DE853873C - Method and device for the production of reinforced cement fiber boards - Google Patents

Method and device for the production of reinforced cement fiber boards

Info

Publication number
DE853873C
DE853873C DES23848A DES0023848A DE853873C DE 853873 C DE853873 C DE 853873C DE S23848 A DES23848 A DE S23848A DE S0023848 A DES0023848 A DE S0023848A DE 853873 C DE853873 C DE 853873C
Authority
DE
Germany
Prior art keywords
reinforcement
absorbent pad
cement fiber
wires
cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DES23848A
Other languages
German (de)
Inventor
Alessandro Magnani
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FLSmidth and Co AS
Original Assignee
FLSmidth and Co AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FLSmidth and Co AS filed Critical FLSmidth and Co AS
Application granted granted Critical
Publication of DE853873C publication Critical patent/DE853873C/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/52Producing shaped prefabricated articles from the material specially adapted for producing articles from mixtures containing fibres, e.g. asbestos cement

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Wire Processing (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Description

(WiGBl. S. 175)(WiGBl. P. 175)

AUSGEGEBEN AM 27. OKTOBER 1952ISSUED OCTOBER 27, 1952

S 23848 VIb/8oaS 23848 VIb / 8oa

Die Erfindung bezieht sich auf ein Verfahren und eine Vorrichtung zur Herstellung armierter Zementfaserplatten durch Verteilen und Formen des Zementfasermaterials um eine Armierung herum auf einer Unterlage.The invention relates to a method and a device for producing armored Cement fiber boards by distributing and shaping the cement fiber material around a reinforcement on a pad.

Es ist bekannt, armierte Zementfaserplatten durchpressen von plastischem Zementmaterial, z.B. in der Form von Platten, um eine Armierung herum zu formen. Jedoch ist es durch dieses Verfahren im allgemeinen nicht möglich gewesen, eine ausreichend innige Verbindung zwischen dem Material und der Armierung zu erhalten. Ferner ist es bekannt, eine Armierung auf der Klebewalze einer Pappmaschine einzusetzen, nachdem das Material auf der Walze abgelegt wurde. Dieses Verfahren bewirkt aber ein Schwächen der Verbindung zwischen der Armierung und dem Material, wenn die Platte ausgefaltet wird, und ferner ist es nicht möglich, eine Armierung in der Querrichtung der Platte einzufügen.It is known to press reinforced cement fiber boards through plastic cement material, e.g. in the form of plates to form reinforcement around. However, by this procedure it is im general has not been possible to establish a sufficiently intimate connection between the material and the To get reinforcement. It is also known to provide a reinforcement on the gluing roller of a cardboard machine after the material has been deposited on the roller. However, this procedure causes a Weakening of the connection between the reinforcement and the material when the panel is unfolded, and furthermore it is not possible to insert a reinforcement in the transverse direction of the plate.

Gemäß der Erfindung besteht ein Verfahren zur ao Herstellung armierter Zementfaserplatten darin, daß fortschreitend feuchtes Zementfasermaterial über der Oberfläche einer Unterlage und rund um eine oberhalb der Unterlage angeordnete Armierung herum zugeführt, verteilt und geformt wird, wobei diese Oberfläche wasserdurchlässig und so ausge-According to the invention, a method for ao production of reinforced cement fiber boards consists in that progressively damp cement fiber material over the surface of a pad and around it a reinforcement arranged above the base is fed around, distributed and shaped, wherein this surface is permeable to water and so

bildet ist, daß sie der gewünschten Form der Unterseite der Platten entspricht, und daß gleichzeitig der Wasserüberschuß von dem Material durch Absaugen durch die Unterlage entfernt wird. Durch dieses Verfahren wird eine sehr innige Verbindung zwischen dem Zementfaserniaterial und der Armierung als Folge des Saugens und des fortschreitenden Zuführens von Zementfasermaterial erzielt. Diese Verbindung ist der nach den bekannten Verfahren erhaltenen überlegen. Außerdem ist die Notwendigkeit des Nachformens der armierten Platte beseitigt.forms is that it corresponds to the desired shape of the underside of the plates, and that at the same time the excess water is removed from the material by suction through the support. By this process creates a very intimate bond between the cement fiber material and the reinforcement as a result of the suction and progressive feeding of cement fiber material achieved. This compound is superior to that obtained by the known methods. Also is eliminates the need to reshape the armored plate.

Die Armierung kann aus Längsdrähten allein oder aus mit Querdrähten verbundenen Längsdrähten in Form von Netzen bestehen.The reinforcement can consist of longitudinal wires alone or of longitudinal wires connected with transverse wires exist in the form of networks.

Das Verfahren kann kontinuierlich sein, wobei die Unterlage während des Zuführens, Verteilens und Formens des Materials kontinuierlich vorgerückt wird. In diesem Fall kann die Armierung ao durch die eigentliche Saugunterlage vorgerückt werden, wobei Material zugeführt und um eine ausreichende Länge der Armierung herum geformt wird, um dieses Vorrücken zu gewährleisten. Vorrücken der Armierung mittels der Saugunterlage ist möglich gemacht, weil der Sog die Armierung fest an das Zementfasermaterial bindet. Bis eine genügende Länge an der Armierung zum Wirksamwerden der Bindung abgelegt ist, kann die Armierung durch unabhängige Mittel vorgerückt werden. Die Armierung wird dann anschließend an der Stelle abgeschnitten,, um welche kein Material geformt ist. Dieses unabhängige Vorrücken der Armierung kann mit einer gleichen oder kleineren Geschwindigkeit als die der Saugunterlage stattfinden. The process can be continuous, with the substrate being distributed during feeding and continuously advancing forming the material. In this case, the reinforcement ao are advanced through the actual absorbent pad, material being fed and around a sufficient length of reinforcement is molded around to accommodate this advancement. Advance The reinforcement by means of the absorbent pad is made possible because the suction tightens the reinforcement binds to the cement fiber material. Until the reinforcement is sufficiently long to take effect When the binding is filed, the reinforcement may be advanced by independent means will. The reinforcement is then cut off at the point around which there is no material is shaped. This independent advance of the reinforcement can be equal or smaller Speed than that of the absorbent pad.

Bei einer Ausführungsform der Erfindung wird die Armierung durch einen Mechanismus abgelegt, welcher oberhalb der Saugunterlage hin und her geht, und die Armierung wird im Verhältnis zu diesem Mechanismus während dessen Rückwärtsbewegung vorgerückt. Dieser Mechanismus kann durch die Saugunterlage mit gleicher Geschwindigkeit wie diese selbst vorgerückt und durch eine hin und her gehende Speise-, Verteil- und Formeinrichtung für das Zementfasermaterial zurückbewegt werden. Während der Rückwärtsbewegung des Mechanismus zum Ablegen der Armierung kann die Armierung durch diesen Mechanismus selbst mit gleicher Geschwindigkeit wie die, mit welcher der Mechanismus zürückbewegt wird, im Verhältnis zur Saugunterlage vorgerückt werden. Die Mittel zum Ablegen der Armierung können so eingerichtet sein, daß sie die Armierung in einer solchen Höhe über der Saugunterlage ablegen, wie sie der erforderlichen Dicke der Schicht an Zementfasermaterial unter der Armierung der fertigen Platte entspricht.In one embodiment of the invention, the reinforcement is deposited by a mechanism which goes back and forth above the absorbent pad, and the reinforcement is in proportion to this mechanism advanced during its backward movement. This mechanism can advanced through the absorbent pad at the same speed as this itself and through one and moving back the feeding, distributing and shaping device for the cement fiber material will. During the backward movement of the mechanism for removing the reinforcement can the reinforcement by this mechanism itself at the same speed as that with which the mechanism is moved backwards in relation to the absorbent pad. the Means for storing the reinforcement can be set up so that they are the reinforcement in a Place such a height above the absorbent pad as the required thickness of the layer of cement fiber material under the reinforcement of the finished panel.

Die Mittel zum Vorrücken der Armierung können synchron mit der Saugunterlage und mit Schneidvorrichtungen für die Armierung und die Zementfaserplatten angetrieben werden. Wenn die Armierung stetig mit der gleichen Geschwindigkeit wie die Saugunterlage vorgerückt wird, kann die | Betätigung der Mittel zum Vorrücken der Armierung für eine Zeit unterbrochen werden, nachdem je eine Länge der Armierung abgeschnitten worden ist, so daß in Abständen nichtarmierte Teile der Platte gebildet werden. Zusätzlich kann die Schneidvorrichtung für die Zementfaserplatten mit den. Mitteln zum Vorrücken der Armierung in einer solchen Weise synchronisiert werden, daß der Schneidmechanismus einen Schnitt in den nichtarmierten Plattenteilen durchführt. Hierdurch wird das Schneiden der Platten vereinfacht.The means for advancing the reinforcement can be synchronized with the absorbent pad and with cutting devices for the reinforcement and the cement fiber panels are driven. If the reinforcement is continuously advanced at the same speed as the absorbent pad, the | Actuation of the means for advancing the reinforcement can be interrupted for a time after a length of the reinforcement has been cut off so that not reinforced at intervals Parts of the plate are formed. In addition, the cutting device for the cement fiber boards with the. Means for advancing the reinforcement are synchronized in such a way that the cutting mechanism makes a cut in the non-reinforced panel parts. This will the cutting of the panels is simplified.

Statt dessen kann die Armierung, wie obenerwähnt, mit geringerer Geschwindigkeit als die Saugunterlage vorgerückt werden. Dies macht die Armierung straff, so daß der gewünschte Abstand der Armierung oberhalb der Saugunterlage genau eingehalten wird. Überdies werden als Folge des langsameren Vorrückens der Armierung nichtarmierte Teile der Zementfaserplatten auf der Saugunterlage zwischen einer abgeschnittenen Länge der Armierung, welche Länge mit gleicher Geschwindigkeit wie die Saugunterlage vorgerückt wird, und der frisch zugeführten Armierung, welche mit geringerer Geschwindigkeit vorgerückt wird, erzeugt. Die Platten können an diesen nichtarmierten Teilen nach dem Verlassen der Saugunterlage zerschnitten werden.Instead, the reinforcement, as mentioned above, at a slower speed than the Absorbent pad are advanced. This makes the reinforcement taut, leaving the desired spacing the reinforcement above the absorbent pad is strictly adhered to. In addition, as a result of the slower advance of the reinforcement non-reinforced parts of the cement fiber boards on the absorbent pad between a cut length of the reinforcement, which length at the same speed how the absorbent pad is advanced, and the freshly added reinforcement, which with less Speed is advanced. The panels can be attached to these non-reinforced parts be cut after leaving the absorbent pad.

Die Armierung kann vor ihrer Ablage auf der Saugunterlage so ausgebildet werden, daß sie der Oberfläche der Saugunterlage entspricht und kann anschließend in einer der Länge der Zementfaserplatten entsprechenden Länge zerschnitten werden. Ein solches Formen kann angewendet werden, wenn die Armierung die Form von mit der Saugunterlage ausgerichteten und mit sich quer zu dieser Unterlage erstreckenden Drähten verbundenen Längsdrähten besitzt. Die Längsdrähte werden nach ihrer Verbindung mit den Querdrähten, aber vor ihrer Ablage dicht zueinander bewegt, und die Querdrähte sind gewellt oder in anderer Weise geformt, um der Form der Oberfläche der Saugunterlage zu entsprechen. Diese Formgebung kann geeigneterweise oberhalb der Saugunterlage unmittelbar vor der Stelle, wo die Armierung abgelegt wird, ausgeführt werden.The reinforcement can be formed before it is placed on the absorbent pad so that it can Surface corresponds to the absorbent pad and can then be in one of the length of the cement fiber board cut to the appropriate length. Such molding can be applied, though the reinforcement takes the form of aligned with the absorbent pad and transverse to it Underlay extending wires has connected longitudinal wires. The line wires are after their connection with the transverse wires, but moved close to each other before being deposited, and the Cross wires are corrugated or otherwise shaped to match the shape of the surface of the absorbent pad correspond to. This shape can suitably be directly above the absorbent pad in front of the point where the reinforcement is placed.

Bei einer anderen Ausführungsform der Erfindung wird die Armierung in die erforderlichen Längen vor ihrer Ablage über der Saugunterlage zerschnitten. In einem solchen Fall kann das Verfahren darin bestehen, eine Schicht von Zementfasermaterial über der Unterlage abzulegen, eine vorher geschnittene Länge der Armierung auf dieser Schicht aufzubringen und dann eine andere Schicht von Zementfasermaterial über der Armierung zu bilden.In another embodiment of the invention, the reinforcement is in the required Cut lengths before placing them over the absorbent pad. In such a case, the procedure can consist of laying a layer of cement fiber material over the base, a to apply a previously cut length of reinforcement on this layer and then another Layer of cement fiber material to form over the reinforcement.

Wie schon erwähnt, betrifft die Erfindung auch eine Vorrichtung zur Herstellung von Zementfaserplatten. Eine solche Vorrichtung kann enthalten: eine sich vorwärts bewegende wasserdurchlässige Unterlage mit einer der gewünschten Form der Unterseite der Platten entsprechenden1 Oberfläche, eine oberhalb der Unterlage angeordnete Einrichtung zum Verteilen von feuchtem Zementfaser-As already mentioned, the invention also relates to an apparatus for producing cement fiber boards. Such a device may include: a forward moving water permeable backing and a desired shape of the underside of the plates corresponding 1 surface, one above the underlay arranged means for distributing moist Zementfaser-

material über die Ol>erfläche der Unterlage und zum Formen dieses Materials auf die gewünschte Gestalt der oberen Fläche der Platten, einen Mechanismus zum Vorrücken und Ablegen einer Armierung in einem Abstand über der Unterlage, so daß sie völlig innerhall) der gebildeten Platte liegt, und Mittel, um gleichzeitig einen Sog auf das Material durch die Unterlage auszuüben. Der Mechanismus zum Vorrücken und Ablegen der Verstärkung kann Antriebsmittel zum Vorrücken der Armierung und Führungen für die Armierung, welche zwischen den Antriebsmitteln und der Verteil- und Formeinrichtung für das Zementfasermaterial angeordnet sind und sich bis zu einem Punkt vor dieser Einrichtung unmittelbar oberhalb der Saugunterlage erstrecken, umfassen. Die Führungen können auf einem hin und her gehenden Wagen angebracht sein, welcher mit so eingerichteten Antriebsmitteln versehen ist, daß die Armierung während der Rückwärtsbeweao gung des Wagens mit einer Geschwindigkeit gleich der, mit welcher der Wagen relativ zur Saugunterlage zurückgeht, vorrückt. Die Antriebsmittel zum Vorrücken der Armierung und Räder, auf welchen der Wagen sich bewegt, können auf einer gemeinsamen Welle angebracht sein. Die Räder des Wagens können sich unmittelbar auf der Saugunterlage abstützen, welche den Wagen mit sich führt, bis ein Teil des Wagens in Berührung mit einem Teil der Verteil- und Formeinrichtung für das Zementfasermaterial kommt.material over the oil surface of the pad and to the Shaping this material to the desired shape of the top surface of the panels, a mechanism to advance and deposit a reinforcement at a distance above the base so that it is completely inside) the formed plate lies, and means to simultaneously draw a suction on the material exercise through the pad. The mechanism for advancing and removing the reinforcement can Drive means for advancing the reinforcement and guides for the reinforcement, which between the Drive means and the distribution and shaping device for the cement fiber material are arranged and extend to a point in front of this device immediately above the absorbent pad, include. The guides can be mounted on a reciprocating carriage, which is provided with drive means set up so that the reinforcement during the Rückwärtsbeweao movement of the carriage at a speed equal to that at which the carriage moves relative to the absorbent pad go back, move forward. The drive means for advancing the reinforcement and wheels on which the carriage moves can be mounted on a common shaft. The wheels of the Carriages can be supported directly on the absorbent pad that the car carries with it leads until part of the carriage comes into contact with part of the distribution and molding device for the cement fiber material comes.

Eine Ausführungsform der Vorrichtung für die Herstellung von gewellten oder nicht ebenen Platten, in welchen die Armierung aus einem Netz von Längs- und Querdrähten besteht, besitzt Mittel zur Formung der Armierung. Diese bestehen aus einem System von Führungen, über welche die Längsdrähte bewegt werden. Dabei sind die Führungen in einer solchen Weise angeordnet, daß die Längsdrähte dichter aneinander gebracht werden. Ferner sind Mittel zwischen den Führungen vorgesehen, um die Querdrähte zu wellen oder in anderer Weise zu formen. Vor den Führungen für die Längsdrähte der Armierungen können an sich bekannte Mittel zum Zuführen und Schneiden der Querdrähte und zu ihrem Befestigen an den Längsdrähten vorgesehen sein.An embodiment of the device for the production of corrugated or non-flat panels, in which the reinforcement consists of a network of longitudinal and transverse wires, has means for Forming the reinforcement. These consist of a system of guides over which the longitudinal wires be moved. The guides are arranged in such a way that the longitudinal wires be brought closer together. Means are also provided between the guides, to curl or otherwise shape the cross wires. In front of the guides for the line wires the reinforcement can means known per se for feeding and cutting the transverse wires and be provided for attaching them to the longitudinal wires.

Bei einer anderen Ausführungsform sind zwei Einrichtungen zum Verteilen und Formen von Zementfasermaterial in einer unteren und oberen Schicht vorhanden, und ein Mechanismus ist zwischen diesen Einrichtungen zum Vorrücken und Ablegen vorgeschnittener Armierungslängen über der unteren Materialschicht vor dem Aufbringen der oberen Schicht angeordnet.In another embodiment, there are two devices for dispensing and shaping Cement fiber material is present in a lower and upper layer, and a mechanism is between these devices for advancing and depositing pre-cut lengths of reinforcement the lower material layer arranged before the application of the upper layer.

Die Zeichnungen sind Beispiele verschiedener Formen von Vorrichtungen gemäß der Erfindung. Sie stellen dar:The drawings are examples of various forms of devices in accordance with the invention. They represent:

Fig. ι eine schematische Ansicht eines Teils einer Ausführungsform der Vorrichtung mit Saugunterlage und Mechanismus für das Formen und Ablegen der Armierung oberhalb der Unterlage,Fig. Ι a schematic view of part of an embodiment of the device with absorbent pad and mechanism for forming and depositing the reinforcement above the base,

Fig. 2 eine schematische Ansicht eines Teils des Mechanismus von Fig. 1 von oben gesehen,Fig. 2 is a schematic view of part of the mechanism of Fig. 1 seen from above,

Fig. 3 einen Teil einer anderen Ausführungsform der Vorrichtung mit einer kontinuierlich bewegten Saugunterlage und einem darüber zum Zuführen qnd Ablegen der Armierung angeordneten Mechanismus, 3 shows a part of another embodiment of the device with a continuously moving one Absorbent pad and a mechanism arranged above it for feeding and depositing the reinforcement,

Fig. 4 den Mechanismus von Fig. 3 von oben gesehen.Fig. 4 shows the mechanism of Fig. 3 seen from above.

Die Vorrichtung nach Fig. 1 und 2 besitzt eine Saugunterlage i, deren obere Oberfläche gewellt und wasserdurchlässig ist, und eine Zuführ-, Verteil- und Formeinrichtung 2 für das Zementfasermaterial. Oberhalb der Saugunterlage 1 ist eine Reihe von Führungsrädern 4 auf einer Welle 13 in einer solchen Weise angeordnet, daß die Räderebenen sich in einer gemeinsamen Linie, wie in Fig. 2 gezeigt, schneiden.The device according to FIGS. 1 and 2 has an absorbent pad i, the upper surface of which is corrugated and is water-permeable, and a supply, distribution and shaping device 2 for the cement fiber material. Above the absorbent pad 1 is a series of guide wheels 4 on a shaft 13 in FIG arranged in such a way that the gear planes are in a common line, as in Fig. 2, cut.

Die Längsarmierungsdrähte 9 werden von Spulen 6 zugeführt. Diese Drähte gehen durch Bremseinrichtung 7 zu Rollen 5 iutid von dort durch Drahtstreckeinrichtungen 8 zu den Führungsrädern 4, welche die Drähte vor ihrem Durchgang zwischen angetriebene Reibrollen 10 führen, welch letztere das Zuführen der Drähte bewirken. Die Drähte gehen dann durch eine Schneidvorrichtung 11 und weiter zu Führungen 12, entlang welchen sie zu dem Raum zwischen Unterlage 1 und Verteileinrichtung 2 geleitet werden.The longitudinal reinforcement wires 9 are fed from spools 6. These wires go through braking device 7 to roll 5 iutid from there through Wire stretching devices 8 to the guide wheels 4, which the wires before their passage lead between driven friction rollers 10, which the latter cause the feeding of the wires. the Wires then go through a cutting device 11 and on to guides 12 along which they are directed to the space between the base 1 and the distribution device 2.

Für das Einsetzen von Längsdrähten allein, z. B. in die Erhöhungen und Vertiefungen einer Zementfaserschicht von wellenförmigem Schnitt, werden die Drähte von den Spulen 6 über die Rollens un<i weiter über die Führungsräder 4 geleitet, wo sie näher aneinandergebracht werden, um dem Abstand zwischen den Erhöhungen und Vertiefungen der Welle zu entsprechen. Die Drähte gehen weiter zwischen Antriebsrollen 10 und entlang Führungen 12, wobei sie von den Rollen 10 vorgerückt werden, bis Material durch die Verteileinrichtung 2 darauf abgelegt und um eine gewisse Länge der Drähte herum geformt wurde. Während dieses Ablegens und Formens wird überschüssiges Wasser gleichzeitig aus dem Material durch Saugen entfernt, und die Drähte werden in und mit dem Material gebunden. For the insertion of line wires alone, e.g. B. in the peaks and valleys of a cement fiber layer of wave-shaped cut, the wires from the coils 6 via the rollers un <i are passed on to the guide wheels 4, where they are brought closer together to the distance between the peaks and valleys of the shaft correspond. The wires continue between drive rollers 10 and along guides 12, being advanced by rollers 10 until material has been deposited thereon by spreader 2 and formed around a certain length of the wires. During this laying down and shaping, excess water is simultaneously removed from the material by suction and the wires are bound in and with the material.

Anschließend werden die Drähte mittels Schneidvorrichtung 11 in einer der Länge der hergestellten Platten entsprechenden Länge zerschnitten.Subsequently, the wires are made by means of cutting device 11 in one of the length of the Cut the panels to the appropriate length.

Wenn auch Querdrähte einverleibt werden sollen, ist eine Drahtspule 14 für den Querdraht iy vorgesehen. Dieser Draht geht durch eine Streckvorrichtung 26, wobei eine geeignete Länge mittels eines hin und her gehenden Schiffchens 15 abgezogen wird.If transverse wires are also to be incorporated, a wire spool 14 is provided for the transverse wire iy . This wire goes through a stretching device 26, a suitable length being withdrawn by means of a shuttle 15 that moves back and forth.

Darauf wird die abgezogene Länge des Querdrahts 17 durch Messer 16 abgeschnitten. Die abgeschnittene Länge wird dann in Führungen 18 gelegt, welche um eine Welle 19 schwenkbar sind. Beim Drehen dieser Führungen 18 wird der Querdraht 17 auf die Längsdrähte 9 abgelegt, worauf Querdraht 17 an den Längsdrähten 9 mittels eines Befestigungsapparates 20 und 21 befestigt wird, welcher auf von Schienen 28 getragenen Rädern 27 angeordnet ist. Der Befestigungsapparat kann bei-Then the drawn off length of the cross wire 17 is cut off by knife 16. The cut off Length is then placed in guides 18 which can be pivoted about a shaft 19. When these guides 18 are rotated, the transverse wire 17 is placed on the longitudinal wires 9, whereupon Transverse wire 17 is attached to the longitudinal wires 9 by means of a fastening device 20 and 21, which is arranged on wheels 27 carried by rails 28. The fastening device can be

spielsweise ein Schweißapparat, eine Biegemaschine od. dgl. sein und wird entlang den Schienen 28 so hin und her bewegt, daß die Befestigung während der stetigen Vorwärtsbewegung der Längsdrähte 9 stattfinden kann.For example, a welding machine, a bending machine or the like. Be along the rails 28 like that moved back and forth that the fastening during the steady forward movement of the longitudinal wires 9 can take place.

Die Armierung in Form eines von aus Längsdrähten 9 mit daran befestigten Querdrähten 17 bestehenden Netzes geht dann über die Führungsräder 4, wie oben beschrieben, und die Längsdrähte 9 werden dichter aneinandergebracht. Gleichzeitig werden die Querdrähte 17 der Einwirkung eines formgebenden Teils 22 unterworfen, welcher mit den Führungsrädern 4 über einen Teil ihres Umfangs zusammenarbeitet. Den Querdrähten wird dadurch eine gewellte Form gegeben entsprechend der gewellten Oberfläche der Saugunterlage i. Das formgebende Glied 22 ist an einem Zapfen 23 aufgehängt und schwenkbar bei 24 mit einem exzentrisch bewegten Arm 25 befestigt, weleher dem Teil 22 eine Vibrierbewegung gibt. Das sich ergebende gewellte Netz geht, wie oben beschrieben, zwischen die Rollen 10, welche hauptsächlich auf die Längsdrähte einwirken, und weiter zu den Führungen 12. Das Netz wird mittels Schneidvorrichtung 11, wie oben für die Längsdrähte allein !beschrieben, abgeschnitten.The reinforcement in the form of a line consisting of longitudinal wires 9 with transverse wires 17 attached thereto Netzes then goes over the guide wheels 4, as described above, and the longitudinal wires 9 are brought closer together. At the same time, the transverse wires 17 are affected subjected to a shaping part 22, which with the guide wheels 4 over a part their scope cooperates. The transverse wires are given a corrugated shape accordingly the corrugated surface of the absorbent pad i. The shaping member 22 is on one Pin 23 suspended and pivotally attached at 24 with an eccentrically moved arm 25, weleher the part 22 gives a vibrating motion. The resulting corrugated mesh goes, as described above, between the rollers 10, which mainly act on the longitudinal wires, and further to the guides 12. The net is cut by means of a cutting device 11, as above for the longitudinal wires alone! described, cut off.

Die Saugunterlage 1 kann in beliebiger geeigneter bekannter Art ausgeführt und feststehend oder beweglich sein. Auch die Zuführ-, Verteil- und Formeinrichtung 2 kann in verschiedener Weise ausgebildet und feststehend oder beweglich sein. Schließlich kann das Abschneiden der Längsdrähte 9 hinter der Saugunterlage stattfinden, und in diesem Fall sind die Rollen 10 überflüssig.The absorbent pad 1 can be of any suitable known type and can be fixed or movable be. The feeding, distributing and shaping device 2 can also be designed in various ways and be fixed or movable. Finally, the cutting of the longitudinal wires 9 can be behind the absorbent pad take place, and in this case the rollers 10 are superfluous.

Die Vorrichtung nach den Fig. 3 und 4 besitzt eine Saugunterlage 1, welche aus einer endlosen Kette von Saugkasten 52 besteht, jeder mit perforierter Oberfläche und stetig über Räder 49 in einer solchen Weise bewegt, daß die Oberseite der Kästen eine flache Saugunterlage bildet, während ihre . Unterseite über öffnungen gleitet und durch sie in Verbindung steht mit dem Innern feststehender Führungen, in welchen ein Vakuum aufrechterhalten wird. Ferner kann in Berührung mit der oberen Reihe von Saugkästen ein endloses nicht gezeigtes Gewebeband bewegt werden, auf welchem das Zementfasermaterial zugeführt wird. Die durchlässigen Oberflächen der Kästen 52 besitzen ein wellenförmiges Muster, wenn die Herstellung gewellter Zementfaserplatten beabsichtigt ist. Die Zufuhr-, Verteil- und Formeinrichtung für das Zementfasermaterial besitzt eine hin und her gehende Bewegung und hat die Gestalt eines Behälters, dessen Endwände aus Walzen mit einem Profil bestehen, welches dem Querschnitt der Zementfaserplatten entspricht, und der sich quer zur Richtung der Saugunterlage erstreckt. Die Einrichtung zum Ablegen der Armierung besteht aus einem Wagen, in dessen Seitenwänden 30 Wellen 33 und 34 angeordnet sind. Welle 33-trägt eine Reihe von Rädern 32 des Wagens, während eine zweite Reihe von Rädern 31 an Welle 34 angeordnet ist. Die Räder 32 des Wagens sind in einer solchen Weise angebracht, daß jedes in einer Rinne der Wellen der Saugkasten 52 ruht, während die Räder 31 in einer solchen Weise angebracht sind, daß jedes auf einer Erhöhung der von den Kästen 52 gebildeten Wellen ruht. Der Wagen ist ferner mit Führungen 41 und 42 für die Längsdrähte 53 der Armierung versehen. Welle 34 besitzt Rollen 35 (s. Fig. 4). Die Armierungsdrähte 53 werden unterhalb dieser Rollen 35 getragen und gegen sie durch Rollen 40 gedrückt (Fig. 3), welche an einem Ende j eines Arms 38 angebracht sind. Dieser Arm wird mittels Feder 39 nach oben gezogen, so daß Rolle 40 sich elastisch gegen die Rolle 35 abstützt. Arm 38 und Feder 39 sind an einer Platte 37 befestigt, welche von einer feststehenden Querstange 36 getragen wird, welche die zwei Endwände 30 des Wagens verbindet. Diese Wände werden auch durch andere ähnliche Stäbe 36' und 36" verbunden. Der Wagen 30 ist mit einem Vorsprung 44 versehen, welcher einen Anschlag 45 am Ende der Rückwärtsbewegung des Wagens berührt. Der Wagen besitzt auch gefederte Vorsprünge 43, welche in Verbindung mit einem pneumatischenoder hydraulischen Puffer stehen und in Berührung mit der Verteileinrichtung 2 für das Zementfasermaterial am Ende der Vorwärtsbewegung des Gestells kommen. Die Verteileinrichtung ist mit Vorsprüngen 47 versehen, welche die Vorsprünge 43 berühren.The device according to FIGS. 3 and 4 has an absorbent pad 1, which consists of an endless one There is a chain of suction box 52, each with a perforated surface and continuously over wheels 49 in one moved in such a way that the top of the boxes forms a flat absorbent pad while their . The underside slides over openings and through them communicates with the interior more firmly Guides in which a vacuum is maintained. It can also be in contact with the Upper row of suction boxes an endless fabric belt, not shown, are moved on which the cement fiber material is fed. The permeable surfaces of the boxes 52 have a wavy pattern if the production of corrugated cement fiber board is intended. the Feed, distribution and shaping device for the cement fiber material has a back and forth walking motion and has the shape of a container, the end walls of which are made of rollers with a Profile exist, which corresponds to the cross-section of the cement fiber board, and which is transverse extends towards the direction of the absorbent pad. The device for storing the reinforcement consists of a carriage in whose side walls 30 shafts 33 and 34 are arranged. Wave 33-carries a number of wheels 32 of the carriage, while a second row of wheels 31 is arranged on shaft 34. The wheels 32 of the car are mounted in such a way that each in a groove of the Shafts the suction box 52 rests while the wheels 31 are mounted in such a way that each rests on an elevation of the corrugations formed by the boxes 52. The car is also with Guides 41 and 42 are provided for the longitudinal wires 53 of the reinforcement. Shaft 34 has rollers 35 (see Fig. 4). The reinforcement wires 53 are carried below these rollers 35 and through against them Rollers 40 pressed (Fig. 3), which are attached to one end j of an arm 38. This arm will pulled upwards by means of spring 39, so that roller 40 is elastically supported against roller 35. poor 38 and spring 39 are attached to a plate 37 which is carried by a fixed cross bar 36 connecting the two end walls 30 of the carriage. These walls are also through other similar rods 36 'and 36 "connected. The carriage 30 is provided with a protrusion 44, which contacts a stop 45 at the end of the rearward movement of the carriage. The car owns also spring-loaded projections 43, which in connection with a pneumatic or hydraulic Stand buffer and in contact with the distributor 2 for the cement fiber material at the end the forward movement of the frame. The distribution device is provided with projections 47, which the projections 43 touch.

Die in den Fig. 3 und 4 dargestellte Vorrichtung arbeitet in folgender Weise: Die Armierungsdrähte 53 werden von einem Rad oder einer Rolle 54 abgezogen und gehen zwischen die Zuführungsrollen 10 und weiter zu den oberen Drahtführungen 41 auf dem Wagen 30 und dann zwischen den Rollen 40 und 35 zur unteren Führung 42, welche ebenfalls auf dem Wagen angebracht ist. Die Drähte 53 gehen jetzt über die Saugunterlage 1 unterhalb der Verteileinrichtung 2 für das Zementfasermaterial. Die Saugunterlage 1 wird stetig in der durch Pfeil 48 gezeigten Richtung bewegt. Die Verteileinrichtung 2 wird in ihrer äußersten linken Stellung in Fig· 3 gezeigt. Wenn diese Einrichtung nach rechts durch unabhängige nicht gezeigte Antriebsmittel in ihre andere äußerste Stellung bewegt wird, wird Wagen 30, dessen Räder 31 und 32 unmittelbar auf der Unterlage ruhen, mit dieser Unterlage nach vorn 'bewegt. Die Rollen 10, welche nicht mit dem Wagen 30 vorrücken, werden mit einer solchen Geschwindigkeit angetrieben^ daß sie den Draht 53 mit der gleichen Geschwindigkeit vorrücken, mit welcher der Wagen 30 vorwärts bewegt wird. Wie dargestellt, kann eine der Rollen 10 durch eine Kette 51 von einem Kettenrad 50 angetrieben werden, dessen Geschwindigkeit mit der Geschwindigkeit der Räder 49 synchronisiert ist. Die Verteileinrichtung 2 wird nach rechts mit größerer Geschwindigkeit als die der Saugunterlage 1 und infolgedessen auch des Wagens 30 bewegt. Während ihrer Rückwärtsbewegung wird sie deshalb den Wagen 30 treffen, und die Vorsprünge 43 des Wagens kommen dabei in Berührung mit den Vorsprüngen 47 der Einrichtung 2, wodurch der Wagen 30 nach links in die Stellung gemäß Fig. 3The device shown in Figs. 3 and 4 operates in the following way: The reinforcement wires 53 are withdrawn from a wheel or roller 54 and go between the feed rollers 10 and on to the upper wire guides 41 on the carriage 30 and then between the rollers 40 and 35 to the lower guide 42, which is also mounted on the carriage. The wires 53 go now over the absorbent pad 1 below the distribution device 2 for the cement fiber material. The absorbent pad 1 is continuously moved in the direction shown by arrow 48. The distribution facility 2 is shown in its leftmost position in FIG. If this facility is right is moved to its other extreme position by independent drive means not shown Car 30, the wheels 31 and 32 of which rest directly on the base, with this base forward 'moved. The rollers 10 which do not advance with the carriage 30 are made with one Speed driven ^ that they advance the wire 53 at the same speed, with which the carriage 30 is moved forward. As shown, one of the rollers 10 can by a Chain 51 driven by a sprocket 50, the speed of which with the speed the wheels 49 is synchronized. The distributor 2 is moving to the right at greater speed than that of the absorbent pad 1 and consequently also of the carriage 30. While its backward movement will therefore hit the carriage 30 and the projections 43 of the Car come into contact with the projections 47 of the device 2, whereby the Carriage 30 to the left into the position shown in FIG. 3

gestoßen wird. Während dieser Rückwärtsbewegung des Wagens 30 werden die Räder 31 auf der Unterlage abrollen, und gleichzeitig werden die Rollen35, welche gleichen Durchmesser wie die Räder 31 besitzen, infolgedessen in einer der Uhrzeigerrichtung entgegengesetzten Richtung mit einer solchen Geschwindigkeit gedreht, daß der Draht 53 in Richtung des Pfeils 48 durch die Rollen 35 und 40 mit gleicher Geschwindigkeit bewegt wird, mit welcher der Wagen 30 in entgegengesetzter Richtung im Verhältnis zur Saugunterlage 1 bewegt wird. Das heißt, der Draht 43 wird stetig der Bewegung der Saugunterlage 1 folgen und dadurch mit gleicher Geschwindigkeit wie diese Unterlage vorgerückt werden.is bumped. During this backward movement of the carriage 30, the wheels 31 are on the base unroll, and at the same time the rollers 35, which have the same diameter as the wheels 31, consequently, in an opposite clockwise direction at such a speed rotated that the wire 53 in the direction of arrow 48 through the rollers 35 and 40 with the same speed is moved with which the carriage 30 in the opposite direction in the Relation to the absorbent pad 1 is moved. That is, the wire 43 is steadily moving the Follow absorbent pad 1 and thereby advance at the same speed as this pad will.

Die Höhe der Führungen 42 ist so eingestellt, daß die Drähte 53 in einer Entfernung oberhalb der Saugunterlage 1 gehalten werden, welche der Dicke des unterhalb der Drähte in den fertigen PlattenThe height of the guides 42 is adjusted so that the wires 53 at a distance above the Absorbent pad 1 must be held, which is the thickness of the underneath the wires in the finished panels

ao erforderlichen Materials entspricht. Das Material wird durch die Vorrichtung 2 um die Drähte herum und zwischen sie abgelegt, so daß es eine Schicht auf der Saugunterlage 1 bildet, in welcher die Drähte in gewünschter Höhe über der unteren Oberfläche eingebettet sind.ao required material. The material is passed through the device 2 around the wires and deposited between them so that it forms a layer on the absorbent pad 1 in which the Wires are embedded at the desired height above the lower surface.

Nachdem Wagen 30 eine Bewegung in Richtung des Pfeils 48, wie beschrieben, vollendet hat, kann eine Schneidvorrichtung 46 für die Drähte 53 betätigt werden, um die Drähte von gewünschter Länge abzuschneiden. Die abgeschnittenen Drähte 53 werden anschließend zusammen mit der Unterlage vorgerückt, wobei eine genügende Länge in dem Zementfasermaterial auf der Unterlage jetzt gebunden ist. Nach dem Abschneiden der Drähte 53 durch die Einrichtung 46 kann der Antriebsmechanismus für die Rollen 10 für eine kurze Zeitspanne außer Eingriff kommen, während welcher ein Stück der Zementfaserplatte gänzlich ohne Armierung auf der Unterlage gebildet wird, und die Zementfaserplatte wird in diesem nichtarmierten Teil nach dem Verlassen der Unterlage 1 abgeschnitten. Der nicht gezeigte diesen Schnitt vornehmende Mechanismus kann in l>eliebiger bekannter Weise von dem Schneidmechanismus 46 für die Drähte 53 gesteuert werden.After carriage 30 has completed a movement in the direction of arrow 48 as described, can a cutting device 46 for the wires 53 can be actuated to cut the wires of desired Cut off length. The cut wires 53 are then together with the base advanced, with sufficient length in the cement fiber material on the backing now is bound. After the wires 53 have been cut by the device 46, the drive mechanism for the rollers 10 to disengage for a short period of time during which a piece the cement fiber board is formed entirely without reinforcement on the substrate, and the cement fiber board is cut off in this non-reinforced part after leaving the base 1. Not that The mechanism shown for making this incision can be modified in any known manner from the Cutting mechanism 46 for the wires 53 can be controlled.

Die Vorrichtung nach den Fig. 3 und 4 kann sich auch in der Weise betätigen, daß die Rollen 10 die Drähte 53 mit einer etwas kleineren Geschwindigkeit als der der Saugunterlage ι stetig vorrücken.The device according to FIGS. 3 and 4 can also operate in such a way that the rollers 10 the wires 53 advance steadily at a slightly slower speed than that of the absorbent pad ι.

Mit dieser Anordnung werden die Drähte 53 straff gegen Speiserollen der Einrichtung 2 gezogen, und die richtige Lage der Drähte in bezug auf die durch die genannten Rollen abgelegte Materialsc'hicht wird genau eingehalten. Da überdies die abgeschnittenen Längen der Drähte 53 unmittelbar nach dem Abschneiden mit gleicher Geschwindigkeit wie die Saugunterlage 1 vorgerückt werden, wird zwischen die abgeschnittenen Längen und den nachgelieferten Draht, welcher mit kleinerer Geschwindigkeit als die der Saugunterlage 1 vorgerückt wird, ein gewisses Stück ohne Armierung gelassen, bei welchem die Platten abgeschnitten werden können. In diesem Fall würde der Schneidmechanismus für die Zementfaserplatten in bekannter Weise von den Rollen 10 gesteuert werden.With this arrangement, the wires 53 are pulled taut against feed rollers of the device 2, and the correct position of the wires in relation to the layer of material deposited by said rollers is strictly adhered to. Since, moreover, the cut lengths of the wires 53 immediately after cutting, they are advanced at the same speed as the absorbent pad 1, is placed between the cut lengths and the supplied wire, which runs at a lower speed than that of the absorbent pad 1 is advanced, a certain amount without reinforcement left, at which the panels can be cut off. In this case the cutting mechanism would for the cement fiber boards are controlled by the rollers 10 in a known manner.

Bei der Vorrichtung nach den Fig. 3 und 4 kann auch ein Armierungsnetz vor dem Ablegen in entsprechender Weise, wie bei Fig. 1 und 2 beschrieben, geformt werden.In the device according to FIGS. 3 and 4, a reinforcement net can also be used in the corresponding Way, as described in Figs. 1 and 2, are formed.

Neben anderen zulässigen Abänderungen kann die Möglichkeit der Verwendung von Armierungsdrähten erwähnt werden, welche schon auf die erforderlichen Längen geschnitten sind, anstatt diese Drähte von einem Vorrat stetig zuzuführen und sie an Ort und Stelle zu zerschneiden. In einem solchen Fall würden die Drähte von einem Speisebehälter zugeführt, auf der oberen Oberfläche einer Schicht von Zementfasermaterial abgelegt, welche bereits von einer hin und her gehenden Verteilungseinrichtung gleich der Einrichtung 2 der Fig. 3 und 4 verteilt wurde, und dann mit einer zweiten Schicht von mittels einer zweiten hin und her gehenden Verteileinrichtung verteiltem Zementfasermaterial überdeckt. Mit anderen Worten, die Drähte würden zwischen zwei hin und her gehenden Speisevorrichtungen, welche über verschiedenen Teilen der gleichen Saugunterlage arbeiten, abgelegt.In addition to other permissible modifications, the possibility of using reinforcement wires can be mentioned, which already correspond to the required Lengths are cut instead of feeding these wires from a supply and feeding them cut up on the spot. In such a case, the wires would be from a food container fed, deposited on the top surface of a layer of cement fiber material, which is already distributed by a reciprocating distribution device similar to device 2 of FIGS was, and then with a second layer by means of a second reciprocating Distributor distributed cement fiber material covered. In other words, the wires would between two reciprocating feeders which are placed over different parts of the work on the same absorbent pad.

Claims (6)

PATENTANSPRÜCHE:PATENT CLAIMS: 1. Verfahren zur Herstellung armierter Zementfaserplatten, dadurch gekennzeichnet, daß fortschreitend Zementfasermaterial über der Oberfläche einer Unterlage und um eine oberhalb der Unterlage abgelegte Armierung herum zugeführt, verteilt und geformt wird, wobei diese Oberfläche wasserdurchlässig und so geformt ist, daß sie der gewünschten Form der Unterseite der Platten entpricht, und daß gleichzeitig überflüssiges Wasser aus dem Material durch Absaugen durch die Unterlage entfernt wird.1. Process for the production of reinforced cement fiber boards, characterized in that that cement fiber progressively over the surface of a pad and around one above Reinforcement deposited around the base is fed, distributed and shaped, wherein this surface is permeable to water and shaped so that it has the desired shape of the Underside of the plates corresponds, and that at the same time excess water from the material is removed by suction through the pad. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Saugunterlage stetig vorgerückt wird, während das Material zugeführt, verteilt und geformt wird, und daß die Armierung durch die Saugunterlage vorgerückt wird, während das Material um eine ausreichende Länge der Armierung zugeführt und geformt wird, um dieses Vorrücken zu gewährleisten.2. The method according to claim 1, characterized in that that the absorbent pad is steadily advanced while the material is fed, distributed and shaped, and that the reinforcement is advanced through the absorbent pad while the material is sufficient Length of reinforcement is fed and shaped to ensure this advance. 3. Verfahren nach Anspruch 2, dadurch gekennzeichnet, daß die Armierung vor ihrem weiteren Vorrücken durch die Saugunterlage anfänglich durch unabhängige Mittel vorgerückt und die Armierung anschließend an einer Stelle abgeschnitten wird, um welche noch kein Material geformt ist.3. The method according to claim 2, characterized in that the reinforcement before its further Absorbent pad advance initially advanced by independent means and the reinforcement is then cut off at a point around which there is no material is shaped. 4. Verfahren nach Anspruch 3, dadurch gekennzeichnet, daß die Armierung durch unabhängige Mittel mit geringerer Geschwindigkeit als die der Saugunterlage vorgerückt wird, bis die Armierung abgeschnitten worden ist.4. The method according to claim 3, characterized in that the reinforcement by independent Means at a slower speed than that of the absorbent pad is advanced until the reinforcement has been cut off. 5. Verfahren nach einem beliebigen der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Armierung durch eine Einrichtung5. The method according to any one of the preceding claims, characterized in that that the reinforcement by a device abgelegt wird, welche oberhalb der Saugunterlage hin und her geht, und daß die Armierung in bezug auf diese Einrichtung während deren Rückwärtsbewegung vorgerückt wird. is deposited, which goes back and forth above the absorbent pad, and that the reinforcement with respect to this device is advanced during its rearward movement. 6. Verfahren nach Anspruch 5, dadurch gekennzeichnet, daß die Einrichtung zum Ablegen der Armierung von der Saugunterlage mit der gleichen Geschwindigkeit wie diese vorgerückt und durch eine hin und her gehende Speise-, Verteil- und Formeinrichtung für das Zementfasermaterial zurüokbewegt wird.6. The method according to claim 5, characterized in that that the device for removing the reinforcement from the absorbent pad is advanced at the same speed as this and a reciprocating feeding, distributing and shaping device for the Cement fiber material is moved back. 7. Verfahren nach Anspruch 6, dadurch gekennzeichnet, daß während der Rückwärtsbewegung der Einrichtung zum Ablegen der Armierung die Armierung durch diese Einrichtung mit einer gleichen Geschwindigkeit wie die, mit welcher die Einrichtung zurückbewegt wird, im Verhältnis zur Saugunterlage vorgerückt wird.7. The method according to claim 6, characterized in that during the backward movement the device for depositing the reinforcement, the reinforcement through this device at the same speed as that with which the device is moved back, is advanced in relation to the absorbent pad. 8. Verfahren nach Anspruch. 5 bis 7, dadurch gekennzeichnet, daß die Mittel zum Vorrücken der Armierung synchron mit der Saugunterlage und Schneidvorrichtung für die Armierung und die Zementfaserplatten angetrieben werden.8. The method according to claim. 5 to 7, characterized in that the means for advancing the reinforcement synchronously with the absorbent pad and cutting device for the reinforcement and the cement fiber boards are driven. 9. Verfahren nach Anspruch 8, dadurch gekennzeichnet, daß die Betätigung der Mittel zum Vorrücken der Armierung für eine Zeit nach dem Abschneiden jeder Länge der Armierung angehalten wird, so daß abstandweise nichtarmierte Plattenteile gebildet werden, ι o. Verfahren nach Anspruch 8 oder 9, dadurch gekennzeichnet, daß die Schneidvorrichtung für die Zementfaserplatten mit den Mitteln zum Vorrücken der Armierung in einer solchen Weise synchronisiert wird, daß die Abschneidvorrichtung einen Schnitt in den nichtarmierten Plattenteilen ausführt.9. The method according to claim 8, characterized in that the actuation of the means to advance the rebar for a time after each length of the rebar is cut is stopped so that spaced non-reinforced plate parts are formed, ι o. The method according to claim 8 or 9, characterized in that the cutting device for the cement fiber boards with the means for advancing the reinforcement in such Way is synchronized that the cutting device makes a cut in the unarmored Plate parts executes. 11. Verfahren nach einem beliebigen der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Armierung vor dem Ablegen auf die Saugunterlage in einer der Oberfläche der Saugunterlage entsprechenden Weise geformt und sie anschließend in den erforderlichen Längen der den armierten Zementfaserplatten entsprechenden Längen zerschnitten wird.11. A method according to any of the preceding Claims, characterized in that the reinforcement in one of the surface of the before being deposited on the absorbent pad The absorbent pad is shaped accordingly and then cut into the required lengths cut to the lengths corresponding to the reinforced cement fiber boards. 12. Verfahren zur Herstellung armierter Zementfaserplatten von gewellter oder anderer nicht ebener Form nach Anspruch 11, dadurch gekennzeichnet, daß die Armierung die Form ' von mit der Saugunterlage ausgerichteten und mit zu dieser Unterlage quer verlaufenden Drähten verbundenen Längsdrähten besitzt, die Längsdrähte nach ihrer Verbindung mit den Querdrähten aber vor ihrer Ablage dichter zueinander bewegt und die Querdrähte gewellt oder in anderer Weise geformt werden, um der Form der Oberfläche der Saugunterlage zu entsprechen. 12. Process for the production of reinforced cement fiber boards of corrugated or other non-planar shape according to claim 11, characterized in that characterized in that the reinforcement has the shape of aligned with the absorbent pad and has longitudinal wires connected with wires running transversely to this base, which Line wires after their connection with the cross wires but closer to one another before they are deposited moved and the transverse wires corrugated or otherwise shaped to match the shape of the surface of the absorbent pad. 13. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Armierung in die erforderlichen Längen vor ihrer Ablage oberhalb der Saugunterlage zerschnitten wird.13. The method according to claim 1, characterized in that that the reinforcement is cut into the required lengths before being placed above the absorbent pad. 14. Verfahren nach Anspruch 13, dadurch gekennzeichnet, daß eine Schicht von Zementfasermaterial über der Unterlage verteilt, eine zuvor abgeschnittene Länge an Armierung auf diese Schicht aufgebracht und dann eine andere Schicht von Zementfasermaterial über der Armierung gebildet wird.14. The method according to claim 13, characterized in that that a layer of cement fiber material spread over the base, one before cut length of reinforcement applied to this layer and then another Layer of cement fiber material is formed over the reinforcement. 15. Vorrichtung zur Herstellung von Zementfaserplatten gewünschter Form, insbesondere zur Ausübung des Verfahrens nach Anspruch 1 bis 14, dadurc'h gekennzeichnet, daß sie aus einer vorrückenden wasserdurchlässigen Unterlage mit einer der gewünschten Form der Unterseite der Platten entsprechenden Oberfläche, aus einer oberhalb der Unterlage zur Verteilung feuchten Zementfasermaterials über der Oberfläche der Unterlage und zur Formung dieses Materials zu der gewünschten Gestalt der oberen Oberfläche der Platten angeordneten Einrichtung, aus einem Mechanismus zum Vorrücken und Ablegen von Armierung in einem Abstand oberhalb der Unterlage, so daß sie völlig innerhalb der gebildeten Platte liegt, und aus Mitteln, um gleichzeitig einen Sog auf das Material durch die Unterlage auszuüben, besteht. 15. Device for the production of cement fiber boards desired shape, in particular for performing the method according to claim 1 to 14, dadurc'h characterized in that they consist of an advancing water-permeable substrate with a surface corresponding to the desired shape of the underside of the panels, from a moist cement fiber material above the base for distribution over the surface of the substrate and for shaping this material into the desired shape of the means arranged on the upper surface of the plates, consisting of a mechanism for advancing and depositing reinforcement a distance above the base so that it lies entirely within the formed panel, and consists of means to simultaneously exert suction on the material through the base. 16. Vorrichtung nach Anspruch 15, dadurch gekennzeichnet, daß der Mechanismus zum Vorrücken und Ablegen der Armierung Antriebsmittel zum Vorrücken der Armierung und zwischen den Antriebsmitteln und der Verteil- und Formeinrichtung für das Zementfasermaterial angeordnete und sich zu einem Punkt vor dieser Einrichtung unmittelbar oberhalb der Saugunterlage erstreckende Führungen für die Armierung enthält.16. The device according to claim 15, characterized characterized in that the mechanism for advancing and removing the reinforcement is drive means for advancing the reinforcement and between the drive means and the distribution and shaping device for the cement fiber material arranged and extending to a point in front of this device immediately above the absorbent pad for guides the reinforcement contains. 17. Vorrichtung nach Anspruch 16, dadurch gekennzeichnet, daß die Führungen auf einem hin und her gehenden Wagen angeordnet sind, welcher mit so eingerichteten Antriebsmitteln versehen ist, daß die Armierung während der Rückwärtsbewegung des Wagens mit einer gleichen Geschwindigkeit vorgerückt wird, mit welcher der Wagen sich im Verhältnis zur Saugunterlage zurückbewegt.17. The device according to claim 16, characterized characterized in that the guides are arranged on a reciprocating carriage, which is provided with so arranged drive means that the reinforcement during the Backward movement of the carriage at an equal speed is advanced with which the carriage moves back in relation to the absorbent pad. 18. Vorrichtung nach Anspruch, 17, dadurch gekennzeichnet, daß die Antriebsmittel zum Vorrücken der Armierung und Räder, auf welchen der Wagen sich bewegt, auf einer gemeinsamen Welle angeordnet sind.18. Apparatus according to claim 17, characterized characterized in that the drive means for advancing the reinforcement and wheels on which the carriage moves are arranged on a common shaft. 19. Vorrichtung nach Anspruch 18, dadurch gekennzeichnet, daß die Räder des Wagens sich unmittelbar auf der Saugunterlage abstützen, welche den Wagen mit sich trägt, bis ein Teil des Wagens in Berührung mit einem Teil der Verteil- und Formeinrichtung für das Zementfasermaterial kommt.19. The device according to claim 18, characterized characterized in that the wheels of the car are supported directly on the absorbent pad, which carries the carriage with it until part of the carriage is in contact with part of the Distribution and molding device for the cement fiber material comes. 20. Vorrichtung nach einem beliebigen der Ansprüche 15 bis 19 zur Herstellung gewellter oder anderer nicht ebener Platten mit einer aus einem Netz von Längs- und Querdrähten bestehenden Armierung, dadurch gekennzeichnet, daß Mittel zum Formen der Armierung vorgesehen sind, bestehend aus einem System von Führungen, über welches die Längsdrähte be-20. Apparatus according to any one of claims 15 to 19 for making corrugated or other non-planar plates with one consisting of a network of longitudinal and transverse wires Reinforcement, characterized in that means are provided for shaping the reinforcement consist of a system of guides through which the line wires are wegt werden, und daß diese Führungen in einer solchen Weise angeordnet sind, daß die Längsdrähte dichter aneinandergebracht werden können, und schließlich Mittel zwischen diesen Führungen, um die Querdrähte zu wellen oder ihnen eine andere Form zu geben, angeordnet sind.are moved away, and that these guides are arranged in such a way that the Line wires can be brought closer together, and ultimately means between them Guides to corrugate the cross wires or to give them another shape, arranged are. 2i. Vorrichtung nach Anspruch 20, dadurch gekennzeichnet, daß vor den Führungen für die Längsdrähte der Armierung Mittel zum Speisen und Abschneiden der Querdrähte und zu ihrer Befestigung an die Längsdrähte vorgesehen sind.2i. Device according to claim 20, characterized in that in front of the guides for the Line wires of the reinforcement Means for feeding and cutting the cross wires and their Attachment to the line wires are provided. 22. Vorrichtung nach Anspruch 15, dadurch gekennzeichnet, daß zwei Einrichtungen zum Verteilen und Formen des Zementfasermaterials in einer unteren und oberen Schicht vorgesehen sind und ein Mechanismus zwischen diesen Einrichtungen zum Vorrücken und Ablegen vorher geschnittener Längen der Armierung auf der unteren Materialschicht angeordnet ist, bevor die obere Schicht gebildet wird.22. The apparatus according to claim 15, characterized in that two devices for Spreading and shaping of the cement fiber material in a lower and upper layer is provided are and a mechanism between these devices for advancing and discarding beforehand cut lengths of the reinforcement is arranged on the lower material layer before the top layer is formed. Hierzu 1 Blatt Zeichnungen1 sheet of drawings I 5432 10.52I 5432 10.52
DES23848A 1950-07-08 1951-07-07 Method and device for the production of reinforced cement fiber boards Expired DE853873C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DK293961X 1950-07-08

Publications (1)

Publication Number Publication Date
DE853873C true DE853873C (en) 1952-10-27

Family

ID=8150424

Family Applications (1)

Application Number Title Priority Date Filing Date
DES23848A Expired DE853873C (en) 1950-07-08 1951-07-07 Method and device for the production of reinforced cement fiber boards

Country Status (3)

Country Link
CH (1) CH293961A (en)
DE (1) DE853873C (en)
GB (1) GB699529A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2306143A1 (en) * 1973-02-08 1974-08-15 Schuller Gmbh Glaswerk DEVICE FOR MANUFACTURING A FLEECE FROM A SUSPENSION OF ARTIFICIAL FIBERS, IN PARTICULAR GLASS FIBERS

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2784650A (en) * 1955-01-25 1957-03-12 Smidth & Co As F L Apparatus for making reinforced fibrous cement sheets

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2306143A1 (en) * 1973-02-08 1974-08-15 Schuller Gmbh Glaswerk DEVICE FOR MANUFACTURING A FLEECE FROM A SUSPENSION OF ARTIFICIAL FIBERS, IN PARTICULAR GLASS FIBERS

Also Published As

Publication number Publication date
GB699529A (en) 1953-11-11
CH293961A (en) 1953-10-31

Similar Documents

Publication Publication Date Title
DE1779369A1 (en) Process and devices for the production of impregnated fiber materials in sheet form
DE2017325C3 (en) Apparatus for making a non-woven open-meshed net
DE1212832B (en) Method and device for producing a fold structure from a web of paper, plastic, metal or the like.
DE2755516A1 (en) PROCESS AND MACHINE FOR CONTINUOUS MANUFACTURING OF A NON-WOVEN NET STRUCTURE
DE2538736A1 (en) METHOD AND DEVICE FOR THE PRODUCTION OF PLASTER BUILDING PANELS
DE2755879A1 (en) METHOD AND DEVICE FOR MANUFACTURING A BUILDING PANEL USING PLASTER
DE1292126B (en) Method and device for the production of pile fabric
DE853873C (en) Method and device for the production of reinforced cement fiber boards
DE3704940A1 (en) METHOD AND SYSTEM FOR THE PRODUCTION OF CHIPBOARD AND SIMILAR PANEL MATERIALS
DE3817588A1 (en) METHOD FOR DEPOSITING A CONTINUOUSLY EXTRUDED IMAGE ON A CONTINUOUSLY DRIVED CONVEYOR AND DEVICE FOR IMPLEMENTING THE METHOD
DE2856415A1 (en) DEVICE FOR PRODUCING A LAYER OF PARALLEL FEDES
AT140496B (en) Device for the production of fabrics, in particular textiles with a hairy blanket.
DE69108348T2 (en) Process for applying bitumen at reduced speed, device for carrying it out and device with this device.
DE1560873A1 (en) Method and machine for the production of boucle or velor carpets by gluing the pile to a base fabric
DE2059902B2 (en) METHOD AND APPARATUS FOR MANUFACTURING A NON-WOVEN PILOT FABRIC
DE2438977A1 (en) METHOD AND MACHINE FOR THE CONTINUOUS MANUFACTURING OF A WEB OF PLASTIC MATERIAL PROVIDED WITH A RIGID COVER PLATE ON AT LEAST ONE SIDE
EP1321548A1 (en) Method and device for winding and attaching warped bands on the drum of a sectional warper
DE2856506A1 (en) METHOD AND DEVICE FOR MANUFACTURING A REINFORCED MOLDING COMPOSITE IN A RAIL SHAPE
DE1071040B (en) Method and apparatus for making carpets and other pile products
DE972098C (en) Process and device for the continuous production of rigid lightweight panels
DE3641345C2 (en)
DE2302309A1 (en) METHOD AND DEVICE FOR MANUFACTURING POLE FABRIC
DE830042C (en) Method and device for the production of carpets, blankets or mats and products made therewith
DE553530C (en) Machine for the production of floor coverings, panels, etc. from reinforced fibro-cement
DE2900702C2 (en) Device for applying paint or the like. onto a textile web