DE4317976A1 - Waste disposal site - Google Patents

Waste disposal site

Info

Publication number
DE4317976A1
DE4317976A1 DE19934317976 DE4317976A DE4317976A1 DE 4317976 A1 DE4317976 A1 DE 4317976A1 DE 19934317976 DE19934317976 DE 19934317976 DE 4317976 A DE4317976 A DE 4317976A DE 4317976 A1 DE4317976 A1 DE 4317976A1
Authority
DE
Germany
Prior art keywords
waste
water
space
waste deposit
surface structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE19934317976
Other languages
German (de)
Inventor
Katsumi Kotani
Kazuo Touge
Hiroki Ogata
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Publication of DE4317976A1 publication Critical patent/DE4317976A1/en
Ceased legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B1/00Dumping solid waste
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Processing Of Solid Wastes (AREA)

Description

Die vorliegende Erfindung bezieht sich allgemein auf ein Abfallablagerungsgelände. Insbesondere bezieht sich die Erfindung auf ein Abfallablagerungsgelände, das eine wirksame Verwendung eines Raumes unmittelbar oberhalb des Ablagerungsgelän­ des vor der Fertigstellung der Erdfüllung mit dem Abfall erlaubt.The present invention relates generally to a waste disposal site. In particular, the invention relates to a waste disposal site that effective use of a space immediately above the deposit area allowed before the completion of the earth filling with the waste.

Beschreibung des Standes der TechnikDescription of the prior art

Wie gut bekannt ist, wird Industrieabfall und/oder Handelsabfall, der durch indu­ strielle Betätigung und/oder Geschäftstätigkeit erzeugt wird, und nicht industriel­ ler Abfall aus dem Haushalt endgültig als Erdfüllung abgelagert. Solche Erdfül­ lungsablagerung von Abfall wird allgemein in einem Abfallablagerungsgelände durch­ geführt, das in einem Binnenlandgebiet wie ein Tal zwischen Bergen oder in einem Küstengebiet angelegt ist.As is well known, industrial waste and / or commercial waste generated by indu strategic activity and / or business activity is generated, and not industrial Final household waste is finally deposited as soil filling. Such earth filling Garbage disposal is generally done in a waste disposal site managed in an inland area like a valley between mountains or in a Coastal area is created.

Ein typisches Ausführungsverfahren des Abfallablagerungsgeländes ist wie folgt. Zuerst wird ein Vertiefungsgebiet, das den Abfall aufnimmt, durch Verwenden der natürlichen Bodenausbildung, künstlich durch Graben des Erdbodens oder durch Umschließen einer Küste mit einer Trennwandstruktur oder dergl. festgelegt. A typical execution process of the waste disposal site is as follows. First, a recess area that receives the waste is created by using the natural soil formation, artificially by digging the ground or by Enclosing a coast with a partition structure or the like.  

Dann wird, um ausgetretenes Wasser, das im Vertiefungsgebiet gesammelt wer­ den kann, am Auslaufen aus diesem Gebiet zu hindern, die Konstruktion solch einer Wasserbarriere wie eine Absperrungswand, eine Wasserbarriereschicht usw. für das Vertiefungsgebiet ausgeführt.Then, in order to leak water, who is collected in the depression area that can prevent the construction from leaving this area a water barrier like a barrier wall, a water barrier layer etc. for the specialization area.

Im Vertiefungsgebiet, für das die Wasserbarriere vorgesehen ist, wird der Abfall vom Boden aus nach und nach abgelagert. Während des Verfahrens, den Abfall abzulagern, wird der bereits abgelagerte Abfall in geeigneten Zeitab­ schnitten verdichtet und versteift. Zu einer Zeit, wo das Vertiefungsgebiet fast mit dem Abfall gefüllt ist, wird Erdboden und Sand auf den Abfall drauf­ gelegt, um den letzteren abzudichten. Das so angelegte Land kann als grünes Gebiet wie ein Park oder dergl. dienen.In the deepening area for which the water barrier is intended, the Waste gradually deposited from the ground. During the process, the To deposit waste, the waste that has already been deposited will be stored in a suitable time cut compacted and stiffened. At a time when the specialization Almost filled with the garbage, soil and sand are put on the garbage placed to seal the latter. The land created in this way can be seen as green Serve area like a park or the like.

Jedoch kann das Abfallablagerungsgelände den folgenden Problemen begegnen.However, the waste deposit site can face the following problems.

Das erste Problem besteht darin, daß der obere Raum des Abfallablagerungsge­ ländes für einen langen Zeitabschnitt nicht benutzt werden kann, bis der ab­ gelagerte Abfall endgültig durch Boden und Sand abgedichtet ist. Die Ursache liegt darin, daß es lange Jahre in Anspruch nimmt, das Abfallablagerungsgelän­ de mit dem Abfall zu füllen und den Abfall endgültig mit dem Boden und Sand abzudichten, und das Land auf dem Abfall kann sich einer wesentlichen Sen­ kung des Bodens aussetzen, was eine lange Zeit braucht, um tragfähig zu werden.The first problem is that the upper space of the waste deposit area Country cannot be used for a long period of time until the stored waste is finally sealed by soil and sand. The cause is that it takes a long time, the waste deposit area de to fill with the waste and the waste finally with the soil and sand seal, and the land on the trash can become an essential sen exposure to the soil, which takes a long time to become sustainable.

Das zweite Problem besteht darin, daß, da die im Wasser enthaltene Umgebungs­ verunreinigung im Regenwasser aufgelöst werden kann, das sich im Abfallabla­ gerungsgelände während des Füllens mit dem Abfall angesammelt hat, um aus­ getretenes Wasser zu erzeugen, eine im Umfang große Kläranlage notwendig wird.The second problem is that because of the ambient environment contained in the water Contamination can be dissolved in the rainwater that is in the waste disposal has accumulated in order to fill out the waste To produce water that has been kicked, a large-scale sewage treatment plant is necessary.

Das dritte Problem besteht darin, daß, da der abgelagerte Abfall aus dem Ab­ fallablagerungsgelände herausfließen kann, ein widerlicher oder unangeneh­ mer Geruch entsteht oder die Bodensicht sich verschlechtert, eine Bedingung für das Auswählen des Gebietes, um das Abfallablagerungsgelände anzulegen, ist notwendigerweise sehr streng im Hinblick auf den Einfluß der Anwohner, die daherum wohnen, so daß das Abfallablagerungsgelände an einem Ort weit entfernt von einem Wohngebiet und einem Gebiet industrieller Tätigkeiten angelegt wird. Solcher Zwang im Auswählen des Gebietes, um das Abfallabla­ gerungsgelände anzulegen, macht den Transport des Abfalls vom Gebiet, wo der Abfall erzeugt wird, zum Abfallablagerungsgelände zur arbeitsintensiven Tätig­ keit. Als Ergebnis werden die Kosten zum Ablagern des Abfalls hoch. Auch ist zu befürchten, während des Transports eine Umweltverschmutzung zu verursachen.The third problem is that since the deposited waste from the Ab fall deposit area can flow out, a disgusting or uncomfortable There is a smell or the ground visibility deteriorates, a condition for selecting the area to create the waste disposal site, is necessarily very strict in terms of the influence of local residents, who therefore live so that the waste deposit site is in one place away from a residential area and an area of industrial activity is created. Such constraint in choosing the area to the waste disposal  Creating waste land makes the waste transported from the area where the Waste is generated, to the waste disposal area for labor-intensive work speed. As a result, the cost of depositing the waste becomes high. Is too fear of causing pollution during transportation.

Es ist möglich, den abdeckenden Boden und Sand bei jedem Vorkommen von Ver­ dichten und Versteifen des Abfalls während des Ablagerns des Abfalls auf dem Abfallablagerungsgelände mit vermeidender Wirkung auf die Randgebiete in Be­ dingungen für die Umgebung vorzusehen. Jedoch kann entsprechend dem Betrag an Boden und Sand, um den Abfall abzudecken, der Betrag an Abfall der abgela­ gert wird, verringert werden.It is possible to cover the soil and sand with every occurrence of Ver sealing and stiffening the waste while the waste is deposited on the Waste deposit area with an avoiding effect on the peripheral areas in Be to provide conditions for the environment. However, according to the amount of soil and sand to cover waste, the amount of waste of waste is reduced.

Übersicht über die ErfindungOverview of the invention

Die vorliegende Erfindung wurde im Hinblick auf die obigen laufenden Probleme so weiter ausgearbeitet. Deshalb ist es ein Ziel der vorliegenden Erfindung, ein Abfallablagerungsgelände vorzusehen, das einen wirksamen Gebrauch des obe­ ren Raumes des Abfallablagerungsgeländes und eine Abfallablagerungstätigkeit unabhängig vom Wetter gestattet, das kein Abdecken des Abfalls mit Boden und Sand auf halbem Wege beim Füllen erfordert und das eine nicht vorzuziehende Wirkung auf die Umgebungsperipherie vermeiden kann.The present invention has been made in view of the above running problems elaborated so on. It is therefore an object of the present invention to provide a waste disposal site that allows for the effective use of the above area of the waste disposal site and a waste disposal activity regardless of the weather, which does not cover the waste with soil and Sand midway through filling is required and one is not preferable Avoid effect on the surrounding periphery.

Um die oben erwähnten und andere Ziele zu erreichen, weist ein Abfallablage­ rungsgelände gemäß dem einen Aspekt der Erfindung einen Raum in Form einer Vertiefung auf, um darin Abfall aufzunehmen, eine Flächenstruktur, die vorge­ sehen ist, die gesamte obere Öffnung des Vertiefungsraumes abzudecken, wobei die Flächenstruktur vor dem Beginn des Ablagerns des Abfalls in den Raum ge­ fertigt wurde, und wenigstens eine Ablagerungsöffnung, die durch die Flächen­ struktur hindurch vorgesehen ist, um den Abfall in den Raum da hindurch abzu­ lagern, wobei die Ablagerungsöffnung hergerichtet ist, geöffnet und ge­ schlossen zu werden.In order to achieve the above and other goals, a waste bin points out rungsgelände according to one aspect of the invention, a room in the form of a Deepening in order to receive waste, a surface structure, the pre can be seen to cover the entire upper opening of the recess space, whereby the surface structure before the waste begins to be deposited in the room was manufactured, and at least one deposit opening through the surfaces structure is provided to drop the waste into the room through it store with the deposit opening prepared, opened and ge to be closed.

Das Abfallablagerungsgelände mit der vorstehend dargelegten Konstruktion ge­ stattet, den oberen Raum unmittelbar nach Fertigstellen der Konstruktion der Flächenstruktur zu benutzen, da die Flächenstruktur, die die gesamte obere Öffnung des Vertiefungsraumes abdeckt, hierfür vorgesehen ist. Der Abfall wird nach dem Abdecken der oberen Öffnung des Vertiefungsraumes mit der Flä­ chenstruktur durch die Ablagerungsöffnung hindurch abgelagert, die in der Flächenstruktur ausgebildet ist, und kann geöffnet und geschlossen werden. Deshalb kann die Abfallablagerungstätigkeit sogar bei schlechtem Wetter wie z. B. bei Regen durchgeführt werden. Da auch der einmal im Vertiefungsraum abgelagerte Abfall niemals aus dem Raum herausfließen wird, wird es unnötig, eine unmittelbare Bodenabdeckung auszutragen. Demgemäß kann das Gesamtvolumen des Vertiefungsraumes zur Aufnahme des Abfalls verwendet werden. Da weiterhin das Eintreten von Regenwasser in den Vertiefungsraum von der Flächenstruktur verhindert werden kann, wird in großem Umfang eine Einrichtung zum Behandeln des ausgetretenen Wassers, das aus dem Abfall gelöste Verunreinigung enthält, unnötig. Durch Abstützen der Flächenstruktur mit einer Mehrzahl von Pfählen oder Wandungen ist die vorliegende Erfindung für den großen Umfang an Abfall­ ablagerungsgelände mit großer Abfallbehandlungskapazität anwendbar.The waste deposit site with the construction set forth above equips the upper room immediately after completing the construction of the Surface structure to use because the surface structure that the entire top Covers opening of the cavity, is provided for this. The trash  after covering the upper opening of the cavity with the surface Chen structure deposited through the deposit opening, which in the Surface structure is formed, and can be opened and closed. Therefore, the waste deposit activity can be like even in bad weather e.g. B. be carried out in the rain. Since also in the deepening room deposited waste will never flow out of the room, it becomes unnecessary to provide immediate ground cover. Accordingly, the total volume of the deepening room can be used to hold the waste. Since continue the entry of rainwater into the deepening space from the surface structure can be prevented, a treatment facility will be used on a large scale the leaked water, which contains contaminants removed from the waste, unnecessary. By supporting the surface structure with a plurality of piles or walls is the present invention for the wide range of waste deposition area with large waste treatment capacity applicable.

