oder andere Fördereinrichtungen (nicht dargestellt) enthalten, welche auf die Verladerinnen 22 zulaufen. Fig. 2 ist eine schematische Darstellung und die tatsächliche Anzahl von Tunnels 23 wird durch den optimalen Abstand der Erzpfade von der Abbausohle darüber bestimmt.Fig. 2 shows a collecting sole 21 above the main transport sole is operated. This second tunnel complex is with the main transport floor 20 through the vertical shippers 22 connected. The collecting floor 21 consists of a network of tunnels 23 »the belt conveyor or other conveying devices (not shown), which run towards the shippers 22. Fig. 2 is a schematic illustration and the actual number of tunnels 23 is determined by the optimal spacing of the ore paths from the mine level determined about it.

Die zweite Sohle 21 ist audidie Abluftsohle bzw. das Abluftniveau. Sie ist mit den Belüftungsschächten 36 über Tunnels 34-verbunden, und der Luftzug wird so eingestellt, daß ein negativer Luftdruck auf dem gesamten Niveau 21 herrscht.The second sole 21 is also the exhaust air sole or the exhaust air level. It is connected to the ventilation shafts 36 via tunnels 34, and the draft is adjusted so that there is a negative air pressure over the entire level 21.

Fig. 3 ist eine schematische Aufsicht auf die erste oder obere Abbausohle 24-, die über der Transport- und Sammelsohle 21 betrieben wird. Die Abbausohle 24· besteht aus einem zentrischen Zugangstunnel 25» der zwischen zwei Zugangsschächten 26 betrieben wird. An den Begrenzungen des Abbaublockes werden Wartungstunnels 30 von dem zentrischen Zugangstunnel 25 aus Setrieben. Die Umfangs-Wartungstunnel 30 verlaufen um den vollständigen äußeren Umfang der gewünschten Abbauzone herum.FIG. 3 is a schematic plan view of the first or upper mining floor 24 operating above the transport and collecting floor 21 will. The excavation level 24 · consists of a central access tunnel 25 'which is operated between two access shafts 26 will. At the boundaries of the dismantling block, maintenance tunnels 30 are created from the central access tunnel 25 Drowned. The perimeter maintenance tunnels 30 run around the complete outer perimeter of the desired mining zone.

609811/0335609811/0335

Fig. 4 ist eine Schnittansicht in vergrößertem Maßstab längs der Linie A-A der Pig. 3 und der Linie B-B der Fig. 1 und 3 ;und zeigt die drei Sohlen 20, 21 und 24, die Verladerinnen 22, die Erzpfade 31, den ölschiefer 40 und den Abraum 39. Wenn diese Sohlen installiert sind, ist die Abbauzone betriebsbereit.Fig. 4 is a sectional view, on an enlarged scale, taken along line A-A of the Pig. 3 and the line B-B of the Figures 1 and 3; and shows the three soles 20, 21 and 24 which Shippers 22, the ore paths 31, the oil shale 40 and the overburden 39. When these soles are installed, the Mining zone ready for operation.

Aus Fig. 5 ergibt sich, daß die Abbauzone in eine Reihe von Produktionsblöcken 29 unterteilt ist. Die Breite Z eines jeden Produktionsblockes hängt von der Art des für den Abbauplan gewählten Abbauschildes ab. Eine beispielsweise Dimension ist für Z ein Wert von 300 m. Quertunnels 27 werden zwischen den Produktionsblöcken 29 so getrieben, daß sie die äußeren Begrenzungen der Produktionsblöcke 29 bilden und sich von dem zentrischen Zugangstunnel 25 zu den Umfangswartungstunnels 30 erstrecken.From Fig. 5 it can be seen that the degradation zone in a series of Production blocks 29 is divided. The width Z of each production block depends on the nature of the mining plan selected dismantling sign. An example dimension is a value of 300 m for Z. Cross tunnels 27 are driven between the production blocks 29 in such a way that they are the outer The boundaries of the production blocks 29 form and extend from the central access tunnel 25 to the circumferential maintenance tunnels 30 extend.

Fig. 6 ist ein vergrößerter Teil der Aufsicht nach Fig. 5 und zeigt die Quer tunnels 27, die sich von dem zentrischen Zugangstunnel 25 aus erstrecken. Die Produktionsblöcke 29 mit der Breite Z sind zwischen die Tunnels 27 eingeschlossen.FIG. 6 is an enlarged part of the plan view of FIG. 5 and shows the transverse tunnels 27 extending from the centric Access tunnel 25 extend out. The production blocks 29 with of width Z are enclosed between the tunnels 27.

Der Abbau beginnt in der Mitte der Abbauzone auf der Abbausohle an einer Stelle etwa im gleichen Abstand zwischen den Zugangsschächten 26 und schreitet von der Mitte der Abbauzone aus fort. Ein Produktionsblock 29ϊ 4er durch Quertunnels 27 begrenzt ist, wird als die Stelle des ersten Schnittes gewählt.The mining begins in the middle of the mining zone on the mining floor at a point approximately at the same distance between the access shafts 26 and proceeds from the center of the mining zone. A production block 29ϊ 4 is delimited by cross tunnels 27, is chosen as the location of the first cut.

Die Bogenschildtechnik mit eingespannten Bögen für den Abbaubetrieb gestattet, einen horizontalen Schnitt aus einer Bearbeitungsfläche eines jeden Produktionsblockes dadurch zu führen, daß eechanische Abbaumaschinen innerhalb des Schildes betrieben werden. Die Bearbeitungsfläche erstreckt sich zwischen zwei Quertunaeis 27 und hat deshalb die Länge Z. Die Höhe des Schildes bestimmt die Dicke des Schnittes, beispielsweise liegt die Dicke eines Schildes im Bereich von 3 m.The arched shield technique with clamped arches for the mining operation allows a horizontal cut from a machining area of each production block thereby run eechanical mining machines inside the shield operate. The working area extends between two transverse tunaeis 27 and therefore has the length Z. The height of the sign determines the thickness of the cut, for example the thickness of a sign is in the range of 3 m.

