DE3035578A1 - Hygienic prefab. concrete grave - has chamber adjoining initial burial chamber with insulating panel inside sealing cover - Google Patents
Hygienic prefab. concrete grave - has chamber adjoining initial burial chamber with insulating panel inside sealing coverInfo
- Publication number
- DE3035578A1 DE3035578A1 DE19803035578 DE3035578A DE3035578A1 DE 3035578 A1 DE3035578 A1 DE 3035578A1 DE 19803035578 DE19803035578 DE 19803035578 DE 3035578 A DE3035578 A DE 3035578A DE 3035578 A1 DE3035578 A1 DE 3035578A1
- Authority
- DE
- Germany
- Prior art keywords
- grave
- burial
- environmentally friendly
- humane
- coffin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H13/00—Monuments; Tombs; Burial vaults; Columbaria
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Agricultural Chemicals And Associated Chemicals (AREA)
Abstract
Description
"Umweltfreundlichere und humanere BestattungK"More environmentally friendly and humane burial K.
Die Erfindung betrifft eine umweltfreundlichere und humanere Bestattung in der heutigen technologisierten Weit.The invention relates to a more environmentally friendly and humane burial in today's technological world.
Nach herkömmlicher Bestattung wird der Leichnam in einen Holzsarg gelegt, den man vorher mit Hobelspänen etc. im uiitersten Teil des. Sarges (ca. 1/3) ausfüllt. Hierauf wird der Deckel gesetzt und verschraubt.After a conventional burial, the body is placed in a wooden coffin placed, which one previously placed with wood shavings etc. in the uppermost part of the coffin (approx. 1/3). The cover is then placed and screwed on.
Am TacJ der Bestatlung wird der Surq in ein voriier ausgehobenes Crab gesenkt. Anschließend wird das Grab wieder mit Erde zugescnüttet. Diese Aufgabe wird meist von einem kleinen Bagger bewältigt.On the day of the burial, the surq is placed in a previously excavated crab lowered. Then the grave is filled with earth again. This task is usually handled by a small excavator.
Hierbei ist die Bodenbeschaffenheit von größter Wichtigkeit, denn bei einem sandigen Boden leidet der Sarg beim Zubaggern wenig. Ist es jedoch ein steiniger, lehmiger Boden, so karin der Sarg schon beim Zubaggern beschädigt werden.The nature of the soil is of the utmost importance here, because If the soil is sandy, the coffin suffers little when being dredged. However, it is a stony, loamy soil, so the coffin can be damaged while being dredged.
Jedoch der beste Holzsarg verhindert nicht, daß nach längerer Zeit, in nasser feuchter Erde, durch das Arbeiteii der großen Ifolzbretter, die FlüssiX-keit, die aus dem Leiciinant dringt, in unser Erdreich gelangt.However, the best wooden coffin does not prevent that, after a long time, in wet moist earth, through the work of the large Ifolz boards, the liquid, which penetrates from the leicinant, reaches our soil.
Es sterben im Jahr ca. 100.000 Menschen. Da der Mensch im Schnitt aus 72 % Wasser besteht, kann man sich ausrechneii, wieviel unreine Flüssigkeit in unser Erdreich gelangt, selbst wenn davon noch ein großer Teil verdunstet. Auch Fette, Fettsäuren und andere Giftstoffe sind meiner Meinung nach erheblich.About 100,000 people die every year. Because man in the cut consists of 72% water, you can calculate how much impure liquid gets into our soil, even if a large part of it is still evaporating. Even Fats, fatty acids, and other toxins are significant in my opinion.
Die meisten Priedhöfe liegen in unmittelbarer Nähe von Städten und Dörfern Uncl somit grenzen viele an Wasserschutz- und Wassereinzu@sqebiete. Diese Friedhöfe wurden vor vielen loo Jahren angelegt. Zu dieser Zeit hat sich noch niemand über Erdschichten und Wasserlauf Gedanken gemacht.Most of the Priedhöfe are in the immediate vicinity of towns and cities Villages Uncl therefore border many on water protection and water control areas. These graveyards were created many thousand years ago. At this time Nobody has ever thought about layers of earth and watercourses.
Nicht nur, daß meine neue Bestattungsmethode umweltfreundlicher ist, sie ist auch humaner. Unsere Lebensqualität hat sich seit dem Zeitalter der Industriealisierung so geändert, daß die herkömmliche Bestattungsmethode mir umweltfeindlich und unmenschlich erscheint.Not only is my new burial method more environmentally friendly, it is also more humane. Our quality of life has increased since the age of industrialization so changed that the conventional burial method is environmentally unfriendly and inhuman to me appears.
Die Kosten sind bei meiner neuen Bestattungsmethode nicht wesentlich iiöher wie bei einer herkömmlichen Bestattunq.The cost is not significant with my new burial method ii higher than a conventional burial.
Der Neuerung liegt die Aufgabe zugrunde alte und neue Friedhöfe mit den aus Stahlgußbeton (Stahl, Kunststoff o.ä. Materialien) serienmäßig hergestellten Standardgräbern auszustatten. Der Vorteil der neuerungsgemäß aus Stahlgußbeton (Stahl, Kunststoff o.ä. Materialien) serienmäßig hergestellten Gröber können ohne Bedenken auf jeden Friedhof eingebaut werden. Dies hat den Vorteil, daß neuerungsgemäß eine beliebige Anzahl von Gräbern vormontiert werden können und nicht wie bei der herkömmlichen Methode mit einem j'insturz der Gräber gerechnct werden muß Man kann diese neuerungsgemäß aus Stahlgußbeton (Stahl, Kunststoff o.ä. Materialien) hergestellten Gräber beliebig oft verwenden, da sic von außen und innen durch mehrere Isolier-und Schutzanstriche wegen Feuchtigkeit, Wasser (Grundwasser, Oberflächenwasser) geschützt sind, so daß keine Feuchtigkeit in das Innere und keine Giftstoffe aus dem Innern in die Umwelt gelangen können.The innovation is based on the task of using old and new cemeteries those made of cast steel concrete (steel, plastic or similar materials) in series Equip standard graves. The advantage of the new, made of cast steel concrete (steel, Plastic or similar materials) mass-produced coarsers can be used without hesitation be built into every cemetery. This has the advantage that according to the innovation Any number of graves can be pre-assembled and not as with the conventional one Method with a collapse of the graves must be reckoned with Man This can now be made of cast steel concrete (steel, plastic or similar materials) The tombs you have made can be used as often as you like, as they can be accessed from outside and inside by several Insulating and protective coatings due to moisture, water (groundwater, surface water) are protected so that no moisture gets inside and no toxins from can get into the environment inside.
Gemäß einer weiteren vorteilhaften Ausgestaltung der Erfindung soll das serienmäßig hergestellte Grab in der Höhe so klein wie möglich gehalten werden, in der Länge jedoch 50 - 60 cm länger sein, wie ein herkömmliches Grab.According to a further advantageous embodiment of the invention is intended the serially produced grave is kept as small as possible in height, however, it should be 50 - 60 cm longer than a conventional grave.
Am Fußende entsteht nun ein Raum; der nicht die volle Höhe des Grabes erhält, so daß die Oberseite, wenn sie mit Boden bedeckt wird, als Fußweg genutzt werden kann. Dies hat den Vorteil, daß die herkömmliche Form eines Grabes beibehalten wird. Dieser Raum kann nach 20 - 25 Jahren für die ueberreste des Leichnams genutzt werden, in dem man die Überreste in einen kleinen Behälter aus Styropor o.ä umbettet. Hier können auch weitere Generationen ihre allerletzte Ruhe finden.A room is now created at the foot end; who is not the full height of the grave so that the top, when covered with soil, is used as a footpath can be. This has the advantage that the conventional shape of a grave is retained will. This room can be used for the remains of the corpse after 20-25 years by embedding the remains in a small container made of styrofoam or similar. This is where other generations can find their ultimate rest.
Das so freigewordene Grab wird am Fußende mit einer Styroporplatte verschlossen und ist Äflt nachdem es gereinigt und mit einem neuen Schutzanstrich versehen wurde, für eine Neubestattung bereit.The grave that has been freed in this way is covered with a styrofoam plate at the foot closed and is Äflt after it has been cleaned and with a new protective coating was provided, ready for a new burial.
liierin sehe ich meine Methode von einer humaneren und umweltfreundlicheren Bestattung als voll verwirklicht So kann man kostensparend arbeiten, indem das aus Stahlgußbeton (Stahl, Kunststoff o.ä. Materialien) serienmäßig hergestellte Grab ca. 1,40 m tief ist und man deshalb weniger Aushub benötigt. Dadurch kommt man mit den vorher bestatteten Leichenresten nicht mehr in Berührung.Here I see my method as being more humane and more environmentally friendly Funeral as fully realized So you can work cost-saving by doing that Cast steel concrete (steel, plastic or similar materials) serially produced grave 1.40 m deep and therefore less excavation is required. This is how you come along no longer in contact with the previously buried remains.
Bevor das neuerungsgemäß aus Stahlgußbeton (Stahl, Kunststoff o.ä, Materialien) serienmäßig heRgestelle Grab in die von einem Bagger ausgeschachtete Grube montiert wird, muß die Sohle platziert werden.Before the new, cast steel concrete (steel, plastic, etc., Materials) serially excavated grave in the excavated by an excavator Pit is assembled, the sole must be placed.
Ist hier kein gewachsener Boden vorhanden, kann man mit zusätzlich serienmäßig vorgefertigten Stahlbetonträgern die Sohle befestigen. Hierauf können alle serienmäßig vorgefertigten GräbFr montiert werden. Durch die feste, oder befestigte Sohle können die Gräber nicht mehr absacken.If there is no natural soil here, you can also use Fasten the base to prefabricated reinforced concrete beams as standard. Can on this all series prefabricated GräbFr can be assembled. By the fixed, or fortified The graves can no longer sink at the bottom.
Gemäß einer weiteren vorteilhaften Ausgestaltung der Neuerung ist die Bedeckung (Deckel).According to a further advantageous embodiment of the innovation the covering (lid).
Die Abdeckung wird in den am oberen Rande des Grabes vorgesehenen Paßsitz (Aussparung) eingelegt. In diesen Paßsitz wird eine kunststoff-oder betumenähnliche Masse eingearbeitet. Diese Abdeckung dichtet das (;rab vollständig ab, so daß kein Wasser von aucn nach innen und keine Fäulnisgase von innen nach außen gelangen können. Auf diese Abdeckung wird eine serienmäßig hergestellte, wasserundurchlässige Kappe, die sich über den Grabrand erstreckt, aufgearbeitet.The cover is provided in the at the top of the tomb Fit (recess) inserted. In this snug fit is a plastic or betumen-like Incorporated mass. This cover seals the (rab completely, so that no Water from inside and no putrefaction gases can get from inside to outside. A serially produced, water-impermeable cap is placed on this cover, which extends over the grave edge, worked up.
Bei der letzten Abdeckung kann eine herkönunliche teuere Grabplatte verwendet werden oder eine neuerungsgemäß aus Spezialbeton serienmäßig vorgefertigte Grabplatte, die z.B. seitlich und von oben geschliffen, gemeißelt, waschbetonartig, ornamentartig (Strukturbeton, Hofer Neugrün, Perlqrau, Moränekies, Nagelfluh) oder nach ähnlichen Verarbeitungsmethoden vorgefertigt ist. Die Grabplatte deckt das Grab von oben und von der Seite im oberen Teil des Grabes vollständig ab; sie hat eine leichte Neigung zum Fußende.A traditional, expensive grave slab can be used for the last covering can be used or a new one made of special concrete as standard Grave slab, which e.g. sanded, chiseled, washed concrete-like, from the side and from above, ornament-like (structured concrete, Hofer Neugrün, Perlqrau, Moränekies, Nagelfluh) or is prefabricated using similar processing methods. The grave slab covers that Grave completely from above and from the side in the upper part of the grave; she has a slight incline towards the foot end.
Man kann dies ncuerungsgemäß aus Stahlgußbeton (Stahl, Kunststoff o.ä. Materialien) hergestellte Grab mit einem herkömmlichen Grabstein versehen.This can be done from cast steel concrete (steel, plastic or similar materials) provided the grave with a conventional tombstone.
Die neuerungsgemäß hierfür vorgefertigte -Grabplatte hat eine Bodenplatte mit seitlicher Grabeinfassung und seitlichen Irhöhungen von ca.The grave plate, which was newly prefabricated for this purpose, has a base plate with lateral grave border and lateral elevations of approx.
15 - So cm (aus einem Guß gegossen). Am Xopfende wird ein herkömmlicher Grabstein verwendet; der Innenraum eignet sich zur Bepflanzüng.15 - So cm (cast from one piece). At the end of the pot there is a conventional one Tombstone used; the interior is suitable for planting.
In das neuerungsgemäß aus Stahlgußbeton (Stahl, Kunststoff o.ä. Materialien) angefertigte Grab ist eine Dämmplatte an der Decke des Grabes angebracht Diese Dämmplatte soll neuerungsgemäß verhindern, daß sich Kondenzwasser an der Decke des Grabes abschlägt und nach unten tropft. Dieses Kondenzwasser soll sich neuerungsgemäß an den mit Kunststoffanstrich oder auf Betumenbasis gestrichenen seitlichen Wänden abschla-en. Das abgeschlagene Kondenzwasser läuft an den Wänden nach unten, wo neuerungsgemäß im unteren Teil des Grabes einen kleine Aussparung eingegossen ist.In the new, according to cast steel concrete (steel, plastic or similar materials) Made grave, an insulation board is attached to the ceiling of the grave This insulation board to prevent condensation water from falling on the ceiling of the grave and dripping down. According to the innovation, this condensation water is to be transferred to the with Plastic paint or side walls painted on the basis of betumen. The condensed water that has been knocked off runs down the walls, where it has been renewed a small recess is cast in the lower part of the grave.
Der obere Teil der Aussparung läuft im spitzen Winkel zu, so daß das Wasser, bedingt durch den spitzen Winkel abtropfen muß. Unter der sogenannten Trofntse wird jetz.t neuerungsgemäß ein aus Kunststoff oder Stahl (V2A) hergestelltes U-Profil, das auf deii Kopfenden geschlossen ist, in die Aussparung gesteckt. Dieses U-Profil wird neuerungsgemäß auf einem Wasser tank befestigt.The upper part of the recess tapers at an acute angle, so that the Water, due to the acute angle, has to drip off. Under the so-called Trofntse is now a new one made of plastic or steel (V2A) U-profile, which is closed on the head ends, inserted into the recess. This U-profile is now attached to a water tank.
Durch Profil; und Wassertank sind kleine Löcher gebohrt, so däß das Kondenzwasser, das sich an den Wänden abschlägt, nach unten läuft, an der Tropfnase ins V-Profil abtropft, von dort durch die Löcher in den Wasserbehälter gelangt. Neuerungsgemäß liegt im Innenraum des Wasserbehälters eine über 20 - 30 Jahre haltbare Kunststoffplatte (styroporähnlich), die in ihren Außenmaßen etwas kleiner ist, wie die Innenmaße des Wasserbehälters. Die Styropoiplatte schwimmt auf dem Kondenzwasser und verhindert, daß das Kondenzwasser, das sich nach einiger Zeit im Wasserbehälter sammelt, aus den Löchern, die durch Tank und U-Profil gebohrt sind, wieder verdunstet. Der Wasserbehälter ist aus Kunststoff stahl o.ä. Materialien) vorgefertigt und gegen Kälte isoliert.By profile; and water tank are bored small holes so that Condensation water, which is chipped off the walls, runs down, on the drip nose drips into the V-profile, from there through the holes in the water tank. According to the innovation, the interior of the water tank has a shelf that can be kept for over 20-30 years Plastic plate (similar to styrofoam), which is slightly smaller in its external dimensions, such as the internal dimensions of the water tank. The styrofoam floats on the condensation water and prevents the condensation water that builds up in the water tank after a while collects, evaporates again from the holes drilled through the tank and U-profile. The water tank is made of plastic steel or similar materials) prefabricated and against Cold insulated.
Neuerungsgemäß der Erfindung einer umweltfreundlicheren und humaneren Bestattuny wird der untere Teil des Sarges mit einer fett- und fettsäurebindenden Masse ausgefüllt. Neuerungsgemäß wird eine aus Styropor serienmäßig hergestellte gelöcherte Liege auf die fettbindende Masse gelegt. Dieses kann in jeden herkömmlichen Sarg eingearbeitet werden. Der Leichnam wird auf diese gelöcherte Liege gebettet. Die nach einiger Zeit austretende Flüssigkeit läuft durch die gelöcherte Styroporliege in die fettbindende Masse.' Das freiwerdende Kondenzwasser verdunstet durch die neuerungsgemäß an dem Deckel angebrachten Verdunstungsklappen. Die neuerungsgemäßen Verdunstungsklappen können an jeden Sarg angebracht werden. Sie werden aus Kunststoff, Metall o.ä. Materialien hergestellt. Bevor das serientnäßig aus Stahlgußbeton (Stahl, Kunststoff o.ä. Materialien) hergestellte Grab geschlossen wird, werden die Verdunstungsklappen geöffnet. Bei dieser Bestattungsmethode kann man auf einen teueren herkömmlichen Sarg verzichten und auf einen neuerungsgemäß serienmäßig aus Hartschaum-Styropor gepreßten Sarg ausweichen (Holzimitation außen). Dieser neuerungsgemäß serienmäßig hergestellte Sarg ist ca. 2/3 biltijer als ein herkömmlicher Sarg.According to the invention of a more environmentally friendly and humane Bestattuny is the lower part of the coffin with a fatty and fatty acid binding Mass filled in. According to the innovation, one made of styrofoam is mass-produced perforated couch placed on the fat-binding mass. This can can be incorporated into any conventional coffin. The corpse is holed on top of this Lounger bedded. The liquid that escapes after a while runs through the perforated one Styrofoam bed in the fat-binding mass. ' The released condensation water evaporates thanks to the evaporation flaps that have now been attached to the lid. The new ones Evaporation flaps can be attached to each coffin. They are made of plastic Metal or similar materials are made. Before the serial production of cast steel concrete (steel, Plastic or similar materials) is closed, the evaporation flaps opened. With this burial method one can rely on an expensive conventional one Do without a coffin and use a new one made of hard foam styrofoam as standard Dodge the pressed coffin (imitation wood outside). This new as standard The manufactured coffin is about 2/3 taller than a conventional coffin.
Lin Ausführungsbeispiel des neuerungsgemäß aus Stahlgußbeton (Stahl, Kunststoff o.ä. Materialien) serienmäßig hergestellten Grabes ist an Hand zweier chematischer Zeichnungen dargestellt. Dei Fi@u@@ zeigen einen Teilquerschnitt durch das Grab, den Sarg und darauf liegendem (;rabdeckel mit Abdeckkappe und Grabplatte oder Bepflanzungsplatte (s. Zeichnung 1).Lin embodiment of the innovation according to cast steel concrete (steel, Plastic or similar materials) serially produced grave is on hand of two chemical drawings. Show the Fi @ u @@ a partial cross-section through the grave, the coffin and lying on it (rabdeckel with cap and grave slab or planting plate (see drawing 1).
Zeichnung 2 zeigt einen Längsschnitt durch das Grab mit Grabraum A) und Nebenraum B), Sarg mit Entlüftungsklappen, Umbettungsbehälter und Grabdeckel. Drawing 2 shows a longitudinal section through the grave with grave space A) and adjoining room B), coffin with ventilation flaps, reburial container and grave lid.
Das neuerungsgemäß ausgebildete, in der Zeichnung dargestellte, serienmäßig hergestellte Stahlbetongrab (1) hat einen Deckel (2), der nach Einlegen in die Aussparung (13), die mit einer Dichtungsmasse (14) ausgearbeitet ist, die das Grab (1) vollständig abschließt.The newly designed, shown in the drawing, comes as standard The reinforced concrete grave (1) produced has a cover (2) which, after being inserted into the recess (13), which is worked out with a sealant (14) that completely covers the grave (1) concludes.
Im inneren Teil des Grabes (1) ist eine Aussparung (15) (Tropfnase) eingegossen. In diese Aussparung (15) wird ein U-Profil (7), das an den Eden geschlossen ist, eingesetzt. Dieses U-Profil (7) sitzt auf einem leeren Behälter (8). Durch U-Profil (7) und Behälter (8) sind kleine Löcher (16) gebohrt, so daß das Kondenzwasser (17),das sich an den Innenwänden (18) abschlägt und nach unten läuft, bei Aussparung (15) (Tropfnase) ins U-Profil (7) abtropft und nun durch die Löcher (16) in den Behälter (8) gelangt. Im Wasserbehälter (8) liegt innen eine Kunststoffplatte (styroporähnlich) (19), die in ihren Außenmaßen etwas kleiner ist wie die Innenmaße vom Wasserbehälter (8). Die Styroporplatte (19) schwimmt auf dem Kondenzwasser (17) und verhindert, daß das Kondenzwasser (17), das sich nach einiger Zeit im Wasserbehälter (8) sammelt, aus den Löchern (16) wieder größtenteils verdunstet. Da sich kein Kondenzwasser (17) an der Decke (20) im Innenraum des Grabes (1) abschlägt, wird an der Decke (20) eine Dämmplatte (3) aus Hartschaum-Styropor o.ä. befestigt. Das aus Stahlgußbeton (Stahl, Kunststoff o.ä. Materialien) serienmäßig hergestellte Grab (1) erhält eine serienmäßig hergestellte Isolierkappe (4), die über Deckel (2) gestülpt wird. Auf die aus Kunststoff oder Betumenbasis hergestellte Isolierkappe (4) wird eine serienmäßige aus Spezialbeton hergestellte Grabplatte (5) gelegt. Die serienmäßig hergestelle Grabplatte (5) hat seitliche Grabeinfassungen (21). Sie kann eine geschliffene, gemeißelte, waschbetonähnliche, ornamentähnliche (Strukturbeton, Perlgrau, Hofer Neugrün, Moränekies, Nagelfluh) o.a. Oberfläche (22) haben. (Die Einfassung läuft zum Fußende keilförmig zu). Die Grabplatte (5) kann aber auch durch eine serienmäßig aus Spezialbeton hergestellte dünne umrahmte Bodenplatte (6)ersetzt werden. Sie hat an den Seiten ca. 15 - 20 cm hohe Wände (oben) und eine Grabeinfassung (21) (unten). (Die Bodenplatte (6) verläuft waagerecht). Hier kann ein herkömmlicher Grabstein auf die Bodenplatte (6) gesetzt werden. Ins innere der Bodenplatte (6) kann man jetzt Blumenerde (23) einschütten. In dem Grab (1) kann ein aus Hartschaum-Styropor serienmäßig vorgefertigter Sarg (9) benutzt werden.In the inner part of the grave (1) there is a recess (15) (drip nose) poured. In this recess (15) is a U-profile (7), which is closed to the Eden is used. This U-profile (7) sits on an empty container (8). By U-profile (7) and container (8) are small holes (16) drilled so that the condensation water (17), which is knocked off on the inner walls (18) and runs downwards, when there is a recess (15) (drip nose) drips into the U-profile (7) and now through the holes (16) into the Container (8) arrives. Inside the water tank (8) there is a plastic plate (similar to styrofoam) (19), which is slightly smaller in its external dimensions than the internal dimensions of the water tank (8th). The styrofoam plate (19) floats on the condensation water (17) and prevents that the condensation water (17), which after a while in the water tank (8) collects, largely evaporated again from the holes (16). Since there is no condensation (17) on the ceiling (20) in the interior of the grave (1) is knocked off on the ceiling (20) an insulation board (3) made of rigid foam styrofoam or similar attached. The one made of cast steel concrete (Steel, plastic or similar materials) serially produced grave (1) receives a Series-produced insulating cap (4) that is slipped over the cover (2). on the insulating cap (4) made of plastic or betumen base becomes a standard one grave slab made of special concrete (5). The series produced Grave slab (5) has lateral grave borders (21). She can be a polished, chiseled, washed concrete-like, ornament-like (structured concrete, pearl gray, Hofer Neugrün, Moränekies, Nagelfluh) or similar surface (22). (The edging is running wedge-shaped towards the foot end). The grave slab (5) can also be fitted with a serial thin framed base plate (6) made of special concrete must be replaced. she has approx. 15 - 20 cm high walls on the sides (top) and a grave border (21) (below). (The base plate (6) runs horizontally). Here can be a conventional Gravestone can be placed on the base plate (6). Inside the base plate (6) you can now pour in potting soil (23). In the grave (1) can be made of hard foam styrofoam standard prefabricated coffin (9) can be used.
Im Sarg (9) wird eine serienmäßig aus Styropor hergestellte gelöcherte Liege (24) eingearbeitet. Durch die gelöcherte Liege (24) sickert die aus dem Leichnam austretende Flüssigkeit in die fettbindende Masse (25). Das bei der Verwesung austretende Kondenzwasser (17) kann durch die Verdunstungsklappen (lo) austreten.In the coffin (9) is a series made of Styrofoam with holes Lounger (24) incorporated. It seeps out of the corpse through the perforated couch (24) escaping liquid into the fat-binding mass (25). The one that emerges from decomposition Condensation water (17) can escape through the evaporation flaps (lo).
Die Zeichnung 2 zeigt das Grab (1) mit dem Bestattungsraum a), dem Sarg (9), den Verdunstungsklappen (10) und dem Grabdeckel (2); weiterhin Nebenraum b) mit Trennwand (12). Hier ist der Behälter (11) schon eingezeichnet, der die Überreste nach 20 - 25 Jahren aufnimmt.The drawing 2 shows the grave (1) with the burial room a), the Coffin (9), the evaporation flaps (10) and the grave lid (2); still adjoining room b) with partition (12). Here the container (11) is already drawn, which contains the remains absorbs after 20-25 years.
1 Grab 2 Deckel 3 Dämmplatte 4 Isolierkappe 5 Grabplatte 6 Bodenplatte für Blumenerde 7 U-Profil 8 Behälter 9 gepreßter Kunststoffsark 10 Verdunstungsklappen 11 Behälter für Leichenüberreste 12 Trennwand 13 Aussparung 14 Dichtungsmasse 15 Aussparung (Tropfnase) 16 Löcher 17 Kondenzwasser 18 Innenwände 19 Styroporplatte im Wasserbehälter 20 Grabdecke (innen) 21 Grabeinfassung 22 Oberfläche (Grabplatte) 23 Blumenerde 24 Liege 25 fettbindende Masse 2G Isolierschicht 27 Stahlbetonträger Leerseite 1 grave 2 cover 3 insulation plate 4 insulating cap 5 grave plate 6 base plate for potting soil 7 U-profile 8 container 9 pressed plastic sark 10 evaporation flaps 11 Body remains container 12 Partition 13 Recess 14 Sealant 15 Recess (drip nose) 16 holes 17 condensation water 18 inner walls 19 styrofoam plate in the water tank 20 grave ceiling (inside) 21 grave border 22 surface (grave slab) 23 potting soil 24 bed 25 fat-binding compound 2G insulating layer 27 reinforced concrete beam Blank page
Claims (8)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19803035578 DE3035578A1 (en) | 1980-09-20 | 1980-09-20 | Hygienic prefab. concrete grave - has chamber adjoining initial burial chamber with insulating panel inside sealing cover |
DE19813150023 DE3150023A1 (en) | 1980-09-20 | 1981-12-17 | Reusable concrete burial vault |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19803035578 DE3035578A1 (en) | 1980-09-20 | 1980-09-20 | Hygienic prefab. concrete grave - has chamber adjoining initial burial chamber with insulating panel inside sealing cover |
Publications (1)
Publication Number | Publication Date |
---|---|
DE3035578A1 true DE3035578A1 (en) | 1982-04-08 |
Family
ID=6112469
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19803035578 Ceased DE3035578A1 (en) | 1980-09-20 | 1980-09-20 | Hygienic prefab. concrete grave - has chamber adjoining initial burial chamber with insulating panel inside sealing cover |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE3035578A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE9108485U1 (en) * | 1991-06-05 | 1991-10-10 | Ackermann, Günther, 7141 Möglingen | Burial chamber |
EP1099809A3 (en) * | 1999-11-09 | 2003-01-15 | Günter Ackermann | Burial vault |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE7044701U (en) * | 1900-01-01 | Freinecker K | Kit for a crypt | |
DE6801899U (en) * | 1969-02-21 | 1969-05-29 | Transportbeton Gmbh & Co Kg | TWO-PIECE CONCRETE CONTAINER, CONCRETE SARCOPHAGUE TO ACCEPT THE COFFIN |
-
1980
- 1980-09-20 DE DE19803035578 patent/DE3035578A1/en not_active Ceased
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE7044701U (en) * | 1900-01-01 | Freinecker K | Kit for a crypt | |
DE6801899U (en) * | 1969-02-21 | 1969-05-29 | Transportbeton Gmbh & Co Kg | TWO-PIECE CONCRETE CONTAINER, CONCRETE SARCOPHAGUE TO ACCEPT THE COFFIN |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE9108485U1 (en) * | 1991-06-05 | 1991-10-10 | Ackermann, Günther, 7141 Möglingen | Burial chamber |
EP1099809A3 (en) * | 1999-11-09 | 2003-01-15 | Günter Ackermann | Burial vault |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1634372A1 (en) | Device for laying foundations, especially larger buildings | |
DE102015117073B4 (en) | Form stone for use in a surface covering and associated surface covering | |
DE3534327C1 (en) | Prefabricated container forming coffin-receiving vault - comprises GRP trough and lid with perimeter holes allowing air circulation | |
DE3035578A1 (en) | Hygienic prefab. concrete grave - has chamber adjoining initial burial chamber with insulating panel inside sealing cover | |
DE4400183A1 (en) | Hexagonal drainage elements assembled as drainage lining for open refuse tip | |
DE3150023A1 (en) | Reusable concrete burial vault | |
DE2059547A1 (en) | Crypt | |
DE19611660A1 (en) | Cultivation system for placing on roof or ground | |
EP1469145B1 (en) | Re-usable tomb and tomb arrangement | |
DE202018003155U1 (en) | urn stele | |
DE19606583C1 (en) | Casing of resistant plastic sheeting, for cladding earth grave | |
DE4417687A1 (en) | Underground garage | |
EP0808966B1 (en) | Burial crypt | |
US1986931A (en) | Individual mausoleum | |
EP1277898B1 (en) | Method of decontaminating graves | |
DE202010012163U1 (en) | Fountain for pouring in dead bag | |
DE6801899U (en) | TWO-PIECE CONCRETE CONTAINER, CONCRETE SARCOPHAGUE TO ACCEPT THE COFFIN | |
DE202009003248U1 (en) | Urn burial system | |
DE9311452U1 (en) | Grave care box | |
DE2158989A1 (en) | UNDERGROUND CHAMBER | |
CH671531A5 (en) | ||
DE102004053414A1 (en) | Cremation device for urns, has two-part dome with upper and lower parts, and handling opening closed by cover, where urns are transferred from support plate into substructure when upper dome part is in rest position | |
DE29520830U1 (en) | Burial chamber | |
DE7914845U1 (en) | CONCRETE BLOCK TO DIVIDE AREA AREAS | |
DE4431709A1 (en) | Modular grave installation with path element |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OM8 | Search report available as to paragraph 43 lit. 1 sentence 1 patent law | ||
OP8 | Request for examination as to paragraph 44 patent law | ||
AG | Has addition no. |
Ref country code: DE Ref document number: 3150023 Format of ref document f/p: P |
|
8131 | Rejection |