DE7420518U - Two-tier precast reinforced concrete frame with welded connection - Google Patents

Two-tier precast reinforced concrete frame with welded connection

Info

Publication number
DE7420518U
DE7420518U DE7420518U DE7420518DU DE7420518U DE 7420518 U DE7420518 U DE 7420518U DE 7420518 U DE7420518 U DE 7420518U DE 7420518D U DE7420518D U DE 7420518DU DE 7420518 U DE7420518 U DE 7420518U
Authority
DE
Germany
Prior art keywords
reinforced concrete
concrete frame
precast reinforced
frame
dipl
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE7420518U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PRESSEL O
Original Assignee
PRESSEL O
Publication date
Publication of DE7420518U publication Critical patent/DE7420518U/en
Expired legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

Dipl.-Ing. Dieter Mohr, 8 München 83. Rubezahlstr. CODipl.-Ing. Dieter Mohr, 8 Munich 83. Rubezahlstr. CO

DipL-lng. Oskar Pressel, 8 München 50,- Werner-Friedmann-Bogen 12DipL-lng. Oskar Pressel, 8 Munich 50, - Werner-Friedmann-Bogen 12

ZWEISTIELIGERSTAHLBETONFERTIGTEILRAHMEN MIT SCHWEISSVERBINDUNGTWO-PIECE PRE-FABRICATED REINFORCED CONCRETE FRAME WITH WELDED JOINT

Beschreibungdescription

Zweck eier Erfindung ist die rationelle Errichtung von Gebäuden in Montagebauweise. The purpose of the invention is the efficient erection of buildings using the assembly method.

Zur Zeit ist der Montagebau noch zu wenig rationalisiert und durch zu geringen Grad von Vorfertigung insbesondere mit folgenden Nachteilen behaftet: zu lange Bauzeiten,At the moment, the assembly line is still not rationalized enough and by too few Degree of prefabrication particularly afflicted with the following disadvantages: too long construction times,

im Arbeitsablauf störende Anschluf ewehrung, teilweise noch nötige Schalungsarbeiten auf der Baustelle, vielfach arbeitsintensiver, zeitraubender Verguß, - Notwendigkeit von Hilfskonstruktionen und AbstützungenConnection reinforcement that disrupts the work process, some formwork work is still required on the construction site, often labor-intensive, time-consuming casting, - necessity of auxiliary structures and supports

während der Montage.during assembly.

Zudem sind die heute verwendeten Bausysteme im allgemeinen nutzungsorientiert. Rjr universelle Bauaufgaben sind sie daher entweder kaum oder nur auf Kosten einer zu großen Typenvielfalt der verwendeten Elemente geeignet.In addition, the building systems used today are generally use-oriented. They are therefore either hardly ever universal building tasks or only at the expense of one suitable for a wide variety of types of elements used.

Die Anmelder sehen ihre Aufgabe in der Erfüllung folgender Forderungen:The applicants see their task in the fulfillment of the following requirements:

1. möglichst wenig verschiedene Grundelemente,1. as few different basic elements as possible,

2. möglichst hoher Grad von Vorfertigung,2. the highest possible degree of prefabrication,

3. schnelle, kraftschlüssige Verbindung der Bauteile untereinander,3. quick, non-positive connection of the components to one another,

4. Versetzen der Bauteile auch ohne Hilfskonstruktion odsr Abstützungen,4. Relocation of the components even without auxiliary construction or supports,

5. {ahreszeitunabhängige Montage (Winterbaumöglichkeit).5. Season-independent assembly (winter construction option).

-2--2-

742051812.12,74742051812.12.74

Diese Forderungen werden folgendermaßen erfüllt:These requirements are met as follows:

Zu 1. Vereinigung von Stützen und Balken zu einem Element, auf dem Jürch äis A«ibi!di;ns ä=r Auflager (2/3) v^h!«>?!<?? n«:l«.nnlatt«nr Balken oder Kombinationen aus beiden aufgelegt werden können.To 1. Combination of columns and beams into one element on which Juerch ais A «ibi! Di; ns ä = r support (2/3) v ^ h!«>?! <?? n «: l« .nnl a tt «n r bars or combinations of both can be placed.

Zu 2. Völlig glattflächige, einbaufertige Teile mit eingebauten Stahlplatten (1) für SchweißanschlUsse zu benachbarten Fertigteilen und eingebauten Schraubhülsen (4) für die senkrechte Anschlußbewehrung (5).2. Completely smooth-surfaced, ready-to-install parts with built-in steel plates (1) for welded connections to neighboring prefabricated parts and built-in screw sleeves (4) for the vertical connecting reinforcement (5).

Zu 3. Schweißverbindungen (1), keinerlei Verguß auf der Baustelle.To 3. Welded connections (1), no grouting on the construction site.

Zu 4. Durch Form und Tiefe des Rahmens steht das Rohbauskelett bei der Montage sofort auch ohne Abstutzen.4. Due to the shape and depth of the frame, the shell is at the Immediate assembly without bracing.

Zu 5. Durch die Art der Verbindungen (siehe Punkt 2/3).To 5. By the type of connections (see point 2/3).

Hierdurch werden folgende Vorteile erzielt:This has the following advantages:

denkbar hoher Grad von Vorfertigung, Nutzungsflexibilität, d.h. Eignung des Bausystems für die verschiedensten Bauaufgaben unter Verwendung eines Minimum an tragenden Grundelementen (in der Regel nur zwei Grundelemente:Conceivably high degree of prefabrication, flexibility of use, i.e. suitability of the building system for the various construction tasks using a minimum of load-bearing basic elements (usually only two basic elements:

Rahmenelement, Deckenelement),Frame element, ceiling element),

extrem kurze Montagezeit durch die Art der Verbindungen und im Normal fall durch den Wegfall jeglicher Hilfskonstruktion oder Abstützungen bei der Montage,extremely short assembly time due to the type of connections and normally due to the elimination of any auxiliary construction or Supports during assembly,

Wiriterbautauglichkeit des Bausystems.Wiriter building suitability of the building system.

Claims (3)

Dipl.-Ing. Dieter Mohr, 8 München 83, Rübezahlstraße 80 Dipl.-Ing. Oskar Presse!, 8 München 50, Werner-Friedmunn-Bogen 12 ZWEISTIELIGER STAHLBETONFERTiGTEILRAHMEN MIT SCHWEISSVERBINDUNG SchutzansprlicheDipl.-Ing. Dieter Mohr, 8 Munich 83, Rübezahlstrasse 80 Dipl.-Ing. Oskar Presse !, 8 Munich 50, Werner-Friedmunn-Bogen 12 TWO-LEVEL PRE-FABRICATED REINFORCED CONCRETE FRAME WITH WELDED JOINT Protection claims 1. Zweistiel iger Stahlbetonfertigteilrahmen dadurch gekennzeichnet, daß am oberen Langstand des Rahmens eine an einigen Stellen vertiefte Aussparung mit der Länge des lichten Stutzabstandes angeordnet ist.1. Zweistiel iger precast reinforced concrete frame, characterized in that on Upper long stand of the frame a recess deepened in some places is arranged with the length of the clear socket spacing. 2. Werden an beiden Längsseiten des Rahmens Deckenkonstruktionen aufgelegt, dann werden in beiden oberen Längsrändern die vorher beschriebenen Aussparungen angeordnet.2. If ceiling structures are placed on both long sides of the frame, then the previously described recesses are arranged in both upper longitudinal edges. 3. Zweistieliger Stahlbetonfertigteilrahmen nach Anspruch 1 dadurch gekennzeichnet, daß an der oberen horizontalen Begrenzungsfläche an der kurzen Außenkante und entlang der Längsaussparung Stahlplatten mit Verankerung eingebaut sind.3. Two-post precast reinforced concrete frame according to claim 1, characterized in that on the upper horizontal boundary surface on the short Steel plates with anchoring are installed along the outer edge and along the longitudinal recess. 742051812.1Z74742051812.1Z74
DE7420518U Two-tier precast reinforced concrete frame with welded connection Expired DE7420518U (en)

Publications (1)

Publication Number Publication Date
DE7420518U true DE7420518U (en) 1974-12-12

Family

ID=1306162

Family Applications (1)

Application Number Title Priority Date Filing Date
DE7420518U Expired DE7420518U (en) Two-tier precast reinforced concrete frame with welded connection

Country Status (1)

Country Link
DE (1) DE7420518U (en)

Similar Documents

Publication Publication Date Title
DE69022604T2 (en) Process for the manufacture of underwater structures.
DE1409988A1 (en) Method for fastening ceiling joists to so-called suspended ceilings
DE7420518U (en) Two-tier precast reinforced concrete frame with welded connection
DE2246441A1 (en) BUILDING CONSTRUCTION
DE7420517U (en) Double-leg reinforced concrete precast frame
DE2309722A1 (en) PROCESS FOR THE PRODUCTION OF CONCRETE BUILDING CEILINGS
DE2702459A1 (en) METHOD OF FASTENING PANELS MADE OF FRAGILE MATERIAL TO BEAMS, COLUMNS OR DGL. LONGITUDINAL PARTS AND FITTINGS FOR CARRYING OUT THE PROCEDURE
DE1684409A1 (en) Formwork beams
DE2616970C3 (en) Method and shuttering element for the production of a diaphragm wall in a prefabricated composite construction
DE3212462A1 (en) Ceiling support
DE2438376A1 (en) Latticed double panel for multiple-service-installation building - with octagonal cutout sides coinciding with base lines of strut-connecting shafts
DE1484318A1 (en) Prefabricated reinforcement elements
DE1182411B (en) Method and device for erecting multi-storey buildings with basements
DE2035372A1 (en) Method and form for forming a shell of construction or structural parts made of concrete or reinforced concrete
AT216742B (en) Formwork system with lost formwork for concrete walls
DE1434550C (en) Basin stiffened in the longitudinal and transverse directions
AT282149B (en) Prefabricated part for walls, floors, ceilings or roofs
DE1928412A1 (en) Light shaft element that can be produced as a prefabricated part
DE1559344C (en) Reinforced concrete mushroom ceiling
DE3505592A1 (en) Shuttering for structures which are rotationally symmetrical, in particular cylindrical and conical, e.g. tapering slightly upwards
DE102004059042B3 (en) Method to create a white basement in foundation secured by sheet piling whereby wall is erected from inter-connecting plates,space between wall and plates is filled and the wall is concreted using inner formwork
CH498269A (en) Formwork device with handrail post
DE2120484C (en) Wall-mounted gauge for follow-up work
DE3027019C2 (en)
EP0608199A2 (en) Segmental shuttering for circular concrete walls