DE494148C - Work scaffolding for building walls - Google Patents

Work scaffolding for building walls

Info

Publication number
DE494148C
DE494148C DEN26378D DEN0026378D DE494148C DE 494148 C DE494148 C DE 494148C DE N26378 D DEN26378 D DE N26378D DE N0026378 D DEN0026378 D DE N0026378D DE 494148 C DE494148 C DE 494148C
Authority
DE
Germany
Prior art keywords
frame strips
work scaffolding
building walls
mortar
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEN26378D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MICHAEL HILTMANN
OTTO NAECKER
Original Assignee
MICHAEL HILTMANN
OTTO NAECKER
Publication date
Priority to DEN26378D priority Critical patent/DE494148C/en
Application granted granted Critical
Publication of DE494148C publication Critical patent/DE494148C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Arbeitsgerüst zum Aufführen von mauern Die Erfindung betrifft ein in der Höhe bewegliches und mit erhöhter Ablegebühne für Baustoffe versehenes Arbeitsgerüst zum Aufführen von Mauern.Work scaffolding for performing walls The invention relates to a Working scaffold that can be moved in height and has a raised platform for building materials for performing walls.

Das Wesen der Erfindung beruht darin, daß die nach der Mauer zu liegende Ablegebühne mit Rahmenleisten an den Bordkanten versehen ist und vorteilhaft weiter darin, daß sich auf den Rahmenleisten verschiebbare Anschläge befinden. Die Rahmenleisten dienen als Lehren, Abstreicher und zum Halten des gleich in ganzer Schicht aufgetragenen Mörtels und die auf den Rahmenleisten verschiebbaren Anschläge für die Mauerecken. Die Verwendung der Rahmenleisten beschleunigt das Aufführen der Mauern, indem der Mörtel in fließendem Zustand gleich auf einmal in den von den Leisten umschlossenen Raum eingebracht wird. Nach Verlegen einer Ziegelschicht auf dem Mörtel werden die Leisten in Höhenrichtung verstellt, und das Spiel wiederholt sich.The essence of the invention is based on the fact that it is to be located after the wall Storage platform is provided with frame strips on the beltlines and is advantageous further that there are slidable stops on the frame strips. The frame strips serve as gauges, scrapers and to hold the same applied in a whole shift Mortar and the stops for the wall corners that can be moved on the frame strips. The use of the frame strips speeds up the installation of the walls by removing the Mortar in the flowing state at once in the one enclosed by the strips Space is introduced. After laying a layer of brick on top of the mortar, the The bars are adjusted in height and the game repeats itself.

In der Zeichnung ist die Erfindung beispielsweise in einer Ausführung in drei Ansichten dargestellt.In the drawing, the invention is for example in one embodiment shown in three views.

Die paarweise innerhalb und außerhalb der zu errichtenden Gebäudewand aufgestellten Pfosten a, die j e durch Auszugsrohre b mit ihre Auszugslänge sichernden Klemmschrauben s und durch Querstege d verstrebt sind, tragen Arbeitsbühnen e, f. Die Bühnen sind an den Pfosten gegenständig angeordnet, werden durch Schienen i bei winkligem Querschnitt der Pfosten oder durch Hülsen bei rundem Querschnitt derselben geführt und haben Auftrittsbretter g für den Maurer. Die Bretter auf den in Reichhöhe des Handwerkers befindlichen Absätzen e haben an den Bordkanten Rahmenleisten h. Die Arbeitsbühnen hängen an Flaschenzügen h, die mittels Seilwinden in von den auf den Auftritten g stehenden Maurern bedient werden. Der Sicherheit halber können unter den Auftritten Steckstifte o in die Pfosten eingeführt sein. Die Baustoffe werden vorn Fuhrwerk aus unmittelbar auf die oberen Bretter lz gelegt. Der Maurer braucht sich also weder zu bücken oder umzudrehen, noch müssen die Steine hochgeworfen oder der Mörtel hinaufgetragen werden. Dieser befindet sich vielmehr in kleinen Rollwagen r auf der Arbeitsbohle, auf der auch die Steine liegen. Nun wird in der Regel der auf den einen Gerüst stehende Maurer die Steine, der auf dem anderen Gerüst befindliche Maurer den Mörtel vor sich haben. Durch Kippen des Rollwagens wird der Mörtel auf die Lagerflächen geworfen, dadurch werden die Seitenfugen voller, als wenn sie ausgestrichen (ausgekellt) werden. Der Maurer braucht auch keine Lagerfuge mehr abzunehmen, da die an den Bordkanten hochstehenden Rahmenleisten h den Mörtel einschließen. Dadurch wird auch das Herabfallen des Mörtels, also Verlust an solchem, vermieden. The posts a, erected in pairs inside and outside the building wall to be erected, each braced by extension tubes b with clamping screws s securing their extension length and by crossbars d, carry working platforms e, f. The platforms are arranged opposite one another on the posts and are supported by rails i with angled cross-section of the posts or through sleeves with a round cross-section of the same and have step boards g for the bricklayer. The boards on the paragraphs e located at the level of the craftsman have frame strips h on the beltlines. The working platforms hang on pulleys h, which are operated by means of cable winches in the bricklayers standing on the steps g. For the sake of security, pins o can be inserted into the posts under the treads. The building materials are placed directly on the upper boards from the wagon. The bricklayer does not have to bend down or turn around, nor do the stones have to be thrown up or the mortar carried up. Rather, this is located in small trolleys r on the work plank on which the stones are also located. As a rule, the bricklayer standing on one scaffolding will have the stones in front of him, while the bricklayer on the other scaffolding will have the mortar in front of him. By tilting the trolley, the mortar is thrown onto the storage surfaces, which makes the side joints fuller than if they were spread out (troweled). The bricklayer also no longer needs to remove a horizontal joint, as the frame strips standing up on the beltline enclose the mortar. This also prevents the mortar from falling down, i.e. preventing it from being lost.

Auf den Rahmenleisten h sind Anschläge p, in Gleitführungen laufend, angebracht, die das Senkeln des Mauerwerks ersparen. Auch das Einteilen des Mauerwerks auf Hochmaß kommt in Wegfall, da die Lagerschichten an den Pfosten a eingeteilt sind.On the frame strips h there are stops p, running in sliding guides, which save the lowering of the masonry. There is also no need to divide the masonry to a high level, since the bearing layers are divided up on the posts a.

Ist das Mauerwerk auf volle Höhe des Gerüstes angewachsen, dann wird auf dieses ein zweites Gerüst aufgepflockt. Die dadurch frei gewordenen Flaschenzüge werden hierauf in dem Aufsatzgerüst angewendet.If the masonry has grown to the full height of the scaffolding, then a second frame is pegged onto this. The pulley blocks that have become free are then applied in the scaffolding.

Claims (2)

PATENTANSPRÜCHE: r. In der Höhe bewegliches und mit erhöhter Ablegebühne für Baustoffe versehenes Arbeitsgerüst zum Aufführen von Mauern, gekennzeichnet durch Rahmenleisten (h) an den Bordkanten der nach der Mauer zu liegenden Ablegebühne. PATENT CLAIMS: r. Height-adjustable and with a raised platform Work scaffolding provided for building materials for laying walls, marked by means of frame strips (h) on the beltline of the storage platform that is located after the wall. 2. Arbeitsgerüst nach Anspruch I, gekennzeichnet durch die auf den Rahmenleisten (h) verschiebbaren Anschläge (p) für die Mauerecken.2. Working scaffold according to claim I, characterized by the stops (p) for the corners of the wall which can be displaced on the frame strips (h).
DEN26378D Work scaffolding for building walls Expired DE494148C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEN26378D DE494148C (en) Work scaffolding for building walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEN26378D DE494148C (en) Work scaffolding for building walls

Publications (1)

Publication Number Publication Date
DE494148C true DE494148C (en) 1930-03-19

Family

ID=7343815

Family Applications (1)

Application Number Title Priority Date Filing Date
DEN26378D Expired DE494148C (en) Work scaffolding for building walls

Country Status (1)

Country Link
DE (1) DE494148C (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2430179A (en) * 1944-06-20 1947-11-04 Lanchester Frank Portable platform
US2444122A (en) * 1946-07-19 1948-06-29 Wahl Joseph Scaffold for builders
EP0102862A1 (en) * 1982-07-15 1984-03-14 Jean-Marie Gérard René Koehl Bricklayer's scaffold with a lifting threstle for conveyers
DE3412936A1 (en) * 1984-04-06 1984-08-30 Gerhard 7958 Laupheim Mayer Combined wall support frame/falsework system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2430179A (en) * 1944-06-20 1947-11-04 Lanchester Frank Portable platform
US2444122A (en) * 1946-07-19 1948-06-29 Wahl Joseph Scaffold for builders
EP0102862A1 (en) * 1982-07-15 1984-03-14 Jean-Marie Gérard René Koehl Bricklayer's scaffold with a lifting threstle for conveyers
DE3412936A1 (en) * 1984-04-06 1984-08-30 Gerhard 7958 Laupheim Mayer Combined wall support frame/falsework system

Similar Documents

Publication Publication Date Title
US3679026A (en) Interior scaffolding arrangement
US2140617A (en) Adjustable scaffold
DE494148C (en) Work scaffolding for building walls
US1393932A (en) Scaffolding
DE861018C (en) Device for erecting walls surrounding or dividing buildings
DE4412681C2 (en) Device for manipulating building blocks
US20010045079A1 (en) Wall panel lifting system used for forming multistory block and brick walls
US3111764A (en) Brick laying device
DE460542C (en) formwork
DE4119760A1 (en) Device to assist in the construction of block walls - has front and back guides for block placement and block lifting device and mortar spreading hose
US2578631A (en) Erection of buildings
US378810A (en) steout
CH638861A5 (en) Apparatus for producing vertical wall panels from masonry blocks
DE2037360C3 (en) Large area formwork and method for its formwork
DE532576C (en) Sliding formwork
DE817515C (en) Device for erecting concrete structures and their parts, as well as application methods
DE418737C (en) Climbing frame
US1742236A (en) Bricklayer's scaffolding
DE3412936A1 (en) Combined wall support frame/falsework system
DE803934C (en) Jack
DE4437858A1 (en) Method of erecting transportable brick wall
AU769914B2 (en) Scaffolding assembly
DE202006015840U1 (en) Transport device for construction scaffold uses crane with four-line hanger to raise platform inclined until front wheels of latter can slide into structure until rear support wheels sit down on floor
DE477399C (en) Process for the production of ascending masonry from building blocks provided with cross holes
AT218708B (en) Procedure for erecting a structure and building gauges for carrying out the procedure