DE2606301C2 - Device for feeding and discharging metal strip - Google Patents
Device for feeding and discharging metal stripInfo
- Publication number
- DE2606301C2 DE2606301C2 DE19762606301 DE2606301A DE2606301C2 DE 2606301 C2 DE2606301 C2 DE 2606301C2 DE 19762606301 DE19762606301 DE 19762606301 DE 2606301 A DE2606301 A DE 2606301A DE 2606301 C2 DE2606301 C2 DE 2606301C2
- Authority
- DE
- Germany
- Prior art keywords
- strip
- storage
- tape
- reel
- metal strip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H19/00—Changing the web roll
- B65H19/10—Changing the web roll in unwinding mechanisms or in connection with unwinding operations
- B65H19/18—Attaching, e.g. pasting, the replacement web to the expiring web
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/22—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
- B21B1/24—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process
- B21B1/28—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process by cold-rolling, e.g. Steckel cold mill
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/22—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
- B21B1/30—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process
- B21B1/32—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process in reversing single stand mills, e.g. with intermediate storage reels for accumulating work
- B21B1/36—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process in reversing single stand mills, e.g. with intermediate storage reels for accumulating work by cold-rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C47/00—Winding-up, coiling or winding-off metal wire, metal band or other flexible metal material characterised by features relevant to metal processing only
- B21C47/24—Transferring coils to or from winding apparatus or to or from operative position therein; Preventing uncoiling during transfer
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B15/00—Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B15/0085—Joining ends of material to continuous strip, bar or sheet
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B15/00—Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B15/0007—Cutting or shearing the product
- B21B2015/0014—Cutting or shearing the product transversely to the rolling direction
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B15/00—Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B2015/0057—Coiling the rolled product
Description
2525th
Die Erfindung betrifft eine Einrichtung zum Zu- und Abführen von Metallband in eine bzw. aus einer Bearbeitungsanlage der im Oberbegriff des Patentan-Spruchs 1 angegebenen Gattung.The invention relates to a device for feeding and discharging metal strip into and out of a Processing system of the type specified in the preamble of patent claim 1.
Zur Steierurig der Produktivität von Kaltwalzwerken oder Galvanisierungsanlagen ist man bestrebt, möglichst große Bandlängen kontinuierlich in einem Durchlauf zu bearbeiten. Zu diesem Zweck werden z. B. in modernen Kaltwalzstraßen .nehrere Bänder von Bunden normaler Größe vor dem Beizen am jeweiligen Bandanfang und Bandende geschöpft und durch Stumpfschweißen miteinander verbunden. Hinter der Schweißmaschine ist ein Rollentisch mit Schiingenheber und Schlingenwagen vorgesehen, wobei der Schlingenwagen einen Bandspeicher darstellt, um auch während des erforderlichen Stillstandes für die Schweißvorgänge und die Bundwechsel kontinuierlich durchfahren zu können. Derartige aus Schiingenheber und Schlingenwagen bestehende Zwischenspeicher benötigen jedoch lange Schlingengruben von mindestens 100 m Länge. Ferner neigt das zu walzende Band zu Verwindungen in den Schlingen, was nur durch außerordentlich aufwendig steuerbare Richtvorgänge vermieden werden kann. Um die durch das Teilen des endlosen Bandes nach dem Überarbeitungsvorgang in Normallängen bedingten Unterbrechungen zu vermeiden, wird häufig auch an der Auslaufseite der Walzstraße ein Zwischenspeicher in Form von Schlingenhebern und Schlingenwagen vorgesehen, wodurch sich der Herstellungsaufwand und die Betriebsführung einer derartigen Konti-Anlage entsprechend erhöhen.To control the productivity of cold rolling mills or electroplating systems, the aim is to have the greatest possible strip lengths continuously in one Edit pass. For this purpose z. B. in modern cold rolling mills. Several strips of Bonds of normal size scooped up and through at the beginning and end of each strip before pickling Butt welding joined together. Behind the welding machine is a roller table with a loop lifter and loop carriage provided, wherein the loop carriage represents a tape storage device to also during of the required standstill for the welding processes and the coil changes can. However, intermediate storage devices of this type, which consist of a sling lifter and a sling carriage, are required long loop pits of at least 100 m in length. Furthermore, the strip to be rolled tends to twist the loops, which can only be avoided by straightening processes that are extremely difficult to control. About those caused by dividing the endless tape into normal lengths after the reworking process To avoid interruptions, an intermediate storage facility is also often installed on the outlet side of the rolling train Form of sling lifters and sling trolleys provided, which increases the manufacturing costs and the Management of such a continuous system accordingly raise.
Aus der AT-PS 2 59 345 ist eine Einrichtung zum kontinuierlichen Zuführen von Stahlband zu einem μ kontinuierlich arbeitenden Rohrschweißwerk bekannt, welche das Bandmaterial von Bunden normaler Größe entnimmt, wobei die einzelnen Bänder vor der Verarbeitung zu einem ununterbrochenen Band zusammengeschweißt werden. Diese bekannte Einrichtung weist als Zwischenspeicher für das Band einen einzigen .Speicherhaspel von vergrößertem Trommeldurchmesser auf, auf welchen die zuvor stumpf zusammengeschweißten schmalen Bänder aufgewickelt und gleichzeitig wieder abgewickelt werden. Das Abziehen des Bandes erfolgt kontinuierlich über das Innere dieses Speicherhaspels und eine schräggestellte Ablaufwalze. Es ist offensichtlich, daß dieser Lösungweg nur bei Verwendung von sehr schmalen und in sich vergleichsweise flexiblem, also verwindungsfähigem Bandmaterial eingeschlagen werden kann. Bei Kaltwalzgut oder Galvamsierbändern, die ja in der Regel eine Breite von bis zu mehreren Metern aufweisen, ist ei« schräges Herausführen des Bandes in Richtung der Haspeldrehachse naturgemäß nicht möglich.From AT-PS 2 59 345 a device for the continuous supply of steel strip to a μ is continuously operating pipe welding plant known, which the strip material from coils of normal size removes, whereby the individual bands are welded together to form an uninterrupted band before processing will. This known device has a single buffer store for the tape . Storage reel of enlarged drum diameter on which the previously butt-welded be wound up on narrow ribbons and unwound again at the same time. Pulling off the The tape is carried out continuously over the inside of this storage reel and an inclined run-off roller. It is obvious that this solution only when using very narrow and in itself comparatively flexible, so twistable tape material can be knocked in. For cold rolled material or Galvamsier ribbons, which usually have a width of up to several meters, the strip is led out at an angle in the direction of the reel axis of rotation naturally not possible.
Aufgabe der Erfindung ist es, eine Einrichtung zum Zu- und Abiuhren von Metallband in eine bzw. aus einer Bearbeitungsanlage der angegebenen Gattung zu schaffen, die eine Bearbeitung auch breiter Metallbänder von relativ großer Länge im kontinuierlichen Durchlaufbetrieb bei geringem Platzbedarf und einfacher Betriebsführung ermöglicht.The object of the invention is to provide a device for feeding and discharging metal strip into and out of a To create machining equipment of the specified type, which also allows machining of wide metal strips of relatively great length in continuous operation with little space requirement and simpler Operational management enables.
Diese Aufgabe wird erfindungsgemäß durch die kennzeichnenden Merkmale des Patentanspruchs 1 gelöst Durch die Verwendung von jeweils zwei Speicherhaspeln pro Zwischenspeicher und durch die verfahrbare Anordnung der beiden Speicherhaspeln ergibt sich die Möglichkeit, daß eine Vielzahl von Einzelbändern normaler Länge stumpf aneinandergeschweißt und anschließend auf den einen Speicherhaspel aufgewickeil werden kann und daß gleichzeitig mit diesem Aufwickelvorgang ein zuvor auf der breiten Speichertrommel aufgewickeltes Band von entsprechend großer Länge kontinuierlich und mit optimaler Geschwindigkeit durch die Bearbeitungsanlage hindurchgeführt werden kann. Aufgrund des kontinuierlichen Durchlaufbetriebes erhöht sich die Leistung der Bearbeitungsanlage und es verringert sich der Ausschuß an den jeweiligen Ein- und Auslaufenden der Einzelbänder sowie die Anzahl der Einfädelvorgänge gegenüber einer herkömmlichen, Bänder normaler Länge gesondert bearbeitenden Anlage. Da keine Schiingenheber verwendet werden, verringert sich nicht nur der Platzbedarf, sondern es vereinfacht sich auch die Steuerung und die Betriebsführung der Anlage. Ferner können die Meßstellen zur Erfassung der Parameter des bearbeiteten Bandes in der Nähe des auslaufseitigen Aufwickelhaspels angeordnet werden, so daß Fehler frühzeitig erfaßt werden können.According to the invention, this object is achieved by the characterizing features of claim 1 solved by using two storage reels per buffer and by the movable arrangement of the two storage reels results in the possibility that a large number of Single strips of normal length butt welded together and then on one storage reel can be wound up and that at the same time with this winding process a previously on the broad Storage drum wound tape of a correspondingly large length continuously and with optimal Speed can be passed through the processing system. Because of the continuous Continuous operation increases the performance of the processing system and reduces the number of rejects at the respective entry and exit ends of the individual belts as well as the number of threading processes opposite a conventional system that processes strips of normal length separately. Since no sling lifters are used, not only does the space requirement decrease, but it also simplifies the Control and operational management of the plant. Furthermore, the measuring points can be used to record the parameters of the processed strip are arranged in the vicinity of the outlet-side take-up reel, so that errors can be recorded at an early stage.
Zweckmäßige Weiterbildungen der Erfindung sind Gegenstand von Unteransprüchen.Expedient further developments of the invention are the subject matter of subclaims.
Im folgenden werden Ausführungsbeispiele der Erfindung anhand der Zeichnung im einzelnen beschrieben. Es zeigtIn the following, exemplary embodiments of the invention are described in detail with reference to the drawing. It shows
Fig. 1 eine schematische Seitenansicht der Zu- und Abführeinrichtung in Verbindung mit einer Kaltwalzstraße: 1 shows a schematic side view of the feed and discharge device in connection with a cold rolling mill:
Fig.2 eine Seitenansicht der Einlaufseite der Einrichtung nach Fig. I;2 shows a side view of the inlet side of the Device according to Fig. I;
Fig. 3 eine Draufsicht auf die Einrichtung nach Fig. 2;FIG. 3 is a plan view of the device according to FIG. 2;
Fig. 4 eine vergrößerte Seitenansicht eines Zwischenspeichers; 4 shows an enlarged side view of an intermediate store;
Fig.5 einen Speicherhaspel im Querschnitt beim Einführen eines Bandendes;Fig.5 shows a storage reel in cross section at Inserting a tape end;
F i g. 6 die Auslaufseite der Einrichtung nach F i g. 1 in schematischer Seitenansicht;F i g. 6 the outlet side of the device according to FIG. 1 in a schematic side view;
F i g. 7 die Auslaufseite der Einrichtung nach F i g. I in Draufsicht;F i g. 7 the outlet side of the device according to FIG. I in plan view;
F g. 8 eine vergrößerte Seitenansicht des auflaufseitigen Zwischenspeichers.F g. 8 is an enlarged side view of the upstream side Cache.
Die in Fig. 1 dargestellte Walzanlage weist einen Abwickelstand mit einem Ablaufhapsel 1, einer Schere 4, einer SchweiQstation 5 sowie zwei Speicherhaspeln 7, 8 an der Einlaufseite einer Walzstraße 12 sowie zwei weitere Speicherhaspel 14,15, eine Schopfschere 19 und einen Aufwickelhaspel 21 an der Gerüstauslaufseite auf. Das im Ablaufhaspel 1 von einem Bund 2 abgezogene Band wird in einer Rollenrichtmaschine 3 geradegerichtet und auf den Speicherhaspel 7 aufgewickelt Wenn das hintere Bandende in die Schere 4 eingelaufen ist, wird das Band bei unterbrochenem Wickelvorgang geschöpft. Anschließend wird das vordere Bandende des nächstfolgenden Bundes in gleicher Weise geschöpft und beide Bandenden werden in der Schweißstation 5 miteinander verschweißt, woraufhin das Aufwickeln des Metallbandes auf den Speicherhaspel 7 fortgesetzt wird. Auf diese Weise werden etwa zehn Rohbänder miteinander verbunden und zu einem Zwischeni/und 9 aufgewickelt Gleichzeitig wird das Band eines Zwischenbundes 10 gewalzt Nach dem Auswalzen dieses Bandes werden die beiden Zwischenhaspel 7, 8 gegensinnig axial verfahren, so daß das voll gewickelte Zwischenbund 9 sich nunmehr in der Walzlinie befindet und das Band ausgewalzt werden kann.The rolling plant shown in Fig. 1 has an unwinding stand with a payout cap 1, a pair of scissors 4, a welding station 5 and two storage reels 7, 8 on the inlet side of a rolling train 12 and two further storage reels 14, 15 , a cropping shear 19 and a winding reel 21 the stand discharge side. The tape withdrawn from a coil 2 in the pay-off reel 1 is straightened in a roll straightening machine 3 and wound onto the storage reel 7. Then the front end of the strip of the next bundle is scooped up in the same way and both ends of the strip are welded to one another in the welding station 5, whereupon the winding of the metal strip onto the storage reel 7 is continued. In this way, about ten raw strips are connected to one another and rolled up to form an intermediate collar 10 is in the rolling line and the strip can be rolled out.
An der Einlaufseite des ersten Walzgerüstes der Walzstraße 12 ist ein Richtrollensatz 11 vorgesehen. Sobald das Band vom auslaufseitigen Speicherhaspel 14 erfaßt worden ist, beginnt der Walzvorgang unter Zug, wobei auf den auslaufseitigen Speicherhaspel 14 ein Zwischenbund 16 von entsprechend großem Durchmesser ohne Unterbrechung oder Verlangsamung des Walzvorganges aufgewickelt wird. Gleichzeitig wird das zuvor gewalzte Band von einem Zwischenbund 17 abgezogen, mittels der Schopfschere 19 in Bänder von normaler Länge unterteilt und auf den Aufwickelhaspel 21 zu Bunden 22 mit Normaldurchmesser aufgewickelt, die in einem Wagen 23 abgeführt werden. Das Band kann an der Auslaufseite kontinuierlich auch zu Bunden mit großem Durchmesser aufgewickelt werden, ohne daß der WHzbetrieb dadurch unterbrochen oder beschleunigt werden müßte.A straightening roller set 11 is provided on the entry side of the first roll stand of the rolling train 12. As soon as the strip has been gripped by the outlet-side storage reel 14, the rolling process begins under tension, with an intermediate collar 16 of a correspondingly large diameter being wound onto the outlet-side storage reel 14 without interrupting or slowing down the rolling process. At the same time, the previously rolled strip is drawn off an intermediate collar 17, divided into strips of normal length by means of cropping shears 19 and wound onto the take-up reel 21 to form collars 22 with normal diameter, which are removed in a carriage 23. The tape can also be continuously wound up into coils with a large diameter on the outlet side without the WHz operation having to be interrupted or accelerated as a result.
Wie aus F i g. 2 ersichtlich, läuft das Band unter einer Andrückrolle 101 vom Bund 2 des Ablaufhaspels 1 über die Rollenrichtmaschine 3 zur Schere 4, die das Vorderende schöpft. Das beschnittene Bandende wird von Klemm.Ollen 6 und einer um eine Achse 102 schwenkbaren Einfädelführung 103 in eine Schlitznut 104 im Speicherhaspel 7 eingeführt, woraufhin das Aufwickeln in der durch den Pfeil angegebenen Drehrichiung mit einer Anfangsgeschwindigkeit von ca. 40 m/min beginnt. Wenn nach mehreren Umdrehungen das Band unter Zug gesetzt werden kann, wird die Aufwickeigeschwindigkeit erhöht. Statt der Schlitznut 104 können auch Greifer zum Haltern des Bandvorderendes vorgesehen sein, oder das Aufwickeln kann mittels eines Riemenumschlingers erfolgen.As shown in FIG. 2, the tape runs under a pressure roller 101 from the collar 2 of the pay-off reel 1 via the roller straightening machine 3 to the scissors 4, which scoop the front end. The trimmed end of the tape is inserted by Klemm.Ollen 6 and a threading guide 103 pivotable about an axis 102 into a slot 104 in the storage reel 7, whereupon winding begins in the direction of rotation indicated by the arrow at an initial speed of approx. 40 m / min. If the tape can be put under tension after several revolutions, the winding speed is increased. Instead of the slot groove 104 , grippers can also be provided for holding the leading end of the tape, or the winding can be carried out by means of a belt loop.
Sobald das hinten: Bandende des Bundes 2 in die Schere 4 einläuft, wird bei unterbrochener Bandbewegung das Hinterende des Bandes geschnitten. Anschlie- ^0 Bend wird das vordere Bandende des folgenden Rohbundes in die Schere 4 eingeführt und geschnitten, woraufhin in der Schweißstation 5 die beiden Bandenden miteinander verschweißt, und die auf diese Weise miteinander verbundenen Bänder zum Zwischenbund 9 aufgewickelt werdenAs soon as the rear end of the band 2 runs into the scissors 4, the rear end of the band is cut when the band movement is interrupted. Subse- ^ 0 Bend is inserted, the front end of the following tape Rohbundes in the cutter 4, and cut, whereupon the two strip ends are welded together in the welding station 5, and connected to each other in this way strips are wound to the intermediate collar 9
Das Band des Zwischenbundes 10 wird gewalzt, während das Zwischenbu ;J 9 gebildet wird. Wenn das Zwischenbund 10 weitgehend abgewickelt 1st und sich sein Durchmesser dabei entsprechend verringert hat, kann das zuvor bereits fertig gewickelte ZwischenbundThe strip of the intermediate collar 10 is rolled while the intermediate bucket J 9 is being formed. When the intermediate collar 10 is largely unwound and its diameter has decreased accordingly, the intermediate collar, which has already been completely wound, can be used
9 zusammen mit dem Zwischenhaspel 7 und einem Lager 109 auf einer Lageführung 110 in Richtung des Pfeiles /in Fig.3 in die Walzlinie axial verfahren werden. Sobald dann das Walzen des Zwischenbundes9 together with the intermediate reel 7 and a bearing 109 on a position guide 110 in the direction of the arrow / in FIG. 3 can be moved axially into the rolling line. As soon as then the rolling of the intermediate collar
10 beendet ist, kann das Band vom nächsten, in die Walziinie axial verfahrenen Zwischenbund 9 abgewikkelt und gewalzt werden. Der leere Speicherhaspel 8 wird zur Bildung des nächsten Zwischenbundes in der Pfeilrichtung g in F i g. 3 axial verfahren, woraufhin ein erneuter Aufwickelvorgang beginnt Das Einführen des vorderen Bandendes erfolgt mit Hilfe einer Einführeinheit 111, die der Einfädelführung 103 zugeordnet und gegenüber dieser vorgeschoben werden kann. 10 is finished, the strip can be unwound and rolled from the next intermediate collar 9, which is axially moved in the rolling line. The empty storage reel 8 is used to form the next intermediate bundle in the direction of arrow g in FIG. 3 move axially, whereupon a new winding process begins. The front end of the tape is inserted with the aid of an insertion unit 111, which can be assigned to the threading guide 103 and advanced relative to it.
Nachdem das Zwischenbund 9 axial in die Walzlinie verfahren ist, wird nach Betätigen einer Andrückrolle das Band von einer am Lager 109 befestigten Leitplatte 112 und einer ortsfesten Führung 108 über die Klemmrollen 11 in die Walzstraße «? eingeführt Für kleinere Zwischenbunde mit z. B. nur sechs normalen Bandlängen kann die Leitplatte 112 verlängert werden. Zum gleichmäßigen Abwickeln des Bandes von den Zwischenbunden kann ferner das hintere Bandende durch eine Biegewalze entgegengerichtet umgebogen werden, die vertikal an der Klemmrolle 6 in der Schweißlinie angeordnet ist. Die Speicherhaspeln 7 und 8 werden von Elektromotoren 115 über Teleskopwellenkupplungen 113 und Untersetzungsgetriebe 114 angetrieben.After the intermediate collar 9 has moved axially into the rolling line, after a pressure roller has been actuated, the strip is moved from a guide plate 112 attached to the bearing 109 and a stationary guide 108 via the pinch rollers 11 into the rolling train «? introduced For smaller intermediate bundles with e.g. B. only six normal tape lengths, the guide plate 112 can be extended. For even unwinding of the tape from the intermediate coils, the rear tape end can also be bent in the opposite direction by a bending roller which is arranged vertically on the clamping roller 6 in the welding line. The storage reels 7 and 8 are driven by electric motors 115 via telescopic shaft couplings 113 and reduction gears 114.
Im folgenden wird das auslaufseitige Aufwickeln anhand der F i g. 6 bis 8 erläutert. Das voll gewickelte Zwischenbund 17 wird zusammen mit seinem Speicherhaspel 15 aus der Walzlinie 221 in eine Teilungs- und Aufwickellinie 222 axial verfahren. Das gewalzte Band wird durch eine Andrückrolle 207 in eine ortsfeste Führung 208 eingeführt, durchläuft Klemmrollen 18 und gelangt über eine Ablenkrolle 20 zum Aufwickelhapsel 21, auf den es mittels eines Riemenumschlingers 24 aufgewickelt wird. Sobald der Durchmesser etwa die Gröfe eines Normalbundes 22 erreicht hat, wird das Band von der Schopfschere 19 geschnitten und das fertige Bund 22 wird vom Wagen 23 abgefördert. Danach wird der verbleibende Teil vom Zwischenbund 17 auf weitere Auflaufhaspel aufgewickelt.In the following, the winding on the outlet side is explained with reference to FIGS. 6 to 8 explained. The fully wound intermediate collar 17, together with its storage reel 15, is moved axially from the rolling line 221 into a dividing and winding line 222. The rolled strip is introduced into a stationary guide 208 by a pressure roller 207, passes through pinch rollers 18 and, via a deflection roller 20 , arrives at the take-up tube 21, onto which it is wound by means of a belt loop 24. As soon as the diameter has reached approximately the size of a normal collar 22 , the band is cut by the cropping shears 19 and the finished collar 22 is conveyed away by the carriage 23. Thereafter, the remaining part of the intermediate collar 17 is wound onto another take-up reel.
Gleichzeitig wird das gewalzte Band auf den in die Walzlinie 221 axial verfahrenen auslaufseitigen Speicherhaspel 14 zum Zwischenbund 16 gewickelt. Sobald das Band vom Zwischenbund 17 voll abgewikkelt ist, wird das Zwischenbund 16 zusammen mit seinem Speicherhaspel 14 und einem Lager 209 auf einer Lagerführung 210 in die Teilungs- und Aufwickellinie 222 in Pfeilrichtung ο verfahren. Vor dem Abwickeln vom Zwischenbund 16 wird der leere Speicherhaspel 15 in die Walzlinie 221 in Pfeilrichtung ρ axial verschoben, woraufhin das Aufwickeln in den Zustand nach Fig. 8 beginnt. In diesem Fall erfolgt das Einfädeln des Bandendes in den Speicherhaspel 15 mittels einer Teleskopführung, '.ie in einer um eine Achse 202 schwingenden Einfädelführung 203 angeordnet ist.At the same time, the rolled strip is wound onto the storage reel 14 on the outlet side, which has moved axially into the rolling line 221, to form the intermediate coil 16. As soon as the band is fully unwound from the intermediate collar 17, the intermediate collar 16, together with its storage reel 14 and a bearing 209, is moved on a bearing guide 210 into the dividing and winding line 222 in the direction of arrow ο . Before it is unwound from the intermediate collar 16, the empty storage reel 15 is axially displaced in the rolling line 221 in the direction of arrow ρ , whereupon winding into the state according to FIG. 8 begins. In this case, the tape end is threaded into the storage reel 15 by means of a telescopic guide, which is arranged in a threading guide 203 which oscillates about an axis 202.
Nach Fig. 8 wird das vordere Ende des vom Zwischenbund 17 ablaufenden Bandes von einer Andrückrolle 206 beaufschlagt und von einer am Lager 209 befestigten Leitplatte 212 sowie der ortsfesten Führung 208 getühri. Zur besseren Bandführung bei kleinen Bunddurchmessern ist die Leitplatte 212 verlängerbar ausgebildet. Die auslaufseitigen Speicher-According to FIG. 8, the front end of the strip running from the intermediate collar 17 is acted upon by a pressure roller 206 and guided by a guide plate 212 attached to the bearing 209 and the stationary guide 208 . For better tape guidance in the case of small collar diameters, the guide plate 212 is designed to be extendable. The storage tank on the outlet side
haspeln 14 und 15 werden von Elektromotoren 215 über Teleskopwellenkupplungen 21.3 und Untersetzungsgetriebe 214 angetrieben.Reels 14 and 15 are driven by electric motors 215 via telescopic shaft couplings 21.3 and reduction gears 214 .
Bei dem vorstehend beschriebenen Ausführungsbeispiel werden sowohl an der Einlaufseite als auch an der Auslaufseite der Walzstraße Zwischenbunde von großem Durchmesser gebildet. Es ist jedoch auch möglich, an der Einlauf- oder der Auslaufseite der Walzstraße eine Schiingenführung und an der jeweils anderen Seite Zwischenbunde als Zwischenspeicher vorzusehen.In the embodiment described above, both on the inlet side and on the On the outlet side of the rolling mill, intermediate coils of large diameter are formed. However, it is too possible, a loop guide on the inlet or outlet side of the rolling train and on each on the other side intermediate collars to be provided as intermediate storage.
Hierzu 6 Blatt ZeichnungenIn addition 6 sheets of drawings
Claims (3)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2061575A JPS5626483B2 (en) | 1975-02-19 | 1975-02-19 | |
JP4962975A JPS51124651A (en) | 1975-04-25 | 1975-04-25 | Method and device for reeling coil |
JP8080375A JPS525649A (en) | 1975-07-02 | 1975-07-02 | Method and device for reversible rolling |
Publications (2)
Publication Number | Publication Date |
---|---|
DE2606301A1 DE2606301A1 (en) | 1976-09-09 |
DE2606301C2 true DE2606301C2 (en) | 1982-06-16 |
Family
ID=27283115
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19762606301 Expired DE2606301C2 (en) | 1975-02-19 | 1976-02-17 | Device for feeding and discharging metal strip |
Country Status (2)
Country | Link |
---|---|
BR (1) | BR7600988A (en) |
DE (1) | DE2606301C2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ITUB20160862A1 (en) * | 2016-02-18 | 2017-08-18 | Danieli Off Mecc | COMBINED WELDING AND LAMINATION OF METALLIC TAPES |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1115681B (en) * | 1959-02-25 | 1961-10-26 | Sundwiger Eisen Maschinen | Double reel for reversing mills, which rewind reels with expandable drums are assigned |
DE1250779B (en) * | 1963-04-11 | 1967-09-28 | Kronprinz Ag | Storage reel for the continuous feeding of strips to a pipe welding plant |
-
1976
- 1976-02-17 DE DE19762606301 patent/DE2606301C2/en not_active Expired
- 1976-02-17 BR BR7600988A patent/BR7600988A/en unknown
Also Published As
Publication number | Publication date |
---|---|
DE2606301A1 (en) | 1976-09-09 |
BR7600988A (en) | 1976-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3203579C2 (en) | Device for feeding a wire from a wire spool to a processing point | |
DE3625192A1 (en) | SPEED CONTROL DEVICE FOR A STEEL SHEET PROCESSING PLANT | |
DE10138857A1 (en) | Device for winding and unwinding hot-rolled pre-strips made of hot metal | |
DE60109846T2 (en) | Method and plant for cold rolling | |
DE2604324C3 (en) | Device for the continuous production of longitudinally welded pipes from strip material, in particular for the production of precision steel pipes | |
DE102008009916A1 (en) | Rolling mill for rolling strip-shaped rolling stock | |
DE10357622A1 (en) | Process and plant for rolling rolling stock | |
EP0521816B1 (en) | Method for transferring a yarn from a full bobbin to a winding tube and winding machine | |
DE2606301C2 (en) | Device for feeding and discharging metal strip | |
DE1452440A1 (en) | Device for the continuous feeding of rolled strip in the form of a bundle, in processing lines for strips | |
DE3216399A1 (en) | DEVICE FOR REPLACING A WINDING CORE Wrapped With Wrapped Material | |
DE3919836A1 (en) | METHOD AND SYSTEM FOR COUPLING THE INITIAL WINDINGS AND / OR FINAL TURNS OF A WIRE HARNESS | |
DE2830253C3 (en) | Method and device for stacking strip parts of rolled strips | |
DE889734C (en) | Feeding and dispensing device in cold rolling mills for strips with pull-winding drums | |
DE3038703C2 (en) | Plant and process for producing bright steel bars | |
DE3513831C2 (en) | ||
AT406938B (en) | System and method for the production of rolled strip | |
AT407613B (en) | DEVICE FOR CONTINUOUSLY WINDING TAPE MATERIAL | |
DE3147180C2 (en) | Pipe welding device for the production of pipes in coils | |
DE1602348A1 (en) | Device for unwinding hot strip from strip coils | |
LU85977A1 (en) | METHOD AND DEVICE FOR MAKING WARMBAND COILS, IN PARTICULAR COILBOX COILS | |
DE1960506A1 (en) | Continuous cold rolling mill for strip steel | |
DE3008621A1 (en) | Overhead metal wire unwinding unit - used for wire of larger than 10 mm dia. from vertically positioned reel fitted with hawse and one or more guide rods | |
AT216309B (en) | ||
DE19624007A1 (en) | Device for storing of metallic tapes in tape handling plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
D2 | Grant after examination | ||
8339 | Ceased/non-payment of the annual fee |