DE2658025A1 - Multistorey building climbing mechanism for crane tower - has sliding climbing frame with rollers on support arms engaged in frame tracks - Google Patents
Multistorey building climbing mechanism for crane tower - has sliding climbing frame with rollers on support arms engaged in frame tracksInfo
- Publication number
- DE2658025A1 DE2658025A1 DE19762658025 DE2658025A DE2658025A1 DE 2658025 A1 DE2658025 A1 DE 2658025A1 DE 19762658025 DE19762658025 DE 19762658025 DE 2658025 A DE2658025 A DE 2658025A DE 2658025 A1 DE2658025 A1 DE 2658025A1
- Authority
- DE
- Germany
- Prior art keywords
- climbing
- support
- support arms
- crane
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
- B66C23/28—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
- B66C23/32—Self-hoisting cranes
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
Abstract
Description
Klettervorrichtung zum schrittweisen-Anheben Climbing device for gradual lifting
des Turmes eines Kletterkranes Die Erfindung bezieht sich auf eine Klettervorrichtung zum schrittweisen Anheben des Turmes eines Kletterkranes, mit einer mit dem Turm verbindbaren Stütze mit waagrecht verschiebbaren Stützarmen zum Abstützen auf einem kranfremden Bauteil, insbesondere Stockwerksdecke von mit Hilfe des Kletterkranes zu errichtenden Gebäuden, mit einer Hubtraverse mit waagrecht verschiebbaren oder um eine Achse verschwenkbaren Stützarmen, und einem Verschiebetrieb, insbesondere hydraulische Kolben-Zylinder-Einheit zum Hochheben der Stütze samt Turm. of the tower of a climbing crane The invention relates to a Climbing device for gradually lifting the tower of a climbing crane, with a connectable to the tower support with horizontally displaceable support arms for Support on a non-crane component, in particular a floor ceiling from with the help of the climbing crane to be erected buildings, with a lifting beam with horizontal movable or pivotable support arms, and a sliding mechanism, in particular hydraulic piston-cylinder unit for lifting the support together Tower.
Bei einer bekannten Kon8truktion dieser Art sind die Stützarme entweder teleskopierbar an der Stütze und der Hubtraverse geführt, oder an ihnen schwenkbar gelagert.In a known construction of this type, the support arms are either telescopically guided on the support and the lifting beam, or pivoted on them stored.
Diese Ausführung ist hinsichtlich der Überleitung der Kräfte über die Stütze in die Stützkonstruktion nachteilig (DT-AS 2406 183).This version is in terms of the transfer of forces over the support in the support structure is disadvantageous (DT-AS 2406 183).
Der Erfindung liegt die Aufgabe zugrunde, während des Arbeitens des Kranes die Vertikalkräfte auf möglichst kurzem Weg über die Stütze und die Stützarme in das kranfremde Bauteil weiterzuleiten.The invention is based on the object during the operation of the Kranes the vertical forces as short as possible over the support and the support arms forward to the non-crane component.
Diese Aufgabe wird erfindungsgemäß dadurch gelöst, daß die verschiebbaren Stützarme der Stütze (Kletterstuhl) Je einen senkrechten Schenkel und je einen waagrechten, starr mit dem senkrechten Schenkel verbunden Schenkel aufweisen, und daß die senkrechten Schenkel an ihren oberen Enden Rollen, Walzen oder dgl. Laufkdrper aufweisen, die auf Laufbahnen der Stütze (Kletterstuhl) abgestützt ind.This object is achieved according to the invention in that the displaceable Support arms of the support (climbing chair) One vertical leg and one horizontal, have legs rigidly connected to the vertical leg, and that the vertical Legs at their upper ends have rollers, cylinders or the like. Laufkdrper, which supported on tracks of the support (climbing chair) ind.
In weiterer Ausgestaltung der Erfindung sind vier StUtzarme vorgesehen.In a further embodiment of the invention, four support arms are provided.
Gemäß einem weiteren Merkmal der Erfindung sind die senkrechten Schenkel der Stützarme länger als deren waagrechte Schenkel. Durch diese L-förmige Ausbildung der Stützarme wird eine günstige Einleitung der Kräfte in die Horizontal-und Vertikalstäbe des Kletterstuhls erreicht. Momente werden über die langen Schenkel als Druckkräfte in die Konstruktion eingeleitet.According to a further feature of the invention are the vertical legs the support arms longer than their horizontal legs. Because of this L-shaped training the support arms are a favorable introduction of the forces in the horizontal and vertical rods reached the climbing chair. Moments are over the long legs as compressive forces initiated into the construction.
Eine vorteilhafte Weiterbildung der Erfindung besteht darin, daß jeder Stützarm aus zwei L-förmigen, beidseitig des zugeordneten Eckpfostens angeordneten Teilen besteht, die über Abstandsstücke entsprechend der Abmessung des dazwischen liegenden Eckpfostens der Stütze (Kletterstuhl) miteinander verbunden sind. Da die Stützarme die Eckpfosten und die die Laufbahn für die Rollen oder dgl. der StUtzarme tragenden Horizontalträger umfassen, werden die Kräfte zentrisch eingeleitet.An advantageous development of the invention is that each Support arm made of two L-shaped, arranged on both sides of the associated corner post Parts consists of spacers according to the dimension of the in between lying corner post of the support (climbing chair) are connected to each other. Since the Support arms, the corner posts and the track for the rollers or the like. The support arms include supporting horizontal beams, the forces are introduced centrally.
In der Zeichnung ist ein Ausführungsbeispiel der Erfindung schematisch dargestellt. Es zeigt: Fig. la, 1b eine Ansicht des unteren Teils eines Turmkranes in Kletterstellung (Fig. la) und Arbeitsstellung (Fig. lb), Fig. 2 eine gegenüber Fig. Ib um 900 gedrehte Ansicht auf den unteren Teil des Turmkranes und Fig. 3 einen Querschnitt gemäß der Linie III-III nach Fig. lb.An exemplary embodiment of the invention is shown schematically in the drawing shown. It shows: Fig. La, 1b a view of the lower part a tower crane in the climbing position (Fig. la) and working position (Fig. lb), Fig. 2 shows a view of the lower part of the tower crane rotated by 900 compared to FIG. 1b and FIG. 3 shows a cross section along the line III-III according to FIG.
Der Turmkran ist von bekannter Bauart und kann z.B. ein Turmdrehkran mit einem Turm, einem Ausleger und einem Gegenausleger sein, was nicht weiter dargestellt ist.The tower crane is of a well-known design and can, for example, be a tower crane with a tower, a jib and a counter jib, which is not shown further is.
Der erwähnte Turm besteht, wie üblich, aus einzelnen Elementen la, lb ... bekannter Konstruktion, wobei in der Zeichnung nur die untersten Elemente dargestellt sind.The mentioned tower consists, as usual, of individual elements la, lb ... known construction, with only the lowest elements in the drawing are shown.
Der Turm steht in einem Schacht, z.B. einem Aufzugschacht, eines mit Hilfe des Kranes zu errichtenden Gebäudes, das Stockwerksdecken 2a, 2b, 2c ... aufweist.The tower stands in a shaft, e.g. an elevator shaft, one with Help of the crane to be erected building which has floor ceilings 2a, 2b, 2c ...
Die Vorrichtung zum schrittweisen Anheben des Turmes besteht aus einem mit dem untersten Element la fest, aber lösbar verbundenen Kletterstuhl 3, einer Hubtraverse 4 und einer hydraulischen Kolben-Zylinder-Einheit 5 zwischen Kletterstuhl und Hubtraverse.The device for gradually lifting the tower consists of one with the lowest element la firmly but detachably connected climbing chair 3, one Lifting cross member 4 and a hydraulic piston-cylinder unit 5 between the climbing chair and lifting beam.
Die Hubtraverse 4, an der die Kolbenstange des hydraulischen Zylinders kardanisch angelenkt ist, weist StUtzarme 6 auf, die dm Je einen waagrechten Bolzen 7 schwenkbar am Mittelteil 8 der Hubtraverse angeordnet sind. Die äußeren Enden der Stützarme 6 liegen in der Kletterstellung (Fig. la) auf der entsprechenden Stockwerksdecke, (z.B. 2a) bzw. deren in den Schacht vorstehenden Deckenvorsprüngen auf, wobei die Verschwenkbarkeit der StUtzarme im Uhrzeigersinn durch Anschläge 9 am Mittelteil 8 begrenzt ist. - Die Stützarme 6 können auch um eine senkrechte Achse klappbar oder teleskopierbar ausgebildet sein.The lifting beam 4, on which the piston rod of the hydraulic cylinder is articulated gimbally, has support arms 6, each dm a horizontal bolt 7 are arranged pivotably on the middle part 8 of the lifting cross member. The outer ends the support arms 6 are in the climbing position (Fig. la) on the corresponding floor ceiling, (e.g. 2a) or their ceiling projections protruding into the shaft, whereby the The support arms can be pivoted clockwise by means of stops 9 on the central part 8th is limited. - The support arms 6 can also be a vertical Axis can be designed to be foldable or telescopic.
Der Kletterstuhl 3 befindet sich in der nach unten ziesenden Verlängerung des unteren Elementes la und weist einen etwa die gleiche Querschnittsform wie die Turmelemente aufweisenden Führungsteil 10, der mit dem unteren Element la fest, aber lösbar verbunden ist, und waagrecht verschiebbare Stützarme tla; 11b auf.The climbing chair 3 is in the downward extension of the lower element la and has approximately the same cross-sectional shape as that Tower elements having guide part 10, which is fixed to the lower element la, but is releasably connected, and horizontally displaceable support arms tla; 11b.
Der Führungsteil 10 besteht - analog den Turmelementen -aus vier senkrechten Eckpfosten 12, entsprechenden Versteifungselementen 13 sowie Trägern und Führungen für die vier Stützarme lla; leib.The guide part 10 consists - analogously to the tower elements - of four vertical ones Corner posts 12, corresponding stiffening elements 13 and beams and guides for the four support arms lla; body.
Jeder Stützarm 11a; lib weist zwei beiderseits des zugeordneten Eckpfostens 12 liegende, L-förmige Teile 15 (Fig. 3) auf, deren durch das Vorbeiführen an den zugeordneten Eckpfosten 12 bedingter Abstand durch Abstandsstücke 16 vor und hinter dem Eckpfosten 12 fixiert ist.Each support arm 11a; lib has two on either side of the assigned corner post 12 lying, L-shaped parts 15 (Fig. 3), whose by passing to the associated corner post 12 conditional distance by spacers 16 in front of and behind the corner post 12 is fixed.
Die senkrechten Schenkel 11a (der Stützarme), die länger als die waagrechten Schenkel 11b sind, weisen an ihren oberen Enden Rollen 17 auf, die auf entsprechenden waagrechten Laufbahnen 18 von horizontalen Querträgern 19 des Kletterstuhls 3 laufen.The vertical legs 11a (the support arms), which are longer than the horizontal ones Legs 11b are, have at their upper ends rollers 17 on corresponding horizontal tracks 18 of horizontal cross members 19 of the climbing chair 3 run.
Der Turm und der Führungsteil 10 sind mit einem gewissen Abstand im Schacht angeordnet.The tower and the guide part 10 are at a certain distance in Shaft arranged.
Die Fixierung und FUhrungrdes Baukranes während seiner Arbeitsphase und reiner Kletterphase wird im folgenden erläutert: Der Kran, einschließlich des Innenkletterwerks als Teil des Kranturmes, wird im allgemeinen auf ein Betonfundament montiert. (Der Hydraulikzylinder und die Steuerung können dabei zunächst weggelassen werden). Der Kraii arbeitet sodann in der üblichen Weise bis sich die Arbeitsebene am zu errichtenden Bauwerk der Kranauslegerebene so weit genähert hat, daß-gerade noch gearbeitet werden kann, Anschließend werden zwei Führungskonstruktionen in geeigneten Horizontalebenen um den Kran turm gelegt, damit die Reaktionskräfte beim K]ettern in daß Gebäude geleitet werden können. Die Führungskonstruktionen bestehen aus je vier Führungsecken 23 und vier Druckstangen, wobei die Führungsecken gegenüber den i;ckpfosten der Turmelemente einen geringen Abstand aufweisen. Die Führungskonstruktionen werden mit Hilfe voll nicht weiter dargestellten Stahlkeilen am Gebäude, der Decke oder einer Wand festgelegt. Die Führungskonstruktionen sind gegen Abheben in an sich bekannter Weise gesichert. An.The fixing and guiding of the construction crane during its work phase and the pure climbing phase is explained below: The crane, including the Indoor climbing equipment, as part of the crane tower, is generally based on a concrete foundation assembled. (The hydraulic cylinder and the control can included initially be omitted). The Kraii then works in the usual way up to the working level on the structure to be erected comes so close to the crane boom level has that-just can still be worked, then two guide structures placed in suitable horizontal planes around the crane tower, so that the reaction forces when K] etter in that buildings can be directed. The guide structures consist of four guide corners 23 and four push rods, the guide corners have a small distance from the rear posts of the tower elements. the Guide structures are made with the help of fully not shown steel wedges fixed to the building, the ceiling or a wall. The guide structures are secured against lifting in a known manner. At.
schließend wird die Verbindung zwischen dem Kletter.-stuhl 3 und den Fundamentankern gelöst und - falls nicht von vornherein geschehen,-der Hydraulikzylinder und die Steuerung eingebaut. Zum Klettern nehmen die Stützarme 11; 11b ihre Innenstellung (Fig. la) ein und die Hubtraverse 4 ruht auf entsprechenden Unterstützungen (z.B. 2a) auf. Durch Ausfahren der Kolbenstange des Hydraulikzylinders 5 wird der Kran turm in der bekannten Weise nach oben bewegt. (Der Kranturm kann dabei in einem Hub oder in zwei Hüben zur nächsten Stockwerksdecke angehoben werden.) Ist die nächste Arbeitsposition für den Kran erreicht, werden die Stützarme 11a; lib nach außen verschoben und automatisch gegen Zurücklaufen mittels an sich bekannter Vorrichtungen gesichert. Der Kran wird nun auf die Stockwerksdecke oder in den Aussparungen eines Schachtes abgesetzt. Abschließend werden die Druckstangen an der oberen Stützkonstruktion gelöst und die Führungsecken 23 mit Hilfe von Stahlkeilen 21 in direktem Kontakt mit den Eckpfosten des zugeordneten Turmelementes gebracht. Der Kranturm ist nun wieder in kraftschlüssigem Kontakt mit dem Gebäude, so daß Horizontal- und Vertikalkräfte ins Gebäude abgeleitet werden.the connection between the climbing chair 3 and the Foundation anchors loosened and - if not done from the start - the hydraulic cylinder and the control installed. For climbing take the support arms 11; 11b their inner position (Fig. La) and the lifting beam 4 rests on corresponding supports (e.g. 2a). By extending the piston rod of the hydraulic cylinder 5, the crane tower moved up in the known way. (The crane tower can be used in one Lift or in two lifts to the next floor.) Is the next Reached the working position for the crane, the support arms 11a; lib to the outside world shifted and automatically against running back by means of known devices secured. The crane is now on the ceiling or in the recesses of a The shaft. Finally, the push rods are attached to the upper support structure solved and the guide corners 23 with the help of steel wedges 21 in direct contact brought with the corner posts of the associated tower element. The crane tower is now again in positive contact with the building, so that Horizontal- and vertical forces are diverted into the building.
I)le Hubraverse 4 kann in den Kranturm eingefahren werden J)er Hydraulikzylinder und der Steuerteil können Jetzt vom Kran entfernt und zum Klettern in einem weiteren Kran benützt werden.I) the lifting cross member 4 can be retracted into the crane tower J) he hydraulic cylinder and the control section can now be removed from the crane and used for climbing in another Crane can be used.
In der Arbeitsposition gemäß Fig. 2 erfolgt die Fixierung des Kranturms über die obere, aus vier lösbaren Druckstangen und vier Stützecken 23 bestehende Sttltzkonstruktioil, sowie Stahlkeilen 20 auf der Ebene der Abstützung der Stützarme 11a; 11b, wobei die Stahlkeile 20 den kraftschlüssigen Kontakt zwischen den Gebäudeteilen 2b rid den Eckpfosten 12 herstellen.In the working position according to FIG. 2, the crane tower is fixed on the upper one, consisting of four detachable push rods and four support corners 23 Support structure, as well as steel wedges 20 on the level of the support of the support arms 11a; 11b, the steel wedges 20 establishing the positive contact between the building parts 2b rid of the corner post 12.
Die erfindungsgemäße Klettervorrichtung ist im Zusammenhang mi t Kranen in Aufzugs schächten, in Betondecken-Aussparungen oder in Stahlkonstruktionen einsetzbar.The climbing device according to the invention is in connection with cranes Can be used in elevator shafts, in concrete ceiling recesses or in steel structures.
L e e r s e i t eL e r s e i t e
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19762658025 DE2658025A1 (en) | 1976-12-22 | 1976-12-22 | Multistorey building climbing mechanism for crane tower - has sliding climbing frame with rollers on support arms engaged in frame tracks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19762658025 DE2658025A1 (en) | 1976-12-22 | 1976-12-22 | Multistorey building climbing mechanism for crane tower - has sliding climbing frame with rollers on support arms engaged in frame tracks |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2658025A1 true DE2658025A1 (en) | 1978-06-29 |
Family
ID=5996172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19762658025 Withdrawn DE2658025A1 (en) | 1976-12-22 | 1976-12-22 | Multistorey building climbing mechanism for crane tower - has sliding climbing frame with rollers on support arms engaged in frame tracks |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2658025A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7290672B2 (en) * | 2001-03-21 | 2007-11-06 | Federated Equipment Co. Llc | Tower crane device |
CN107915158A (en) * | 2017-12-08 | 2018-04-17 | 中建三局集团有限公司 | A kind of inner climbing type tower crane is from climbing adhering supporter and its construction method |
CN117819410A (en) * | 2024-01-18 | 2024-04-05 | 山东建筑大学 | Tower crane jacking system and method |
-
1976
- 1976-12-22 DE DE19762658025 patent/DE2658025A1/en not_active Withdrawn
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7290672B2 (en) * | 2001-03-21 | 2007-11-06 | Federated Equipment Co. Llc | Tower crane device |
CN107915158A (en) * | 2017-12-08 | 2018-04-17 | 中建三局集团有限公司 | A kind of inner climbing type tower crane is from climbing adhering supporter and its construction method |
CN117819410A (en) * | 2024-01-18 | 2024-04-05 | 山东建筑大学 | Tower crane jacking system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3136102C2 (en) | Small crane for laying in layers, especially large-format bricks | |
DE202008004374U1 (en) | Device for breaking off structures | |
DE2658025A1 (en) | Multistorey building climbing mechanism for crane tower - has sliding climbing frame with rollers on support arms engaged in frame tracks | |
DE29908482U1 (en) | Cap shutter device | |
DE3417524C2 (en) | Device for moving formwork rings, each composed of several ring segments, of an inner formwork for an in-situ concrete tunnel lining | |
DE19704967C2 (en) | Gantry crane, in particular for the construction of buildings | |
DE2324843C2 (en) | Device for assembling multi-part masts | |
DE2208911C3 (en) | Device for distributing concrete in the course of erecting buildings | |
AT389842B (en) | SHUTTERING DEVICE FOR PRODUCING FINISHED GARAGES | |
DE2157669A1 (en) | PROCEDURE AND DEVICE FOR ASSEMBLING A STRUCTURE, IN PARTICULAR A GENTLE CRANE | |
DE1531102C3 (en) | Well equipment for an elevator | |
AT397404B (en) | DEVICE FOR BUILDING CONSTRUCTION WALLS | |
DE1434537C3 (en) | Device for the execution of tower-like structures | |
DE4113877A1 (en) | WORKING STAGE FOR COLUMN FORMWORK | |
DE3911044C2 (en) | ||
DE2418411C3 (en) | Walker for heavy equipment, such as excavators, spreaders or the like | |
DE1174033B (en) | Construction crane with a tower assembled from a number of elements | |
DE19717859A1 (en) | Overhead crane | |
DE759687C (en) | For the heaviest loads, it can be dismantled and easily erected | |
DE2132597C3 (en) | Method and device for erecting an elongated vertical structure, e.g. a chimney | |
DE1285163B (en) | Process for the production of tall structures and apparatus for carrying out this process | |
DE202021106889U1 (en) | Mobile suspended platform for concrete construction of the tunnel base vault | |
DE1481911A1 (en) | Mobile lifting frame | |
DE2756390A1 (en) | PROCESS AND CLIMBING ARMOR FOR THE PRODUCTION OF HORIZONTAL REINFORCEMENT RINGS ON REINFORCED CONCRETE COOLING TOWER SHELLS | |
DE2311639C3 (en) | Internal formwork for room-sized concrete structures, especially prefabricated garages |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OAM | Search report available | ||
OAP | Request for examination filed | ||
OC | Search report available | ||
OD | Request for examination | ||
8139 | Disposal/non-payment of the annual fee |