DE502005000725D1 - Tile-deck construction in tunnel construction and manufacturing method - Google Patents
Tile-deck construction in tunnel construction and manufacturing methodInfo
- Publication number
- DE502005000725D1 DE502005000725D1 DE502005000725T DE502005000725T DE502005000725D1 DE 502005000725 D1 DE502005000725 D1 DE 502005000725D1 DE 502005000725 T DE502005000725 T DE 502005000725T DE 502005000725 T DE502005000725 T DE 502005000725T DE 502005000725 D1 DE502005000725 D1 DE 502005000725D1
- Authority
- DE
- Germany
- Prior art keywords
- tunnel
- construction
- manufacturing
- tile
- deck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004519 manufacturing process Methods 0.000 title abstract 2
- 238000010276 construction Methods 0.000 title 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F1/00—Ventilation of mines or tunnels; Distribution of ventilating currents
- E21F1/003—Ventilation of traffic tunnels
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The arrangement consists of at least two finished units (2) viewed in a cross section of the tunnel, whereby the nearest finished units to the tunnel wall (6) are fixed on their nearest side to the tunnel wall (6) or supported on brackets (5) of the tunnel wall (6) and connected to the next finished unit on their side facing the inside of the tunnel by locally poured concrete end blocks (3). An independent claim is also included for a method of manufacturing an intermediate ceiling.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102004038595A DE102004038595A1 (en) | 2004-08-06 | 2004-08-06 | Tile-deck construction in tunnel construction and manufacturing method |
Publications (1)
Publication Number | Publication Date |
---|---|
DE502005000725D1 true DE502005000725D1 (en) | 2007-06-28 |
Family
ID=35375697
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102004038595A Withdrawn DE102004038595A1 (en) | 2004-08-06 | 2004-08-06 | Tile-deck construction in tunnel construction and manufacturing method |
DE502005000725T Expired - Fee Related DE502005000725D1 (en) | 2004-08-06 | 2005-07-29 | Tile-deck construction in tunnel construction and manufacturing method |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102004038595A Withdrawn DE102004038595A1 (en) | 2004-08-06 | 2004-08-06 | Tile-deck construction in tunnel construction and manufacturing method |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP1630349B1 (en) |
AT (1) | ATE362578T1 (en) |
DE (2) | DE102004038595A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ITMI20100895A1 (en) * | 2010-05-19 | 2011-11-20 | Zecca Prefabbricati S P A | SUPPORT STRUCTURE FOR AUXILIARY SYSTEMS, PARTICULARLY FOR ROAD TUNNELS. |
ITSO20120002A1 (en) * | 2012-06-22 | 2013-12-23 | Zecca Prefabbricati S P A | SUPPORT STRUCTURE FOR AUXILIARY SYSTEMS, PARTICULARLY FOR ROAD TUNNELS |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH192320A (en) * | 1939-03-27 | 1937-08-15 | Bartholomaei Alfred | Ventilation system in tunnels, especially road tunnels. |
CH402926A (en) * | 1963-08-07 | 1965-11-30 | Rudolf Dipl Ing Stuessi | Process for the production of a secondary vault in a tunnel and vault produced according to this process |
CH471287A (en) * | 1968-08-14 | 1969-04-15 | Beton Ag | Suspended ceiling and partition wall construction for tunnel ventilation |
CH681646A5 (en) * | 1990-07-06 | 1993-04-30 | Manfred Krattiger | |
JP2000104495A (en) * | 1998-09-28 | 2000-04-11 | Ishikawajima Constr Materials Co Ltd | Arched tunnel |
EP1081331B1 (en) * | 1999-09-02 | 2004-08-11 | Rud. Otto Meyer GmbH & Co. KG | Method and suction system for ventilation, i.e. smoke suction in tunnels |
JP2002106293A (en) * | 2000-09-29 | 2002-04-10 | Nippon Zenith Pipe Co Ltd | Hollow structure |
-
2004
- 2004-08-06 DE DE102004038595A patent/DE102004038595A1/en not_active Withdrawn
-
2005
- 2005-07-29 AT AT05016492T patent/ATE362578T1/en not_active IP Right Cessation
- 2005-07-29 DE DE502005000725T patent/DE502005000725D1/en not_active Expired - Fee Related
- 2005-07-29 EP EP05016492A patent/EP1630349B1/en not_active Not-in-force
Also Published As
Publication number | Publication date |
---|---|
EP1630349A1 (en) | 2006-03-01 |
DE102004038595A1 (en) | 2006-03-16 |
EP1630349B1 (en) | 2007-05-16 |
ATE362578T1 (en) | 2007-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE502005009482D1 (en) | Lightweight panel and method for its production | |
ATE510974T1 (en) | PANEL FOR FLOORING, WALL AND CEILING CLADDING, AND A METHOD FOR PRODUCING THE PANEL | |
ATE419260T1 (en) | C-ARYL-GLUCOSIDE SGLT2 INHIBITORS AND METHOD FOR THE PRODUCTION THEREOF | |
DE602006020763D1 (en) | METHOD FOR THE PRODUCTION OF MULTILAYER PAINT BUILDINGS ON AUTOMOTIVE BODIES WITHOUT FOUNDATION OF FOUNDRED AGENT | |
DE60333662D1 (en) | POROUS COMPOSITE MEMBRANE AND METHOD FOR PRODUCING THE MEMBRANE | |
GB2445904A (en) | Concrete floor system,incorporating foundation footing | |
BR0215545A (en) | Reinforcement device | |
DE502005000725D1 (en) | Tile-deck construction in tunnel construction and manufacturing method | |
DE502005008303D1 (en) | Method and device for producing a multilayer concrete slab | |
DE502004006013D1 (en) | Method for producing a noise barrier made of sound-absorbing components. | |
ATA3752003A (en) | COMPOSITE AND METHOD FOR THE PRODUCTION THEREOF | |
ATE395822T1 (en) | PRECAST CONCRETE SYSTEM FOR A STABLE FLOOR, METHOD FOR PRODUCING A STABLE FLOOR, STABLE FLOOR AND A STABLE COMPRISING THE STABLE FLOOR | |
MA29162B1 (en) | CONCRETE BEAM AND PROCESS FOR PRODUCING THE SAME | |
EP1619005A3 (en) | Manufacturing process for a prefabricated construction element with reinforcing steel bars | |
WO2010032117A3 (en) | Reinforcement for tunnel constructions and method of productions thereof | |
DE10332634A1 (en) | Support structure for vehicle has sill connected to roof structure by support pillar, whereby sill has break in region of support pillar and support pillar forms part of sill | |
ATE273421T1 (en) | BUILDING FLOOR WITH PREFABRICATED DOUBLE WALL ELEMENTS AND ITS PRODUCTION PROCESS | |
ATE460544T1 (en) | LOST FORMWORK AND BUILDING WALL PRODUCED USING THIS FORMWORK | |
DE502004000579D1 (en) | Soundproofing element | |
DE202004019685U1 (en) | Acoustic building block for construction of walls comprises two sections separated from one another by a sound decoupling layer | |
DE60313316D1 (en) | Microstrip line and method for its manufacture | |
ITSV20030051A1 (en) | STRUCTURE FOR THE PREFABRICATED FORMWORK REALIZATION, | |
ATE388004T1 (en) | PLOW FOR PRODUCING THE PROFILING OF A FACING SHELL MADE OF POROROUS CONCRETE ON A REINFORCED CONCRETE Slab WITHOUT FORMWORK | |
SE0401526L (en) | System and method for the construction of a building element | |
DE10213942B4 (en) | Concrete slab and method for its production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8364 | No opposition during term of opposition | ||
8339 | Ceased/non-payment of the annual fee |