DE2325079A1 - METHOD FOR FIXING LOAD-BEARING BUILDING ELEMENTS IN THE FLOOR - Google Patents
METHOD FOR FIXING LOAD-BEARING BUILDING ELEMENTS IN THE FLOORInfo
- Publication number
- DE2325079A1 DE2325079A1 DE19732325079 DE2325079A DE2325079A1 DE 2325079 A1 DE2325079 A1 DE 2325079A1 DE 19732325079 DE19732325079 DE 19732325079 DE 2325079 A DE2325079 A DE 2325079A DE 2325079 A1 DE2325079 A1 DE 2325079A1
- Authority
- DE
- Germany
- Prior art keywords
- load
- ground
- openings
- support
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Description
VERFAHREN ZUR FIXIERUNG VON TRAGENDEN BAUELEMENTEN IM BODEN Die Erfindung bezieht sich auf Hochspannungsleitungsbauten, insbesondere auf Verfahren zur Verfestigung von deren tragenden Bauelementen. Diese sind z.3 Betonplatten, Pfähle aus Stahlbeton, Metall bzw. Holz. tragende Stätzen od. dgl. METHOD FOR FIXING LOAD-BEARING COMPONENTS IN THE SOIL The invention relates to high-voltage line construction, in particular to methods of consolidation of their load-bearing components. These are e.g. 3 concrete slabs, reinforced concrete piles, Metal or wood. load-bearing props or the like.
Bekanntlich sind die tragenden Bauelemente äußeren Beanspruchungen ausgesetzt, die durch die Änderung der Windrichtung die Vereisung der Freileitungsdrähte, das Au£blahen des Bodens uswO hervorgerufen werden Weitgehend bekannt sind Verfahren zur Fixierung tragender Bauelemente mit Hilfe von Rammpfählen. Die Arbeitsgange eines derartigen Verfahrens sind wie folgt: Anfertigung der Pfähle, ihr Transport an den Aufstellungsort, Einrammen dieser Pfähle unter Verwendung einer Sondereinrichtung. It is well known that the load-bearing components are subject to external stresses exposed, which by the change of the wind direction the icing of the overhead line wires, the bulging of the soil etc. are caused. Processes are widely known for fixing load-bearing construction elements with the help of driven piles. The operations such a procedure are as follows: Manufacture the stakes, their transport to the installation site, driving these piles using a Special facility.
Der Nachteil der besagten Verfahren besteht darin, daß sie bei dichten Baden nur begrenzt verwendet werden können. The disadvantage of the said methods is that they are dense Bathing can only be used to a limited extent.
Sobald ein Pfahl auf eine bestimmte Tiefe eingerammt worden ist, bewegt er sich nicht iaehr weiter, weil die Widerstandskraft des Bodens die Festigkeit des Pfahles selbst zu über steigen beginnt, so daß dieser bricht.Once a pile has been driven to a certain depth, move he doesn’t go any further, because the resistance of the soil increases the strength the post itself begins to rise over, so that this breaks.
Ein weiterer Nachteil ist der, daß die Pfähle infolge ihrer geringen Umfangslänge sowie einer kleinea Reibung zwischen der Oberflache dieser Pfähle und einem Lockeren Boden eine geringfügige Tragfähigkeit gegenüber einer Beanspruchung des Lockeren Bodens auf Herausreißen aufweisen. Another disadvantage is that the piles due to their small Circumferential length as well as a smalla friction between the surface of these piles and a loose soil has a negligible load-bearing capacity compared to stress of loose soil for tearing out.
Um diesem Nachteil begegnen zu können, wurden die tragenden Bauelemente Ctragenden Stützen) auf einer Gründung aufgestellt, deren Tiefe sich nach dem geologischen ProfiL des Bodens richtete. Man errichtete die Gründung aus Beton an ort und Stelle. Dazu fertigte man eine Schalung, in die ein Bewehrungsgerüst eingesetzt und Frischbeton gegossen wurde. Das in dieser Weise hergestellte Fundament widerstand den Beanspruchungen dank seinem Eigengewicht. In order to be able to counter this disadvantage, the load-bearing components C load-bearing columns) erected on a foundation, the depth of which depends on the geological Profile of the floor leveled. The concrete foundation was built on the spot. For this purpose, a formwork was made into which a reinforcement frame was inserted and fresh concrete was poured. The foundation made in this way withstood the stresses and strains thanks to its own weight.
