DE2737660B2 - Connection of a precast reinforced concrete part with a sheet pile wall - Google Patents
Connection of a precast reinforced concrete part with a sheet pile wallInfo
- Publication number
- DE2737660B2 DE2737660B2 DE19772737660 DE2737660A DE2737660B2 DE 2737660 B2 DE2737660 B2 DE 2737660B2 DE 19772737660 DE19772737660 DE 19772737660 DE 2737660 A DE2737660 A DE 2737660A DE 2737660 B2 DE2737660 B2 DE 2737660B2
- Authority
- DE
- Germany
- Prior art keywords
- reinforced concrete
- steel
- concrete part
- precast reinforced
- sheet pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Revetment (AREA)
Description
Die Erfindung betrifft eine Verbindung zwischen einem Stahlbetonfertigteil und dem Kopf einer Spundwand, wobei die Bewehrung des Stahlbetonfertigteiles mit dem Kopf der Spundwand verbindbar ist.The invention relates to a connection between a precast reinforced concrete part and the head of a sheet pile wall, the reinforcement of the precast reinforced concrete part can be connected to the head of the sheet pile wall.
Aus dem DE-GM 19 51086 ist ein Bausatz zur 4r> Erstellung von Wänden für Flußbauzwecke aus Fertigteilen ähnlich der bekannten Bauweise »Berliner Verbau« bekannt. Dabei besteht der Bausatz aus einzelnen mit Abstand zueinander einrammbaren Stahloder Stahlbetonträgern mit I-förmigem Querschnitt und w zwischen die Flansche dieser Träger von oben einschiebbaren Fertig-Stahlbetonplatten. Hierbei erfolgt der Verbund der Stahlbetonplatten über die Träger ausschließlich in waagerechter Richtung und nicht in vertikaler.From DE-GM 19 51086 a kit for 4 r> creating walls for Flußbauzwecke prefabricated Berlin wall "is similar to the familiar design" known. The kit consists of individual steel or reinforced concrete girders with an I-shaped cross-section that can be driven at a distance from one another and prefabricated reinforced concrete slabs that can be pushed in from above between the flanges of these girders. In this case, the reinforced concrete slabs are bonded exclusively in a horizontal direction and not in a vertical direction.
Die Zeitschrift »Die Bautechnik«, 1973, Heft 12, Seite 412 zeigt Stahlbetonholme auf Spundwänden, wobei bei dieser bekannten Holmausbildung jeweils der Holm zwar über einze'ne Anschlußstähle im Holm mit der Spundwand verschweißt ist, aber diese Holmausbil- wi dung keine biegesteife vertikale Verbindung zwischen Holm und Spundwand bildet, was ja hierbei auch nicht erforderlich ist, da die Aufgabe derartiger Holme lediglich die förmliche Abdeckung der Spundwandköpfe ist. Dieses geht auch aus dem letzten Absatz unter t>"> Punkt 11.6 dieser Literaturstelle hervor, wo es heißt: »Die genannten Fertigbetonholme sind nicht zur Übertragung großer lotrechter Kräfte geeignet. Ähnliches gilt auch hinsichtlich der Aufnahme waagerechter Kräfte, da solche Fertigteile im allgemeinen verhältnismäßig leicht ausgeführt werden«.The magazine »Die Bautechnik«, 1973, issue 12, page 412 shows reinforced concrete spars on sheet piling, with this known spar design, the spar in each case with individual connecting steels in the spar the sheet pile wall is welded, but this spar formation is wi dung does not form a rigid vertical connection between the spar and sheet pile wall, which is also not the case here is necessary, since the task of such spars only the formal covering of the sheet pile heads is. This can also be found in the last paragraph under t> "> Point 11.6 of this reference, where it says: “The precast concrete spars mentioned are not for Suitable for the transmission of large perpendicular forces. The same applies to the inclusion of horizontal ones Forces, since such prefabricated parts are generally carried out relatively easily ”.
Die Literaturstelle »Die Stahlspundwand Hoesch«, 6, verbesserte Auflage 1965, Seite 96, Bild 88 zeigt einen I-förmigen Holmgurt aus Stahl für eine Schrägpfahiverankerung, dessen oberer offener Teil mit Beton verfüllt ist, wobei die Betonfüllung siatisch keinerlei Bedeutung hat, sondern lediglich nach rein konstruktiven Gesichtspunkten gewählt worden ist Es könnten statt der Betonfüllung auch aufgeschweißte Abdeckbleche, Asphaltbetonfüllung oder Bodenfüllung Verwendung finden.The reference "Die Stahlspundwand Hoesch", 6, improved edition 1965, page 96, Fig. 88 shows one I-shaped spar chord made of steel for inclined pile anchoring, the upper open part of which is filled with concrete is, whereby the concrete filling siatisch no meaning has, but has only been chosen on the basis of purely constructive criteria. It could instead of the Concrete filling also welded on cover plates, asphalt concrete filling or floor filling use Find.
Ferner ist ein? Verbindung zwischen einem Stahlbetonfertigteil und einem Spundwandkopf bekannt, bei der das Stahlbetonfertigteil über eine Ortbetonplombe an den Spundwandkopf angeschlossen ist Durch diese Ortbetonplombe, die aufwendige Schal-, Bewehrungsund Betonierarbeiten auf der Baustelle voraussetzt, gehen aber die Vorteile der Spundwand- und der Stahlbetonfertigteilbauweise, die moderne Fertigbauweisen sind, teilweise verloren.Furthermore is a? Connection between a precast reinforced concrete part and a sheet pile head known at which the precast reinforced concrete part is connected to the sheet pile head via an in-situ concrete seal In-situ concrete seal, which requires complex formwork, reinforcement and concreting work on the construction site, however, the advantages of sheet piling and prefabricated reinforced concrete construction, which are modern prefabricated construction methods, are partially lost.
Von daher liegt der Erfindung die Aufgabe zugrunde, eine biegesteife Verbindung in vertikaler Richtung zwischen einem horizontal und vertikal großflächigen Stahlbetonfertigteil und einem Spundwandkopf zu schaffen, die weitgehendst werksseitig und ohne aufwendige Schal-, Bewehrungs- und Betonierarbeiten auf der Baustelle herstellbar ist.The invention is therefore based on the object of providing a rigid connection in the vertical direction between a horizontally and vertically large-area precast reinforced concrete element and a sheet pile head create that largely at the factory and without time-consuming formwork, reinforcement and concreting work can be produced on site.
Nach der Erfindung wird die Aufgabe in der Weise gelöst, daß das Stahlbetonfertigteil mit fußseitig außen einbetonierten und an die Bewehrung angeschweißten Stahlplatten versehen ist, die mit einem auf dem Kopf der Spundwand biegesteif angeordneten Profilstahl verbindbar sind. Dabei können die an die Bewehrung im Stahlbetonfertigteil angeschweißten Stahlplatten mit dem Profilstahl verschweißt sein. Um auch noch diese Schweißarbeiten auf der Baustelle zu vermeiden, ist der Fuß des Stahlbetonfertigteiles mit dem Profilstahl verschraubt.According to the invention, the object is achieved in such a way that the precast reinforced concrete part with the foot side on the outside Concrete and welded to the reinforcement steel plates is provided with a on the head the sheet pile wall rigidly arranged section steel can be connected. The reinforcement in the Precast reinforced concrete part welded on steel plates with the profile steel. To even this Avoiding welding work on the construction site is the base of the precast reinforced concrete part with the profile steel screwed.
In zweckmäßiger Weise ist der Profilstahl ein U-Stahl oder Doppel-T-Stahl, wobei auch ein oder beide nach oben zeigende Flansche des U-Stahls oder Doppel-T-Stahls nach innen geneigt sind, um z. B. Toleranzen der Breite des Fußes des Stahlbetonfertigteiles ausgleichen zu können. Um z. B. das Einsetzen des Stahlbetonfertigteiles in den auf dem Spundwandkopf angeordnete Profilstahl zu erleichtern und eine Möglichkeit zum Ausrichten des Stahlbetonfertigteiles in der Vertikalen zu schaffen, ist es von Vorteil, daß die fußseitig im Stahlbetonfertigteil einbetonierten Stahlplatten keilförmig angeordnet sind.The profile steel is expediently a channel steel or double-T-steel, one or both of the upward-facing flanges of the channel-steel or double-T-steel also being inclined inwards in order to e.g. B. Tolerances of the To be able to compensate for the width of the foot of the precast reinforced concrete part. To z. B. the insertion of the precast reinforced concrete part in the arranged on the sheet pile head To facilitate profile steel and a possibility of aligning the precast reinforced concrete part in the vertical To create, it is advantageous that the steel plates concreted in the precast reinforced concrete part are arranged in a wedge shape.
Um eine weitere Möglichkeit zum Ausrichten des Stahlbetonfertigteiles in der Vertikalen zu schaffen, ist der Profilstahl ein konkav gebogenes Blech, wobei im Stahlbetonfertigteil fußseitig nur eine einbetonierte entsprechend konvexe Stahlplatte vorgesehen ist.In order to create a further possibility for aligning the precast reinforced concrete part in the vertical, is the profile steel is a concave curved sheet, with only one concreted in the precast reinforced concrete part corresponding convex steel plate is provided.
Die Vorteile der Verbindung zwischen einem Stahlbetonfertigteil und dem Kopf einer Spundwand nach der Erfindung sind insbesondere in der weitgehenden werksseitigen Bearbeitung und Herstellung zu sehen, wodurch außer Schweiß- bzw. Schraubarbeiten keine weiteren Arbeiten auf der Baustelle notwendig sind. Außerdem bleiben die Vorteile der modernen Fertigbauweise erhalten.The advantages of the connection between a precast reinforced concrete part and the head of a sheet pile wall according to the invention are particularly in the extensive factory machining and production to see, which means that apart from welding or screwing work, no further work is necessary on the construction site are. In addition, the advantages of modern prefabricated construction are retained.
In der Zeichnung wird die Verbindung nach der Erfindung anhand von Ausführungsbeispielen näher erläutert. Es zeigtIn the drawing, the connection according to the invention is explained in more detail with the aid of exemplary embodiments explained. It shows
F i g. 1 eine Verbindung im Schnitt,
F i g. 2 eine andere Verbindung im Schnitt,
F i g. 3 eine weitere Verbindung im Schnitt,
F i g. 4 eine weitere Verbindung im Schnitt und
F i g. 5 eine weitere Verbindung im Schnitt.
Wie aus den F i g. i bis 4 hervorgeht, besteht die Verbindung zwischen einem Stahlbetonfertigteil 1 und
dem Kopf einer Spundwand 2 aus einem auf dem Kopf der Spundwand 2 angeordneten Profilstahl, z. B. einem
U-Stahl 3 oder Doppel-T-Stah! 4 (F i g. 1, rechte Seite),
das nach oben offen und mit dem Kopf der Spundwand 2 verschweißt ist, und zwei fußseitig außen im in das nach
oben offene Profilstahl 3, 4 eingesetzte Stahlbetonfertigteil 1 einbetonierte und an die Bewehrung 5 im
Stahlbetonfertigteil 1 angeschweißten Stahlplatten 6, die mit dem Profil 3,4 verschweißt (Fig. 1,3 und 4) oder
über Schraubenbolzen 7 (F i g. 2) verbunden sind, wobei die Schraubenbolzen 7 horizontal durch die Flansche 8
und Stahlbetonfertigteil 1 mit den Stahlpbtten 6 geführt sind.F i g. 1 a connection in section,
F i g. 2 another connection in section,
F i g. 3 another connection in section,
F i g. 4 another connection in section and
F i g. 5 a further connection in section.
As shown in FIGS. i to 4 shows, there is the connection between a precast reinforced concrete part 1 and the head of a sheet pile wall 2 from a section steel arranged on the head of the sheet pile wall 2, z. B. a U-steel 3 or double-T-steel! 4 (Fig. 1, right-hand side), which is open at the top and welded to the head of the sheet pile wall 2, and two on the foot-side outside in the reinforced concrete prefabricated part 1 inserted into the open-top section steel 3, 4 and attached to the reinforcement 5 in Precast reinforced concrete part 1 welded on steel plates 6, which are welded to the profile 3, 4 (Fig. 1,3 and 4) or via screw bolts 7 (Fig. 2), the screw bolts 7 horizontally through the flanges 8 and reinforced concrete prefabricated part 1 with the Stahlpbtten 6 are performed.
Um Breitentoleranzen des Fußes des Stahlbetonfertigteiles 1 ausgleichen zu können, kann ein nach oben zeigender Flansch 8 des U-Stahls 3 bzw. Doppel-T-Stahls 4 nach innen geneigt sein (F i g. 3).In order to be able to compensate for width tolerances of the foot of the precast reinforced concrete part 1, an upward pointing flange 8 of the channel steel 3 or double-T steel 4 be inclined inward (FIG. 3).
Bei einer nicht dargestellten Ausführungsform können auch beide Flansche nach innen geneigt sein.In an embodiment not shown, both flanges can be inclined inward.
Um z. B. das Einfädeln des Fußes des Stahlbetonfertigteiles 1 in das U-Stahl 3 zu erleichtern jnd eine Möglichkeit zum Ausrichten des Stahlbetonfertigteiles 1 in der Vertikalen zu schaffen, sind die Stahlplatten 6 keilförmig angeordnet (F i g. 4).To z. B. threading the foot of the precast reinforced concrete part 1 into the channel steel 3 to facilitate alignment of the precast reinforced concrete part 1 To create in the vertical, the steel plates 6 are arranged in a wedge shape (Fig. 4).
Eine besondere Ausführungsform zeigt die Fig.5. Um eine weitere Möglichkeit zum Ausrichten des Stahlbetonfertigteiles 1 in der Vertikalen zu schaffen, ist das auf dem Kopf der Spundwand 2 aufgeschweißte Profilstahl ein konkav gebogenes Blech 9, das mit einer entsprechend konvex gebogenen Stahlplatte 10 im Fuß des Stahlbetonfertigteiles 1 verschweißt ist, wobei dieA special embodiment is shown in FIG. In order to create a further possibility for aligning the precast reinforced concrete part 1 in the vertical the welded on the head of the sheet pile wall 2 profile steel a concave curved sheet 9, which with a Correspondingly convex curved steel plate 10 is welded in the foot of the precast reinforced concrete part 1, the
ίο Stahlplatte 10 ebenfalls an die Bewehrung 5 im Stahlbetonfertigteil 1 angeschweißt ist.ίο Steel plate 10 also to the reinforcement 5 in Precast reinforced concrete part 1 is welded on.
Zur Herstellung einer erfindungsgemäßen Verbindung zwischen dem Stahlbetonfertigteil 1 und dem Kopf der Spundwand 2 wird die Spundwand 2 schon im WerkTo produce a connection according to the invention between the precast reinforced concrete part 1 and the head the sheet pile wall 2 is the sheet pile wall 2 already in the factory
i> zu Tafeln von mehreren Metern Breite zusammengezogen und mit dem gewählten Profilstahl 3, 4 oder 9 versehen. Diese fertigen Spundwandtafeln werden dann auf der Baustelle als großes Flächenelement eingerammt bzw. einvibriert. Danach wird das Stahlbetonfer-i> pulled together to form panels several meters wide and provided with the selected section steel 3, 4 or 9. These finished sheet piling panels are then used Rammed or vibrated in on the construction site as a large surface element. Then the reinforced concrete
2i) tigteil 1, das ebenfalls werksseitig mit den Stahlplatten 6, 10 hergestellt wird, in den Profilstahl eingesetzt und nur noch mit diesem durch Schweißen oder Schraubenbolzen 7 verbunden.2i) tigteil 1, which is also factory-made with the steel plates 6, 10 is produced, inserted into the profile steel and only with this by welding or screw bolts 7 connected.
Die Dichtung der Verbindung wird durch dieThe seal of the connection is made by the
r> durchgehenden Schweißnähte gewährleistet bzw. bei der Schraubverbindung durch nicht dargestellten, eingepreßten, dauerplastischen Kitt bzw. einem ähnlichen Material.r> continuous welds guaranteed or in the case of the screw connection by not shown, pressed-in, permanently plastic putty or a similar material.
Hierzu 3 Blatt ZeichnungenFor this purpose 3 sheets of drawings
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19772737660 DE2737660C3 (en) | 1977-08-20 | 1977-08-20 | Connection of a precast reinforced concrete part with a sheet pile wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19772737660 DE2737660C3 (en) | 1977-08-20 | 1977-08-20 | Connection of a precast reinforced concrete part with a sheet pile wall |
Publications (3)
Publication Number | Publication Date |
---|---|
DE2737660A1 DE2737660A1 (en) | 1979-02-22 |
DE2737660B2 true DE2737660B2 (en) | 1980-05-29 |
DE2737660C3 DE2737660C3 (en) | 1981-03-26 |
Family
ID=6016936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19772737660 Expired DE2737660C3 (en) | 1977-08-20 | 1977-08-20 | Connection of a precast reinforced concrete part with a sheet pile wall |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2737660C3 (en) |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1951056U (en) * | 1966-06-22 | 1966-12-01 | Haus Der Werbung Hermann Knauf | CONTAINER FOR BEER DRINKS. |
-
1977
- 1977-08-20 DE DE19772737660 patent/DE2737660C3/en not_active Expired
Also Published As
Publication number | Publication date |
---|---|
DE2737660C3 (en) | 1981-03-26 |
DE2737660A1 (en) | 1979-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2840195C3 (en) | Device for fastening storage boxes used to hold bundles of fuel assemblies to the bottom of a water basin | |
AT517231A4 (en) | Method for producing a roadway slab for a bridge | |
DE2737660C3 (en) | Connection of a precast reinforced concrete part with a sheet pile wall | |
DE202019102588U1 (en) | Attachment of a bridge superstructure and thereby edge element to be used | |
DE9114733U1 (en) | Kit for a drainage channel | |
DE4345415C2 (en) | Assembly and repair kit with steel cassette | |
DE2903785C3 (en) | Bridge support at the head of a sheet pile wall | |
DE2636168C2 (en) | Buildings made from load-bearing prefabricated components | |
DE1659218A1 (en) | Truss | |
DE2912131C2 (en) | garage | |
DE6609772U (en) | COMPONENT FOR THE PRODUCTION OF SLOTTED OR DRILLED PILE WALLS. | |
DE3203980C2 (en) | Underpass structure and process for its construction | |
DE1434673C3 (en) | Transformer station made of prefabricated concrete slabs and corner parts placed one on top of the other | |
EP1210485A1 (en) | Reinforced concrete part for producing foundations of buildings | |
DE69801084T2 (en) | METHOD FOR UNDERWALLING A WALL OR WALL | |
DE3632703A1 (en) | Joint-shuttering element | |
DE1709385C3 (en) | Sliding formwork for building structures | |
WO2010105791A1 (en) | Apparatus and method for casting concrete wall elements | |
DE2356409A1 (en) | Large shutter panel for concrete formwork - uses clamping brackets for holding panels on longitudinal supporting members | |
DE3153198C2 (en) | Installation guide for at least two separate anchor elements | |
DE3137661A1 (en) | Half-frame which is assembled from two parts and is intended for 3-hinged frames for hall-type buildings | |
DE2352801A1 (en) | Base-plate attachment for fixing prefabricated bearing wall-sections - with upright bolts associated with inserted clamp-plates for walls, and crosswise wedges | |
DE2616970A1 (en) | Sectioned trench of reinforced concrete parts - has space between visible faces of finished parts and soil filled with gravel | |
DE245435C (en) | ||
DE2051002A1 (en) | Frame construction, consisting of prefabricated reinforced concrete parts |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OAP | Request for examination filed | ||
OD | Request for examination | ||
BGA | New person/name/address of the applicant | ||
C3 | Grant after two publication steps (3rd publication) | ||
8327 | Change in the person/name/address of the patent owner |
Owner name: ESTEL HOESCH WERKE AG, 4600 DORTMUND, DE |
|
8327 | Change in the person/name/address of the patent owner |
Owner name: HOESCH WERKE AG, 4600 DORTMUND, DE |
|
8339 | Ceased/non-payment of the annual fee |