Prior art keywords
shoring
pipes
lowered
foundation
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE4100138A
Other languages
German (de)
Other versions
DE4100138C2 (en
Inventor
Des Erfinders Auf Nennung Verzicht
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Walter Bau AG
Original Assignee
Dyckerhoff and Widmann AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dyckerhoff and Widmann AG filed Critical Dyckerhoff and Widmann AG
Priority to DE4100138A priority Critical patent/DE4100138A1/en
Priority to EP91122346A priority patent/EP0493823B1/en
Priority to AT91122346T priority patent/ATE91312T1/en
Priority to CS9213A priority patent/CZ279224B6/en
Priority to HU9200027A priority patent/HUT60797A/en
Publication of DE4100138A1 publication Critical patent/DE4100138A1/en
Application granted granted Critical
Publication of DE4100138C2 publication Critical patent/DE4100138C2/de
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • E01F8/0005Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
    • E01F8/0023Details, e.g. foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Sustainable Development (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Foundations (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Earth Drilling (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Building Environments (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

To construct a foundation for a noise barrier, which foundation consists of a number of individual foundations, along a traffic route, e.g. a railway track, running on an embankment, steel sheeting tubes (7) are first of all progressively positioned at the locations provided for the foundations and are lowered into the embankment body (1) while excavating the surrounding soil. Track supports (16) for forming a temporary track (14) for mobile construction equipment are laid across the lowered sheeting tubes (7). By means of this construction equipment, small pillars (18) can be lowered into the ground from this track (14) in the protection of the sheeting tubes (7) and finally - during simultaneous retreat of the track (14) - concrete can be placed in the hollow spaces formed by the sheeting tubes while the same are withdrawn. The sheeting tubes (7) therefore serve as formwork for foundation bodies in which the pillar heads of the small pillars bond in place and on which posts or the like for the noise barrier to be constructed can then be mounted. <IMAGE>

Description

Die Erfindung betrifft ein Verfahren zum Errichten einer aus einer Reihe von Einzelfundamenten bestehenden Gründung für ein sich in unmittelbarer Nähe des Lichtraumprofils entlang eines auf einem Damm verlaufenden Verkehrsweges, z. B. eines Bahngleises erstreckendes Bauwerk, z. B. eine Sicht- oder Lärmschutzwand.The invention relates to a method for establishing a a series of individual foundations for one in the immediate vicinity of the clearance profile a traffic route running on a dam, e.g. B. one Railway track extending structure, e.g. B. a view or Noise barrier.

Im Zuge der immer weitergehenden Bestrebungen, die Umwelt vor den von Verkehrswegen ausgehenden Emissionen zu schützen, werden entlang von Verkehrswegen in zunehmendem Maße Sicht- und Lärmschutzwände angeordnet. Lärmschutzwände finden sich nicht nur entlang von Straßen, insbesondere Autobahnen; sie werden zunehmend auch entlang von Eisenbahnstrecken angeordnet.In the course of ever-increasing efforts, the environment before the emissions from traffic routes protect, are increasing along traffic routes Dimensions of privacy and noise barriers arranged. Noise barriers are not only found along streets, in particular Highways; they are also increasingly along Railway lines arranged.

Während die Errichtung von Lärmschutzwänden entlang von in Geländehöhe verlaufenden Eisenbahnstrecken keine Probleme bereitet, ist dies bei auf einem Damm verlaufenden Eisenbahnstrecken problematisch, weil außerhalb des Lichtraumprofils der betreffenden Bahnstrecke nicht genügend Arbeitsraum zur Verfügung steht; oft liegt die Wand bei einem normalen Regelquerschnitt eines Dammes schon im Bereich der Böschung. Da der Bereich der Dammkrone oft schon wegen der Höhe des Dammes über dem Gelände, aber auch aus Gründen der Geländebeschaffenheit von der Geländeoberfläche aus für schweres Baugerät meist nicht zugänglich ist, kann bei der Errichtung einer Lärmschutzwand in solchen Fällen praktisch nur vom Eisenbahngleis selbst aus gearbeitet werden; dies bedingt, daß nur in Zugpausen gearbeitet werden kann, was die Arbeiten sehr behindert. Außerdem muß eine Langsamfahrstrecke eingerichtet und müssen Gleiswarnposten aufgestellt werden.During the construction of noise barriers along in Terrain railways no problems prepares, this is when running on a dam Railway lines problematic because outside the Clearance profile of the relevant railway line is not sufficient Work space is available; often the wall is included a normal regular cross section of a dam already in Embankment area. Since the area of the dam crown is often already because of the height of the dam above the site, but also from Ground condition of the terrain surface is usually not accessible for heavy construction equipment when installing a noise barrier in such cases worked practically only from the railway track itself will; this means that work is only done during breaks can, which hinders the work very much. In addition, one Slow travel route set up and need track warning posts be set up.