Gemäß dem anderen Aspekt der Erfindung weist ein Abfallablagerungsgelände ei­ nen Raum in Form einer Vertiefung auf, um darin Abfall aufzunehmen, eine Flä­ chenstruktur, die vorgesehen ist, die gesamte obere Öffnung des Vertiefungs­ raumes abzudecken, wobei die Flächenstruktur vor dem Beginn des Ablagerns des Abfalls in den Raum gefertigt wurde, eine Einrichtung an der unteren Ober­ fläche der Flächenstruktur angeordnet ist, um Wasser auf den Abfall zu sprü­ hen, und eine Einrichtung auf dem Boden des Vertiefungsraumes zum Abführen der Luft angeordnet ist.In accordance with the other aspect of the invention, a waste deposit site has a space in the form of a recess to hold waste, a surface Chen structure, which is provided, the entire upper opening of the recess cover space, the surface structure before the start of deposition the garbage was made into the room, a facility on the lower upper surface of the surface structure is arranged to spray water onto the waste hen, and a device on the bottom of the recess space for draining the air is arranged.

Das Abfallablagerungsgelände mit der vorstehend dargelegten Konstruktion kann, da die Luft von der die Luft abführenden Einrichtung abgeführt werden kann, die auf dem Boden des Vertiefungsraumes angeordnet ist, welcher durch die Flächenstruktur geschlossen ist, die den Abfall im Vertiefungsraum umgebende Atmosphäre aus einem anaeroben Zustand in einen aeroben Zustand ändern. In Verbindung damit kann, da das Wasser auf den Abfall von der wassersprühen­ den Einrichtung zugeführt wird, eine Kompostierung organischer Substanzen usw. unterstützt werden, die unter aerobem Zustand kompostiert werden.The waste deposit site with the construction set out above can since the air can be exhausted from the air exhausting device, which is arranged on the floor of the depression space, which by the Surface structure is closed, the surrounding waste in the deepening space Change the atmosphere from an anaerobic state to an aerobic state. In connection with this, since the water can spray on the waste from the water the device is fed, a composting of organic substances etc. are supported, which are composted under aerobic conditions.

Wenn ferner die Luft nicht von der luftabführenden Einrichtung abgeführt wird, wird der Abfall in den anaeroben Zustand gesetzt, eine Kompostierung der organischen Substanz oder dergl., die unter anaerobem Zustand kompostiert wird, kann unterstützt werden. Furthermore, if the air is not exhausted from the air exhaust device the waste is put into the anaerobic state, composting the organic matter or the like which composts under anaerobic conditions can be supported.  

Denn der Zustand, in den der Abfall gesetzt wird, kann zwischen anaerobem Zu­ stand und aerobem Zustand durch Abführen oder Nichtabführen der Luft im Ver­ tiefungsraum ausgewählt werden. Deshalb kann der Schadstoff aus unterschied­ lichen organischen Substanzen, der im Abfall enthalten ist, sowohl durch die anaerobe als auch durch die aerobe Kompostierung kompostiert werden.Because the state in which the waste is placed can vary between anaerobic standing and aerobic condition by removing or not removing the air in the ver can be selected. Therefore the pollutant can be distinguished from Lichen organic substances contained in the waste, both by the anaerobic as well as composted by aerobic composting.

Ferner kann durch Anordnen der Einrichtung für eine Wasserzufuhr am Boden des Vertiefungsraumes zu einer weiteren Wasserzufuhr von der unteren Seite des Ab­ falls der Umgebungszustand innerhalb des Vertiefungsraumes empfindlicher ein­ gestellt werden, um an den Zustand für die Kompostierungs-Unterstützung der organischen Substanzen anzupassen, die im Abfall enthalten sind.Furthermore, by arranging the device for a water supply at the bottom of the Deepening room for a further water supply from the lower side of the Ab if the environmental condition within the cavity is more sensitive be put to the state for composting support adapt the organic substances contained in the waste.

Kurzbeschreibung der ZeichnungenBrief description of the drawings

Die vorliegende Erfindung wird besser aus der nachstehenden detaillierten Be­ schreibung und aus den begleitenden Zeichnungen der bevorzugten Ausgestaltun­ gen der Erfindung verstanden werden, die jedoch nicht zum Begrenzen der Erfin­ dung, sondern nur zur Erläuterung und zum Verständnis dienen sollen.The present invention will be better understood from the detailed Be below writing and from the accompanying drawings of the preferred embodiment gene understood to be the invention, but not to limit the inven but should only serve to explain and understand.

In den Zeichnungen istIn the drawings is

Fig. 1 ein Schnitt einer Ausgestaltung eines Abfallablagerungsgeländes gemäß der vorliegenden Erfindung; . Figure 1 is a section of an embodiment of a waste disposal site according to the present invention;

Fig. 2 ein Schnitt, der eine Wasserabsperrstruktur zeigt, die zwischen einer Wasserbarriereschicht und einem Pfahl vorgesehen ist; Fig. 2 is a section showing a water barrier structure provided between a water barrier layer and a pile;

Fig. 3 ein Schnitt, der eine Ausgestaltung einer Wasserabsperrstruktur zwischen Strukturelementen zeigt, die eine ebene Platte bilden; Fig. 3 is a sectional view showing a configuration of a Wasserabsperrstruktur between structural elements which form a flat plate;

Fig. 4 eine Draufsicht, die grafisch Abfallablagerungsöffnungen ver­ deutlicht; Fig. 4 is a plan view graphically illustrating waste deposit openings;

Fig. 5 ein Schnitt einer anderen Ausgestaltung eines Abfallablagerungs­ geländes gemäß der vorliegenden Erfindung; Fig. 5 is a section of another embodiment of a waste disposal site according to the present invention;

Fig. 6 ein Schnitt einer weiteren Ausgestaltung eines Abfallablagerungs­ geländes gemäß der vorliegenden Erfindung; Fig. 6 is a section of another embodiment of a waste disposal site according to the present invention;

Fig. 7 ein Schnitt einer weiteren Ausgestaltung eines Abfallablagerungs­ geländes gemäß der vorliegenden Erfindung; Fig. 7 is a sectional view of another embodiment of a waste deposition site according to the present invention;

Fig. 8 ein Schnitt einer weiteren Ausgestaltung eines Abfallablagerungs­ geländes gemäß der vorliegenden Erfindung und Fig. 8 is a section of a further embodiment of a waste disposal site according to the present invention and

Fig. 9 ein Schnitt einer weiteren Ausgestaltung eines Abfallablagerungs­ geländes gemäß der vorliegenden Erfindung. Fig. 9 is a section of another embodiment of a waste disposal site according to the present invention.

Beschreibung der bevorzugten AusgestaltungDescription of the preferred embodiment

Die bevorzugten Ausgestaltungen eines Abfallablagerungsgeländes gemäß der vor­ liegenden Erfindung werden nachstehend mit Bezug auf die begleitenden Zeich­ nungen besprochen.The preferred embodiments of a waste disposal site according to the above lying invention are below with reference to the accompanying drawing discussed.

Fig. 1 ist ein Schnitt, der eine Ausgestaltung eines Abfallablagerungsgeländes gemäß der vorliegenden Erfindung zeigt. Ein Vertiefungsgebiet 12 zur Aufnahme von Abfall 10 ist durch Verwenden eines Naturtales einer Geländeausbildung oder durch Graben des Erdbodens 14 hergerichtet. Sogar wenn die natürliche Gelände­ ausbildung verwendet wird, ist es natürlich notwendig, Tiefbau- und Konstruk­ tionsarbeiten durchzuführen, wie sie zum Anlagen des Abfallablagerungsgeländes gefordert werden. Am untersten Niveau des so ausgebildeten Vertiefungsgebietes 12 ist ein Wassersammelschacht 16 zum Sammeln von Grundwasser ausgebildet. Fig. 1 is a section showing a configuration of a waste disposal site according to the present invention. A deepening area 12 for receiving waste 10 is prepared by using a natural valley of terrain formation or by digging the ground 14 . Even if natural terrain training is used, it is of course necessary to carry out civil engineering and construction work as required to construct the waste disposal site. At the lowest level of the deepening area 12 formed in this way , a water collecting shaft 16 is formed for collecting groundwater.

Dann wird als ein Wasserbarriere-Erzeugnis eine Wasserbarriereschicht 18 über die innere periphere Oberfläche des Vertiefungsgebietes 12 gelegt, um die ge­ samte Oberfläche abzudecken. Als Wasserbarriereschicht kann eine Schichtform aus undurchlässigen Material wie z. B. synthetischem Gummi, synthetischem Harz usw. oder einem Gewebe mit notwendiger Zugfestigkeit und beschichtet mit einem undurchlässigen Material wie z. B. synthetischem Gummi, synthetischem Harz oder dergl. verwendet werden.Then, as a water barrier product, a water barrier layer 18 is placed over the inner peripheral surface of the depression area 12 to cover the entire surface. As a water barrier layer, a layer form made of impermeable material such. As synthetic rubber, synthetic resin, etc. or a fabric with the necessary tensile strength and coated with an impervious material such. B. synthetic rubber, synthetic resin or the like.

Die über den Innenumfang des Vertiefungsgebietes 12 ausgedehnte äußere Umfangs­ kante der Wasserbariereschicht 18 erstreckt sich in eine Rinne 20, die auf dem Gelände ausgebildet ist, um den Außenumfang des Vertiefungsgebietes 12 zu um­ geben. Auf die Wasserbarriereschicht 18 werden Betonblöcke 22 gesetzt, die in der Rinne 20 angebracht ist. In der dargestellten Ausgestaltung werden die Be­ tonblöcke 22 mit einem komplementären Querschnitt mit der Rinne 20 ausgebildet, um die Wasserbarriereschicht 18 an die Rinne 20 festzuklemmen. Deshalb kann ein Herabfallen der Wasserbarriereschicht 18 die Neigung des Vertiefungsgebie­ tes 12 entlang verhindert werden. The extended over the inner circumference of the depression area 12 outer peripheral edge of the water barrier layer 18 extends into a groove 20 which is formed on the site to give the outer circumference of the depression area 12 around. Concrete blocks 22 , which are attached in the channel 20, are placed on the water barrier layer 18 . In the illustrated embodiment, the clay blocks 22 are formed with a complementary cross section with the channel 20 in order to clamp the water barrier layer 18 to the channel 20 . Therefore, the water barrier layer 18 can be prevented from falling down the inclination of the depression region 12 .

Nach dem Vorsehen der Wasserbarriereschicht 18 werden, um die gesamte innere Oberfläche des Vertiefungsgebietes 12 abzudecken, Pfähle 24 in den Erdboden getrieben, um durch die Wasserbarriereschicht 18 hindurchzugehen und eine stützende Grundschicht zu erreichen. Als Pfähle 24 können handelsüblich lie­ ferbare Betonpfähle verwendet werden.After providing the water barrier layer 18 , to cover the entire inner surface of the depression 12 , piles 24 are driven into the ground to pass through the water barrier layer 18 and reach a supporting base layer. As piles 24 commercially available concrete piles can be used.

