DE3400392C2 - Device for setting measuring points and for setting distances and directions - Google Patents

Device for setting measuring points and for setting distances and directions

Info

Publication number
DE3400392C2
DE3400392C2 DE19843400392 DE3400392A DE3400392C2 DE 3400392 C2 DE3400392 C2 DE 3400392C2 DE 19843400392 DE19843400392 DE 19843400392 DE 3400392 A DE3400392 A DE 3400392A DE 3400392 C2 DE3400392 C2 DE 3400392C2
Authority
DE
Germany
Prior art keywords
marking
plate
pipe section
floor
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE19843400392
Other languages
German (de)
Other versions
DE3400392A1 (en
Inventor
Petrus Antonius Johannes Hoof
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of DE3400392A1 publication Critical patent/DE3400392A1/en
Application granted granted Critical
Publication of DE3400392C2 publication Critical patent/DE3400392C2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/02Means for marking measuring points

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Die Erfindung betrifft eine Vorrichtung zum Festlegen von Meßpunkten und zur Festlegung von Abständen und Richtungen beim Errichten eines mehrstöckigen Gebäudes.The invention relates to a device for setting Measuring points and to determine distances and directions for Construction of a multi-story building.

Bisher hat es beim Errichten von Gebäuden in bezug auf die Ausführung von Messungen meistens keine festen Richtlinien gegeben. Die Festlegung bestimmter Stellen zum Anbringen von Bauteilen o. dgl. erfolgt mittels Markierungen, welche mit Nägeln, Sägeschnitten und/oder Bleistiftstrichen auf bereits vorhandenen fertigen Teilen des Gebäudes oder auf Brettern, Balken o. dgl. in bekannter Weise angebracht werden. Die Verwendung solcher Markierungen ergibt jedoch Ungenauigkeiten, da die Stellen solcher Markierungen nicht gut gesichert sind bzw. die Markierungen während der Bauarbeit völlig verloren gehen. Andererseits stellt die zunehmende Anwendung vorgefertigter Einzelteile an deren Maßgenauigkeit hohe Anforderungen, da sonst beim Montieren der vorgefertigten Einzelteile Schwierigkeiten auftreten können.So far it has been when building buildings in relation to the Execution of measurements mostly no fixed guidelines given. The establishment of certain places for attaching Components or the like are made by means of markings, which with Nails, saw cuts and / or pencil strokes on already existing finished parts of the building or on boards, Beams or the like can be attached in a known manner. The However, using such markers will result in inaccuracies, because the locations of such markings are not well secured or completely lost the markings during construction go. On the other hand, the increasing application prefabricated individual parts with high dimensional accuracy  Requirements, otherwise when assembling the prefabricated Items may experience difficulties.

Ein Verfahren zum Festlegen von Meßpunkten beim Errichten eines mehrstöckigen Gebäudes ist aus der DE-Z "Vermessungstechnik", (1977), Heft 12, Seiten 420 bis 422 bekannt. Dort kommt eine Vorrichtung zur Anwendung, die eine Grundplatte mit einer Zentrierschiene aufweist. An der Zentrierschiene ist ein Steckzapfen mit Zentrierkreuz vorgesehen.A method of setting measurement points when building a multi-storey building is from DE-Z "surveying technology", (1977), issue 12, pages 420 to 422. There comes one Device for use, which has a base plate with a Centering rail has. There is a on the centering rail Spigot provided with centering cross.

Der Erfindung liegt die Aufgabe zugrunde, eine Vorrichtung der eingangs genannten Art zu schaffen, mit welcher in einfacher Weise während der ganzen Bauarbeit eine gute Meßgenauigkeit gewährleistet wird.The invention has for its object a device to create the type mentioned, with which in easier A good measuring accuracy during the whole construction work is guaranteed.

Diese Aufgabe wird erfindungsgemäß durch die Merkmale des Kennzeichenteiles des Anspruchs gelöst.This object is achieved by the features of Characteristic part of the claim solved.

Die erfindungsgemäße Vorrichtung, d. h. die Markiervorrichtung wird in folgender Weise angewandt: Zunächst wird am zuerst ausgebildeten Fußboden oder auf einer ähnlichen horizontalen Konstruktion an mindestens einer bestimmten Stelle eine Markierung in Form eines Rohrstückes und in jedem darüberliegenden Fußboden oder einer ähnlichen horizontalen Konstruktion des mehrstöckigen Gebäudes über diesem Rohrstück im Fußboden ein Durchgang mittels eines mit dem ersten Rohrstück koaxial angeordneten Rohrstücks vorgesehen.The device according to the invention, i. H. the marking device is used in the following way: First is on first trained floor or on a similar horizontal Construction in at least one specific place Marking in the form of a piece of pipe and in each overlying floor or a similar horizontal Construction of the multi-storey building above this pipe section in the Floor a passage by means of a with the first pipe section coaxially arranged pipe section provided.

Das zuerst z. B. auf dem unteren Fußboden angebrachte Rohrstück bildet dabei einen während der ganzen Bauarbeit aufrechtzuerhaltenden Ausgangspunkt, während auf jedem darüberliegenden Etagenboden ein lotrecht darüberliegender Hilfsausgangspunkt vorgesehen wird, von dem ausgehend in der entsprechenden horizontalen Ebene eines darüberliegenden Etagenbodens Messungen durchgeführt werden können. Solche in den Fußböden untergebrachte Markierstellen gehen in vorteilhafter Weise während der Bauarbeit nicht verloren und lassen sich somit wiederholt als Ausgangspunkt zum Durchführen von Messungen benutzen.The first z. B. pipe piece attached to the lower floor forms one during the whole construction work sustainable starting point while on everyone a floor above the one above Auxiliary starting point is provided, from which in the corresponding horizontal level of an overlying one  Floor measurements can be carried out. Such in the Marking points housed on floors are more advantageous Way not lost during construction and can be thus repeated as a starting point for performing Use measurements.

Die zuerst anzubringende Markiereinrichtung kann unter Anwendung der Einkerbungen z. B. genau auf zwei zueinander senkrechten Maßlinien aufgelegt werden, während bei darüberliegenden Fußböden infolge der exzentrischen Lage der das Rohrstück tragenden Platte die Platte möglichst derart aufgestellt wird, daß das unter dieser Platte liegende Loch möglichst verschlossen wird.The marking device to be attached first can be found under Application of the notches z. B. exactly two to each other vertical dimension lines are placed, while at overlying floors due to the eccentric location of the the plate carrying the pipe piece the plate as possible is set up that the hole under this plate is closed as possible.

