DE3201087A1 - "COMBINED TUNNEL OR SHAFT DRILLING MACHINE WITH SIMULTANEOUS SHELLING AND REINFORCEMENT OF THE SHAFT TUNNEL AND RETURN TRANSPORT OF THE EXCAVATION MATERIAL" - Google Patents

"COMBINED TUNNEL OR SHAFT DRILLING MACHINE WITH SIMULTANEOUS SHELLING AND REINFORCEMENT OF THE SHAFT TUNNEL AND RETURN TRANSPORT OF THE EXCAVATION MATERIAL"

Info

Publication number
DE3201087A1
DE3201087A1 DE19823201087 DE3201087A DE3201087A1 DE 3201087 A1 DE3201087 A1 DE 3201087A1 DE 19823201087 DE19823201087 DE 19823201087 DE 3201087 A DE3201087 A DE 3201087A DE 3201087 A1 DE3201087 A1 DE 3201087A1
Authority
DE
Germany
Prior art keywords
shaft
tunnel
drilling
plastic
combined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE19823201087
Other languages
German (de)
Inventor
Erich 6312 Laubach Bingießer
Karl 6800 Mannheim Merkle
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19823201087 priority Critical patent/DE3201087A1/en
Priority to EP83100314A priority patent/EP0084365A3/en
Publication of DE3201087A1 publication Critical patent/DE3201087A1/en
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Laser Beam Processing (AREA)

Description

Karl Merkte 8^ MannheimKarl Marked 8 ^ Mannheim

D β. 16 9 TeL (0β21)2β4β^D β. 16 9 TeL (0β21) 2β4β ^

und A/and A /

Erich Bingießer
Grüneinannsgasse 26
Laubach 1
Erich Bingießer
Grüneinannsgasse 26
Laubach 1

Kombinierte Tunnel- bzw. Schachtbohracschin.es mit- gleichzeitigem Verschc.lon und Versteifen des Schachttunnels sowie Rücktransport des Au5hubmaterials. Combined tunnel or shaft drilling machine with simultaneous locking and stiffening of the shaft tunnel and return transport of the excavation material.

Die !Combinations er findung betrifft eine Maschine, mittels der Tunnels oder Schächte ohne vorheriges Aufreißen des Abräur.unaterials (Erde, Gestein etc.) ausgenommen der Ansatz der Bohrung - in einem Arbeitsgans gebohrt, verschalt, mit 3eton, Guß oder sonstigem Baustoff versteift und kunststoffversiegelt werden, wobei gleichzeitig das aushubmaterial (Erde, Gestein ac.) beim Bohren der Tunnels herausgefördert wird.The! Combinations he invention relates to a machine by means of which tunnels or shafts without first tearing open the Abräur.unaterials (earth, rock, etc.) except for the approach of the hole - drilled in a work passage, boarded, stiffened with 3eton, cast or other building material and at the same time the excavated material (soil, rock ac.) is fed out during the drilling of the tunnels are plastic sealed.

Die !conventionalle Art der Herstellung von Tunnels oder Schächten besteht darin, daß man die Erde aufreißt, abstützt und dann den Tunnel oder Schacht einschalt und mit flüssigen oder plastischen, später hart werdenden Baustoffen ausfüllt, danach'wieder ausschalt und die entstandenen Hohlräume mit Ausfüllmaterial ausfüllt und verdichtet.The! Conventionalle way of making tunnels or shafts consists in tearing up the earth, propping it up and then turning on the tunnel or shaft and filled with liquid or plastic, later hardening building materials, then switch off again and the resulting cavities are filled with filling material and compacted.

Die bishor bekannten Verfahren sind ausgesprochen zeitaufwendig, mit hohen Lohnkosten und durch die jeweilige Absperrung des Sausektors mit Verkehrsbehinderungen und erheblichen Unannehmlichkeiten (Lärmbelästigung etc.) für die Verkehrsteilnehmer und Anwohner verbunden.The procedures known so far are pronounced time consuming, with high labor costs and by the respective cordoning off of the boating sector with traffic obstructions and considerable inconvenience (Noise pollution etc.) for road users and residents.

— 2 —- 2 -

Nach den bisher bekannten Verfahren kann auch das verwandte Schalmaterial selten nochmals eingesetzt werden.. According to previously known methods also related formwork material can be rarely used again ..

Die bisher bekanntlich anzusetzenden Material- und Lohnkosten fallen nach deu umständlichen Verfahren abgesehen von erheblichen Lärmbelästigungen und Verkehrsbehinderungen der Anwohner und Verkehrsteilnehmer - neben in Kauf zu nehmenden langen Bauzeiten erheblich ins Gewicht. Auch die Umweltbelastungen sind nach den bisherigen Verfahren außerordentlich hoch.The material and wage costs that were previously known to be applied are disregarded after cumbersome procedures of considerable noise pollution and traffic obstructions for residents and road users - In addition to the long construction times that have to be accepted, this is of considerable importance. The environmental pollution is also the same as before Procedure extraordinarily high.

Der Kombinationserfindung liegt die Aufgabe zugrunde eine kombinierte Tunnel- bzw. Schachtbohrnaschirie mit gleichzeitigem Verschalen und Versteifen des Schachttunnels sowie Rücktransport des Aushubmaterials vorzuschlagen, die die vorstehend aufgezählten Nachteile der bisher bekannten Verfahren beseitigt, Behinderungen etc. verhindert und auf ein 2-lindestmaß beschränkt.The combination invention is based on the task of a combined tunnel or shaft boring machine with simultaneous boarding and stiffening of the shaft tunnel as well as return transport of the excavated material to propose the disadvantages of the previously known methods listed above removed, disabilities etc. prevented and limited to a minimum.

Damit entfallen:This eliminates:

Absperren ganzer '.fohnscbiete für den Verkehr, Aufreißen dervorhandenen Straßendecken, Verbrauch erheblichen Schalungsmaterials, bisher hohe Lärmbelästigungen und Umweltbelastungen und damit gleichzeitig bisher anfallende enorme Lohnkosten.Blocking off whole '.fohnsciete for traffic Tearing up the existing road surface, Consumption of considerable formwork material, so far high noise pollution and Environmental pollution and, at the same time, the enormous wage costs incurred so far.

Diese Aufgabe wird erfindungsgeaiäß dadurch gelöst, dciß die kombinierte Maschine einen windinühlflügelartigen Abraunikopf trägt, der das bestehende Material abbautThis object is achieved according to the invention by dciß the combined machine a windmill-wing type Carrying an Abraunikopf, which breaks down the existing material

und zugleich in den Trichter unter der 3ohrwelle auf das darunterlaufende Förderband transportiert.and at the same time transported into the funnel under the tube shaft on the conveyor belt below.

Dabei kann dor Abraumkopf, der sich unmittelbar hinter dem ,eigentlichen Bohrer befindet, auch so konstruiert sein, daß der Tunnel oder Schacht jeweils fast kantig wird und lediglich leicht abgerundet wird.In doing so, the overburden head, which is directly located behind the actual drill, also be constructed in such a way that the tunnel or shaft each is almost angular and is only slightly rounded.

Die Versteifungen der einzelnen mit harten Materialien beschichteten Abräumblätter sind so angelegt, daß beim Bohren und Abräumen des Materials dieses direkt über den Trichter auf das Förderband gelangt.The stiffeners of each with hard materials coated clearing sheets are designed so that when drilling and clearing the material this directly reaches the conveyor belt via the funnel.

O v O v

Der mit hartem Material beschichtete Bohrer,an den sich der erste Abräuinflüge1.anschließt, wied von einer mindestens 2 m langen, tragenden Welle geführt.The hard material coated drill to which the first clearing flight follows, again by one at least 2 m long, supporting shaft.

Daran anschließend befinden sich auf der gleichen Welle fest montiert die zweiten - den mindestens 2/3 Durchmesser des ersten Abräumflügels übersteigenden Abräumflügel mit dem eigentlichen. Tunneldurchmesser sowie Versteifungen die so angebracht sind, daß das Abraummaterial auf das .unter der './eile laufende Förderband gelangt.Then there are the second ones firmly mounted on the same shaft - at least the one 2/3 diameter of the first clearing wing exceeding the clearing wing with the actual. Tunnel diameter as well as stiffeners that are attached in such a way that the waste material on the .under the './eile running Conveyor belt arrives.

Am hinteren Ende der Uelle befindet sich ein lager mit Gehäuse.At the far end of the Uelle there is a bearing with housing.

Auf der gleichen V/elle, aber vorn unmittelbar hinter der Versteifung des Abräumkopfes sind mindestens drei Hydraulikzylinder - einzeln steuerbar aber letzten Endes doch aufeinander abgestimmt - die ihrerseits wiederum.auf fest eingeschweißten. Stahlschiener laufen, aufmontiert.On the same square, but in front immediately behind the stiffening of the clearing head are at least three hydraulic cylinders - individually controllable but ultimately coordinated with one another - the in turn, on firmly welded. Steel rail run, mounted.

Lber diese Hydraulikzylinder wird durch Meßgeräte an der Bohrmaschine der Bohr- und Abräumkopf in der gewünschten Richtung gesteuert.The drilling and clearing head in controlled in the desired direction.

Die am Ende der 'felle angesetzte Schlagbohrmaschine kann mit Druckluft oder elektrisch angetrieben werden.The hammer drill attached to the end of the skin can be driven with compressed air or electrically.

Zwischen dem Abräumkopf und dem dahinter befindlichen Stahlring sind mehrere Kunststoff-Spritzdiisen bzw. Schweißgeräte angebracht, die nach dem Abbau der Abraummaterialien durch Auftragen eines Kunststofffiliaes ein Abbröckeln des noch bestehenden Materials nach dem Ausbohren und Abräumen verhindert.Between the clearing head and the steel ring behind it, there are several plastic injection nozzles or Welding equipment attached after the removal of the excavated material by applying a plastic filament Prevents the remaining material from crumbling after drilling and clearing.

Der Stahlring selbst enthält mehrere Stutzen an seiner Vorderseite, an die wiederum ein flexibler Schlauch angeschlossen ist, durch den mittels Druck flüssiger oder plastischer, jedenfalls später hart werdender Baustoff gepreßt wird und zugleich zusammen mit der Schlagbohrmaschine die ganze Kombination mit vorantreibt.The steel ring itself contains several nozzles on its front, to which in turn a flexible nozzle Hose is connected, by means of pressure more fluid or plastic, at least later hard the building material to be pressed and at the same time together with the hammer drill the whole combination with drives forward.

Durch die an Baustoffpumpen angeschlossenen flexiblen Schläuche und die ihrerseits am Stahlring sitzenden Stutzen wird je nach Richtungsänderung - gesteuert über Hydraulikzylinder - mehr oder weniger Baustoff eingepreßt.Thanks to the flexible ones connected to building material pumps Hoses and the nozzles, which in turn are seated on the steel ring, are controlled depending on the change in direction via hydraulic cylinder - more or less building material pressed in.

Der Stahlring mit seinen äußeren und inneren Kunststoff-Spritzdüsen und Baustoffanschlußstutzen muß mit einem Kugelgelenk auf der gleichen Welle und starken Federn zwischen Abräumkopf, Kugelgelenk und Halterung des Lagers, auf dam. die Hydraulikzylinder aufmontiert sind, derart versteift werden,!daß indirekt der Druck der Baustoffpumpen die Vorwärtsbewegung der kombinierten Maschine mitfördert.The steel ring with its outer and inner plastic spray nozzles and building material connection pieces must have a ball joint on the same shaft and strong springs between the clearing head and ball joint and bracket of the bearing, on dam. the hydraulic cylinders are mounted, are stiffened in such a way that indirectly the pressure of the building material pumps the forward movement of the combined machine.

Der jeweils zur Versteifung des Tunnels benötigte Baustoff wird durch kleine Rollen, die die innere Plastikverschalung anpreßt auf den ganzen Umfang des Tunnels bis zur Erhärtung des Baustoffes verteilt.The one needed to stiffen the tunnel The building material is made of small rollers, which the inner plastic cladding presses over the entire circumference of the tunnel until the building material has hardened distributed.

Durch den Stahlring hindurch wird mittels Schweißgerät unmittelbar am hinteren Ende des Stahlrings eine der mindestens drei notwendigen Gtahlschienen aufgeschweißt, auf denen die Rollen der Hydraulikzylinder laufen, die ihrerseits unmittelbar hinter der .Versteifung auf dem vorstehend erwähnten Lager angebracht sind.A welding device is used to pass through the steel ring one of the at least three necessary steel rails directly at the rear end of the steel ring welded onto which the rollers of the hydraulic cylinders run, which in turn immediately behind the .Stiffening on the above-mentioned camp are appropriate.

Mit dem gebohrten Tuxaiel laufend sind an den Hydraulikzylindern Icings- und Cuerschienen verbunden.Icings and Cu rails are continuously connected to the hydraulic cylinders with the drilled Tuxaiel.

Diese Schienen mit einer bestimmtea Länge müssen mit Kugelgelenken längs und quer zur Ermöglichung einer Richtungsänderung durch kleine Hollen mit einer Federhalteruns a.n den Schienen verbunden sein.These rails must have a certain length with ball joints lengthways and crossways to make it possible a change of direction through small knobs with a spring holder on the rails.

Claims (2)

Ansprüche^Claims ^ 1. Verfahren zur Herstellung von Tunneln bzw. Schächten, dadurch gekennzeichnet, daß durch eine kombinierte, über Computer und Hydraulikzylinder steuerbare·Schlagbohrmaschine in einem Arbeitsgang unmittelbar nach dem Bohren das Abraummaterial herausbefördert, der Tunnel verschalt und mit isolierten Baustoffen sicher versteift wi rd.1. A method for the production of tunnels or shafts, characterized in that a combined, Impact drill controllable via computer and hydraulic cylinder The excavated material is conveyed out in one operation immediately after drilling, the tunnel boarded and securely stiffened with insulated building materials. 2. Kombinierte Maschine zum Ausführen des Verfahrens nach Anspruch 1, dadurch gekennzeichnet, daß unmittelbar hinter dem Bohr- und Abräumkopf Kunststoffspritzdüsen oder auf Rollen rotierende Schweißgeräte sofort nach dem Bohren auf das stehenbleibende Material eine Kunststoffschicht aufbringen, hinter der ein auf der Bohrwelle mit Kugelgelenk und Versteifungen gelagerter Stahl ring mit Anschlußstutzen und flexiblen Schläuchen zum Einpressen von Baustoffen mittels Pumpen an den elastischen Kunststoff gepreßt wird, wobei auf der Innenseite des Stahlringes wiederum Kunststoffspritzdüsen oder Schweißgeräte Kunststoff in jeweils bestimmbarer Stärke auftragen, während kleine, auf Federhalterungen an längs- und querlaufenden, mit Kugelgelenken versehenen Schienen gelagerte Rollen den eingepreßten Baustoff auf einem jeweils regulierbaren Maß halten, während im Zentrum die mit Hydraulikzylindern auf eingeschweißten Schienen beweglich geführte Welle an ihrem hinteren Ende durch eine Schlagbohrmaschine angetrieben wird, wobei der beim Bohren anfallende Abbraum durch einen unter der Welle befindlichen trichterförmigen Einlaufstutzen unmittelbar auf das abtransportierende Förderband gelangt, während an den Hydraulikzylindern Baustoffpumpen und Restmaterialien absaugende Staubsauger angebracht sind.2. Combined machine for carrying out the method according to Claim 1, characterized in that immediately behind the drilling and clearing head plastic injection nozzles or Welding equipment rotating on rollers immediately after drilling a layer of plastic on the material that has remained standing Apply, behind which a steel ring with connection piece supported on the drilling shaft with ball joint and stiffeners and flexible hoses for pressing building materials into the elastic plastic by means of pumps is, with plastic spray nozzles or plastic welding equipment on the inside of the steel ring Apply in a definable thickness, while small, on spring holders on longitudinal and transverse, with ball joints provided rails mounted rollers the pressed-in building material to an adjustable level while in the center the shaft, which is movably guided by hydraulic cylinders on welded rails, is attached to your rear end is driven by a hammer drill, the excavation resulting from drilling by a The funnel-shaped inlet connection located under the shaft directly onto the transporting conveyor belt while building material pumps are attached to the hydraulic cylinders and vacuum cleaners that extract residual materials are installed.
DE19823201087 1982-01-15 1982-01-15 "COMBINED TUNNEL OR SHAFT DRILLING MACHINE WITH SIMULTANEOUS SHELLING AND REINFORCEMENT OF THE SHAFT TUNNEL AND RETURN TRANSPORT OF THE EXCAVATION MATERIAL" Ceased DE3201087A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE19823201087 DE3201087A1 (en) 1982-01-15 1982-01-15 "COMBINED TUNNEL OR SHAFT DRILLING MACHINE WITH SIMULTANEOUS SHELLING AND REINFORCEMENT OF THE SHAFT TUNNEL AND RETURN TRANSPORT OF THE EXCAVATION MATERIAL"
EP83100314A EP0084365A3 (en) 1982-01-15 1983-01-15 Combined tunnelling or shaft boring machine with simultaneous shuttering and supporting of the tunnel excavation, and removal of the excavated material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19823201087 DE3201087A1 (en) 1982-01-15 1982-01-15 "COMBINED TUNNEL OR SHAFT DRILLING MACHINE WITH SIMULTANEOUS SHELLING AND REINFORCEMENT OF THE SHAFT TUNNEL AND RETURN TRANSPORT OF THE EXCAVATION MATERIAL"

Publications (1)

Publication Number Publication Date
DE3201087A1 true DE3201087A1 (en) 1983-07-28

Family

ID=6153151

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19823201087 Ceased DE3201087A1 (en) 1982-01-15 1982-01-15 "COMBINED TUNNEL OR SHAFT DRILLING MACHINE WITH SIMULTANEOUS SHELLING AND REINFORCEMENT OF THE SHAFT TUNNEL AND RETURN TRANSPORT OF THE EXCAVATION MATERIAL"

Country Status (2)

Country Link
EP (1) EP0084365A3 (en)
DE (1) DE3201087A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387121A (en) * 2017-08-15 2017-11-24 中铁工程装备集团有限公司 The all-hydraulic coupling control system of novel double liquid grout injecting

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3343212A1 (en) * 1983-11-30 1985-06-13 MC-Bauchemie Müller GmbH & Co, Chemische Fabrik, 4300 Essen Process for lining construction spaces, in particular shafts, galleries, tunnels or the like
FR3093126B1 (en) * 2019-02-27 2021-02-19 Bouygues Travaux Publics Unclogging of an evacuation opening of a tunnel boring machine using ultrasonic waves
CN111927483A (en) * 2020-07-27 2020-11-13 中铁十九局集团轨道交通工程有限公司 Discharging device for tunneling

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2420340A1 (en) * 1973-04-30 1974-11-07 Mcalpine & Sons Ltd Sir Robert TUNNEL DRILLING MACHINE
DE2427638B2 (en) * 1974-06-07 1976-05-06 Aktiengesellschaft Eisenhütte Prinz Rudolph, 4408 Dülmen PROCEDURE FOR LINE EXTENSION IN LINE FORWARD
DE2717381A1 (en) * 1976-04-21 1977-10-27 Helvoirt C DEVICE FOR PUNCHING A DIKE OR DGL.
DE3043312A1 (en) * 1980-11-17 1982-07-08 Heinz-Theo Dipl.-Ing. 5300 Bonn Walbröhl METHOD AND DEVICE FOR DRIVING A SLIDE SHUTTER

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1751147A (en) * 1929-03-11 1930-03-18 Roy C Hackley Method of lining tunnels with concrete and apparatus therefor
GB710494A (en) * 1951-01-10 1954-06-16 Edmund Nuttall Sons & Company Improvements in and relating to lining tunnels or bores with concrete
DE913403C (en) * 1951-06-05 1954-06-14 Paul Chlebus Dipl Ing Dr Process and device for lining shafts, mines, galleries and tunnels
DE915925C (en) * 1951-10-21 1954-08-02 Paul Chlebus Dipl Ing Dr Process for lining shafts, mines, galleries and tunnels
DE1006879B (en) * 1955-09-12 1957-04-25 Wayss & Freytag Ag Method for producing a gallery or tunnel masonry
DE1229962B (en) * 1960-06-11 1966-12-08 Bergwerksverband Gmbh Process for maintaining the initial properties of the walls of mine workings
US3309142A (en) * 1963-05-31 1967-03-14 Robbins & Assoc James S Cutterhead assembly for a shield-type tunneling machine
US3247675A (en) * 1963-05-31 1966-04-26 Robbins & Assoc James S Segment erectors for a tunneling machine
DE1534602C3 (en) * 1966-09-27 1978-05-11 Bade & Co Gmbh, 3160 Lehrte Tubbing machine for tunneling shields
FR1506054A (en) * 1966-12-23 1967-12-15 Mekh Zd N Deg 5 Mechanized tunnel digging shield
SE378436B (en) * 1967-07-03 1975-09-01 Skanska Cementgjuteriet Ab
FR1567230A (en) * 1968-02-23 1969-05-16
US4043600A (en) * 1975-09-22 1977-08-23 Dresser Industries, Inc. Adjustable bucket for an earth boring machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2420340A1 (en) * 1973-04-30 1974-11-07 Mcalpine & Sons Ltd Sir Robert TUNNEL DRILLING MACHINE
DE2427638B2 (en) * 1974-06-07 1976-05-06 Aktiengesellschaft Eisenhütte Prinz Rudolph, 4408 Dülmen PROCEDURE FOR LINE EXTENSION IN LINE FORWARD
DE2717381A1 (en) * 1976-04-21 1977-10-27 Helvoirt C DEVICE FOR PUNCHING A DIKE OR DGL.
DE3043312A1 (en) * 1980-11-17 1982-07-08 Heinz-Theo Dipl.-Ing. 5300 Bonn Walbröhl METHOD AND DEVICE FOR DRIVING A SLIDE SHUTTER

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
DE-Z.: Glückauf, 117, 1981, Nr. 11, S. 636-642 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387121A (en) * 2017-08-15 2017-11-24 中铁工程装备集团有限公司 The all-hydraulic coupling control system of novel double liquid grout injecting

Also Published As

Publication number Publication date
EP0084365A2 (en) 1983-07-27
EP0084365A3 (en) 1983-11-30

Similar Documents

Publication Publication Date Title
EP2054552B1 (en) Method and device for renewing a ballast bed
DE3419517A1 (en) METHOD FOR UNDERGROUND INSTALLATION OF PIPELINES AND DEVICE FOR IMPLEMENTING THE METHOD
DE2550050C2 (en) Device for driving tunnels or the like. by means of a shoring sign with the introduction of an in-situ concrete lining
DE4237712A1 (en)
DE4329208A1 (en) Versatile method and device for soil reinforcement and compaction
DE2108591A1 (en) Device and procedure for the implementation of the shield construction method for the construction of tunnels or galleries
DE3201087A1 (en) "COMBINED TUNNEL OR SHAFT DRILLING MACHINE WITH SIMULTANEOUS SHELLING AND REINFORCEMENT OF THE SHAFT TUNNEL AND RETURN TRANSPORT OF THE EXCAVATION MATERIAL"
DE2063567C3 (en) Device for widening a pre-borehole produced by the displacement and compaction of soil
WO1984002740A1 (en) Combined machine for drilling tunnels, respectively wells, with simultaneous coffering and shoring of the tunnel for the well, as well as rear transport of the cuttings
EP0159573B1 (en) Process and device for the controlled advancing of under-ground pipes in inaccesible cross-sectional areas
DE2021839C3 (en) Device for driving advancing structures
DE4217293A1 (en) Laying drainage and sewage pipes without excavating - using water-jet mounted at front of pipe string which removes spoil internally as pipe driven through soil
DE20006092U1 (en) Pipeline cleaning device
DE1920322C3 (en) Device for loosening and loading the existing soil during pipe pre-pressing
DE19619532C2 (en) Method for producing a walkable tunnel connection between two adjacent, drilled shaft bores and device for carrying out the method
DE2931177C2 (en) Method and device for sinking a freezer shaft
DE68760C (en) Process and devices for tunnel construction in non-rocky soil with simultaneous production of a permanent concrete lining that absorbs the rock pressure
DE3030517A1 (en) Soft ground tunnel bore continuously lined with quick setting coating - simultaneously with driving of tunnel by spray nozzles fitted on driving machine
DE1963300A1 (en) Device for expelling water from a street body
DE1205576B (en) Method and device for the mechanical excavation of the face in tunnels or galleries to be driven using shield construction or the pipe penetration method
EP0835984B1 (en) Method to substitute the supporting liquid by compressed air in an hydro-shield
DE9306544U1 (en) Device for driving over defective sewer pipes
DE744916C (en) Process for the repair and reinforcement of structures and for consolidating and sealing cracked rock layers or the like.
DE3610118A1 (en) Method of placing concrete in formwork for constructing a tunnel lining in cast-in-situ concrete, and devices for carrying out the method
DE3826772A1 (en) Driving apparatus for shield driving or for pipe-jacking operations with a hydraulic conveying arrangement

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8131 Rejection