Vor diesem Hintergrund liegt der Erfindung die Aufgabe zugrunde, ein Verfahren anzugeben, nach dem in unmittelbarer Nähe des Lichtraumprofils entlang eines auf einem Damm verlaufenden Verkehrsweges, z. B. eines Bahngleises, in wirtschaftlicher Weise eine Gründung für ein Bauwerk, wie z. B. eine Lärmschutzwand, errichtet werden kann, ohne hierzu das Lichtraumprofil des Verkehrsweges in Anspruch nehmen zu müssen.Against this background, the object of the invention  based on specifying a procedure according to which immediate Close to the clearance profile along one on a dam current traffic route, e.g. B. a train track, in economical foundation for a building, such as e.g. B. a noise barrier can be erected without this occupy the clearance profile of the traffic route have to.

Diese Aufgabe wird gemäß der Erfindung durch die im kennzeichnenden Teil des Anspruchs 1 angegebenen Merkmale gelöst.This object is achieved according to the invention by the characterizing part of claim 1 specified features solved.

Vorteilhafte Weiterbildungen ergeben sich aus den Unteransprüchen.Advantageous further developments result from the Subclaims.

Der wesentliche Vorteil des erfindungsgemäßen Verfahrens basiert auf dem Einsatz von stählernen Verbaurohren für eine vorübergehende Befestigung der Dammbereiche, in denen die Gründung für das betreffende Bauwerk herzustellen ist. Die Verbaurohre, die nach einer geringfügigen Verbreiterung der Dammkrone bzw. nach Abtrag eines Teils derselben zur Gewinnung einer ebenen Aufstandsfläche unter Aushub des umschlossenen Bodens in den Dammkörper abgesenkt werden, haben eine dreifache Funktion. Sie dienen zunächst als Unterkonstruktion für eine Fahrbahn bzw. als Plattform für Baugeräte, mit denen somit außerhalb des Lichtraumprofils der Bahn, auch vor Kopf, gearbeitet werden kann. Weiterhin dienen die Verbaurohre der vorübergehenden Befestigung des Dammkörpers, um in ihrem Schutz Pfähle, vorzugsweise Kleinbohrpfähle, niederzubringen, die mit kleinerem und weniger aufwendigem Gerät gebohrt werden können als normale Bohrpfähle; schließlich dienen die Verbaurohre als Schalung bei der Herstellung der Einzelfundamente, indem unter gleichzeitigem Ziehen der Verbaurohre der in ihnen gebildete Hohlraum ausbetoniert wird. The main advantage of the method according to the invention is based on the use of steel shoring pipes for one temporary attachment of the perineal areas where the Foundation for the building in question is to be produced. The Installation pipes that after a slight widening of the Dam crown or after removal of part of the same Obtaining a flat contact area while excavating the enclosed soil are lowered into the perineum, have a triple function. They initially serve as Substructure for a roadway or as a platform for Construction equipment with which thus outside the clearance profile the train, even in front of your head. Farther the shoring pipes serve to temporarily fix the Dam body, in their protection piles, preferably Small bored piles to bring down those with smaller and less complex device can be drilled than normal Bored piles; finally the shoring pipes serve as formwork in the manufacture of the individual foundations by taking at the same time pulling the shoring pipes formed in them Cavity is concreted.  

Sowohl das Niederbringen der Verbaurohre, z. B. durch Rammen oder Rütteln bei gleichzeitigem Bodenaushub, als auch das Einbringen von Kleinbohrpfählen durch die Verbaurohre hindurch sind Maßnahmen, die den Dammkörper weitestgehend schonen und unbeeinträchtigt lassen. Dennoch gestatten die Kleinbohrpfähle in Verbindung mit den die Kopfbereiche der ein Gründungselement bildenden Kleinbohrpfähle durch jeweils ein Betonfundament eine zuverlässige Gründung des zu errichtenden Bauwerks.Both the bringing down of the shoring pipes, e.g. B. by ramming or shaking while digging at the same time, as well Insertion of small bored piles through the shoring pipes through this are measures that largely affect the perineum spare and leave undisturbed. Nevertheless, allow Small bored piles in connection with the the head areas of the a foundation element forming small bored piles through each a concrete foundation is a reliable foundation of the building.

Die Erfindung wird nachstehend anhand der Zeichnung näher erläutert. Es zeigen die Fig. 1 bis 7 in Querschnitten durch einen Eisenbahndamm einige Phasen bei der Durchführung des erfindungsgemäßen Verfahrens und die Fig. 8a und b einen Schnitt durch den Kopfbereich eines Verbaurohres sowie eine Draufsicht in größerem Maßstab.The invention is explained below with reference to the drawing. There, Figs. 1 to 7 in cross-section through a railway embankment some phases when carrying out the inventive method and Fig. 8a and b a section through the head region of a Verbaurohres and a plan view in a larger scale.

Fig. 1 zeigt die Ausgangssituation. Auf der Krone 2 eines Dammes 1 verläuft ein Schotterbett 3 für ein Eisenbahngleis 4, das nur durch die äußere Schiene angedeutet ist. Außerhalb des Lichtraumprofils dieses Gleises soll eine Lärmschutzwand hergestellt werden, deren Achse mit 5 bezeichnet ist; die Lärmschutzwand soll auf Einzelfundamenten gegründet werden, die entlang der Achse 5 in Abständen hintereinander liegen. Da die in der Achse 5 vorzusehenden Fundamente teilweise bereits im Bereich der Dammböschung liegen, wird zunächst durch teilweisen Abtrag der Dammkrone 2 eine in Fig. 1 gestrichelt angegebene Aufstandsfläche 6 hergestellt. Fig. 1 shows the initial situation. On the crown 2 of a dam 1 runs a ballast bed 3 for a railroad track 4 , which is only indicated by the outer rail. Outside the clearance profile of this track, a noise barrier is to be produced, the axis of which is designated 5 ; the noise barrier is to be founded on individual foundations that are spaced one behind the other along axis 5 . Since the foundations to be provided in the axis 5 are already partially in the area of the embankment embankment, a contact area 6 shown in dashed lines in FIG. 1 is first produced by partially removing the embankment crown 2 .

Wie Fig. 2 zeigt, wird sodann in der Achse 5 an der Stelle eines herzustellenden Fundamentes auf die Aufstandsfläche 6 ein Verbaurohr 7 gesetzt. Das Verbaurohr 7 ist ein Stahlrohr, das nach statischen, konstruktiven und rammtechnischen Gesichtspunkten dimensioniert ist und zur Erhöhung der Formstabilität am oberen Ende einen Flansch 8 besitzt, der sich auf Konsolen 9 abstützt. Der obere Bereich eines solchen Verbaurohres 7 ist in Fig. 8 in größerem Maßstab dargestellt. An zwei einander gegenüberliegenden Stellen ist der Flansch 8 zu Auflagerkonsolen 10 verbreitert, die später zur Auflagerung von Fahrbahnträgern dienen.As shown in FIG. 2, a shoring tube 7 is then placed on the contact surface 6 in the axis 5 at the location of a foundation to be produced. The shoring tube 7 is a steel tube, which is dimensioned according to static, constructive and ramming aspects and has a flange 8 at the upper end, which is supported on brackets 9, in order to increase the dimensional stability. The upper region of such a shoring tube 7 is shown on a larger scale in FIG. 8. At two opposite points, the flange 8 is widened to support brackets 10 , which will later be used to support roadway supports.

Das Verbaurohr 7 wird, wie in den Fig. 3 und 4 dargestellt ist, in Richtung der Pfeile 11 durch Rammen in den Dammkörper eingetrieben. Dabei wird iterativ vorgegangen, d. h. es wird jeweils am Grunde des Verbaurohres 7 ein keilförmiger Schlitz 12 als Entspannungsraum für den anschließenden Rammvorgang ausgehoben, in den das Verbaurohr 7 nach einem Rammvorgang eindringen kann. Der Aushub des Bodens kann in an sich bekannter Weise erfolgen, bei nichtbindigen bis schwachbindigen Böden z. B. über Aufwirbelung mittels zugeführter Druckluft bei gleichzeitigem Absaugen des aufgewirbelten Materials.As shown in FIGS . 3 and 4, the sheeting tube 7 is driven into the dam body by ramming in the direction of the arrows 11 . The procedure is iterative, ie a wedge-shaped slot 12 is excavated at the bottom of the shoring tube 7 as a relaxation space for the subsequent ramming process, into which the shoring tube 7 can penetrate after a ramming process. The soil can be excavated in a manner known per se, for non-cohesive to slightly cohesive soils. B. by swirling by means of compressed air supplied with simultaneous suction of the swirled material.

Die Rammung selbst kann entweder als Freifallrammung mit einem Rammblock 13 ausgeführt werden (Fig. 4), der in seinen Abmessungen auf das Verbaurohr 7 abgestimmt ist, d. h. in dieses von der Oberseite her eingeführt werden kann und unter Zwischenschaltung eines Rammfutters auf dessen oberen Rand einschließlich Flansch 8 wirkt. Es kann auch eine aufgesetzte, ebenfalls für das Verbaurohr 7 gefertigte Rammhaube verwendet werden, die durch Schnellschlagbären beaufschlagt wird. Schnellschlagbären können außermittig schlagen, so daß auch einer eventuellen Schiefstellung entgegengewirkt werden kann.The ramming itself can either be carried out as a free-fall pounding with a ramming block 13 ( FIG. 4), the dimensions of which are matched to the sheeting tube 7 , ie can be inserted into it from the top and including a ramming chuck on the upper edge thereof Flange 8 acts. It is also possible to use an attached ram hood, also made for the sheeting tube 7 , which is acted upon by quick-action bears. Quick-action bears can hit off-center, so that any misalignment can also be counteracted.

Wenn die Stelle an der Dammkrone 2, an der die Verbaurohre 7 abzusenken sind, von der Geländeoberfläche her erreicht werden kann, können das Positionieren und Absenken der Verbaurohre 7 von der Geländeoberfläche aus erfolgen. Ist die Einbaustelle nicht erreichbar, so kann auch vor Kopf gearbeitet werden, und zwar von einer Fahrbahn 14 aus, die über die in einer Reihe hintereinander liegenden Verbaurohre 7 gelegt wird. Fig. 5 zeigt, wie über die seitlichen Auflagerkonsolen 10 Längsträger 15, z. B. Peiner-Träger gelegt werden, die ihrerseits an der Oberseite Fahrbahnträger 16 z. B. in Form von U-Profilen tragen. Zwischen den Fahrbahnträgern 16 befindet sich eine begehbare Abdeckung 17, z. B. ein Rost.If the location on the dam crown 2 at which the installation pipes 7 are to be lowered can be reached from the surface of the site, the positioning and lowering of the installation pipes 7 can take place from the surface of the site. If the installation location cannot be reached, work can also be carried out in front of the head, from a roadway 14 that is laid over the shoring pipes 7 lying in a row in a row. Fig. 5 shows how 10 side members 15 , z. B. Peiner girder can be placed, which in turn on the top of roadway carrier 16 z. B. wear in the form of U-profiles. Between the road surface beams 16 is a walk-in cover 17, for example. B. a grate.

Der Abstand der beiden Fahrbahnträger 16 voneinander ist so gewählt, daß er der Spurbreite üblicher Baumaschinen entspricht, z. B. eines Baggers, mit dem vor Kopf weitere Verbaurohre gesetzt werden können oder eines Bohrgeräts, mittels dessen im Schutze der Verbaurohre 7 Kleinpfähle 18 in den Dammkörper eingebaut werden können. Der Erleichterung der Baumaßnahmen dient ein Arbeitsgerüst 19 mit einer Arbeitsbühne 20, das umsetzbar seitlich an den Fahrbahnträgern 16 anbringbar ist.The distance between the two carriageway supports 16 is selected so that it corresponds to the track width of conventional construction machinery, for. B. an excavator with which additional shoring pipes can be placed in front of the head or a drilling device by means of which 7 small piles 18 can be installed in the dam body under the protection of the shoring pipes. A work scaffold 19 with a work platform 20 , which can be implemented laterally on the roadway supports 16, is used to facilitate the construction measures.

Nach dem Einbringen der Kleinpfähle 18 (Fig. 6) werden die Fahrbahnträger 16 und die Längsträger 15 demontiert und wird das Verbaurohr 7 gezogen (Pfeil 21). Zugleich wird der Hohlraum innerhalb des Verbaurohres 7 mit Beton zur Bildung eines Fundamentes gefüllt. Der dabei entstehende Fundamentkörper 22 hüllt die Köpfe der Pfähle 18 ein und schafft so eine einwandfreie Abtragung der über die Fundamente 22 abgegebenen Lasten auf die Pfähle 18 und über diese in die Tiefe des Dammkörpers.After the small piles 18 have been introduced ( FIG. 6), the carriageway girders 16 and the longitudinal girders 15 are dismantled and the shoring tube 7 is pulled (arrow 21 ). At the same time, the cavity inside the shoring tube 7 is filled with concrete to form a foundation. The resultant foundation body 22 envelops the heads of the piles 18 and thus creates a perfect transfer of the loads released via the foundations 22 onto the piles 18 and via these into the depth of the dam body.

Fig. 7 zeigt den Endzustand. Die Fundamente 22 sind als Köcherfundamente ausgebildet; in den Köchern 23 sind Pfosten 24 eingestellt. Eine durchgehende Sockelplatte 25 bildet einen unteren Abschluß; an sie schließt sich nach oben hin die von den Pfosten 24 getragene Lärmschutzwand 26 an. Fig. 7 shows the final state. The foundations 22 are designed as quiver foundations; in the quiver 23 posts 24 are set. A continuous base plate 25 forms a lower end; the noise barrier 26 carried by the posts 24 adjoins them at the top.

Claims (4)

1. Verfahren zum Errichten einer aus einer Reihe von Einzelfundamenten bestehenden Gründung für ein sich in unmittelbarer Nähe des Lichtraumprofils entlang eines auf einem Damm verlaufenden Verkehrsweges, z. B. eines Bahngleises, erstreckendes Bauwerk, z. B. eine Sicht- oder Lärmschutzwand, dadurch gekennzeichnet, daß in Längsrichtung des Bauwerks fortschreitend an den für die Fundamente (22) vorgesehenen Stellen zunächst Verbaurohre (7) aus Stahl positioniert und unter Aushub des umschlossenen Bodens in den Dammkörper (1) abgesenkt werden, daß über die abgesenkten Verbaurohre (7) hinweg Fahrbahnträger (16) zur Bildung einer provisorischen Fahrbahn (14) für Baugeräte gelegt werden, von der aus im Schutze der Verbaurohre (7) Kleinpfähle (18) in den Boden eingebracht werden und schließlich - bei gleichzeitigem Rückbau der Fahrbahn (14) unter Ziehen der Verbaurohre (7) Beton in die durch diese gebildeten Hohlräume für die die Pfahlköpfe der Kleinpfähle (18) einbindenden Fundamentkörper (22) eingebracht wird.1. Method for establishing a foundation consisting of a number of individual foundations for a in the immediate vicinity of the clearance profile along a traffic route running on a dam, z. B. a railroad track, extending structure, e.g. B. a visual or noise barrier, characterized in that progressively in the longitudinal direction of the structure at the locations provided for the foundations ( 22 ) initially shoring pipes ( 7 ) made of steel and lowered while excavating the enclosed floor in the dam body ( 1 ), that over the lowered shoring pipes ( 7 ) roadway girders ( 16 ) are placed to form a provisional carriageway ( 14 ) for construction equipment, from which under the protection of the shoring pipes ( 7 ) small piles ( 18 ) are inserted into the ground and finally - at the same time Demolition of the roadway ( 14 ) by pulling the shoring pipes ( 7 ) concrete into the cavities formed by them for the foundation bodies ( 22 ) integrating the pile heads of the small piles ( 18 ). 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Verbaurohre (7) von der Fahrbahn (14) aus - vor Kopf arbeitend - positioniert und abgesenkt werden.2. The method according to claim 1, characterized in that the shoring pipes ( 7 ) from the roadway ( 14 ) - working in front of the head - are positioned and lowered. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß vor dem Positionieren der Verbaurohre (7) unter Abtrag eines Teils der Dammkrone eine ebene Aufstandsfläche (6) für die Verbaurohre (7) geschaffen wird.3. The method according to claim 1 or 2, characterized in that before the positioning of the shoring pipes ( 7 ) with removal of part of the dam crown a flat contact surface ( 6 ) for the shoring pipes ( 7 ) is created. 4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß die Verbaurohre (7) iterativ durch Rammen, Rütteln oder dergleichen bei gleichzeitigem Aushub des Bodens abgesenkt werden.4. The method according to any one of claims 1 to 3, characterized in that the shoring pipes ( 7 ) are lowered iteratively by ramming, shaking or the like while simultaneously excavating the ground.
DE4100138A 1991-01-04 1991-01-04 METHOD FOR ESTABLISHING A FOUNDATION FOR A CONSTRUCTION CONSTRUCTION ALONG A TRAFFIC PATH, e.g. A VISIBLE OR NOISE PROTECTIVE WALL Granted DE4100138A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
DE4100138A DE4100138A1 (en) 1991-01-04 1991-01-04 METHOD FOR ESTABLISHING A FOUNDATION FOR A CONSTRUCTION CONSTRUCTION ALONG A TRAFFIC PATH, e.g. A VISIBLE OR NOISE PROTECTIVE WALL
EP91122346A EP0493823B1 (en) 1991-01-04 1991-12-28 Method for constructing a foundation for a structure like a view or noise barrier, along a traffic route
AT91122346T ATE91312T1 (en) 1991-01-04 1991-12-28 PROCEDURE FOR BUILDING A FOUNDATION FOR A STRUCTURE EXTENDED ALONG A TRAFFIC ROUTE, E.G. A PRIVACY OR NOISE PROTECTION WALL.
CS9213A CZ279224B6 (en) 1991-01-04 1992-01-03 Method of foundation engineering along a traffic road, for instance soundproof walls
HU9200027A HUT60797A (en) 1991-01-04 1992-01-03 Method for making point-bases situating in single line first for founding walls protecting against noise

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE4100138A DE4100138A1 (en) 1991-01-04 1991-01-04 METHOD FOR ESTABLISHING A FOUNDATION FOR A CONSTRUCTION CONSTRUCTION ALONG A TRAFFIC PATH, e.g. A VISIBLE OR NOISE PROTECTIVE WALL

Publications (2)

Publication Number Publication Date
DE4100138A1 true DE4100138A1 (en) 1992-07-09
DE4100138C2 DE4100138C2 (en) 1992-12-24

Family

ID=6422567

Family Applications (1)

Application Number Title Priority Date Filing Date
DE4100138A Granted DE4100138A1 (en) 1991-01-04 1991-01-04 METHOD FOR ESTABLISHING A FOUNDATION FOR A CONSTRUCTION CONSTRUCTION ALONG A TRAFFIC PATH, e.g. A VISIBLE OR NOISE PROTECTIVE WALL

Country Status (5)

Country Link
EP (1) EP0493823B1 (en)
AT (1) ATE91312T1 (en)
CZ (1) CZ279224B6 (en)
DE (1) DE4100138A1 (en)
HU (1) HUT60797A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008002836A1 (en) 2008-04-30 2009-11-05 Msb-Management Gmbh Low noise barrier on tracks
IT1397399B1 (en) * 2009-12-11 2013-01-10 Urbantech S R L FUNDAMENTAL CARRIERS FOR AN ANTI-NOISE BARRIER.
CN107354952B (en) * 2017-09-12 2018-03-09 李建龙 A kind of installation method of mountain area steep slope region Road Bridge Pile Foundation

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4007990A1 (en) * 1989-03-15 1990-09-20 Hermann Claus Wooden component for soundproof wall - has protruding and recessed coupling portions at edges and vertical passage

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL125801C (en) * 1959-04-22
DE3131725C2 (en) * 1981-08-11 1987-07-09 Siemens AG, 1000 Berlin und 8000 München Noise barrier

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4007990A1 (en) * 1989-03-15 1990-09-20 Hermann Claus Wooden component for soundproof wall - has protruding and recessed coupling portions at edges and vertical passage

Also Published As

Publication number Publication date
DE4100138C2 (en) 1992-12-24
ATE91312T1 (en) 1993-07-15
HUT60797A (en) 1992-10-28
CZ279224B6 (en) 1995-02-15
CZ1392A3 (en) 1993-05-12
EP0493823A1 (en) 1992-07-08
EP0493823B1 (en) 1993-07-07
HU9200027D0 (en) 1992-04-28

Similar Documents

Publication Publication Date Title
DE69635549T2 (en) METHOD AND DEVICE FOR ESTABLISHING ENDLESS UNDERGROUND WALLS
DE4226067A1 (en) Device and method for stabilising highways in sloping locations - involves vertical injection posts fitted in lowermost stage with externally extending sections provided with inclined posts and steel reinforcement of concrete support wall
DE68904949T2 (en) Methods and components for the construction of underground garages.
DE202019100752U1 (en) shoring
DE4236766C2 (en) Method for renovating a dam construction for a roadway
DE4100138C2 (en)
DE102006002375B3 (en) Method for producing a solid roadway
DE102006000920A1 (en) Underground station e.g. urban railway station, building method, involves conveying excavated material that is accumulated during building of foundation pit to outweighed part and removing material through underground railway galleries
DE10256421B4 (en) Method and apparatus for making a tunnel or trough
DE2219567A1 (en) PROCEDURE FOR NIGHTLY INSTALLATION OF AN UNDERGROUND STRUCTURE
DE1634589B2 (en) PILE GRATING MADE FROM CONCRETE PILES
DE19648648A1 (en) Method of stabilising and raising tower-like structures positioned at an angle
AT519819B1 (en) METHOD FOR SUBSEQUENT SOIL CONSOLIDATION
DE69006144T2 (en) Process for the production of structures, in particular railway underpasses.
DE2917994B1 (en) Process for the production of a building pit lining or support wall from reinforced concrete for incisions in the terrain
DE3507730C2 (en)
DE19818338C1 (en) Platform construction for providing access to and from trains, trams etc.
LU502198B1 (en) Platform for receiving a rectangular jacking pipe
EP0981673B2 (en) Device for stabilising an unstable shoulder in railway and road construction and method for producing the same
DE19713990C2 (en) Platform system and method for creating a platform
DE4445707A1 (en) Economical removal of same level traffic surfaces
DE1282048B (en) Bridge structure made of reinforced or prestressed concrete for installation at crossings of existing railway lines with traffic routes to be underpassed
DE1247221B (en) Covering device for the cantilever spanning of structures of greater length to be created under the earth&#39;s surface, in particular tunnels
DE1220879B (en) Underpass structure and procedure for its subsequent installation
DE19608092C1 (en) Underwater sheet-piling installation method

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee