DE6948385U - PORTAL CRANE FOR LAYING TRACKS. - Google Patents

PORTAL CRANE FOR LAYING TRACKS.

Info

Publication number
DE6948385U
DE6948385U DE19696948385 DE6948385U DE6948385U DE 6948385 U DE6948385 U DE 6948385U DE 19696948385 DE19696948385 DE 19696948385 DE 6948385 U DE6948385 U DE 6948385U DE 6948385 U DE6948385 U DE 6948385U
Authority
DE
Germany
Prior art keywords
portal
cross member
gantry crane
laying tracks
portal crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19696948385
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gottfried Hoefels & Co KG GmbH
Original Assignee
Gottfried Hoefels & Co KG GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gottfried Hoefels & Co KG GmbH filed Critical Gottfried Hoefels & Co KG GmbH
Priority to DE19696948385 priority Critical patent/DE6948385U/en
Publication of DE6948385U publication Critical patent/DE6948385U/en
Expired legal-status Critical Current

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Description

• · > 1• ·> 1

lit 1911 Vtlit 1911 Vt

Dr. phil. G. B. HAGENDr. phil. G. B. HAGEN PatentanwaltPatent attorney

MÜNCHEN 71 (SoIIn)
Franz-Hato-Straße 21
MUNICH 71 (SoIIn)
Franz-Hato-Strasse 21

Telefon796213 KHnohen, den 13.Dezember 1969Telephone 796213 KHnohen, December 13, 1969

HÖF 2624 Dr.H./P./mHÖF 2624 Dr.H./P./m

Gottfried Hufeis GmbH & Co. KGGottfried Hufeis GmbH & Co. KG

4048 Grevenbroiah Düsseldorfer Straße 33 4048 Grevenbroiah Düsseldorfer Strasse 33

Portalkrs. α zum Verlegen von GleisenPortal crs. α for laying tracks

Die Neuerung betrifft einen Portalkran zum Verlegen von Gleisen, bestehend aus zwei je durch ein Stützenpaar und einem Portalquerträger gebildeten Portalen, die miteinander durch eine von den Portalquerträgern getragene Längetra"eree verfc üäen sind.The innovation concerns a gantry crane for laying Tracks, consisting of two each with a pair of supports and Portals formed by a portal cross member, which are connected to one another by a longitudinal beam carried by the portal cross members are obscured.

Solche P03-"' ilkräne sind in ihrer äußeren Höhe durch ein Lichtraumprofil, wie es bei der Bundesbahn verwendet wird, beschränkt. J .e maximale Durchfe'irtshöhe durch einen solchen Portp-llcran wird durch die konstruktionsmäßige Stärke der Bauteile Such P03 "'ilkräne are limited in their outer height by a light gauge, such as is used in the Federal Railroad. J .e maximum Durchfe'irtshöhe by such PORTP-llcran is determined by the construction even thickness of the components

Es ist e? . derartiger Porta3.1r^an bekar^.t, der jedoch den Nachteil hat, daß seine maximale Höhe nicht zum Entladen der entsprechend dem Lichtraumprofil zugelassenen obersten Schwellensohichi auf einem Transportwagen ausreicht. Die oberste SchichtIt is e? . Such a porta3.1r ^ an bekar ^ .t, which however has the disadvantage has that its maximum height does not allow unloading of the uppermost sleeper sohichi approved according to the clearance profile on a trolley is sufficient. The top layer

Bayerische Vereinsbank Mündien 820993Bayerische Vereinsbank Mündien 820993

HOP 2624 -Z- HOP 2624 -Z-

muß daher zunächst gesondert abgeladen werden, ehe der Brtalkran am Arbeitsort in Aktion treten kann.must therefore first be unloaded separately before the bar crane can go into action at the place of work.

Es ist Aufgabe der Neuerung, einen Portalkran zu schaffen, mit dem auch eine Entladung der obersten durch das Lichtraumprofil zugelassenen Schicht am Arbeitsplatz möglich ist.It is the task of the innovation to create a gantry crane with which the topmost crane can also be unloaded through the clearance profile authorized shift at the workplace is possible.

Ein derartiger Portalkran kennzeichnet sich gemäß der Meuerung dadurch, daß die Traverse an der Verbindungsstelle mit dem Portalquerträger auf einem Bruchteil ihrer sonstigen Höhe ausgekröpft ist.A gantry crane of this type is characterized according to the tower in that the traverse at the connection point with the portal cross member on a fraction of its other Height is cranked.

Weitere Merkmale und Zweckmäßigkeiten der Neuerung ergeben sich aus den beiliegenden Figuren und der Beschreibung einesFurther features and practicalities of the innovation emerge from the accompanying figures and the description of a

™ AusfUhrungsbeispieles.™ exemplary embodiment.

Von den Figuren zeigen:From the figures show:

Figur 1 eine perspektivische Ansicht eines Portalkranes mit Längstraverse;FIG. 1 is a perspective view of a gantry crane with a longitudinal traverse;

Figur 2 einen Schnitt durch ein Portal mit gekröpfter Längstraverse.FIG. 2 shows a section through a portal with a cranked longitudinal traverse.

Figur 1 zeigt einen Portalkran mit einem durch eine Längstraverse 3 verbundenen Portalkranpaar 4,5, bestehend aus Stützen 1 und Portalquerträger 2. Dieser Portalkran fährt auf seitlich ausgelegten Hilfsschienen über einen beladenen Transportwagen, auf dem zu verlegende Schwellen schichtweise gestapelt sind. Die Schwellen werden dann an an der Traverse dafür vorgesehenen ( hier nicht gezeigten) Vorrichtungen befestigt, gleichzeitig angehoben und dann zu der Stelle gefahren, an der sie verlegt werden sollen. Nach dem Ablegen der neuen Schwellen greift der Portalkran mit an den Traversen dafür vorgesehenen Greifern ein Stück des alten, auszuwechselnden Gleises aus Schienen und Schwellen, hebt diesesFIG. 1 shows a gantry crane with a gantry crane pair 4, 5, which is connected by a longitudinal traverse 3 and consists of Supports 1 and gantry cross members 2. This gantry crane moves on auxiliary rails laid out on the side over a loaded one Transport trolley on which sleepers to be laid are stacked in layers. The sleepers are then attached to the traverse Devices provided for this purpose (not shown here) attached, simultaneously lifted and then driven to the point where they are to be relocated. After the new sleepers have been laid down, the gantry crane grabs the crossbars Grippers provided for this purpose lift a piece of the old, replaceable track made of rails and sleepers

HÖF 2624 - 3 -HÖF 2624 - 3 -

an und fährt es auf dafür vorgesehene Transportwagen. Nach dem Absetzen des alten G-leisstückes wird wiederum ein Satz neuer Schwellen transportiert.and drives it on specially designed trolleys. To when the old G-leisstück is set down, a Set of new sleepers transported.

Die Ladungshöhe der Schwellen wird durch ein Lichtraumprofil bestimmt. Sie maximale äußere Höhe der Portale ist aber ebenfalls nach oben begrenzt, da vermieden werden muß, daß etwa Kontakt mit elektrischen Oberleitungen entsteht oder aber, daß die Portale bei Brücken oder ähnlichem obenaastoßen. Die Längstraverse eines solchen Portalkranes ist etwa 24 m lang und muß wegen der notwendigen Stabilität eine Mindestbreite aufweisen. In der neuerungsgemäßen Ausführung wird die Breite der Längstraverse beibehalten, lediglich an der Verbin? ungsstelle mit dem Portalquerträger wird sie so ausgekröpft (Fig. 2), daß die Traverse um etwa 35 cm nach oben versetzt wird.The load height of the sleepers is determined by a clearance profile. The maximum external height of the portals is, however, also limited to the top, as it must be avoided that there is contact with electrical overhead lines or else, that the portals come up against bridges or the like. The longitudinal traverse of such a gantry crane is around 24 m long and must have a minimum width because of the necessary stability. In the design according to the innovation keep the width of the longitudinal traverse, only at the conn? It is cranked out at the point of connection with the portal cross member (Fig. 2) that the traverse is offset by about 35 cm upwards.

Die dadurch gewonnene Durchfahrtshöhe ermöglicht die Entladung auch ier obersten vom Lichtraumprofil zugelassenen Schwellenschicht.The resulting clearance height enables unloading even at the top of the clearance profile Threshold layer.

Eb ist noch zu bemerken, daß auf den kurzen ausgekröpften Stellen die notwendige statische Festigkeit durch geringe Vereteifungsmittel erreicht wird, während für eine Traverse gleicher Belastbarkeit mit einer auf der ganzen Länge gleich geringen Breite erhebliche Versteifungsmittel erforderlich wären.Eb should also be noted that on the short cranked Provide the necessary static strength is achieved by low stiffening agents, while for a truss The same load-bearing capacity with a width that is equally small over the entire length requires considerable stiffening means would be.

- Schutzanspruch -- right to protection -

Claims (1)

Ho? 2624Ho? 2624 SchutzanspruchClaim to protection Portalkran zum Verlegen von Gleisen, bestehend aus zwei je durch ein Stützenpaar und einen Portalquerträger gebildeten Portalen, die miteinander durch eine von den Portalquerträgern getragene Längstraverse verbunden sind, dadurch gekennzeichnet, daß die Traverse (3) an der Verbindungsstelle mit dem Portalquerträger (2) a c einen Brv.ohteil ihrer sonstigen Höhe aasgekröpft is υ. Gantry crane for laying tracks, consisting of two portals each formed by a pair of supports and a portal cross member, which are connected to one another by a longitudinal cross member carried by the portal cross members, characterized in that the cross member (3) at the connection point with the portal cross member (2) ac a gross part of their other height is cranked υ.
DE19696948385 1969-12-15 1969-12-15 PORTAL CRANE FOR LAYING TRACKS. Expired DE6948385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19696948385 DE6948385U (en) 1969-12-15 1969-12-15 PORTAL CRANE FOR LAYING TRACKS.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19696948385 DE6948385U (en) 1969-12-15 1969-12-15 PORTAL CRANE FOR LAYING TRACKS.

Publications (1)

Publication Number Publication Date
DE6948385U true DE6948385U (en) 1970-09-03

Family

ID=6607071

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19696948385 Expired DE6948385U (en) 1969-12-15 1969-12-15 PORTAL CRANE FOR LAYING TRACKS.

Country Status (1)

Country Link
DE (1) DE6948385U (en)

Similar Documents

Publication Publication Date Title
DE102010022679A1 (en) Vehicle combination for transporting rails
DE2138468C2 (en) Crane undercarriage
DE6948385U (en) PORTAL CRANE FOR LAYING TRACKS.
DE2243107C2 (en) Pallet undercarriage for loading the individual shelves in a high-bay warehouse
DE1810956A1 (en) Loader for shelf operation
DE2435692C2 (en) Swivel platform on an inclined conveyor system for mining operations
DE20205223U1 (en) Crane has telescopic jib with jib sections with retractable and extendable running tracks for travelling crab which from first jib section continue onto second jib section with same track width
DE1189247B (en) Slewing crane
DE615450C (en) Rail vehicle for moving and laying switches
DE1166430B (en) Mobile crane with rotating boom
DE8336253U1 (en) Transport container
DE852376C (en) Log loading device with Schraeg track
DE1197025B (en) Stacking crane system with sliding platform
DE2803073A1 (en) TOWER-SHAPED SCAFFOLDING
AT133956B (en) Rail vehicle for moving and laying switches.
DE1994664U (en) ALL SIDE ROLLER TABLE SWEEPER.
DE1047817B (en) Device for replacing a track in sections
DE1098687B (en) Craneway girder with running rail
DE3628040A1 (en) Mine walling shield transport equipment - has driving chain guided in rails for transport platform
DE1983711U (en) DOUBLE-BAR COMPOSITE BEAM.
DE1145098B (en) Truck with a gantry crane
DE6808624U (en) LIFTING LOADER FOR SHELVING OPERATION.
DE1899850U (en) ROLLER POINT.
DE9013767U1 (en) Trolley
DE1147532B (en) Receiving device for bulk goods