DE3114602A1 - Device for scaffoldings with raisable and lowerable working platform - Google Patents

Device for scaffoldings with raisable and lowerable working platform

Info

Publication number
DE3114602A1
DE3114602A1 DE19813114602 DE3114602A DE3114602A1 DE 3114602 A1 DE3114602 A1 DE 3114602A1 DE 19813114602 DE19813114602 DE 19813114602 DE 3114602 A DE3114602 A DE 3114602A DE 3114602 A1 DE3114602 A1 DE 3114602A1
Authority
DE
Germany
Prior art keywords
working platform
scaffolding
guide rails
work
lifting mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19813114602
Other languages
German (de)
Other versions
DE3114602C2 (en
Inventor
Lothar DDR 7021 Leipzig Hoppe
Fritz DDR 7027 Leipzig Keil
Joachim DDR 7031 Leipzig Mahler
Hans-Jürgen Dipl.-Ing. DDR 7030 Leipzig Schulze
Wolfgang Prof. Dr.Sc.Techn. Wittig
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baurep & Rekonstr Kom Veb
Original Assignee
Baurep & Rekonstr Kom Veb
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baurep & Rekonstr Kom Veb filed Critical Baurep & Rekonstr Kom Veb
Priority to DE19813114602 priority Critical patent/DE3114602A1/en
Publication of DE3114602A1 publication Critical patent/DE3114602A1/en
Application granted granted Critical
Publication of DE3114602C2 publication Critical patent/DE3114602C2/de
Granted legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/02Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
    • B66B5/16Braking or catch devices operating between cars, cages, or skips and fixed guide elements or surfaces in hoistway or well
    • B66B5/26Positively-acting devices, e.g. latches, knives
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/20Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong

Abstract

The invention relates to a device for raising and lowering a working platform which is arranged between two tubular steel towers and has an associated safety device. The aim of the invention is to make it possible to carry out work on roof or facades without using complex sheet-like or three-dimensional scaffoldings. The object was therefore to provide a device which permits uncomplicated raising and lowering of the working platform and, at the same time, prevents the latter from falling downwards. This has been achieved in that the working platform is arranged between four guide rails, provided with cutouts, and is connected, on both sides, to the guide rails via a lifting mechanism and a suspension means, and in that a bearing member is arranged on both sides of the working platform, with the aid of which member the working platform is positioned on the tubular steel towers. On the bearing member there are arranged drop latches (Fig. 3) which prevent the working platform from falling downwards in that, when the chain of the lifting mechanism fails, they latch into the cutouts of the guide rails. The invention can be used, in particular, for repair or reconstruction work on building facades. <IMAGE>

Description

Titel der ErfindungTitle of the invention

Einrichtung für Arbeitsgerüste mit heb- und senkbarer Arbeitsbühne Anwendungsgebiet der Erfindung Die Erfindung betrifft eine Einrichtung zum Heben und Senen einer zwischen zwei Gerüsttürmen angeordneten Arbeitsbühne mit zugehöriger Sicherheitsvorrichtung.Equipment for work scaffolding with a work platform that can be raised and lowered Field of application of the invention The invention relates to a device for lifting and a working platform arranged between two scaffolding towers with associated Safety device.

Charakteristik der bekannten technischen Lösungen Es ist bekannt, bei Arbeiten an Gebäudefassaden Arbeitsgerüste mit heb- und senkbarer Arbeitsbühne anzuwenden.Characteristics of the known technical solutions It is known When working on building facades, work scaffolding with a work platform that can be raised and lowered apply.

Eine bekannte Gerüstkonstruktion dieser Art besteht aus zwei vor der Fassade hängenden Leitertürmen und einer senkrecht zwischen diesen verfahrbaren Arbeitsbühne, Dieses Gerüst kann nur an bestimmten Gebäuden eingesetzt werden, da es auf dem Dach des Gebäudes verfahrbar angeordnet ist und hierzu eine spezielle Fahrbahn benötigt. Ein weiterer Nachteil besteht darin, daß das Gerüst nur gering belastet werden kann und sowohl für die Befestigung am Dach, als aucn zur Erzielung der notwendigen Steifigkeit einen hohen konstruktiven Aufwand erfordert. Darüber hinaus kann es nicht für Arbeiten im Bereich der Dachstrecke eingesetzt werden.A known scaffolding structure of this type consists of two in front of the Façade hanging ladder towers and one vertically movable between them Working platform, This scaffolding can only be used on certain buildings, as it is arranged movably on the roof of the building and for this purpose a special one Lane required. Another disadvantage is that the scaffolding is only slight can be loaded and both for the attachment to the roof, as well as to achieve the necessary rigidity requires a high level of design effort. About that In addition, it cannot be used for work in the area of the roof section.

Es wurde deshalb bereits vorgeschlagen, eine heb- und senkbare Arbeitsbühne zwischen zwei auf dem Boden stehenden Leitertürmen anzuordnen und mittels über Umlenicrollen laufenden Stahlseilen unter Verwendung von zwei synchron arbeitenden Bauaufzügen in die Arbeitsstellung zu heben, wo sie dann mit den Leitertürmen verbunden wird.It has therefore already been proposed, a lifting and lowerable To arrange the working platform between two ladder towers standing on the ground and by means of Steel ropes running over Umlenic pulleys using two synchronously working To lift construction hoists into the working position, where they are then connected to the ladder towers will.

Diese Gerüstkonstruktion wird vorwiegend für Arbeiten an der Dachatrecke von Gebäuden eingesetzt, da infolge des Fehlens von Führungs- und Sicherheitsvorrichtungen ein öfteres Verändern der Arbeitshöhe nicht möglich ist. Die Hubeinrichtung wird bei diesem Gerüst vorwiegend zum Transport der Arbeitsbühne in die Höhe der Dachtraufe benutzt, wo diese dann mit den Leitertürmen fest verbunden wird.This scaffolding structure is mainly used for work on the roof section used by buildings because of the lack of guidance and safety devices frequent changing of the working height is not possible. The lifting device will With this scaffolding mainly for transporting the working platform up to the eaves used, where this is then firmly connected to the ladder towers.

Ziel der Erfindung Ziel der Erfindung ist es, Arbeitsgerüste mit zwischen zwei Gerüsttürmen angeordneter Arbeitsbühne sowohl für Arbeiten an der Fassade als auch im Bereich der Dachstrecke einzuset7en und damit den Aufwand an Material und I<osten für das Einrüsten wesentlich zu senken.Object of the invention The aim of the invention is to provide work scaffolding with between two scaffold towers arranged work platform both for work on the facade and can also be used in the area of the roof section and thus the expenditure on material and Significantly lower the cost of scaffolding.

Darlegung des Weaens der Erfindung Die technische Aufgabe der Erfindung besteht darin, eine Einrichtung zu schaffen, mit der eine zwischen zwei Gerüsttürmen angeordnete Arbeitsbühne problemlos in die gewünschte Arbeitsnshe gehoben oder gesenkt und dann auf den Gerüsttürmen aufgelagert werden kann. Dabei soll die Arbeitsbühne gleichzeitig während des Hub- und Senkvorganges gegen Absturz gesichert sein.Statement of the weave of the invention The technical problem of the invention is to create a facility with the one between two scaffolding towers arranged working platform easily raised or lowered into the desired working area and then can be placed on the scaffolding towers. The work platform should be secured against falling at the same time during the lifting and lowering process.

Erfindungsgemäß vird die Aufgabe dadurch gelöst, daß die Arbeitsbühne zwischen vier mit Aussparungen versehenen und an den Stielen der Gerüsttürme befestigten Führungsschienen angeordnet und an beiden Seiten über einen Hub- mechanismus, eine aus Ketten oder dergleichen sowie Traverse und Zugseilen bestehendc Aufhängung, mit jeweils zwei Führungsschienen oder mit den Gerüsttürmen verbunden ist.According to the invention, the object is achieved in that the working platform between four recessed and attached to the posts of the scaffolding towers Guide rails arranged and on both sides via a lifting mechanism, a suspension consisting of chains or the like as well as traverse and pulling ropes, is connected with two guide rails or with the scaffolding towers.

An beiden Seiten der Arbeitsbühne befindet sich ein mit Lagerböcken versehener Auflageriegel.On both sides of the work platform there is one with bearing blocks provided support bar.

Jedem Lagerbock ist eine gelenkig gelagerte Fallklinke zugeordnet, deren inneres Endstück über ein Spannseil mit der Traverse und über eine Zug feder mit dem inneren Endstück der gegenüberliegenden Fallklinke verbunden ist.An articulated latch is assigned to each bearing block, the inner end of which spring over a tensioning cable with the crossbeam and a train is connected to the inner end piece of the opposite latch.

Der Auflage riegel besteht zwecksmäßig aus zwei in einem Rohr gleitbar angeordneten Riegelstangen.The purpose of the support bar consists of two slidable in a tube arranged locking bars.

Die Befestigung des Auflageriegele kann mittels auf den Lagerböcken angeordneter Klemmvorrichtung als lösbare Verbindung ausgeführt sein.The attachment of the support bar can be done by means of the bearing blocks arranged clamping device be designed as a releasable connection.

Der Hubmechanismus, der aus einem Eletrokettenzug bestehen kann, ist entweder an einem mit zwei Führungsschienen verbundenen Kopfträger oder an einem mit dem Gerüstturm verbundenen Auslegeträger angehängt.The lifting mechanism, which can consist of an electric chain hoist, is either on a head carrier connected to two guide rails or on one attached to the scaffolding tower connected jib.

Es ist vorteilhazt, an der Arbeitsbühne Führungswinkel anzuordnen, die aeim Hubvorgang an den Führungsschienen entlanggleiten.It is advantageous to arrange guide brackets on the working platform, which slide along the guide rails during the lifting process.

Ausführungsbeisplel In der Zeichnung zeigen Fig. 1 die Ansicht der crfindungsgemäßen Einrichtung mit den Hauptfunktionsteilen und zwei verschiedenen Anordnungsvarianten für den Hubmechanismus, Fig, 2 eine Darstellung der Aufhängung der Arbeitsbühne mit Auflageriegel und Fangvorrichtung, Fig. 3 eine Detailzeichnung des Auflageriegels mit Fangvorrichtung.Exemplary embodiments In the drawing, FIG. 1 shows the view of FIG according to the invention with the main functional parts and two different Arrangement variants for the lifting mechanism, FIG. 2 shows a representation of the suspension the working platform with support bolt and safety catch, Fig. 3 is a detailed drawing of the support bar with safety catch.

Die Arbeitsbühne 1 ist, wie Fig. 1 zeigt, zwischen Führungsschienen 2 angeordnet und beiderseits mittels zwei Zugseilen 3; 3' an den Traversen 4 befestigt. Die Traver- sen 4 sind an den Ketten 5 eines Elektrokettenzuges 6 befestigt, der entweder an einem mit den Führungsschienen 2 verbundenen Kopfträger 7 oder an einem mit dem Gerüst turm verbundenen Auslegeträger 8 angehängt ist. Die Führungsschienen 2 sind paarweise an den Stielen 9 von Gerüsttürmen angeordnet und durch Verbindungsbügel 10 fest måt diesen verbunden.The working platform 1 is, as FIG. 1 shows, between guide rails 2 arranged and on both sides by means of two pull cables 3; 3 'attached to the crossbars 4. The traverse sen 4 are on the chains 5 of an electric chain hoist 6 attached, either to a head carrier connected to the guide rails 2 7 or attached to an extension beam 8 connected to the scaffolding tower. the Guide rails 2 are arranged in pairs on the posts 9 of scaffolding towers and by connecting bracket 10 firmly connected to this.

An den Enden der Arbeitsbühne 1 befinden sich l<opfplatten 11, mit daran befestigten Führungswinkeln 12. Die Führungswinkel 12 gleiten beim Heben und Senen-der Arbeitsbühne 1 an den Führungsschienen 2 und verhindern damit ein unbeabsichtigtes Pendeln oder Verkanten der Arbeitsbühne 1.At the ends of the working platform 1 there are top plates 11, with attached guide brackets 12. The guide brackets 12 slide when lifting and Senen-the working platform 1 on the guide rails 2 and thus prevent a unintentional swinging or tilting of the working platform 1.

An beiden Seiten der Arbeitsbühne 1 sind Auflageriegel 13 angeordnet, deren Einzelteile aus Fig. 3 ersichtlich sind.Support bars 13 are arranged on both sides of the working platform 1, the individual parts of which can be seen from FIG.

Der Auflageriegel 13 besteht aus einem Rohr 13', in welchem zwei Riegelstangen 13" gleitbar angeordnet sind. Auf beiden Seiten des Auflageriegels sind Lagerblöcke 14 aufgeschweißt. Auf den Lagerböcken 14 befinden sich Klemmvorrichtungen 156 mit deren Hilfe der Auflageriegel 13 an den Rohrgurten d3r Arbeitsbühne 1 befestigt ist.The support bar 13 consists of a tube 13 'in which two locking bars 13 "are slidably arranged. There are bearing blocks on both sides of the support bar 14 welded on. Clamping devices 156 are also located on the bearing blocks 14 the help of which the support bar 13 is attached to the pipe belts d3r working platform 1 is.

Wenn die Arbeitspühne 1 mittels des Elektrokettenzuges 6 in die vorgesehene Arbeitshöhe gebracht wurde, werden die Riegelstangen 13" aus dem Rohr 13' seitlich herausgeschoben, wobei sie in jeweils eine der in den Führungsschienen 2 befindlichen Aussparungen 2' eingreifen. Damit ist die Arbeitsbühne 1 fest auf den Führungsschienen 2 gelagert und kann von den Arbeitskräften, die sich während des Hubvorganges in den Gerüsttürmen aufhalten, betreten werden.When the working platform 1 is moved to the intended position by means of the electric chain hoist 6 Working height was brought, the locking rods 13 "from the tube 13 'to the side pushed out, in each case one of the located in the guide rails 2 Recesses 2 'engage. The working platform 1 is thus firmly on the guide rails 2 and can be used by the workers in stop the scaffolding towers, be stepped on.

Um im Falle des reißens der Kette 5 des Elektrozuges 6 einen Absturz de Arbeitsbühne 1 zu verhindern, ist dem Auflageriegel 13 eine Fangvorrichtung zugeordnet. Die Fangvorrichtung l esteht aus den Fallfrlinken 16; 17, die drehbar in den L, gerböcken 14 gelagert sind.To avoid a crash in the event of the chain 5 of the electric hoist breaking To prevent de working platform 1, a safety catch is assigned to the support bar 13. The safety gear consists of the Fallfrlinken 16; 17, which can be rotated in the L, tunnels 14 are stored.

Die inneren Ends ücke 16'; 17' der Fallklinken 16; 17 sind untereinandcir durch eine Zugfeder 18 verbunden.The inner ends 16 '; 17 'of the pawls 16; 17 are among each other connected by a tension spring 18.

An den inneren Endstücken 16'; 17' sind außerdem Spannseile 19, 19' befestigt, die mit den entsprechenden Enden der Traverse 4 verbunden sind.At the inner end pieces 16 '; 17 'are also tension ropes 19, 19' attached, which are connected to the corresponding ends of the cross member 4.

Durch Spannen der Spannseile 19; 19' werden die inneren Endstücke 16'; 17' so weit angehoben, daß sich die Fallklinkn 1; rr, co wie in Fig. 3 rechtsseitig dargestellt, im entriegelten Zustand befinden. Die Zugfeder 18 wird dabei gleichzeitig gespannt.By tensioning the tension ropes 19; 19 'are the inner end pieces 16 '; 17 'raised so far that the latches 1; rr, co as in Fig. 3 on the right shown are in the unlocked state. The tension spring 18 is at the same time tense.

Reißt nun während des Hebens oder Sendens der Arbeitsbühne 1 die Kette 5 des Elektrokettenzuges 6, so werden die Spanneeile 19; 19' schlaff. Durch die Federkraft der Zugfeder 18 werden die inneren Endstücke 16', 17' nach unten gezogen, so daß die Fallklinken 16; 17 die Lage einnehmen, die linksseitig in Fig. 3 dargestellt ist. Dabei rasten die Fallklinken 16; 17 in die in den Führungsschienen 2 befindlichen Aussparungen 2' ein und verhindern einen Absturz der Arbeitsbühne 1.Now breaks the chain while lifting or sending the work platform 1 5 of the electric chain hoist 6, the clamping parts 19; 19 'limp. Through the The spring force of the tension spring 18 pulls the inner end pieces 16 ', 17' downwards, so that the latches 16; 17 assume the position shown on the left in FIG. 3 is. The latch latches 16; 17 into those located in the guide rails 2 Recesses 2 'and prevent the working platform 1 from falling.

Die erfindungsgemäße Einrichtung gestattet unkompliziertes und absturzs@cheres Heben und Senken der Arbeitsbühne und ermöglich: damit bei gleichzeitig hoher Belastbarkeit die Durcuführung von Arbeiten an Fassaden ohne aufwendige Flächen- oder Raumgerüste.The device according to the invention allows uncomplicated and crash-safe Raising and lowering the work platform and enables: with high load capacity at the same time the completion of work on facades without complex surface or room scaffolding.

L e e r s e i t eL e r s e i t e

Claims (6)

P a t e n t a n s p r u c h 1. Einrichtung für Arbeitsgerüste mit einer zwischen zwei Gcrüsttürmen heb- und senkbar angeordneten Arboitsbühne, dadurch gekennzeichnet, daß die Arbeitsbühne (1) zwischen vier mit Ausoparungen (2') versehenen und an den Stielen (9) der Gerüsttürme befestigten Führungsschienen (2) angeordnet und beiderseitig über einen Hubmechanismus (6), eine aus Ketten (5) oder dergleichen sowie Traverse (4) und Zugseilen (3; 3') bestehende Aufhängung, mit jeweils zwei Führungsschienen (2) oder mit den Gerüsttürmen verbunden ist, und daß sich an beiden Seiten der Arbeitsbühne (1) ein mit Lagerböcke (14) versohoner Auflageriogel (13) befindet, wobei jedem Lagerbock (14) eine gelenkig gelagerte Fallklinke (1; 17) zugeordnet ist, deren inneres Endstück (16'; 17') über ein Spannseil (19; 19') mit der Traverse (4) and über eine Zugfeder (18) mit dem inneren Endstück (16'; 17') der gegenüberliegenden Fallklinke (16; 17) verbunden ist.P a t e n t a n s p r u c h 1. Equipment for working scaffolding with an arboits platform that can be raised and lowered between two scaffolding towers characterized in that the working platform (1) is provided between four with cutouts (2 ') and guide rails (2) attached to the posts (9) of the scaffolding towers and on both sides via a lifting mechanism (6), one of chains (5) or the like as well as traverse (4) and pull cables (3; 3 ') existing suspension, each with two Guide rails (2) or connected to the scaffolding towers, and that on both Sides of the working platform (1) a bearing block (13) with bearing blocks (14) is located, each bearing block (14) an articulated latch (1; 17) is assigned, the inner end piece (16 '; 17') via a tensioning cable (19; 19 ') with the traverse (4) and via a tension spring (18) with the inner end piece (16 '; 17') the opposite latch (16; 17) is connected. 2. Einrichtung für Arbeitsgerüste nach Punkt 1, dadurch gekennzeichnet, daß der Auflageriegel (13) aus zwei in einem Rohr (13') gleitbar angeordneten Riegelstangen (13") besteht.2. Device for work scaffolding according to point 1, characterized in that that the support bolt (13) consists of two locking rods slidably arranged in a tube (13 ') (13 ") exists. 3. Einrichtung für Arbeitsgerüste nach Punkt 1 und 2, dadurch gekennzeichnet, daß der Auflageriegel (13) mittels auf den Lagerböcken (14) angeordneten Klemmvorrichtungen (15) lösbar an der Arbeitsbühne (1) befestigt ist.3. Device for work scaffolding according to item 1 and 2, characterized in that that the support bar (13) by means of clamping devices arranged on the bearing blocks (14) (15) is releasably attached to the working platform (1). 4. Einrichtung für Arbeitsgerüste nach Punkt 1, dadurch gekennzeichnet, daß der Hubmechanismus (6) aus einem an sich bekannten Elektrokettenzug besteht.4. Device for work scaffolding according to item 1, characterized in that that the lifting mechanism (6) consists of a known electric chain hoist. 5. Einrichtung für Arbeitsgerüste nach Punkt 1 und 4, dadurch gekennzeichnet, daß der Hubmechanismus (6) an einem mit zwei Führungsschienen (2) verbundenen Kopfträger (7) oder an einem mit dem Gerüstturm verbundenen Auslegeträger (8) befestigt ist.5. Device for work scaffolding according to point 1 and 4, characterized in that that the lifting mechanism (6) on a head support connected to two guide rails (2) (7) or attached to an extension beam (8) connected to the scaffolding tower. 6. Einrichtung für Arbeitsgerüste nach Punkt 1, dadurch gekennzeichnet, daß an der Arbeitsbühne (1) Führungswinkel (12) angeordnet sind.6. Device for work scaffolding according to point 1, characterized in that that on the working platform (1) guide brackets (12) are arranged.
DE19813114602 1981-04-10 1981-04-10 Device for scaffoldings with raisable and lowerable working platform Granted DE3114602A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19813114602 DE3114602A1 (en) 1981-04-10 1981-04-10 Device for scaffoldings with raisable and lowerable working platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19813114602 DE3114602A1 (en) 1981-04-10 1981-04-10 Device for scaffoldings with raisable and lowerable working platform

Publications (2)

Publication Number Publication Date
DE3114602A1 true DE3114602A1 (en) 1984-04-26
DE3114602C2 DE3114602C2 (en) 1990-03-22

Family

ID=6129914

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19813114602 Granted DE3114602A1 (en) 1981-04-10 1981-04-10 Device for scaffoldings with raisable and lowerable working platform

Country Status (1)

Country Link
DE (1) DE3114602A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0218805A2 (en) * 1985-10-08 1987-04-22 GEDA-Dechentreiter Maschinenbau GmbH Catching device for a lift cage
DE4406987C1 (en) * 1994-03-03 1995-07-06 Paul Lingen Lift scaffolding with several masts standing on at least one platform
EP2487130A1 (en) 2011-02-14 2012-08-15 Siemens Aktiengesellschaft Static safety guard for a platform lift and a platform lift with same
US20140102828A1 (en) * 2005-06-29 2014-04-17 Sky Climber, Llc Suspension platform system
CN107642228A (en) * 2017-07-24 2018-01-30 浙江诚骏建设工程有限公司 A kind of steel pipe scaffold yoke crosstie with arrangement for adjusting height
DE102016010789A1 (en) 2016-09-01 2018-03-01 Eduard Ognew rail structure
CN111646398A (en) * 2020-05-29 2020-09-11 福建省闽鑫建设工程有限公司 Auxiliary building displacement platform and using method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1948167U (en) * 1966-08-17 1966-10-20 Huennebeck A G FACADE FRAMEWORK.

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1948167U (en) * 1966-08-17 1966-10-20 Huennebeck A G FACADE FRAMEWORK.

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0218805A2 (en) * 1985-10-08 1987-04-22 GEDA-Dechentreiter Maschinenbau GmbH Catching device for a lift cage
EP0218805A3 (en) * 1985-10-08 1989-03-29 Geda-Dechentreiter Maschinenbau Gmbh Catching device for a lift cage
DE4406987C1 (en) * 1994-03-03 1995-07-06 Paul Lingen Lift scaffolding with several masts standing on at least one platform
US5992565A (en) * 1994-03-03 1999-11-30 Lingen; Paul Lifting scaffold assembly
US20140102828A1 (en) * 2005-06-29 2014-04-17 Sky Climber, Llc Suspension platform system
US9217254B2 (en) * 2005-06-29 2015-12-22 Sky Climber, Llc Suspension platform system
EP2487130A1 (en) 2011-02-14 2012-08-15 Siemens Aktiengesellschaft Static safety guard for a platform lift and a platform lift with same
DE102016010789A1 (en) 2016-09-01 2018-03-01 Eduard Ognew rail structure
DE102016010789B4 (en) 2016-09-01 2021-11-11 Galina Ognew Rail framework
CN107642228A (en) * 2017-07-24 2018-01-30 浙江诚骏建设工程有限公司 A kind of steel pipe scaffold yoke crosstie with arrangement for adjusting height
CN111646398A (en) * 2020-05-29 2020-09-11 福建省闽鑫建设工程有限公司 Auxiliary building displacement platform and using method thereof

Also Published As

Publication number Publication date
DE3114602C2 (en) 1990-03-22

Similar Documents

Publication Publication Date Title
DE69531619T2 (en) FRAMEWORK ARRANGEMENT
DE2622840C2 (en) Climbing frame unit with associated formwork
DE2400313A1 (en) AUXILIARY DEVICE FOR A CABLE NET COOLING TOWER
DE3050022A1 (en) Folding scaffold system
DE3420737A1 (en) Auxiliary apparatus for vertically adjustable scaffolding
DE2050516A1 (en) Vertically adjustable platform for scaffolding
DE3114602A1 (en) Device for scaffoldings with raisable and lowerable working platform
EP2631390A2 (en) Lifting and securing device for a ladder scaffold and lifting and securing scaffold
DD244274A3 (en) GERUEST FOR REPAIR WORK ON FACADES AND ROOF ROOFS
EP3947237A1 (en) Assembly device and method for carrying out an installation process in a lift shaft of a lift system
DE102012015987A1 (en) Telescopic scaffold and method for operating a telescopic scaffold
DE1941940B2 (en) Vehicle with lifting device for large-volume boxes, preferably made of concrete with recesses in the floor for telescopically adjustable legs of the lifting device
DE19704967C2 (en) Gantry crane, in particular for the construction of buildings
DD157871A3 (en) EQUIPMENT FOR WORKERS WITH LIFTING AND SLEEVABLE WORK BREAKERS
DE2629253C3 (en) Device for conveying building material through an opening in a wall into a building
DE2829863C2 (en) Device for the production of vertical wall panels from masonry stones
DE4224631C2 (en) Method and device for driving towers, chimneys, shafts or the like by means of a working platform
DE2324843C2 (en) Device for assembling multi-part masts
DE2556891C3 (en) Mobile working platform equipped with a guardrail on which a hoist for assembly parts is mounted
DE3517291A1 (en) Hoist for the transport of loads
DE2811580C3 (en)
DE102020126730B4 (en) Elevator Device of a Building Scaffolding
DE3717661C1 (en) Inclined hoist
DE2134631C3 (en) Collapsible shoring, especially for tents
DE1534604C (en) Formwork equipment for concreting tunnel walls and ceilings for large tunnel cross-sections

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee