DE2426211A1 - FASTENING EQUIPMENT FOR BEAM OF SCAFFOLDING IN CONCRETE - Google Patents
FASTENING EQUIPMENT FOR BEAM OF SCAFFOLDING IN CONCRETEInfo
- Publication number
- DE2426211A1 DE2426211A1 DE19742426211 DE2426211A DE2426211A1 DE 2426211 A1 DE2426211 A1 DE 2426211A1 DE 19742426211 DE19742426211 DE 19742426211 DE 2426211 A DE2426211 A DE 2426211A DE 2426211 A1 DE2426211 A1 DE 2426211A1
- Authority
- DE
- Germany
- Prior art keywords
- fork
- formwork
- pin
- girders
- falsework
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
- E04G11/483—Supporting heads
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
- E04G11/486—Dropheads supporting the concrete after removal of the shuttering; Connecting means on beams specially adapted for dropheads
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G25/00—Shores or struts; Chocks
- E04G25/04—Shores or struts; Chocks telescopic
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Package Frames And Binding Bands (AREA)
Description
Pedro Valero de la Parra
Colombia Nr. 1, Madrid / SpanienPedro Valero de la Parra
Colombia No. 1, Madrid / Spain
Befestigungsmittel für Träger von Lehrgerüsten im BetonbauFastening means for supports of falsework in concrete construction
Die Erfindung betrifft eine neuartige Befestigungsvorrichtung für Lehrgerüstteile (Träger), die besonders für die Verwendung in zerfegbaren Metallschalungen gedacht ist.The invention relates to a novel fastening device for falsework parts (carriers), which are particularly suitable for use is intended in dismantling metal formwork.
Die weitreichende und immer stärkere Verwendung von Eisenbeton hat zur Entwicklung und Schaffung von Schalungen und Lehrgerüsten verschiedenster Art geführt, von den einfachen auf der BasisThe widespread and increasing use of reinforced concrete has led to the development and creation of formwork and falsework of various types, from the simple to the base
ΑΪ39851/Ό351ΑΪ39851 / Ό351
von Holzbohlen, die auf roh gezimmerten Gerüsten aus gleichem Material befestigt werden/ bis zu weiteren, moderneren, einschliesslich metallischen und zerlegbaren, bei denen eine vollständig Material-Rückgewinnung und ausserdem verringerte Ein- und Äusschaltungszeiten zu erzielen sind.of wooden planks, which are made of the same on roughly timbered scaffolding Material to be attached / up to further, more modern, including metallic and demountable, in which a complete material recovery and also reduced Switch-on and switch-off times can be achieved.
Die hier beschriebene Befestigungsvorrichtung dient zur Ergänzung einer aus Baugruppen bestehenden Schalung der angegebenen allgemeinen Art, in der vermittels dieser Vorrichtung eine optimale Befestigung der die Schalung tragenden Lehrgerüstteile, Bockstützen, waagrechten Träger (Holme) usw., erzielt wird, während gleichzeitig die normalerweise· problematische des Ausbaues der erwähnten Lehrgerüstteile und der Schalungsplatten selbst auf einen einfachen Arbeitsgang in den ersten 3 bis 4 Tagen der Betonierung beschränkt wird, ohne irgendwie das Gefüge des Lehrgerüstes zu beeinträchtigen,, das über d.ie zum Abbinden des Betons notwendigen ungefähr 21 Tage bestehen bleibt.The fastening device described here is used to supplement a formwork consisting of modules of the specified general way in which by means of this device an optimal fastening of the falsework parts supporting the formwork, Trestle supports, horizontal beams (spars), etc., is achieved, while at the same time the normally problematic the expansion of the mentioned falsework parts and the formwork panels themselves on a simple operation in the first 3 to 4 days of concreting is limited without in any way affecting the structure of the falsework, that about the roughly necessary to set the concrete Remains for 21 days.
Allgemein gesagt, umfasst die vorgeschlagene Vorrichtung Elementepaare, die aus einer Gabel und einem Abstandhalter (Trennprofil) gebildet werden. Hierzu wird die erwähnte Gabel aus einem U-Profil gebildet, das in seinem mittleren Teil einen oben und unten offenen Hals zu dem Zweck aufweist, dass es sich durch teleskopartiges Einschieben auf den oberen, ebenfallsGenerally speaking, the proposed device comprises pairs of elements consisting of a fork and a spacer (Separation profile) are formed. For this purpose, the fork mentioned is formed from a U-profile that has a has an open neck at the top and bottom for the purpose of telescoping it onto the upper one, too
409851/0351409851/0351
rohrförmigen Teil des lotrechten Bestandteils des Stützgerüstes der Schalung aufsetzen kann.tubular part of the vertical part of the support frame the formwork can put on.
Durch den erwähnten Hals schiebt sich dann die Gabel auf den lotrechten Teil und setzt sich an diesem in der erforderlichen Höhe durch den Abstandshalter fest, der einfach aus einem U-Profilstück besteht, das mit einem Splint versehen ist, um die Anordnung unter Umfassen des zuvor erwähnten Teils des Stützgerüstes unterhalb der Gabel festzulegen.The fork then slides through the aforementioned neck onto the vertical part and sits on it in the required position Height by the spacer, which simply consists of a U-profile piece that is provided with a split pin to define the arrangement including the aforementioned part of the support frame below the fork.
In idealer Form besitzt dieser Abstandhalter, beispielsweise gegen das obere Ende, wenigstens einen abgeschrägten Rand, um mittels eines Schlages seine spätere Entnahme zu erleichtern, was auch das Herausfallen der Gabel und damit die sofortige Ausschalung und den Abbau der Träger des Stützgerüstes einschliesst. In an ideal form, this spacer has at least one beveled edge, for example towards the upper end to facilitate its later removal by means of a blow, which also causes the fork to fall out and thus immediate Includes formwork and dismantling of the support structure girders.
Die Einzelheiten und Merkmale der hier vorgeschlagenen Erfindung werden durch die nachstehende Erläuterung anhand der beigefügten Zeichnungen besser herausgestellt, die ein bevorzugtes Ausführungsbeispiel darstellen, und zwar zeigtThe details and features of the invention proposed here will be clarified by the following explanation with reference to the attached Drawings better set out that illustrate a preferred embodiment, namely shows
Fig. 1 schaubildlich eine vorgefertigte, aus Metall bestehende und zerlegbare Schalung, welche die hier beschriebene Befestigungsvorrichtung benutzt; «Fig. 1 is a diagrammatic view of a prefabricated formwork made of metal and which can be dismantled, which is the one described here Fastening device used; «
40 9~85 i/035 140 9 ~ 85 i / 035 1
Fig. 2 veranschaulicht die gleitende Gabel undFig. 2 illustrates the sliding fork and
Fig. 3 ist eine Ansicht des Abstandshalter.Figure 3 is a view of the spacer.
Wie aus den Zeichnungen zu entnehmen ist, enthält die Erfindung Gabel 1 von U-förmigem Querschnitt, die mit einem mittleren rohrförmigen! und hohlen Hals 2 versehen ist und nach Fig. 3 auf jeder Seite d.h. am einen und anderen Ende des Hohlraums einen Stift oder eine Bohrung 3 aufweisen kann, um richtiges Einfügen und Einpassen der Träger 4 zu ermöglichen, die zu diesem Zweck mit einem damit übereinstimmenden Loch oder Stift versehen werden, um den Stift oder die Bohrung im Abstandshalter aufzunehmen. Die Stifte oder Bohrlöcher können abwechselnd verteilt sein/fl.As can be seen from the drawings, the invention includes fork 1 of U-shaped cross-section with a central tubular! and hollow neck 2 and, as shown in Fig. 3, on either side, i.e. at one and the other end of the cavity may have a pin or a hole 3 to enable correct insertion and fitting of the carrier 4, the to for this purpose a matching hole or pin must be provided around the pin or the hole in the spacer to record. The pins or drill holes can be distributed alternately / fl.
Dieser Stift oder Bohrung ist jedoch nicht unumgänglich und nach Fig. 2 kann die Gabel inbezug auf ihre befestigende und gleitende Form ohne sie ausgeführt werden.However, this pin or hole is not indispensable and according to Fig. 2, the fork in relation to its fastening and sliding form can be run without them.
Die Hälse 2 werden in die rohrförmigen Teile 5 der Bockstützen eingesetzt und liegen direkt auf der Traverse 6 und dem ihr gegenüberliegenden Vorsprung 7 (linker Teil der Fig. 1 in Ausschaltungsstellung) oder auf dem Abstandshalter 8 auf, der dies seinerseits auf jenen Teilen tut (Einschaltungsstellung rechts in der Fig. 1).The necks 2 are inserted into the tubular parts 5 of the trestle supports and lie directly on the traverse 6 and that of you opposite projection 7 (left part of Fig. 1 in the disconnected position) or on the spacer 8, the this in turn does this on those parts (switched-on position on the right in Fig. 1).
409851 /0351409851/0351
Dieser Abstanshalter besitzt einen Stift mit Haltekettchen 9, das dessen zufälliges Herausfallen verhindert, und weist eine abgeschrägte (rampenartige) Oberseite auf, um seine Entnahme beim Ausschalen zu erleichtern, wodurch die Gabel freigegeben und die Entnahme der Träger 4 ermöglicht wird.This Abstanshalter has a pin with holding chain 9 that prevents the accidental falling out, and has a chamfered (ramped) top, to facilitate its removal during stripping released whereby the fork and the removal of the carrier is made possible. 4
PatentansprücheClaims
409851/0351409851/0351
Claims (4)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES1973192131U ES192131Y (en) | 1973-06-04 | 1973-06-04 | HOLDING DEVICE FOR SHRIMPS. |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2426211A1 true DE2426211A1 (en) | 1974-12-19 |
Family
ID=8362583
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19742426211 Pending DE2426211A1 (en) | 1973-06-04 | 1974-05-29 | FASTENING EQUIPMENT FOR BEAM OF SCAFFOLDING IN CONCRETE |
Country Status (3)
Country | Link |
---|---|
DE (1) | DE2426211A1 (en) |
ES (1) | ES192131Y (en) |
FR (1) | FR2231835A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104131699A (en) * | 2014-08-11 | 2014-11-05 | 江苏中南建筑产业集团有限责任公司 | Light early-demounting formwork |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2645568B1 (en) * | 1989-04-07 | 1995-03-31 | Ricard Coffrages | ASSEMBLY FLANGE, MANUFACTURING METHOD THEREOF, AND METAL REINFORCEMENT OR FRAMEWORK PARTS EQUIPPED WITH SUCH A FLANGE |
ES2173039B2 (en) * | 2000-11-24 | 2004-08-01 | Encofrados Inde-K, S.A. | IMPROVED IMPROVEMENTS IN THE FORMWORK SYSTEMS. |
-
1973
- 1973-06-04 ES ES1973192131U patent/ES192131Y/en not_active Expired
-
1974
- 1974-05-29 DE DE19742426211 patent/DE2426211A1/en active Pending
- 1974-06-04 FR FR7419229A patent/FR2231835A1/fr not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104131699A (en) * | 2014-08-11 | 2014-11-05 | 江苏中南建筑产业集团有限责任公司 | Light early-demounting formwork |
Also Published As
Publication number | Publication date |
---|---|
ES192131Y (en) | 1975-01-01 |
FR2231835A1 (en) | 1974-12-27 |
ES192131U (en) | 1974-08-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2658583C3 (en) | Guard rails for scaffolding | |
DD291110A5 (en) | METHOD FOR CONNECTING JOINTS AND CONSTRUCTION SYSTEMS | |
DE1901879A1 (en) | Load-bearing component | |
DE202020104196U1 (en) | Scaffolding | |
DE2461124A1 (en) | DIVISIBLE TUNNEL FORMWORK | |
DE2426211A1 (en) | FASTENING EQUIPMENT FOR BEAM OF SCAFFOLDING IN CONCRETE | |
DE3922722C2 (en) | ||
EP0512428A1 (en) | Working platform for walls or shuttering | |
DE2407103A1 (en) | Ladder scaffolding supporting working-platform - with triangle-grouped cantilevered supports with hooked traverses on base bar | |
DE3923815A1 (en) | FRAMEWORK | |
DE202005003790U1 (en) | Mobile scaffold | |
DE3222811C1 (en) | Connection device for dismantled half-timbered buildings | |
EP1134331A2 (en) | Set of elements for a scaffold | |
DE3312582A1 (en) | FORMWORK FOR PRODUCING SIDES ON CONCRETE CEILINGS | |
DE1554472B1 (en) | Device on shelves or the like. for easily detachable connection of a post with a support piece | |
DE102019114913A1 (en) | Mounting adapters, safety railings, kit for a scaffolding and scaffolding and methods therefor | |
DE10128595A1 (en) | End railing for closing off end side of scaffolding has handling section movable in relation to base section between in-use position and handling position for manipulation of railing during assembly and disassembly | |
DE2236165B2 (en) | framework | |
DE3624011A1 (en) | Means for fitting a protective apparatus at a point located high up on a building | |
DE7524017U (en) | SCAFFOLDING - PROTECTIVE RAILING | |
DE202023105830U1 (en) | Device for attaching fall protection to scaffolding | |
DE1584397A1 (en) | Method for building molds for concrete elements on metal tables, the walls of the molds being made of metal profiles | |
DE4113877A1 (en) | WORKING STAGE FOR COLUMN FORMWORK | |
EP0803018B1 (en) | Frame-connector unit for scaffolding assemblies | |
DE202023100314U1 (en) | scaffolding |