Ein wesentlicher Mangel dieses Verfahrens liegt in den kostspieligen Arbeiten bei der Herstellung des Fundament es be@ründet, weil hierbei ein zusätzlicher Materialverbrauch sowie ein erschwerter -ransport zu verzeichnen sind. Noch ein angei des Verfahrens besteht darin, daß zur Erreichung einer erwünschten Betonfestigkeit viel Zeit in Anspruch genommen wird. A major shortcoming of this process is that it is costly Working in the manufacture of the foundation is due, because this is an additional Material consumption and more difficult transport are recorded. Another angei of the process is that to achieve a desired one Concrete strength takes a lot of time.
Darüber hinaus sind Verfahren zur Fixierung tragender Bauelemente ( tragender Stützen) mit Hilfe von an Platten befestigten Abspannungen bekannt. Ein derartiges Verfahren beinhaltet folgende Arbeitsvorgänge: Aushub von 2,5 bis 3,5 m tiefen Gruben für die Unterbringung von Platten und pilzförmigen Fundamenten zur Aufnahme einer Stütze; Aufschüttung der Gruben und nachfolgende Verdichtung des Bodens; Befestigung der besagten Abspannungen an dem oberen Teil der senkrechten tragenden Stütze. In addition, there are methods for fixing load-bearing components (load-bearing supports) known with the help of bracing fastened to plates. Such a method involves the following operations: excavation from 2.5 to 3.5 m deep pits for the accommodation of slabs and mushroom-shaped foundations for receiving a support; Backfilling of the pits and subsequent compaction of the soil; Fixing of said guy lines to the upper part of the vertical load-bearing support.
Der Nachteil dieser Verfahren besteht.darin, daß die Auflagerplatten und die tilzförmigen Fundamente in einem Boden gestörter Struktur verfestigt werden, dessen Tragfähigkeit einem Boden naturlicher Struktur beachtlich nachsteht. The disadvantage of this method is that the support plates and the tilz-shaped foundations are consolidated in a soil with a disturbed structure, whose load-bearing capacity is considerably inferior to a floor with a natural structure.
Bei der Änderung der Richtung von Windlasten werden die Platten durch die Ab spannungen aus dem Boden gestörter Struktur gewissermaßen herausgezogen; die Abspannungen hängen durch, so daß die Stütze pendelt und umfallen kann. When changing the direction of wind loads, the panels will go through the tension from the bottom of the disturbed structure to a certain extent pulled out; the guy lines sag, so that the support swings and can fall over.
Nachteilig sind diese Verfahren auch dadurch, daß hierbei umfangreiche Erdarbeiten, nämlich Aushub von Gruben, ihre Zuwschüttung und Verdichtung, erforderlich sind. These methods are also disadvantageous in that they are extensive Earthworks, namely excavation of pits, their filling and compaction, required are.
Durch die genannten Arbeitsgänge wird die Bodenstruktur gestört, wobei sich das Volumengewicht und die Haftung des aufgeschütteten Bodens an der Grubenwandung stark vermindern. Deswegen ergibt sich bei der Anwendung der besprochenen Verfahren kein großer Nutzeffekt.The soil structure is disturbed by the operations mentioned, whereby the volume weight and the adhesion of the heaped soil to the pit wall greatly decrease. Therefore, when applying the discussed procedure not a great benefit.
Fernerhin sind Verfahren zum Befestigen tragender Bauelemente ( tragender Stützen) an Metallpfählen bekannt, welche mit angeschweißten Blättern versehen sind. Furthermore, methods for attaching load-bearing components (load-bearing Supports) known on metal posts, which are provided with welded leaves.
Diese Pfähle werden in den Boden eingeschraubt, wonach die tragenden Elemente an diesen Pfählen oberhalb ihres Versenkten Teiles befestigt werden. Die Fixierung dieser Art erweist sich als ausreichend fest und sichert die Arbeit des pfahles im Boden ungestörter Struktur.These piles are screwed into the ground, after which the load-bearing Elements are attached to these piles above their recessed part. the Fixation of this kind proves to be sufficiently firm and secures the work of the pile in the ground of undisturbed structure.
Die Anfertigung solcher Pfähle sowie die Verwenaung von Einrichtungen zu deren Einschrauben sind dagegen teuer. The manufacture of such piles and the use of facilities screwing them in, however, is expensive.
Dazu kommt, daß die Festigkeit der Konstruktion selbst infolge des Einschraubens des öfteren beeinträchtigt wird.In addition, the strength of the construction itself as a result of the Screwing in is often impaired.
Die Erfindung bezweckt die Beseitigung der oben ge.-genannten Mängel. The invention aims to eliminate the above-mentioned deficiencies.
Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren zur Fixierung von tragenden Bauelementen zu schaffen, das eine feste Fixierung der Elemente im Boden ungestörter Struktur sicherstellt. The invention is based on the object of a method for fixing to create of load-bearing components, a firm fixation of the elements in the Ensures undisturbed structure.
Die Aufgabe ist dadurch gelost, daß beietnem Verfahren zur Fixierung tragender Bauelemente im Boden geiaäß der Erfindung das zu fixierende Element mit einer schrägen durchgehenden Öffnung versehen und derart angeordnet wird, daß seine Öffnung den Boden zugewandt ist, wobei in die schräge durchgehende Öffnung ein Keil eingeführt und dann in den Boden eingedrückt wird. The object is achieved in that both methods for fixing supporting components in the ground geiaäß the invention with the element to be fixed provided a sloping through opening and is arranged such that its Opening facing the floor, with a wedge in the sloping through opening inserted and then pushed into the ground.
Hierbei ist es sinnvoll, das tragende Bauelement mit < > schrägen durchgehenden Öffnungen <zusätzlich@>dergestalt zu versehen, daß sich samtliche Öffnungen miteInander kreuzen. It makes sense to designate the load-bearing component with <> sloping through openings <additionally @> in such a way that all Cross openings with one another.
der Ferner ist es zweckmäßig, bei Fixierung tragender Bauelemente in Form von Platten die schrägen durchgehenden Offnungen in deren Ecken vorzusehen. Furthermore, it is useful when fixing load-bearing components in the form of plates to provide the inclined through openings in their corners.
Bei der Fixierung tragender Bauelemente in Form einer Stütze empfiehltes sich, ein Ende dieser Stütze mit schrägen durchgehenden Öffnungen zu versehen, dieses Ende 2 4 in den Boden versenken zu und an der Stütze oberhalb des Bodens eine Manschette starr zu befestigen, die über Führungen verfügt, welche derart geneigt sind, daß sie sich bei einer Verlängerung in Richtung zum Boden kreuzen und zum Richtungsgeben für die Keile bei deren Einführung in die jeweiligen durchgehenden schrägen Öffnungen der Stütze und deren Einbringen in den Boden dienen; nach der Fixierung der tragenden Stütze mittels der Keile entf-ernt man die Lanschette. Recommended when fixing load-bearing components in the form of a support to provide one end of this support with inclined through openings, this one Sink the end 2 4 into the ground and place a sleeve on the support above the ground to be rigidly attached, which has guides which are inclined in such a way that they cross each other in an extension towards the ground and to give direction for the wedges when they are inserted into the respective continuous sloping openings serve the support and its introduction into the ground; after fixing the load-bearing Remove the support by means of the wedges.
Das vorgeschlagene Verfahren zur Fixierung tragend er Bauelemente ( PLatten, Pfähle, Stützen od. dgl.) im Boden gestattet den Erdarbeitsumfang stark zu reduzieren. The proposed method for fixing he structural elements (Plates, piles, supports or the like) in the ground allows the scope of earthworks to be strong to reduce.
Daneben wiId eine viel zuverlässigere Fixierung der genannten Elemente im Boden ungestörter Struktur erzielt, die Trag fähigkeit der Konstruktionen vergrößert und dazu beigetragen, daß Belastungen von jeder Seite her aufgenonmen werden0 Nachstehend werden eine ausführliche Beschreibung des voraeschlazenen Verfahrens zur Fixierung; tragender Bau- elemente unter die Zeichnungen angeführt, die das Wesen des erfindungsgemäßen Verfahrens veranschaulichen. Es zeigt Fig.1 eine Draufsicht auf ein Ausführungsbeispiel des Verfahrens zur Fixierung eines tragenden Bauelementes in Form einer Platte im Boden, welche schräge durchgehende Öffnungen, die sich miteinander kreuzen, besitzt; eine auf Fig.2 eine Draufsicht auf ein andere Ausführungsbeispiel des Verfahrens zur Fixierung einer Platte im Boden; eine Fig.3 Gesamtansicht auf die Fixierung eines tragenden Bauelementes in Form einer Stütze; dabei ist am oberen Teil der Stütze eine Manschette befestigt, welche über Führungen verfügt, die für die Binfünrtng der Keile in die jeweiligen schrägen durchgehenden Öffnungen sorgen.In addition, a much more reliable fixation of the mentioned elements in the ground of an undisturbed structure is achieved, the load-bearing capacity of the structures is increased and loads are taken up from each side. load-bearing construction elements listed under the drawings that illustrate the essence of the method according to the invention. 1 shows a plan view of an exemplary embodiment of the method for fixing a load-bearing component in the form of a plate in the floor, which has inclined through openings which intersect with one another; FIG. 2 shows a plan view of another exemplary embodiment of the method for fixing a plate in the ground; 3 shows an overall view of the fixation of a load-bearing component in the form of a support; a cuff is attached to the upper part of the support, which has guides that ensure that the wedges are inserted into the respective inclined through openings.
Das Verfahren zur fixierung tragend er Bauelemente in Form von Platten wird wie folgt durchgeführt. The method for fixing load-bearing components in the form of panels is carried out as follows.
Die Platte 1 (Fig.1, 2) wird mit durchgehenden Öffnungen 2 versehen, die gegenüber der oberen und unteren Fläche der Platte 1 schräg verlaufen. The plate 1 (Fig. 1, 2) is provided with through openings 2, which are inclined with respect to the upper and lower surfaces of the plate 1.
Je nach der Tragfähigkeit des Bodens und den äußeren auf die tragenden Bauelemente einwirkenden Kräften kann init einer bzw. mehreren Oeffnungen gerechnet werden. Davon abhängig sind ebenfalls der Durchmesser der Öffnungen 2 sowie deren Neigungswinkel innerhalb der Platte. Die besagten Öffnunsen 2 können hierbei in den Ecken angeordnet werden. Depending on the bearing capacity of the soil and the external on the load-bearing Forces acting on structural elements can be calculated with one or more openings will. The diameter of the openings 2 and their also depend thereon Angle of inclination within the plate. Said openings 2 can here in placed in the corners.
Die Fixierung der Platte 1 erfolgt mit Hilfe von Keilen 3, die in die Öffnungen 2 eingeführt werden. Anschließend werden die Keile 3 unter Verwendung einer (in den Zeichnungen nicht veranschaulichten) Sondereinrichtung in den Boden eingerückt, ohne daß die natürliche Bodenstruktur gestört wird. The fixation of the plate 1 takes place with the help of wedges 3, which in the openings 2 are introduced. Then be the wedges 3 using a special device (not shown in the drawings) indented into the ground without disturbing the natural soil structure.
Die Keile 3 können aus Stahl, Holz, Stahlbeton oder einem anderen Werkstoff geeigneter Festigkeit angefertigt werden.The wedges 3 can be made of steel, wood, reinforced concrete or another Material of suitable strength can be made.
Das Verfahren zur Fixierung der tragenden Bauelemente in Form einer Stütze 4 (Fig.3) @einhaltet die folgenden Arbeitsgänge. The method for fixing the load-bearing structural elements in the form of a Support 4 (Fig. 3) @ includes the following operations.
Ein Ende der Stütze 4 wird mit in Bezug auf ihre Längsachse schrägen durchgehenden Öffnungen 5 versehen; in ein vorher hergestelltes Bohrloch wird nun die Stütze 4 mit dem Ende eingeführt, das die Öffnungen 5 besitzt. Anschließend wird an der Stütze 4 oberhalb der Bodenhöhe eine Manschette 6 starr befestigt. Diese verfügt über Führungen 7, welche derart geneigt sind, daß sie sich im Falle ihrer Verlängerung in Richtung Boden kreuzen wurden. Der Neigungswinkel der Führungen 7 st stimmt mit dem der Öffnungen 5 überein. In Anpassung an den Neigungswinkel der oeffnungen 5 erfolgt die Einstellung des Neigungswinkels der Führuiigen 7 unter Ver wendung eines (in Zeichnungen nicht gezeigten) Winkeliaessers. One end of the support 4 is inclined with respect to its longitudinal axis through openings 5 provided; in a previously drilled hole is now the support 4 is inserted with the end that has the openings 5. Afterward a sleeve 6 is rigidly attached to the support 4 above ground level. These has guides 7, which are inclined so that they are in the case of their Were crossing extension towards the ground. The angle of inclination of the guides 7 st corresponds to that of the openings 5. In adaptation to the angle of inclination The opening 5 is used to set the angle of inclination of the guide 7 below Use an angle knife (not shown in the drawings).
Durch die Führungen 7 werden die Keile 8 in die jeweiligen schrägen durchgehenden Öffnungen 5 der Stütze 4 eingeführt. Dann erfolgt mit Hilfe einher Sondereinrichtung das Eindrücken der Keile in den Boden. Through the guides 7, the wedges 8 are in the respective inclines through openings 5 of the support 4 introduced. Then help is done with it Special device for pressing the wedges into the ground.
In Abhängigheit von der Bodenfestigkeft werden den schrägen durchgehenden Öffnungen entsprechende Bohrlöcher vorgebohrt, deren Durchmesser etwas dem der Keile nachsteht. Depending on the strength of the ground, the sloping Through openings corresponding drill holes are pre-drilled, the diameter of which is somewhat that is behind the wedges.
In ähnlicher oben beschriebener Weise erfolgt dann das Ein drücken der Keile in den Boden.In a similar manner as described above, the A press then takes place the wedges in the ground.
Unter dem Einfluß der Belastungen beginnen nebst der Stütze die Keile und somit das Bodenmassiv der ungestörten Struktur zu wirken, so daß die Standfestigkeit der vorgeschlagenen Konstruktionen auch bei viel höheren Belastungen im Vergleich zu gegenwärtig bestehenden konstruktiven Lösungen gesichert wird. Under the influence of the loads, the wedges begin next to the support and thus the soil massif of the undisturbed structure to act, so that the stability compared to the proposed designs even at much higher loads is secured to currently existing constructive solutions.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19732325079 DE2325079A1 (en) | 1973-05-17 | 1973-05-17 | METHOD FOR FIXING LOAD-BEARING BUILDING ELEMENTS IN THE FLOOR |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19732325079 DE2325079A1 (en) | 1973-05-17 | 1973-05-17 | METHOD FOR FIXING LOAD-BEARING BUILDING ELEMENTS IN THE FLOOR |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2325079A1 true DE2325079A1 (en) | 1974-11-28 |
Family
ID=5881287
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19732325079 Pending DE2325079A1 (en) | 1973-05-17 | 1973-05-17 | METHOD FOR FIXING LOAD-BEARING BUILDING ELEMENTS IN THE FLOOR |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2325079A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5568785A (en) * | 1995-08-03 | 1996-10-29 | Hazen; Hallie W. | Utility marking device |
-
1973
- 1973-05-17 DE DE19732325079 patent/DE2325079A1/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5568785A (en) * | 1995-08-03 | 1996-10-29 | Hazen; Hallie W. | Utility marking device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0080143A1 (en) | Foundation for a pole, a pillar or the like | |
DE3215153C2 (en) | Retaining structure and method of manufacturing a retaining structure | |
DE102012016092A1 (en) | Procedure for establishing an offshore structure and foundation for an offshore structure | |
DE19716472C2 (en) | Component, heavy weight wall made therefrom and method for manufacturing the heavy weight wall | |
DE102008018382A1 (en) | Method for securing retaining walls | |
EP0516942B1 (en) | Method and device for stabilising friction soils and bordering cohesive soils | |
DE3416679A1 (en) | Method and apparatus for producing foundations by embedding precast members, in particular pillars, in the end base | |
DE2022787C3 (en) | Process for the production of an underwater concrete base secured against buoyancy | |
DE19808020C2 (en) | Procedure for the renovation of retaining walls | |
DE19648648A1 (en) | Method of stabilising and raising tower-like structures positioned at an angle | |
DE2325079A1 (en) | METHOD FOR FIXING LOAD-BEARING BUILDING ELEMENTS IN THE FLOOR | |
EP1254999B1 (en) | Prefabricated construction element with natural stone components | |
DE1963852A1 (en) | Method of erecting a structure that is at least partially submerged in a body of water | |
DE3626169A1 (en) | Foundation with pile support | |
AT385553B (en) | Foundation which is anchored in the ground and is intended for fastening structural parts, in particular uprights, masts or the like | |
DE102014118543B4 (en) | Demarcation arrangement | |
EP0056422A1 (en) | Process and falsework for constructing bridges of reinforced concrete | |
DE2148748C3 (en) | Methods of lifting and leveling buildings | |
DE3912796A1 (en) | Sloping earthworks climbing construction system - comprises shuttering sections with adjustable supports anchored in completed portion | |
DE1944644C3 (en) | Process for the production of a reinforced concrete pile from in-situ concrete used for the foundation of a corner post and steel pipe for the implementation of the process | |
AT388406B (en) | Pile foundation structure and apparatus and concreting tank for producing the same | |
AT396280B (en) | ARMED CONCRETE FRAME FOR LEVELING GRAVE EDGES | |
DE2651590A1 (en) | Steel pile system for retaining wall - uses U-section vertical piles to support horizontal planks | |
DE102020109352A1 (en) | Support arrangement | |
DE1220879B (en) | Underpass structure and procedure for its subsequent installation |