Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ground pressure‐dependent segment opening options for cross passages on Koralm Tunnel contract KAT3–Development of support types for cross passage excavation to segment‐lined tunnel
Verfahren zur Herstellung einer im Erdboden unter dem Grundwasserspiegel angeordneten Wanne und hiefür vorgefertigter Stahlbetonträger zu deren Herstellung