DE2548249C2 - Device for the hydraulic removal of dry mined and pre-crushed material - Google Patents

Device for the hydraulic removal of dry mined and pre-crushed material

Info

Publication number
DE2548249C2
DE2548249C2 DE2548249A DE2548249A DE2548249C2 DE 2548249 C2 DE2548249 C2 DE 2548249C2 DE 2548249 A DE2548249 A DE 2548249A DE 2548249 A DE2548249 A DE 2548249A DE 2548249 C2 DE2548249 C2 DE 2548249C2
Authority
DE
Germany
Prior art keywords
slide
coal
flume
water
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE2548249A
Other languages
German (de)
Other versions
DE2548249A1 (en
Inventor
Arthur W.T. Fernie Grimley
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KAISER RESOURCES Ltd VANCOUVER BRITISH COLUMBIA CA
Original Assignee
KAISER RESOURCES Ltd VANCOUVER BRITISH COLUMBIA CA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KAISER RESOURCES Ltd VANCOUVER BRITISH COLUMBIA CA filed Critical KAISER RESOURCES Ltd VANCOUVER BRITISH COLUMBIA CA
Publication of DE2548249A1 publication Critical patent/DE2548249A1/en
Application granted granted Critical
Publication of DE2548249C2 publication Critical patent/DE2548249C2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/04Transport of mined material in gravity inclines; in staple or inclined shafts
    • E21F13/042Vertical hydraulic conveying of coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C25/00Cutting machines, i.e. for making slits approximately parallel or perpendicular to the seam
    • E21C25/68Machines for making slits combined with equipment for removing, e.g. by loading, material won by other means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/20General features of equipment for removal of chippings, e.g. for loading on conveyor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Disintegrating Or Milling (AREA)

Description

— daß die Förderleitung in an sich bekannter Weise als abschüssige, offene Schwemmrinne (28) ausgebildet ist,- That the delivery line in a manner known per se as a sloping, open flume (28) is designed,

— daß als Obergabestation eine an dem Continuous .Miner (13) beweglich angeordnete, in Richtung der Schwemmrinne (28) abschüssige Rutsche (20) vorgesehen ist, die mit ihrem einen Ende an der Fördereinrichtung (19) des Continuous Miner (13) beweglich aufgehängt ist und deren anderes Ende verschieblich in die Schwemmrinne (28) eingreift,- that as an overhead station one on the Continuous .Miner (13) movably arranged, sloping in the direction of the flume (28) Slide (20) is provided, one end of which is attached to the conveyor (19) of the Continuous miner (13) is movably suspended and the other end of which can be slid into the The flume (28) engages,

— daß die Schwemmrinne (28) am Seitenrand der Abbaustrecke (12) angeordnet ist und die Rutsche (20) eine seitliche Abknickung aufweist,- That the flume (28) is arranged on the side edge of the mining section (12) and the Chute (20) has a lateral bend,

— daß an der Rutsche (20) an einer Stelle oberhalb der von dem abgebauten Material beaufschlagten Stehe ein Wassereinlauf aus einem quer zur SchwemmrichtUKg über i>ie gesamte Breite der Rutsche (20) reichenden geschlitzten Rohr (33) vorgesehen ist, dessen Schlitze (34) in Schwemmrichtung weisen,- That on the slide (20) at a point above the exposed by the degraded material stand a water inlet from a transverse to Flushing direction over i> the entire width of the Slide (20) reaching slotted tube (33) is provided, the slots (34) in Show the direction of the flood,

— und daß die Wasserzufuhrleitungen (30. 32) auf jeder oberen Seitenkante der Rutsche (20) angeordnet sind und einen Wulst zur Stabilisierung formen.- and that the water supply lines (30. 32) on each upper side edge of the slide (20) are arranged and form a bead for stabilization.

2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Rutsche (20) ganz oder teilweise abgedeckt ist.2. Device according to claim 1, characterized in that that the slide (20) is completely or partially covered.

Die Erfindung betrifft eine Vorrichtung zur hydraulischen Abförderung von trocken abgebautem und vorgebrochenem Material, insbesondere Kohle, enthaltend eine zwischen dem rückseitigen Abförderer eines Continuous Miners und einer hydraulischen Förderleitung angeordneten Übergabestation, in der das von dem Continuous Miner gelieferte Material aufgenommen, mi4, Wasser gemischt und dann der Förderleitung zugeführt wird.The invention relates to a device for the hydraulic removal of dry mined and pre-crushed material, in particular coal, containing a transfer station arranged between the rear removal conveyor of a continuous miner and a hydraulic delivery line, in which the material delivered by the continuous miner is received, mixed with 4 water and then fed to the delivery line.

Bei dem erwähnten vorgebrochenem Material handelt es sich vornehmlich um zerbrechbare kohlenstoffhaltige Materialien, wie z. B. Kohle, Teersand, reiner Asphalt (Gilsonil) usw., insbesondere jedoch um Kohle. Der Einfachheit halber wird die Erfindung deshalb anhand des Kohleabbaus beschrieben, sie erstreckt sich jedoch auf alle fossilen Brennstoffe sowie auch auf andere zerbrechbare Materialien, die bergmännisch gewonnen werden.The pre-crushed material mentioned is primarily frangible carbonaceous Materials such as B. coal, tar sand, pure asphalt (Gilsonil), etc., but especially coal. For the sake of simplicity, the invention will therefore be described in terms of coal mining, it extends however, on all fossil fuels as well as on other breakable materials that are mined be won.

Continuous Miner werden in erheblichem Umfang im Kohleabbau eingesetzt, weil sie eine sehr große Produktionsleistung besitzen. Sie umfassen einen AbbaukoDf und enthalten w iterhin im allgemeinen eine Fördereinrichtung zum Transport der abgebauten Kohle zum hinteren Maschinenende, Der weitere Transport der Kohle aus der Abbaustrecke heraus erfolgt dann meistens mit kontinuierlichen Förderern. Besonders wirtschaftlich ist der Abtransport der abgebauten Kohle in Form eines Kohle-Wasser-Schlammes entlang einer Schwemmrinne. Dieses Transportmittel war jedoch bislang für den direkten Anschluß an einen Continuous Miner ungeeignet, weil eine Schwemmrinne stets fest installiert, d.h. also unbeweglich ist, wohingegen der Continuous Miner während der Arbeitsphasen bewegt wird, und zwar nicht nur zu beiden Seiten, sondern auch vor- und rückwärts.Continuous miners are used to a considerable extent in coal mining because they are a very large Own production capacity. They include a dismantling code and also generally contain one Conveyor device for transporting the mined coal to the rear end of the machine, the other The coal is then usually transported out of the mining line using continuous conveyors. The removal of the mined coal in the form of a coal-water sludge is particularly economical along a flume. However, this means of transport was previously for direct Connection to a continuous miner unsuitable because a flood channel is always permanently installed, i.e. is immobile, whereas the continuous miner is moved during the work phases, namely not only on both sides, but also forwards and backwards.

Im einfachsten Fall kann man, wie es durch die GB-PS 3 59 515 bekanntgeworden ist, das trocken abgebaute und auf entsprechende Teilchengröße verkleinerte Material von Hand in offene, abschüssige Schwemmrinnen schaufeln, welche mit Wasser bedient werden und das Material dann zu einer tiefergeiegenen Sammelstelle fördern, von wo aus es weiter verarbeitet wird. Eine solche manuelle Arbeitsweise ist allerdings als sehr umständlich anzusehen, wenn man aus wirtschaftlichen Gründen bestrebt ist, moderne und weitgehend vollständig automatisch arbeitende Abbaumaschinen einzusetzen.In the simplest case one can, as it is through the GB-PS 3 59 515 has become known, the dry degraded and reduced to appropriate particle size Shovel material by hand into open, sloping flumes, which are served with water and the material then to a deeper collection point convey from where it is further processed. Such a manual way of working is, however, considered very awkward to look at if one is striving for economic reasons, modern and largely to use fully automatic mining machines.

Man hat sich daher in solchen Fällen auch schon damit beholfen, die Kohle von der Abbaumaschine aus mit Grubenwagen 2U den ortsfesten Schwemmrinnen zu bringen. Allerdings konnte auch dadurch die an sich vorhandene Wirtschaftlichkeit der Continuous Miner einerseits und des Schwemmrinnentransports andererseits nicht voll ausgeschöpft werden.
Es ist auch schon üblich geworden, eine besondere Kopplungs- bzw. Übergabestation vorzusehen, in der das von der Abbaumaschine gelieferte Material mit Wasser gemischt und danach in die hydraulische Förderleitung übergeben wird
In such cases it has therefore already been resorted to bring the coal from the mining machine to the stationary flumes with a pit car 2U. However, this also meant that the existing economic efficiency of the continuous miners on the one hand and the flume transport on the other hand could not be fully exploited.
It has also become customary to provide a special coupling or transfer station in which the material delivered by the mining machine is mixed with water and then transferred to the hydraulic delivery line

Bei einer durch die DL-PS 61 251 bekanntgewordcnen Horizontalförderanlage für den Braunkohlenbergbau hat die Übergabestation die Form eines sehr langen Mischbehälters, auf dem ein von der Rückseite der dort in Form einer Streckenvortriebsmaschine vorgesehenen Abbaumaschine kommender St.egkettenförderer verfahrbar ist. Am Auslaß dieses Stegkettenförderers befindet sich ein Brechwerk, so daß das zugelieferte Material mit der entsprechenden Teilchengröße in den Mischbehälter fällt. An letzterem ist eine Wasserleitung angeschlossen, und der Auslaß des Mischbehälters geht über eine Pumpe in ein hydraulisches Förderrohr.In a horizontal conveyor system for lignite mining that has become known through DL-PS 61 251 the transfer station has the shape of a very long mixing container on which one from the back of there in the form of a tunneling machine provided for the mining machine of the upcoming chain conveyor is movable. At the outlet of this chain conveyor there is a crusher so that the delivered Material with the appropriate particle size falls into the mixing container. There is a water pipe on the latter connected, and the outlet of the mixing container goes through a pump into a hydraulic delivery pipe.

Durch die DE-PS 3 55 859 ist für Hoch- oder Tief-Ba.gger-Anlagen eine Einrichtung bekannt, bei der am Ende eines horizontalen Transportbandes, auf das die Schüttklappe entleert, ein Rührtrichter angeordnet ist, in welchen das vom Transportband gespritzte Materiail hineinfällt. Innerhalb des Rührtrichters wird durch ein eingebautes Rührwerk das Material schweiTimfähig gehalten. Am unteren Ende des Rührtrichters ist ein Förderrohr angeschlossen, in das dieses schwemmfähige Material mit Hilfe von Druckwasscr hineingedrückt wird, das aus einer Düsenanordnung austritt.From DE-PS 3 55 859 a device is known for high or low Ba.gger systems in which at the end of a horizontal conveyor belt, onto which the pouring flap empties, a stirring funnel is arranged into which the material injected by the conveyor belt falls. Inside the stirring funnel is The material is kept weldable by a built-in agitator. At the bottom of the stirring funnel a delivery pipe is connected, into which this floodable material with the help of pressurized water is pushed in, which emerges from a nozzle arrangement.

Die Zeitschrift »Glückauf«, 1963, Seite 1081 bis 1088 beschreibt hydraulischen Abbau von Kohle. Bei dem hydraulischen Abbau bedarf es keiner besonderen Übergabestation. denn dort schwemmt das aus den Abbau-Driickstrahlen stammende Wasser das abgebaute Material mehr oder weniger flächig aus derThe magazine "Glückauf", 1963, pages 1081-1088 describes hydraulic mining of coal. There is no need for any special hydraulic dismantling Transfer station. for there the water coming from the decomposition pressure jets washes away the decomposed water Material more or less flat from the

Abbausirecke heraus. Dabei sorgen geeignete Barrieren, Platten oder dergleichen dafür, daß das Gemisch aus Wasser und Material in den Einlaß einer Schwemmrinne gelangt, in der es bis zum Schacht gefördert wird. Ferner ist es durch die genannte Zeitschrift bekannt, offene Schwemmrinnen am Strekkenstoß anzuordnen. Die Schwemmrinnen werden an ihren Enden ineinandergelegt Für sie ist eine Neigung von mindestens 5% erforderlich, sie sind auch bis 15% Neigung eingesetzt worden. Auch kann dabei die Kohle mit Schrämladern oder durch Schießarbeit gewonnen und hydraulisch gefördert werden. Die Strebförderung erfolgt dabei mit Wasser fiber das Liegende.Dismantling corner out. Suitable barriers, plates or the like ensure that the mixture of water and material enters the inlet of a flume, in which it reaches the shaft is promoted. It is also known from the magazine mentioned, open flumes at the route joint to arrange. The drainage channels are nested at their ends. For them there is an inclination of at least 5% required, they are also up to 15% Inclination has been employed. The coal can also be extracted with cutter loaders or by shooting and are conveyed hydraulically. The face conveyance takes place with water over the lying surface.

Bei einem durch die DE-OS 23 51 884 bekanntgewordenen Suspensions-Behältersystem wird als Obergabestation ein speziell ausgebildeter Behälter in Form einer oben offenen Wanne verwendet In diese Wanne wird das von einer Abbaumaschine kommende und über ein Transportband geförderte Abbaugut geschüttet Zur Bildung einer Suspension wird außerdem in die Wanne nahe dem höheren Ende des geneigten Bodens Wa.cser eingeführt Am unteren Ende des Bodens der Wanne befindet sich ein Anschluß für eine Pumpe, welche die Suspension unter Druck abfördertIn a suspension container system made known by DE-OS 23 51 884, a specially designed container in the form of an open-topped tub is used as the top station in the tub, near the higher end of the inclined bottom Wa. c ser introduced at the lower end of the bottom of the tub there is a connection for a pump which abfördert the suspension under pressure

Der Erfindung liegt die Aufgabe zugrunde, eine Übergabestation zu schaffen, die einen Längenausgleich zwischen dem beweglichen Continuous Miner und der ortsfesten Schwemmrinne gewährleistet, und die bei Aufrechterhaltung des Förderstromes den Eintritt der Kohle in die Schwemmrinne in bereits schwemmfähi- M gern Zustand und die Verlegung der Schwemmrinne am Stoß des Abbauraumes gestattet.The invention has for its object to provide a transfer station, which ensures a length compensation between the movable continuous miner and the stationary launder, and while maintaining the flow rate the occurrence of the coal into the flume in already schwemmfähi- M like state, and the transfer of the Flume allowed at the joint of the mining area.

Die Lösung dieser Aufgabe erfolgt bei der im Oberbegriff des Anspruchs 1 vorausgesetzten Vorrichtung durch die im kennzeichnenden Teil des An-Spruchs 1 angegebenen Merkmale.This object is achieved in the device presupposed in the preamble of claim 1 by the features specified in the characterizing part of claim 1.

Die Erfindung beschreitet also den Weg, ais Förderleitung eine offene Schwemmrinne zu verwenden und als Übergabestation eine zwischen dem Continuous Miner und der Schwemmrinne angeordnete Rutsche vorzusehen. Eine selche Rutsche ist sehr einfach und billig im Aufbau, sehr leicht verfahrbar und handhabbar, nimmt wenig Raum ein und ermöglicht es vor allem, das von dem Continuous Miner stammende Material bei fortdauernder Bewegung, nämlich während der Überwindung des Höhenunterschiedes zwischen dem Abförderer des Continuous Miner und der Schwemmrinne, mit dem Schwemmwasser zu bedienen. Dabei ist es von Vorteil daß das Material also nicht mehr zur Ruhe kommt, sondern während seiner Fall- und Rutschbewegung entlang der Schrägfläche der Rutsche schon mit dem Wasser vermischt wird, so daß es zügig in bereits schwemmfähigem Zustand in die Schwemmrinne eintritt. Hier wird also der Gedanke verwirklicht, das Material während seiner Abwärtsbcwegung schwemmfähig zu machen und unter Beibehaltung dieser Bewegung fortzuschwemmen. Da das Material dabei nicht mehr zur Ruhe kommt, ist der benötigte Energieaufwand relativ gering.The invention thus takes the path of using an open flume as the delivery line and a transfer station between the continuous miner and the flume Provide a slide. Such a slide is very simple and cheap to build, and is very easy to move manageable, takes up little space and, above all, enables that coming from the continuous miner Material with continuous movement, namely while overcoming the height difference between the conveyor of the continuous miner and the flume to operate with the flume. It is advantageous that the material no longer comes to rest, but rather during its fall and sliding movement along the inclined surface of the slide is already mixed with the water, so that it quickly enters the flume in a condition that is already capable of being flooded. So here is the thought realizes making the material floodable during its downward movement and while maintaining it to wash away this movement. Since the material no longer comes to rest, it is required energy expenditure relatively low.

Im Vergleich zu dem herkömmlichen Verfahren, die Kohle nach dem Ausstoß in Grubenwagen zu verladen und zu einer fest verlegten Schwemmrinne zu bringen, in die sie dann hineingekippt wird, bietet die Erfindung erhebliche Vorteile. So kann z. B. zum Abbau der gleichen Kohlemengi eine Mannschaft von neun Mann δ5 auf sechs Mann herabgesetzt werden. Weiterhin wurde gefunden, daß mit Hilfe aer Erfindung eine Steigerung von etwa 50% der abgebauten Strecke pro Mann und Schicht möglich istCompared to the conventional method of loading the coal into mine cars after it has been ejected and bringing it to a permanently installed flume, into which it is then tipped, the invention offers considerable advantages. So z. B. to dismantle the same coal mine a crew of nine men δ5 are reduced to six men. Furthermore, it was found that with the help of the invention an increase of about 50% of the distance covered per man and shift is possible

Zur ordnungsgemäßen Funktion einer Schwemmrinne ist im allgemeinen eine Neigung von mindestens 7° ± 3" erforderlich. Die mit Hilfe eines Continuous Miner geschaffenen Stollen und Förderstrecken müssen also eine derartige Neigung aufweisen. Das bedeutet für diese Maschinen keine Schwierigkeit, da sie ohne weiteres in der Lage sind, auf schrägen Flächen dieser Neigung zu arbeiten.For a flood channel to function properly, an incline of at least at least is generally required 7 ° ± 3 "required. The tunnels and conveyor lines created with the help of a continuous miner must thus have such a tendency. This means no difficulty for these machines, as they are without are also able to work on sloping surfaces with this inclination.

Schwemmrinnen sind an sich bekannt; sie können aus Stahl, Beton, Holz oder ähnlichem bestehen. Wenn sie aus Stahl hergestellt sind, können ihre einzelnen Abschnitte zusammengeschweißt sein. Dies ist jedoch nicht Bedingung. Wenn nämlich die Rinnenabschnitte schuppenartig von oben nach unten derart ineinandergelegt sind, daß der bergaufwärts liegende Rinnenabschnitt den bergabwärts folgenden Abschnitt überlappt, gibt es im allgemeinen keine Leckage zwischen den Nahtstellen, da die Trägheit des Wassers ein Zurückfließen an den Nahtstellen verhindertFlumes are known per se; they can consist of steel, concrete, wood or the like. If you are made of steel, their individual sections may be welded together. However, this is not condition. That is, if the channel sections are so nested together like scales from top to bottom are that the uphill channel section overlaps the downhill section, there is generally no leakage between the seams due to the inertia of the water causing a backflow prevented at the seams

Für den Transport in einer derartigen geneigten Schwemmrinne hat der Schlamm im allgemeinen ein Kohle-Wasser-Verhältnis von 1 :4 bis 1 :0,5. Die Kohlestücke besitzen dabei üblicherweise eine Größe, die nich." über die halbe Breite der Rinne hinausgeht Da kleinere Kohlestücke leichter in einer Schwemmrinne zu transportieren sind, wird die Kohle vor dem Fortschwemmen in der Rutsche und anschließend in der Schwemmrinne zerkleinert Eine solch«: Zerkleinerung erfolgt in der Weise, daß oberhalb der Zähne des Kopfes des Continuous Miner kurz vor dem maschinenseitigen Förderband ein Brechhaupt in Form eines Zahneisens angeordnet wird, doch ist ebenso auch die Anordnung eines Walzenbrechwerks im Zusammenwirken mit dem maschinenseitigen Förderband als Zerkleinerungsstation möglich.For the transport in such a sloping flume, the sludge generally has one Coal to water ratio from 1: 4 to 1: 0.5. The coal pieces usually have a size the nich. "goes beyond half the width of the gutter Da smaller pieces of coal are easier to transport in a flume, the coal is before the Floating away in the chute and then comminuted in the flume. Such a «: comminution takes place in such a way that above the teeth of the head of the continuous miner just before the machine-side Conveyor belt a crushing head in the form of a toothed iron is arranged, but is also the same Arrangement of a roller crusher in cooperation with the machine-side conveyor belt as Shredding station possible.

Es ist wünschenswert, die Kohle so weit zu zerkleinern, daß die maximale Stückgrö3e generell kleiner ist als etwa die halbe Schwemmrinnenbreite. Bei ausgeführten Anlagen sollte die Stückgröße nicht gröjer als 15 cm sein und vorzugsweise bei ungefähr 10 cm liegen. Natürlich kommen Stücke vor, deren Größe kleiner oder größer ist als die oben angegebenen Werte, eine Schwemmrinne kann jedoch im allgemeinen sporadisch auftretende Stücke einer Größe, die knapp unter der eigenen Breite liegt, verkraften.It is desirable to crush the coal to such an extent that the maximum lump size in general is less than about half the width of the flume. In the case of implemented systems, the piece size should not greater than 15 cm and preferably around 10 cm. Of course there are pieces whose Size is smaller or larger than the values given above, but a flood channel can in general Cope with sporadic pieces of a size that is just under your own width.

Die im Rahmen der Erfindung vorgesehene Rutsche wird vorzugsweise mit ihrem oberen Ende unter die Ausstoßöffnung des Continuous Miner gehängt, beispielsweise mit Hilfe von Ketten, Seilen oder ähnlichem, so daß eine Bewegungsmöglichkeit gegenüber dem Förderband des Continuous Miner gegeben ist. Ebenso isf eiri Halterung auf einer Schwinge möglich, die an dem Continuous Miner befestigt ist. Vorzugsweise ist die Breite der Rutsche an ihrem oberen Ende größer als die Breite des Förderbandes des Continuous Miner. Natürlich ist aber auch die Anwendung eines Trichters möglich, der den von dem Förderband ablaufenden Kohlestrom einengt und so die Voraussetzung schafft, eine Rutsche zu benutzen, deren Breite geringer als die des Förderbandes ist.The chute provided within the scope of the invention is preferably hung with its upper end under the discharge opening of the continuous miner, for example with the aid of chains, ropes or the like, so that there is a possibility of movement relative to the conveyor belt of the continuous miner. Likewise is eiri bracket f possible on a rocker which is mounted on the continuous miner. The width of the chute at its upper end is preferably greater than the width of the conveyor belt of the continuous miner. Of course, it is also possible to use a funnel which restricts the flow of coal running off the conveyor belt and thus creates the prerequisite for using a chute whose width is less than that of the conveyor belt.

Das untere Ende der Rutsche ist mit dem Ende der Schwemmrinne funktionsgemäß und beweglich verbunden. Dies kann am besten in der Weise geschehen, da3 die Rutsche mit dem unteren Ende, das schmaler ist als die Schwemmrinne, in diese hineingelegt wird. Bei einer Bewegung des Continuous Miner rutscht dann die Rutsche in der Rinne hin und her. Dabei können zurThe lower end of the slide is functionally and movably connected to the end of the flume. This can best be done in such a way that 3 the slide with the lower end, which is narrower than the flume, is placed in this. At a Movement of the continuous miner then slides the chute back and forth in the gutter. Here you can

Reibungsminderung Rollen unterhalb der Rutsche oder neben den oberen Kanten der Rutsche vorgesehen sein, die auf entsprechenden Flächen abrollen.Friction reduction rollers can be provided below the slide or next to the upper edges of the slide, which roll on appropriate surfaces.

Durch die Trägheit des Kohle-Wasser-Schlammes gibt es bei der an den Seiten offenen Verbindungsstelle zwischen Rutsche und Schwemmrinne keine Rückströmung, sondern der Schlamm fließt stets nur in Förderrichtung, so daß also eine reichliche Bemessung des Spiels zwischen der Rutsche und der Rinne möglich ist. Es hat sich gezeigt, daß ein Breitenunterschied von ca. 5 cm befriedigend ist, es können jedoch ohne weiteres auch engere oder noch größere Breitenunterschiede verwirklicht werden, je nach den Abmessungen der Rinne und der Rutsche, je nach dem geförderten Material und je nach der Gesamtkonzeption.Due to the inertia of the coal-water-sludge, there is an open connection point at the sides There is no backflow between the chute and the flume, but the sludge only flows into the Direction of conveyance, so that an ample dimensioning of the game between the slide and the channel is possible is. It has been shown that a difference in width of about 5 cm is satisfactory, but it can be done without further narrower or even larger differences in width can be realized, depending on the dimensions the gutter and the slide, depending on the material conveyed and depending on the overall design.

Die Schwemmrinnen werden in Nähe eines Stoßes eines Stollens oder einer Abbaustrecke verlegt, so daß in der Mitte ein freier Gang freibleibt. Um die Verbindung zwischen dem im allgemeinen etwa in der Mitte oder sogar über die Mitte der Abbaustrecke hinaus plazierten Continuous Miner und der nahe der einen Wand verlegten Schwemmrinne herstellen zu können, ist es zweckmäßig, die Rutsche mit einer Abknickung, z. B. einer Biegung bzw. einem oder mehreren Knicken, zu versehen. Wenn z. B. die Abbaustrecke ca. 5 m oder noch breiter ist und der Continuous Miner auf dem der Schwemmrinne gegenüberliegenden Stoß arbeiten kann, muß die Rutsche einen seitlichen Versatz von etwa 3 m besitzen, gemessen von der Mittellinie zur Schwemmrinne.The flumes are laid in the vicinity of a joint of a tunnel or a mining section, so that A free passage remains in the middle. To establish the connection between the in general about in the Continuous miners placed in the middle or even beyond the middle of the mine and the one near the To be able to produce a wall-laid flume, it is advisable to use the slide with a Kink, e.g. B. a bend or one or more kinks to be provided. If z. B. the The mining section is approx. 5 m or even wider and the continuous miner is on the one opposite the flume Push can work, the slide must have a lateral offset of about 3 m, measured from the center line to the flume.

Nachfolgend wird ein Ausführungsbeispiel der Erfindung anhand der Zeichnung erläutert; darin bedeutetAn exemplary embodiment of the invention is explained below with reference to the drawing; in this means

Fig. 1 eine Grundrißansicht eines Stollens mit einer davon abzweigenden Abbaustrecke,Fig. 1 is a plan view of a cleat with a dismantling line branching off from it,

Fig. 2 eine Seitenansicht der erfindungsgemäßen Vorrichtung.Fig. 2 is a side view of the device according to the invention.

Fig.3 eine Draufsicht auf die erfindungsgemäße Vorrichtung,3 shows a plan view of the inventive Contraption,

Fi g. 3a—d Querschnittsansichten verschiedener Rutschenabschnitte in den Ebenen AA bis DD. Fi g. 3a-d cross-sectional views of various slide sections in planes AA to DD.

Bei der Darstellung der F i g. 1 ist davon ausgegangen, daß von einem Stollen 10 aus eine Abbaustrecke 12 in ein Kohleflöz 11 hinein vorgetrieben wird. Der Stollen 10 ist abwärts geneigt, was durch Pfeile angedeutet ist. Innerhalb der Abbaustrecke 12 ist ein Continuous Miner 13 aufgestellt, der sich in das Flöz 11 vorschiebt und dabei die Kohle an der Strecken-Stirnwand 14 abbaut. Der Continuous Miner 13 besitzt einen Abbaukopf 15, welcher beim Vorschub der Maschine die Abbaustrecke formt Mit fortschreitendem Vorschub des Continuous Miner 13 in das Flöz 11 hinein wird die Abbaustrecke 12 nach und nach mit einer Auskleidung 16 aus Holz oder Metall, die mit Stempeln 17 verstärkt ist, stabilisiert.In the illustration of FIG. 1 is based on the assumption that a mining section 12 in a coal seam 11 is driven into it. The cleat 10 is inclined downward, which is indicated by arrows. A continuous miner 13 is set up within the mining section 12, which advances into the seam 11 and in the process, the coal breaks down on the front wall 14 of the route. The continuous miner 13 has a mining head 15, which forms the excavation section when the machine is advanced Miner 13 into seam 11 becomes mining route 12 gradually stabilized with a lining 16 made of wood or metal, which is reinforced with punches 17.

Der Abbaukopf 15 schwenkt zum Herauslösen der Kohle in einem Bogen von einer Seite zur anderen und nach vorn vor den Continuous Miner 13, so daß der Abbau von einer zentralen Position aus quer zur Abbaustreckenrichtung erfolgt- Die mit Hilfe des Abbaukopfes 15 aus dem Flöz 11 herausgelöste Kohle wird unter einem Brechhaupt 21 hindurchgeführt und auf ein Förderband 18 gegeben, das ein Teil des Continuous Miner 13 ist und die Kohle in eine Rutsche 20 ausstößt Das Förderband 18 ist mit einem in einem Winkel zur Förderrichtung angeordneten Abschnitt 19 versehen, der die Kohle so weit aus der Mitte der Abbaustrecke zur Seite leitet, wie es für das Einschütten in die Rutsche 20 notwendig ist. Auch kann der Abschnitt 19 auf Wunsch angehoben oder abgesenkt werden.The mining head 15 pivots in an arc from one side to the other and to loosen the coal forward in front of the Continuous Miner 13, so that mining can be started from a central position across the Mining route direction takes place - The coal extracted from the seam 11 with the aid of the mining head 15 is passed under a crushing head 21 and placed on a conveyor belt 18, which is part of the Continuous miner 13 is and ejects the coal into a chute 20. Conveyor belt 18 is one in one Angle to the conveying direction arranged section 19 provided that the coal so far from the center of the Mining track to the side, as is necessary for pouring into the chute 20. Also can Section 19 can be raised or lowered if desired.

Der Continuous Miner 13 ist mit einem Antriebsmotor ausgestattet, der die Maschine vorschiebt und ebenfalls den Abbaukopf 15 sowie das Förderband 18 antreibt. Dies geschieht am zweckmäßigsten durch voll gekapselte Motoren, deren Zuleitungen gepanzert sind. Auf der einen Seite des Continuous Miner 13 ist für die Kontrolle und Bedienung durch einen BedienungsmannThe Continuous Miner 13 is equipped with a drive motor that advances the machine and also drives the excavation head 15 and the conveyor belt 18. This is most expediently done by fully encapsulated motors, the leads of which are armored. On one side of the Continuous Miner 13 is for the Control and operation by one operator

ic> eine Bedientafel 31 vorgesehen.ic> an operator panel 31 is provided.

Der abgebaute" Kohle wird in der Rutsche 20 noch Wasser zugegeben, so daß ein Kohle-Wasser-Schlamm entsteht, der ans der Abbaustrecke 12 mit Hilfe einer Schwemmrinne 28 abgeführt wird. Das Wasserleitungssystem reicht von einer Druckquelle außerhalb des Arbeitsbereiches bis in die Abbaustrecke hinein und umfaßt eine Vielzahl von Rohrabschnitten 23, die mit Hilfe vuii SC'Mrici'ivci jciiiüSicn 24 äricmändcrgcküppc!; sind. Erforderlichenfalls wird in die Schwemmrinne 28 ebenfalls Wasser eingeführt.The mined "coal" is added to the chute 20, so that a coal-water sludge arises, the ans of the mining route 12 with the help of a Flume 28 is discharged. The water supply system extends from a pressure source outside the Working area into the mining section and comprises a plurality of pipe sections 23 with Help vuii SC'Mrici'ivci jciiiüSicn 24 äricmändcrgcküppc !; are. If necessary, water is also introduced into the flume 28.

Das Wasserleitungssystem leitet das Wasser bis zu einem Punkt noch hinter dem unteren Ende der Rutsche 20, von wo aus über einen flexiblen Druckschlauch 27 ein Anschluß an einen Verteiler 25, der sich an der Rutsche 20 befindet, vorgesehen ist. Der Dnickschlauch kann auf eine Schlauchrolle 22 aufgewickelt sein, um ein Schlaii„!igewirr auf dem Boden der Abbaustrecke 12 zu vermeiden. Die Wasserführung innerhalb der Rutsche 20 wird in weiteren Einzelheiten im Zusammenhang mit den F i g. 2 und 3 beschrieben.The aqueduct system directs the water to a point beyond the bottom of the slide 20, from where a connection to a manifold 25, which is connected to the Slide 20 is provided. The thin hose can be wound onto a hose reel 22 in order to Loopy tangles on the floor of the mining section 12 too avoid. The flow of water within the slide 20 is described in more detail in connection with the F i g. 2 and 3.

Der Kohle-Wasser-Schlamm gelangt aus der Rutsche 20 in die Schwemmrinne 28, die aus Metall oder einem anderen Werkstoff hergestellt ist und sich in oder auf dem Boden der Abbauslrecke 12 befindet. Sie führt jegliche von dem Continuous Miner gelieferte Kohle aus der Abbaustrecke 12 heraus in den Stollen 10 hinein. Dort ist eine ähnliche Schwemmrinne 29 vorgesehen, die den Kohle-Wasser-Schlamm zu einer Entwässerungsstation befördert, wo Kohle und Wasser wieder getrennt werden. Das Wasser wird dabei für einen neuerlichen Gebrauch wiedergewonnen und über das Wasserleitungssystem wieder benutzt.The coal-water sludge comes from the chute 20 in the flume 28, which is made of metal or a Another material is made and is in or on the floor of the degradation line 12. she leads any coal delivered by the continuous miner out of the mining route 12 into the gallery 10. A similar flume 29 is provided there, which carries the coal-water sludge to a drainage station where coal and water are separated again. The water will be there for you regained use and reused via the water supply system.

Die Rutsche 20 ist mit Hilfe von z. B. Ketten 26 (F i g. 2) an jeder Seite des Förderbandes 19 aufgehängt.The slide 20 is with the help of z. B. Chains 26 (Fig. 2) suspended on each side of the conveyor belt 19.

Die Neigung der Rutsche 20 kann somit durch Anheben oder Absenken des hinteren Endes des Förderbandes 19 verändert werden.The inclination of the chute 20 can thus be adjusted by raising or lowering the rear end of the conveyor belt 19 to be changed.

Das Wasser aus dem Leitungssystem gelangt durch den flexiblen Druckschlauch 27 zu dem Verteiler 25 am unteren Ende der Rutsche 20. Bei der darge^ellten Ausführung führen von dort aus zwei Leitungen 30 undThe water from the pipe system reaches the distributor 25 through the flexible pressure hose 27 lower end of the chute 20. In the embodiment shown, two lines 30 and 30 lead from there

32 das Wasser auf jeder Seite entlang den oberen Rutschenkanten zu einem weiteren Verteiler 33 in der Nähe des oberen Rutschenendes. Diese Leitungen 30 und 32 formen einen Wulst, der dazu beiträgt, den Medienstrom innerhalb der Rutsche 20 zu halten, und der außerdem die Formstabilität der Rutsche 20 erhöht. Die Leitungen können zwar auch anders verlegt sein, doch dann ist es wünschenswert wenn auch nicht nötig.32 the water on each side along the upper chute edges to another distributor 33 in the Near the top of the slide. These lines 30 and 32 form a bead that helps the To keep media flow within the slide 20, and which also increases the dimensional stability of the slide 20. The lines can also be laid differently, but then it is desirable if not necessary.

an den oberen Kanten der Rutsche 20 gesonderte Wülste vorzusehen, die das Austreten von Flüssigkeit verhindern, zumindest aber vermindern. Der Verteilerto provide separate beads on the upper edges of the chute 20, which prevent the escape of liquid prevent, or at least reduce it. The distributor

33 ist mit Schlitzen 34 versehen, die das Wasser in die Rutsche 20 hinablenken. Außerdem ist an ihm noch ein Ablenkblech 35 angebracht, das zum Abfangen von Wasserspritzern dient33 is provided with slots 34 which deflect the water down into the slide 20. Besides, there is one more to him Deflector 35 attached, which is used to catch water splashes

Wie in F i g. 3 zu erkennen ist. besitzt die Rutsche 20 eine Abknickung mit einem Winkel von etwa 20°. womitAs in Fig. 3 can be seen. the slide 20 has a kink at an angle of about 20 °. by which

ein seitlicher Versatz erreicht wird, der zur Überbrükkunp des in der Mitte der Abbaustrecke angeordneten Continuous Miner und der an der Seite der Förderstrekke angeordneten Schwemmrinne beiträgt. Gegen unerwünschtes Spritzen des Wassers über den Rand der Rutsche 20 besonders in der Knickstelle, kann es zweckmäßig sein, die Rutsche 20 ganz oder teilweise abzudecken, was in Fig.3 durch eine gestrichelt dargestellte Abdeckung 36 angedeutet ist.a lateral offset is achieved, which leads to the bridging the Continuous Miner located in the middle of the mining line and the one on the side of the conveyor line arranged flume contributes. Against unwanted splashing of water over the edge of the Slide 20 especially in the kink, it may be useful to fully or partially slide the slide 20 to cover what is indicated in Figure 3 by a cover 36 shown in dashed lines.

Bei dem dargestellten speziellen Beispiel besitzen die Rohrabschnitte 23 des Wasserleitungssystems und der rohrförmige Verteiler 25 jeweils einen Durchmesser von etwa 10 cm (4ZoII), was auch für den Druckschlauch 27 gilt. Die Leitungen 30 und 32 entlang den Trogkanten bestehen aus Rohren von etwa 6,5 cm (2,5 Zoll) Durchmesser, und der ebenfalls rohrförmige Verteiler weist einen solchen von etwa 20 cm (8ZoIl) auf. Die Schütze in dem Verteiler 33 besitzen zusammen eine Austrittsfläche von ca. 70 cm2, was in etwa der Querschnittsfläche des Verteilers 33 entspricht. Mit Hilfe einer solchen Auslegung ist eine Wasserdurchflußmenge von bis zu 6800 l/min möglich. Es ist sehr vorteilhaft, wenn das Wasser gleichmäßig über den Grund der Rutsche verteilt wird, da nur so die in die Rutsche stürzende Kohle vollständig weggeschwemmt wird.In the particular example shown, the pipe sections 23 of the water pipe system and the tubular distributor 25 each have a diameter of approximately 10 cm (4 inches), which also applies to the pressure hose 27. The conduits 30 and 32 along the trough edges are made of tubing about 6.5 cm (2.5 inches) in diameter and the manifold, also tubular, has one about 20 cm (8 inches). The contactors in the distributor 33 together have an exit area of approximately 70 cm 2 , which corresponds approximately to the cross-sectional area of the distributor 33. With the help of such a design, a water flow rate of up to 6800 l / min is possible. It is very advantageous if the water is evenly distributed over the bottom of the slide, as this is the only way to completely wash away the coal falling into the slide.

Weiterhin beträgt die Förderbandbreite ca. 70 cm mit einem Support von ca. 10 cm Breite auf jeder Seite. Die Breite der aus Stahl hergestellten Rutsche 20 unterhalb des Forderbandes 19 liegt bei ungefähr 1 m. Wie F i g. 3a zeigt, besitzt die Rutsche 20 unterhalb des Förderbandes 19 nach innen zusammenlaufende Seitenwände und einen ebenen Boden. Der Boden ist 50 cm breit, während die Seitenwände ungefähr 42 cm oberhalb des Bodens aufhören. Im Bereich der Ebene B-B (F i g. 3b) weist die Rutsche 20 einen gekrümmten Boden auf mit im wesentlichen vertikalen Seitenwänden. In diesem Bereich beträgt die Breite ungefähr 46 cm. Das Rutschenende in der Schwemmrinne 28 ruhend ist ungefähr 46 cm breit, während die Schwemmrinne 28 ca. 51 cm breit ist. Die Höhe der Schwemmrinne beträgt etwa 61 cm. Der untere Abschnitt der Rutsche 20 ist ungefähr 4,90 m lang; im Anschluß daran knickt die Rutsche um etwa 20° seitlich ab, und der abgeknickte Abschnitt ist ungefähr 2,30 m lang.Furthermore, the conveyor belt width is approx. 70 cm with a support of approx. 10 cm width on each side. The width of the slide 20 made of steel below the conveyor belt 19 is approximately 1 m, as shown in FIG. 3a shows, the chute 20 below the conveyor belt 19 has inwardly converging side walls and a level floor. The floor is 50 cm wide while the side walls stop approximately 42 cm above the floor. In the area of the plane BB (FIG. 3b), the slide 20 has a curved bottom with essentially vertical side walls. In this area, the width is approximately 46 cm. The end of the slide resting in the flume 28 is approximately 46 cm wide, while the flume 28 is approx. 51 cm wide. The height of the flood channel is about 61 cm. The lower portion of the slide 20 is approximately 4.90 meters long; then the slide bends sideways by about 20 °, and the bent section is about 2.30 m long.

Im Zusammenhang mit dem abgewinkelten Förderband 19 ist es mit Hilfe der Abknickung der Rutsche 20 möglich, von dem etwa in der Mitte der Abbauslrecke angeordneten Continuous Miner die Kohle direkt in die an der Wand verlegte Schwemmrinne 28 zu leiten, also den Transportweg der Kohle seitlich zu versetzen. Obwohl das Spiel zwischen der Rutsche und derIn connection with the angled conveyor belt 19, it is with the help of the kink of the slide 20 possible, from the Continuous Miner arranged approximately in the middle of the mining area, the coal directly into the to guide the flume 28 laid on the wall, that is to say to offset the transport route of the coal to the side. Although the game between the slide and the

f_l : ..nnrt[Kl,P C ~«, Untrlir,* ki,<,mnt e't^U f_l: .. nnrt [Kl, P C ~ «, Untrlir, * ki, <, m n t e't ^ U

Ol.ll WCIIIIIM HIIH- HUI Ulfßl-IUlll JHIIUI-(IiIgI1UV-OV6IJ^Ii die Rutsche ungehindert in der Schwemmrinne, wenn der Continuous Miner Vor- und Rückwärtsbewegungen ausführt. Die Flexibilität infolge der Aufhängung der Rutsche mittels Ketten bewirkt im Verein mit dem Gleitkontakt zwischen dem rutschenden Ende der Rutsche und der Schwemmrinne einen stets zuverlässigen Betrieb trotz des seitlichen Versatzes zwischen Continuous Miner und Schwemmrinne. Bei der Vorwärtsbewegung des Continuous Miner rutscht das untere Ende der infolge ihrer Aufwärtsbewegung auch leicht über die Nahtstellen der in Strömungsrichtung schuppenartig ineinandergelegten Schwemmrinnenabschnitte hinweg, während die Nahtstellen der Schwemmrinnenabschnitte bei einer Rückwärtsbewegung des Continuous Miners dem Rutschenende ohnehin keinen Widerstand entgegenstellen. Ol.ll WCIIIIIM HIIH- HUI Ulfßl-IUlll JHIIUI- (IiIgI 1 UV-OV 6 IJ ^ Ii the slide unhindered in the flume when the continuous miner makes back and forth movements Combined with the sliding contact between the sliding end of the chute and the flume always reliable operation despite the lateral offset between the continuous miner and the flume. When the continuous miner moves forward, the lower end of the slides slightly over the seams in the direction of flow due to its upward movement In any case, when the continuous miner moves backwards, the seams of the flume sections do not offer any resistance to the end of the slide.

Hierzu 3 Blatt ZeichnungenFor this purpose 3 sheets of drawings

Claims (1)

Patentansprüche:Patent claims: 1. Vorrichtung zur hydraulischen Abförderung von trocken abgebautem und vorgebrochenem Material, insbesondere Kohle, enthaltend eine zwischen dem rückseitigen Abförderer eines Continuous Miners und einer hydraulischen Förderleitung angeordnete Obergabestation, in der das von dem Continuous Miner gelieferte Material aufgenommen, mit Wasser gemischt und dann der Förderleitung zugeführt wird, dadurch gekennzeichnet, 1. Device for hydraulic discharge of dry mined and pre-crushed material, in particular coal, containing a between the rear conveyor of a continuous miner and a hydraulic delivery line arranged transfer station in which the material delivered by the continuous miner is received, mixed with water and then fed to the delivery line, characterized in that
DE2548249A 1974-10-25 1975-10-25 Device for the hydraulic removal of dry mined and pre-crushed material Expired DE2548249C2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA212,298A CA1020176A (en) 1974-10-25 1974-10-25 Method of driving a mine entry

Publications (2)

Publication Number Publication Date
DE2548249A1 DE2548249A1 (en) 1976-05-06
DE2548249C2 true DE2548249C2 (en) 1983-05-05

Family

ID=4101452

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2548249A Expired DE2548249C2 (en) 1974-10-25 1975-10-25 Device for the hydraulic removal of dry mined and pre-crushed material

Country Status (9)

Country Link
BE (1) BE834733A (en)
BR (1) BR7506952A (en)
CA (1) CA1020176A (en)
DE (1) DE2548249C2 (en)
FR (1) FR2289721A1 (en)
GB (1) GB1526775A (en)
NL (1) NL7512491A (en)
NZ (1) NZ179042A (en)
ZA (1) ZA756403B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2510427A1 (en) * 1981-07-31 1983-02-04 Mangieu Pierre Transfer and cleaning of ore - by water sluice esp. for use in rough country

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD61251A (en) *
DE355859C (en) * 1922-07-03 Gewerkschaft Hausbach O A flushing funnel designed to be passable for deep or high excavators
GB359515A (en) * 1930-06-24 1931-10-26 John Brown Improvements in or relating to hydraulic conveying systems for use in mines
ZA736063B (en) * 1972-10-16 1974-08-28 Continental Oil Co Slurry hopper system

Also Published As

Publication number Publication date
ZA756403B (en) 1977-05-25
NZ179042A (en) 1979-08-31
FR2289721A1 (en) 1976-05-28
FR2289721B1 (en) 1982-10-01
GB1526775A (en) 1978-09-27
CA1020176A (en) 1977-11-01
BR7506952A (en) 1976-08-17
BE834733A (en) 1976-04-22
AU8599875A (en) 1977-04-28
NL7512491A (en) 1976-04-27
DE2548249A1 (en) 1976-05-06

Similar Documents

Publication Publication Date Title
DE2307413C2 (en) Device for the extraction of a floz-like deposit in longwall mining
DE3107955A1 (en) DEVICE FOR UNDERGROUND MINING, ESPECIALLY FOR THE EXTRACTION OF MIGHTY FLOORS
DE3601485C2 (en)
DE2548249C2 (en) Device for the hydraulic removal of dry mined and pre-crushed material
EP1646766B1 (en) Method and device for extracting extraction products in underground mining
DE3017046A1 (en) EXTRACTION PLANT FOR UNDERGROUND EXTRACTION COMPANIES
DE102005043236B4 (en) Arrangement for mining of mining products in underground mining operations in quarry construction
DE2820020C2 (en)
DE3501509C2 (en) Conveyor with feeder and passage crusher for tunneling of underground operations
DE3104730C2 (en)
DE2659855A1 (en) Transfer joint for mine road conveyor - has U-shape joint to box in face conveyor obliquely to road conveyor
DE3009923A1 (en) METHOD AND DEVICE FOR DISASSEMBLING THE PILLARS IN CHAMBER PILLAR CONSTRUCTION
DE3627270A1 (en) Driving shield, in particular for driving with a heading face supported by earth pressure, with a screw conveyor for the earth moving
DE2833628A1 (en) Machine to discharge stock piled material - has bucket conveyor top run travelling over hopper and across pile at bottom
DE2548252A1 (en) METHOD AND DEVICE FOR DEGRADING CARBON MATERIAL
DE2346149A1 (en) Delivery station for bulk gravel, sand or coal - has two tracks for bucket scraper bridging hopper(s)
DE2450819A1 (en) Hydraulic mining of coal - using at least one upward entry at five degree slope
DE19750484B4 (en) Extraction device, in particular for the coal production in unterertätigen extraction struts
DE19625590C2 (en) Device for filling construction pits, pipe trenches, cable trenches or the like
DE2649694A1 (en) METHOD AND DEVICE FOR PROMOTING DEGRADATION PRODUCTS
DD154352A5 (en) BOESCHUNGSBRUECKE
EP1067272B1 (en) Apparatus for forcing pipes in the underground
DE1255069B (en) Extraction system for underground operations, consisting of planer and conveyor
DE4041490A1 (en) Machine way for drum loader - comprises twin channel box section elements bolted to conveyor through parallel to longwall side face
DE4023873A1 (en) Side wall of channel for scraper bar conveyor - is made from two V=sections welded together at tips of their flanges

Legal Events

Date Code Title Description
D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee