DE4313482A1 - Dump for refuse and other waste - Google Patents

Dump for refuse and other waste

Info

Publication number
DE4313482A1
DE4313482A1 DE19934313482 DE4313482A DE4313482A1 DE 4313482 A1 DE4313482 A1 DE 4313482A1 DE 19934313482 DE19934313482 DE 19934313482 DE 4313482 A DE4313482 A DE 4313482A DE 4313482 A1 DE4313482 A1 DE 4313482A1
Authority
DE
Germany
Prior art keywords
chamber
landfill according
landfill
ventilation
ventilation shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19934313482
Other languages
German (de)
Inventor
Detlef Windhausen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19934313482 priority Critical patent/DE4313482A1/en
Publication of DE4313482A1 publication Critical patent/DE4313482A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE
    • B09B1/00Dumping solid waste

Abstract

Dump for refuse and other waste, which is provided as a building-like chamber system (1) which comprises a plurality of chambers (2), is intended for charging with refuse and exhibits distributed ventilating and venting shafts (29). <IMAGE>

Description

Die Erfindung betrifft eine Deponie für Müll und andere Ab­ fälle, die flüssigkeitsundurchlässig und mit Fördermittel be­ schickbar ist sowie Mittel zur Be- und Entlüftung aufweist.The invention relates to a landfill for garbage and other Ab cases that are impermeable to liquids and with subsidies is sendable and has means for ventilation.

Nach dem Stand der Technik sind Freiland-Mülldeponien bekannt, die eine flüssigkeitsundurchlässige Grundfläche aufweisen. Bei längerem Gebrauch können sich in dieser Grundfläche Risse oder Beschädigungen durch Setzungserscheinungen herausbilden, durch die Schadstoffe in das Erdreich eindringen.State-of-the-art landfills are known which have a liquid-impermeable base. At Prolonged use may cause cracks or cracks in this base Form damage through signs of settlement, by the pollutants penetrate into the soil.

Um diesen Bodenbereich kontrollfähig zu gestalten, wurde nach PS DE 34 48 160 C2 eine Deponie geschaffen, die unter ihrer Bo­ denplatte einen begehbaren Zwischenraum aufweist, von wo aus Kontrollen vorgenommen werden können.In order to make this floor area controllable, PS DE 34 48 160 C2 created a landfill that under their Bo denplatte has a walk-in space, from where Checks can be made.

Diese Anordnung ist jedoch sehr aufwendig in der Bauausführung, hohen statischen Belastungen ausgesetzt und sehr abhängig von der Tragfähigkeit des Untergrundes.However, this arrangement is very complex to construct, exposed to high static loads and very dependent on the load-bearing capacity of the subsurface.

Nach PS DE 34 45 127 C2 wird eine Abfalldeponie mit gewölbeartiger Unterkellerung vorgeschlagen, wobei die Last des Deponiekörpers auf Stützen und weiter auf Fundamente und den Untergrund über­ tragen wird. Die Stützen sind hierbei als Hohlkörper gestaltet und bilden zugleich Sammelzonen für Sickerwasser. Über ein Ent­ wässerungssystem ist eine Verbindung zu einer Reinigungsanlage geschaffen.According to PS DE 34 45 127 C2, a waste landfill with a vaulted Basement proposed, taking the load of the landfill body on supports and further on foundations and the underground will wear. The supports are designed as hollow bodies and at the same time form collection zones for leachate. About an ent watering system is a connection to a cleaning system created.

Nachteilig an dieser Anordnung ist der immens hohe Bauaufwand, der durch die unterirdische Abführung und Kontrolle der giftigen Materialien entsteht.The disadvantage of this arrangement is the immensely high construction effort, by the underground drainage and control of the toxic Materials are created.

Außerdem müssen die Stützelemente für eine hohe Biege- und Knick­ beanspruchung ausgelegt sein. In addition, the support elements for a high bending and kink be designed.  

Zur oberirdischen Aufnahme und Beseitigung des sich in einer Deponie ansammelnden Sickerwassers wird nach PS DE 34 00 799 ein Rohr eingesetzt, das mit hygroskopischen Mitteln umlagert ist und im unteren Teil einen Sickerwasserspeicher aufweist. Dieses wird in vorhandene Deponien an gewählten Punkten in den Müll eingebracht.For above-ground absorption and removal of the in one Landfill of leachate is a according to PS DE 34 00 799 Pipe used, which is rearranged with hygroscopic means and has a leachate tank in the lower part. This will be dumped into existing landfills at selected points brought in.

Die Einbringbarkeit des Rohres über große Höhen ist sehr schwer durchführbar, da oft Fremdkörper u. a. harte Materialien das Herstellen der Bohrlöcher behindern. Da das Rohr an willkür­ lichen Punkten eingebracht wird, können die erhaltenen Meßer­ gebnisse nicht immer ein wirklichkeitsnahes Bild von der vor­ handenen Schadstoffverteilung vermitteln, oder man erhält reale Werte erst bei Vergleich einer relativ hohen Anzahl von Meß­ bohrungen.It is very difficult to insert the pipe over great heights feasible, since foreign bodies and a. hard materials that Obstruct the drill holes. Because the pipe at random Lichen points is introduced, the knife received do not always provide a realistic picture of the mediate existing pollutant distribution, or you get real Values only when comparing a relatively high number of measurements holes.

In PS DE 33 03 067 wird eine Lagerstätte für Abfälle beschrieben, die eine undurchlässige Unterlage aufweist. Auf dieser wird in insbesondere sechseckige Betonbehälter der Müll mit einem Zuförderer gefüllt. Ist jeweils ein Behälter gefüllt, wird er mit einer Betondecke dicht verschlossen.PS DE 33 03 067 describes a deposit for waste, which has an impermeable underlay. On this one in particular hexagonal concrete bins with a garbage Feed conveyor filled. If a container is filled, it becomes sealed with a concrete ceiling.

Diese Erfindung hat den Nachteil, daß eine Entgasung des einge­ füllten Mülls nicht möglich ist. Außerdem können vorhandene und sich bildende Schadstoffkonzentrationen nicht gemessen wer­ den. Ein möglicher Austritt von Schadstoffen ins Erdreich durch sich bildende Risse ist außer Kontrolle, da die gefüllte Müll- Lagerstätte aufgrund ihrer Anordnung im Bodenbereich keine Unter­ suchungen zuläßt.This invention has the disadvantage that a degassing of the filled garbage is not possible. In addition, existing ones and pollutant concentrations that are not being measured the. A possible escape of pollutants into the soil cracks that form are out of control because the filled garbage Deposit no sub due to their arrangement in the bottom area permits searches.

Die Erfindung erlaubt nur eine begrenzte Lagerhöhe in Abhängig­ keit von der Höhe der Behälter. Eine Erweiterung der Aufnahme­ kapazität der Lagerstätte setzt die Vergrößerung ihrer Grund­ fläche durch neu zu errichtende Betonbehälter voraus.The invention only allows a limited storage height depending the height of the containers. An extension of the recording Capacity of the deposit is increasing its base area ahead thanks to new concrete tanks.

Aufgabe der Erfindung ist es, eine Deponie für Müll und andere Abfälle zu schaffen, die eine leichte und zuverlässige Kontrolle sowie Entsorgung sich im Sickerwasser ansammelnder chemischer Bestandteile sowie entstehender Gase ermöglicht.The object of the invention is a landfill for garbage and others Create waste that is easy and reliable to control as well as disposal of chemical accumulating in the leachate Components and resulting gases enabled.

Weiterhin soll die Deponie ohne großen konstruktiven Aufwand eine hohe statische Belastbarkeit bei Erhöhung der Lagermengen gewährleisten.Furthermore, the landfill should be constructed without great design effort a high static load capacity when increasing the storage quantities guarantee.

Beschreibungdescription

Erfindungsgemäß wird diese Aufgabe durch ein aus mehreren Kammern bestehendem, gebäudeartigem Kammersystem zur Müllbeschickung gelöst, das verteilte Be- und Entlüftungsschächte aufweist.According to the invention, this object is achieved by one of several chambers existing, building-like chamber system for loading waste solved, the distributed ventilation and ventilation shafts.

Nach einer vorteilhaften Ausführung kann das Kammersystem kasset­ tenartig ausgebildet sein und je Kammer einen verlängerbaren Be- und Entlüftungsschacht aufweisen.According to an advantageous embodiment, the chamber system can cassette be designed like a ten and an extendable per chamber Have ventilation and ventilation shaft.

Durch die einfache, gleichmäßige Kassettenbildung kann das System hohe statische Belastungen aufnehmen und ist ohne großen Bauaufwand herstellbar.Thanks to the simple, even cassette formation, this can be done System absorb high static loads and is without major Construction costs can be produced.

Das Be- und Entlüftungssystem gewährleistet, daß bereits mit Einbringen des Mülls ständig die Kontrolle des im Schacht sich ansammelnden Sickerwassers durchführbar ist.The ventilation system ensures that already with Introducing the garbage constantly checking the in the manhole accumulating leachate is feasible.

Weiterhin wird der Austrocknungsprozeß des Mülls begünstigt und bei der Zersetzung desselben entstehende Gase können abgeführt werden.Furthermore, the drying process of the garbage is promoted and gases produced during the decomposition can be removed become.

Zur Förderung der Be- und Entlüftungswirkung kann der Be- und Entlüftungsschacht Lüftungsschlitze aufweisen.To promote the ventilation effect, the ventilation and Ventilation shaft have ventilation slots.

Eine Ausführung der Erfindung sieht vor, daß als Systemgründung Streifenfundamente vorgesehen sind. Die Belastbarkeit der Deponie wird dadurch weitergehend erhöht, so daß auch über die Wandhöhe der Kammern hinaus Materialien lagenweise bis in Höhe bekannter Freilanddeponien eingebracht werden können, ohne daß die Gefahr der Schadens- und Rissebildung für das Bauwerk besteht.An embodiment of the invention provides that as a system foundation Strip foundations are provided. The resilience of the landfill is thereby increased further, so that the wall height  of the chambers, materials in layers up to the height of known Landfills can be brought in without the risk there is damage and crack formation for the structure.

Besonders günstig erweist es sich als Baumaterial flüssigkeits­ undurchlässigen Stahlbeton einzusetzen. Auf diese Weise soll auch von der Materialart her das Eindringen von Schadstoffen in das Erdreich verhindert werden.It proves to be particularly favorable as a liquid building material use impermeable reinforced concrete. This is supposed to the penetration of pollutants also from the type of material be prevented into the ground.

Sehr vorteilhaft ist eine konstruktive Gestaltung, nach der der vorzugsweise im mittigen Bereich einer Kammer jeweils vor­ gesehene Be- und Entlüftungsschacht auf verstärktem Fundament angeordnet sein kann, so daß die statische Belastbarkeit erhöht ist.A constructive design according to which is very advantageous preferably in the central area of each chamber Seen ventilation duct on reinforced foundation can be arranged so that the static load capacity increases is.

Eine weitere Ausführung sieht vor, daß der Be- und Entlüftungs­ schacht aus Teilsegmenten teleskopartig montierbar ist. Auf diese Weise kann der Be- und Entlüftungsschacht bei höheren Müllaufschichtungen gleichlaufend mit verlängert werden.Another version provides that the ventilation shaft can be assembled telescopically from sub-segments. In this way, the ventilation shaft at higher Garbage stratifications can be extended at the same time.

Vorteilhaft erweist sich eine Ausgestaltung, wonach im Be- und Entlüftungsschacht Meßinstrumente anbringbar sind. Auf diese Weise kann das sich ansammelnde Sickerwasser ständig hinsichtlich seiner chemischen Zusammensetzung überprüft und wenn erforderlich, in Zeitabständen abgepumpt werden.It is advantageous to have a configuration according to which loading and Vent shaft measuring instruments are attachable. In this way, the accumulating leachate can constantly checked for its chemical composition and if necessary, be pumped out at intervals.

Zu diesem Zweck sieht eine weitere Entwicklung vor, daß die Bodenplatte jeweils einer Kammer zum Kammermittelpunkt hin ver­ laufend mit Gefälle versehen sein kann. Auf diese Weise sammelt sich das Sickerwasser im untersten Bereich der jeweiligen Kammer an und kann von dort günstig abgepumpt werden. To this end, a further development provides that the Bottom plate of one chamber towards the center of the chamber can be continuously inclined. This way collects the leachate in the lowest area of the respective chamber and can be pumped out cheaply from there.  

Nach einer anderen Entwicklung weisen die Längs- und Querwände der Kammern im oberen Kreuzungsbereich Nutaussparungen für den Radlauf einer jeweiligen Beschickungseinrichtung auf. Auf diese Art kann die gewählte Beschickungseinrichtung günstig auf den Oberkanten der Kammerwände zur Auffüllung der Kammern verfahren werden.According to another development, the longitudinal and transverse walls have of the chambers in the upper crossing area groove recesses for the Wheel arch of a respective loading device. To this Art can the selected loading device favorably on the Move the upper edges of the chamber walls to fill the chambers become.

Einer weiteren Ausführungsvariante folgend, weist die Bodenplatte in erforderlichen Abständen vertikale Dehnungsfugen auf, die sich vorzugsweise zwischen Kammerwand und Streifenfundament befinden und mit Dichtungsmitteln ausgefüllt sind. Obwohl die Dehnungsfugen bereits abgedichtet sind, befinden sie sich zwischen Streifenfundament und darüber angeordneter Kammerwand, so daß ein Eindringen von Sickerwasser und schad­ haften Stoffen ins Erdreich mit Sicherheit vermieden wird.Following a further embodiment variant, the base plate has vertical expansion joints at the required intervals preferably between the chamber wall and the strip foundation located and filled with sealants. Although the expansion joints are already sealed between the strip foundation and above Chamber wall, so that penetration of leachate and harm sticking substances into the ground is definitely avoided.

Die Außenwände des Kammersystems sind entsprechend einer Vari­ ante böschungsartig ausgebildet und weisen in ihrem Außenbereich terassenförmige Aussparungen auf.The outer walls of the chamber system are in accordance with a Vari ante embankment-like and have in their outer area terrace-shaped recesses.

Auf diese Weise können die Außenwände des Kammersystems den hohen, durch den Müllberg entstehenden Seitendruck aufnehmen. Die terassenartigen Aussparungen verleihen dem auf die Deponie aufzubringenden Boden für die Rekultivierung eine zusätzliche Haftwirkung.In this way, the outer walls of the chamber system can absorb high side pressure caused by the garbage mountain. The terrace-like recesses give this to the landfill additional soil for recultivation Adhesive effect.

Vorteilhaft erweist sich, daß die einzelnen Kammern über dem Bereich der Bodenplatte in dem Längs- und/oder Querwänden Öff­ nungen aufweisen können.It proves advantageous that the individual chambers above the Area of the base plate in the longitudinal and / or transverse walls Publ can have openings.

Durch diese Verbindungssystem der einzelnen Kammern unterein­ ander wird bei einer bestimmten Höhe des Sickerwasserspiegel ein Ausgleich des Flüssigkeitsstandes ermöglicht. Through this connection system of the individual chambers different becomes at a certain height of the leachate a balance of the liquid level enables.  

In gleicher Art kann der Be- und Entlüftungsschacht im unteren Drittel Durchflußöffnungen am Umfang verteilt aufweisen, so daß eine Sickerwasseransammlung in diesem Bereich begünstigt wird.In the same way, the ventilation shaft in the lower one Have third flow openings distributed around the circumference, so that favors leachate in this area becomes.

AusführungsbeispielEmbodiment

Ein Ausführungsbeispiel wird im folgenden anhand der Zeichnungen näher erläutert. Die Zeichnungen zeigen:An embodiment is shown below with reference to the drawings explained in more detail. The drawings show:

Fig. 1 Prinzipdarstellung der Deponie Schematische Draufsicht Fig. 1 Schematic plan view of the landfill

Fig. 2 Ausschnitt A aus dem Kammersystem nach Fig. 1 mit ange­ ordneten Be- und Entlüftungsschächten als Draufsicht Fig. 2 section A from the chamber system of FIG. 1 with arranged ventilation shafts as a top view

Fig. 3 Schnitt A-B nach Fig. 2 Teilquerschnitt der Deponie ohne Be- und Entlüftungs­ schacht Fig. 3 section AB of Fig. 2 partial cross-section of the landfill without a ventilation shaft

Fig. 4 Schnitt C-D nach Fig. 2 Darstellung des Be- und Entlüftungsschachtes Fig. 4 section CD according to Fig. 2 representation of the ventilation shaft

Fig. 5 Einzelheit G nach Fig. 2 Kreuzungspunkt einer Quer- und Längswand des Kammer­ systems als Draufsicht Fig. 5 detail G of FIG. 2 crossing point of a transverse and longitudinal wall of the chamber system as a plan view

Fig. 6 Schnitt E-F nach Fig. 2 Darstellung des Außenwandbereiches des Kammersystems Fig. 6 section EF according to Fig. 2 representation of the outer wall area of the chamber system

Fig. 7 Schematische Darstellung der Beschickungseinrichtung. Fig. 7 Schematic representation of the loading device.

In Fig. 1 ist schematisch die Deponie als Kammersystem 1 mit zueinander angrenzenden einzelnen Kammern 2 als Draufsicht dargestellt. Die Beschickung der Deponie erfolgt mittels Trans­ portband 46 einer Beschickungseinrichtung 39 mit einem Aktions­ radius bis 250 m. An dem an der Außenwand des Kammersystems 1 gelagerten Ende weist das Transportband 46 ein Rutschblech 45 auf. Dieses ist an seinem der Außenwand des Kammersystems 1 zugewandten Ende verjüngt.In Fig. 1, the landfill is shown schematically as a chamber system 1 with individual chambers 2 adjacent to each other as a top view. The landfill is loaded by means of a conveyor belt 46 of a loading device 39 with an operating radius of up to 250 m. At the end mounted on the outer wall of the chamber system 1 , the conveyor belt 46 has a slide plate 45 . This is tapered at its end facing the outer wall of the chamber system 1 .

Mit dem entgegengesetzten breitflächigen Ende ermöglicht das Rutschblech 46 eine großflächige Aufnahme des Mülls, der dann auf dem Transportband 46 weiterbefördert wird.With the opposite broad end, the slide plate 46 enables the waste to be picked up over a large area, which is then conveyed on the conveyor belt 46 .

Das Kammersystem 1 kann bei errechneter Statik eine Fläche von ca. 500 m × 500 m umfassen und bis zu einer Höhe von 70 m aufgeschichtet werden.When the statics are calculated, the chamber system 1 can cover an area of approximately 500 m × 500 m and can be stacked up to a height of 70 m.

Auf diese Weise läßt sich die Deponie für eine Stadt von ca. 200 000 Einwohnern ausrichten und reicht ca. 20 Jahre. Das Kammersystem 1 wird vorzugsweise aus Stahlbeton WU 35 gefertigt.In this way, the landfill can be set up for a city of approximately 200,000 inhabitants and lasts for approximately 20 years. The chamber system 1 is preferably made of reinforced concrete WU 35.

In dem in Fig. 2 gezeigtem Ausschnitt aus dem Kammersystem 1 sind mehrere Kammern 2 mit jeweils einem mittig angeordneten Be- und Entlüftungsschacht 20 schematisch dargestellt. Die Bo­ denplatte 30 der Kammern 2 weist im Bereich des Be- und Ent­ lüftungsschachtes 20 eine Verstärkung 31 auf.In the detail from the chamber system 1 shown in FIG. 2, several chambers 2 , each with a centrally arranged ventilation shaft 20, are shown schematically. The Bo denplatte 30 of the chambers 2 has a reinforcement 31 in the area of the ventilation shaft 20 .

In den Seitenwänden der einzelnen Kammern 2 befinden sich über dem Bodenplattenbereich Öffnungen 8, um einen Ausgleich des Flüssigkeitsabstandes zwischen den Kammern 2 zu ermöglichen. Openings 8 are located in the side walls of the individual chambers 2 above the base plate area in order to enable the liquid distance between the chambers 2 to be compensated for.

Fig. 3 als Schnitt A-B nach Fig. 2 stellt die Anordnung des Kammersystems 1 im Querschnitt ohne Be- und Entlüftungsschacht 20 dar. Zur Herstellung des Kammersystems 1 werden in die pla­ nierte Bodenfläche 37 die statisch berechneten Streifenfunda­ mente 10 und die Verstärkung 31 der Bodenplatte 30 eingebracht. Die im mittigen Bereich je Kammer 2 befindlichen Verstärkungen 31 dienen zur Aufnahme der erhöhten Druckbelastung durch den Be- und Entlüftungsschacht 20. In der Bodenplatte 30 sind Dehnungsfugen 32 vorgesehen. Sie besitzen eine Breite von 1-2 cm und werden mit synthetischem Kautschuk ausgespritzt. Fig. 3 as the section AB according to FIG. 2, the arrangement of the chamber system 1 in cross section without a ventilation shaft 20. In order to manufacture the chamber system 1 are in the pla-defined bottom surface 37, the static calculated strip foundation elements 10 and the reinforcement 31 of the bottom plate 30 introduced. The reinforcements 31 located in the central area of each chamber 2 serve to absorb the increased pressure load through the ventilation shaft 20 . Expansion joints 32 are provided in the base plate 30 . They have a width of 1-2 cm and are sprayed with synthetic rubber.

Vorzugsweise ist die Dehnungsfuge 32 zwischen Streifenfunda­ ment 10 und Kammerwand 5 anzubringen, damit die Dichtheit des Kammersystems 1 gesichert ist. Auf der Bodenplatte 30 über dem Streifenfundament 10 werden im Abstand von 10 m × 10 m die Kammerwände 5 als Kassetten­ wände errichtet in der erforderlichen Höhe. Im mittigen Bereich je Kammer 2 wird ein Betonsockel 23 auf die Bodenplatte 30 aufgebracht zur Aufnahme des Be- und Ent­ lüftungsschachtes 20. Im Bodenbereich weist der Betonsockel 23 mehrere Öffnungen 33 zum Flüssigkeitsausgleich auf.The expansion joint 32 is preferably to be installed between the strip foundation 10 and the chamber wall 5 so that the tightness of the chamber system 1 is ensured. On the bottom plate 30 to the strip foundation 10 are at a distance of 5 10 m x 10 m, the chamber walls as the cassette walls erected at the required height. In the central area of each chamber 2 , a concrete base 23 is applied to the base plate 30 for receiving the ventilation shaft 20 . In the floor area, the concrete base 23 has a plurality of openings 33 for liquid compensation.

Fig. 4 zeigt als Schnitt C-D der Fig. 2 den Be- und Ent­ lüftungsschacht 20. Im unteren Drittel des auf der Bodenplatte 30 angebrachten Teilsegmentes 21 weist der Be- und Entlüftungs­ schacht 20 umlaufend Öffnungen 25 auf zum Durchfluß von an­ fallendem Sickerwasser in die mittige, tiefer gelegene Sammel­ stelle der Bodenplatte 30. Das Gefälle der Bodenplatte 30 ist in der Zeichnung nicht dargestellt. Durch das Be- und Ent­ lüftungssystem wird erreicht, daß Sickerwasser u. a. Flüssig­ keiten aus den Kammern 2 verdunsten können, der Müllberg 35 in sich austrocknet und die Sauerstoffzuführung den Zersetzungs­ prozeß beschleunigt. Gleichzeitig dient dieses System auch zum Ableiten auftretender Zersetzungsgase. Fig. 4 shows a section CD of FIG. 2, the ventilation shaft Ent. 20 In the lower third of the sub-segment 21 attached to the base plate 30 , the ventilation shaft 20 has circumferential openings 25 for the flow of falling seepage water into the central, lower collecting point of the base plate 30 . The slope of the base plate 30 is not shown in the drawing. The aeration and ventilation system ensures that leachate, among other things, liquid can evaporate from the chambers 2 , the waste mountain 35 dries out and the oxygen supply accelerates the decomposition process. At the same time, this system also serves to discharge decomposition gases.

Zur Unterstützung dieser Funktionen sind in den Wandungen der Teilsegmente 21 Lüftungsschlitze 26 angebracht. Das unterste Teilsegment 21 des Be- und Entlüftungsschachtes 20 weist an seiner Oberseite einen ringförmigen Stulp 24 auf. In der diesem Stulp 24 zugewandten Seite des anschließenden Teilsegmentes 21 ist eine Aussparung 22 mit zugehöriger Feder angearbeitet, wodurch ein fester Halt beim Aufsetzen dieses Teilsegmentes 21 auf das darunter befindliche Teilsegment 21 ermöglicht wird.To support these functions, 21 ventilation slots 26 are provided in the walls of the sub-segments. The lowermost sub-segment 21 of the ventilation shaft 20 has an annular faceplate 24 on its upper side. In the side of the adjoining sub-segment 21 facing this faceplate 24 , a recess 22 with an associated spring is machined, which enables a firm hold when this sub-segment 21 is placed on the sub-segment 21 located below it.

An seiner oberen Seite weist das aufgesetzte Teilsegment 21 ebenfalls eine Aussparung 22 mit Feder auf, in die dann das nächstfolgende Teilsegment 21 teleskopartig eingesetzt wird. Nach diesem Verbindungssystem kann der Be- und Entlüftungs­ schacht entsprechend der wachsenden Höhe des Müllberges 35 verlängert werden. Der Be- und Entlüftungsschacht 20 kann vor­ zugsweise aus Stahlbeton WU 35 gefertigt sein.On its upper side, the attached segment 21 also has a recess 22 with a spring, into which the next segment 21 is then inserted telescopically. According to this connection system, the ventilation shaft can be extended in accordance with the growing height of the waste mountain 35 . The ventilation shaft 20 can preferably be made of reinforced concrete WU 35.

Er kann weiterhin zur Messung der Sickerwasserhöhe dienen mit­ tels anbringbarer nicht dargestellter Meßinstrumente. Das Sickerwasser bei größeren Ansammlungen abgepumt werden. Aus entnommenen Proben des Sickerwassers oder mittels der bis zur Oberkante der Kammern 2 angeordneten Meßinstrumente kann bei Bedarf der Gehalt an Schadstoffen und chemischen Substanzen gemessen werden.It can also be used to measure the leachate height by means of attachable measuring instruments, not shown. The leachate can be pumped out of larger accumulations. If necessary, the content of pollutants and chemical substances can be measured from samples of the leachate taken or by means of the measuring instruments arranged up to the upper edge of the chambers 2 .

In Fig. 5 ist der Kreuzungspunkt einer Quer- und Längswand 7, 6 des Kammersystems 1 als Draufsicht dargestellt. Die Nutaussparung 9 auf der Oberkante der Kammerwände ist für den Radlauf der Beschickungseinrichtung 39 vorgesehen. In FIG. 5, the intersection of a lateral and longitudinal wall 7 of the chamber system 6 1 is shown as a plan view. The groove recess 9 on the upper edge of the chamber walls is provided for the wheel arch of the loading device 39 .

Fig. 6 zeigt eine Darstellung des Außenwandbereiches des Kammer­ systems 1. Das Wandelement der Kammer 5 ist im Außenwandbereich als Böschung 11 ausgebildet zur Aufnahme des erhöhten Seiten­ druckes. Fig. 6 shows a representation of the outer wall area of the chamber system 1st The wall element of the chamber 5 is formed in the outer wall area as an embankment 11 for receiving the increased side pressure.

Der Müllberg 35 ist bereits über Kammerhöhe aufgeschichtet. Auf seine Oberfläche wurde Boden 36 für die Rekultivierung auf­ gebracht. Zur Unterstützung der Haftfähigkeit des Bodens 36 weist die äußere Kammerwand 5 in Ihrer Schräge terrassenartige Ausbildungen 12 auf.The garbage mountain 35 is already piled up over chamber height. Soil 36 was placed on its surface for recultivation. To support the adhesiveness of the floor 36 , the outer chamber wall 5 has terrace-like designs 12 in its incline.

Diese Anordnung hat den Vorteil, daß die Deponie bei der Re­ kultivierung bereits böschungsartig angelegt ist. Entsprechend der statischen Berechnung ist die als Böschung 11 ausgebildete äußere Kammerwand 5 auf ein Streifenfundament 10 aufgesetzt.This arrangement has the advantage that the landfill is already embankment-like in the re-cultivation. According to the static calculation, the outer chamber wall 5 designed as an embankment 11 is placed on a strip foundation 10 .

Fig. 7 zeigt eine schematische Darstellung der Beschickungs­ einrichtung 39, bestehend aus der Unterkonstruktion 42 mit dem Fahrwerk 43 sowie der Hubvorrichtung 44. Fig. 7 shows a schematic representation of the loading device 39 , consisting of the substructure 42 with the chassis 43 and the lifting device 44th

Auf die Unterkonstruktion 42 wurde als Hebevorrichtung ein Kran 40 aufgesetzt mit dem Teleskoparm 41.A crane 40 with the telescopic arm 41 was placed on the substructure 42 as a lifting device.

Das Fahrwerk 43 besteht aus Rollen, die seitwärts mit Leitele­ menten verkleidet sind, die in ihrer Länge die jeweiligen Längs­ und/oder Querwände 6, 7 der Kammern 2 umfassen. Hierdurch wird beim Verfahren der Beschickungseinrichtung 39 eine Führung des Fahrwerkes 43 gewährleistet.The undercarriage 43 consists of rollers which are laterally clad with Leitele elements, the length of which comprises the respective longitudinal and / or transverse walls 6 , 7 of the chambers 2 . This ensures that the carriage 43 is guided when the loading device 39 is moved.

Beim Überfahren des Kreuzungspunktes von Längs- und Querwand 6, 7 der Kammern 2 gewährleisten die vorhandenen Nutaussparungen 9 im oberen Kreuzungsbereich ein ungehindertes Weiterfahren der Beschickungseinrichtung 39.When passing over the crossing point of the longitudinal and transverse walls 6 , 7 of the chambers 2 , the existing groove cutouts 9 in the upper crossing area ensure that the loading device 39 can continue to move unhindered.

Bei Veränderung der Fahrtrichtung werden die Hubvorrichtungen 44 auf die jeweilige Kammerwand 5 abgesenkt und die Beschickungs­ einrichtung 39 angehoben. When changing the direction of travel, the lifting devices 44 are lowered onto the respective chamber wall 5 and the loading device 39 is raised.

Das nun entlastete Fahrwerk kann um 90 Grad verstellt werden und nach dem Hochnehmen der Hubvorrichtung 44 kann die Be­ schickungseinrichtung 39 in eine andere gewünschte Richtung verfahren werden zur Beschickung des Transportbandes 46 oder der direkten Auffüllung der Kammern 2.The now relieved chassis can be adjusted by 90 degrees and after lifting the lifting device 44 , the loading device 39 can be moved in another desired direction for loading the conveyor belt 46 or the direct filling of the chambers 2 .

Auf diese Weise kann jeder Punkt der Deponie erreicht werden. Ist die Deponie über den Rand der Kammern 2 gefüllt, kommt ein normal, verfahrbarer Kran 40 zum Einsatz. This way every point of the landfill can be reached. If the landfill is filled over the edge of the chambers 2 , a normal, movable crane 40 is used.

BezugszeichenlisteReference list

1 - Kammersystem
2 - Kammer
3 - Längsseite des Kammersystems
4 - Querseite des Kammersystems
5 - Kammerwand
6 - Längswand der Kammer
7 - Querwand der Kammer
8 - Öffnung in Kammerwand
9 - Nutaussparung im oberen Kreuzungsbereich der Kammerwände
10 - Streifenfundament
11 - Böschung
12 - terrassenförmige Aussparungen der äußeren Kammerwand
20 - Be- und Entlüftungsschacht
21 - Teilsegment des Be- und Entlüftungsschachtes
22 - Aussparung mit Feder im Be- und Entlüftungsschacht
23 - Betonsockel für den Aufsatz des Be- und Entlüftungs­ schachtes
24 - Stulp am Teilsegment
25 - Durchflußöffnungen im Be- und Entlüftungsschacht
26 - Lüftungsschlitze im Be- und Entlüftungsschacht
31 - Verstärkung der Bodenplatte
32 - Dehnungsfuge in Bodenplatte
33 - Öffnungen im Betonsockel
35 - Müllberg
36 - Boden für Rekultivierung
37 - Untergrundland
39 - Beschickungseinrichtung
40 - Kran
41 - Telescoparm
42 - Unterkonstruktion der Beschickungseinrichtung
43 - Fahrwerk
44 - Hubvorrichtung
45 - Rutschblech
46 - Transportband
1 - chamber system
2 - chamber
3 - Long side of the chamber system
4 - transverse side of the chamber system
5 - chamber wall
6 - longitudinal wall of the chamber
7 - transverse wall of the chamber
8 - Opening in the chamber wall
9 - Groove recess in the upper crossing area of the chamber walls
10 - strip foundation
11 - embankment
12 - terrace-shaped recesses of the outer chamber wall
20 - Ventilation shaft
21 - sub-segment of the ventilation shaft
22 - Spring recess in the ventilation shaft
23 - Concrete base for the top of the ventilation shaft
24 - forend on the subsegment
25 - Flow openings in the ventilation shaft
26 - Ventilation slots in the ventilation shaft
31 - reinforcement of the base plate
32 - Expansion joint in floor slab
33 - openings in the concrete base
35 - Garbage Mountain
36 - Soil for recultivation
37 - underground
39 - loading device
40 - crane
41 - Telescope arm
42 - Substructure of the loading device
43 - landing gear
44 - lifting device
45 - slide plate
46 - conveyor belt

Claims (16)

1. Deponie für Müll und andere Abfälle, die flüssigkeitsundurch­ lässig und mit Fördermitteln beschickbar ist, sowie Mittel zur Be- und Entlüftung aufweist, dadurch gekennzeichnet, daß ein aus mehreren Kammern (2) bestehendes, gebäudeartiges Kammersystem (1) zur Müllbeschickung vorgesehen ist, das ver­ teilte Be- und Entlüftungsschächte (20) aufweist.1. landfill for waste and other waste, which is impermeable to liquids and can be fed with subsidies, and has means for aeration and ventilation, characterized in that a building-like chamber system ( 1 ) consisting of several chambers ( 2 ) is provided for loading waste, the ver distributed ventilation and ventilation shafts ( 20 ). 2. Deponie nach Anspruch 1, dadurch gekennzeichnet, daß das Kammersystem (1) kassettenförmig ausgebildet ist.2. Landfill according to claim 1, characterized in that the chamber system ( 1 ) is cassette-shaped. 3. Deponie nach Anspruch 1, dadurch gekennzeichnet, daß das Kammersystem (1) je Kammer (2) einen verlängerbaren Be- und Entlüftungsschacht (20) aufweist.3. Landfill according to claim 1, characterized in that the chamber system ( 1 ) per chamber ( 2 ) has an extendable ventilation shaft ( 20 ). 4. Deponie nach Anspruch 1 und 2, dadurch gekennzeichnet, daß als Systemgründung Streifenfundamente (10) vorgesehen sind.4. Landfill according to claim 1 and 2, characterized in that strip foundations ( 10 ) are provided as the system foundation. 5. Deponie nach Anspruch 1 bis 3, dadurch gekennzeichnet, daß als Baumaterial flüssigkeitsundurchlässiger Stahlbeton einsetz­ bar ist.5. Landfill according to claim 1 to 3, characterized in that use liquid-impermeable reinforced concrete as a building material is cash. 6. Deponie nach Anspruch 3, daß der im mittigen Bereich einer Kammer (2) jeweils vorgesehene Be- und Entlüftungsschacht (20) auf einer Verstärkung (31) der Bodenplatte (30) angeordnet sein kann.6. Landfill according to claim 3, that in the central region of a chamber ( 2 ) each provided ventilation shaft ( 20 ) on a reinforcement ( 31 ) of the base plate ( 30 ) can be arranged. 7. Deponie nach Anspruch 3 und 6, dadurch gekennzeichnet, daß der Be- und Entlüftungsschacht (20) Lüftungsschlitze (26) auf­ weist.7. Landfill according to claim 3 and 6, characterized in that the ventilation shaft ( 20 ) has ventilation slots ( 26 ). 8. Deponie nach Anspruch 3, 6 und 7, dadurch gekennzeichnet, daß der Be- und Entlüftungsschacht (20) aus Teilsegmenten (21) teleskopartig montierbar ist. 8. Landfill according to claim 3, 6 and 7, characterized in that the ventilation shaft ( 20 ) from sub-segments ( 21 ) can be mounted telescopically. 9. Deponie nach Anspruch 3, 6, 7 und 8, dadurch gekennzeichnet, daß im Be- und Entlüftungsschacht (20) Meßinstrumente anbring­ bar sind.9. landfill according to claim 3, 6, 7 and 8, characterized in that in the ventilation shaft ( 20 ) measuring instruments are attachable bar. 10. Deponie nach Anspruch 1 und 2, dadurch gekennzeichnet, daß die Bodenplatte (30) jeweils einer Kammer (2) zum Kammermittel­ punkt hin verlaufend mit Gefälle versehen sein kann.10. Landfill according to claim 1 and 2, characterized in that the bottom plate ( 30 ) each of a chamber ( 2 ) to the chamber center point can be provided with a gradient. 11. Deponie nach Anspruch 1 und 2, dadurch gekennzeichnet, daß die Längs- und Querwände (6, 7) der Kammern (2) im oberen Kreu­ zungsbereich Nutaussparungen (9) für den Radlauf einer jeweiligen Beschickungseinrichtung (39) aufweisen.11. Landfill according to claim 1 and 2, characterized in that the longitudinal and transverse walls ( 6, 7 ) of the chambers ( 2 ) in the upper Kreu zungsbereich groove recesses ( 9 ) for the wheel arch of a respective loading device ( 39 ). 12. Deponie nach Anspruch 1, 2, 4 und 10, dadurch gekennzeichnet, daß die Bodenplatte (30) in erforderlichen Abständen vertikale Dehnungsfugen (32) aufweist, die sich vorzugsweise zwischen Kammerwand (5) und Streifenfundament (10) befinden und mit Dich­ tungsmitteln ausgefüllt sind.12. Landfill according to claim 1, 2, 4 and 10, characterized in that the base plate ( 30 ) has vertical expansion joints ( 32 ) at required intervals, which are preferably between the chamber wall ( 5 ) and strip foundation ( 10 ) and processing means with you are filled out. 13. Deponie nach Anspruch 1 und 2, dadurch gekennzeichnet, daß die Außenwände des Kammersystems (1) böschungsartig ausgebildet sein können.13. Landfill according to claim 1 and 2, characterized in that the outer walls of the chamber system ( 1 ) can be embankment-like. 14. Deponie nach Anspruch 13, dadurch gekennzeichnet, daß die böschungsartigen Außenwände des Kammersystems (1) terassen­ förmige Aussparungen (12) in ihrem Außenbereich aufweisen kön­ nen.14. Landfill according to claim 13, characterized in that the slope-like outer walls of the chamber system ( 1 ) can have terrace-shaped recesses ( 12 ) in their outer region. 15. Deponie nach Anspruch 1 und 2, dadurch gekennzeichnet, daß die einzelnen Kammern (2) über dem Bereich der Bodenplatte (30) in den Längs- und/oder Querwänden (6, 7) Öffnungen (8) aufweisen können.15. Landfill according to claim 1 and 2, characterized in that the individual chambers ( 2 ) over the area of the base plate ( 30 ) in the longitudinal and / or transverse walls ( 6 , 7 ) can have openings ( 8 ). 16. Deponie nach Anspruch 3, 6, 7 und 8, dadurch gekennzeichnet, daß der Be- und Entlüftungsschacht (20) im unteren Drittel Durch­ flußöffnungen (25) am Umfang verteilt aufweisen kann.16. Landfill according to claim 3, 6, 7 and 8, characterized in that the ventilation shaft ( 20 ) in the lower third through flow openings ( 25 ) may have distributed around the circumference.
DE19934313482 1993-04-24 1993-04-24 Dump for refuse and other waste Withdrawn DE4313482A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19934313482 DE4313482A1 (en) 1993-04-24 1993-04-24 Dump for refuse and other waste

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19934313482 DE4313482A1 (en) 1993-04-24 1993-04-24 Dump for refuse and other waste

Publications (1)

Publication Number Publication Date
DE4313482A1 true DE4313482A1 (en) 1994-10-27

Family

ID=6486298

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19934313482 Withdrawn DE4313482A1 (en) 1993-04-24 1993-04-24 Dump for refuse and other waste

Country Status (1)

Country Link
DE (1) DE4313482A1 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3306067A1 (en) * 1982-03-09 1983-09-22 E.C.H. Will (Gmbh & Co), 2000 Hamburg Device for filling a cardboard box open on one side with a pile of paper
DE8608549U1 (en) * 1986-03-29 1986-05-28 Hochtief Ag Vorm. Gebr. Helfmann, 4300 Essen Reinforced concrete container for a container landfill
DE3631807A1 (en) * 1986-09-18 1988-04-07 Dyckerhoff & Widmann Ag CONTAINER SYSTEM FOR STORAGE OF WASTE
DE3714744A1 (en) * 1987-05-02 1988-11-17 Holzmann Philipp Ag Landfill site with boxes
DE3448160C2 (en) * 1984-06-26 1989-06-22 Ed. Zueblin Ag, 7000 Stuttgart, De Device for sealing landfill sites
DE3816221A1 (en) * 1988-05-11 1989-11-23 Ludwig Hans Christian Hochheim Apparatus for storing refuse
DE3445127C2 (en) * 1984-12-11 1989-11-30 Karl Dipl.-Ing. Dr.Techn. 6238 Hofheim De Grund
DE4118415A1 (en) * 1991-06-05 1992-12-10 Adolf Luedecke Container pump allowing processing of waste prods. - has sealed container reactors with controlled water and water seepage circuits and gas extn., and avoids any environmental side-effects

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3306067A1 (en) * 1982-03-09 1983-09-22 E.C.H. Will (Gmbh & Co), 2000 Hamburg Device for filling a cardboard box open on one side with a pile of paper
DE3448160C2 (en) * 1984-06-26 1989-06-22 Ed. Zueblin Ag, 7000 Stuttgart, De Device for sealing landfill sites
DE3445127C2 (en) * 1984-12-11 1989-11-30 Karl Dipl.-Ing. Dr.Techn. 6238 Hofheim De Grund
DE8608549U1 (en) * 1986-03-29 1986-05-28 Hochtief Ag Vorm. Gebr. Helfmann, 4300 Essen Reinforced concrete container for a container landfill
DE3631807A1 (en) * 1986-09-18 1988-04-07 Dyckerhoff & Widmann Ag CONTAINER SYSTEM FOR STORAGE OF WASTE
DE3714744A1 (en) * 1987-05-02 1988-11-17 Holzmann Philipp Ag Landfill site with boxes
DE3816221A1 (en) * 1988-05-11 1989-11-23 Ludwig Hans Christian Hochheim Apparatus for storing refuse
DE4118415A1 (en) * 1991-06-05 1992-12-10 Adolf Luedecke Container pump allowing processing of waste prods. - has sealed container reactors with controlled water and water seepage circuits and gas extn., and avoids any environmental side-effects

Similar Documents

Publication Publication Date Title
DE3303067C2 (en) Waste storage facility and procedures for filling and sealing it
DE3445127C2 (en)
DE2253906B2 (en) ORNAMENTAL GARDEN ARRANGED ON A SUPPORTING SURFACE, PREFERABLY A FLAT ROOF
DE4400183A1 (en) Hexagonal drainage elements assembled as drainage lining for open refuse tip
DE4131391A1 (en) Sealing system for steeply sloping dumps - has inner sealing membrane with reinforcements and special surface texture, drainage layer, and outermost covering of suitable material
DE4313482A1 (en) Dump for refuse and other waste
DE2250057A1 (en) STORAGE CONTAINER FOR PETROLEUM PRODUCTS, IN PARTICULAR INTO THE EARTH SEMI-RECESSED STORAGE CONTAINER
DE2212892A1 (en) Membrane roof and supporting structure for this roof
AT389826B (en) Elevated tip
EP0362311A1 (en) Refuse dump for temporary or permanent disposal of hazardous waste and process for installing refuse dumps
DE3816221C2 (en) Storage facility for waste and / or residues
DE4312047C1 (en) Arrangement for collecting and storing seepage water from a landfill site
AT387344B (en) Refuse tip
EP0402844B1 (en) Arrangement at a hollow construction embedded in the ground for the transportation or storage of polluting liquids
DE4116096C2 (en) Security procedures for contaminated sites in the form of an inclined, circumferential, trough-shaped sealing bowl, which is subsequently created as a seal
AT389064B (en) High-level tip
DE3827710A1 (en) Flat silo, especially mobile silo
DE2307196A1 (en) PRE-FABRICATED SILO PLANT ESPECIALLY SUITABLE AS POISON DEPOSIT
DE3714742C2 (en)
DE3714664A1 (en) Vertical sealing wall for landfill sites
DE3703936A1 (en) Roofing structure for large dumps
DE202020107415U1 (en) Use of a waterproofing system approved by water law in a catchment area of a LAU system
DE3732262C2 (en) High-security large landfill and processing of waste materials and for highly secure final storage of non-reusable waste materials including contaminated sites
DE3545280A1 (en) Special-waste landfill site of reinforced-concrete earth containers
DE202021003723U1 (en) depot