Eine Ausgestaltung einer Wasserabsperrstruktur zwischen der Wasserbarriere­ schicht 18 und dem Pfahl 24 ist in Fig. 2 dargestellt. An den Abschnitten der Wasserbarriereschicht 18, durch die die Pfähle 24 hindurchgehen, werden die Öffnungen 26 mit einem größeren Durchmesser als die Außendurchmesser der Pfähle 24 vorbereitend ausgebildet. Unter den Öffnungen 26 werden ringförmige Rinnen 28 mit einem größeren Außendurchmesser als der Innendurchmesser der Öffnungen 26 durch Graben des Erdbodens ausgebildet. Nach dem Passieren des Pfahles 24 durch je eine ringförmige Rinne 28 wird ein wasserabsperrender Ring 30 am Außenumfang des Pfahles 24 in einer wasserdichten Art und Weise an­ gebracht. Dann wird Beton in der ringförmigen Rinne 28 angeordnet, um einen ringförmigen Ring 32 auszubilden, der den Außenumfang des Pfahles 24 umgibt. Die innere Umfangskante der Öffnung 26 der Wasserbarriereschicht 18 wird in dem Außenumfangsabschnitt des ringförmigen Ringes 32 versenkt. Auch der was­ serabsperrende Ring 30 wird in dem Abschnitt rund um das Zentrum des ringför­ migen Ringes 32 versenkt. Als Material für den wasserabsperrenden Ring 30 werden Materialien bevorzugt, die eine ausreichende Elastizität und eine Auf­ blähneigung durch Absorbieren von Wasser haben, um ein wasserdichtes Anbrin­ gen am Außenumfang des Pfahles 24 zu erreichen. Ein Beispiel von solchem Mate­ rial ist ein aufblähender Gummi. Es sollte gewürdigt werden, daß die Wasser­ barriereschicht 18 mit den Pfahlanpassungsöffnungen 26 nach dem Treiben der Pfähle 24 mit nachfolgender wasserabsperrender Behandlung zwischen den Pfäh­ len 24 und der Wasserbarriereschicht 18 installiert werden kann.An embodiment of a water barrier structure between the water barrier layer 18 and the pile 24 is shown in FIG. 2. At the portions of the water barrier layer 18 through which the piles 24 pass, the openings 26 with a larger diameter than the outer diameters of the piles 24 are prepared. Under the openings 26 , annular grooves 28 having an outer diameter larger than the inner diameter of the openings 26 are formed by digging the ground. After passing the pile 24 through an annular groove 28 , a water-blocking ring 30 is placed on the outer circumference of the pile 24 in a watertight manner. Concrete is then placed in the annular trough 28 to form an annular ring 32 that surrounds the outer periphery of the pile 24 . The inner peripheral edge of the opening 26 of the water barrier layer 18 is recessed in the outer peripheral portion of the annular ring 32 . Also what serabsperrende ring 30 is sunk in the section around the center of the ringför shaped ring 32 . As a material for the water-blocking ring 30 , materials are preferred which have sufficient elasticity and a tendency to bloat by absorbing water in order to achieve a watertight attachment on the outer circumference of the pile 24 . An example of such material is an inflating rubber. It should be appreciated that the water barrier layer 18 with the pile adjustment openings 26 after the driving of the piles 24, with subsequent treatment wasserabsperrender between the Pfäh len 24 and the water barrier layer may be installed 18th

Wenn die wasserabsperrende Behandlung zwischen den Pfählen 24 und der Wasser­ barriereschicht 18 vollendet ist, wird eine Wassersammelvorrichtung 34 in der Lage des untersten Niveaus im Vertiefungsgebiet 12 vorgesehen.When the water blocking treatment between the piles 24 and the water barrier layer 18 is completed, a water collecting device 34 is provided in the deepest area 12 in the lowest level position.

Die Wassersammelvorrichtung 34 umfaßt ein poröses Rohr 36 zum Wassersammeln und eine Schicht 38 von zerbrochenem Gestein zum Filtern von gesammeltem Was­ ser. Die Wassersammelvorrichtung 34 ist an der Wasserbarriereschicht 18 in überlappender Art angeordnet. The water collection device 34 includes a porous tube 36 for water collection and a layer 38 of broken rock for filtering collected water. The water collecting device 34 is arranged on the water barrier layer 18 in an overlapping manner.

Parallel zur Konstruktion der Wassersammelvorrichtung 34 wird ein im wesent­ lichen flacher künstlicher Boden 42 über der oberen Öffnung des Vertiefungs­ gebietes 12 ausgeführt, um das letztere abzudecken. Der künstliche Boden 42 wird an der Spitze der Pfähle 24 abgestützt.Parallel to the construction of the water collecting device 34 , a flat artificial soil 42 is executed above the upper opening of the depression area 12 to cover the latter. The artificial floor 42 is supported on the top of the piles 24 .

In der dargestellten Ausgastaltung wird der künstliche Boden 42 aus einer Mehrzahl von vorgefertigten Betonplatten hergestellt. Wasserabsperrplatten 44 werden zwischen entsprechende Betonplatten gesetzt, um die Zwischenräume zwischen den Betonplatten abzudichten, so daß Extrafeuchtigkeit wie z. B. Re­ genwasser in das Vertiefungsgebiet 12 nicht eindringen wird und das Gas, das vom im Vertiefungsgebiet 12 abgelagerten Abfall erzeugt wird, nicht nach außen abgeführt wird.In the outgassing arrangement shown, the artificial floor 42 is produced from a plurality of prefabricated concrete slabs. Water barrier plates 44 are placed between corresponding concrete slabs to seal the spaces between the concrete slabs so that extra moisture such as. B. Re genwasser will not penetrate into the depression 12 and the gas generated by the deposited in the depression 12 waste is not discharged to the outside.

In dem künstlichen Boden 42 sind eine oder mehr Abfallablagerungsöffnungen 46, die geöffnet oder geschlossen sein können, zum Ablagern des Abfalls in das Vertiefungsgebiet 12 vorgesehen, wie in Fig. 4 dargestellt ist. In der darge­ stellten, in Fig. 4 erläuterten Ausgestaltung sind die Abfallablagerungsöff­ nungen 46 fluchtend mit einem regelmäßigen Abstand angeordnet. An beiden Sei­ ten einer Linie, entlang welcher die Abfallablagerungsöffnungen 46 fluchten, ist ein Paar von Wandungen 48, 48 mit einem gleichen Abstand von der Linie an­ gebracht. Der Abstand zwischen den Wandungen 48 wird festgelegt, um einem den Abfall 10 transportierenden Fahrzeug zu gestatten, dazwischen zu passieren.In the artificial floor 42 , one or more garbage dump openings 46 , which may be open or closed, are provided for dumping the garbage into the depression area 12 , as shown in FIG. 4. In the Darge presented in Fig. 4 embodiment, the waste disposal openings 46 are aligned with a regular distance. On both sides of a line along which the waste deposit openings 46 are aligned, a pair of walls 48 , 48 are placed at the same distance from the line. The distance between walls 48 is determined to allow a vehicle carrying waste 10 to pass therebetween.

In dem künstlichen Boden 42 ist eine Mehrzahl von Belüftungstürmen 50 vorgese­ hen. Jeder Belüftungsturm 50 erstreckt sich durch den künstlichen Boden 42 hindurch, um das Gas zu ventilieren, das vom Abfall 10 innerhalb des Vertie­ fungsgebietes 12 erzeugt wird.A plurality of ventilation towers 50 are provided in the artificial floor 42 . Each ventilation tower 50 extends through the artificial floor 42 to ventilate the gas generated by the waste 10 within the depression region 12 .

In Fig. 1 veranschaulichte Querträger 52 erstrecken sich zwischen benachbar­ ten Pfählen 24, um letztere miteinander zu verbinden. Die Querträger 52 kön­ nen Drähte sein, die z. B. von den Pfählen 24 abnehmbar sind. Demgemäß können während des Verfahrens zum Ablagern des Abfalls 10 in das Vertiefungsgebiet 12 die Querträger 52 von den Pfählen 24 entfernt werden, wenn sie die Betä­ tigung der Geräte zum Verdichten der Abfälle 10, z. B. von Bulldozern oder dergl., stören. In Fig. 1 illustrated cross members 52 extend between adjacent th piles 24 to connect the latter together. The cross member 52 can be NEN wires, the z. B. are removable from the piles 24 . Accordingly, during the process of depositing the waste 10 into the depression 12, the cross members 52 can be removed from the piles 24 when they operate the devices for compacting the waste 10 , e.g. B. from bulldozers or the like.

Erst nach Vollenden der Konstruktion des künstlichen Bodens 42 wird der Abfall 10 in das Vertiefungsgebiet 12 durch die Abfallablagerungsöffnungen 46 hindurch abgelagert. Ein Ablagern des Abfalls 10 wird fortgesetzt, bis der Abfall 10 sich angesammelt hat, um den künstlichen Boden 42 zu erreichen. Während dieses Vorgangs wird der innerhalb des Vertiefungsgebietes 12 angesammelte Abfall 10 zusammengepreßt und verdichtet, wie gefordert wird.Only after the construction of the artificial floor 42 has been completed is the waste 10 deposited in the depression 12 through the waste storage openings 46 . Depositing the waste 10 is continued until the accumulated waste 10, in order to achieve the artificial surface of the 42nd During this process, the waste 10 accumulated within the depression 12 is compressed and compacted as required.

Wie vorstehend dargelegt ist, kann im Abfallablagerungsgelände gemäß der vor­ liegenden Erfindung, wenn der künstliche Boden 42, der den oberen Raum des Ver­ tiefungsgebietes 12 abdeckt, vor dem Beginn der Ablagerung des Abfalls 10 in das Vertiefungsgebiet 12 ausgeführt wurde, der obere Raum des Abfallablagerungs­ geländes für den Gebrauch unmittelbar nach der Herstellung des künstlichen Bo­ dens 42 verfügbar sein.As set forth above, in the waste disposal site according to the prior lying invention, when the artificial bottom 42 that covers the upper space of the Ver tiefungsgebietes 12, was carried out prior to the start of the deposition of the waste 10 into the recess area 12, the upper space of the waste deposition site for use immediately after the manufacture of the artificial floor 42 is available.

Da ferner der Abfall 10 durch die Abfallablagerungsöffnungen 46 hindurch abge­ lagert wird, die im künstlichen Boden 42 vorgesehen sind, der das gesamte Vertie­ fungsgebiet 12 abdeckt, und die geöffnet und geschlossen werden können, kann das Ablagern des Abfalls 10 ohne Rücksicht auf die natürlichen Voraussetzungen wie z. B. Wetter oder dergl. getan werden. Da ferner das Vertiefungsgebiet 12 mit dem künstlichen Boden 42 abgedeckt ist, wird der einmal im Vertiefungsgebiet 12 ab­ gelagerte Abfall 10 niemals aus dem Vertiefungsgebiet 12 herausfließen. Deshalb wird es unnötig, den angesammelten Abfall 10 im Vertiefungsgebiet 12 mit Boden und Sand während der Fortsetzung der Ablagerung abzudecken. Dies erlaubt sei­ nerseits, das ganze Volumen des Vertiefungsgebietes 12 zum Ablagern des Abfalls 10 zu verwenden. Da zusätzlich ein Fließen von Regenwasser in das Vertiefungs­ gebiet 12 durch den künstlichen Boden gesperrt werden kann, wird nur benötigt, eine Kläranlagen-Einrichtung zum Klären des Wassers vorzusehen, das vom Abfall 10 per se geliefert wird.Further, since the waste 10 is deposited through the waste depositing openings 46 provided in the artificial floor 42 which covers the entire deepening area 12 and which can be opened and closed, the depositing of the waste 10 can be made regardless of the natural conditions such as B. weather or the like. Furthermore, since the depression 12 is covered with the artificial soil 42 , the waste 10 deposited once in the depression 12 will never flow out of the depression 12 . Therefore, it becomes unnecessary to cover the accumulated waste 10 in the depression 12 with soil and sand while the deposition continues. On the other hand, this allows the entire volume of the deepening area 12 to be used for depositing the waste 10 . In addition, since a flow of rainwater into the depression 12 can be blocked by the artificial soil, it is only necessary to provide a sewage treatment plant for clarifying the water supplied by the waste 10 per se.

Andererseits ergibt sich durch Treiben der Pfähle 24 mit der Wasserabsperrstruk­ tur, die den ringförmigen Ring 32 einschließt, in welcher der wasserabsperrende, den Pfahl 24 umgebende Ring 30 versenkt ist, in den Boden 14 durch die Wasser­ barriereschicht 18 hindurch und durch Abstützen des künstlichen Bodens 42 mit diesen Pfählen 24 ein großes Ausmaß an Abfallablagerungsgelände zum Abnehmen eines wesentlich großen Betrages an Abfall 10. Andererseits werden im Fall ei­ nes kleinen Ausmaßes an Abfallablagerungsgelände die Pfähle 24 zum Abstützen des künstlichen Bodens 42 unnötig werden.On the other hand, by driving the piles 24 with the water shut-off structure, which includes the ring-shaped ring 32 , in which the water-blocking ring 30 surrounding the pile 24 is sunk, into the soil 14 through the water barrier layer 18 and by supporting the artificial soil 42 with these piles 24 a large amount of waste deposit area for the removal of a substantially large amount of waste 10 . On the other hand, in the case of a small amount of waste deposit area, the piles 24 for supporting the artificial floor 42 will become unnecessary.

Der wassersammelnde Schacht 16 zum Sammeln des Unterbodenwassers kann vernach­ lässigt werden, wenn er auf dem Boden 14 der Erde angelegt ist, die keinen Anstieg des Unterboden-Wasserspiegels haben wird. Zusätzlich kann durch Vor­ sehen einer wasser - durchlässigen Schicht 40 über der Wasserbarriereschicht 18 in überlappender Weise und durch Anordnen der Wassersammelvorrichtung 34 bei der wasserdurchlässigen Schicht 40 an der tiefsten Position in dem Vertiefungs­ gebiet 12 ein kleiner Betrag an Wasser, das vom Abfall 10 abgeführt wird, durch die Wassersammelvorrichtung 34 gesammelt werden. Andererseits wird, wenn der Abfall, der abgelagert werden soll, einen geringen Wasserbestandteil enthält und wenn der angesammelte Abfall nicht das Abfallwasser abführen wird, die Was­ sersammelvorrichtung 34 unnötig.The water-collecting shaft 16 for collecting the underbody water can be neglected if it is laid on the floor 14 of the earth, which will not have an increase in the underbody water level. In addition, by providing a water-permeable layer 40 above the water barrier layer 18 in an overlapping manner and by arranging the water collecting device 34 at the water-permeable layer 40 at the deepest position in the depression area 12, a small amount of water that is discharged from the waste 10 can be seen , are collected by the water collecting device 34 . On the other hand, if the waste to be deposited contains a small amount of water and if the accumulated waste does not discharge the waste water, the water collecting device 34 becomes unnecessary.

Als nächstes wird die zweite Ausgestaltung der vorliegenden Erfindung mit Be­ zug auf Fig. 5 erörtert. Im Unterschied zur vorhergehenden ersten Ausgestal­ tung wird eine Absperrwandung 60 als Wasserbarrierestruktur angewandt.Next, the second embodiment of the present invention will be discussed with reference to FIG. 5. In contrast to the previous first embodiment, a shut-off wall 60 is used as the water barrier structure.

Um das Abfallablagerungsgelände gemäß der dargestellten Ausgestaltung auszufüh­ ren, wird die Absperrwandung 60 von einer fortlaufenden Untergrundwandungskon­ struktion oder von getriebenen Bohlenwänden aus Stahlblech errichtet, die das Gebiet umgeben, um ein Vertiefungsgebiet 12 vor dem Graben der Geländeoberflä­ che zu bilden. Die Absperrwandung 60 dient dazu, ein Eindringen des Untergrund­ wassers von der Seite des Geländes und ein Fließen des vom Abfall 10 ausgetrete­ nen Wassers seitlich in das Gelände zu blockieren. In Verbindung damit dient die Absperrwandung 60 auch als eine Ummantelungswand, um die seitliche Gelände­ seite am Abtragen zu hindern. Es sollte vermerkt werden, daß die Absperrwan­ dung 60 vorzugsweise eine wasserundurchlässige Schicht für das Gelände erzielt, wenn die wasserundurchlässige Schicht unterhalb des Grundes vorhanden ist, wo das Vertiefungsgebiet 12 angelegt ist. Auch innerhalb des von der Absperrwan­ dung 60 umgebenen Gebietes werden die abstützenden Pfähle 24 oder die Abstütz­ wandung usw. zum Abstützen des künstlichen Bodens 42 vorgesehen, der über das Vertiefungsgebiet 12 angelegt ist, wenn es notwendig ist. Es sollte richtig eingeschätzt werden, daß es vorgezogen wird, daß sich die stützenden Pfähle oder die stützenden Wandungen zur stützenden Schicht des Geländes bis unter­ halb des Vertiefungsgebietes 12 erstrecken. In order to carry out the waste disposal site in accordance with the illustrated embodiment, the barrier wall 60 is constructed by a continuous sub-wall construction or by driven plank walls made of sheet steel surrounding the area to form a depression area 12 prior to digging the site surface. The shut-off wall 60 serves to block penetration of the underground water from the side of the site and a flow of the water leaked from the waste 10 laterally into the site. In connection with this, the barrier wall 60 also serves as a sheathing wall in order to prevent the side terrain from being removed. It should be noted that the barrier 60 preferably achieves a waterproof layer for the terrain when the waterproof layer is beneath the bottom where the depression 12 is located. Also within the area surrounded by the barrier 60 , the supporting piles 24 or the supporting wall, etc. are provided for supporting the artificial soil 42 , which is applied over the depression area 12 , if necessary. It should be properly appreciated that it is preferred that the support posts or walls extend to below the subsurface 12 to the support layer of the site.

Nach Vollendung der Konstruktion der Absperrwandung 60 und Treiben der stüt­ zenden Pfähle 24 wird dann eine Ausschachtung des von der Absperrwandung 60 umgebenen Gebietes zum Ausbilden des Vertiefungsgebietes 12 für ein Ablagern des Abfalls 10 durchgeführt. Die Ausschachtung kann schnell durch Verwenden eines Baggers, z. B. eines Greifers, eines Löffelbaggers usw., durchgeführt werden. Zusätzlich wird gemäß dem Ausschachtungsverfahren eine dazwischenlie­ gende Schachtzimmerung vorgesehen, um die Absperrwandung 60 zu verstärken, die einen Erdbodendruck in der seitlichen Richtung erhält. Die Absperrwandung 60 wird ausgeführt, indem sie den Außenumfang des Vertiefungsgebietes 12 umgibt und sich in die Tiefe erstreckt, wobei sie die wasserundurchlässige Schicht 62 im Erdboden 14 erreicht. Die Absperrwandung 60 wird unter Anwendung von Bohlen, z. B. Stahlblechbohlenwand, Stahlrohrbohlenwand oder dergl., ausgeführt, eine fortlaufende Untergrundwandung, die eine wasserundurchlässige Schicht in Form einer Folge von Pfeilern oder einer Wand oder verschiedener Wandbewürfe aufweist.After completion of the construction of the barrier wall 60 and driving of the supporting piles 24 , excavation of the area surrounded by the barrier wall 60 is then carried out to form the depression area 12 for depositing the waste 10 . The excavation can be done quickly by using an excavator, e.g. B. a gripper, a backhoe, etc., are performed. In addition, in accordance with the excavation process, an intermediate chimney is provided to reinforce the barrier wall 60 which receives soil pressure in the lateral direction. The barrier wall 60 is formed by surrounding the outer periphery of the depression area 12 and extending in depth, reaching the waterproof layer 62 in the ground 14 . The barrier wall 60 is made using planks, e.g. B. sheet steel wall, tubular steel wall or the like., Running, a continuous sub-surface, which has a water-impermeable layer in the form of a series of pillars or a wall or various wall projections.

In der dargestellten Ausgestaltung wird der künstliche, über dem Vertiefungs­ gebiet 12 ausgebildete Boden 42 von einem Wandungskörper 64 gestützt, der in ringförmiger oder Gitterform ausgebildet ist und Pfeiler einschließt. Es sollte vermerkt werden, daß es auch möglich ist, den künstlichen Boden 42 durch Pfähle 24 wie in der ersten Ausgestaltung zu stützen.In the illustrated embodiment, the artificial floor 42 formed above the deep area 12 is supported by a wall body 64 which is formed in an annular or lattice shape and includes pillars. It should be noted that it is also possible to support the artificial floor 42 with piles 24 as in the first embodiment.

Der künstliche Boden 42 wird mit einer oder mehr Öffnungsabschnitten 66 für ei­ nen Zugriff auf das Vertiefungsgebiet 12 für ein Ablagern des Abfalls 10 verse­ hen. Der Öffnungsabschnitt 66 wird von einer Kabine 68 abgedeckt, die abgedichtet werden kann. Die Kabine 68 ist von der Gestalt und Größe, um das den Abfall 10 transportierende Fahrzeug unterzubringen. Um den Zugriff zum Innern durch das abfalltransportierende Fahrzeug zu gestatten, ist die Kabine 68 mit einem Ein­ gang und einem Ausgang versehen, der geöffnet und geschlossen werden kann. Ob­ gleich der Öffnungsabschnitt 66 deshalb konstant offengehalten wird, kann er im wesentlichen gleichartige Funktionen an den abfallablagernden Öffnungen 46, die in der ersten Ausgestaltung geöffnet und geschlossen werden können, durch den Eingang und Ausgang durchführen, die geöffnet und geschlossen werden können.The artificial floor 42 is provided with one or more opening sections 66 for egg access to the depression 12 for depositing the waste 10 . The opening section 66 is covered by a cabin 68 which can be sealed. The cabin 68 is of the shape and size to accommodate the vehicle carrying the waste 10 . In order to allow access to the interior by the waste-transporting vehicle, the cabin 68 is provided with an entrance and an exit which can be opened and closed. Therefore, although the opening portion 66 is kept constantly open, it can perform substantially similar functions on the waste depositing openings 46 , which can be opened and closed in the first embodiment, through the entrance and exit, which can be opened and closed.

Zusätzlich zu den Funktionen, die gleichartig zu jenen durch die erste Ausge­ staltung des Abfallablagerungsgeländes erreichten sind, wird die dargestellte Ausgestaltung des Abfallablagerungsgeländes niemals eine Verunreinigung an der Umgebung verursachen, sogar ohne die Wasserbarriereschicht innerhalb des Ver­ tiefungsgebietes 12, da der Seitenabschnitt des Vertiefungsgebietes 12 beim An­ sammeln des Abfalls 10 von dem Umgebungsgelände durch die Absperrwandung 60 isoliert ist und der Boden des Vertiefungsgebietes 12 mit der wasserundurchläs­ sigen Schicht 62 abgedeckt ist.In addition to the functions that are similar to those achieved by the first design of the waste deposit area, the illustrated design of the waste deposit area will never cause contamination to the environment, even without the water barrier layer within the depression area 12 , since the side portion of the depression area 12 at To collect the waste 10 is isolated from the surrounding area by the barrier wall 60 and the bottom of the depression area 12 is covered with the water-impermeable layer 62 .

Die dritte Ausgestaltung der vorliegenden Erfindung wird nachstehend mit Bezug auf Fig. 6 erörtert werden. In der dargestellten Ausgestaltung wird die Ab­ sperrwandung 60 als Wasserbarrierestruktur wie in der zweiten Ausgestaltung ver­ wendet.The third embodiment of the present invention will be discussed below with reference to FIG. 6. In the illustrated embodiment, the barrier wall 60 is used as a water barrier structure as in the second embodiment.

Die Absperrwandung 60 hat einen ringförmigen Abschnitt, wie von oben zu sehen ist. Die Absperrwandung 60 wird ausgeführt, um die wasserundurchlässige Schicht 62 vor der Ausschachtung des Vertiefungsgebietes 12 zu erreichen. Nach Vollen­ dung der Ausführung der Absperrwandung 60 wird der von der Absperrwandung 60 umgebene Boden 14 ausgeschachtet, um die wasserundurchlässige Schicht 62 zu erreichen, so daß das Vertiefungsgebiet 12 mit der von der Absperrwandung 60 umgebenen Seite und dem von der wasserundurchlässigen Schicht 62 abgedeckten Boden ausgebildet werden kann. In diesem Fall dient die Absperrwandung 60 auch als eine Umkleidungswand.The shut-off wall 60 has an annular section, as can be seen from above. The barrier wall 60 is implemented in order to reach the water-impermeable layer 62 before excavation of the depression area 12 . After solid execution of Absperrwandung 60 dung is the area surrounded by the Absperrwandung 60 bottom 14 excavated, in order to achieve the water-impermeable layer 62, so that the recess area 12 is formed with the by Absperrwandung 60 surrounding side and the area covered by the water-impermeable layer 62 bottom can be. In this case, the barrier wall 60 also serves as a cladding wall.

Zwischen den in Fig. 6 erläuterten Absperrwandungen 60 ist eine dazwischenlie­ gende Schachtzimmerung 70 zum Verstärken der ersteren vorgesehen. Wenn die Ab­ sperrwandung 60 in ringförmiger Gestalt ausgebildet ist, wie vorstehend dar­ gelegt wurde, kann die dazwischenliegende Schachtzimmerung vernachlässigt wer­ den.Between the shut-off walls 60 illustrated in FIG. 6, an intermediate shaft lining 70 is provided for reinforcing the former. If the barrier wall 60 is formed in an annular shape, as was set out above, the intermediate shaft clearing can be neglected.

Über dem so ausgeführten Vertiefungsgebiet 12 wird der künstliche Boden 42 aufgebaut. Der künstliche Boden 42 wird durch den Wandungskörper 64 oder die Pfähle 24 gestützt. Für den künstlichen Boden 42 können nicht dargestellte Ab­ fallablagerungsöffnungen, die geöffnet und geschlossen werden können, an ge­ eigneten Positionen vorgesehen werden.The artificial floor 42 is built up over the deepening area 12 designed in this way. The artificial floor 42 is supported by the wall body 64 or the piles 24 . For the artificial floor 42 , waste deposition openings (not shown) that can be opened and closed can be provided at suitable positions.

Die dargestellte Ausgestaltung erreicht im wesentlichen die gleichartigen Funktionen wie jene der zweiten Ausgestaltung.The configuration shown essentially achieves the same Functions like those of the second embodiment.

Es sollte vermerkt werden, daß in der zweiten und dritten Ausgestaltung, wie oben dargelegt wurde, wenn die wasserundurchlässige Schicht auf einem zu tiefen Niveau vorhanden ist, um sie durch Ausschachten zu erreichen, oder wenn die wassersperrende Ausführung der wasserundurchlässigen Schicht nicht ausreichend ist, die Wasserbarriereschicht 18 an der Oberfläche des Vertiefungsgebietes 12 vorgesehen werden kann.It should be noted that in the second and third embodiments as set out above, if the waterproof layer is too deep to be reached by excavation, or if the water barrier design of the waterproof layer is insufficient, that Water barrier layer 18 can be provided on the surface of the depression region 12 .

Bei einer bestimmten Art des Abfalls, der auf den Vertiefungsgebieten abgela­ gert wird, kann die Wasserabsperrstruktur vernachlässigt werden.In the case of a certain type of waste that was dumped in the specialization areas the water shut-off structure can be neglected.

Ferner kann in einer der vorhergehenden Ausgestaltungen der künstliche Boden 42 durch Hängeeinrichtungen aufgehangen werden, z. B. durch einen Draht oder dergl. Ferner kann, wie in Fig. 7 dargestellt ist, der künstliche Boden 42 von Stütz­ teilen 72 gestützt werden, die sich schräg von der Neigung des Vertiefungsge­ bietes 12 erstrecken.Furthermore, in one of the previous embodiments, the artificial floor 42 can be suspended by hanging devices, e.g. B. by a wire or the like. Furthermore, as shown in Fig. 7, the artificial bottom 42 of support parts 72 are supported, which extend obliquely from the inclination of the depression 12 area.

Als nächstes wird eine weitere Ausgestaltung der vorliegenden Erfindung erörtert werden. Eine der bevorzugten Ausgestaltungen des Abfallablagerungsgeländes gemäß der vorliegenden, in Fig. 8 erläuterten Erfindung weist im allgemeinen das Vertiefungsgebiet 12 auf, das durch Ausschachten eines im wesentlichen glatten Bodens in einer gegebenen Tiefe ausgeführt ist, um darin den Abfall 10 aufzuneh­ men, den künstlichen Boden 42, der die gesamte obere Öffnung des Vertiefungsge­ bietes 12 abdeckt, eine wassersprühende Einrichtung 80, die an der unteren Ober­ fläche des künstlichen Bodens 42 vorgesehen ist, und eine Belüftungseinrichtung 90 und eine Wasserzufuhreinrichtung 100, die am Boden des Vertiefungsgebietes 12 vorgesehen sind.Next, another embodiment of the present invention will be discussed. One of the preferred embodiments of the waste disposal site in accordance with the present invention illustrated in FIG. 8 generally includes the depression area 12 , which is accomplished by excavating a substantially smooth floor at a given depth to receive the waste 10 , the artificial floor 42 , which covers the entire upper opening of the deepening area 12 , a water-spraying device 80 which is provided on the lower upper surface of the artificial floor 42 , and a ventilation device 90 and a water supply device 100 which are provided on the bottom of the deepening area 12 .

Ähnlich der vorhergehenden zweiten Ausgestaltung wird, wenn eine Ausschachtung des Vertiefungsgebietes 12 bis zu einer gegebenen Tiefe vollendet ist, ein Fuß­ boden 19 auf dem ausgeschachteten Boden des Vertiefungsgebietes 12 gefertigt. Auf dem Fußboden 19 als dem Boden des Vertiefungsgebietes werden die Belüftungs­ einrichtung 90 und die Wasserzufuhreinrichtung 100 angeordnet. Der Fußboden 19 wird mit einer gegebenen Dicke aus Beton ausgeführt. Die Belüftungseinrichtung 90 weist eine Mehrzahl von Belüftungsrohren mit luftausströmenden Düsen auf, die auf dem gesamten Gebiet des Bodens des Vertiefungsgebiets 12 angeordnet sind. Auch die Wasserzufuhreinrichtung 100 weist eine Mehrzahl von Wasserzu­ fuhrrohren mit wasserausströmenden Düsen auf, die im gesamtem Gebiet am Boden des Vertiefungsgebietes 12 angeordnet sind. Die Belüftungseinrichtung 90 und die Wasserzufuhreinrichtung 100 stehen mit einem Luftkompressor 92, einem Was­ serspeicherpool 82 oder dergl. über ein Luftzufuhr- oder Wasserzufuhrrohr 94 in Verbindung, das sich die Absperrwandung 60 entlang erstreckt. Deshalb werden zu dem im Vertiefungsgebiet 12 abgelagerten Abfall 10 hin Luft und Wasser durch die Belüftungseinrichtung und die Wasserzufuhreinrichtung ausgeströmt.Similar to the previous second embodiment, when excavation of the depression 12 is completed to a given depth, a floor 19 is made on the excavated floor of the depression 12 . On the floor 19 as the bottom of the depression area, the ventilation device 90 and the water supply device 100 are arranged. The floor 19 is made of concrete with a given thickness. The ventilation device 90 has a plurality of ventilation pipes with air-flowing nozzles, which are arranged over the entire area of the bottom of the depression area 12 . The water supply device 100 also has a plurality of water supply pipes with water-flowing nozzles, which are arranged in the entire area at the bottom of the depression region 12 . The ventilation device 90 and the water supply device 100 are connected to an air compressor 92 , a water storage pool 82 or the like via an air supply or water supply pipe 94 which extends along the shut-off wall 60 . Therefore, air and water flow out through the ventilation device and the water supply device towards the waste 10 deposited in the depression region 12 .

Andererseits wird an der oberen Oberfläche des Fußbodens 19 eine Schutzschicht 23 zum Abdecken und Schützen der Belüftungseinrichtung 90 und der Wasserzufuhr­ einrichtung 100 ausgebildet. Die Schutzschicht 23 wird aus einem wasser- und gasdurchlässigen Material gebildet wie z. B. Sand, zerbrochene Steine, Schlacke usw., ungewebtem Gewebe, gewebtem Gewebe usw. oder geeigneten laminierten Schich­ ten davon. Die Schutzschicht 23 hält die luftausströmenden Düsen und die wasser­ ausströmenden Düsen vom Blockieren und Verstopfen fern und hält genauso die Be­ lüftungseinrichtung 90 und die Wasserzufuhreinrichtung 100 von Beschädigung we­ gen des direkten Kontaktes mit dem Abfall 10 fern. Ferner wird die Wassersammel­ einrichtung an der oberen Oberfläche des Fußbodens 19 zum Sammeln des Wassers vorgesehen, das durch die Wasserzufuhreinrichtung 100 ausgeströmt ist und aus dem Abfall 10 herausgequetscht wurde.On the other hand, a protective layer 23 for covering and protecting the ventilation device 90 and the water supply device 100 is formed on the upper surface of the floor 19 . The protective layer 23 is formed from a water and gas permeable material such as. B. sand, broken stones, slag etc., non-woven fabric, woven fabric etc. or suitable laminated layers thereof. The protective layer 23 keeps the air outflow nozzles and the water outflow nozzles away from blocking and clogging and also keeps the ventilation device 90 and the water supply device 100 away from damage because of direct contact with the waste 10 . Furthermore, the water collecting device is provided on the upper surface of the floor 19 for collecting the water which has flowed out through the water supply device 100 and has been squeezed out of the waste 10 .

Es sollte vermerkt werden, daß, obgleich die dargestellte Ausgestaltung den Fußboden 19 auf dem ausgeschachteten Boden ausbildet, der Fußboden 19 nicht im­ mer notwendig ist. Wenn z. B. die Absperrwandung 60 die wasserundurchlässige Schicht des Bodens erreicht, so daß nur wenig Untergrundwasser eindringen wird, wird der Fußboden 19 nicht notwendig sein. Auch im Fall, daß keine Möglichkeit besteht, ein Aufschwellen oder Schäumen zu verursachen, kann die aus einem synthetischen Gummi, einem synthetischen Harz oder dergl. hergestellte Wasser­ barriereschicht auf dem ausgeschachteten Boden anstelle des Fußbodens vorgese­ hen werden. Im Fall, daß die Wasserbarriereschicht angewandt wird und wenn die stützenden Pfähle durch die Wasserbarriereschicht hindurch getrieben werden, sind wasserabsperrende Ringe, die wasseraufnehmenden Gummi aufweisen, an den stützenden Pfählen angebracht, und die Umfangskanten der Öffnungen, die durch Treiben der Pfähle ausgebildet sind, werden zusammengerollt und mittels des Be­ tons festgeklemmt, der rund um den Pfahl z. B. gegossen ist, um das Eindringen des Untergrundwassers in das Vertiefungsgebiet 12 zu verhindern.It should be noted that, although the embodiment shown forms the floor 19 on the excavated floor, the floor 19 is not always necessary. If e.g. B. the barrier wall 60 reaches the water-impermeable layer of the ground so that only little underground water will penetrate, the floor 19 will not be necessary. Even in the event that there is no possibility of causing swelling or foaming, the water made of a synthetic rubber, a synthetic resin or the like can be provided on the excavated floor instead of the floor barrier layer. In the event that the water barrier layer is applied and when the supporting piles are driven through the water barrier layer, water-blocking rings, which have water-absorbent rubber, are attached to the supporting piles and the peripheral edges of the openings formed by driving the piles are formed rolled up and clamped by means of the Be tons that z around the pile. B. is poured to prevent the penetration of the underground water into the depression 12 .

Andererseits wird das obige Vertiefungsgebiet 12 durch Ausschachten ausgebil­ det, der künstliche Boden 42 wird als eine platte Konstruktionsstruktur ausge­ bildet. Der künstliche Boden 42 kann mit vorgegossenen Betonplatten ausgeführt werden, die an der Absperrwandung 60 oder an den stützenden Pfählen 24 abge­ stützt sind. Alternativ kann der künstliche Boden 42 auch durch direktes Gießen des Betons auf der Baustelle ausgeführt werden. Der künstliche Boden 42 wird mit einer oder mehr Abfallablagerungsöffnungen versehen, die in geeigneten Positio­ nen geöffnet und geschlossen werden. Auch kann der künstliche Boden 42 einen abfallausgebenden Auslaß aufweisen, der zum Herausnehmen des in ungiftigen Ab­ fall durch Lagern im Vertiefungsgebiet 12 umgewandelten Abfalls geöffnet und geschlossen werden kann, wie es verlangt wird. Zusätzlich zu dem künstlichen Boden sind Belüftungsöffnungen zur Belüftung des Innenraumes des Vertiefungsge­ bietes 12 und zum Sammeln von Methangas oder dergl. vorgesehen, das während ei­ nes Kompostierungsverfahrens des Abfalls in anaerobem Zustand zu wirksamem Ge­ brauch erzeugt wird. Es sollte gewürdigt werden, daß die obere Oberfläche des künstlichen Bodens 42 als eine örtliche Umgebung schützende Einrichtung wie z. B. ein Park oder dergl. verwendet werden kann.On the other hand, the above deepening area 12 is formed by excavation, the artificial floor 42 is formed as a flat structure. The artificial floor 42 can be carried out with pre-cast concrete slabs, which are supported on the barrier wall 60 or on the supporting piles 24 . Alternatively, the artificial floor 42 can also be made by pouring the concrete directly on the construction site. The artificial floor 42 is provided with one or more waste deposit openings which are opened and closed in suitable positions. Also, the artificial floor 42 may have a waste-dispensing outlet which can be opened and closed as required to take out the waste converted into non-toxic waste by storage in the depression 12 . In addition to the artificial soil, vents are provided for ventilating the interior of the area 12 and for collecting methane gas or the like, which is generated during effective composting of the waste in an anaerobic state for effective use. It should be appreciated that the top surface of the artificial floor 42 acts as a local environmental protection device, such as. B. a park or the like can be used.

An der unteren Oberfläche des künstlichen Bodens 42 ist eine Wassersprühein­ richtung 80 angebracht, um Wasser zum Abfall 10 im Vertiefungsgebiet 12 hin zu sprühen. Die Wassersprüheinrichtung 80 schließt eine Mehrzahl von wasser­ sprühenden Rohren mit Sprühdüsen ein und ist über das gesamte Gebiet des künst­ lichen Bodens 42 angeordnet. Jedes wassersprühende Rohr ist an der unteren Ober­ fläche des künstlichen Bodens 42 mittels einer Mehrzahl von Befestigungsteilen oder Spannvorrichtungen fest angebracht, die vorbereitend an der unteren Ober­ fläche des künstlichen Bodens 42 vorgesehen sind. Die Wassersprüheinrichtung 80 ist ausgelegt, Wasser vom Wasserspeicherpool 82 zu sprühen.On the lower surface of the artificial floor 42 , a water spray device 80 is attached in order to spray water towards the waste 10 in the depression region 12 . The water spray device 80 includes a plurality of water spraying tubes with spray nozzles and is arranged over the entire area of the artificial floor 42 . Each water-spraying pipe is fixedly attached to the lower upper surface of the artificial floor 42 by means of a plurality of fasteners or jigs which are preparatively provided on the lower upper surface of the artificial floor 42 . The water spray device 80 is designed to spray water from the water storage pool 82 .

Andererseits ist in der dargestellten Ausbildung der Wasserspeicherpool 82 be­ nachbart zum Vertiefungsgebiet 12 positioniert und in der Verbindung mit der oberen Oberfläche des künstlichen Bodens 42, so daß das auf den künstlichen Boden 42 gefallene Regenwasser durch Wassersammelrinnen 84 oder dergl. zum Speichern gesammelt werden kann. Dies macht es möglich, das Regenwasser zum Sprühen auf den Abfall 10 im Vertiefungsgebiet 12 zu verwenden. Auch ein Steu­ erventil 86 kann im Wasserspeicherpool 82 zur Steuerfähigkeit des Wassersprüh­ betrages im Vertiefungsgebiet 12 vorgesehen werden. On the other hand, in the illustrated embodiment, the water storage pool 82 is positioned adjacent to the depression area 12 and in connection with the upper surface of the artificial floor 42 , so that the rain water fallen on the artificial floor 42 can be collected by water collecting troughs 84 or the like for storage. This makes it possible to use the rainwater to spray onto the waste 10 in the depression 12 . A control valve 86 can also be provided in the water storage pool 82 to control the amount of water spray in the depression 12 .

Die dargestellte Ausgestaltung des Abfallablagerungsgeländes, das, wie vorste­ hend dargelegt, hergestellt ist, ist fähig zum Umwandeln des abgelagerten Ab­ falls 10 in ungiftigen Abfall, um leicht eine Verunreinigung der Umgebung we­ gen der Übertragung der Verunreinigung oder dergl. zu verhindern. Denn der Ab­ fall 10, der im Vertiefungsgebiet 12 abgelagert ist, das als umschlossener Raum durch Abdecken der oberen Öffnung durch den künstlichen Boden 42 angelegt ist, ist normalerweise in anaerobem Zustand. Durch Luftzufuhr von der unteren Seite durch die Belüftungseinrichtung 90 und durch Wassersprühen von der obe­ ren Seite durch die Wassersprüheinrichtung 80 kann der Abfall 10 in einen aero­ ben Zustand umgewandelt werden. Durch Steuern des anaeroben und des aeroben Zu­ stands des Abfalls in geeigneter Weise und durch Handhabung der Beträge, die an Luft und Wasser zugeführt werden, kann eine Kompostierung von organischen Substanzen oder dergl. im Abfall 10 gesteuert werden. Ferner kann durch Steu­ ern der anaeroben und aeroben Kompostierung in geeigneter Weise eine Stabili­ sierung der organischen Substanz unterstützt werden, um leicht den Abfall 10 in eine ungiftige Form umzuwandeln. Zusätzlich kann auch durch Wasserzufuhr von der unteren Seite des Abfalls 10 und durch Handhabung der Temperatur innerhalb des Vertiefungsgebietes 12 bei Verwenden eines Solarsystems oder dergl. der Zu­ stand des Abfalls 10 im Vertiefungsgebiet geeignet für das Kompostierungsver­ fahren zu weiterer unterstützender Umwandlung des Abfalls in eine ungiftige Form aufrechterhalten werden. Ferner kann durch einheitliche Steuerung des Be­ trages an Luft und Wasser, der von der Belüftungseinrichtung 90, der Wasser­ sprüheinrichtung 80 und der Wasserzufuhreinrichtung 100 dem Vertiefungsgebiet 12 und der Temperatur im Vertiefungsgebiet 12 zugeführt wird, das Kompostie­ rungsverfahren des Abfalls 10 wirksam durchgeführt werden.The illustrated configuration of the waste deposit site, which is manufactured as set forth above, is capable of converting the deposited waste 10 into non-toxic waste to easily prevent environmental pollution due to the transfer of the pollution or the like. Because from the fall 10 , which is deposited in the depression region 12, which is created as an enclosed space by covering the upper opening through the artificial floor 42 , is normally in an anaerobic state. By supplying air from the lower side through the ventilation device 90 and by spraying water from the upper side through the water spraying device 80 , the waste 10 can be converted into an aerobic condition. By controlling the anaerobic and aerobic conditions of the waste appropriately and by handling the amounts supplied to air and water, composting of organic substances or the like in the waste 10 can be controlled. Furthermore, stabilization of the organic substance can be supported in a suitable manner by controlling the anaerobic and aerobic composting, in order to easily convert the waste 10 into a non-toxic form. In addition, by supplying water from the lower side of the waste 10 and by handling the temperature within the recess area 12 when using a solar system or the like. The state of the waste 10 in the recess area is suitable for the composting process to further assist in converting the waste into a non-toxic one Shape is maintained. Furthermore, by uniformly controlling the amount of air and water that is supplied from the ventilation device 90 , the water spray device 80 and the water supply device 100 to the depression area 12 and the temperature in the depression area 12 , the composting process of the waste 10 can be carried out effectively.

Ferner kann durch die dargestellte Ausgestaltung des Abfallablagerungsgeländes, da das Volumen des Abfalls 10 durch Kompostierung und Verdichten durch Wasser verringert werden kann, ein größerer Betrag an Abfall 10 im Vertiefungsgebiet 12 abgelagert werden. Der durch das Kompostierungsverfahren in eine ungiftige Form umgewandelte Abfall 10 kann herausgenommen und kann der Natur durch Ver­ wenden als Ersatz für den Boden und Sand zum Rückfüllen oder dergl. in den Kreislauf zurückgeführt werden. Andererseits kann das Abfallablagerungsgelände durch Entfernen des Abfalls 10 wiederholt verwendet werden. Ferner kann durch Sammeln von nützlichem Gas, das durch die Kompostierung des Abfalls 10 erzeugt wird, wie z. B. durch anaerobe Kompostierung erzeugtes Methangas oder dergl., es wirksam als Brennstoff verwendet werden. Furthermore, since the volume of the waste 10 can be reduced by composting and compaction by water, a larger amount of waste 10 can be deposited in the deepening area 12 due to the design of the waste deposit site shown. The waste 10 converted into a non-toxic form by the composting method can be taken out and can be recycled to nature by using a substitute for the soil and sand for filling or the like. On the other hand, the waste deposit site can be used repeatedly by removing the waste 10 . Furthermore, by collecting useful gas generated by composting the waste 10 , such as. B. methane gas generated by anaerobic composting or the like., It can be used effectively as a fuel.

Andererseits zeigt Fig. 9 eine noch weitere Ausgestaltung des Abfallablage­ rungsgeländes gemäß der vorliegenden Erfindung. Das dargestellte Abfallabla­ gerungsgelände ist von ähnlicher Ausführung wie das Abfallablagerungsgelände der Fig. 8 mit Ausnahme von einer stützenden Struktur des künstlichen Bodens 42 und der Absperrwandung 60. Denn das Abfallablagerungsgelände der dargestell­ ten Ausgestaltung stützt den künstlichen Boden 42 und die Absperrwandung 60 durch eine Pfeiler- und Trägerstruktur 60a. Mit der dargestellten Ausführung können der künstliche Boden 42 und die Absperrwandung 60 fest und stabil durch die Pfeiler- und Trägerstruktur gestützt werden, so daß das Abfallablagerungs­ gelände mit einem großen Umfang ausgeführt werden kann.On the other hand, Fig. 9 shows a still further embodiment of the waste storage area according to the present invention. The illustrated waste deposit area is of a similar design to the waste deposit area of FIG. 8 with the exception of a supporting structure of the artificial floor 42 and the barrier wall 60 . Because the waste disposal site of the configuration shown supports the artificial floor 42 and the barrier wall 60 by means of a pillar and support structure 60 a. With the illustrated embodiment, the artificial floor 42 and the barrier wall 60 can be firmly and stably supported by the pillar and support structure, so that the waste deposit area can be carried out on a large scale.

Obgleich die Erfindung hinsichtlich ihrer beispielhaften Ausgestaltung erläu­ tert und beschrieben wurde, sollte es von Fachleuten verstanden werden, daß vorhergehende und verschiedene andere Änderungen, Auslassungen und Zufügungen hierin und hierzu gemacht werden können, ohne vom Geist und Bereich der vorlie­ genden Erfindung abzuweichen. Deshalb sollte die vorliegende Erfindung nicht als auf die vorstehend dargelegte spezielle Ausgestaltung begrenzt verstanden wer­ den, sondern alle möglichen Ausgestaltungen einschließen, die innerhalb eines eingeschlossenen Bereichs und Äquivalente davon hinsichtlich des dargelegten Kennzeichens in den beigefügten Ansprüchen verkörpert werden.Although the invention is explained in terms of its exemplary embodiment tert and described, it should be understood by those skilled in the art that previous and various other changes, omissions and additions can be made here and here without departing from the spirit and scope of the present deviating invention. Therefore, the present invention should not be considered limited to the specific configuration set out above who understood but include all possible configurations that are within a included area and equivalents thereof in relation to the stated Characteristics are embodied in the appended claims.

Obgleich z. B. die diesbezüglichen vorangehenden Ausgestaltungen in der Ausfüh­ rung erläutert sind, daß das Vertiefungsgebiet 12 durch die Absperrwandung 60 umgeben ist, sollte das Abfallablagerungsgelände gemäß der vorliegenden Erfin­ dung nicht auf die speziellen Konstruktionen begrenzt werden. Wenn z. B. ein großes Gebiet in einem Tal in einem bergigen Gebiet verfügbar ist, kann das Abfallablagerungsgebiet durch Bilden des Seitenumfangs des Vertiefungsgebietes in einen Abhang bis zu dem Ausmaß ausgeführt werden, daß ein Abbrechen des Bodens niemals verursacht werden wird, und durch Legen der Wasserbarriereschicht an die geneigte Oberfläche.Although e.g. B. the relevant previous embodiments in the Ausfüh tion that the depression 12 is surrounded by the barrier wall 60 , the waste deposit area should not be limited to the special constructions according to the present inven tion. If e.g. For example, if a large area in a valley is available in a mountainous area, the garbage deposit area can be formed by forming the side circumference of the depression area in a slope to the extent that bottom breaking will never be caused and by laying the water barrier layer on the sloping surface.

Claims (31)

1. Abfallablagerungsgelände, das aufweist:
einen Raum in Form einer Vertiefung, um darin Abfall aufzunehmen,
eine Flächenstruktur, die vorgesehen ist, die gesamte obere Öffnung des Vertiefungsraumes abzudecken, wobei die Flächenstruktur vor dem Beginn des Ablagerns des Abfalls in den Raum hergestellt ist, und
mindestens eine Ablagerungsöffnung, die für ein Ablagern des Abfalls durch die Flächenstruktur hindurch in den Raum vorgesehen ist, wobei die Ablage­ rungsöffnung geeignet ist, geöffnet und geschlossen zu werden.
1. Waste deposit site, which has:
a space in the form of a depression to hold waste in it,
a surface structure which is provided to cover the entire upper opening of the depression space, the surface structure being produced before the waste is started to be deposited into the space, and
at least one deposit opening, which is provided for depositing the waste through the surface structure into the room, the deposit opening being suitable for being opened and closed.
2. Abfallablagerungsgelände nach Anspruch 1, worin der Vertiefungsraum mit einer Wasserbarriere versehen ist.2. waste deposit area according to claim 1, wherein the deepening space is provided with a water barrier. 3. Abfallablagerungsgelände nach Anspruch 2, worin die Wasserbarriere eine Wasserbarriereschicht aufweist, die an der inneren Oberfläche des Vertiefungsraumes liegt.3. waste deposit area according to claim 2, wherein the water barrier has a water barrier layer attached to the inner surface of the cavity. 4. Abfallablagerungsgelände nach Anspruch 2, worin die Wasserbarriere eine Absperrwandung aufweist, die den Außenumfang des Vertiefungsraumes umgibt und sich darin erstreckt, um eine wasserun­ durchlässige Schicht des Bodens zu erreichen.4. waste deposit area according to claim 2, wherein the water barrier has a barrier wall that defines the outer circumference surrounds the depression space and extends therein to a water reach permeable layer of soil. 5. Abfallablagerungsgelände nach Anspruch 1, worin die Flächenstruktur von Stützteilen gestützt wird, die in den Vertiefungsraum hinein getrieben sind.5. waste deposit area according to claim 1, wherein the surface structure is supported by supporting parts that are in the Deepening space are driven into it. 6. Abfallablagerungsgelände nach Anspruch 5, worin eine Wasserbarriere innerhalb des Vertiefungsraumes vorgesehen ist.6. waste deposit site according to claim 5, wherein a water barrier is provided within the well space. 7. Abfallablagerungsgelände nach Anspruch 6, worin die Wasserbarriere eine Wasserbarriereschicht aufweist, die auf der inneren Oberfläche des Vertiefungsraumes liegt. 7. waste deposit area according to claim 6, wherein the water barrier has a water barrier layer on top of the inner surface of the cavity.   8. Abfallablagerungsgelände nach Anspruch 6, worin die Wasserbarriere eine Absperrwandung aufweist, die den Außenumfang des Vertiefungsraumes umgibt und sich darin erstreckt, um eine wasserun­ durchlässige Schicht des Bodens zu erreichen.8. waste deposit site according to claim 6, wherein the water barrier has a barrier wall that defines the outer circumference surrounds the depression space and extends therein to a water reach permeable layer of soil. 9. Abfallablagerungsgelände nach Anspruch 1, worin die Flächenstruktur von einer Stützstruktur gestützt wird, die Pfeiler und Querträger aufweist.9. waste deposit site according to claim 1, wherein the surface structure is supported by a support structure which Has pillars and cross beams. 10. Abfallablagerungsgelände nach Anspruch 9, worin eine Wasserbarriere innerhalb des Vertiefungsraumes vorgesehen ist.10. waste deposit area according to claim 9, wherein a water barrier is provided within the well space. 11. Abfallablagerungsgelände nach Anspruch 10, worin die Wasserbarriere eine Wasserbarriereschicht aufweist, die auf der inneren Oberfläche des Vertiefungsraumes liegt.11. Waste deposit area according to claim 10, wherein the water barrier has a water barrier layer on top of the inner surface of the cavity. 12. Abfallablagerungsgelände nach Anspruch 10, worin die Wasserbarriere eine Absperrwandung aufweist, die den Außenumfang des Vertiefungsraumes umgibt und sich darin erstreckt, um eine wasserun­ durchlässige Schicht des Bodens zu erreichen.12. waste deposit area according to claim 10, wherein the water barrier has a barrier wall that defines the outer circumference surrounds the depression space and extends therein to a water reach permeable layer of soil. 13. Abfallablagerungsgelände, das aufweist:
eine ebene Betonplatte, die eine obere Öffnung eines Vertiefungsraumes abdeckt, in welchem Abfall abgelagert ist,
ein Wasserbarrierematerial, das an der inneren Oberfläche des Vertiefungs­ raumes vorgesehen ist, und
mindestens eine Abfallablagerungsöffnung, die in der Betonplatte vorgesehen ist und ein Ablagern des Abfalls in den Raum gestattet.
13. Waste disposal site, which has:
a flat concrete slab covering an upper opening of a depression space in which waste is deposited,
a water barrier material, which is provided on the inner surface of the recess space, and
at least one waste deposit opening provided in the concrete slab and allowing waste to be deposited into the room.
14. Abfallablagerungsgelände, das aufweist:
eine ebene Betonplatte, die eine obere Öffnung eines Vertiefungsraumes abdeckt, in welchem Abfall abgelagert ist,
eine Absperrwandung, die den Außenumfang des Vertiefungsraumes umgibt und sich darin erstreckt, um eine wasserundurchlässige Schicht des Bodens des Vertiefungsraumes zu erreichen, und
mindestens eine Abfallablagerungsöffnung, die in der Betonplatte vorge­ sehen ist und ein Ablagern des Abfalls in den Raum gestattet.
14. Waste disposal site, which has:
a flat concrete slab covering an upper opening of a depression space in which waste is deposited,
a barrier wall surrounding and extending into the outer periphery of the cavity to reach a waterproof layer of the bottom of the cavity, and
at least one waste deposit opening, which is provided in the concrete slab and allows the waste to be deposited in the room.
15. Verfahren zum Herstellen eines Abfallablagerungsgeländes, in welchem Abfall in einem Vertiefungsraum in Reihenfolge abgelagert wird, das folgende Schritte aufweist:
Herstellen einer Flächenstruktur, die eine obere Öffnung des Vertie­ fungsraumes vor dem Beginn der Ablagerung des Abfalls abdeckt, und
Ausbilden mindestens einer Ablagerungsöffnung zum Ablagern des Abfalls in der Flächenstruktur.
15. A method of manufacturing a waste disposal site, in which waste is deposited in order in a well, comprising the following steps:
Producing a surface structure covering an upper opening of the recess space before the waste is started to be deposited, and
Form at least one deposit opening for depositing the waste in the surface structure.
16. Abfallablagerungsgelände, das aufweist:
einen Raum in Form einer Vertiefung zur Aufnahme von Abfall darin,
eine Flächenstruktur, die vorgesehen ist, die gesamte obere Öffnung des Vertiefungsraumes abzudecken, wobei die Flächenstruktur vor dem Beginn der Ablagerung des Abfalls in den Raum hergestellt ist,
Einrichtungen, die an der unteren Oberfläche der Flächenstruktur zum Sprühen von Wasser auf den Abfall angeordnet sind, und
Einrichtungen, die am Boden des Vertiefungsraumes zum Ausströmen von Luft angeordnet sind.
16. Waste disposal site, which has:
a space in the form of a recess to hold waste in it,
a surface structure which is provided to cover the entire upper opening of the depression space, the surface structure being produced before the waste begins to be deposited in the space,
Means arranged on the lower surface of the surface structure for spraying water onto the waste, and
Devices which are arranged at the bottom of the depression space for the outflow of air.
17. Abfallablagerungsgelände nach Anspruch 16, das ferner eine Einrichtung aufweist, die am Boden des Vertiefungsraumes für eine Wasserzufuhr zum Abfall von unten angeordnet ist.17. Waste deposit area according to claim 16, which further comprises a device at the bottom of the depression space is arranged for a water supply for waste from below. 18. Abfallablagerungsgelände nach Anspruch 16, worin die an der unteren Oberfläche der Flächenstruktur angeordnete Einrichtung zum Sprühen von Wasser auf den Abfall eine Mehrzahl von Wasserzufuhrrohren mit einer Mehrzahl von Wassersprühdüsen aufweist, einen Wasserspeicherpool zum Speichern von Wasser, das zugeführt werden soll, und eine Wasserzufuhrrohrleitung als Verbindung zwischen den Wasserzufuhrrohren und dem Wasserspeicherpool zum Zuführen von Wasser im Wasserspeicherpool zu den Wasserzufuhrrohren. 18. Waste deposit area according to claim 16, wherein the one located on the lower surface of the sheet structure Means for spraying water on the waste a plurality of Has water supply pipes with a plurality of water spray nozzles, a water storage pool for storing water to be supplied and a water supply pipe as a connection between the Water supply pipes and the water storage pool for supplying water in the water storage pool to the water supply pipes.   19. Abfallablagerungsgelände nach Anspruch 18, worin ein Steuerventil im Wasserspeicherpool zum Steuern eines Wasserzu­ fuhrbetrages zu den Wasserzufuhrrohren vorgesehen ist.19. The waste deposit site according to claim 18, wherein a control valve in the water storage pool for controlling water driving amount to the water supply pipes is provided. 20. Abfallablagerungsgelände nach Anspruch 18, worin der Wasserspeicherpool mit einer Wassersammelvorrichtung zum Sammeln von Regenwasser an der oberen Oberfläche der Flächenstruktur zum Speichern des Wassers im Wasserspeicherpool verbunden ist.20. waste deposit site according to claim 18, wherein the water storage pool with a water collection device for Collecting rainwater on the top surface of the surface structure connected to storing the water in the water storage pool. 21. Abfallablagerungsgelände nach Anspruch 16, worin eine Einrichtung am Boden des Vertiefungsraumes zum Ausströmen von Luft angeordnet ist, die eine Mehrzahl von Belüftungsrohren mit einer Mehr­ zahl von Luftausströmdüsen aufweist, einen Luftkompressor zum Erzeugen von Druckluft, eine Luftzufuhrrohrleitung, die die Belüftungsrohre mit dem Luftkompressor zum Zuführen der Druckluft zu den Belüftungsrohren verbindet.21. Waste deposit area according to claim 16, wherein a device at the bottom of the recess space for the outflow of Air is arranged which has a plurality of ventilation pipes with a more Number of air outlet nozzles, an air compressor for generating Compressed air, an air supply pipeline that connects the ventilation pipes with the Air compressor for supplying compressed air to the ventilation pipes. 22. Abfallablagerungsgelände nach Anspruch 17, worin die Einrichtung am Boden des Vertiefungsraumes angeordnet ist und zum Zuführen von Wasser zum Abfall angeordnet ist, die eine Mehrzahl von Wasserzufuhrrohren mit einer Mehrzahl von Wasserausströmdüsen aufweist, einen Wasserspeicherpool zum Speichern von Wasser, das zugeführt werden soll, und eine Wasserzufuhrrohrleitung, die die Wasserzufuhrrohre und den Wasserspeicherpool zum Zuführen von Wasser des Wasserspeicherpools zu den Wasserzufuhrrohren verbindet.22. waste deposit site according to claim 17, wherein the device is arranged at the bottom of the well and arranged for supplying water to the waste, which a plurality of Has water supply pipes with a plurality of water outflow nozzles, a water storage pool for storing water to be supplied and a water supply pipeline that connects the water supply pipes and the Water storage pool for supplying water from the water storage pool to the Water supply pipes connects. 23. Abfallablagerungsgelände nach Anspruch 22, worin ein Steuerventil im Wasserspeicherpool zum Steuern eines Wasserzu­ fuhrbetrages zu den Wasserzufuhrrohren vorgesehen ist.23. Waste deposit area according to claim 22, wherein a control valve in the water storage pool for controlling water driving amount to the water supply pipes is provided. 24. Abfallablagerungsgelände nach Anspruch 22, worin der Wasserspeicherpool mit einer Wassersammelvorrichtung zum Sam­ meln von Regenwasser an der oberen Oberfläche der Flächenstruktur zum Speichern des Wassers im Wasserspeicherpool verbunden ist.24. Waste deposit area according to claim 22, wherein the water storage pool with a water collection device to Sam of rainwater on the upper surface of the surface structure Saving the water in the water storage pool is connected. 25. Abfallablagerungsgelände nach Anspruch 16, worin die Flächenstruktur ein Betonfeld in einer flachen Plattenform und unterstützende Pfähle aufweist, die innerhalb des Vertiefungsraumes zum zum Stützen des Betonfeldes eingetrieben werden.25. waste deposit site according to claim 16, wherein the surface structure is a concrete field in a flat plate shape and has supporting piles, which to the inside of the cavity  be driven to support the concrete field. 26. Abfallablagerungsgelände nach Anspruch 16, worin die Flächenstruktur ein Betonfeld in einer flachen Plattenform und eine stützende Struktur aufweist, die Pfeiler und Querträger einschließt.26. Waste deposit area according to claim 16, wherein the surface structure is a concrete field in a flat plate shape and has a supporting structure that includes pillars and cross beams. 27. Abfallablagerungsgelände nach Anspruch 16, worin die Flächenstruktur mit mindestens einer Abfallablagerungsöffnung für ein Ablagern des Abfalls in den Vertiefungsraum ausgebildet ist, wobei die Abfallablagerungsöffnung geöffnet und geschlossen wird.27. The waste deposit site according to claim 16, wherein the surface structure with at least one waste deposit opening is designed for depositing the waste in the depression space, the waste deposit opening being opened and closed. 28. Abfallablagerungsgelände nach Anspruch 16, worin die Flächenstruktur mit einer Abfallentnahmeöffnung für ein Entneh­ men eines durch Lagerung im Vertiefungsraum behandelten ungiftigen Abfalls ausgebildet ist.28. Waste deposit area according to claim 16, wherein the surface structure with a waste removal opening for removal of non-toxic waste treated by storage in the deepening room is trained. 29. Abfallablagerungsgelände nach Anspruch 16, worin die Flächenstruktur mit mindestens einer Ventilationsöffnung zum Sammeln von Gas versehen ist, das vom Abfall erzeugt wird, der im Vertie­ fungsraum angeordnet ist.29. Waste deposit area according to claim 16, wherein the surface structure with at least one ventilation opening for Gathering gas is provided, which is generated from the waste that goes in the Vertie is arranged. 30. Abfallablagerungsgelände, das aufweist:
einen Raum in Vertiefungsform, der zur Aufnahme von Abfällen bestimmt ist,
eine flache Plattenform eines Betonfeldes, das die obere Öffnung des Ver­ tiefungsraumes vor dem Beginn der Ablagerung des Abfalls abdeckt,
eine Wassersprüheinrichtung, die eine Mehrzahl von Wasserzufuhrrohren mit einer Mehrzahl von Wasserausströmdüsen einschließt, und ein Wasser­ speicherpool, der mit den Wasserzufuhrrohren verbunden ist, und
eine Belüftungseinrichtung, die am Boden des Vertiefungsraumes vorgesehen ist und eine Mehrzahl von Belüftungsrohren mit einer Mehrzahl von Luft­ ausströmdüsen einschließt, ein Luftkompressor, der Druckluft erzeugt, eine Luftzufuhrrohrleitung, die zwischen den Belüftungsrohren und dem Luftkompressor zum Zuführen von Druckluft zu den Belüftungsrohren ver­ bindet.
30. Waste deposit site, which includes:
a well-shaped room that is used to hold waste,
a flat plate shape of a concrete field, which covers the upper opening of the deepening space before the waste begins to be deposited,
a water sprayer including a plurality of water supply pipes with a plurality of water outflow nozzles, and a water storage pool connected to the water supply pipes, and
a ventilation device which is provided at the bottom of the depression space and includes a plurality of ventilation pipes with a plurality of air outlet nozzles, an air compressor which generates compressed air, an air supply pipe which connects between the ventilation pipes and the air compressor for supplying compressed air to the ventilation pipes.
31. Abfallablagerungsgelände nach Anspruch 30, das weiter aufweist eine Wasserzufuhreinrichtung, die eine Mehrzahl von Wasserzufuhrrohren mit einer Mehrzahl von Wasserausströmdüsen einschließt,
einen Wasserspeicherpool zum Speichern von Wasser, das zugeführt werden soll, und
eine Wasserzufuhrrohrleitung, die die Wasserzufuhrrohre und den Wasser­ speicherpool zum Zuführen von Wasser des Wasserspeicherpools zu den Wasser­ zufuhrrohren verbindet.
31. The waste deposit site of claim 30, further comprising a water supply device including a plurality of water supply pipes with a plurality of water outflow nozzles,
a water storage pool for storing water to be supplied, and
a water supply pipe connecting the water supply pipes and the water storage pool for supplying water from the water storage pool to the water supply pipes.
DE19934317976 1993-04-09 1993-05-28 Waste disposal site Ceased DE4317976A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8353493A JPH06292874A (en) 1993-04-09 1993-04-09 Waste disposal plant

Publications (1)

Publication Number Publication Date
DE4317976A1 true DE4317976A1 (en) 1994-10-13

Family

ID=13805171

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19934317976 Ceased DE4317976A1 (en) 1993-04-09 1993-05-28 Waste disposal site

Country Status (8)

Country Link
US (1) US5375944A (en)
JP (1) JPH06292874A (en)
BE (1) BE1007800A5 (en)
DE (1) DE4317976A1 (en)
FR (1) FR2703603B1 (en)
GB (1) GB2276905B (en)
IT (1) IT1262123B (en)
NL (1) NL194034C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19548184A1 (en) * 1995-12-22 1997-06-26 Heuser Consult Ingenieurbueros Device for reducing emissions from landfill

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5564862A (en) * 1994-05-04 1996-10-15 Markels, Jr.; Michael Method of improved landfill mining
DE19510917C1 (en) * 1995-03-24 1996-02-22 Fraunhofer Ges Forschung Research and development pilot plant simulator, for a wide range of long term experiments
US6024513A (en) * 1996-11-14 2000-02-15 American Technologies Inc Aerobic landfill bioreactor
JP3703288B2 (en) * 1997-03-26 2005-10-05 キヤノン株式会社 Soil purification method
US6481929B1 (en) * 1998-04-27 2002-11-19 Arcadis Geraghty & Miller Aerobic bioreduction of municipal solid waste landfill mass
EP1086756A3 (en) * 1999-09-23 2003-03-19 Gerhard Prof. Rettenberger Process for creating or sanitising or sealing landfills
KR20020076390A (en) * 2001-03-28 2002-10-11 이복일 The landfill construction method which uses air dome
CA2468158C (en) * 2003-08-14 2006-05-23 Brian Joseph Forrestal System and method for the production of biogas and compost
JP4649657B2 (en) * 2005-06-02 2011-03-16 学校法人福岡大学 Waste landfill disposal method and waste landfill structure
KR100894471B1 (en) * 2007-08-06 2009-04-22 엘지전자 주식회사 Clothe dryer
JP4824659B2 (en) * 2007-10-25 2011-11-30 前田建設工業株式会社 Waste and leachate stabilization methods
US8091202B2 (en) 2009-05-06 2012-01-10 Synventive Molding Solutions, Inc. Method and apparatus for coupling and uncoupling an injection valve pin
US8662791B2 (en) * 2010-09-09 2014-03-04 Impact Bidenergy LLC Subterranean alternating digester system and method
ITBS20120028A1 (en) * 2012-02-28 2013-08-29 G & G Partners S R L COVERING SYSTEM OF A LANDFILL
JP6234204B2 (en) * 2013-12-17 2017-11-22 クボタ環境サ−ビス株式会社 Organic waste landfill treatment method and pretreatment equipment
US11655625B2 (en) * 2020-12-16 2023-05-23 Donna Woodrum Floodwater redistribution assembly
CN114059598B (en) * 2021-12-07 2022-09-16 湘潭大学 Automatic ecological restoration system suitable for phosphate slag landfill and construction method thereof
CN116251388B (en) * 2023-03-08 2024-05-10 中百盈科技发展有限公司 Dust fall carwash pond of building site environmental protection construction

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB841018A (en) * 1957-07-26 1960-07-13 Express Maschinen A G Storage tank
NL262097A (en) * 1960-04-20
US3904524A (en) * 1973-06-11 1975-09-09 Advanced Fibre Glass Ltd Container structure
DE2519618C3 (en) * 1975-05-02 1982-04-29 Jung, Hermann, Dr., 4060 Viersen Device for the mechanical fast composting of sewage sludge and other liquid, semi-solid or solid waste materials as well as mixtures of these
GB2014227B (en) * 1978-02-10 1983-01-12 Shaw C B Building construction
US4323367A (en) * 1980-06-23 1982-04-06 Institute Of Gas Technology Gas production by accelerated in situ bioleaching of landfills
US4396402A (en) * 1980-06-23 1983-08-02 Institute Of Gas Technology Gas production by accelerated bioleaching of organic materials
US4618284A (en) * 1984-05-24 1986-10-21 Marks Alvin M Device and method for the reclamation of polluted land areas
IT1177961B (en) * 1984-08-07 1987-09-03 Sorain Cechini Spa AERATION DEVICE FOR BIOMASS COMPOSTING BASINS
DE3521947A1 (en) * 1985-06-14 1987-01-15 Holzmann Philipp Ag CONTAINER FOR LANDFILLABLE WASTE
US4643111A (en) * 1985-08-21 1987-02-17 Jones Robert L Resource recovery utility
DE3545679A1 (en) * 1985-12-21 1987-06-25 Messerschmitt Boelkow Blohm METHOD FOR DISPOSAL OF THE ORGANIC HOUSEHOLD FACTION
US4844813A (en) * 1987-06-29 1989-07-04 Amerada Hess Corporation System and process for treatment of biodegradable waste
DE3809128A1 (en) * 1988-03-18 1989-10-05 Schoenmackers Umweltdienste Gm Method of setting up a landfill
JPH01304092A (en) * 1988-06-01 1989-12-07 Ohbayashi Corp Preparation of waste disposal site
WO1990003232A1 (en) * 1988-09-29 1990-04-05 Hans Richter Process for treating refuse dumps
IT1242259B (en) * 1990-10-11 1994-03-03 Giancarlo Galeazzi WASTE COLLECTION DEVICE
DE4102210A1 (en) * 1991-01-25 1992-07-30 Licencia Holding Sa METHOD AND DEVICE FOR COMPOSTING ORGANIC WASTE OR CLEANING SLUDGE
US5037239A (en) * 1991-02-05 1991-08-06 Olsen-Beal Associates Underground concrete vault structure for hazardous liquid storage tanks

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19548184A1 (en) * 1995-12-22 1997-06-26 Heuser Consult Ingenieurbueros Device for reducing emissions from landfill

Also Published As

Publication number Publication date
NL194034C (en) 2001-05-03
FR2703603B1 (en) 1996-05-10
GB9311061D0 (en) 1993-07-14
GB2276905B (en) 1997-04-09
JPH06292874A (en) 1994-10-21
US5375944A (en) 1994-12-27
ITUD930096A1 (en) 1994-12-01
BE1007800A5 (en) 1995-10-24
IT1262123B (en) 1996-06-19
NL9300923A (en) 1994-11-01
GB2276905A (en) 1994-10-12
FR2703603A1 (en) 1994-10-14
ITUD930096A0 (en) 1993-05-31
NL194034B (en) 2001-01-02

Similar Documents

Publication Publication Date Title
DE4317976A1 (en) Waste disposal site
DE69304048T2 (en) ARRANGEMENT FOR THE TREATMENT OF POLLUTED GROUND WATER
EP0187874A1 (en) Dumping place for waste and method for manufacturing the same
DE4304609A1 (en) Shaped body for drainage treatment to prepare the substrate for planting trees and the associated storage and flushing system
CN107366251B (en) Construction method of sludge pond site in-situ ecological restoration system
US5183355A (en) Method of draining water through a solid waste site without leaching
CN114319455B (en) Full-coverage sealing field, environment treatment and re-greening process for large refuse landfill
CN114457855B (en) Sinking type horizontal seepage-proofing and vertical seepage-proofing combined structure
JP4000780B2 (en) Waste landfill method
JPH0379074B2 (en)
EP0362311A1 (en) Refuse dump for temporary or permanent disposal of hazardous waste and process for installing refuse dumps
CN114033009A (en) Ecological restoration construction method and system for surface sludge of sludge landfill
JPH0341237B2 (en)
DE19647361A1 (en) Laminated floor surface for roads, etc.
EP1067243B1 (en) Catchment basin for above ground water and construction method thereof
CN220521375U (en) Gravity drainage irrigation system for ecological side slope
DE19609159A1 (en) Track with rails supported on sleepers lying on gravel bed
CN114525817B (en) Construction method of horizontal seepage-proofing and vertical seepage-proofing combined structure
CN209716031U (en) A kind of heavy metals in farmland pollution soil moved in improve the original reparation barrier layer
DE4030349C2 (en) Process for the harmless dumping of solidified inorganic residues and waste in abandoned quarries
CN217710882U (en) Anti structure of subsiding of landfill
JPS61109816A (en) Repairing of water-stop sheet in waste disposal site
DE3519225A1 (en) Method of constructing slope-supporting bodies required for hydraulic spoil heaps, and arrangement for carrying out the method
CN101486039A (en) Method and device for constructing solid waste landfill yard with group silos
DE3025692A1 (en) Retaining or noise screen wall supporting vegetation - has drainage layer storing moisture between humus layer chambers, and filter mats

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8125 Change of the main classification

Ipc: B09B 1/00

8131 Rejection