Ausführungsbeispiele der Erfindung sind in der Zeichnung dargestellt und werden nachfolgend beschrieben. Es zeigen:Embodiments of the invention are in the drawing are shown and are described below. Show it:

Fig. 1 eine Markiereinrichtung in einer perspektivischen Ansicht ohne die Darstellung eines zugehörigen Markierelementes, Fig. 1 shows a marking device in a perspective view without the appearance of an associated marking element,

Fig. 2 eine Draufsicht auf die Einrichtung nach Fig. 1 mit einer auf einem Einzelteil des Gebäudes angebrachten Meßlinie, Fig. 2 is a plan view of the device of FIG. 1 with a mounted on a single part of the building measuring line,

Fig. 3 eine perspektivische Darstellung einer Markiereinrichtung mit einer Klemmeinrichtung, mittels der die Markiereinrichtung temporär fixiert werden kann, Fig. 3 is a perspective view of a marking device with a clamping device by means of the marking device can be temporarily fixed,

Fig. 4 eine perspektivische Ansicht eines Markierelementes der Markiereinrichtung, Fig. 4 is a perspective view of a marking element of the marking,

Fig. 5 eine räumliche und teilweise aufgeschnittene Ansicht des in Fig. 4 dargestellten Markierelemen­ tes in einer um 180° umgedrehten Stellung, Fig. 5 a perspective and partly cutaway view of the Markierelemen shown in Fig. 4 tes in a 180 ° inverted position,

Fig. 6 eine Draufsicht auf ein erfindungsgemäßes Mar­ kierelement, das mit einem Meßband gemeinsam anwendbar ist, Fig. 6 is a plan view of an inventive kierelement Mar, which is commonly applicable to a measuring belt,

Fig. 7 einen Schnitt durch das Markierelement gemäß Fig. 6, Fig. 7 is a section through the marking element according to FIG. 6,

Fig. 8 ein Markierelement gemäß den Fig. 6 und 7 mit einem Teil eines an diesem Markierelement fest­ geklemmten Meßbandes, Fig. 8 is a marking element according to FIGS. 6 and 7 with a portion of the clamped at this marker measuring band,

Fig. 9 eine räumliche Darstellung eines Teiles einer Bodenverschalung und eine daran zu befestigende Platte mit dem dabei benutzten Markierelement, Fig. 9 shows a spatial representation of a portion of a bottom slab and a fact plate to be fastened with the marker used therein

Fig. 9A eine Draufsicht auf das in Fig. 9 dargestellte Markierelement, FIG. 9A is a plan view of that shown in Fig. 9 marker,

Fig. 10 eine räumliche Darstellung der zur Bildung eines Durchgangs in einem Etagenboden verwendeten Ein­ richtungen, Fig. 10 senses a spatial representation of the one used for forming of a passage in a floor surface,

Fig. 11 den durch die in Fig. 10 dargestellten Einrichtungen hergestellten Durchgang mit Ausnehmung in einem Etagenboden, Fig. 11 through the in Fig. 10 produced devices illustrated with passage recess in a floor surface,

Fig. 12 eine Draufsicht auf eine Einstellvorrichtung zum Einstellen eines Rohrstückes an der richtigen Stelle eines Etagenbodens, Fig. 12 is a plan view of a setting device for setting a piece of pipe in place of a floor surface,

Fig. 13 einen Schnitt durch das Rohrstück längs der Linie XIII-XIII in Fig. 12 gemeinsam mit einer anzu­ bringenden Markiereinrichtung und dem dabei zu verwendenden Markierelement, Fig. 13 is a section through the pipe section along the line XIII-XIII in Fig. 12 to, together with a marker-bearing and thereby to be used marker

Fig. 14 einen Schnitt längs der Linie XIV-XIV in Fig. 12, Fig. 14 shows a section along the line XIV-XIV in Fig. 12,

Fig. 15 einen Schnitt längs der Linie XV-XV in Fig. 12, Fig. 15 shows a section along the line XV-XV in Fig. 12,

Fig. 16 eine Draufsicht auf einen Sperr- und Markier­ pfropfen, Figure 16 is a plan view graft. A locking and marking,

Fig. 17 einen Schnitt längs der Linie XVII-XVII in Fig. 16, Fig. 17 shows a section along the line XVII-XVII in Fig. 16,

Fig. 18 eine Draufsicht auf ein Markierelement zum Anbrin­ gen eines Durchgangs in einer auf einem Boden anzubringenden Abdeckschicht, Fig. 18 is a plan view of a marker gene for Anbrin a passage in a mounted on a floor covering,

Fig. 19 einen Schnitt längs der Linie XIX-XIX in Fig. 18, Fig. 19 shows a section along the line XIX-XIX in Fig. 18,

Fig. 20 einen Schnitt durch einen Teil eines Bodens mit einer darauf angebrachten Abdeckschicht, in der ein Durchgang vorgesehen ist, Fig. 20 shows a section through a part of a floor covering with a mounted thereon, in which a passage is provided,

Fig. 21 eine Ansicht eines Stativs im Zusammenhang mit der Erfindung, Fig. 21 is a view of a stand in connection with the invention,

Fig. 22 eine Seitenansicht des Stativs nach Fig. 21 mit einem darauf angebrachten Theodoliten, Fig. 22 is a side view of the stand according to FIG. 21 with a theodolite mounted thereon,

Fig. 23 eine Draufsicht auf das Stativ nach Fig. 21. Fig. 23 is a plan view of the stand according to Fig. 21.

Beim Einsatz der Markiereinrichtung nach der Erfindung wird auf einem zuerst hergestellten, horizontalen Konstruk­ tionsteil des Gebäudes z. B. auf dem unteren Fußboden mindestens eine Markierstelle mittels der in den Fig. 1 und 2 dargestellten Markiereinrichtung angebracht. When using the marking device according to the invention on a first manufactured, horizontal construction part of the building z. B. at least one marking point on the lower floor by means of the marking device shown in FIGS. 1 and 2.

Diese Markiereinrichtung besteht aus einer dünnen, runden Platte 1, in der ein Loch 2 vorgesehen ist. Aus den Fig. 1 und 2 geht hervor, daß das Loch 2 zum Mittel­ punkt der Platte 1 exzentrisch angeordnet ist. Im Be­ grenzungsrand des Loches 2 sind vier V-förmige Einker­ bungen 3 derart vorgesehen, daß diese um einen Winkel von 90° gegeneinander versetzt sind. Ferner ist an der Platte 1 ein Rohrstück 4 befestigt, das zur Mittellinie des Loches 2 koaxial angeordnet ist.This marking device consists of a thin, round plate 1 , in which a hole 2 is provided. From Figs. 1 and 2, it is apparent that the hole 2 is to the middle of the plate 1 point arranged eccentrically. In the boundary of the hole 2 Be four V-shaped Einker exercises 3 are provided such that these are offset from one another by an angle of 90 °. Furthermore, a piece of pipe 4 is attached to the plate 1 , which is arranged coaxially to the center line of the hole 2 .

Die Fig. 2 zeigt, daß die Mitte des Ausgangspunktes für die Messungen mit zwei zueinander senkrechten Markier­ linien 5 und 6 angegeben werden kann, wobei mittels der Einkerbungen 3 die in den Fig. 1 und 2 dargestellten Markiereinrichtung derart eingestellt werden kann, daß die Mitte des Loches 2 und die Mittellinie des Rohrstückes 4 lotrecht über dem Schnittpunkt der Linien 5 und 6 zur Anlage kommen. Fig. 2 shows that the center of the starting point for the measurements with two mutually perpendicular marking lines 5 and 6 can be specified, the marking device shown in FIGS . 1 and 2 can be adjusted by means of the notches 3 so that the center of the hole 2 and the center line of the pipe section 4 perpendicular to the intersection of lines 5 and 6 come to rest.

Für eine gute Fixierung der Markiereinrichtung kann ein L-förmiger Klemmstreifen 7 benutzt werden, der an einem Ende eine Ausnehmung zur Aufnahme des oberen Endes des Rohres 4 aufweist. Durch ein im horizontalen Schenkel des Klemmstreifens 7 vorgesehenes Langloch 8 ist eine Klemm­ schraube 9 geführt, die z. B. in eine im unteren Betonbo­ den vorhandene Buchse eingeschraubt ist. Wenn durch Ver­ drehung und Verschiebung des Klemmstreifens 7 in Bezug zum Bolzen 9 das Rohr 4 in die richtige Stellung geführt ist, kann das Rohr 4 in dieser Stellung durch Festziehen der Klemmschraube 9 fixiert werden. Anschließend kann rings um die Platte 1 und das Rohr 4 Mörtel angebracht werden. Nach dem Erhärten des Mörtels ist das Rohr 4 an der gewünschten Stelle im Gebäude fixiert, worauf die Klemmschraube 9 und der Klemmstreifen 7 entfernt werden können.For a good fixation of the marking device, an L-shaped clamping strip 7 can be used, which has a recess at one end for receiving the upper end of the tube 4 . Through a provided in the horizontal leg of the clamping strip 7 slot 8 , a clamping screw 9 is guided, the z. B. is screwed into an existing socket in the lower concrete bo. If rotation by locking and displacement of the clamping strip 7 is guided in relation to the bolt 9, the tube 4 in the proper position, the tube 4 can be fixed in this position by tightening the clamping screw. 9 Then mortar can be applied around the plate 1 and the pipe 4 . After the mortar has hardened, the pipe 4 is fixed at the desired location in the building, after which the clamping screw 9 and the clamping strip 7 can be removed.

Meistens werden mehrere solcher Markiereinrichtungen am unteren Fußboden oder dgl. an vorgewählten Punkten angebracht.Most often there are several such marking devices on the lower floor or the like at selected points appropriate.

Zum Durchführen von diesen durch die Rohrstücke 4 gebildeten Markierstellen ausgehenden Messungen kann z. B. ein Markierelement nach den Fig. 4 und 5 benutzt werden. Dieses Markierelement weist einen ringförmigen Kör­ per 10 auf, der an einem Ende durch eine Querwand 11 ab­ geschlossen ist, in deren Mitte ein kleiner Durchgang 12 vorgesehen ist. Der ringförmige Körper 10 ist derart aus­ gebildet, daß der Durchmesser seines Außenumfangs wenig­ stens nahezu gleich dem Innendurchmesser des Rohrstücks 4 ist, so daß der Körper 10 im Rohrstück 4 eng passend ver­ schiebbar ist. Zwischen den Enden ist der Körper 10 noch mit einem umlaufenden vorstehenden Kragen 13 versehen, so daß es möglich ist, den ringförmigen Körper in zwei um 180° umgedrehten Stellungen in das offene obere Ende des Rohrstückes 4 zu schieben, bis der als Anschlag wirkende ringförmige Kragen 13 auf dem oberen Rand des Rohrstückes 4 anliegt.To carry out these outgoing measurements formed by the pipe sections 4 marking points z. B. a marking element according to FIGS. 4 and 5 can be used. This marking element has an annular Kör by 10 , which is closed at one end by a transverse wall 11 , in the middle of which a small passage 12 is provided. The annular body 10 is formed in such a way that the diameter of its outer circumference is little least almost equal to the inner diameter of the pipe section 4 , so that the body 10 in the pipe section 4 is slidably fitted ver. Between the ends, the body 10 is also provided with a circumferential projecting collar 13 , so that it is possible to push the annular body in two positions turned through 180 ° into the open upper end of the pipe section 4 until the annular collar acting as a stop 13 rests on the upper edge of the pipe section 4 .

Das in den Fig. 4 und 5 dargestellte Markierelement ist ferner mit einem über die Wand überstehenden Ansatz 14 versehen, von dem sich eine Begrenzungsfläche 15 diametral durch die Mittellinie des ringförmigen Körpers 10 und durch die damit zusammenfallende Mittellinie des Loches 12 er­ streckt. Auf der Begrenzungsfläche 15 sind Markierzeichen 16 angebracht.The marking element shown in FIGS. 4 and 5 is also provided with a projection 14 projecting from the wall, of which a boundary surface 15 extends diametrically through the center line of the annular body 10 and through the center line of the hole 12 coinciding therewith. Marking marks 16 are attached to the boundary surface 15 .

Der Ansatz 14 ist ferner mit zwei vorstehenden Nasen 17 versehen, die eine V-förmige Einkerbung 18 begrenzen, die sich senkrecht zur Begrenzungsfläche 16 erstreckt.The extension 14 is further provided with two protruding lugs 17 which delimit a V-shaped notch 18 which extends perpendicular to the boundary surface 16 .

Das in den Fig. 4 und 5 dargestellte Markierelement kann mit dem nach Fig. 4 unteren Teil des zylinder­ förmigen Körpers 10 in ein im Boden festgesetztes Rohr­ stück 4 geschoben werden, wobei der Ansatz 14 über die Bodenfläche herausragt. Die Markierungen 16 können z. B. zum Festlegen von Richtungen mittels eines auf dem be­ treffenden Boden angebrachten Theodoliten benutzt wer­ den. Durch die Einkerbung 18 kann auch ein Meßdraht geführt werden.The marking element shown in FIGS . 4 and 5 can be pushed with the lower part of the cylindrical body 10 according to FIG. 4 into a pipe 4 fixed in the bottom, the extension 14 projecting over the bottom surface. The marks 16 can e.g. B. for setting directions by means of a beod attached to the ground the who used the. A measuring wire can also be passed through the notch 18 .

Wenn das Markierelement in der in Fig. 5 angegebenen Stellung auf ein Rohrstück 4 gesetzt wird, kommt der Ansatz 14 in diesem Rohrstück zur Anlage, worauf der dann im Blickfeld liegende Durchgang 12 als Zentrierpunkt zur Aufstellung von Meßinstrumenten z. B. zum Aufstellen eines Theodo­ liten benutzt werden kann. Dabei kann zweckmäßig das in den Fig. 21 bis 23 dargestellte Stativ für den Theodoliten verwendet werden. Aus diesen Figuren geht hervor, daß dieses Stativ ein Hauptbein 19 mit einem an dessen unteren Ende befestigten Zentrierstift 20 auf­ weist. Ferner ist nahe dem unteren Ende des zentralen Beines 19 eine Wasserwaage 21 angebracht. Am oberen Ende erstreckt sich das Bein 19 bis zu einem Gewindeende 28. Von diesem oberen Ende verläuft schräg nach unten ein Arm 22. Am unteren Ende des Armes 22 ist eine zum Bein 19 senkrechte Achse 23 angeordnet. An den beiden gegenüber­ liegenden Enden der Achse 23 sind einstellbare Zentrier­ stifte 24 angeordnet. Am oberen Ende des Armes 22 ist ein Handgriff 25 befestigt. Der Arm 22 ist einstückig mit einer zur Mittellinie des Beines 19 senkrechten Stütz­ platte 26 versehen, auf die ein Theodolit 27 gestellt werden kann, was schematisch in Fig. 22 dargestellt ist. If the marking element in the position shown in Fig. 5 is placed on a pipe section 4 , the approach 14 comes to rest in this pipe section, whereupon the passage 12 then in the field of view as a centering point for setting up measuring instruments z. B. can be used to set up a Theodo liten. The stand shown in FIGS. 21 to 23 can expediently be used for the theodolite. From these figures it can be seen that this tripod has a main leg 19 with a centering pin 20 attached to its lower end. In addition, a spirit level 21 is attached near the lower end of the central leg 19 . At the upper end, the leg 19 extends to a threaded end 28 . An arm 22 runs obliquely downward from this upper end. At the lower end of the arm 22 there is an axis 23 perpendicular to the leg 19 . At the two opposite ends of the axis 23 adjustable centering pins 24 are arranged. At the upper end of the arm 22 , a handle 25 is attached. The arm 22 is integrally provided with a plate 26 perpendicular to the center line of the leg 19 , on which a theodolite 27 can be placed, which is shown schematically in FIG. 22.

Die Zentrierung dieses Theodoliten in Bezug zur Längsachse des Beines 19 erfolgt mittels des über die Stützplatte 26 vorstehenden Gewindeendes 28.The theodolite is centered in relation to the longitudinal axis of the leg 19 by means of the threaded end 28 protruding beyond the support plate 26 .

Zum Aufstellen des Theodoliten mittels des in den Fig. 21 bis 23 dargestellten Stativs wird der Zentrierstift 20 in ein Loch 12 gebracht, nachdem das in den Fig. 4 und 5 dargestellte Markierelement in ein Rohrstück 4 ge­ drückt ist. Mittels der Stifte 24 wird der Theodolit dann horizontal ausgerichtet, so daß er lotrecht über der durch das Rohrstück 4 bestimmten Mitte liegt.To set up the theodolite by means of the tripod shown in FIGS . 21 to 23, the centering pin 20 is brought into a hole 12 after the marking element shown in FIGS. 4 and 5 is pressed into a piece of pipe 4 ge. The theodolite is then aligned horizontally by means of the pins 24 , so that it lies perpendicularly above the center determined by the pipe section 4 .

Ein anderes Markierelement ist in den Fig. 6 bis 8 dargestellt.Another marking element is shown in FIGS. 6 to 8.

Dieses Markierelement ist aus einer runden Scheibe 29 aufge­ baut, deren Außendurchmesser an den Innendurchmesser eines Rohrstückes 4 angepaßt ist, so daß die Scheibe 29 in ein Rohrstück 4 einpaßbar ist. Die Scheibe 29 hat eine zen­ trale Bohrung 30 und zwei dazu parallele Gewindebohrungen 31 zur Aufnahme von Flügelschrauben 32.This marking element is built up from a round disk 29 , the outer diameter of which is adapted to the inner diameter of a pipe section 4 , so that the disk 29 can be fitted into a pipe section 4 . The disc 29 has a central bore 30 and two parallel threaded bores 31 for receiving wing screws 32nd

Mittels der Flügelschrauben 32 ist auf der Oberseite der Scheibe 29 ein Ring 33 angeordnet, dessen Außendurchmes­ ser größer ist als der Außendurchmesser der Scheibe 29, so daß der Ring 33 als Anschlag wirksam ist und beim Ein­ schieben der Scheibe 29 in das Rohrstück 4 auf dem oberen Rand des Rohrstückes 4 zur Anlage kommt.By means of the thumbscrews 32 , a ring 33 is arranged on the top of the disc 29 , the outer diameter of which is larger than the outer diameter of the disc 29 , so that the ring 33 is effective as a stop and when the disc 29 is pushed into the pipe section 4 on the top of the pipe section 4 comes to rest.

Eine Flügelschraube 22 ist durch ein in der Scheibe 29 vorgesehenes Langloch 34 und die andere Flügelschraube 32 ist durch ein weiteres, an einem Ende am Außenumfang des Ringes 33 ausmündendes Langloch 35 geführt. Nach dem Lösen der Flügelschrauben 32 kann der Ring 33 relativ ge­ gen die Scheibe 29 verdreht und in eine Stellung ver­ schoben werden, in welcher der Ring 33 wenigstens größtenteils neben der Scheibe 29 liegt, während der Ring 33 dennoch mit der Scheibe 29 verbunden ist.A wing screw 22 is guided through an elongated hole 34 provided in the washer 29 and the other wing screw 32 is guided through a further elongated hole 35 opening at one end on the outer circumference of the ring 33 . After loosening the thumbscrews 32 , the ring 33 can be rotated relatively to the disc 29 and pushed into a position in which the ring 33 is at least largely adjacent to the disc 29 , while the ring 33 is nevertheless connected to the disc 29 .

Fig. 8 zeigt, daß zwischen dem Ring 33 und der Scheibe 29 das Ende einer Meßschnur 36 festgeklemmt werden kann, so daß z. B. der Nullpunkt der Meßschnur 36 sich mit der Mittellinie der Scheibe 29 und der Bohrung 30 deckt. Nach dem Einstecken der Scheibe 29 in ein Rohr­ stück 4 können mittels dieser Meßschnur ab dieser eine Fixlage einnehmenden, durch das Rohrstück 4 gebildeten Markierstelle Abstände genau festgelegt werden. Fig. 8 shows that between the ring 33 and the disc 29, the end of a measuring cord 36 can be clamped so that, for. B. the zero point of the measuring cord 36 coincides with the center line of the disk 29 and the bore 30 . After inserting the washer 29 into a pipe piece 4 , this measuring cord can be used to precisely define distances from this marking position which takes up a fixed position and is formed by the pipe piece 4 .

Ausgehend von den z. B. auf dem unteren Fußboden ange­ brachten Markierstellen können ähnliche Markierstellen lotrecht über den auf dem unteren Boden angeordneten Markierstellen angebracht werden. Dazu wird z. B. an der Verschalungsplatte 37 eines über dem unteren Boden an­ zubringenden Etagenbodens im Bereich der in diesem Boden anzubringenden Markierung ein Loch 38 vorgesehen. Dieses Loch 38 wird mittels einer Platte 39 abgedeckt, die mit einer unterhalb der Platte 39 herausragenden Buchse 40 versehen ist. In die Buchse 40 kann ein Markierelement 41 geschoben werden. Das Markierelement 41 weist einen zylinder­ förmigen Körper 42, der mit enger Passung in das Rohr­ stück 40 eingesteckt werden kann und der am oberen Rand mit einem vorstehenden Kragen 43 versehen ist, der die Abwärtsbewegung des zylinderförmigen Körpers 42 im Rohr­ stück 40 begrenzt.Starting from the z. B. on the lower floor brought marking points, similar marking points can be attached vertically above the marking points arranged on the lower floor. For this, z. B. a hole 38 is provided on the shuttering plate 37 of a floor to be attached to the lower floor in the area of the marking to be made in this floor. This hole 38 is covered by a plate 39 , which is provided with a socket 40 which protrudes below the plate 39 . A marking element 41 can be pushed into the socket 40 . The marking element 41 has a cylindrical body 42 , which can be inserted into the tube piece 40 with a close fit and which is provided at the upper edge with a projecting collar 43 , which limits the downward movement of the cylindrical body 42 in the tube piece 40 .

Im zylinderförmigen Körper 43 sind zwei durchsichtige Schei­ ben 44 und 45 untergebracht. Die Scheibe 45 ist mit Mar­ kierungszeichen versehen, zwischen denen ein die Mitte des zylinderförmigen Körpers 43 andeutendes Kreuz (Fig. 9A) liegt.In the cylindrical body 43 , two transparent disks ben 44 and 45 are accommodated. The disc 45 is provided with markings, between which there is a cross indicating the center of the cylindrical body 43 ( FIG. 9A).

In der vorstehend beschriebenen Weise kann dann an einer z. B. auf dem unteren Boden angebrachten Markier­ stelle ein Theodolit derart aufgestellt werden, daß die Visierlinie des Theodoliten vertikal steht. Die Platte 39 wird dann solange verschoben, bis die Mitte 46 des Meßelementes 41 in der Visierlinie des Theodo­ liten liegt. Anschließend wird die Platte 39 z. B. mit Nägeln an der Verschalungsplatte 37 befestigt.In the manner described above, a z. B. on the lower floor markers put a theodolite so that the line of sight of the theodolite is vertical. The plate 39 is then moved until the center 46 of the measuring element 41 lies in the line of sight of the Theodo liten. Then the plate 39 z. B. attached with nails to the shuttering plate 37 .

An der Verschalungsplatte 37 kann mit den Markierelementen nach den Fig. 4 bis 8 und den Fig. 21 bis 23 ge­ messen werden.On the shuttering plate 37 can be measured with the marking elements according to FIGS. 4 to 8 and FIGS. 21 to 23.

Auf der Platte 39 wird ein Rohr z. B. ein Rohr 47 aus PVC angeordnet. Dazu wird die in Fig. 10 dargestellte, mit einem Gewinde versehene Stange 48 verwendet, an der zwei Scheiben 49 nahe den Enden des anzubringenden Rohres 47 angeordnet sind. Die Länge des Rohres 47 wird entsprechend der Dicke des zu gießenden Betonbo­ dens gewählt.On the plate 39 a pipe is z. B. a tube 47 made of PVC. For this purpose, the threaded rod 48 shown in FIG. 10 is used, on which two disks 49 are arranged near the ends of the pipe 47 to be attached. The length of the tube 47 is selected according to the thickness of the concrete floor to be poured.

Dabei kann das Rohr 47 dadurch an der Platte festgeklemmt werden, daß eine auf das untere Ende der Stange 48 ge­ schraubte Mutter 50 gegen ein unter der Verschalungs­ platte 37 liegendes Klemmprofil 51 festgezogen wird, das ein Langloch 52 aufweist, durch welches das untere Ende der Gewindestange 48 hindurchgeführt ist.The tube 47 can thereby be clamped to the plate in that a screwed on the lower end of the rod 48 ge nut 50 is tightened against a plate 37 under the shuttering clamping profile 51 , which has an elongated hole 52 through which the lower end of the Threaded rod 48 is passed.

Auf dem oberen Ende des Rohres 47 ruht eine runde, qua­ dratische oder rechteckige, dicke Platte 53, an deren oberer Fläche eine quadratische oder rechteckige Platte größerer Abmessungen befestigt ist. An dem außerhalb der Platte 53 liegenden Teil der Platte 54 sind an deren Unter­ seite mittels Bolzen 55 Buchsen 56 mit Innengewinde festgeklemmt.On the upper end of the tube 47 rests a round, square or rectangular, thick plate 53 , on the upper surface of which a square or rectangular plate of larger dimensions is attached. On the outside of the plate 53 part of the plate 54 55 bushings 56 with internal thread are clamped on the underside thereof.

Nachdem an den gewählten Markierstellen in der beschrie­ benen Weise die Rohrstücke 47 und die Platten 53, 54 an­ gebracht sind, kann der betreffende Etagenboden gegossen werden. Nach ausreichender Erhärtung des Betons können die Platten 53 und 54 und die Gewindestange 48 mit dem Klemmprofil 51 entfernt werden. Dabei wird, wie in Fig. 11 dargestellt ist, im fertigen Boden 57 ein Durchgang ge­ bildet, der durch das Rohr 47 und das unter der Platte 39 herausragende Rohrstück 40 festgelegt ist. Dabei endet das Rohrstück 47 nahe dem oberen Ende in der durch die Platten 53 und 54 im Boden gebildeten Ausnehmung 58, in der auch die Enden der Gewindebuchsen 56 liegen.After the pipe sections 47 and the plates 53 , 54 are brought to the selected marking points in the manner described, the respective floor can be cast. After the concrete has hardened sufficiently, the plates 53 and 54 and the threaded rod 48 with the clamping profile 51 can be removed. Here, as shown in Fig. 11, in the finished floor 57 forms a passage ge, which is defined by the tube 47 and the pipe section 40 projecting out from under the plate 39 . The pipe section 47 ends near the upper end in the recess 58 formed by the plates 53 and 54 in the bottom, in which the ends of the threaded bushings 56 also lie.

In dieser Ausnehmung 58 kann wieder eine Markiereinrichtung gemäß den Fig. 1 und 2 angebracht werden, worauf die Ausnehmung zum Fixieren dieser Markiereinrichtung mit Mörtel oder dgl. gefüllt werden kann.A marking device according to FIGS. 1 and 2 can again be attached in this recess 58 , whereupon the recess can be filled with mortar or the like for fixing this marking device.

Infolge von Bewegungen beim Gießen des Etagenbodens 57 kann jedoch nicht gewährleistet werden, daß die Mittel­ linie des Rohrstücks 40 und/oder die Mittellinie des Rohres 47 noch genau fluchtend zur Mitte des auf dem darunter liegenden Boden angebrachten Rohrstückes verlaufen, das auf diesem darunterliegenden Boden eine Markierstelle auf­ weist. Zum ortsgenauen Anbringen der Markiereinrichtung in der Ausnehmung 58 ist es zweckdienlich, die in den Fig. 12 bis 15 dargestellte Einstellvorrichtung zu verwenden.Due to movements in the casting of the floor 57 , however, it can not be guaranteed that the center line of the pipe section 40 and / or the center line of the pipe 47 are still exactly aligned with the center of the pipe section attached to the underlying floor, the one on this underlying floor Marking point on. To position the marking device in the recess 58 in a precise location, it is expedient to use the adjusting device shown in FIGS . 12 to 15.

Diese Einstellvorrichtung enthält eine Basisplatte 59, die mittels in die Gewindebuchsen 56 einschraubbaren Schraubbolzen 60 auf dem betreffenden Boden befestigt werden kann. Dabei stützt die Basisplatte 59 eine ho­ rizontale runde Stange 61 ab, die durch eine Bohrung in einem Schiebestück 62 geführt ist. In weiteren Bohrungen in diesem Schiebestück 62 sind zwei zueinander parallele zur Stange 62 senkrechte Stangen 63 und 64 angeordnet. Die Stangen 63 und 64 dienen zum Abstützen eines Trag­ stücks 65, welches ein rundes Loch 66 aufweist.This adjusting device contains a base plate 59 which can be fastened to the relevant floor by means of screw bolts 60 which can be screwed into the threaded bushings 56 . The base plate 59 supports a ho horizontal round rod 61 , which is guided through a hole in a sliding piece 62 . In further bores in this sliding piece 62 , two rods 63 and 64 which are parallel to one another and perpendicular to the rod 62 are arranged. The rods 63 and 64 serve to support a support piece 65 , which has a round hole 66 .

Aus Fig. 14 ist ersichtlich, daß die Stange 61 sich durch eine Ausnehmung in einem im Schiebestück 62 angebrachten, über einen Teil seiner Länge mit Gewinde versehenen Stift 67′ erstreckt. Wird eine auf den Stift 67′ aufgeschraubte Mutter 67 gelöst, so kann das Schiebestück 62 längs der Stange 61 verschoben werden. Wenn das Schiebestück 62 in die gewünschte Stellung gebracht ist, kann es in Bezug zur Basisplatte 59 festgeklemmt werden, indem die Mutter 67 festgezogen wird. Wenn die Mutter 67 gelöst ist, kann das Schiebestück 62 nicht nur längs der Stange 61 verscho­ ben, sondern mittels eines Bolzens 68 auch um die Mittel­ linie der Stange 61 verdreht werden, der in ein Schraub­ loch im Schiebestück 62 eingeschraubt ist und dessen unte­ res Ende auf der Basisplatte 59 aufliegt.From Fig. 14 it can be seen that the rod 61 extends through a recess in an attached in the sliding piece 62 , over part of its length threaded pin 67 '. If a dissolved on the pin 67 'screwed nut 67, the pushing piece 62 can be moved along the rod 61st When the sliding piece 62 is brought into the desired position, it can be clamped in relation to the base plate 59 by tightening the nut 67 . When the nut 67 is loosened, the sliding piece 62 can not only be moved along the rod 61 , but can also be rotated by means of a bolt 68 around the center line of the rod 61 , which is screwed into a screw hole in the sliding piece 62 and its bottom res End rests on the base plate 59 .

Wie aus Fig. 15 ersichtlich ist, ist die Stange 64 durch eine Ausnehmung in einem im Schiebestück 62 angebrachten Stift 69 geführt, der über einen Teil seiner Länge mit einem Gewinde versehen ist. Wenn eine auf den Stift 69′ aufgeschraubte Mutter 69 gelöst wird, können die Stangen 63 und 64 in ihrer Längsrichtung relativ zum Schiebestück 62 verschoben werden, wobei die Stangen 63 und 64 und das an diesen befestigte Tragstück 65 in der gewünschten Stel­ lung in Bezug zum Schiebestück 62 durch Festziehen der Mutter 69 festgeklemmt werden können. As can be seen from FIG. 15, the rod 64 is guided through a recess in a pin 69 which is fitted in the sliding piece 62 and is threaded over part of its length. If a screwed on the pin 69 'nut 69 is loosened, the rods 63 and 64 can be moved in their longitudinal direction relative to the sliding piece 62 , the rods 63 and 64 and the support piece 65 attached to this in the desired position with respect to Sliding piece 62 can be clamped by tightening the nut 69 .

Im Loch 66 des Tragstücks 65 kann ein rohrförmiger Körper 70 (Fig. 13) angebracht werden, der mit einem herausragenden Kragen 71 zur Begrenzung der Abwärts­ bewegung des Körpers 70 versehen ist. Im unteren Ende des Körpers 70 ist eine durchsichtige, mit Markier­ zeichen versehene Platte 72 angebracht, die der in Fig. 9A dargestellten Platte 45 entspricht.In the hole 66 of the support member 65 , a tubular body 70 ( Fig. 13) can be attached, which is provided with a protruding collar 71 to limit the downward movement of the body 70 . In the lower end of the body 70 , a transparent, marked with mark plate 72 is attached, which corresponds to the plate 45 shown in Fig. 9A.

Die Fig. 13 zeigt ferner, daß das untere Ende des zylin­ derförmigen Körpers 70 eng in das Rohrstück 4 einer Markiereinrichtung hineinpaßt, deren Platte 1 auf den Boden der Ausnehmung 58 gelegt ist. Fig. 13 also shows that the lower end of the cylindrical body 70 fits closely into the pipe section 4 of a marking device, the plate 1 is placed on the bottom of the recess 58 .

Durch Verschiebung des Schiebestücks 62 in Bezug zur fest angeordneten Basisplatte 59 und durch Verschiebung des Tragstückes 65 im Bezug zum Schiebestück 62 kann der Körper 70 der Markiereinrichtung 1, 4 bis in die Stellung geschoben werden, in der die Mitte der durchsichtigen Platte 72 und somit die Mittellinie des Rohres 4 genau mit dem auf dem darunterliegenden Boden befestigten Mar­ kierrohr 4 fluchtet, wobei ein Theodolit benutzt wird, der in der vorstehend beschriebenen Weise über dem auf dem darunterliegenden Boden angeordneten Rohr 4 ange­ ordnet ist.By moving the sliding piece 62 in relation to the fixed base plate 59 and by moving the support piece 65 in relation to the sliding piece 62 , the body 70 of the marking device 1, 4 can be pushed into the position in which the center of the transparent plate 72 and thus the Center line of the tube 4 exactly aligned with the attached to the underlying floor kierrohr 4 , using a theodolite, which is arranged in the manner described above above the tube 4 arranged on the underlying floor.

Nachdem das Rohr 4 in die gewünschte Stellung gebracht ist, kann das Rohr und somit die Platte 1 um die Mittellinie des Rohres 4 bis in eine Stellung gedreht werden, in der die Platte den Durchgang eines darunterliegenden Rohres 47 möglichst absperrt. Anschließend kann die Ausnehmung 58 mit Mörtel oder einem ähnlichen Material gefüllt werden, so daß nach dem Erhärten dieses Materials an dem be­ treffenden Boden eine neue Markierstelle gegeben ist, deren Ausführungsform der vorstehend beschriebenen, im unteren Boden ausgebildeten Markierstelle entspricht und die lotrecht über dieser am unteren Boden ausge­ bildeten Markierstelle angeordnet ist.After the tube 4 is brought into the desired position, the tube and thus the plate 1 can be rotated about the center line of the tube 4 to a position in which the plate blocks the passage of an underlying tube 47 as possible. Subsequently, the recess 58 can be filled with mortar or a similar material, so that after hardening of this material, a new marking point is given on the floor concerned, the embodiment of which corresponds to the marking point described above, which is formed in the lower floor, and which is perpendicular to this bottom bottom formed marking point is arranged.

Auf diese Weise können auf den übereinanderliegenden Etagenböden mehrere lotrecht übereinanderliegende, iden­ tische Markierstellen gebildet werden, von denen aus­ gehend weitere Messungen in den einzelnen horizontalen Ebenen durchgeführt werden können.In this way, the superimposed Multi-storey floors that are vertically one above the other table marking points are formed, from which going further measurements in the individual horizontal Levels can be done.

Die auf den unterschiedlichen Böden angebrachten Rohre 4 werden im allgemeinen nur im Bedarfsfall zur Durchführung von Messungen benutzt. Zum Abschirmen dieser Buchsen in den Zeiten, in denen keine Messungen durch­ geführt werden, können zweckdienlich Abdeckkappen nach den Fig. 16 und 17 benutzt werden. Eine solche Kappe ist mit einem gestuften Rohrstück 73 versehen, von dem das untere Teil mit dem kleineren Durchmesser eng passend in ein Rohrstück 4 einschiebbar ist. An das obere Ende des Rohrstückes 73 schließt sich eine von diesem Rohr­ stück außen vorstehende, ringförmige Wand 74 an, die zur Längsachse des Rohrstückes 73 senkrecht ist und die an dem von dem Rohrstück 73 abgewandten Umfangsrand in einen schräg nach unten verlaufenden Wandteil 75 übergeht, der zwei diametral einander gegenüberliegende Ausnehmungen 76 aufweist. Der Außenrand des Wandteiles 75 ist kon­ zentrisch mit der Mittellinie des Rohrteiles 73 und der untere Rand des Wandteiles 75 liegt in der gleichen Ebene wie die Schulter, die am Übergang zwischen den Teilen des Rohres 73 verschiedenen Durchmessers gebildet wird.The pipes 4 attached to the different floors are generally used only when necessary to carry out measurements. To shield these sockets at times when no measurements are being carried out, cover caps according to FIGS . 16 and 17 can expediently be used. Such a cap is provided with a stepped pipe section 73 , of which the lower part with the smaller diameter can be inserted snugly into a pipe section 4 . At the upper end of the pipe section 73 there is an annular wall 74 projecting from the outside of this pipe section, which is perpendicular to the longitudinal axis of the pipe section 73 and which merges into an obliquely downwardly extending wall part 75 on the peripheral edge facing away from the pipe section 73 , which has two diametrically opposite recesses 76 . The outer edge of the wall part 75 is con centric with the center line of the tube part 73 and the lower edge of the wall part 75 lies in the same plane as the shoulder, which is formed at the transition between the parts of the tube 73 of different diameters.

Die Kappe deckt die an der Markierstelle gebildete Öffnung im Boden vor abfließendem Wasser ab, während die Innen­ wand des Rohrteiles 4 rein gehalten wird. Es wird dabei ein freier Durchgang der Markierstelle beibehalten. Der Durchgang in der Kappe kann im Bedarfsfall noch mit einem nicht dargestellten Pfropfen abgedichtet werden.The cap covers the opening formed at the marking point in the floor from running water, while the inner wall of the tube part 4 is kept clean. A free passage of the marking point is maintained. The passage in the cap can be sealed with a plug, not shown, if necessary.

Eine auffallende Farbe der Kappe hat den Vorteil, die Markierstelle deutlich darzustellen, was von Bedeutung sein kann, um unwillkürliche Beschädigung dieser Mar­ kierstellen während der Bauarbeit zu vermeiden.A striking color of the cap has the advantage that Marking point clearly depict what matters can be to involuntary damage to this mar Avoid kier sites during construction.

Während einer bestimmten Phase im Bau werden - wie dies in Fig. 20 dargestellt ist - auf den verschiedenen Böden z. B. auf dem Etagenboden 57 häufig Abdeckschichten oder Abdeckböden 77 angebracht. Wenn die Markierstellen er­ halten bleiben sollen, können die in den Fig. 18 und 19 dargestellten Hilfsmittel benutzt werden. Diese Hilfs­ mittel enthalten ein erstes Rohrstück 78 mit einem Muffenende 79, an dessen Außenumfang vorstehende Rippen 80 angebracht sind. In dieses Muffenende 79 ist ein Ende eines weiteren Rohrstücks eingeschoben, dessen Außen­ durchmesser gleich dem Innendurchmesser des Rohrstückes 4 ist. Das Rohrstück 78 paßt eng in das Rohrstück 4 hinein.During a certain phase in construction - as shown in Fig. 20 - z. B. on the floor 57 often cover layers or cover floors 77 attached. If the marking points are to be kept, the aids shown in FIGS. 18 and 19 can be used. This auxiliary medium contain a first pipe section 78 with a sleeve end 79 , on the outer circumference of which projecting ribs 80 are attached. In this sleeve end 79 one end of another pipe section is inserted, the outer diameter of which is equal to the inner diameter of the pipe section 4 . The pipe section 78 fits tightly into the pipe section 4 .

