DE299412C - - Google Patents
Info
- Publication number
- DE299412C DE299412C DENDAT299412D DE299412DA DE299412C DE 299412 C DE299412 C DE 299412C DE NDAT299412 D DENDAT299412 D DE NDAT299412D DE 299412D A DE299412D A DE 299412DA DE 299412 C DE299412 C DE 299412C
- Authority
- DE
- Germany
- Prior art keywords
- buffer stop
- track
- rails
- rail
- buffer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 210000003467 Cheek Anatomy 0.000 description 1
- 229910001208 Crucible steel Inorganic materials 0.000 description 1
- 206010012411 Derailment Diseases 0.000 description 1
- 210000002832 Shoulder Anatomy 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000003116 impacting Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61K—AUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
- B61K7/00—Railway stops fixed to permanent way; Track brakes or retarding apparatus fixed to permanent way; Sand tracks or the like
- B61K7/16—Positive railway stops
- B61K7/18—Buffer stops
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Warehouses Or Storage Devices (AREA)
Description
KAISERLICHESIMPERIAL
PATENTAMT.PATENT OFFICE.
PATENTSCHRIFTPATENT LETTERING
- JVi 299412 KLASSE 20#. GRUPPE- JVi 299412 CLASS 20 #. GROUP
REISCHACH & CO, G.m.b.H. in BERLIN. Verschiebbarer Prellbock für Eisenbahngeleise. Patentiert im Deutschen Reiche vom 4. Januar 1914 ab.REISCHACH & CO, G.m.b.H. in Berlin. Slidable buffer stop for railroad tracks. Patented in the German Empire on January 4, 1914.
Damit in Kopfbahnhöfen oder auf totlaufenden Geleisen das Geleisende nicht überfahren werden kann, bedient man sich bekanntlich auch solcher Prellböcke, die als wesentlichen Bestandteil eine auf den Fahrschienen gleitende Bühne oder einen desgl. Schlitten besitzen, auf die der anfahrende Zug auffährt, so daß das Zuggewicht zum Bremsen des Schlittens und damit des ZugesSo that the end of the track is not run over in terminal stations or on dead-running tracks can be used, as is well known, such buffer stops, which are considered essential Part of a platform sliding on the rails or a similar one. Own carriage on which the approaching train drives so that the train weight to Braking the sled and thus the train
ίο selbst mit verwertet wird.ίο is also recycled.
Unter diesen gleitenden Prellböcken sindUnder these sliding buffer blocks are
ι auch solche bekannt geworden, bei denen das mit dem Prellbock fest verbundene verschiebbare Geleise mit dem Fahrgeleis auf gleicher Höhe- liegt und wie ein Hemmschuh ein niedriger liegendes Geleis von oben umfaßt. ι also become known in which the sliding track firmly connected to the buffer stop is at the same level as the driving track and, like a drag shoe, encompasses a lower track from above.
' Diese Anordnungen haben den wesentlichen Nachteil, daß der ankommende Zug entweder auf den Schlitten hinauffahren müß oder daß beim Verschieben des Prellbocks eine Lücke entsteht, die zu Entgleisungen Veranlassung geben kann.'These arrangements have the major disadvantage that the incoming train either must go up on the slide or that when moving the buffer stop there is a gap arises, which can give rise to derailments.
Diese Nachteile werden bei dem gleitenden Prellbock nach, vorliegender Erfindung dadurch zu vermeiden gesucht, daß die im Geleise liegenden, mit dem Prellbock fest verbundenen gleitenden Schienen auf einer Unterlage gleiten, die zugleich für den ganzen Prellbock als seitliche Führung und für die das Fahrgeleis verlassenden Räder als Auflager oder Geleise dient, wobei die Unterlagen zu den Schienenenden des festliegenden Fahrgeleises so angeordnet sind, daß keine Lücke vorhanden ist.These disadvantages are in the sliding buffer stop according to the present invention sought to avoid that those lying in the track, firmly connected to the buffer stop sliding rails slide on a base, which at the same time for the whole buffer stop as a lateral guide and for the wheels leaving the track as a support or Track serves, with the documents to the rail ends of the fixed track are arranged so that there is no gap.
Die Prellbockschienen können einfach lose auf ihrer Führung aufliegen oder miteinander verbunden sein, damit der gleitende Prellbock in sich versteift ist. Die Führung des verschiebbaren Prellbocks ist dicht an die Schienen herangerückt und ist etwas niedriger wie der Scheitel des Schienenkopfes.The buffer stop rails can simply rest loosely on their guide or together be connected so that the sliding buffer stop is stiffened in itself. The leadership of the sliding Buffer stop is moved close to the rails and is a little lower than the apex of the rail head.
Ein derartiger verschiebbarer Prellbock ist in der beiliegenden Zeichnung dargestellt, und zwar zeigt:Such a displaceable buffer stop is shown in the accompanying drawing, and although shows:
Fig. ι den Prellbock von der Seite,Fig. Ι the buffer stop from the side,
Fig. 2 den Prellbock im Schnitt nach A-B von Fig. i.FIG. 2 shows the buffer stop in section along AB of FIG.
Die in üblicher Weise gebetteten Schwellen h, k, k. . . dienen zur Befestigung der beiden Rahmenteile if, e, die etwa aus Stahlguß hergestellt und durch Bolzen i und Muttern k noch weiter gegen Verschiebung gesichert sein können. Auf den Absätzen f, g der Rahmenteile d, e liegen lose die Schienen b und c auf, die an ihrem einen Ende hochgebogen sind und den Prellbock m bilden. The thresholds h, k, k bedded in the usual way. . . serve to fasten the two frame parts if, e, which are made from cast steel and can be further secured against displacement by bolts i and nuts k. On the paragraphs f, g of the frame parts d, e , the rails b and c lie loosely, which are bent up at one end and form the buffer stop m .
Der Prellbock m bildet also mit den Schienen b, c ein Ganzes und kann auf den Absätzen f, g der Rahmenteile d, e gleiten, wenn go er durch einen aufprallenden Zug (Puffer n) unter Überwindung der Reibung zwischen den Schienen b, c und den Absätzen f, g verschoben wird. The buffer stop m thus forms a whole with the rails b, c and can slide on the shoulders f, g of the frame parts d, e if it is caused by an impacting train (buffer n) overcoming the friction between the rails b, c and the paragraphs f, g is moved.
Die Oberkante der Schienen δ, c muß etwas höher liegen als der obere Rand der Rahmenteile d, e, damit das Gewicht des Zuges usw. die Reibung möglichst vermehrt. Auch müssen diese Teile so nahe an die Schiene herangerückt sein, daß der Radreifen / in der entstehenden Schienenlücke sofort eine neue Stütze auf den Wangen der Rahmenteile d, e findet.The upper edge of the rails δ, c must be slightly higher than the upper edge of the frame parts d, e, so that the weight of the train etc. increases the friction as much as possible. These parts must also be moved so close to the rail that the wheel tire / in the gap between the rails immediately finds a new support on the cheeks of the frame parts d, e.
ίο Die Schiene des Prellbocks m kann eine beliebige Gestalt haben, und zwar ist in Fig. 2 links eine Schiene δ gewöhnlichen Profils und rechts eine besondere Schiene c eines" H-förmigen Profils dargestellt.ίο The rail of the buffer stop m can have any shape, namely in Fig. 2, a rail δ ordinary profile is shown on the left and a special rail c of an "H-shaped profile" is shown on the right.
Bei dieser zweiten Gestaltung der Schiene besteht kaum eine Lücke zwischen ihr und dem Rahmenteile e, so daß der Radreifen I nach Weiterschieben des Prellbocks mit Sicher-' heit auf dem Rahmenteil ein neues Auflager findet. Die Schiene c kann so dicht an den ■ Rahmenteil β herangerückt werden, daß sie sowohl seitlich wie unten am Rahmen reibt, namentlich da der Raddruck die Schiene nach außen zu drücken bestrebt ist.In this second design of the rail there is hardly any gap between it and the frame part e, so that the wheel tire I will surely find a new support on the frame part after the buffer stop has been pushed further. The rail c can be moved so close to the ■ frame part β that it rubs both laterally and below the frame, namely because the wheel pressure tends to push the rail outwards.
Der verschiebbare Prellbock arbeitet wie folgt:The sliding bumper works as follows:
Wenn der ankommende Zug auf die Gleitschienen δ aufgefahren ist und der Prellbock m wird verschoben, so werden die nachfolgenden Räder beim Verlassen der Fahrschienen sofort von den Seitenteilen d, e weiter getragen und sinken deshalb nicht in eine Lücke hinein.When the incoming train has run onto the slide rails δ and the buffer stop m is moved, the following wheels are immediately carried on by the side parts d, e when they leave the rails and therefore do not sink into a gap.
Claims (1)
Publications (1)
Publication Number | Publication Date |
---|---|
DE299412C true DE299412C (en) |
Family
ID=553508
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DENDAT299412D Active DE299412C (en) |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE299412C (en) |
-
0
- DE DENDAT299412D patent/DE299412C/de active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2006081870A1 (en) | Track compacting machine | |
DE299412C (en) | ||
CH370428A (en) | Joint bridging with switch switches for monorail railways | |
DE2314895C3 (en) | Device for creating a steady transition in bridges with railways | |
DE225490C (en) | ||
DE2052349C3 (en) | Centerpiece with fillers that can be raised and lowered | |
DE659477C (en) | Crawler undercarriage with a crawler with lateral guide jaws for the support rollers | |
DE421904C (en) | Traveling table made up of several rail cars | |
DE33247C (en) | Switch for field railways on which double flange wheels are used | |
DE14837C (en) | Innovations in the construction of switches and crossings for railways | |
DE441756C (en) | Wheel chocks | |
DE11132C (en) | Improvements in construction. of level crossings and switch rails, as well as of the apparatus to be used. (Second | |
DE102005024398B3 (en) | Buffer stop for rails of track system, has carrier profile arranged freely movable relative to railway sleepers and lateral projection laterally gripping to head of rail before buffer-stop | |
DE267421C (en) | ||
DE840258C (en) | Slidable brake bumper | |
DE558077C (en) | Two-rail brake shoe with rollers and brake plate | |
DE583481C (en) | Railway master car | |
DE172514C (en) | ||
DE533572C (en) | Cantilever track turning machines that run next to each other on rails and are coupled by horizontal rods | |
DE3102537C2 (en) | Undercarriage for rail-bound vehicles | |
DE8771C (en) | Innovations to the railway superstructure | |
EP1873309A1 (en) | Protective ramp of a wing rail in points | |
DE248344C (en) | ||
DE151381C (en) | ||
DE439469C (en) | Climbing turntable |