DE7524017U - SCAFFOLDING - PROTECTIVE RAILING - Google Patents
SCAFFOLDING - PROTECTIVE RAILINGInfo
- Publication number
- DE7524017U DE7524017U DE19757524017 DE7524017U DE7524017U DE 7524017 U DE7524017 U DE 7524017U DE 19757524017 DE19757524017 DE 19757524017 DE 7524017 U DE7524017 U DE 7524017U DE 7524017 U DE7524017 U DE 7524017U
- Authority
- DE
- Germany
- Prior art keywords
- holding
- rod
- rods
- scaffolding
- guard rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G5/147—Railings specially adapted for mounting prior to the mounting of the platform
Description
Die Neuerung betrifft ein Gerüstbau-Schutzgeländer, welches an einem Gerüst befestigbar ist und welches mindestens eine Schutzstange, mindestens zwei quer bzw. senkrecht zu dieser Schutzstange verlaufende Haltestangen sowie an den Stangen eines Stehrahmens des Gerüstes befestigbare Halteelemente für jede Haltestange aufweist.The innovation relates to a scaffolding protective railing which can be attached to a scaffolding and which has at least one protective rod, at least two holding rods extending transversely or perpendicular to this protective rod and holding elements for each holding rod that can be fastened to the rods of a standing frame of the scaffolding.
Bei Gerüsten, insbesondere bei Stahlrohrgerüsten ist es üblich, dass diese abschnittsweise errichtet werden, d.h. es wird zunächst ein erster Gerüstabschnitt fertiggestellt und im Anschluß daran auf diesem ersten Gerüstabschnitt ein weiterer Gerüstabschnitt errichtet. Ist dieser weitere Gerüstabschnitt fertiggestellt, so wird auf diesem ein dritter Gerüstabschnitt errichtet usw., bis die benötigte Gerüsthöhe erreicht ist. Zur Errichtung eines nachfolgenden Gerüstabschnittes ist es dabei erforderlich, dass die mit der Aufstellung eines Gerüstes beauftragten Arbeiter auf den obersten Gerüstboden des bereits fertiggestellten Gerüstabschnittes steigen und dort irgendeine seitliche Sicherung die Montage des nächsten Gerüstabschnittes vornehmen. Insbesondere bei höheren Gerüsten besteht hier in erhöhtem Maße die Gefahr von Unfällen durch Herabstürzen, so dass höhere Gerüste nach dem heutigen Stand der Technik in der Regel nur von Gerüstbauspezialisten aufgestellt werden können.In the case of scaffolding, in particular tubular steel scaffolding, it is common for these to be erected in sections, i.e. a first scaffolding section is first completed and then a further scaffolding section is erected on this first scaffolding section. If this further frame section is completed, a third frame section is built on it erected, etc., until the required scaffolding height is reached. To erect a subsequent scaffolding section, it is necessary that the workers commissioned with erecting a scaffolding climb to the top scaffolding floor of the already completed scaffolding section and use some sort of lateral securing to assemble the next scaffolding section. In particular with higher scaffolding, there is an increased risk of accidents due to falling, so that higher scaffolding according to the current state of the art can generally only be erected by scaffolding specialists.
Um diese Nachteile zu vermeiden wurde in der älteren Patentanmeldung bzw. in dem älteren Gebrauchsmuster bereits ein Schutzgeländer für den Gerüstbau vorgeschlagen, welches entsprechend der wachsenden Höhe des Gerüstes derart vorgebaut werden kann, dass es über einen bereits fertiggestellten Gerüstabschnitt hinausragt und für die mit dem Gerüstbau beauftragten Handwerker einen seitlichen Schutz bei der Errichtung des nächsten Gerüstabschnittes bietet, ohne dass durch dieses Schutzgeländer der Auf- bzw. Abbau des Gerüstes behindert wird.In order to avoid these disadvantages, a protective railing for scaffolding was already proposed in the older patent application or in the older utility model, which can be pre-built according to the increasing height of the scaffolding in such a way that it protrudes over an already completed scaffolding section and for those with the scaffolding provides the contracted craftsman with lateral protection when erecting the next section of scaffolding, without this guardrail hindering the erection or dismantling of the scaffolding.
Der vorliegenden Neuerung liegt die Aufgabe zugrunde, ein Gerüstbau-Schutzgeländer der eingangs erwähnten Art dahingehend zu verbessern, dass es noch einfacher gehandhabt bzw. am Gerüst befestigt und von einem Gerüst wieder entfernt werden kann. Zur Lösung dieser Aufgabe ist ein Gerüstbau-Schutzgeländer der eingangs geschilderten Art neuerungsgemäß so ausgebildet, dass die Halteelemente als Einhängehalter ausgebildet sind und dass an den Einhängehaltern und/oder an den Haltestangen des Schutzgeländers hakenförmige Elemente vorgesehen sind, die zur Befestigung der Haltestangen an den Halteelementen bzw. an den Stangen eines Stehrahmens des Gerüstes in entsprechende Bohrungen der Einhängehalter und/oder Haltestangen eingreifen.The present innovation is based on the object of improving a scaffolding protective railing of the type mentioned at the outset in such a way that it can be handled even more easily or attached to the scaffolding and removed again from a scaffolding. To solve this problem, a scaffolding protective railing of the type described above is designed in such a way that the holding elements are designed as hanging brackets and that hook-shaped elements are provided on the hanging brackets and / or on the holding bars of the protective railing, which are used to attach the holding bars to the holding elements or engage on the rods of a standing frame of the scaffolding in corresponding bores in the suspension brackets and / or holding rods.
Die Einhängehalter sind dabei entweder, z.B. mittels die Stangen
<NichtLesbar>
des Gerüstes umgreifenden Bügelteilen, abnehmbar
an den Stehrahmen befestigt oder aber
<NichtLesbar>
The hanging brackets are either, for example by means of the rods
<nonreadable>
of the frame encompassing bracket parts, detachably attached to the standing frame or else
<nonreadable>
Anhand der Figuren wird die Neuerung an Ausführungsbeispielen näher erläutert. Es zeigen:The innovation is explained in more detail in exemplary embodiments with the aid of the figures. Show it:
Figur 1 eine Vorderansicht eines Stahlrohrgerüstes zusammen mit Schutzgeländern gemäß der Neuerung;Figure 1 is a front view of a tubular steel frame together with guard rails according to the innovation;
Figur 2 eine Seitenansicht des Stahlrohrgerüstes gemäß Figur 1;FIG. 2 shows a side view of the tubular steel frame according to FIG. 1;
Figur 3 eine Teildarstellung eines Schutzgeländers gemäß der Neuerung in Einzeldarstellung;FIG. 3 shows a partial representation of a guardrail according to the innovation in an individual representation;
Figur 4 in Teildarstellung eine Seitenansicht des Stahlrohrgerüstes zusammen mit zwei übereinander angeordneten Einhänghaltern zur Befestigung einer Haltestange eines Schutzgeländers gemäß der Neuerung;FIG. 4 shows, in partial representation, a side view of the tubular steel frame together with two hanging brackets arranged one above the other for fastening a holding rod of a guardrail according to the innovation;
Figur 5 und 6 eine Vorderansicht bzw. eine Draufsicht auf den unteren Einhängehalter zusammen mit den Haltestangen zweier benachbarter Schutzgeländer; Figur 7 in Draufsicht eine weitere Ausführungsform eines Einhänghalters zusammen mit einer Stange eines Stehrahmens.FIGS. 5 and 6 show a front view and a plan view, respectively, of the lower hanging holder together with the holding bars of two adjacent guardrails; FIG. 7 shows a plan view of a further embodiment of a hanging holder together with a rod of a standing frame.
Das in den Fig. 1 und 2 gezeigte Stahlgerüst besteht in an sich bekannter Weise aus einer Vielzahl von unteren Stehrahmen 1, die jeweils von zwei senkrecht zum Boden 2 verlaufenden Stahlrohren 3 und mindestens einem oberen Querrohr 4 gebildet werden, welch letzteres beispielsweise mit den Stahlrohren 3 verschweißt ist. Die einzelnen Stehrahmen 1 sind über weitere Verbindungs<Nicht lesbar>The steel frame shown in Figs. 1 and 2 consists in a known manner of a plurality of lower standing frames 1, each formed by two steel tubes 3 extending perpendicular to the floor 2 and at least one upper cross tube 4, the latter for example with the steel tubes 3 is welded. The individual standing frames 1 are not via further connection readable>
<NichtLesbar>
<nonreadable>
Die Schutzgeländer 8 bestehen jeweils aus einer Quer- bzw. Schutzstange 9 sowie aus zwei an den Enden dieser Schutzstange befestigten, senkrecht nach unten ragenden Haltestangen 10 bzw. 11, die jeweils mit zwei übereinander angeordneten Einhänghaltern 12 und 13 an den senkrechten Stahlrohren 3 der oberen Stehrahmen 1 des fertiggestellten Gerüstabschnittes befestigt sind, wobei diese Befestigung durch einfaches Einhängen erfolgt, wie dies im folgenden noch im einzelnen beschrieben wird.The guardrails 8 each consist of a transverse or protective bar 9 and two at the ends of this protective bar, attached vertically downward support rods 10 and 11, each with two hanging brackets 12 and 13 arranged on top of each other on the vertical steel tubes 3 of the upper Standing frame 1 of the completed scaffolding section are attached, this attachment being carried out by simply hanging it in, as will be described in detail below.
Wie die Figur 3 zeigt, sind die Haltestangen 10 und 11 an der Schutzstange 9 durch Scharniere 14 bzw. 15 angelenkt, so dass das Schutzgeländer 8 zur Reduzierung des Transportraumes in der in Fig. 3 mit gestrichelten Linien gezeigten Weise zusammengeklappt werden kann, wobei dann im zusammengeklappten Zustand die Haltestangen 10 bzw. 11 parallel zur Schutzstange 9 liegen und die Scharniere 14 und 15 in der Höhe derart gegeneinander versetzt angeordnet sind, dass sich die Haltestangen 10 und 11 im zusammengeklappten Zustand gegenseitig nicht behindern bzw. sperren.As FIG. 3 shows, the holding rods 10 and 11 are linked to the protective rod 9 by hinges 14 and 15, respectively, so that the protective railing 8 can be folded up to reduce the transport space in the manner shown in FIG In the folded state, the holding rods 10 and 11 are parallel to the protective rod 9 and the hinges 14 and 15 are offset from one another in height so that the holding rods 10 and 11 do not interfere with or lock each other in the folded state.
Wie die Figuren 4 bis 6 zeigen, sind die oberen und unteren Einhänghalter 12 bzw. 13 bei der gezeigten Ausführungsform völlig gleichartig ausgebildet und bestehen jeweils aus einem Halteklotz 16 bzw. einer entsprechenden Platte, die sich im wesentlichen senkrecht zur Stange 3 des Stehrahmens 1 erstreckt und zwei Öffnungen bzw. Ösen 17 und 18 zur Halterung der Haltestangen 10 und 11 zweier benachbarter Schutzgeländer aufweist.As FIGS. 4 to 6 show, the upper and lower hanging brackets 12 and 13 in the embodiment shown are designed in exactly the same way and each consist of a holding block 16 or a corresponding plate which extends essentially perpendicular to the rod 3 of the vertical frame 1 and has two openings or eyelets 17 and 18 for holding the holding rods 10 and 11 of two adjacent guardrails.
Zur Befestigung an dem senkrechten Stehrohr 3 des Stehrahmens 1 ist weiterhin der Halteklotz 16 mit einer halbkreisförmigen
<NichtLesbar>
versehen, die durch einen Bügelteil 20 zu einer
das Stahlrohr 3 aufnehmenden kreisförmigen Öffnung ergänzt wird. Der Bügelteil 20 ist am Halteklotz 16 durch Muttern 21 bzw. 22 befestigt, die auf Gewindebolzen 23 des Halteklotzes 16 aufschraubbar sind. Durch Festdrehen der Muttern 21 bzw. 22 wird der Halteklotz 16 durch den Bügelteil 21 am Stahlrohr 3 festgeklemmt.For attachment to the vertical upright tube 3 of the standing frame 1, the retaining block 16 continues to have a semicircular shape
<nonreadable>
provided, which is supplemented by a bracket part 20 to form a circular opening receiving the steel tube 3. The bracket part 20 is fastened to the holding block 16 by nuts 21 and 22, which can be screwed onto threaded bolts 23 of the holding block 16. By tightening the nuts 21 and 22, the retaining block 16 is clamped to the steel tube 3 by the bracket part 21.
Es ist selbstverständlich auch möglich, den Bügelteil 20 einseitig am Halteklotz 16 anzulenken und das andere Ende des Bügelteils mittels einer Schraubenmutter und eines entsprechenden Gewindebolzens mit dem Halteklotz zu verbinden oder aber anstelle dieser Schraubverbindung ein sogenanntes Steckschloß vorzusehen, welches unter Verwendung eines Metallkeiles ein Anpressen des Bügelteiles 20 an das Stahlrohr 3 bewirkt.It is of course also possible to articulate the bracket part 20 on one side of the retaining block 16 and to connect the other end of the bracket part to the retaining block by means of a screw nut and a corresponding threaded bolt or, instead of this screw connection, to provide a so-called plug lock which, using a metal wedge, enables the Bracket part 20 causes the steel tube 3.
An der dem Bügelteil 20 abgewandeten Vorderseite weist der Halteklotz 16 zwei halbkreisförmige Ausnehmungen 24 und 25 auf, die die Haltestangen 10 bzw. 11 zweier benachbarter Schutzgeländer teilweise aufnahmen und ein seitliches Verrutschen dieser Haltestangen vermeiden.On the front side facing away from the bracket part 20, the retaining block 16 has two semicircular recesses 24 and 25, which partially received the retaining rods 10 and 11 of two adjacent guardrails and prevent these retaining rods from slipping sideways.
An den Haltestangen 10 bzw. 11 sind Haken 26 bzw. 27 (Fig. 4) angeschweißt, die zur Befestigung des jeweiligen Schutzgeländers 8 in die Öffnungen 17 bzw. 18 des Halteklotzes 16 eingreifen.Hooks 26 and 27 (FIG. 4) are welded to the holding rods 10 and 11, respectively, which engage in the openings 17 and 18 of the holding block 16 to fasten the respective guardrail 8.
Die Aufstellung des Gerüstes unter Verwendung des neuerungsgemäßen Schutzgeländers erfolgt in der Weise, dass am fertiggestellten obersten Gerüstabschnitt bzw. an den senkrechten Stahlrohren 3 der Stehrahmen 1 dieses Gerüstabschnittes die Einhänghalter 12 und 13 befestigt werden. Im Anschluß daran werden mit diesen Einhänghaltern die Schutzgeländer 8 bzw. deren Haltestangen oder rohre 10 und 11 durch Einhängen der Haken 26 und 27 in den Öffnungen 17 bzw. 18 der Halteklötze 16 befestigt.The erection of the scaffolding using the protective railing according to the invention takes place in such a way that the hanging brackets 12 and 13 are attached to the completed uppermost scaffolding section or to the vertical steel tubes 3 of the standing frames 1 of this scaffolding section. Following this, the guard rails 8 or their holding rods or pipes 10 and 11 are fastened by hanging the hooks 26 and 27 in the openings 17 and 18 of the holding blocks 16 with these hanging brackets.
<NichtLesbar>
<nonreadable>
Stahlrohren dieser weiteren Stehrahmen wiederum Einhängehalter 12 bzw. 13 befestigt. Nach der Fertigstellung eines weiteren Gerüstabschnittes bzw. Stockwerkes werden die Schutzgeländer 8 von den Stehrahmen des darunterliegenden Gerüstabschnittes entfernt und an den gerade fertigmontierten Stehrahmen bzw. an den dort vorgesehenen Einhängehaltern 12 bzw. 13 derart befestigt, dass die Schutzstange 9 dieser Schutzgeländer 8 über die Oberseite des nunmehr fertiggestellten weiteren Gerüstabschnittes hinausragen. Im Anschluß daran werden die nicht mehr benötigten Einhängehalter 12 bzw. 13 von den Stahlrohren des darunterliegenden Gerüstabschnittes bzw. Stockwerks entfernt, so dass sie an den Stehrahmen eines weiteren Gerüstabschnittes wieder verwendet werden können. Auf diese Weise ist es möglich, das Schutzgeländer jeweils vor der Errichtung eines weiteren Gerüstabschnittes vorzubereiten und mit einer verhältnismäßig geringen Anzahl von Einhängehaltern 12 bzw. 13 auszukommen. Beim fertiggestellten Gerüst verbleiben die Schutzgeländer 8 an den senkrechten Stahlrohren des obersten Stehrahmens und bilden dadurch ein Schutzgeländer für den obersten Gerüstboden. Bei Fertigstellung eines Gerüstabschnittes können die entfernten Schutzgeländer 8 jeweils durch eine Geländerstange 28 ersetzt werden, die parallel zu den Verbindungsrohren 5 bzw. 5 verläuft.Steel tubes of this further standing frame in turn hanging bracket 12 or 13 attached. After the completion of a further scaffolding section or story, the guardrails 8 are removed from the standing frames of the scaffolding section below and attached to the standing frame that has just been assembled or to the hanging brackets 12 or 13 provided there in such a way that the protective bar 9 of this guardrail 8 over the top of the now completed further scaffolding section protrude. Subsequently, the suspension brackets 12 or 13 that are no longer required are removed from the steel tubes of the scaffolding section or storey below so that they can be used again on the standing frame of a further scaffolding section. In this way, it is possible to prepare the guardrail in each case before the erection of a further scaffold section and to get by with a relatively small number of hanging brackets 12 or 13. When the scaffolding is completed, the guardrails 8 remain on the vertical steel tubes of the top standing frame and thereby form a guardrail for the top scaffolding floor. When a scaffolding section is completed, the removed guard rails 8 can each be replaced by a railing rod 28 which runs parallel to the connecting pipes 5 and 5, respectively.
In analoger Weise erfolgt auch der Aufbau des Gerüstes. Hierzu werden die Schutzgeländer 8 bei der Demontage eines Gerüstabschnittes bzw. eines Gerüststockwerks an den senkrechten Stahlstangen des darunterliegenden Gerüstabschnittes derart befestigt, dass sich die Schutzstangen 9 dieser Schutzgeländer 8 seitlich von dem abzubauenden Gerüstabschnitt befinden und für die mit der Gerüstdemontage beauftragten Arbeiter einen seitlichen Schutz gegen Herunterstürzen bilden.The construction of the scaffolding is carried out in an analogous manner. For this purpose, the guardrails 8 are attached to the vertical steel rods of the underlying scaffolding section during the dismantling of a scaffold section or a scaffolding level in such a way that the guardrails 9 of these guardrails 8 are to the side of the scaffold section to be dismantled and a lateral protection against the workers tasked with the scaffolding dismantling Form tumbling down.
In Fig. 7 ist eine abgeänderte Ausführungsform eines Einhängehalters 29 gezeigt, der von seiner Verwendung her den Einhänghaltern 12 bzw. 13 der Figuren 1 6 entspricht, der jedochFIG. 7 shows a modified embodiment of a hanging holder 29 which, in terms of its use, corresponds to the hanging holders 12 or 13 of FIGS
<NichtLesbar>
<nonreadable>
Im Zusammenhang mit der Figur 3 wurde ein Schutzgeländer 8 beschrieben, bei dem die Haltestangen 10 und 11 an der Querstange 9 angelenkt sind, um das Schutzgeländer 8 für den Transport zusammenlegen zu können. Es versteht sich, dass auch andere Ausführungen des Schutzgeländers möglich sind. So ist beispielsweise Figur 8 eine Ausführung eines Schutzgeländers 8 gezeigt, bei dem die Haltestangen 10 und 11 mit einer Quer- bzw. Schutzstange 9 durch Zusammenstecken verbunden werden können. Zu diesem Zweck sind die Haltestangen 10 bzw. 11 an ihrem oberen Ende abgebogen und weisen einen zapfenförmigen Teil 33 auf, der in die Innenbohrung 34 der Schutzstange 9 einführbar ist. Im Bereich des Zapfens 33 weisen die Haltestangen 10 bzw. 11 jeweils eine rechteckigförmige Öffnung 35 auf, welcher Öffnungen 36 in der Haltestange 9 entsprechen, wobei die Öffnungen 35 und 36 derart angeordnet sind, dass sie sich beim zusammengesteckten Schutzgeländer 8 zumindest teilweise
<NichtLesbar>
In connection with FIG. 3, a guardrail 8 has been described in which the holding rods 10 and 11 are hinged to the crossbar 9 in order to be able to fold the guardrail 8 together for transport. It goes without saying that other designs of the guardrail are also possible. For example, FIG. 8 shows an embodiment of a guardrail 8 in which the holding rods 10 and 11 can be connected to a transverse or protective rod 9 by being plugged together. For this purpose, the holding rods 10 and 11 are bent at their upper end and have a peg-shaped part 33 which can be inserted into the inner bore 34 of the protective rod 9. In the area of the pin 33, the holding rods 10 and 11 each have a rectangular opening 35, to which openings 36 in the holding rod 9 correspond, the openings 35 and 36 being arranged in such a way that they are at least partially close when the guardrail 8 is plugged together
<nonreadable>
Claims (10)
<NichtLesbar>
<nonreadable>
<NichtLesbar>
6. Guard rail according to claim 1 or 2, characterized in that the holding block 16 has at least one
<nonreadable>
<NichtLesbar>
10. Guard rail according to claim 9, characterized in that the holding rods (10, 11) are preferably angled at their end and there have a pin-shaped projection (33) which is received by the inner bore (34) of the protective rod (9), and that on the pin-shaped extension (33) and on the ends of the protective rod (9) openings (35 and 36) are provided in which to connect the holding rods
<nonreadable>
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19757524017 DE7524017U (en) | 1975-07-29 | 1975-07-29 | SCAFFOLDING - PROTECTIVE RAILING |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19757524017 DE7524017U (en) | 1975-07-29 | 1975-07-29 | SCAFFOLDING - PROTECTIVE RAILING |
Publications (1)
Publication Number | Publication Date |
---|---|
DE7524017U true DE7524017U (en) | 1975-12-18 |
Family
ID=6654115
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19757524017 Expired DE7524017U (en) | 1975-07-29 | 1975-07-29 | SCAFFOLDING - PROTECTIVE RAILING |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE7524017U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2543200A1 (en) * | 1983-03-26 | 1984-09-28 | Layher Eberhard | SAFETY PROTECTION DEVICE FOR THE ASSEMBLY OF SCAFFOLD COMPOUND OF VERTICALLY DRESSED FRAMES |
EP1338723A2 (en) * | 2002-02-20 | 2003-08-27 | Wilhelm Layher Vermögensverwaltungs-GmbH | Mounting device for a temporary scaffolding safety rail |
DE10243356A1 (en) * | 2002-07-22 | 2004-02-05 | Peri Gmbh | Method for fitting safety railing to demountable scaffold has vertical supports clamped parallel to the scaffold vertical supports and with clamping fittings to the plank supports |
-
1975
- 1975-07-29 DE DE19757524017 patent/DE7524017U/en not_active Expired
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2543200A1 (en) * | 1983-03-26 | 1984-09-28 | Layher Eberhard | SAFETY PROTECTION DEVICE FOR THE ASSEMBLY OF SCAFFOLD COMPOUND OF VERTICALLY DRESSED FRAMES |
EP1338723A2 (en) * | 2002-02-20 | 2003-08-27 | Wilhelm Layher Vermögensverwaltungs-GmbH | Mounting device for a temporary scaffolding safety rail |
EP1338723A3 (en) * | 2002-02-20 | 2006-04-26 | Wilhelm Layher Vermögensverwaltungs-GmbH | Mounting device for a temporary scaffolding safety rail |
DE10243356A1 (en) * | 2002-07-22 | 2004-02-05 | Peri Gmbh | Method for fitting safety railing to demountable scaffold has vertical supports clamped parallel to the scaffold vertical supports and with clamping fittings to the plank supports |
DE10243356B4 (en) * | 2002-07-22 | 2007-03-22 | Peri Gmbh | Dismountable scaffolding |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0918912B1 (en) | Dismountable facade scaffold | |
EP2253764B1 (en) | Frame-shaped truss | |
DE2658583B2 (en) | Guard rails for scaffolding | |
WO2019238154A1 (en) | Individual scaffolding post | |
DE2119720A1 (en) | Working platform for suspended scaffolding and the like | |
DE3108020C2 (en) | ||
DE102021004490A1 (en) | Modular scaffolding and modular scaffolding bars for such | |
DE820963C (en) | Scaffolding with stands made of tubes | |
EP1983128B1 (en) | Scaffolding frame and method for manufacturing a scaffolding frame assembly made of at least one frame | |
DE3539653C2 (en) | ||
DE7524017U (en) | SCAFFOLDING - PROTECTIVE RAILING | |
DE2910467A1 (en) | DEVICE FOR CHANGING THE HEIGHT OF THE STANDS OF A SCAFFOLDING TOWER | |
DE2507577A1 (en) | ADJUSTABLE SUPPORT FOR MASONRY FORMWORK | |
DE3401906A1 (en) | Apparatus for the suspended fastening of a scaffold element | |
EP0268197B1 (en) | Scaffolding, in particular a building scaffolding | |
DE4114328C2 (en) | Device for hanging a bracket frame element | |
EP1134331A2 (en) | Set of elements for a scaffold | |
EP0803018B1 (en) | Frame-connector unit for scaffolding assemblies | |
DE3624011A1 (en) | Means for fitting a protective apparatus at a point located high up on a building | |
DE3040707C2 (en) | ||
DE60111615T2 (en) | PROCESS FOR ESTABLISHING A SCAFFOLD, SCAFFOLD AND PARTS THEREFOR | |
DE2526561A1 (en) | High rise metal scaffolding safety rail - has bar with transverse retainers and scaffolding attachable clamps | |
DE202023105830U1 (en) | Device for attaching fall protection to scaffolding | |
DE3730846A1 (en) | Apparatus for erecting a working platform upon which it is possible to walk | |
DE2426211A1 (en) | FASTENING EQUIPMENT FOR BEAM OF SCAFFOLDING IN CONCRETE |