DE4011546A1 - Traverse winder thread guide roller - utilises sequential assembly technique for prodn. - Google Patents

Traverse winder thread guide roller - utilises sequential assembly technique for prodn.

Info

Publication number
DE4011546A1
DE4011546A1 DE19904011546 DE4011546A DE4011546A1 DE 4011546 A1 DE4011546 A1 DE 4011546A1 DE 19904011546 DE19904011546 DE 19904011546 DE 4011546 A DE4011546 A DE 4011546A DE 4011546 A1 DE4011546 A1 DE 4011546A1
Authority
DE
Germany
Prior art keywords
jacket
thread guide
guide drum
metal
drum according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19904011546
Other languages
German (de)
Inventor
Helmut Fossen
Gerard Kuesters
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oerlikon Textile GmbH and Co KG
Original Assignee
W Schlafhorst AG and Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by W Schlafhorst AG and Co filed Critical W Schlafhorst AG and Co
Priority to DE19904011546 priority Critical patent/DE4011546A1/en
Publication of DE4011546A1 publication Critical patent/DE4011546A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/02Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
    • B65H54/40Arrangements for rotating packages
    • B65H54/46Package drive drums
    • B65H54/48Grooved drums
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/31Textiles threads or artificial strands of filaments

Abstract

The thread guide roller for a traverse winding mechanism may be cylindrical or conical. The groove surface is made from a hard wearing metal fixed to radial supports from the axis. The space between is filled with material of a lower relative density. A cylindrical traverse winding roller (22) has radial supports (11,12). The outer sheet metal cylinder (16) is made from stainless steel, and is preformed with the guide grooves (2) into which the thread lies when being wound onto a reel. The radial supports (11,12) may number four or six, aligned axially and welded equidistantly to the outer cylinder. These are of varying length and dia.. ADVANTAGE - The construction is conductive to an automated prodn. line procedure, with sectional assembly.

Description

Die Erfindung betrifft eine Fadenführungstrommel einer Spuleinrichtung mit einer den Faden führenden Kehrgewinderille von unterschiedlicher Breite und Tiefe, bestehend aus einem zylinderförmigen oder kegelförmigen Mantel aus verschleißfestem Metall und einem auf eine Antriebswelle aufsteckbaren, den Mantel tragenden und/oder stützenden Unterbau.The invention relates to a thread guide drum Winding device with a thread groove leading the thread of different widths and depths, consisting of one cylindrical or conical sheath made of wear-resistant Metal and a clip on a drive shaft, the jacket load-bearing and / or supporting substructure.

Derartige Fadenführungstrommeln werden für reine Spulmaschinen, aber auch für Textilmaschinen verwendet, denen eine oder mehrere Spuleinrichtungen zugeordnet sind.Such thread guide drums are used for pure winding machines, but also used for textile machines that have one or more Spooling devices are assigned.

Folgende Druckschriften zeigen und beschreiben derartige Fadenführungstrommeln: GB-PS 10 97 028, CH-PS 5 58 763, US-PS 27 53 126, US-PS 33 86 150.The following publications show and describe such Thread guide drums: GB-PS 10 97 028, CH-PS 5 58 763, US-PS 27 53 126, US-PS 33 86 150.

Die bekannten Fadenführungstrommeln haben Nachteile. Sie sind entweder zu kompliziert in ihrem Aufbau und daher für eine Massenfertigung entweder zu teuer oder in ihrem Aufbau und ihren Laufeigenschaften schlecht reproduzierbar, oder sie sind so beschaffen, daß an ihnen keine für Hochleistungsspulbetrieb mit hohen Wickelgeschwindigkeiten geeignete Kehrgewinderille ausführbar ist.The known thread guide drums have disadvantages. you are either too complicated in structure and therefore for one Mass production either too expensive or in their structure and their Running properties difficult to reproduce, or they are like that procure that none of them for high performance winding operation with suitable winding thread groove at high winding speeds is executable.

Der Erfindung liegt die Aufgabe zugrunde, eine für Massenfertigung geeignete, identisch reproduzierbar und einen Wickelbetrieb mit hohen Wickelgeschwindigkeiten ermöglichende Fadenführungstrommel zu schaffen.The invention has for its object one for Mass production suitable, identically reproducible and one Enabling winding operation with high winding speeds To create thread guide drum.

Gemäß der Erfindung wird diese Aufgabe dadurch gelöst, daß der Unterbau mehrere achsparallel zur Drehachse der Fadenführungstrommel ausgerichtete, sich radial bis an den Mantel erstreckende Metallstege aufweist, die mit dem Mantel verbunden sind, und daß die zwischen den Metallstegen und dem Mantel liegenden Sektoren mit den Mantel unterstützendem Feststoff verhältnismäßig geringen spezifischen Gewichts ausgefüllt sind. Insbesondere in diesen Feststoff, aber auch in die Metallstege hinein kann jede für einen Hochleistungs-Wickelbetrieb geeignete Kehrgewinderille eingearbeitet werden. Das Konzept der Erfindung ist daher sehr anpassungsfähig und die Fadenführungstrommel hat eine für Hochleistungs-Wickelbetrieb geeignete geringe Masse bei gegebenem Trommeldurchmesser.According to the invention, this object is achieved in that the Substructure several axially parallel to the axis of rotation of the Thread guide drum aligned, radially up to the jacket has extending metal webs connected to the jacket and that between the metal bars and the jacket lying sectors with the mantle supporting solid relatively low specific weight are filled. Especially in this solid, but also in the metal bars Any suitable for high-performance winding operation can be inserted Reverse thread groove can be incorporated. The concept of the invention is therefore very adaptable and has the thread guide drum a low mass suitable for high-performance winding operation given drum diameter.

Obwohl bei Hochleistungs-Wickelbetrieb der Verschleiß der Trommeloberlfäche viel größer ist als bei normalem Wickelbetrieb, falls die Fadenführungstrommel zugleich auch die zu wickelnde Kreuzspule antreibt, so besitzt die erfindungsgemäße Fadenführungstrommel doch eine völlig ausreichende Verschleißfestigkeit und damit lange eine volle Funktionstüchtigkeit.Although the wear of the Drum surface is much larger than in normal winding operation, if the thread guide drum also the one to be wound Drives cheese, so has the invention Thread guide drum a completely sufficient Wear resistance and thus a full one for a long time Functionality.

In Weiterbildung der Erfindung sind vier bis sechs vorzugsweise gleichmäßig über den inneren Mantelumfang verteilt angeordnete Metallstege zur Unterstützung des Mantels vorgesehen. Mit vier Metallstegen wird ein Optimum hinsichtlich der Notwendigkeit der metallenen Unterstützung und Versteifung des Mantels und der Wirtschaftlichkeit der Herstellung dieser Unterstützung erwartet. In a further development of the invention, four to six are preferred evenly distributed over the inner circumference of the jacket Metal bars are provided to support the jacket. With four Metal bars will be an optimum in terms of the need for metal support and stiffening of the jacket and the Profitability of producing this support is expected.  

In Weiterbildung der Erfindung ist vorgesehen, daß Metallstege und Mantel aus nichtrostendem Stahl bestehen und miteinander verschweißt sind.In a development of the invention it is provided that metal webs and jacket made of stainless steel and together are welded.

Ein Mantel aus nichtrostendem Stahl stellt das derzeitige Optimum an Verschleißfestigkeit und Korrosionsbeständigkeit sowie eines ausreichend großen Reibwertes zwischen Mantel und Spulenwicklung dar. Metallstege aus dem gleichen Material wiederum schaffen unter den gegebenen Umständen optimale Schweißbedingungen.A jacket made of stainless steel represents the current optimum in wear resistance and corrosion resistance as well as one sufficiently large coefficient of friction between the jacket and the coil winding Create metal bars from the same material optimal welding conditions under the given circumstances.

In Weiterbildung der Erfindung ist vorgesehen, daß die Metallstege mit einem aus Metall bestehenden Zentralrohr verbunden sind, das die Antriebswelle aufnimmt. Im Fertigzustand ist somit eine metallische Verbindung zwischen dem Zentralrohr und dem Mantel vorhanden. Das Zentralrohr ist beispielsweise als Klemmbuchse ausgebildet.In a development of the invention it is provided that the Metal bars with a central tube made of metal are connected, which receives the drive shaft. In the finished state is therefore a metallic connection between the central tube and the coat. The central tube is, for example, as Clamp bushing designed.

In Weiterbildung der Erfindung sind in die zwischen dem Zentralrohr, den Metallstegen und dem Mantel gelegenen Freiräume Feststoffsegmente eingesetzt. Bei vier Metallstegen sind beispielsweise vier Feststoffsegmente erforderlich.In a development of the invention are in between Central tube, the metal bars and the jacket located free spaces Solid segments used. With four metal bars for example, four solid segments required.

Alternativ ist in Weiterbildung der Erfindung ein Feststoffteil vorgesehen, in dem die Metallstege enden.Alternatively, in a further development of the invention, a solid part provided in which the metal webs end.

Ob ein einteiliger Feststoffteil den Feststoffsegmenten in allen Fällen überlegen ist, kann ohne weiteres nicht entschieden werden. In bestimmten Fällen sind Montagevorteile vorhanden.Whether a one-piece solid part the solid segments in all Cases that are superior cannot easily be decided will. In certain cases there are assembly advantages.

In Weiterbildung der Erfindung sind das Feststoffteil oder die Feststoffsegmente mit den Metallstegen und/oder mit dem Zentralrohr und/oder dem Mantel verklebt. Das Verkleben kann beispielsweise mit wärmefestem Gießharz vorgenommen werden. In a further development of the invention, the solid part or the Solid segments with the metal bars and / or with the Central tube and / or the jacket glued. Gluing can for example with heat-resistant cast resin.  

In Weiterbildung der Erfindung ist in das Feststoffteil oder in die Feststoffsegmente die Kehrgewinderille zumindest teilweise eingearbeitet.In a development of the invention is in the solid part or in the solid segments at least partially the reverse thread groove incorporated.

Es ist denkbar, daß bei exakter Massenfertigung die Kehrgewinderille in alle Teile derart exakt eingearbeitet sein kann, daß nach exakt passendem Zusammenbau keinerlei Nacharbeit mehr erforderlich ist. Dann wäre es aber zweckmäßig, auch in den Mantel die Kehrgewinderille genauso exakt einzuarbeiten, wenn man keinerlei Nacharbeit wünscht. Diese Bedingung ist jedoch schwer zu erfüllen. Sehr vorteilhaft ist es aber, in die Teile die Kehrgewinderille teilweise einzuarbeiten, beispielsweise so, daß bei der späteren Nacharbeit nur noch wenig Material abgetragen werden muß. Die teilweise eingearbeitete Kehrgewinderille kann auch eine Art Führungsrille für das nacharbeitende Werkzeug bilden.It is conceivable that with exact mass production The sweeping thread groove must be worked into all parts so precisely can do that after exactly fitting assembly no rework more is needed. Then it would be useful, even in the Coat the reverse thread groove just as precisely if you does not want any rework. However, this condition is difficult to fulfill. It is very advantageous, however, in the parts Partly incorporate the reverse thread groove, for example so that only a little material removed during subsequent rework must become. The partially built-in reverse thread groove can also a kind of guide groove for the reworking tool form.

In Weiterbildung der Erfindung bestehen das Feststoffteil oder die Feststoffsegmente aus Leichtmetall, aus duroplastischem Kunststoff (Duroplast) oder aus Gießharz. Die Feststoffe sollten tunlichst so beschaffen sein, daß die in sie eingearbeitete Kehrgewinderille keinem zu großem Verschleiß durch den laufenden Faden unterliegt. Erwärmungsprobleme entstehen dabei während des Wickelbetriebs im allgemeinen nicht, weil die Wärmeabgabe teils über den Mantel geht und weil beim Wickeln eine gute Luftdurchwirbelung eintritt.In a further development of the invention, the solid part or the solid segments made of light metal, thermoset Plastic (thermoset) or cast resin. The solids should if possible be such that the one incorporated into it Reverse thread groove does not cause excessive wear due to running Thread is subject. Heating problems arise during the Winding operation in general not because the heat is partly goes over the coat and because a good one when wrapping Air swirl occurs.

In Weiterbildung der Erfindung ist vorgesehen, daß das Feststoffteil oder die Feststoffsegmente an den Wendestellen und/oder Kreuzungsstellen der Kehrgewinderille Einlagen aus verschleißfestem Werkstoff besitzen. Es ist ja bekannt, daß gerade dort die Kehrgewinderille einem erhöhten Verschleiß ausgesetzt ist. In a development of the invention it is provided that Solid part or the solid segments at the turning points and / or intersections of the reverse thread groove deposits possess wear-resistant material. It is known that just there the sweeping thread groove increased wear is exposed.  

In Weiterbildung der Erfindung sind die Metallstege derartig über den Umfang verteilt angeordnet, daß sich jeweils ein Metallsteg an der Wendestelle der Kehrgewinderille befindet. In diesen Metallsteg ist oder wird die Kehrgewinderille mit eingearbeitet, so daß er selbst den Verschleißschutz übernehmen kann. Der Mantel könnte aus einem nahtlos gezogenen Rohr, Kegel oder dergleichen hergestellt sein. Eine einfachere Montage ergibt sich im allgemeinen aber dadurch, daß in Weiterbildung der Erfindung der Mantel aus Blech geformt und an der Nahtstelle geschweißt ist. Das Schweißen braucht erst bei der Montage zu geschehen, so daß der Mantel zuvor noch fest um den Unterbau herum geklammert und dann erst geschweißt werden kann.In a further development of the invention, the metal webs are over distributed around the circumference, that there is a metal web located at the turning point of the reverse thread groove. In these Metal bar is or is the sweeping thread groove incorporated, so that he can take over wear protection himself. The coat could be from a seamless drawn tube, cone or the like be made. A simpler assembly results in general, however, in that in further development of the invention Sheath is formed from sheet metal and welded at the seam. The welding only needs to be done during assembly, so that the coat had previously been firmly clamped around the base and only then can be welded.

In Weiterbildung der Erfindung ist vorgesehen, daß in den Mantel von vornherein die Kehrgewinderille zumindest teilweise eingearbeitet ist. Die Vorteile wurden weiter oben schon erwähnt.In a development of the invention it is provided that in the jacket from the outset, the reverse thread groove at least partially is incorporated. The advantages have already been mentioned above.

Zum Herstellen einer Fadenführungstrommel nach den Ansprüchen 1 bis 5 und 7 bis 14 wird in Weiterbildung der Erfindung ein Verfahren beansprucht, das darin besteht, daß eine Schweißkonstruktion, bestehend aus einem Zentralrohr und mehreren radial vom Zentralrohr abstehenden Metallstegen hergetellt wird, daß die Feststoffsegmente vorgefertigt, zwischen die Metallstege eingelegt und zu einem Grundkörper verklebt werden, und daß der Mantel vorgefertigt, über den Grundkörper geschoben und mit den Metallstegen verschweißt wird.For producing a thread guide drum according to claims 1 to 5 and 7 to 14 is a further development of the invention Claims method, which consists in that a Welded construction consisting of a central tube and several metal ridges protruding radially from the central tube are produced, that the solid segments are prefabricated, between the metal bars inserted and glued to a base body, and that the Prefabricated coat, pushed over the base body and with the Metal bars are welded.

Alternativ hierzu werden zum Herstellen einer Fadenführungstrommel nach einem der Ansprüche 1 bis 4 und 6 bis 14 das Feststoffteil, die Metallstege und gegebenenfalls die aus verschleißfestem Werkstoff bestehenden Einlagen einzeln vorgefertigt und anschließend miteinander zu einem Grundkörper verklebt. Der Mantel wird vorgefertigt, über den Grundkörper geschoben und mit den Metallstegen verschweißt. Das Zentralrohr wird in das Feststoffteil eingepreßt und/oder eingeklebt. Alternatively, to make one Thread guide drum according to one of claims 1 to 4 and 6 to 14 the solid part, the metal webs and, if necessary, the wear-resistant material existing insoles individually prefabricated and then together to form a basic body glued. The coat is prefabricated, over the base body pushed and welded to the metal bars. The central tube is pressed into and / or glued into the solid part.  

Die Verfahren bieten verschiedene Vorteile. Metallteile und Kunststoffteile beziehungsweise Feststoffteile können je für sich in hierfür besonders eingerichteten Fabrikanlagen hergestellt werden. Die Montage kann an einem hierzu besonders geeigneten Ort wieder an anderer Stelle vorgenommen werden. So kann die ganze Herstellung sehr flexibel gestaltet werden.The methods offer various advantages. Metal parts and Plastic parts or solid parts can each stand alone manufactured in specially equipped factories will. The assembly can take place in a particularly suitable place can be made elsewhere. So can the whole Manufacturing can be made very flexible.

In Weiterbildung der Erfindung ist vorgesehen, daß die Stoßnaht des vorgefertigten Mantels erst auf dem Grundkörper verschweißt wird. Die Vorteile wurden schon weiter oben erwähnt. Zusätzlich wird der Mantel vorteilhaft mit dem Grundkörper verklebt.In a further development of the invention it is provided that the butt seam of the prefabricated jacket only welded to the base body becomes. The advantages have already been mentioned above. In addition the jacket is advantageously glued to the base body.

In Weiterbildung der Erfindung wird vor und/oder nach dem Aufbringen des Mantels auf den Grundkörper ein Ausarbeiten beziehungsweise Nacharbeiten der Kehrgewinderille, eine Beseitigung von Unrundheiten durch Überdrehen und/oder Überschleifen und Putzen vorgenommen und danach werden Unwuchten festgestellt und beseitigt.In a further development of the invention, before and / or after Apply the jacket to the base body or reworking the reverse thread groove, one Eliminating out-of-roundness by overturning and / or Grinding and cleaning are carried out and then there are imbalances found and eliminated.

Ob schon am Grundkörper Unrundheiten beseitigt werden müssen, hängt entscheidend von der Exaktheit der Vorfertigung ab. Ein Nacharbeiten der Kehrgewinderille ist beim Grundkörper allein im allgemeinen nicht erforderlich. Dies geschieht erst dann, wenn der Mantel aufgebracht ist.Whether out-of-roundness has to be removed from the base body, depends crucially on the accuracy of the prefabrication. A Reworking the sweeping thread groove is only in the basic body generally not required. This only happens when the coat is applied.

In Weiterbildung der Erfindung ist vorgesehen, daß das oder die Feststoffteile alternativ durch Gießen, Pressen oder Spritzgießen gebildet und dabei mit den Metallteilen verbunden werden.In a development of the invention it is provided that the or Solid parts alternatively by casting, pressing or injection molding formed and connected to the metal parts.

Ausführungsbeispiele der Erfindung sind in den Zeichnungen dargestellt. Anhand dieser Ausführungsbeispiele wird die Erfindung noch näher beschrieben und erläutert. Embodiments of the invention are in the drawings shown. Based on these embodiments, the Invention described and explained in more detail.  

Fig. 1 zeigt die Vorderansicht einer erfindungsgemäßen fertigen Fadenführungstrommel. Fig. 1 shows the front view of a finished thread guide drum according to the invention.

Fig. 2 zeigt die Vorderansicht der gleichen Trommel nach einer Drehung um 180 Grad. Fig. 2 shows the front view of the same drum after a rotation of 180 degrees.

Fig. 3 zeigt die Vorderansicht eines zu der Fadenführungstrommel nach Fig. 1 passenden vorgefertigten Mantels. Fig. 3 shows the front view of a prefabricated jacket matching the thread guide drum according to Fig. 1.

Fig. 4 zeigt die Vorderansicht eines vorgefertigten, zu der Fadenführungstrommel nach Fig. 2 passenden Grundkörpers mit eingearbeiteter Kehrgewinderille. FIG. 4 shows the front view of a prefabricated base body, which matches the thread guide drum according to FIG. 2, and has an integrated reversing thread groove.

Fig. 5 zeigt die Stirnseite einer Fadenführungstrommel, deren Grundkörper vier Feststoffsegmente aufweist. Fig. 5 shows the front end a yarn guide drum, the base body has four solid segments.

Fig. 6 zeigt die Vorderansicht eines zu der Fadenführungstrommel nach Fig. 1 und 2 passenden vorgefertigten Grundkörpers ohne eingearbeitete Kehrgewinderille. FIG. 6 shows the front view of a prefabricated base body matching the thread guide drum according to FIGS . 1 and 2, without an integrated sweeping thread groove.

Fig. 7 zeigt die Stirnseite einer weiteren Fadenführungstrommel, deren Grundkörper ein einziges Feststoffteil aufweist. Fig. 7 shows the end face of a further thread guide drum, the base body of which has a single solid part.

Bei der in den Fig. 1 und 2 dargestellten Fadenführungstrommel 1 hat die Kehrgewinderille 2 eine unterschiedliche Breite und Tiefe. Der Rillenabschnitt 2′ ist beispielsweise schmal und tief, die hinter den Kreuzungsstellen 4, 5 und 6 gelegenen Fangtaschen 19, 21 und 20 stellen Verbreiterungen der Kehrgewinderille 2 dar. Der Rillenabschnitt 2′′ ist beispielsweise schmal und flach. Wenn sich die Fadenführungstrommel 1 in Richtung des Pfeils 3 dreht, so liegt die linke Wendestelle 8 der Kehrgewinderille 2 bei 0 Grad Drehwinkel. Die erste Kreuzungsstelle 4 liegt bei 180 Grad, die zweite Kreuzungsstelle 5 bei 360 Grad und die dritte Kreuzungsstelle 6 bei 540 Grad Drehwinkel. Die rechte Wendestelle 7 liegt dann bei 720 Grad Drehwinkel, und dort geht dann der hier nicht dargestellte, bis jetzt von links nach rechts changierende Faden in die Changiergegenrichtung über. Die rechte Kreuzungsstelle 6 erreicht er daraufhin bei einem Drehwinkel von 900 Grad, die mittlere Kreuzungsstelle 5 bei einem Drehwinkel von 1080 Grad, die linke Kreuzungsstelle 4 bei einem Drehwinkel von 1260 Grad und die Ausgangsposition bei einem Drehwinkel von 1440 Grad der Fadenführungstrommel 1.In the thread guide drum 1 shown in FIGS . 1 and 2, the reversing thread groove 2 has a different width and depth. The groove portion 2 'is, for example, narrow and deep, which situated behind the crossing points 4, 5 and 6 collecting pockets 19, 21 and 20 provide extensions of the reversing screwthread groove 2. The groove portion 2' 'is, for example, narrow and flat. When the thread guide drum 1 rotates in the direction of arrow 3 , the left turning point 8 of the sweeping thread groove 2 is at an angle of 0 degrees. The first crossing point 4 is 180 degrees, the second crossing point 5 is 360 degrees and the third crossing point 6 is 540 degrees of rotation. The right turning point 7 is then at an angle of 720 degrees, and there the thread (not shown here), which has been changing from left to right up to now, merges into the direction of change. He then reaches the right crossing point 6 at a rotation angle of 900 degrees, the middle crossing point 5 at a rotation angle of 1080 degrees, the left crossing point 4 at a rotation angle of 1260 degrees and the starting position at a rotation angle of 1440 degrees of the thread guide drum 1 .

Der Aufbau der Fadenführungstrommel 1 ergibt sich aus den Fig. 3, 4 und 5.The structure of the thread guide drum 1 results from FIGS . 3, 4 and 5.

Nach Fig. 5 sind auf ein Zentralrohr 9 radial abstehende und über die ganze Trommellänge parallel zur Drehachse verlaufende Metallstege 11, 12, 13, 14 aufgeschweißt, die gemeinsam mit dem Zentralrohr 9 eine kompakte Schweißkonstruktion darstellen. Die Metallstege sind jeweils unter 90 Grad voneinander distanziert. Zwischen die Metallstege 11 bis 14 sind Feststoffsegmente 15 bis 18 eingesetzt. Sie sind mit den Metallstegen 11 bis 14 verklebt und bilden gemeinsam mit dem Zentralrohr und den Metallstegen einen in Fig. 4 dargestellten Grundkörper 22. In Fig. 4 sind von dem Grundkörper 22 lediglich die Metallstege 11 und 12 und die Feststoffsegmente 15, 16 und 18 sichtbar. Fig. 4 läßt erkennen, daß die Kehrgewinderille 2 schon in die Feststoffsegmente eingearbeitet ist, jedoch nicht in ihrer ganzen Breite und Tiefe.According to FIG. 5, metal webs 11 , 12 , 13 , 14 projecting radially from a central tube 9 and extending parallel to the axis of rotation over the entire length of the drum, which together with the central tube 9 represent a compact welded construction. The metal bars are spaced 90 degrees apart. Solid segments 15 to 18 are inserted between the metal webs 11 to 14 . They are glued to the metal webs 11 to 14 and, together with the central tube and the metal webs, form a base body 22 shown in FIG. 4. In FIG. 4, only the metal webs 11 and 12 and the solid segments 15, 16 and 18 are visible from the base body 22. Fig. 4 shows that the sweeping thread groove 2 is already incorporated in the solid segments, but not in its entire width and depth.

Nach Fig. 5 erstrecken sich die Metallstege 11 bis 14 und die Feststoffsegmente 15 bis 18 bis an einen zylindrischen Mantel 23. Der Mantel 23 ist aus etwa 1,5 mm dickem Blech gefertigt und an der Nahtstelle 24 zusammengeschweißt und gleichzeitig an den Metallsteg 13 angeschweißt. Zentralrohr, Metallstege und Mantel bestehen aus nichtrostendem Stahl, vorzugsweise Chromstahl. Auch sämtliche anderen Stege 11, 12 und 14 sind mit dem Mantel 23 an geeigneten Stellen durch Punktschweißen verschweißt. Alternativ kann, falls erforderlich, der in Fig. 3 dargestellte Mantel 23 hier nicht dargestellte Löcher erhalten, so daß jeder Steg an ausreichend vielen Schweißpunkten mit dem Mantel verbunden werden kann, unabhängig davon, ob dies durch Punktschweißen geschieht oder auf andere Weise.According to FIG. 5, the metal webs 11 extend to 14 and the solid segments 15 to 18 as far as a cylindrical shell 23. The jacket 23 is made of approximately 1.5 mm thick sheet metal and welded together at the interface 24 and at the same time welded to the metal web 13 . The central tube, metal bars and jacket are made of stainless steel, preferably chrome steel. All other webs 11 , 12 and 14 are also welded to the jacket 23 at suitable points by spot welding. Alternatively, if necessary, the jacket 23 shown in FIG. 3 can be provided with holes, not shown here, so that each web can be connected to the jacket at a sufficient number of welding points, regardless of whether this is done by spot welding or in some other way.

Der vorgefertigte Mantel 23 ist nach Fig. 3 schon gerollt, aber an der Nahtstelle 24 noch nicht verschweißt. Auch in den vorgefertigten Mantel 23 ist die Kehrgewinderille 2 schon eingearbeitet, jedoch nicht in ihrer vollen Breite. Außerdem ist die Kehrgewinderille 2 noch durch diverse Stege 25 bis 32 überbrückt, die später beim Nacharbeiten beziehungsweise Fertigstellen der Kehrgewinderille 2 durchtrennt werden. Es kann in gewissen Fällen aber auch vorteilhaft sein, an den Kreuzungsstellen der Kehrgewinderille 2 die Stege 27 und 30 nach Fig. 3 und entsprechende Stege an den anderen Kreuzungsstellen stehenzulassen. Dies kommt aber auf die jeweilige Art der Kehrgewinderille 2 an. Bei Montage des vorgefertigten Mantels 23 wird er mit dem Grundkörper 22 verklebt.The prefabricated jacket 23 is already rolled according to FIG. 3, but not yet welded at the interface 24 . The sweeping thread groove 2 is already incorporated into the prefabricated casing 23 , but not in its full width. In addition, the reverse thread groove 2 is still bridged by various webs 25 to 32 , which will be cut later when reworking or finishing the reverse thread groove 2 . In certain cases, however, it can also be advantageous to leave the webs 27 and 30 according to FIG. 3 and corresponding webs at the other crossing points at the crossing points of the reversing thread groove 2 . However, this depends on the type of sweeping thread groove 2 . When assembling the prefabricated jacket 23 , it is glued to the base body 22 .

Nach dem Schweißen beziehungsweise Verbinden des Mantels mit den Stegen und nach dem Fertigarbeiten der Kehrgewinderille 2 werden Unrundheiten durch Überdrehen und Abschleifen beseitigt, dann wird die Fadenführungstrommel 1 noch geputzt und danach werden Unwuchten ermittelt und beseitigt.After welding or connecting the jacket to the webs and after finishing the sweeping thread groove 2 , non-roundness is eliminated by overtightening and grinding, then the thread guide drum 1 is cleaned and then imbalances are determined and eliminated.

Bei der alternativen Fadenführungstrommel 1′ nach Fig. 7 besteht der auch in Fig. 6 dargestellte Grundkörper 22′ aus einem einzigen Feststoffteil 33, dem in das Feststoffteil 33 eingepreßten Zentralrohr 9′ und den in das Feststoffteil 33 eingeklebten Metallstegen 11′ bis 14′. Der Mantel 23 ist der gleiche wie bei der Fadenführungstrommel 1.In the alternative thread guide drum 1 'according to FIG. 7, the base body 22 ' also shown in FIG. 6 'consists of a single solid part 33 , the central tube 9 ' pressed into the solid part 33 'and the metal webs 11 ' to 14 'glued into the solid part 33 . The jacket 23 is the same as that of the thread guide drum 1 .

Auch bei diesem Ausführungsbeispiel bestehen alle Metallteile aus nichtrostendem Stahl. Das Feststoffteil 33 wird lediglich mit Aufnahmenuten für die Metallstege versehen, jedoch nicht mit der Kehrgewinderille 2. Sie wird erst nach der Endmontage der Teile hergestellt, wobei die noch nicht in voller Breite in den Mantel 23 eingearbeitete Kehrgewinderille 2 als Führungsrille eines die Kehrgewinderille herstellenden Werkzeugs dienen kann. Alternativ kann vorgesehen sein, weder in den Mantel 23 noch in die Feststoffsegmente 15 bis 18 des ersten Ausführungsbeispiels von vornherein Kehrgewinderillen einzuarbeiten. Es kann durchaus vorteilhaft sein, die Kehrgewinderille erst nach der Montage aller Teile insgesamt herzustellen. Wenn die Feststoffteile jedoch durch Gießen, Pressen oder Stanzen vorgefertigt werden, ist es schon allein zur Werkstoffeinsparung günstiger, die Kehrgewinderill zumindest teilweise schon mit auszuformen.In this embodiment, too, all metal parts are made of stainless steel. The solid part 33 is only provided with receiving grooves for the metal webs, but not with the reverse thread groove 2 . It is only produced after the final assembly of the parts, the reversing thread groove 2 , which has not yet been fully worked into the casing 23, being able to serve as a guide groove of a tool producing the reversing thread groove. Alternatively, provision can be made not to incorporate sweeping thread grooves from the outset into the jacket 23 or into the solid segments 15 to 18 of the first exemplary embodiment. It can be advantageous to make the sweeping thread groove only after all the parts have been assembled. However, if the solid parts are prefabricated by casting, pressing or punching, it is cheaper to save the material, at least in part, by forming the reverse thread groove.

Als Fertigungsalternative ist vorgesehen, das aus Mantel und Stegen bestehende Gebilde, das gegebenenfalls auch Verschleißschutzteile enthält, vorzufertigen und den oder die Feststoffteile durch anschließendes Gießen, Pressen oder Spritzgießen zu bilden.As a manufacturing alternative is provided that the jacket and Are there any existing structures? Contains wear protection parts, prefabricate and the or Solid parts by subsequent casting, pressing or To form injection molding.

Das Zentralrohr gehört hierbei je nach Bauart entweder zu der Schweißkonstruktion, oder es wird gegen die Schweißkonstruktion ausgerichtet und mit eingegossen, oder eingepreßt.Depending on the design, the central tube either belongs to the Welded structure, or it becomes against the welded structure aligned and cast in, or pressed in.

Claims (19)

1. Fadenführungstrommel einer Spuleinrichtung mit einer den Faden führenden Kehrgewinderille von unterschiedlicher Breite und Tiefe, bestehend aus einem zylinderförmigen oder kegelförmigen Mantel aus verschleißfestem Metall und einem auf eine Antriebswelle aufsteckbaren, den Mantel tragenden und/oder stützenden Unterbau, dadurch gekennzeichnet, daß der Unterbau mehrere achsparallel zur Drehachse (10) der Fadenführungstrommel (1, 1′) ausgerichtete, sich radial bis an den Mantel (23) erstreckende Metallstege (11 bis 14; 11′ bis 14′) aufweist, die mit dem Mantel (23) verbunden sind, und daß die zwischen den Metallstegen (11 bis 14; 11′ bis 14′) und dem Mantel (23) liegenden Sektoren mit den Mantel (23) unterstützendem Feststoff (15 bis 18, 33) verhältnismäßig geringen spezifischen Gewichts ausgefüllt sind.1. Thread guide drum of a winding device with a thread-guiding reversing thread groove of different width and depth, consisting of a cylindrical or conical jacket made of wear-resistant metal and a plug-on to a drive shaft, supporting the jacket and / or supporting substructure, characterized in that the substructure has several has axially parallel to the axis of rotation ( 10 ) of the thread guide drum ( 1 , 1 '), radially extending to the jacket ( 23 ) metal webs ( 11 to 14 ; 11 ' to 14 ' ) which are connected to the jacket ( 23 ), and that between the metal webs ( 11 to 14 ; 11 'to 14 ') and the jacket ( 23 ) lying sectors with the jacket ( 23 ) supporting solid ( 15 to 18 , 33 ) are filled relatively low specific weight. 2. Fadenführungstrommel nach Anspruch 1, dadurch gekennzeichnet, daß vier bis sechs vorzugsweise gleichmäßig über den inneren Mantelumfang verteilt angeordnete Metallstege (11 bis 14; 11′ bis 14′) zur Unterstützung des Mantels (23) vorgesehen sind.2. Thread guide drum according to claim 1, characterized in that four to six metal webs ( 11 to 14 ; 11 'to 14' ), preferably distributed uniformly over the inner circumference of the jacket, are provided to support the jacket ( 23 ). 3. Fadenführungstrommel nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß Metallstege (11 bis 14; 11′ bis 14′) und Mantel (23) aus nichtrostendem Stahl bestehen und miteinander verschweißt sind.3. Thread guide drum according to claim 1 or 2, characterized in that metal webs ( 11 to 14 ; 11 'to 14 ') and jacket ( 23 ) consist of stainless steel and are welded together. 4. Fadenführungstrommel nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß die Metallstege (11 bis 14) mit einem aus Metall bestehenden Zentralrohr (9) verbunden sind, das die Antriebswelle aufnimmt. 4. Thread guide drum according to one of claims 1 to 3, characterized in that the metal webs ( 11 to 14 ) are connected to a metal central tube ( 9 ) which receives the drive shaft. 5. Fadenführungstrommel nach Anspruch 4, dadurch gekennzeichnet, daß in die zwischen dem Zentralrohr (9), den Metallstegen (11 bis 14) und dem Mantel (23) gelegenen Freiräume Feststoffsegmente (15 bis 18) eingesetzt, eingepreßt oder eingegossen sind.5. Thread guide drum according to claim 4, characterized in that in the between the central tube ( 9 ), the metal webs ( 11 to 14 ) and the jacket ( 23 ) free spaces solid segments ( 15 to 18 ) are used, pressed or cast. 6. Fadenführungstrommel nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß ein eingesetztes, eingepreßtes oder eingegossenes Feststoffteil (33) vorgesehen ist, und daß die Metallstege (11′ bis 14′) in dem Feststoffteil enden.6. Thread guide drum according to one of claims 1 to 3, characterized in that an inserted, pressed or cast solid part ( 33 ) is provided, and that the metal webs ( 11 'to 14 ') end in the solid part. 7. Fadenführungstrommel nach Anspruch 5 oder 6, dadurch gekennzeichnet, daß das Feststoffteil (33) oder die Feststoffsegmente (15 bis 18) mit den Metallstegen (11′ bis 14′; 11 bis 14) und/oder dem Zentralrohr (9′; 9) und/oder dem Mantel (23) verklebt sind.7. Thread guide drum according to claim 5 or 6, characterized in that the solid part ( 33 ) or the solid segments ( 15 to 18 ) with the metal webs ( 11 'to 14 '; 11 to 14 ) and / or the central tube ( 9 '; 9 ) and / or the jacket ( 23 ) are glued. 8. Fadenführungstrommel nach einem der Ansprüche 5 bis 7, dadurch gekennzeichnet, daß in das Feststoffteil (33) oder in die Feststoffsegmente (15 bis 18) die Kehrgewinderille (2) zumindest teilweise eingearbeitet ist.8. Thread guide drum according to one of claims 5 to 7, characterized in that in the solid part ( 33 ) or in the solid segments ( 15 to 18 ) the reverse thread groove ( 2 ) is at least partially incorporated. 9. Fadenführungstrommel nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, daß das Feststoffteil (33) oder die Feststoffsegmente (15 bis 18) aus Leichtmetall bestehen.9. Thread guide drum according to one of claims 1 to 8, characterized in that the solid part ( 33 ) or the solid segments ( 15 to 18 ) consist of light metal. 10. Fadenführungstrommel nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, daß das Feststoffteil (33) oder die Feststoffsegmente (15 bis 18) aus duroplastischem Kunststoff (Duroplast) oder aus Gießharz bestehen.10. Thread guide drum according to one of claims 1 to 8, characterized in that the solid part ( 33 ) or the solid segments ( 15 to 18 ) consist of thermosetting plastic (thermoset) or cast resin. 11. Fadenführungstrommel nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, daß das Feststoffteil (33) oder die Feststoffsegmente (15 bis 18) an den Wendestellen (7, 8) und/oder Kreuzungsstellen (4, 5, 6) der Kehrgewinderille (2) Einlagen aus verschleißfestem Werkstoff besitzen.11. Thread guide drum according to one of claims 1 to 10, characterized in that the solid part ( 33 ) or the solid segments ( 15 to 18 ) at the turning points ( 7 , 8 ) and / or crossing points ( 4 , 5 , 6 ) of the sweeping thread groove ( 2 ) Have inserts made of wear-resistant material. 12. Fadenführungstrommel nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, daß die Metallstege (11 bis 14; 11′ bis 14′) derartig über den Umfang verteilt angeordnet sind, daß sich jeweils ein Metallsteg (13, 13′) an der Wendestelle (7, 8) der Kehrgewinderille (2) befindet.12. Thread guide drum according to one of claims 1 to 11, characterized in that the metal webs ( 11 to 14 ; 11 'to 14' ) are so distributed over the circumference that there is a metal web ( 13 , 13 ') at the turning point ( 7 , 8 ) of the reverse thread groove ( 2 ). 13. Fadenführungstrommel nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, daß der Mantel (23) aus Blech geformt und an der Nahtstelle (24) geschweißt ist.13. Thread guide drum according to one of claims 1 to 12, characterized in that the jacket ( 23 ) is formed from sheet metal and is welded at the interface ( 24 ). 14. Fadenführungstrommel nach einem der Ansprüche 1 bis 13, dadurch gekennzeichnet, daß in den Mantel (23) von vornherein die Kehrgewinderille (2) zumindest teilweise eingearbeitet ist.14. Thread guide drum according to one of claims 1 to 13, characterized in that the reversing thread groove ( 2 ) is at least partially incorporated into the jacket ( 23 ) from the outset. 15. Verfahren zum Herstellen einer Fadenführungstrommel nach einem der Ansprüche 1 bis 5 und 7 bis 14, dadurch gekennzeichnet, daß eine Schweißkonstruktion, bestehend aus einem Zentralrohr und mehreren radial vom Zentralrohr abstehenden Metallstegen hergestellt wird, daß die Feststoffsegmente vorgefertigt, zwischen die Metallstege eingelegt und zu einem Grundkörper verklebt werden, und daß der Mantel vorgefertigt, über den Grundkörper geschoben und mit den Metallstegen verschweißt wird.15. A method for manufacturing a thread guide drum according to one of claims 1 to 5 and 7 to 14, characterized characterized in that a welded structure consisting of one central tube and several radially from the central tube protruding metal bars that the Prefabricated solid segments, between the metal bars inserted and glued to a base body, and that the jacket is prefabricated, pushed over the body and is welded to the metal bars. 16. Verfahren zum Herstellen einer Fadenführungstrommel nach einem der Ansprüche 1 bis 4 und 6 bis 14, dadurch gekennzeichnet, daß das Feststoffteil, die Metallstege und gegebenenfalls die aus verschleißfestem Werkstoff bestehenden Einlagen einzeln vorgefertigt und anschließend miteinander zu einem Grundkörper verklebt werden, daß der Mantel vorgefertigt, über den Grundkörper geschoben und mit den Metallstegen verschweißt wird, und daß ein Zentralrohr in das Feststoffteil eingepreßt und/oder eingeklebt wird.16. A method of manufacturing a thread guide drum according to one of claims 1 to 4 and 6 to 14, characterized characterized in that the solid part, the metal webs and if necessary, those made of wear-resistant material Inserts individually prefabricated and then closed together be glued to a base body that the jacket prefabricated, pushed over the base body and with the  Metal webs is welded, and that a central tube in the Solid part is pressed and / or glued. 17. Verfahren nach Anspruch 15 oder 16, dadurch gekennzeichnet, daß die Stoßnaht des vorgefertigten Mantels erst auf dem Grundkörper verschweißt wird.17. The method according to claim 15 or 16, characterized in that the butt seam of the prefabricated jacket only on the Basic body is welded. 18. Verfahren nach einem der Ansprüche 15 bis 17, dadurch gekennzeichnet, daß vor und/oder nach dem Aufbringen des Mantels auf den Grundkörper ein Ausarbeiten beziehungsweise Nacharbeiten der Kehrgewinderille, eine Beseitigung von Unrundheiten durch Überdrehen und/oder Überschleifen und Putzen erfolgt und daß danach Unwuchten festgestellt und beseitigt werden.18. The method according to any one of claims 15 to 17, characterized characterized in that before and / or after the application of the Working out a coat on the base body respectively Reworking the reverse thread groove, an elimination of Out of roundness due to overtightening and / or smoothing and Cleaning takes place and that afterwards imbalances are determined and be eliminated. 19. Verfahren nach Anspruch 15 oder 16, dadurch gekennzeichnet, daß das oder die Feststoffteile (15 bis 18; 33) alternativ durch Gießen, Pressen oder Spritzgießen gebildet und dabei mit den Metallteilen (9, 11 bis 14, 23; 9′, 11′ bis 14′, 23) verbunden werden.19. The method according to claim 15 or 16, characterized in that the solid part or parts ( 15 to 18 ; 33 ) alternatively formed by casting, pressing or injection molding and thereby with the metal parts ( 9 , 11 to 14 , 23 ; 9 ', 11th 'To 14 ', 23 ) are connected.
DE19904011546 1990-04-10 1990-04-10 Traverse winder thread guide roller - utilises sequential assembly technique for prodn. Withdrawn DE4011546A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19904011546 DE4011546A1 (en) 1990-04-10 1990-04-10 Traverse winder thread guide roller - utilises sequential assembly technique for prodn.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19904011546 DE4011546A1 (en) 1990-04-10 1990-04-10 Traverse winder thread guide roller - utilises sequential assembly technique for prodn.

Publications (1)

Publication Number Publication Date
DE4011546A1 true DE4011546A1 (en) 1991-10-17

Family

ID=6404126

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19904011546 Withdrawn DE4011546A1 (en) 1990-04-10 1990-04-10 Traverse winder thread guide roller - utilises sequential assembly technique for prodn.

Country Status (1)

Country Link
DE (1) DE4011546A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105565068B (en) * 2015-12-28 2018-08-31 江阴市长泾花园毛纺织有限公司 Regular polygon groove drum group

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE658945C (en) * 1935-11-07 1938-04-20 Carl Zangs Akt Ges Maschf Thread guide roller for winding and similar machines
DE663451C (en) * 1938-08-06 Carl Zangs Akt Ges Maschf Thread guide roller for winding and similar machines
US2753126A (en) * 1954-03-17 1956-07-03 Barber Colman Co Yarn winding drum
DE1789935U (en) * 1958-08-30 1959-06-04 Walter Dr Ing Reiners THREAD GUIDE DRUM.
DE1837503U (en) * 1961-06-02 1961-09-07 Adolff Emil Fa THREAD GUIDE DRUM.
GB1097028A (en) * 1965-04-28 1967-12-29 Shimadzu Corp A yarn-guiding traverse drum
US3386150A (en) * 1966-05-31 1968-06-04 Leesona Corp Traverse roll
US3806053A (en) * 1971-06-03 1974-04-23 N Kinariwala Traverse drum

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE663451C (en) * 1938-08-06 Carl Zangs Akt Ges Maschf Thread guide roller for winding and similar machines
DE658945C (en) * 1935-11-07 1938-04-20 Carl Zangs Akt Ges Maschf Thread guide roller for winding and similar machines
US2753126A (en) * 1954-03-17 1956-07-03 Barber Colman Co Yarn winding drum
DE1789935U (en) * 1958-08-30 1959-06-04 Walter Dr Ing Reiners THREAD GUIDE DRUM.
DE1837503U (en) * 1961-06-02 1961-09-07 Adolff Emil Fa THREAD GUIDE DRUM.
GB1097028A (en) * 1965-04-28 1967-12-29 Shimadzu Corp A yarn-guiding traverse drum
US3386150A (en) * 1966-05-31 1968-06-04 Leesona Corp Traverse roll
US3806053A (en) * 1971-06-03 1974-04-23 N Kinariwala Traverse drum

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105565068B (en) * 2015-12-28 2018-08-31 江阴市长泾花园毛纺织有限公司 Regular polygon groove drum group

Similar Documents

Publication Publication Date Title
DE3304784C2 (en) Device for converting a rotary movement into a linear movement
DE2921874A1 (en) BRUSH ROLLER FOR PAPER AND BRUSH VACUUM CLEANER
DE3140546C2 (en) Role, especially transport role
DE4025011A1 (en) BALL GUIDE
DE3401782A1 (en) WRAPPED CYLINDRICAL SOCKET
DE2917928A1 (en) OPENING ROLLER FOR AN OPEN END SPINNING DEVICE AND METHOD FOR MANUFACTURING IT
DE3530041C2 (en)
DE2245437B2 (en) Ball bearings for longitudinal and rotary movements
DE3402864C2 (en)
EP1997757B1 (en) Roll changer with a clamping cone for supporting a core with a coiled roll of material
DE4011546A1 (en) Traverse winder thread guide roller - utilises sequential assembly technique for prodn.
DE2439096A1 (en) BEARING BUSHING AND THE METHOD AND DEVICE FOR THEIR PRODUCTION
DE2502366A1 (en) ROLLER
DE2903421C2 (en)
DE2627966C2 (en) Roller sleeve for rolling bearings
DE4317363A1 (en) Wire guide body for a wire drawing machine and method for its production
DE1629490C (en)
DE1943388C3 (en) Helical potentiometer
DE2846414C3 (en) Drying cylinder for a paper machine
DE2632283A1 (en) PREFORM DEVICE
DE3818756C1 (en) Device for the production of helical recesses on the inside of tubes
WO2003079503A1 (en) Commutator and method for the production thereof
DE19805495B4 (en) Rotary sleeve for a sleeve with yarn for a loom
DE2523573C3 (en) Process for the production of spiral spring rollers and spiral spring rollers produced by this method
DE1949429A1 (en) Method and device for the continuous production of a hose with a helical stiffening material embedded in its wall

Legal Events

Date Code Title Description
OM8 Search report available as to paragraph 43 lit. 1 sentence 1 patent law
8139 Disposal/non-payment of the annual fee