6Ö9811/033g6Ö9811 / 033g

Nach vorliegender Erfindung werden zwei Abbauschilde Rücken an Rücken in dem zentrischen Zugangstunnel 25 aufgebaut. Die Produktionsfläche 28 ist zu Beginn die Seitenwand des zentrischen ZugangstunnoXs 25, die Haschinen in dem Schild "baggern eine Scheibe 'Xl?.-hrlofer von der Seite des zentrischen Zugangs tunnels und ,-.irbreitern den Tunnel 25 über die Länge Z, bis das Dach des Tunnels 25 einbricht.According to the present invention, two mining shields are built back to back in the central access tunnel 25. The production area 28 is at the beginning the side wall of the central access tunnel 25, the machines in the shield "excavate a disc 'Xl ?. -hrlofer from the side of the central access tunnel and, -. Widen the tunnel 25 over the length Z until the The roof of tunnel 25 collapses.

Die Produktionsfläche 28 wird dadurch vorgeschoben, daß wiederholt Schnitte aus der Stirnfläche 28 lierausgebaggert werden, wenn das Schild kontinuierlich zur Stirnfläche 28 zwischen den Quertunnels 27 längs der Basis des Produktionsblockes 29 bewegt werden. The production area 28 is advanced in that repeated cuts from the end face 28 are dredged as the shield are continuously moved to the face 28 between the transverse tunnels 27 along the base of the production block 29.

Das Ölschiefermaterial, das aus der Produktionsfläche 28 entfernt wird, wird auf Kettenförderer (nicht dargestellt) in dem Schild aufgebracht, die auch als Spur für die Schneidmaschinen (nicht dargestellt) dienen, wie dies bei herkömmlichen Strebbauverfahren üblich ist. Das Erz wird in horizontaler Richtung längs der Stirnseite 28 zu den Quertunnels 27 gefördert, auf Förderbändern in den Quertunnels 27 übertragen und aus dem zentrischen Tunnel 25 abgefördert.The oil shale material extracted from the production area 28 is removed, is applied to chain conveyors (not shown) in the shield, which also act as a track for the cutting machines (not shown), as is customary with conventional longwall mining methods. The ore is in horizontal Conveyed in the direction along the end face 28 to the transverse tunnels 27, transferred to conveyor belts in the transverse tunnels 27 and conveyed away from the central tunnel 25.

Wenn ein Quertunnel 27 auf der ersten oder Abbausohle 24-einen Tunnel 23 auf der zweiten Sohle 21 kreuzt, wird ein vertikaler "Erzpfad" . 31 hergestellt, der die beiden Tunnels 27 und 23 miteinander verbindet, so daß der Förderer in dem Quertunnel 27 den Erzpfad 31 nach abwärts auf den Bandförderer im Tunnel 23 fördert. Das Erz wird dann in die Verladerinne 22 weitertransportiert (Fig. 16).When a transverse tunnel 27 on the first or excavation level 24 crosses a tunnel 23 on the second level 21, a vertical "ore path". 31 made of the two Tunnels 27 and 23 connects with each other, so that the conveyor in the transverse tunnel 27, the ore path 31 down to the Belt conveyor in tunnel 23 promotes. The ore is then transported further into the loading chute 22 (FIG. 16).

Die Entwicklung der Bogenschildtechnik mit eingespannten Bögen macht es nicht mehr erforderlich, das Dach oder den Rücken beim Abbau abzustützen. Wenn die Produktionsfläche durch den Betrieb des Schildes vorgeschoben wird, fällt das Dach 32 hinter dem Schild in den leeren Raum 33· Da die Breite Z der Produktionsfläche 28 groß ist, gibt es keine andere Alternative, als daß ein solcher Einsturz erfolgt. Die MengeThe development of the arched shield technology with clamped arches makes it no longer necessary to have the roof or the Support your back during dismantling. When the production area is advanced by the operation of the shield, that falls Roof 32 behind the shield in the empty space 33 · As the width Z of the production area 28 is large, there is no other alternative than that such a collapse occurs. The amount

60981 1/033560981 1/0335

j/p 8260 -tv-41* J538663j / p 8260 -tv- 41 * J538663

des einstürzenden Materials, die von einem Schnitt herrührt, ist sehr begrenzt. Wenn beispielsweise das Abbauschild 3 m hoch ist und Z etwa 240 m beträgt, würde ein Nachgeben um 2^q m eintreten, was ein verhältnismäßig kleiner Einsturz ist, dies würde unmittelbar über dem Dach nur eine begrenzte Störung ergeben·the collapsing material resulting from a cut is very limited. For example, if the dismantling sign is 3 m is high and Z is about 240 m, a yield of 2 ^ q m would occur, which is a relatively small collapse, this would result in limited disruption immediately above the roof

Wenn das Dach in Kontakt mit dem darunter liegenden Boden kommt, wird jedes weitere Nachgeben unterbunden und es wird ein Gleichgewichtszustand erzielt.When the roof comes into contact with the ground below, any further yielding is stopped and it will a state of equilibrium is achieved.

Venn ein derartiges Nachgeben bzw. Einstürzen abgeschlossen ist, wird der zentrische Tunnel 25 wieder freigebaggert, es werden zwei weitere Schilde Eücken an^Bücken eingesetzt und dann nach außen längs des Produktionsblockes vorgeschoben, damit ein zweiter Schnitt 42 durchgeführt wird.When such a yield or collapse is complete, the central tunnel 25 is dredged open again, it two more shields are placed on the backs of stoops and then advanced outwardly along the production block for a second cut 42 to be made.

Fig. 7 ist eine schematische Aufsicht auf den gesamten Bereich nach Fig. 6, wobei die ersten Abbauschnitte 41 gezeigt sind, die von dem zentrischen Zugangs turm el 25 in sechs Produktionsblocks 29 auf der Abbausohle 24 vorgenommen werden.FIG. 7 is a schematic plan view of the entire area according to FIG. 6, the first dismantling sections 41 being shown are that of the central access tower el 25 in six Production blocks 29 are made on the mining floor 24.

Fig. 8 ist eine Schnittansieht längs der Linie C-C nach Fig. 7, wobei die sich bewegenden Produktionsflächen 28 die ersten Schnitte 41 ergeben. Es ist gezeigt, daß Ölschiefer in den Raum 33 hinter der Produktionsfläche 28 nachgibt, wobei die Absenkung 37 sich nach oben erstreckt und durch den Ölschiefer 40 und den Abraum 39 ausbreitet.Fig. 8 is a sectional view taken along line C-C 7, the moving production surfaces 28 producing the first cuts 41. It is shown that oil shale yields into the space 33 behind the production area 28, the depression 37 extending upwards and through the Oil shale 40 and the spoil 39 spreads.

Fig. 9 ist eine scheuatische Ansicht der gleichen Fläche wie in Fig. 7, wobei jedoch auf die ersten Schnitte 41 zweite Schnitte 42 folgen. Es sind mehr Produktionsblocke 29 unter aktivem Betrieb , und die Fläche, in der der Betrieb vorgenommen wird, ist sowohl vor als seitlich von den nach Fig. gezeigten erweitert.Fig. 9 is a schematic view of the same area as in Fig. 7, but with the first cuts 41 second Sections 42 follow. There are more production blocks 29 under active operation, and the area in which operations are carried out is expanded both in front and to the side of those shown in FIG.

Fig. 10 ist eine Schnittansicht längs der Linie D-D nach Fig. 9, wobei der erste Schnitt 41 vorgeschoben ist und derFig. 10 is a sectional view taken along line D-D of FIG Fig. 9, wherein the first cut 41 is advanced and the

•09811/0335• 09811/0335

zweite Schnitt 42 folgt. Die Absenkung 37 im Ölschiefer 40 .und der Abraum ist weitläufiger und wird an der Oberfläche mit Abfall 38 gefüllt.second cut 42 follows. The depression 37 in the oil shale 40 .and the spoil is more extensive and is on the surface filled with waste 38.

Fig. 11 ist eine schematische Aufsicht auf die gleiche Fläche wie in den Fig. 5, 7> 9 in einer weiter fortgeschrittenen Entwicklungsstufe, wenn die Produktionsflächen 28 weiter vorgeschoben sind und der fünfte Schnitt 45 früheren Schnitten 44, 43, 42 folgt (Schnitt 41 ist bereits über den Bereich hinaus vorgeschoben). Alle Produktionsblöcke sind in aktiver Entwicklung innerhalb der ausgewählten Abbauzone.11 is a schematic plan view of the same area as in FIGS. 5, 7 9 in a more advanced stage of development, when the production areas 28 are further advanced and the fifth cut 45 earlier cuts 44, 43, 42 follows (cut 41 has already been advanced beyond the area). All production blocks are in active development within the selected mining zone.

Fig. 12 ist eine Schnittansicht längs der Linie E-E der Fig. 11, wobei fünf aufeinanderfolgende Schnitte eingeleitet wurden und andere folgen; auch hier ist gezeigt, daß Ölschiefer 40 in die Räume 33 hinter den Produktionsflächen nachfällt und die Absenkung des Abraumes 37 an der Oberfläche mit Abfall 38 gefüllt wird.Figure 12 is a sectional view taken along line E-E of Figure 11 with five successive cuts initiated were and others follow; Here, too, it is shown that oil shale 40 is in the rooms 33 behind the production areas falls and the lowering of the spoil 37 on the surface is filled with waste 38.

Die Fig. 7-12 einschließlich zeigen somit das fortschreitende Entfernen des Ölschiefers, die Absenkung des verbleibenden Ölschiefers und des Abraumes und das Auffüllen der Absenkung mit Abfall.FIGS. 7-12 inclusive thus show the progressing Removal of the oil shale, the lowering of the remaining oil shale and the spoil and the filling of the lowering with waste.

Fig. 13 ist eine Schnittansicht längs der Linie E-E der Fig. 11 in einem sehr weit fortgeschrittenen Stadium, wenn zwanzig aufeinanderfolgende Schnitte eingeleitet worden sind und sich an die vorausgehenden Schnitte anschließen. Ein großer Teil des Ölschiefers in der Abbauzone ist in diesem Stadium aus der ursprünglichen Lage entfernt worden und es ist eine große Menge an Abfall eingefüllt worden.Fig. 13 is a sectional view taken along line E-E of Fig. 11 at a very advanced stage when twenty consecutive cuts have been initiated and follow the previous cuts. A much of the oil shale in the mining zone has been removed from its original location at this stage and it a large amount of waste has been poured in.

Fig. 14 ist eine Schnittansicht längs der Linie F-F nach Fig. 11 und zwar im rechten Winkel zur Linie E-E und nach Fig. 13, wobei die gleichen zwanzig Schnitte begonnen worden sind, die gleiche Menge an ölschiefer entfernt worden ist, der gleiche Wert für die Absenkung vorliegt und die gleiche Menge an Abfall eingefüllt worden ist, wie in Fig. 13.Fig. 14 is a sectional view taken along line F-F of Fig. 11 and at right angles to line E-E and after Fig. 13, with the same twenty cuts started, the same amount of oil shale removed, the same value for the lowering is present and the same amount of waste has been filled in as in FIG. 13.

60981 1 /033560981 1/0335

Fig. 15 zeigt die Quertunnels mit Bögen aus vorzugsweise Stahl oder Materialien mit ähnlichen Eigenschaften ausgestattet. Die bewegung einer jeden aufeinanderfolgenden Produktionsfläche 28 in Längsrichtung des Produktionsblockes 29 zwischen ölen Quertunnels 27 in der Bogenschildtechnik mit eingespannten Bögen wird von der Verschiebung und der Neuanordnung dieser Bögen begleitet. Das Material oberhalb der Bögen wird weggebaggert, so daß sich kein Druck auf die Bögen aufbauen kann, wenn das Dach oder der Rücken 22 sich hinter der Produktionsfläche 28 absenkt.Fig. 15 shows the cross tunnels with arches from preferably Steel or materials with similar properties. The movement of each successive Production area 28 in the longitudinal direction of the production block 29 between oil transverse tunnels 27 using the arched shield technology clamped arches is accompanied by the displacement and rearrangement of these arches. The material above the Arches are dredged away so that no pressure can build up on the arches when the roof or ridge 22 moves lowers behind the production area 28.

Fig. 16 schließlich zeigt in perspektivischer Ansicht die Zwischenverbin&ung der drei Sohlen 20, 21 und der Quertunnels 27 der Abbausohle. Die Winkelbeziehung des Tunnel systems kann so gewählt werden, daß sie einer entsprechenden Abbauzone angepaßt lot und ist deshalb nicht auf die dargestellte Gestalt beschränkt.Finally, FIG. 16 shows in a perspective view the interconnection of the three soles 20, 21 and the transverse tunnels 27 of the excavation floor. The angular relationship of the tunnel system can be chosen so that it corresponds to a corresponding mining zone adjusted plumb and is therefore not based on the one shown Shape limited.

Die Auskleidung von Mehrfachbögen, Fig. 15 und 16, verbleibt in den Quertunnels 27 hinter der Produktionsfläche 28, wenn die Produktionefläche 28 längs des Produktionsblockes 29 vorgeschoben wird, ist jedoch nicht besetzt (mit Ausnahme für die Verwendung als Notausgang). DerTunnel 27 ist so fortgesetzt, daß er eine Belüftung der Produktionsfläche 28 ergibt. Wenn ein weiteres Paar von Schilden Rücken an Bücken in den zentrischen Zugangstunnel 25 eingesetzt wird, sind nach dem Absenken und Vorbereiten zu» Beginn eines weiteren Schnittes längs eines !Produktionsblockes 29 die Quertunnels 27 für die Wartung der Produktionsflache 28 des neuen Schnittes wieder zur Verfügung.The lining of multiple sheets, FIGS. 15 and 16, remains in the transverse tunnels 27 behind the production area 28 when the production area 28 is advanced along the production block 29, but is not occupied (with the exception of for use as an emergency exit). The tunnel 27 is like this continued that it results in ventilation of the production area 28. When another pair of shields back to stoop is inserted into the central access tunnel 25, after lowering and preparation are at the »start of another cut along a! production block 29, the transverse tunnels 27 for the Maintenance of the production area 28 of the new cut again to disposal.

Wenn die Produktionsfläche 28 durch die Bewegung des Schildes über die Länge der Produktionsblocke 29 so weit wie der Wartungstunnel JO vorgeschoben sind, wird der gesamte Abbauschild einschließlich der gesamten Maschinerie entfernt und über den Wartungstunnel 30 zum zentrischen Zugangstunnel 25 transportiert, wo das Schild für einen weiteren Schnitt versetzt wird.When the production area 28 by the movement of the shield over the length of the production blocks 29 as far as the Maintenance tunnel JO are advanced, the entire dismantling shield including all machinery removed and via the maintenance tunnel 30 to the central access tunnel 25, where the sign is moved for another cut.

609811/033S609811 / 033S

4$$ 4

Das Verfahren des erneuten Ausbaggerns des zentrischen Zugangstunnels nach dem Absenken, der Aufbau der beiden Schilde Rücken an Rücken und der beginn eines weiteren Schnittes wird so oft wiederholt, v:,--.i es notwendig ist, um die Mächtigkeit des Ölschiefers abzube.v.en. Die Anzahl, wie viel mal dies wiederholt werden muß, wird durch die folgende Formel bestimmt:The process of re-excavating the central access tunnel after lowering it, the construction of the two Shields back to back and the beginning of another cut is repeated as often as: v:, -. I it is necessary to remove the thickness of the oil shale. The number, how many times this has to be repeated is determined by the following formula:

Anzahl von aufeinanderfolgenden Schritten «Number of consecutive steps "

s Mächtigkeit des Erzes
iCiefe eines Schnittes *
s thickness of the ore
iCiefe of a cut *

Die Steuerung der breccienartigen Beschaffenheit der ölschiefer, die Geschwindigkeit des AbSinkens und die Produktionsgeschwindigkeit werden durch Regelung des Schemas der Produktionsblöcke 29 einschließlich der Breite Z erzielt, in dem die aufeinanderfolgenden Schnitte enger oder weiter auseinander gesetzt werden (durch Änderung von 2, Fig. 11), und intern die Anzahl von Produktionsblöcken 29, die aktiv abgebaut werden, vergrößert wird.Controlling the brecciated nature of the oil shale, the rate of descent and the speed of production are achieved by regulating the scheme of the production blocks 29 including the width Z, in which the successive cuts are set closer or further apart (by changing 2, FIG. 11), and internally the number of production blocks 29 that are actively being dismantled is enlarged.

Die breccienartige Beschaffenheit des Ölschiefers 40 ist für einen besonders wirtschaftlichen Abbau erwünscht, weil sie genau so wirksam ist wie herkömmliche Sprengtechniken; die breccienartige Beschaffenheit soll jedoch auf die Zone unmittelbar oberhalb der Abbausohle 24 begrenzt sein, so daß die gesamte Abbauzone nicht für Oberflächenwasser zu durchlässig wird.The breccia-like nature of the oil shale 40 is desirable for particularly economical mining because it is just as effective as traditional blasting techniques; however, the breccia-like texture is said to affect the zone be limited immediately above the mining floor 24, so that the entire mining zone does not become too permeable for surface water.

Das Absenken bedingt durch einen einzelnen Schnitt ist relativ gering. Wegen der vergleichbar großen vorhandenen Fläche muß sich die Absenkung zur Oberfläche erstrecken. Wenn jedoch die Absenkung die Oberfläche erreicht hat, breitet sie sich über eine Fläche aus, die etwa doppelt so groß ist, wie die Fläche des Schnittes im Produktionsblock 29· Sie hat auch nur etwa die Hälfte der vertikalen Bewegung über diese größere Fläche. Sie zeigt sich jedoch an der Oberfläche als eine geringe Absenkung, die nur durch genaue Messungen angezeigt werden kann.The lowering caused by a single cut is relatively small. Because of the comparably large existing ones The depression must extend to the surface. However, when the subsidence has reached the surface, it spreads it extends over an area that is about twice as large as the area of the cut in production block 29 · It has also only about half the vertical movement over this larger area. However, it shows up on the surface as a small decrease that can only be indicated by precise measurements.

609811/0335609811/0335

Eine dünne Schicht von Abfallerz 38 wird auf der Oberfläche über die Absenkfläche ausgebreitet. Das Ausbreiten dieses Abfallerzes wird fortgesetzt, wenn der Abbau und die Absenkung weitergehen. Dies hat den Einfluß auf die Oberfläche, daß eine kontinuierliche Ausbreitung einer dünnen Schicht erhalten wird. Es fallen keine bergähnlichen Haufen aus Abfallerz an. Jede Vergrößerung des Volumens an Abfallerz über dem Volumen von nicht gebrochenem Erz wird in einem langsamen und kaum wahrnehmbaren Anstieg des Oberflächenniveaus aufgenommen. Wenn die Tiefe der Abfallerze zunimmt, tritt eine Kontaktierung der Abfallerze auf, die die Volumenausdehnung praktisch auf KuIl bringt.A thin layer of waste ore 38 is on the surface Spread out over the lowering surface. The spreading of this waste ore will continue as the mining and subsidence go on. This has the effect on the surface that a continuous spread of a thin layer is obtained. No mountain-like heaps of waste ore fall at. Any increase in the volume of waste ore over the volume of uncrushed ore will result in a slow and barely noticeable rise in the surface level. As the depth of the refuse ores increases, if the waste ores come into contact, the volume expansion practically on cool.

Auf der Oberfläche können laufend Jahrespflanzen, Gräser usw. gezogen werden, mit Ausnahme eines sehr kleinen Teiles, an dem derKSlVorgang gerade vorgenommen wird. Die Gräser können sich selbst fortpflanzen, so daß sie mit zunehmender Füllung weiterwachsen·Annual plants, grasses etc. can be grown continuously on the surface, with the exception of a very small part, on which the KS process is currently being carried out. The grasses can reproduce themselves, so that they increase with The filling continues to grow

609811/0335609811/0335

Claims (14)

PatentansprücheClaims 1. Einrichtung zum Abbauen von brüchigen Mineralerζablagerungen an der Oberfläche, mit einer Grube, die wenigstens zwei Betriebsniveaus bzw. Betriebssohlen aufweist, welche über Schächte miteinander verbunden und voneinander in vertikaler Richtung versetzt sind, gekennzeichnet durch1. Device for breaking down brittle mineral deposits at the surface, with a pit which has at least two operating levels or operating floors, which via shafts are connected to one another and offset from one another in the vertical direction, characterized by (a) eine erste Betriebssohle (24), die etwa an der Basis der Ablagerung vorgesehen ist und einen Tunnelkomplex (21) aufweist, welcher enthält:(a) a first operating floor (24) which is provided approximately at the base of the deposit and a tunnel complex (21) which contains: (aa) eine Vielzahl von Bedienungstunnels (30), die eine vorgegebene Abbaufläche begrenzen,(aa) a plurality of service tunnels (30), the one limit the specified mining area, (ab) einen Hauptzugangstunnel (25), der zentrisch die Abbaufläche/ schneidet, und (ab) a main access tunnel (25) which centrally cuts the mining area /, and (ac) eine Vielzahl von Quertunnels (27), die in gleichem Abstand in paralleler Anordnung versetzt sind und von dem Hauptzugangstunnel (25) aus benachbarten Bedienungstunnels verlaufen, damit eine Verbindung dazwischen hergestellt wird und eine Vielzahl von Abbaublöcken (29) definiert wird, wobei die Sohle ferner eine Fördervorrichtung besitzt, die das abgebaute Erz in die Schachtanordnung (36) sammelt und transportiert,(ac) a plurality of transverse tunnels (27) which are equally spaced and offset in a parallel arrangement and from the main access tunnel (25) run from adjacent service tunnels, thus providing a connection between them and a plurality of excavation blocks (29) is defined, the sole further comprising a conveyor owns, which collects and transports the mined ore in the shaft arrangement (36), (b) eine Vorrichtung zum Abbau der Ablagerung und(b) a device for removing the deposit; and (c) eine zweit Betriebssohle (21), die unterhalb der ersten Sohle und parallel dazu angeordnet ist, die einen Tunnelkomplex (34) besitzt, der mit der Schachtanordnung (36) gekoppelt ist, und die eine Vorrichtung aufweist, die antriebsmäßig mit der Schachtanordnung (36) verbunden ist, und Erz aufnimmt, das von der ersten Sohle über die Schachtanordnung verläuft sowie das Erz aus der Grube transportiert.(c) a second operating floor (21), which is arranged below and parallel to the first floor, which has a tunnel complex (34) which connects to the shaft arrangement (36) is coupled, and which has a device which is drivingly connected to the shaft arrangement (36), and receives ore passing from the first level across the shaft assembly and the ore from the pit transported. • in zwei Hälften• in two halves /0/ 0 J/ρ 8260 - ξΓ- J / ρ 8260 - ξΓ- 2. Einrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Vorrichtung zum Abbau eines jeden Abbaublockes ein Vortriebsschild aufweist, das zwischen benachbarten Quertunnels (27) verläuft und quer zur Stirnseite des Blockes (29) angeordnet ist, wobei das Schild teilweise die Abbaumaschinen einschließt, nämlich eine Drehschneidvorrichtung,die über die Fläche hin- und herbewegbar ist, einen Abscherpflug und eine Vorrichtung zum Transportieren des abgebauten Erzes von der Stirnseite zu den Quertunnels·2. Device according to claim 1, characterized in that the device for dismantling each mining block is a propulsion shield which runs between adjacent transverse tunnels (27) and is arranged transversely to the end face of the block (29) with the shield partially enclosing the mining machinery, namely a rotary cutter that reciprocates across the surface is movable, a shear plow and a device for transporting the mined ore from the end face the cross tunnels 3. Einrichtung «um Abbau von Qberflächenraineralerzablagerungen mit drei Betriebsniveaus bzw. Betriebssohlen, die durch eine Vielzahl von Schächten miteinander verbunden und voneinander in vertikaler Richtung versetzt sind, gekennzeichnet durch3. Facility for the removal of surface mineral ore deposits with three operating levels or operating floors, which are connected to and from each other by a large number of shafts are offset in the vertical direction, characterized by (a) eine einsige Abbausohle, die etwa an der Basis der Ablagerung angeordnet ist und einen Tunnelkomplex besitzt, welcher aufweist:(a) A solitary excavation floor roughly at the base of the deposit is arranged and has a tunnel complex, which has: (aa) eine Vielzahl von Bedienungstunnels, die eine bezeichnete Abbaufläche begrenzen,(aa) a large number of service tunnels that delimit a designated mining area, (ab) eine Vielzahl von Quertunnels, die in gleichem Abstand in paralleler Anordnung vorgesehen sind, und von den Hauptzugangstunnel zu benachbarten Bedienungstunnels verlaufen, um eine Verbindung dazwischen herzustellen und eine Vielzahl von Abbaublöcken zu bilden, wobei jeder Abbaublock getrennt mit Hilfe einer Vorrichtung abgebaut werden kann und wobei die Sohle eine Fördervorrichtung aufweist, die abgebautes Erz aufnimmt und das Erz über einen ersten Abschnitt der Schachtanordnung transportiert,(ab) a plurality of transverse tunnels, which are provided at the same distance in a parallel arrangement, and extend from the main access tunnels to adjacent service tunnels to establish a connection therebetween and forming a plurality of mining blocks, each mining block being separated by means of a device can be mined and wherein the bottom has a conveyor device, the mined ore picks up and transports the ore over a first section of the shaft arrangement, (b) eine zweit Betriebssohle, die unterhalb der ersten Sohle und parallel daau angeordnet ist, die ein Tunnelsystem besitzt, das mit den ersten Abschnitt der Schachtanordnung zusammenwirkt, und die eine Vorrichtung aufwist, wiche antriebsmäßig mit der Schachtanordnung zusammenwirkt und(b) a second operating sole that is below the first sole and is arranged parallel to it, which has a tunnel system, which cooperates with the first section of the shaft arrangement, and which has a device, gave way cooperates drivingly with the shaft arrangement and G09811/033SG09811 / 033S J/p 8260 .- > _J / p 8260 .-> _ Erz aufnimmt, das von der ersten Sohle hindurchgeführt wird, und welche das Erz durch die Sohle zu einem zweiten Abschnitt der Schachtanordnung transportiert, undReceives ore which is passed through from the first level, and which the ore through the level to a second Section of the shaft arrangement transported, and (c) eine dritte Betriebssohle, die unterhalb der zweiten Sohle und parallel dazu angeordnet ist, die ein Tunnelsystem besitzt, das mit dem zweiten Abschnitt der Schachtanordnung zusammenwirkt und die eine Vorrichtung aufweist, welche antriebsmäßig dem zweiten Abschnitt der Schachtanordnung zugeordnet ist und so ausgelegt ist, daß sie Erz von der zweiten Sohle hindurch- und aus der Grube abtransportiert.(c) a third operating sole that is below the second sole and is arranged in parallel therewith having a tunnel system which is connected to the second section of the shaft arrangement cooperates and which has a device which drives the second section of the shaft arrangement is assigned and is designed so that it transports ore from the second level through and out of the pit. 4. Einrichtung nach Anspruch 3, dadurch gekennzeichnet, daß die Vorrichtung zum Abbau jedes Abbaublockes ein Vortriebsschild aufweist, das sich zwischen benachbarten Quertunnels erstreckt und quer zur Fläche eines jedes Blockes angeordnet ist sowie teilweise die Abbaumaschinen mit einschließt, nämlich die Drehschneidvorrichtung, die über die Fläche hin- und herbewegbar ist, den Abscherpflug und die Vorrichtung zum Transportieren des abgebauten Erzes aus der Stirnfläche zu den Quertunnels.4. Device according to claim 3, characterized in that the device for dismantling each mining block is a propulsion shield which extends between adjacent transverse tunnels and is disposed across the face of each block; partially includes the mining machines, namely the rotary cutting device which is reciprocable across the surface is, the shear plow and the device for transporting the mined ore from the end face to the Cross tunnels. 5. Einrichtung nach Anspruch 1 oder 3, dadurch gekennzeichnet, daß die Sch-achtanordnung ein getrenntes Ventilatinsleitungs- und Speiseleitungssystem sowie Verladerinnen aufweist.5. Device according to claim 1 or 3, characterized in that the Sch-eight arrangement a separate Ventilatinsleitungs- and Has feeder system as well as shippers. 6. Einrichtung nach Anspruch 1 oder 3, dadurch gekennzeichnet, daß eine Vielzahl von Ventilationsleitungen mit der zweiten Betriebssohle in Verbindung stehen, und daß eine Vorrichtung vorgesehen ist, die einen negativen Luftdruck innerhalb der zweiten Sohle erzeugt.6. Device according to claim 1 or 3, characterized in that a plurality of ventilation ducts are in communication with the second operating floor, and that a device is provided which generates a negative air pressure within the second sole. 7. Einrichtung nach Anspruch 1 oder 3, dadurch gekennzeichnet, daß jedes Vortriebsschild eine Vielzahl von unabhängigen Vortriebsabschnitten aufweist, die seitlich nebeneinander angeordnet sind und deren jeder einen Bodenteil und eine Seitenwand, die in einem spitzen Winkel vom Bodenteil nach oben verläuft,7. Device according to claim 1 or 3, characterized in that each propulsion shield has a plurality of independent propulsion sections, which are arranged side by side and each of which has a bottom part and a side wall that runs at an acute angle from the bottom part upwards, S0981 1 /0335S0981 1/0335 besitzt, wobei das Schild an der einer freiliegenden Fläche des Abbaublockes zugewandten Seitenwand offen ist.wherein the shield is open on the side wall facing an exposed surface of the mining block. 8. Einrichtung nach Anspruch 1 oder 3, dadurch gekennzeichnet, daß das Vortriebsschild abschnittweise in den Abbaublock während der Hin- und Herbewegung der Abbaumaschine vorgeschoben wird.8. Device according to claim 1 or 3, characterized in that that the propulsion shield is pushed forward in sections into the mining block during the to-and-fro movement of the mining machine will. 9. Einrichtung nach Anspruch 4, dadurch gekennzeichnet, daß die zweite Sohle mit der dritten Sohle durch Verladerinnen verbunden ist, die an vorbestimmten Stellen angeordnet sind, wobei jedes Tunnel des Systems auf einer benachbarten Rinne konvergiert und mit den Erzfordervorrichtungen versehen ist.9. Device according to claim 4, characterized in that the second sole is connected to the third sole by means of loaders which are arranged at predetermined locations, with each tunnel of the system on an adjacent channel is converged and provided with the ore conveying devices. 10. Verfahren zum Abbauen von brüchigen Mineralerzablagerungen auf der Oberfläche, gekennzeichnet durch10. A method for breaking down fragile mineral ore deposits on the surface, characterized by a) Markieren einer entsprechend großen Abbauzone,a) Marking a correspondingly large mining zone, b) Ausbilden eines Tunnelkomplexes unterhalb der Abbauzone, um eine Haupterzfördersohle auszubilden,b) Building a tunnel complex below the mining zone in order to create a main ore production floor, c) Ausbilden eines Tunnelkomplexes, der oberhalb und parallel zu der Hauptfördersohle im Abstand, jedoch unterhalb der Abbauzone angeordnet ist, um ein Erzsammei- und -transportniveau zu erhalten,c) Forming a tunnel complex, which is above and parallel to the main conveying floor at a distance, but below the Mining zone is arranged to maintain a level of ore collection and transport, d) Ausbilden einer Schaltanordnung zum Überführen von Erz aus der Transportsohle in die Fördersohle,d) forming a switching arrangement for transferring ore from the transport floor to the conveyor floor, e) Ausbilden einer einzigen Abbausohle an der Basis der Abbauzone oberhalb der Transportsohle, wobei diese Sohle eine Vielzahl von Bedienungstunnels besitzt, die eine bezeichnete Abbaufläche begrenzen, eines Hauptzugangstunnels, der zentrisch die Abbaufläche in zwei Hälften schneidet, und einer Vielzahl von Quertunnels, die parallel zueinander in gleichem Abstand versetzt angeordnet sind und von dem Hauptzugangstunnel zu benachbarten Bedienunstunnels führen, damit eine Verbindung dazwischen erzielt wird und eine Vielzahl von Abbaublöcken entsteht,e) Formation of a single mining floor at the base of the mining zone above the transport floor, this floor being a Has a plurality of service tunnels delimiting a designated mining area, a main access tunnel, the centrically cuts the mining area in half, and a multitude of transverse tunnels that are parallel to each other are arranged offset at the same distance and lead from the main access tunnel to adjacent service tunnels, so that a connection is achieved between them and a large number of mining blocks are created, f) Abbauen der Blöcke, undf) dismantling the blocks, and g) Abtransportieren abgebauten Erzes von der Abbausohle durch Fördern von Erz an benachbarte Schächte, Abführen des Erzesg) Removal of mined ore from the mining floor by conveying ore to neighboring shafts, removal of the ore 609811/0335609811/0335 J/ρ 8260 - fr- J / ρ 8260 - fr- 15386631538663 aus der Abbausohle in die Fördersohle und Entfernen des Erzes an die Bodenoberflache.from the mining floor to the mining floor and removing the ore to the soil surface. 11. Verfahren nach Anspruch 10, dadurch gekennzeichnet, daß jeder der Erzblöcke getrennt abgebaut wird, dadurch gekennzeichnet, daß11. The method according to claim 10, characterized in that each of the ore blocks is mined separately, characterized in that that a) ein Abbauschild mit einer Vielzahl von unabhängigen Gewölbeabschnitten, welche seitlich nebeneinander angeordnet' sind, versehen sind, wobei jeder Gewölbeabschnitt einen Bodenteil und eine Seitenwand, die in spitzem Winkel von der Bodenwand nach aufwärts verläuft, besitzt, und wobei das Schild gegenüber der Seitenwand zu einer freiliegenden Stirnseite des Abbaublockes geöffnet ist,a) a mining shield with a large number of independent vault sections, which are arranged side by side ', are provided, each vault portion having a Bottom part and a side wall which extends upwards at an acute angle from the bottom wall, and wherein the The shield opposite the side wall is open to an exposed face of the mining block, b) innerhalb des Schildes eine Abbaumaschine mit einer rotierender Schneidvorrichtung, die eine Hin- und Herbewegung über die freiliegende Stirnseite ausführt, eine Pflugvorrichtung zum Entfernen des abgebauten Materials, eine Fördervorrichtung zum Abtransportieren des bewegten Materials in die Schachtvorrichtung und eine der Abbaumaschine zugeordnete Vorrichtung, die nacheinander jeden Gewölbeabschnitt um einen Abstand gleich der Tiefe des Abbauschnittes vorschiebt, wenn die Abbaumaschine die Stirnseite überquert·b) a mining machine with a rotating one inside the shield Cutting device that performs a reciprocating movement over the exposed face, a plowing device for Removal of the excavated material, a conveying device for transporting away the moved material into the shaft device and a device associated with the mining machine sequentially removing each vault section by a distance equal to the depth of the excavation cut when the excavation machine crosses the face 12. Verfahren nach Anspruch 10, dadurch gekennzeichnet, daß der Abbauvorgang von einer abgeschirmten Anordnung aus gesteuert wird, die mit den Quertunnels an jedem Ende des Schildes angeordnet ist und die das Bedienungspersonal und Einrichtungen aufnehmen kann, die erforderlich sind, um eine Neuordnung der Gewölbeabschnitte, die die Quertunnels bilden, zu erzielen.12. The method according to claim 10, characterized in that the dismantling process is controlled from a shielded arrangement which is arranged with the cross tunnels at each end of the shield and which the operators and facilities which are necessary to achieve a rearrangement of the vault sections that form the transverse tunnels. 13. Verfahren nach Anspruch 10, dadurch gekennzeichnet, daß eine Ventilationsleitungsanordnung zu jeder Betriebssohle vorgesehen wird und daß ein negativer Luftdruck innerhalb eines Tunnelkomplexes der Transportsohle aufgegeben wird.13. The method according to claim 10, characterized in that a ventilation line arrangement is provided for each operating sole and that a negative air pressure is given up within a tunnel complex of the transport floor. 14. Verfahren nach Anspruch 10, dadurch gekennzeichnet, daß der Grenzwert, das Ausmaß und die Neigung der Oberflächenabsenkung durch Einstellung der Dimensionen der Abbaublöcke und durch Regelung der Häufigkeit und des Abstandes der Abbauvorgängejgesteuert werden, und daß in einer Richtung vom Mittelpunkt der Abbauzone nach außen abgebaut wird.14. The method according to claim 10, characterized in that the Limit value, the extent and the inclination of the surface subsidence by adjusting the dimensions of the mining blocks and by Regulation of the frequency and the interval between the dismantling processes and that mining is carried out in a direction from the center of the mining zone to the outside. 609811/0335609811/0335 16 > 16 > LeerseiteBlank page
DE19752538663 1974-09-03 1975-08-30 PROCEDURE AND EQUIPMENT FOR THE MINING OF OIL SHALE, TAR SANDS AND OTHER MINERALS Withdrawn DE2538663A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US502296A US3888543A (en) 1974-09-03 1974-09-03 Method for mining oil shales, tar sands, and other minerals

Publications (1)

Publication Number Publication Date
DE2538663A1 true DE2538663A1 (en) 1976-03-11

Family

ID=23997189

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19752538663 Withdrawn DE2538663A1 (en) 1974-09-03 1975-08-30 PROCEDURE AND EQUIPMENT FOR THE MINING OF OIL SHALE, TAR SANDS AND OTHER MINERALS

Country Status (4)

Country Link
US (1) US3888543A (en)
BR (1) BR7505564A (en)
CA (1) CA1038411A (en)
DE (1) DE2538663A1 (en)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6536523B1 (en) 1997-01-14 2003-03-25 Aqua Pure Ventures Inc. Water treatment process for thermal heavy oil recovery
US6554368B2 (en) * 2000-03-13 2003-04-29 Oil Sands Underground Mining, Inc. Method and system for mining hydrocarbon-containing materials
US6372123B1 (en) 2000-06-26 2002-04-16 Colt Engineering Corporation Method of removing water and contaminants from crude oil containing same
US7097255B2 (en) * 2002-01-09 2006-08-29 Oil Sands Underground Mining Corp. Method and means for processing oil sands while excavating
US7128375B2 (en) * 2003-06-04 2006-10-31 Oil Stands Underground Mining Corp. Method and means for recovering hydrocarbons from oil sands by underground mining
US20070044957A1 (en) * 2005-05-27 2007-03-01 Oil Sands Underground Mining, Inc. Method for underground recovery of hydrocarbons
US8287050B2 (en) * 2005-07-18 2012-10-16 Osum Oil Sands Corp. Method of increasing reservoir permeability
US8127865B2 (en) * 2006-04-21 2012-03-06 Osum Oil Sands Corp. Method of drilling from a shaft for underground recovery of hydrocarbons
US20080078552A1 (en) * 2006-09-29 2008-04-03 Osum Oil Sands Corp. Method of heating hydrocarbons
US7644769B2 (en) * 2006-10-16 2010-01-12 Osum Oil Sands Corp. Method of collecting hydrocarbons using a barrier tunnel
CA2668774A1 (en) 2006-11-22 2008-05-29 Osum Oil Sands Corp. Recovery of bitumen by hydraulic excavation
US20090084707A1 (en) * 2007-09-28 2009-04-02 Osum Oil Sands Corp. Method of upgrading bitumen and heavy oil
US8167960B2 (en) * 2007-10-22 2012-05-01 Osum Oil Sands Corp. Method of removing carbon dioxide emissions from in-situ recovery of bitumen and heavy oil
US20090139716A1 (en) * 2007-12-03 2009-06-04 Osum Oil Sands Corp. Method of recovering bitumen from a tunnel or shaft with heating elements and recovery wells
WO2009098597A2 (en) * 2008-02-06 2009-08-13 Osum Oil Sands Corp. Method of controlling a recovery and upgrading operation in a reservor
CA2718885C (en) 2008-05-20 2014-05-06 Osum Oil Sands Corp. Method of managing carbon reduction for hydrocarbon producers
BR112012021093B1 (en) * 2010-02-22 2019-12-24 Tech Resources Pty Ltd method for block abatement mining

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1502030A (en) * 1922-07-01 1924-07-22 Goodney Samuel John Process of mining soft ore
US3588175A (en) * 1969-04-15 1971-06-28 Atlantic Richfield Co Methods for mining deep thick oil shale deposits
US3586379A (en) * 1969-09-24 1971-06-22 Bechtel Int Corp Mining method

Also Published As

Publication number Publication date
BR7505564A (en) 1976-08-03
US3888543A (en) 1975-06-10
CA1038411A (en) 1978-09-12

Similar Documents

Publication Publication Date Title
DE2538663A1 (en) PROCEDURE AND EQUIPMENT FOR THE MINING OF OIL SHALE, TAR SANDS AND OTHER MINERALS
EP0002877B1 (en) Method for the removal of methane
DE10393535T5 (en) mining system
DE3115293A1 (en) METHOD FOR DEGRADING CARBONES
EP0257652B1 (en) Method of and device for driving a coal winning gallery partly in the footwall of a seam
DE3605062A1 (en) Sealing of landfill sites
EP0731863B1 (en) Process and device used to renovate railroad track installations
EP0230667B1 (en) Method for the stripe-wise removal of subsoil layers, especially non-rigid ones
DE3009923A1 (en) METHOD AND DEVICE FOR DISASSEMBLING THE PILLARS IN CHAMBER PILLAR CONSTRUCTION
DE2802943A1 (en) RADIAL MINING PROCESS FOR THE EXTRACTION OF MINERALS
DE2647281A1 (en) METHOD AND DEVICE FOR UNDERGROUND MINING OF ROCK AND THE LIKE.
EP0233979B1 (en) Sealing of dumps
DE678589C (en) Procedure for dismantling camps
DE2161291A1 (en) Movable ceiling support, especially for mining
DE1248588B (en) Equipment for the mechanical extraction of coal
DE974152C (en) Device for the dismantling of powerful floeze
DE865290C (en) Method for driving up stretches in steep storage
DE2533904C3 (en) Shield driving device for driving a trench and laying a pipe string in the trench
DE3024464C2 (en)
DE1088898B (en) Process for the device and for the mining of coal layers
DE3018507A1 (en) METHOD FOR UNDERGROUND PITCHING AND DEVICE FOR ITS IMPLEMENTATION
DE19536778C1 (en) Groundwater seal forming machine for continuous seals against metal contaminants
DE903806C (en) Method for mining coal, in particular lignite, by means of a mining chamber
DE3536990A1 (en) REMOVAL UNDER DEPOSITS
DE3405069A1 (en) Method of advancing a driving shield

Legal Events

Date Code Title Description
8139 Disposal/non-payment of the annual fee