Wie in Fig. 20 dargestellt ist, kann das Rohrstück 78 in das Rohrstück 4 so tief eingeschoben werden, daß das obere Ende des Rohrstückes 81, das im Muffenende des Rohrstücks 78 festgeleimt sein kann, mit der oberen Begrenzungsfläche der anzubringenden Abdeckschicht 77 flächig abschließt. Auf diese Weise wird in der Abdeck­ schicht 77 wieder mittels eines Rohrstückes eine Mar­ kierstelle gebildet, deren innere Abmessung gleich der inneren Abmessung der übrigen Markierstellen bilden­ den Rohrstücke 4 ist.As shown in Fig. 20, the pipe section 78 can be inserted into the pipe section 4 so deep that the upper end of the pipe section 81 , which can be glued in the socket end of the pipe section 78, is flush with the upper boundary surface of the cover layer 77 to be attached. In this way, a mar kierstelle is formed in the cover layer 77 again by means of a pipe piece, the inner dimension of the pipe pieces 4 is equal to the inner dimension of the other marking points.

Claims (1)

Markiereinrichtung zum Festlegen von Meßpunkten und zur Festlegung von Abständen und Richtungen beim Errichten eines mehrstöckigen Gebäudes, gekennzeichnet durch eine runde Platte (1) mit einem bezüglich der Mitte der Platte (1) exzentrischen Loch (2), an dessen Rand vier um 90° gegeneinander versetzte Einkerbungen (3) vorgesehen sind, wobei an der Platte (1) ein Rohrstück (4) befestigt ist, das mit der Mittellinie des Loches (2) koaxial fluchtet und das zur paßgenauen Aufnahme eines Markierelementes vorgesehen ist, das einen ringförmigen Körper mit einem zwischen seinen Enden vorstehenden Kragen (13) und nahe einem Ende eine Querwand (11) mit einer Zentrieröffnung (12) und einen Ansatz (14) mit einer diametral verlaufenden Begrenzungsfläche (15) aufweist, auf der Markierzeichen (16) vorgesehen sind, und das mit zwei vorstehenden Nasen (17) versehen ist, die eine V-förmige Einkerbung (18) begrenzen, die zur Begrenzungsfläche (15) senkrecht steht.Marking device for determining measuring points and for defining distances and directions when erecting a multi-storey building, characterized by a round plate ( 1 ) with an eccentric hole ( 2 ) with respect to the center of the plate ( 1 ), four at 90 ° against one another at the edge staggered notches ( 3 ) are provided, a tube piece ( 4 ) being fastened to the plate ( 1 ), which is coaxially aligned with the center line of the hole ( 2 ) and which is provided for precisely fitting a marking element which has an annular body with a between its ends projecting collar ( 13 ) and near one end has a transverse wall ( 11 ) with a centering opening ( 12 ) and a shoulder ( 14 ) with a diametrically extending boundary surface ( 15 ) on which marking marks ( 16 ) are provided, and that is provided with two protruding lugs ( 17 ) which delimit a V-shaped notch ( 18 ) which is perpendicular to the delimiting surface ( 15 ) stands.
DE19843400392 1983-01-15 1984-01-07 Device for setting measuring points and for setting distances and directions Expired - Fee Related DE3400392C2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL8300153A NL8300153A (en) 1983-01-15 1983-01-15 METHOD AND MEANS FOR DETERMINING MEASURING POINTS AND SETTING DISTANCES AND DIRECTION.

Publications (2)

Publication Number Publication Date
DE3400392A1 DE3400392A1 (en) 1984-07-19
DE3400392C2 true DE3400392C2 (en) 1993-10-07

Family

ID=19841241

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19843400392 Expired - Fee Related DE3400392C2 (en) 1983-01-15 1984-01-07 Device for setting measuring points and for setting distances and directions

Country Status (3)

Country Link
BE (1) BE898651A (en)
DE (1) DE3400392C2 (en)
NL (1) NL8300153A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO983663D0 (en) * 1998-08-10 1998-08-10 Steinar Vardheim membrane Protection
NL2004473C2 (en) * 2010-03-29 2011-10-03 Stephen James Bates METHOD FOR DETERMINING THE PLACE OF A MASON PROFILE TO BE ESTABLISHED AND A SOCLE TO BE USED IN THAT METHOD FOR THAT PROFILE.
CN117171853B (en) * 2023-09-15 2024-04-26 中建七局建筑装饰工程有限公司 BIM+C# based lower hanging plate forward design and construction method

Also Published As

Publication number Publication date
BE898651A (en) 1984-05-02
DE3400392A1 (en) 1984-07-19
NL8300153A (en) 1984-08-01

Similar Documents

Publication Publication Date Title
DE112010003523T5 (en) Embedded height adjustment mechanism for double-walled construction panels
DE3400392C2 (en) Device for setting measuring points and for setting distances and directions
DE2421985A1 (en) Orificed concrete slab maing appts - tapered plug forced out after casting by rotating flanged screw
EP0862047B1 (en) Device for levelling a measuring device
DE936895C (en) Method and device for measuring distances
DE4123329A1 (en) DEVICE FOR MOUNTING A DOOR FRAME IN A WALL OPENING
DE2348506C3 (en) Marking tool
DE19503408A1 (en) Building or manual template for marking or drilling jig for standard distance
EP2871497A1 (en) Method for marking a measurement point in a cast concrete ceiling and apparatus for signaling a measurement point
DE3438924A1 (en) Process for establishing corner points of structures to be erected, and instrument for carrying out this process
DE3211504C2 (en) Device for measuring doors when renovating old buildings
DE19751812A1 (en) Adjustment element for coordinate measuring machines
DE663687C (en) Device with spirit level for rough adjustment of angles with the help of a hinged ruler that can be adjusted over a degree
DE1946944U (en) KIT FOR THE PRODUCTION OF A MOLDED PIPE PIECE, IN PARTICULAR FOR WASTEWATER AND SEWER PIPES.
DE8431210U1 (en) AUXILIARY ELEMENT TO MARK A CORNER OF A CONSTRUCTION
EP0773428A1 (en) Device for making a measuring point in terrain
AT244572B (en) Device for setting end plates on pre-concreted flights of stairs
AT360200B (en) CHRISTMAS STAND
WO1996017132A1 (en) Device for marking levelling height
DE102004025242A1 (en) Vernier caliper gauge has a hollow shaft in which a moving jaw mounted on a circular shaft slides up and down, in the manner of a piston in a cylinder, with a measurement jaw extending through a slit in the hollow shaft
DE7207572U (en) Alignment device for the prefabrication of pipeline systems
DE8431209U1 (en) MEASURING POLE FOR DETERMINING THE HEIGHT OR OF THE LEVEL OF A CONSTRUCTION SECTION
DE1784920C (en) Electrode for a device for measuring the specific electrical resistance of the mix in the preparation of concrete od the like
DE1623162C (en) Measuring device for inner cones
DE3520620A1 (en) Sighting and aligning pole

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8125 Change of the main classification

Ipc: G01C 15/00

D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee