DE3602004A1 - Masonry-wall machine - process for the location-independent erection of masonrywork with conventional bricks, consisting of the usual materials, and normal masonry mortar, including the application of the first plaster layer (spray application) - Google Patents
Masonry-wall machine - process for the location-independent erection of masonrywork with conventional bricks, consisting of the usual materials, and normal masonry mortar, including the application of the first plaster layer (spray application)Info
- Publication number
- DE3602004A1 DE3602004A1 DE19863602004 DE3602004A DE3602004A1 DE 3602004 A1 DE3602004 A1 DE 3602004A1 DE 19863602004 DE19863602004 DE 19863602004 DE 3602004 A DE3602004 A DE 3602004A DE 3602004 A1 DE3602004 A1 DE 3602004A1
- Authority
- DE
- Germany
- Prior art keywords
- wall
- mortar
- masonry
- brick
- slide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/22—Tools or apparatus for setting building elements with mortar, e.g. bricklaying machines
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
NACHGEREICHT jSUBMITTED j
36Ό2Ό0436Ό2Ό04
Die Erfindung; betrifft ein Verfahren zum Ausführen von Steinmauern mit Steinen, die als regelmäßige Quader ausgebildet sind und im Bereich von Fugen, die sich zwischen ihnen erstrecken, miteinander verbunden sind.The invention; relates to a method for performing Stone walls with stones that are designed as regular cuboids and in the area of joints that are extend between them, are interconnected.
Es bestehen seit langem in der Bauindustrie Bestrebungen, das bisher übliche Aufmauern von Wandscheiben durch Handarbeit zu vermeiden. Die Kritik an der Herstellung von Mauerwerk durch Handarbeit liegt in der körperlichen Erschwernis, der damit nicht voll erreichten Mauerwerksqualität und in der geringen Mauerleistung. Es sind bisher im wesentlichen zwei Verfahren bekanntgeworden, die aufwendige Handarbeit zu vermeiden. Einmal wird so vorgegangen, daß Mauerwände aus Platten hergestellt werden, die in Sandwich-Weise zusammengeklebt sind. Bei der anderen Verfahrensart werden Steinkörper mit Hohlräumen zu fertigen Mauerscheiben aufeinandergeschichtet und diese Hohlräume dann mit Beton vergossen. So werden die Wände dann eingebaut. Die vorliegende Erfindung geht von diesen beiden bekannten Verfahren ab und will einen neuen Weg weisen, indem sich die Erfindung die Aufgabe gestellt hat, an Crt und Stelle, d.h. also dort, wo das Haus gebaut wird, eine Maschine aufzustellen, die das Aufniauern von einbaufertigen Mauerscheiben weitgehend maschinell vornimmt. Weitere Aufgaben für die Erfindung waren die Erstellung von Mauerwerk mit genau denselben Eigenschaften wie von Hand aufgeschichtetes Kauerwerk und eine Erhöhung der Mauerleistung in qm Wand oder cbm Mauerwerk pro Zeiteinheit und notwendigem Personal.There have been efforts in the construction industry for a long time to break up wall panels that have been customary up to now Avoid manual labor. The criticism of the manufacture of masonry by manual labor lies in the physical Difficulty, the masonry quality not fully achieved and the low masonry performance. There are So far, essentially two methods have become known to avoid the time-consuming manual labor. Once will proceeded so that wall walls are made of panels that are glued together in a sandwich manner. In the other type of process, stone bodies with cavities are stacked on top of one another to form finished wall panels and then pour concrete into these cavities. This is how the walls are then installed. The present Invention goes from these two known methods and wants to show a new way by the invention has set the task in place, i.e. so To set up a machine where the house is being built, which largely removes the need for ready-to-install wall panels mechanically. Further tasks for the invention were the creation of masonry with exactly same characteristics as hand-piled Masonry and an increase in masonry performance in square meters of wall or cbm of masonry per unit of time and what is necessary Staff.
Der technische Fortschritt der Erfindung besteht darin, daP^ Hochbauten in massiver Bauweise sehr schnell errichtet werden können'und somit die Gesamtbauzeit sehr stark reduziert werden kann. Als erreichbares Leistunprsergebnis wird zum Beispiel die Errichtung von 200 qm aufgehendem Kauerwerk in etwa 10 Maschinenstunden gesehen. Zur Maschi-The technical progress of the invention consists in the fact that high-rise buildings of massive construction are erected very quickly and thus the overall construction time is very high can be reduced. As an achievable achievement result For example, the construction of 200 square meters of rising masonry can be seen in about 10 machine hours. To the machine
NACHob.r-iE.ICHT INachob.r-iE.ICHT I
/O " ' """ 36Ό2Ό04 / O "'""" 36Ό2Ό04
nenbedienung sind 2 Kann sowie der Schwerlastkran mit Bedienung sowie weitere 2 bis 3 Mann auf den Einbaustellen der Mauerscheiben erforderlich.The operator is 2 cans as well as the heavy-duty crane with operator and another 2 to 3 men on the installation sites of the wall washers required.
Das Verfahren ist dadurch gekennzeichnet, daß durch eine ortsunabhängige Mauermaschine eine automatische Herstellung von Ziegelmauerv:erk mit herkömmlichen Ziegeln und normalen Mauermörteln ermöglicht wird. Die Maschine ist ortsunabhängig, da die Aufbauten über 3,5 Meter Höhe (Kranarm 6,1 und Mörtelschlitten 3) abgenommen werden können. Die Maschine ist auf einem Fahrwerk montiert und kann so an ,jeden beliebigen Ort transportiert werden. An der Baustelle ist die Maschine mit vier höhenverstellbaren Abstützungen - an jeder Ecke eine - zu horizontieren. Um die Maschine betriebsbereit zu machen, wird der Kranaufbau 6,1 und der Mörtelschlitten 3 eingehoben.The method is characterized in that a location-independent masonry machine is an automatic Manufacture of brick wall: Erk with conventional Bricks and normal masonry mortar is made possible. The machine is location-independent because the superstructures over 3.5 meters high (crane arm 6.1 and mortar sledge 3) can be removed. The machine is mounted on a chassis and can be used anywhere be transported. The machine is at the construction site with four height-adjustable supports - on each one Corner one - to level. To make the machine ready for operation, the crane structure 6.1 and the mortar slide 3 lifted.
Der Ablauf des erfindungsgemäßen Verfahrens wird an der hier beispielsweise dargestellten Mauermaschine wie folgt beschrieben:The sequence of the method according to the invention is based on The masonry machine shown here as an example is described as follows:
Die Mauerziegel werden aus einem Vorratsmagazin über eine Sortierscheibe auf das Förderband 7*2 gelegt, über das die Kauerziegel auf die Rollenbahn 1 gelangen. Auf der Hollenbahn werden c ie Mauerziegel in für den Facharbeiter optimaler Position, je nach Aussparungen (Türen, Fenster) oder dem Ziegelverbund, ausgerichtet. Die Rollenbahn besteht aus senkrecht zueinander angeordneten kugelgelagerten Rollen 1,2. Die Kauerzierel kommen über das Förderband 7»2 auf die Rollenbahn. Der Lsuf des Förderbands 7,2 ist je nach Ziegelbedarf von dar Fachkraft zu steuern. Die Rollenbahn ist die erste Strecke leicht geneigt. So rollen die Zierel in leichtem Gefrlle auf die horizontale Bahn bis nach hinten durch. Voncbrt werden sie je nach Aussparungen verschoben bzw. kleine Formate einrelert und mit der variablen Lisple 1,1 fixiert.The bricks are placed from a storage magazine over a sorting disk on the conveyor belt 7 * 2, over that the bricks get onto the roller conveyor 1. On the Hollenbahn, the bricks are used in for the skilled worker in the optimal position, depending on the recesses (Doors, windows) or the brick composite. The roller conveyor consists of vertical ball-bearing rollers 1,2 arranged relative to one another. The croissants come up on the conveyor belt 7 »2 the roller conveyor. The Lsuf of the conveyor belt is 7.2 each to be controlled by the skilled worker according to brick requirements. The first stretch of the roller conveyor is slightly inclined. In this way, the ornaments roll gently down the horizontal track to the rear. Voncbrt they are shifted depending on the gaps or small formats are integrated and with the variable Lisple 1.1 fixed.
ο BAD ORIGINALο ORIGINAL BATHROOM
N'ACHGEREICH-SUBSCRIBE-
Um Fenster- und Türaussparungen schon vorher zu kennzeichnen, befindet sich vor der Rollenbahn ein kleiner Tafelstreifen 1,3» auf dem die Aussparungen mit Kreide vor Beginn der Arbeiten an einer Kauer festgehalten werden können. Es können nur Ziegelformate mit seitlichen Körteltaschen verwendet werden, da di« Ziegel ganz aneinander geschoben werden können müssen. Das heißt, daß bei den kleinen Formaten zum Teil neue Ziegelformen verwendet werden müssen. Diese Ziegelformate sind auf Fig. 6 abgebildet. Können manche Formate, wie Stürze Rollokästen oder kleinere Formate nicht über den Ziegelgreifer 2 bewegt werden, so können sie auch leicht -da Wandüberkante in optimaler Arbeitst>osition für die Fachkraft auf der Mauermaschine- direkt auf die Wand gemauert werden.There is a small one in front of the roller conveyor so that window and door openings can be marked beforehand Blackboard strip 1.3 »on which the cutouts are made with chalk can be held on a crook before starting work. Only tile formats with lateral Mortar pockets are used because the bricks must be able to be pushed together completely. It means that in some cases, new tile shapes have to be used for the small formats. These tile formats are on Fig. 6 shown. Some formats, such as lintels with roller blind boxes or smaller formats, cannot use the brick gripper 2 are moved, so they can also be easily - because the wall is in an optimal working position for the skilled worker on the masonry machine - to be bricked directly on the wall.
Sind die Ziegel ausgerichtet, werden sie in der ganzen Länge der Rollenbahn 1 vom Ziegelgreifer 2 aufgenommen und in Schichten auf die Tragkonstruktion 4, die auf dem Fiauerschlitten 5 aufsitzt, exakt horizontiert aufgelegt. Der Ziegelpreifer ist auf alle Wandstärken von 17,5cm bis 49cm verstellbar. Dazu bedient man sich der vari-.ablen Schablone 2,5 , womit in sehr kurzer Zeit auf ein anderes Ziegelformat umgestellt werden kann. Es ist nur das Seil bei der variablen Verbindung 2,7 umzuhängen und der Bolzen 2,8 umzustecken. Die zweite Verbindung des Seils 2,6 mit der variablen Schablone 2,5 stellt eine feste Verbindung dar. Um die Ziegel beim Greifen nicht zu beschädigen, ist als Zwischenschicht ein Lederpolster 2,5 an den Stellen angebracht, an denen Berührung zum Ziegel stattfindet. Zum Greifen der Ziegel wird die Kraft von lufthydraulischen Zylindern 2,1 über Gestänge 2,2 auf den eigentlichen Greifer übertragen. Die Zylinder 2,1 sind im Abstand von 50cm über die Gesasu&tlänge des Greifers angeordnet.Once the bricks have been aligned, they are picked up by the brick gripper 2 along the entire length of the roller conveyor 1 and in layers on the supporting structure 4, which is on the Firing slide 5 is seated, placed exactly leveled. The brick gripper is for all wall thicknesses of 17.5cm adjustable up to 49cm. For this one uses the variable Template 2.5, which can be used to switch to a different tile format in a very short time. It the rope is only to be relocated for the variable connection 2.7 and the bolt 2.8 to be repositioned. The second Connection of the rope 2.6 with the variable template 2.5 represents a permanent connection. To the bricks Not to be damaged when gripping, is as an intermediate layer a leather pad 2.5 attached to the places where there is contact with the brick. At your fingertips the brick is the force of air hydraulic cylinders 2.1 via linkage 2.2 on the actual Transfer gripper. The cylinders 2.1 are at a distance of 50cm over the entire length of the gripper.
- 10 -- 10 -
·'" ' ■ "36Ό2Ό04 - *o - · '"' ■ " 36Ό2Ό04 - * o -
Im Bereich der Kraneu<=rträger 6,1 ist der Greifer (an insgesammt drei Stellen) über eine Aufhängevorrichtung 2,4 und ein Seil mit der Laufkatze'2,9 des Kranquerträfers 6,1 verbunden. Am unteren Ende der Aufhängevorrichtung-2,4 befindet sich ein Stempel, der das Aufsetzen auf die Ziegel sowie das 'Wiedersbheben davon erleichtert. Die Aufhäneevorrichtung 2,4 ist vom Greifer trennbar, de der Kranarm 6,1 beim TransDort der Mauermaschine abgenommen werden muß. Auch die Laufkatzen 2,9 sind untereinander trennbar 2,11 verbunden. So ist der einzelne Kranträger 6,1 mit Laufkatze 2,9 als Ganzes abnehmbar. Die drei Laufkatzen 2,9 erhalten ihre Energie über einen E-Motor 2,10, dessen Kraft über trennbare Gestänge 2,11 auf alle Laufkatzen 2,9 übertragen wird.In the area of the crane girders 6.1, the gripper (an a total of three places) via a hanging device 2,4 and a rope with the trolley'2,9 of the crane cross member 6.1 connected. At the bottom of the hanger-2,4 there is a stamp that allows it to be placed on the brick and lifted off again relieved. The suspension device 2.4 is from Separable gripper, the crane arm 6.1 must be removed when the masonry machine is transported. The trolleys too 2.9 are separably connected to one another, 2.11. The single crane girder is 6.1 with the trolley 2.9 detachable as a whole. The three trolleys 2,9 get their energy from an electric motor 2,10, whose power via separable rods 2.11 on all trolleys 2.9 is transmitted.
Ist eine Steinschicht aufgelegt und der Ziegelgreifer 2 wieder entfernt, läuft automatisch der Mörtelschlitten J über die vorher aufgesetzte Reihe, bringt den Spritzputz auf, verschließt d^e Stoßfugen und bringt desweiteren ein neues Mörtelbett auf. Der Mörtelschlitten besteht aus einem Mörtelvorratsbehälter 3,1 mit dem Fassungsvermögen von ca. zwei Mauerlängen bei einer angenommenen Wandstärke von 49 cm. In der Mitte befindet sich an der Unterkante der Mörtelmischkranz 3,2, der eine Entmischung des Mörtels sowie eine gute Verteilung auf der '.'«'and und ein besseres Einfließen des Mörtels in die Mörteltaschen bewirken soll. Der Mörtelschlitten läßt sich auf alle Wandsterken von 17»5 cm bis 49 cn umstellen, um dies zu erreichen, wird ganz einfach pro Seite ein Stab durch die öffnungen 3,4- für die jeweilige Wandstärke geschoben.. Somit können sich die Absperrschieber 3,3 nicht mehr weiter öffnen. Die Absperrschieber 3,3 werden über lufthydraulische Zylinder 3,5 , dessen Kraft über ein Gestänge 3,6 übertragen wird, geöffnet bzw. geschlossen.If a layer of stone has been placed and the brick gripper 2 is removed again, the mortar carriage runs automatically J over the previously placed row, applies the spray plaster, seals the butt joints and also applies a new bed of mortar. The mortar slide consists of a mortar storage container 3.1 with the capacity of about two Wall lengths with an assumed wall thickness of 49 cm. In the middle is at the bottom edge the mortar mixing ring 3.2, the segregation of the Mortar as well as good distribution on the '.' «'And and should cause the mortar to flow better into the mortar pockets. The mortar sledge can be switch to all wall thicknesses from 17 »5 cm to 49 cn, to do this, simply one per page will be used Rod through the openings 3, 4 for the respective wall thickness pushed .. Thus, the gate valve 3.3 can no longer open. The gate valve 3.3 are opened via air hydraulic cylinders 3.5, the power of which is transmitted via a linkage 3.6 or closed.
- 11 -- 11 -
NACHGERETJCHTINACHGERETJCHTI
---- -" 36Ό2Ό04 ---- - "36Ό2Ό04
Der Körtelschlitten besitzt drei Absperrschieber 3,3 an jeder Seite, um bei eventuellen Isaueraussparunpren Mörtelverluste zu vermeiden. Die Absperrschieber 3,3 werden über Lichtschranken 3,7 gesteuert, dessen Teile beiderseits des Mörtelschlittens angeordnet sind,-Die Lichtschranken 3»7 zeigen also an, -ob eine Aussparung vorliegt und sogleich schließt sich der Absperrschieber, der derjenigen Lichtschranke zugeordnet ist. Während des Auftragens des Mörtels auf die Kauer wird zugleich der Spritzwurf (erste Putzlage) aufgebracht. Dazu wird Kauermörtel über das Förderrohr für den Spritzputz 3»8 beidseitig des Mörtelschlittens aus dem Vorratsbehälter 3,1 über eine Schnecke 3,9 gefördert. Bei der Förderung des Mörtels wird ihm noch etwas »Vasser über eine Düse 3,1 G zugegeben, da Mauermörtel trockener ist als Spritzputz. Über die Ausfallöffnung für den Spritzputz 3,11 aus dem Förderrohr 3,8 fällt der Putz nach unten bis er durch einen Druckluftstrahl aus der Druckluftdüse 3,12 an die Mauer geworfen wird. Die Kraft für die Bewegung des Mörtelschlittens sowie für den Mörtelmischkranz 3,2 samt Schnecke für die Spritzputzbeförderung 3,9 erhält das ganze System von einem Ε-Motor. Dessen Kraft wird über einen Keilriemen 3,13 bis zum Mörtelmischkranz 3,2 und von dort über einen weiteren 3,13 an die Mittelrolle der drei Auflagerrollen 3,15a weitergegeben. Die Keilriemen 3,13 werden über Riemenspanner 3,14 straff gehalten. Die drei KolLen tür die Auflagerung 3,15a sowie die vier Rollen für die seitliche Stabilisierung 3,15b rebeηόer Körtelschlitten eine reradlinige Lauffläche, was für ein gutes Körtelbett erforderlich ist. Die Seinigungsschieber 3,17 sorgen dafür, daß die Laufbahnen 3,16 immer frei von Verschmutzungen sind. Ist der Mörtelschlitten bis ans Ende der Schlittenbahn 3,1£ belaufen wird ein Schalter betätigt, der den Motor umschaltet und den Schlitten wieder zurücklaufen läiit. Dabei wird auch die Schnecken-The mortar slide has three gate valves 3, 3 on each side, in order to avoid any Isauer omissions To avoid mortar losses. The gate valves 3.3 are controlled via light barriers 3.7, their parts are arranged on both sides of the mortar carriage, -The Light barriers 3 »7 therefore indicate whether there is a recess is present and immediately the gate valve that is assigned to that light barrier closes is. While the mortar is being applied to the plaster, the spray shot (first layer of plaster) is carried out at the same time. upset. For this purpose, chewing mortar is applied over the delivery pipe for the spray plaster 3 »8 on both sides of the mortar carriage conveyed from the storage container 3.1 via a screw 3.9. When pumping the mortar, a little more water is added to it via a 3.1 G nozzle, as masonry mortar is drier than spray plaster. Via the opening for the spray plaster 3.11 from the delivery pipe 3.8 the plaster falls down until it is thrown against the wall by a jet of compressed air from the compressed air nozzle 3, 12 will. The force for moving the mortar carriage and for the mortar mixing ring 3.2 including auger for the spray plaster conveyance 3.9 maintains the whole system from a Ε engine. Its power is via a V-belt 3.13 to the mortar mixing ring 3.2 and from there passed on via a further 3.13 to the central roller of the three support rollers 3.15a. The V-belt 3.13 are held taut by belt tensioners 3.14. The three Columns for the support 3.15a and the four rollers for lateral stabilization 3.15b rebeηόer mortar sledge a straight running surface, which is necessary for a good mortar bed. The settlement slide 3.17 ensure that the raceways 3.16 are always free from dirt. Is the mortar sledge up At the end of the toboggan run there will be a switch actuated, which switches the motor and lets the slide run back again. The snail
- 12 -- 12 -
36Ό2Ό0436Ό2Ό04
bewegung 3,9 umgekehrt, wodurch der Mörtel aus dem Förderrohr für den Spritzputz 3,8 wieder zurück in den Vorratsbehälter 3,1 gefördert wird. Dadurch wird ein Verfestigen des Putzes im Förderrohr 3,8 verhindert. Die Wasserzugabe an der Wasserdüse 3,10 wird beim Zurücklaufen verhindert. Ist der Hörtelschlitten am .-.nfang seiner Laufbahn 3,16 anpekommen, wird neuer Mörtel aus einem Trockenmörtelbehälter 7,1 automatisch bis zu einem bestimmten Füllstand des Vorratsbehälters 3,1 nachgefüllt.movement 3.9 reversed, which removes the mortar from the Delivery pipe for the spray plaster 3.8 is conveyed back into the storage container 3.1. This will prevents the plaster from solidifying in the delivery pipe 3.8. The addition of water at the water nozzle 3.10 is prevented when walking back. If the Hörtelschlitten arrives at the beginning of its career 3.16, it becomes newer Mortar from a dry mortar container 7.1 automatically up to a certain level of the storage container 3.1 refilled.
Nach dem Auftragen des Körtelbetts fährt der Mauerschlitten 5 um das Ziegelmaß 12,5 oder 25 cm nach unten und somit kann eine neue Schicht aufgesetzt werden. Die Hauerschlitten bewegen sich auf senkrechten Doppe 1-Τ-ϊγγgern IFB140 5,4-, die für den Transport der Mauermaschine zur Baustelle nach oben gezogen werden können. Die Dor>T>el-T-Tr<vger 5,4- wiederum pleiten auf anderen Schlitten 5,5, die fest am Fahrwerk der Mauermaschine befestigt sind. Ist nun die Maschine an der Baustelle, werden die Träger 5,4 wieder nach unten gelassen und die Mauerschlitten 5 auf die Doppel-T-Träger 5,4 von unten aufgeschoben. Danach wird der Träger 5,4 an dem Schlitten 5,5, der mit dem Fahrwerk fest verbunden ist, fixiert.. Jetzt werden die Seile 5,3 über die Umlenkrollen 5,2 am Mauerschlitten 5 befestigt. Nun ist der Mauerschlitten betriebsbereit. Bei einer Wandstärke kleiner als 4-9 cm werden in die Aussparungen 5,1 für die jeweilige Wandstärke Keile geschoben, gegen die die V.'andträger der Tragkonstruktion 4,1 gestellt werden. Um Maueraussparungen gleich zu erkennen, befindet sich wie an der Bollenbahn 1 auch hier seitlich ein kleiner Kreidetafelstreifen 1,3 mit einer metrischen Durchnummerierung Auf ihr werden durch Kreidestriche Aussparungen zum leichteren Erkennen festgehalten. Soll eine Wand gebaut werden, wird der Mauerschlitten 5 ganz abgesenktAfter the mortar bed has been applied, the wall slide 5 moves down by the brick size 12.5 or 25 cm, so that a new layer can be put on. The carriages move on vertical doubles 1-Τ-ϊγγgern IFB140 5,4-, which can be pulled up to transport the masonry machine to the construction site. The Dor>T> el-T-Tr < v ger 5.4- again bankrupt on other sleds 5.5, which are firmly attached to the chassis of the masonry machine. If the machine is now at the construction site, the girders 5, 4 are lowered again and the wall slides 5 are pushed onto the double-T girders 5, 4 from below. The carrier 5, 4 is then fixed to the slide 5, 5, which is firmly connected to the chassis. Now the ropes 5, 3 are attached to the wall slide 5 via the pulleys 5, 2. The wall slide is now ready for use. In the case of a wall thickness smaller than 4-9 cm, wedges are pushed into the recesses 5.1 for the respective wall thickness, against which the end supports of the supporting structure 4.1 are placed. In order to recognize wall gaps straight away, there is a small chalk board strip 1.3 with a metric numbering on the side as well as on the Bollenbahn 1. If a wall is to be built, the wall slide 5 is lowered completely
- 13 -- 13 -
NACHSEREICHT]NEWS]
und ά ie Tragkonstruktion 4 darauf fixiert. Nun wird der Mauerschlitten 5 ganz nach oben gezogen, wo die erste Ziegelreihe aufgesetzt wird. Nun läuft der Mörtelschlit ten 3 über die aufgesetzte Reihe, verschließt die Mörteltaschen und bringt ein neues Mörtelbett auf. Zudem wird der Spritzputz auf die vorhergehende Reihe aufgebracht. Danach senkt sich dar Mauerschlitten 5 um das Ziegelhöhenmaß, 12,5 cm oder 25 cm je nach verwendeten Ziegeln und schon kann die nächste Ziegelreihe aufgesetzt werden. So wird Reihe um Reihe aufgesetzt, bis die Mauerscheibe bis oben durchgemauert ist.and the supporting structure 4 is fixed on it. Now the Wall slide 5 pulled all the way up, where the first row of bricks is placed. Now the mortar chute is running ten 3 over the attached row, closes the mortar pockets and applies a new mortar bed. In addition the spray plaster is applied to the previous row. Then the wall slide 5 is lowered by the Brick height, 12.5 cm or 25 cm depending on the bricks used and the next row of bricks can be put on will. So row by row is put on until the wall plate is bricked up to the top.
Ist die Mauer fertiig, wird die Tragkonstruktion 4 mit der fertigen Mauer an einen Schwerlastkran gehängt. Die Tragkonstruktion besteht aus zwei U 200-Trägern 4,1, auf deren Außenseite ein Blechsteg von 8 χ 80 mm aufgeschweißt wurde. Zur Stabilisierung des Blechsteges werden oben und unten Dreiecke aufgeschweißt. An cen Stellen, auf. denen die Tragkonstruktion auf dem Mauerschlitten aufliegt, sind an der Tragkonstruktion Haken 4,4 angebracht, an denen die Tragkonstruktion an einen Schwerlastkran gehängt werden kann. Um einen exakten Abstand der Tragkonstruktion zu gewährleisten, wird alle Mfcter ein Abstandshalter 4,2 in die U 200-Träger 4,1 eingeschoben. Die Abstandhalter sind für jede zu bauende Wandstärke unterschiedlich lang, ähnlich verhält es sich mit den Bügeln 4,3, da sie ebenso für jede wandst&rke verschieden lang sind. Bei den Büreln werden pro '.'«andstErke zwei Stück benötipt. Sie werden beim Kauertrsns-oort benötirt, um ein .verdrehen der U 200-TrKger 4,1 bein Transport zu vermeiden. Dazu werden die Bügel 4,3 vor dem Transport vorne und hinter der Kauer nur auf die U 200-Trh'ger 4,1 festeckt. Ie das Mauerwerk vor dem Auseinanderreifren bei .-iusEnarunren (Fenster, Türen) während das Transports zu schützen,When the wall is finished, the supporting structure 4 is hung with the finished wall on a heavy-duty crane. The supporting structure consists of two U 200 beams 4.1, on the outside of which is a sheet metal web of 8 χ 80 mm was welded on. To stabilize the sheet metal web, triangles are welded on top and bottom. At cen Set up. where the supporting structure rests on the wall slide, there are hooks on the supporting structure 4.4 attached, on which the supporting structure can be hung from a heavy-duty crane. To be exact To ensure the spacing of the supporting structure, all Mfcter is a spacer 4.2 in the U 200 girders 4.1 inserted. The spacers are of different lengths for each wall thickness to be built, and behave similarly it is the same with the temples 4, 3, as they are also of different lengths for each wall thickness. At the Büreln two pieces are required per '.' «and thickness. you will be at the Kauertrsns-oort needed to twist the U 200-TrKger 4.1 during transport. To be the brackets 4.3 are only attached to the U 200 Trh'ger 4.1 in front of the transport and behind the Kauer. Ie that Masonry before ripping apart at.-IusEnarunren To protect (windows, doors) during transport,
- Ί4 -- Ί4 -
BAD ORIGINALBATH ORIGINAL
werden in die Einlegehaken 4,6 der Seile des Schwerlastkranträgers 4,8 Verspannstäbe 4,5 gelegt, Bleche vorne und hinter den Aussparungen sowie an die Mauerenden eingelegt und die Bleche mit Verspannschrauben 4,7 fest an die Laibungen gedrückt. So wird das Mauerwerk für den (Transport fest verspannt und kann problemlos transportiert werden. Die Kauerscheibe wird jetzt an den Schwerlastkranträger 4,8 genommen und mittels Kran an die Einbaustelle befördert und sogleich gesetzt. Als Vorarbeit auf den Einbaustellen der Mauer ist es notwendig, die unterste Ziegelreihe -mindestens 11,5 cm hoch zuzüglich oberes Mörtelbett- bereits anzulegen, da die Tragkonstruktion sonst nicht verwendet werden kann. Dies ist aber nicht von Kachteil, da eventuelle Türaussparungen so präzise angelegt werden können, was das Einrichten der Mauer sehr erleichtert.. Sobald die Mauer aufsitzt, werden die Seile des Kranträgers 4,8 aus den Haken 4,4 ausgehängt und die Tragkonstruktion samt Verspannschrauben und Aussparungsblechen 4,7 abgebaut. Nun werden die Bügel 4,3 abgenommen, die Abstandhalter 4,2 gezogen und die beiden Wandtrager '4,1 erneut zur Mauermaschine gebracht. Dort werden sie erneut auf dem Mauerschlitten 5 zusammengebaut. bracing rods 4.5 are placed in the insertion hooks 4.6 of the ropes of the heavy-duty crane girder 4.8 bracing rods 4.5, sheets are inserted in front and behind the recesses and at the wall ends and the sheets are pressed firmly against the soffits with bracing screws 4.7. The stonework of the (transport is firmly clamped and can be transported easily. The Kauer disc will now be made to the heavy-duty crane girder 4.8 and transported by crane to the installation site and immediately set. In preparation to the locations of the wall it is necessary that The lowest row of bricks - at least 11.5 cm high plus the upper mortar bed - is to be laid out as the supporting structure cannot otherwise be used. As soon as the wall sits down, the ropes of crane girder 4.8 are unhooked from hooks 4.4 and the supporting structure including bracing screws and recess plates 4.7 are dismantled.Now the brackets 4.3 are removed, the spacers 4.2 are pulled and the two of them Wall supports' 4, 1 are brought back to the masonry machine, where they are reassembled on the masonry slide 5.
Bs ist ersichtlich, daß durch die erfindungsgemäße Maschine jedes beliebige Kauermuster erstellt werden kann, unabhängig wie £roß die Fenster-, Tür- oder sonstigen Haueröffnungen sind. Bs can be seen that any pattern may Kauer by the inventive machine are created, regardless of how £ Ross the window, door or other openings are Hauer.
Die Maschine arbeitet mit einem Minimum an Bedienungsaufwand und ist, wie dies bei Baukränen bekannt ist, leicht verfahrbar und damit schnell an den verschiedenenThe machine works with a minimum of operating effort and, as is known from construction cranes, is easy to move and therefore quick to access the various
Baustellen aufbaubar.Buildable construction sites.
- 15 -- 15 -
MACHGKREiCHT jMACHGKREICHT j
Weitere Einzelheiten der Erfindung ergeben sich aus den nachfolgenden ausführlichen Zeichnungen, in denen eine bevorzugte Ausführungsform der Erfindung beispielsweise veranschaulicht ist.Further details of the invention emerge from the following detailed drawings, which illustrate, for example, a preferred embodiment of the invention.
Fig. 1 Die RollenbahnFig. 1 The roller conveyor
Quer-Schnitt und Längs-SchnittCross cut and lengthwise cut
2 Der Ziegelgreifer Fig. 2a Längs-Schnitt2 The brick gripper Fig. 2a Longitudinal section
Fig. 2b Quer-Schnitt bei Aufhängevorrichtung Fig. 2c Quer-Schnitt bei lufthyraulischem ZylinderFig. 2b cross section with suspension device Fig. 2c cross section with air hydraulic cylinder
3 Der Mörtelschlitten Fig. 3a Quer-Schnitt Fig. 3b Ansicht3 The mortar sledge Fig. 3a Cross section Fig. 3b view
Fig. 3c Längs-SchnitteFig. 3c longitudinal sections
4- Die Tragkonstruktion Fig. 4a Quer-Schnitt, Zusammengebauter Zustand4- The supporting structure Fig. 4a Cross-section, assembled state
Fig. ^b Abstandhalter, U-Träger mit Blechsteg, Längs- und Querschnitt mit Kranträger und fertiger WandscheibeFig. ^ B spacer, U-beam with sheet metal web, Longitudinal and cross-section with crane girder and finished wall panel
Fig. 5 Der MauerschlittenFig. 5 The wall sledge
Draufsicht mit Umlenkrollen Fig. 6 Ansicht der Mauermaschine von hintenTop view with pulleys Fig. 6 View of the masonry machine from behind
im betriebsbereiten Zustand Fig. 7 Ansicht der Mauermaschine von der Seitein the ready-to-operate state FIG. 7 view of the masonry machine from the side
im betriebsbereiten Zustandin operational condition
8 Auflistung der Ziegelformate, die mit8 List of tile formats that can be used with
der Kauermaschine vermauert werden könnenthe chewing machine can be walled up
Krämer Albert Dipl.Ing(FH) Lettenstr. 17 84-79 MuschenriedKrämer Albert Dipl.Ing (FH) Lettenstr. 17 84-79 Muschenried
- 16 -- 16 -
Leerseite -Blank page -
Claims (1)
Bie Rollenbahn 1Apparatus for carrying out the method according to claim 1
At roller conveyor 1
Der Ziegelgreifer 2Apparatus for carrying out the method according to claim 1
The brick grab 2
Lettenstr. 17Albert Kramer
Lettenstrasse 17th
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19863602004 DE3602004A1 (en) | 1986-01-23 | 1986-01-23 | Masonry-wall machine - process for the location-independent erection of masonrywork with conventional bricks, consisting of the usual materials, and normal masonry mortar, including the application of the first plaster layer (spray application) |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19863602004 DE3602004A1 (en) | 1986-01-23 | 1986-01-23 | Masonry-wall machine - process for the location-independent erection of masonrywork with conventional bricks, consisting of the usual materials, and normal masonry mortar, including the application of the first plaster layer (spray application) |
Publications (1)
Publication Number | Publication Date |
---|---|
DE3602004A1 true DE3602004A1 (en) | 1986-10-30 |
Family
ID=6292481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19863602004 Ceased DE3602004A1 (en) | 1986-01-23 | 1986-01-23 | Masonry-wall machine - process for the location-independent erection of masonrywork with conventional bricks, consisting of the usual materials, and normal masonry mortar, including the application of the first plaster layer (spray application) |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE3602004A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112012434A (en) * | 2020-08-09 | 2020-12-01 | 杭州旭京装饰工程有限公司 | Efficient ceramic tile starching equipment |
CN114482579A (en) * | 2022-01-11 | 2022-05-13 | 谢新苟 | Red brick mortar paints device for construction |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT247768B (en) * | 1963-12-23 | 1966-06-27 | Schach Alfred | Method and device for the production of prefabricated, preferably story-high brick slabs |
DE2215661A1 (en) * | 1972-03-27 | 1973-10-04 | Alfred Dr Schach | PROCESS FOR MANUFACTURING PREFERRED FLOOR-HIGH BRICK PANELS AND DEVICE FOR CARRYING OUT THE PROCESS |
US3834973A (en) * | 1973-01-02 | 1974-09-10 | Storer & Sons Co Sa | Apparatus for fabricating modular wall sections |
DE2538829A1 (en) * | 1974-09-02 | 1976-03-11 | Bates Ventilsaekke | METHOD AND DEVICE FOR LAYING BRONES ON A HORIZONTAL SURFACE |
DE2632086B1 (en) * | 1976-07-16 | 1978-01-19 | Lingl Anlagenbau | PROCESS AND DEVICE FOR THE AUTOMATIC PRODUCTION OF ROWS OF BRICKS COATED WITH MOERTEL FROM LARGE BLOCK BRICKS |
DE2654584A1 (en) * | 1976-12-02 | 1978-06-08 | Alfred Dr Schach | Prefabricating plant for large masonry walls - has frame and crane for handling and holding composite wall section (NL 6.6.78) |
DE3136102A1 (en) * | 1981-09-11 | 1983-03-24 | Mauer-Blitz Bau-Service GmbH, 4670 Lünen | Small crane for laying blocks, especially large-sized wall blocks, in layers |
DE8423232U1 (en) * | 1984-08-04 | 1984-12-20 | Mauer-Blitz Bau-Service GmbH, 4670 Lünen | STONE LAYER GRIPPER |
DE3406108A1 (en) * | 1984-02-21 | 1985-08-22 | Ernst Riffel | Apparatus for applying mortar to a masonry structure |
DE3406965A1 (en) * | 1984-02-25 | 1985-08-29 | SÜBA-Cooperation Gesellschaft für Bauforschung, Bauentwicklung und Franchising mbH, 6832 Hockenheim | SEMI-AUTOMATIC SETTING DEVICE FOR BLOCKS |
-
1986
- 1986-01-23 DE DE19863602004 patent/DE3602004A1/en not_active Ceased
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT247768B (en) * | 1963-12-23 | 1966-06-27 | Schach Alfred | Method and device for the production of prefabricated, preferably story-high brick slabs |
DE2215661A1 (en) * | 1972-03-27 | 1973-10-04 | Alfred Dr Schach | PROCESS FOR MANUFACTURING PREFERRED FLOOR-HIGH BRICK PANELS AND DEVICE FOR CARRYING OUT THE PROCESS |
US3834973A (en) * | 1973-01-02 | 1974-09-10 | Storer & Sons Co Sa | Apparatus for fabricating modular wall sections |
DE2538829A1 (en) * | 1974-09-02 | 1976-03-11 | Bates Ventilsaekke | METHOD AND DEVICE FOR LAYING BRONES ON A HORIZONTAL SURFACE |
DE2632086B1 (en) * | 1976-07-16 | 1978-01-19 | Lingl Anlagenbau | PROCESS AND DEVICE FOR THE AUTOMATIC PRODUCTION OF ROWS OF BRICKS COATED WITH MOERTEL FROM LARGE BLOCK BRICKS |
DE2654584A1 (en) * | 1976-12-02 | 1978-06-08 | Alfred Dr Schach | Prefabricating plant for large masonry walls - has frame and crane for handling and holding composite wall section (NL 6.6.78) |
DE3136102A1 (en) * | 1981-09-11 | 1983-03-24 | Mauer-Blitz Bau-Service GmbH, 4670 Lünen | Small crane for laying blocks, especially large-sized wall blocks, in layers |
DE3406108A1 (en) * | 1984-02-21 | 1985-08-22 | Ernst Riffel | Apparatus for applying mortar to a masonry structure |
DE3406965A1 (en) * | 1984-02-25 | 1985-08-29 | SÜBA-Cooperation Gesellschaft für Bauforschung, Bauentwicklung und Franchising mbH, 6832 Hockenheim | SEMI-AUTOMATIC SETTING DEVICE FOR BLOCKS |
DE8423232U1 (en) * | 1984-08-04 | 1984-12-20 | Mauer-Blitz Bau-Service GmbH, 4670 Lünen | STONE LAYER GRIPPER |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112012434A (en) * | 2020-08-09 | 2020-12-01 | 杭州旭京装饰工程有限公司 | Efficient ceramic tile starching equipment |
CN114482579A (en) * | 2022-01-11 | 2022-05-13 | 谢新苟 | Red brick mortar paints device for construction |
CN114482579B (en) * | 2022-01-11 | 2023-12-22 | 江西盛鼎环保科技有限公司 | Red brick mortar smearing device for building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1584691A1 (en) | Machine and method for producing concrete structural parts | |
EP0225893A1 (en) | Process and device for constructing wall sections from building blocks. | |
AT247768B (en) | Method and device for the production of prefabricated, preferably story-high brick slabs | |
AT253200B (en) | Method and device for producing masonry from building blocks | |
DE2257768A1 (en) | PLANT FOR PRODUCING PRE-FABRICATED CONCRETE PARTS | |
DE10019050C1 (en) | Platform for building bridges, has a central section for preparing a sandwich panel base, which comprises a front platform for assembling steel sections and rear platform for fitting cantilever components | |
DE3602004A1 (en) | Masonry-wall machine - process for the location-independent erection of masonrywork with conventional bricks, consisting of the usual materials, and normal masonry mortar, including the application of the first plaster layer (spray application) | |
DE1808989A1 (en) | Device for the production of monolithic, room-sized structures made of reinforced concrete, in particular prefabricated reinforced concrete garages | |
DE19544557C1 (en) | Shuttering wagon to form concrete carriageway slabs on steel bridges | |
DE2646496B2 (en) | Facility for the continuous expansion of a line with a door frame expansion | |
DE4028884C2 (en) | Device and method for producing vertical wall elements from masonry | |
DE2654584A1 (en) | Prefabricating plant for large masonry walls - has frame and crane for handling and holding composite wall section (NL 6.6.78) | |
AT263597B (en) | Method and device for manufacturing large components | |
EP0872609B1 (en) | Method of making a layered wall-slab | |
DE102004026574B4 (en) | Support plate for supporting a roof jib on a building roof | |
DE1683884C (en) | Distribution device for aggregates for connection to concrete mixers | |
DE2344719C3 (en) | Device for the prefabrication of prefabricated bricks | |
DE2411773C3 (en) | Lifting device for carrying out a method for creating multi-storey buildings | |
WO2024141252A1 (en) | Platform for an elevator system for a building which is under construction | |
DE923995C (en) | Concrete floor ceiling with prefabricated reinforced concrete beams and fillers as well as auxiliary equipment for laying the reinforced concrete beams | |
DE2229979A1 (en) | MOBILE DEVICE FOR THE PRODUCTION OF COMPONENTS | |
DE1559159A1 (en) | Parking for vehicles | |
DE2037360A1 (en) | Large area formwork and method for its formwork | |
DE805930C (en) | Method and device for the mechanical erection of masonry | |
DE844814C (en) | Steel stone beam and method for its manufacture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OAV | Applicant agreed to the publication of the unexamined application as to paragraph 31 lit. 2 z1 | ||
OP8 | Request for examination as to paragraph 44 patent law | ||
8131 | Rejection |