DE202023106579U1 - Single-sided suspension support structure of a cast-in-place side span section of a continuous beam - Google Patents

Single-sided suspension support structure of a cast-in-place side span section of a continuous beam Download PDF

Info

Publication number
DE202023106579U1
DE202023106579U1 DE202023106579.1U DE202023106579U DE202023106579U1 DE 202023106579 U1 DE202023106579 U1 DE 202023106579U1 DE 202023106579 U DE202023106579 U DE 202023106579U DE 202023106579 U1 DE202023106579 U1 DE 202023106579U1
Authority
DE
Germany
Prior art keywords
frame
double
bere
suspension
spliced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DE202023106579.1U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Sixth Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Sixth Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Sixth Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Publication of DE202023106579U1 publication Critical patent/DE202023106579U1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers, umfassend einen Längsträger (5) eines Bere-Rahmens, dadurch gekennzeichnet, dass der Längsträger (5) des Bere-Rahmens mit einem Aufhängungsmechanismus zum Positionieren nahe einem Ende der Brückenpfeilersäule (21) versehen ist, wobei der Längsträger (5) des Bere-Rahmens im oberen Teil der Brückenpfeilersäule (21) durch einen Aufhängungsmechanismus angeordnet ist,dass der Längsträger (5) des Bere-Rahmens mit einem Stützmechanismus zum Positionieren weg von einem Ende der Brückenpfeilersäule (21) versehen ist, wobei eine Holzschalung (19) über dem Längsträger (5) des Bere-Rahmens durch ein Verschlussgerüst ausgebildet und gestützt ist, wobei die Holzschalung (19) zum Gießen eines Trägerkörpers (20) eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers verwendet wird,dass der Aufhängungsmechanismus einen Spannträger (2) aus doppelt gespleißtem I-Träger umfasst, der am oberen Ende des Abdeckträgers (3) angeordnet ist, wobei zwei parallel angeordnete Querträger (6) aus doppelt gespleißtem I-Träger am Aufhängungsende fest auf beiden Seiten der Brückenpfeilersäule (21) durch eine horizontale Zugstange (10) aus fertiggewalztem Bewehrungsstahl installiert sind, wobei eine Holzmatte (9) zum Stützen zwischen der Brückenpfeilersäule (21) und dem Querträger (6) aus doppelt gespleißtem I-Träger am Aufhängungsende angeordnet ist, wobei eine vertikale Aufhängungsstange (1) aus fertiggewalztem Bewehrungsstahl zum Aufhängen zwischen den beiden Enden des Spannträgers (2) aus doppelt gespleißtem I-Träger und den zwei Querträgern (6) aus doppelt gespleißtem I-Träger am Aufhängungsende angeordnet ist, wobei eine Stahlgrundplatte (7) mit einer Doppelmutter zum Positionieren an beiden Enden der vertikalen Aufhängungsstange (1) aus fertiggewalztem Bewehrungsstahl und der horizontalen Zugstange (10) aus fertiggewalztem Bewehrungsstahl geschraubt ist, wobei der Längsträger (5) des Bere-Rahmens nahe einem Ende der Brückenpfeilersäule (21) durch den Querträger (6) aus doppelt gespleißtem I-Träger am Aufhängungsende gestützt ist,dass der Stützmechanismus eine Stahlrohrpfahlsäule (12), die in das Flussbettbohrloch eingeführt wird, einen Unterwasserbetonfüllpfahl (11), der zwischen der Stahlrohrpfahlsäule (12) und dem Bohrlochspalt gegossen wird, und einen Querträger (13) aus doppelt gespleißtem I-Träger am Stützende umfasst, das am oberen Ende der Stahlrohrpfahlsäule (12) angeordnet ist, wobei der Längsträger (5) des Bere-Rahmens weg von einem Ende der Brückenpfeilersäule (21) durch den Querträger (13) aus doppelt gespleißtem I-Träger am Stützende gestützt ist,dass das Verschlussgerüst einen Verteilungsträger (14) aus I-Träger umfasst, der parallel auf dem Längsträger (5) des Bere-Rahmens angeordnet ist, ein Stahlrohrgerüst (15), das auf der oberen Oberfläche des Verteilungsträgers (14) aus I-Träger angeordnet ist, eine obere Stütze (16), die am oberen Ende des Stahlrohrgerüsts (15) befestigt ist, und ein Doppelstahlrohr (17) umfasst, das in einem Lagertank am oberen Ende der oberen Stütze (16) gelagert ist, wobei ein quadratisches Holz (18) durch die obere Stütze (16) und das Doppelstahlrohr (17) zusammenwirkend gestützt ist, wobei das quadratische Holz (18) mit einer Holzschalung (19) versehen ist.A single-sided suspension support structure of a cast-in-place side span portion of a continuous beam comprising a longitudinal beam (5) of a Bere frame, characterized in that the longitudinal beam (5) of the Bere frame is provided with a suspension mechanism for positioning near an end of the bridge pier column (21), wherein the longitudinal beam (5) of the Bere frame is arranged in the upper part of the bridge pier column (21) by a suspension mechanism, in that the longitudinal beam (5) of the Bere frame is provided with a support mechanism for positioning away from one end of the bridge pier column (21). , wherein a wooden formwork (19) is formed and supported over the longitudinal beam (5) of the Bere frame by a closure frame, the wooden formwork (19) being used for casting a support body (20) of a cast-in-place side tensioning section of a continuous beam, that the Suspension mechanism comprises a tension beam (2) made of double spliced I-beam arranged at the upper end of the cover beam (3), with two parallel arranged cross beams (6) made of double-spliced I-beam at the suspension end fixedly on both sides of the bridge pier column (21 ) are installed by a horizontal tie rod (10) made of finish-rolled reinforcing steel, a wooden mat (9) for support being arranged between the bridge pier column (21) and the cross member (6) made of double spliced I-beam at the suspension end, a vertical suspension rod ( 1) made of finished rolled reinforcing steel for hanging between the two ends of the tension beam (2) made of double spliced I-beam and the two cross beams (6) made of double spliced I-beam at the suspension end, with a steel base plate (7) with a double nut for Positioning at both ends of the vertical suspension rod (1) made of finish-rolled reinforcing steel and the horizontal tie rod (10) of finish-rolled reinforcing steel is screwed, with the longitudinal beam (5) of the bere frame near one end of the bridge pier column (21) through the cross beam (6) of double spliced I-beam at the suspension end, the supporting mechanism is a tubular steel pile column (12) inserted into the riverbed borehole, an underwater concrete fill pile (11) cast between the tubular steel pile column (12) and the borehole gap, and a cross beam ( 13) of double spliced I-beam at the support end, which is arranged at the upper end of the tubular steel pile column (12), the longitudinal beam (5) of the Bere frame away from one end of the bridge pier column (21) through the cross member (13). double spliced I-beam at the support end, the closure frame comprises a distribution beam (14) made of I-beam arranged in parallel on the longitudinal beam (5) of the Bere frame, a tubular steel frame (15) located on the upper surface of the I-beam distribution beam (14), an upper support (16) secured to the upper end of the tubular steel frame (15), and a double steel pipe (17) located in a storage tank at the upper end of the upper support ( 16), a square piece of wood (18) being supported cooperatively by the upper support (16) and the double steel tube (17), the square piece of wood (18) being provided with a wooden formwork (19).

Description

TECHNISCHES GEBIETTECHNICAL FIELD

Das vorliegende Gebrauchsmuster bezieht sich auf das technische Gebiet der Durchlaufträgerhalterungen, insbesondere auf eine einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers.The present utility model relates to the technical field of continuous beam supports, particularly to a single-sided suspension support structure of a cast-in-place side tension portion of a continuous beam.

STAND DER TECHNIKSTATE OF THE ART

Der vor Ort gegossene Seitenspannabschnitt des Durchlaufträgers wird durch die Vollraumhaltermethode, die Regalmethode und die Klammermethode konstruiert, die technisch ausgereift, sicher und zuverlässig ist. Diese Strukturform wird stark gefördert und angewendet. Während des Baus des vor Ort gegossenen Seitenspannabschnitts des Durchlaufträgers im Wasser ist die Behandlung des Stützfundaments jedoch ein komplizierter Prozess unter den geologischen Bedingungen der Navigationsanforderungen und des verwitterten Gesteins des Flussbetts. Die Maßnahmen zur Verhinderung des Treffens von schwimmenden Objekten während der Hochwassersaison sind schwierig, so dass der Bau während der Hochwassersaison das Risiko eines Zusammenbruchs der Halterung erhöht. Unter den geologischen Bedingungen des verwitterten Gesteins des Flussbetts ohne Deckschicht wird das traditionelle Lochführungsbehandlungsverfahren für das Stützfundament durch die Regalmethode angewendet, das schwierig zu konstruieren und ineffizient ist. Der in das Flussbett verankerte Teil kann in der späteren Zeit nicht entfernt werden, was zu erhöhten Bauinvestitionen führt. Die traditionelle Vollraumhaltermethode wird verwendet, um das Wasserboot unpassierbar zu machen und die blockierte Fläche der Wasseroberfläche zu vergrößern. Es ist anfällig für das Treffen von schwimmenden Objekten während der Hochwassersaison, was das Sicherheitsrisiko hoch macht. Die traditionelle Klammermethode wird verwendet, um die Kippschutzmaßnahmen für die Pfeilersäule hinzuzufügen, und die Länge des vor Ort gegossenen Seitenspannabschnitts ist begrenzt, was hohe Baukosten aufweist.The cast-in-place side span section of the continuous beam is constructed by the full space bracket method, shelf method and bracket method, which is technically sophisticated, safe and reliable. This structural form is strongly promoted and used. However, during the construction of the cast-in-place side span section of the continuous beam in the water, the treatment of the supporting foundation is a complicated process under the geological conditions of navigation requirements and weathered rock of the river bed. The measures to prevent the hitting of floating objects during the flood season are difficult, so construction during the flood season increases the risk of support collapse. In the geological conditions of the weathered rock of the river bed without overburden, the traditional hole guiding treatment method for the supporting foundation is adopted by the shelf method, which is difficult to construct and inefficient. The part anchored in the riverbed cannot be removed later, which leads to increased construction investments. The traditional full space holder method is used to make the water boat impassable and increase the blocked area of the water surface. It is vulnerable to hitting floating objects during flood season, making the safety risk high. The traditional bracket method is used to add the anti-tip measures for the pier column, and the length of the cast-in-place side span section is limited, which has high construction costs.

INHALT DES VORLIEGENDEN GEBRAUCHSMUSTERSCONTENT OF THIS USER MODEL

Um die in der obigen Hintergrundtechnologie aufgeworfenen Probleme zu lösen, stellt das vorliegende Gebrauchsmuster eine einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers bereit.In order to solve the problems raised in the above background technology, the present utility model provides a one-sided suspension support structure of a cast-in-place side span portion of a continuous beam.

Um den obigen Zweck zu erreichen, stellt das vorliegende Gebrauchsmuster die folgenden technischen Lösungen bereit: Einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers, umfassend einen Längsträger eines Bere-Rahmens, wobei der Längsträger des Bere-Rahmens mit einem Aufhängungsmechanismus zum Positionieren nahe einem Ende der Brückenpfeilersäule versehen ist, wobei der Längsträger des Bere-Rahmens im oberen Teil der Brückenpfeilersäule durch einen Aufhängungsmechanismus angeordnet ist,
dass der Längsträger des Bere-Rahmens mit einem Stützmechanismus zum Positionieren weg von einem Ende der Brückenpfeilersäule versehen ist, wobei eine Holzschalung über dem Längsträger des Bere-Rahmens durch ein Verschlussgerüst ausgebildet und gestützt ist, wobei die Holzschalung zum Gießen eines Trägerkörpers eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers verwendet wird,
dass der Aufhängungsmechanismus einen Spannträger aus doppelt gespleißtem I-Träger umfasst, der am oberen Ende des Abdeckträgers angeordnet ist, wobei zwei parallel angeordnete Querträger aus doppelt gespleißtem I-Träger am Aufhängungsende fest auf beiden Seiten der Brückenpfeilersäule durch eine horizontale Zugstange aus fertiggewalztem Bewehrungsstahl installiert sind, wobei eine Holzmatte zum Stützen zwischen der Brückenpfeilersäule und dem Querträger aus doppelt gespleißtem I-Träger am Aufhängungsende angeordnet ist, wobei eine vertikale Aufhängungsstange aus fertiggewalztem Bewehrungsstahl zum Aufhängen zwischen den beiden Enden des Spannträgers aus doppelt gespleißtem I-Träger und den zwei Querträgern aus doppelt gespleißtem I-Träger am Aufhängungsende angeordnet ist, wobei eine Stahlgrundplatte mit einer Doppelmutter zum Positionieren an beiden Enden der vertikalen Aufhängungsstange aus fertiggewalztem Bewehrungsstahl und der horizontalen Zugstange aus fertiggewalztem Bewehrungsstahl geschraubt ist, wobei der Längsträger des Bere-Rahmens nahe einem Ende der Brückenpfeilersäule durch den Querträger aus doppelt gespleißtem I-Träger am Aufhängungsende gestützt ist,
dass der Stützmechanismus eine Stahlrohrpfahlsäule, die in das Flussbettbohrloch eingeführt wird, einen Unterwasserbetonfüllpfahl, der zwischen der Stahlrohrpfahlsäule und dem Bohrlochspalt gegossen wird, und einen Querträger aus doppelt gespleißtem I-Träger am Stützende umfasst, das am oberen Ende der Stahlrohrpfahlsäule angeordnet ist, wobei der Längsträger des Bere-Rahmens weg von einem Ende der Brückenpfeilersäule durch den Querträger aus doppelt gespleißtem I-Träger am Stützende gestützt ist,
dass das Verschlussgerüst einen Verteilungsträger aus I-Träger umfasst, der parallel auf dem Längsträger des Bere-Rahmens angeordnet ist, ein Stahlrohrgerüst, das auf der oberen Oberfläche des Verteilungsträgers aus I-Träger angeordnet ist, eine obere Stütze, die am oberen Ende des Stahlrohrgerüsts befestigt ist, und ein Doppelstahlrohr umfasst, das in einem Lagertank am oberen Ende der oberen Stütze gelagert ist, wobei ein quadratisches Holz durch die obere Stütze und das Doppelstahlrohr zusammenwirkend gestützt ist, wobei das quadratische Holz mit einer Holzschalung versehen ist.
In order to achieve the above purpose, the present utility model provides the following technical solutions: Single-side suspension support structure of a cast-in-place side tensioning portion of a continuous beam comprising a side member of a Bere frame, the side member of the Bere frame having a suspension mechanism for positioning near one end the bridge pier column, the longitudinal beam of the Bere frame being arranged in the upper part of the bridge pier column by a suspension mechanism,
in that the longitudinal beam of the Bere frame is provided with a support mechanism for positioning away from one end of the bridge pier column, wherein a wooden formwork is formed and supported over the longitudinal beam of the Bere frame by a locking frame, the wooden formwork for casting a support body of a cast-in-place side tensioning section of a continuous beam is used,
in that the suspension mechanism comprises a double-spliced I-beam tension beam disposed at the upper end of the cover beam, with two parallel-arranged double-spliced I-beam cross beams at the suspension end being firmly installed on both sides of the bridge pier column by a horizontal tie rod made of finish-rolled reinforcing steel , wherein a wooden mat for support is arranged between the bridge pier column and the double spliced I-beam cross member at the suspension end, with a vertical suspension rod made of finish-rolled reinforcing steel for hanging between the two ends of the double spliced I-beam tension beam and the two double spliced I-beam cross members spliced I-beam is arranged at the suspension end, with a steel base plate screwed with a double nut for positioning at both ends of the vertical suspension rod made of finish-rolled reinforcing steel and the horizontal tie rod made of finish-rolled reinforcing steel, with the longitudinal beam of the Bere frame near one end of the bridge pier column through the Cross member made of double spliced I-beam is supported at the suspension end,
that the support mechanism includes a tubular steel pile column inserted into the riverbed borehole, a submerged concrete fill pile cast between the tubular steel pile column and the borehole gap, and a double-spliced I-beam cross member at the support end disposed at the upper end of the tubular steel pile column, the Bere frame longitudinal beam is supported away from one end of the bridge pier column by the double spliced I-beam cross member at the supporting end,
that the closure frame comprises an I-beam distribution beam disposed in parallel on the longitudinal beam of the Bere frame, a tubular steel frame disposed on the upper surface of the I-beam distribution beam, an upper support disposed at the upper end of the tubular steel frame is attached, and includes a double steel tube, which is stored in a storage tank at the top of the upper support, a square log being cooperatively supported by the top support and the double steel pipe, the square log being provided with a wooden formwork.

Als eine bevorzugte technische Lösung für eine einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers gemäß dem vorliegenden Gebrauchsmuster ist vorgesehen, dass ein Begrenzungskanalstahl zum Positionieren fest auf der Innenseite des Längsträgers des Bere-Rahmens installiert ist, wobei vier Begrenzungskanalstähle angeordnet sind, wobei die vier Begrenzungskanalstähle auf Oberflächen auf beiden Seiten der Brückenpfeilersäule verteilt sind.As a preferred technical solution for a one-sided suspension support structure of a cast-in-place side tensioning portion of a continuous beam according to the present utility model, it is provided that a limiting channel steel for positioning is fixedly installed on the inside of the longitudinal beam of the Bere frame, wherein four limiting channel steels are arranged, the four Boundary channel steels are distributed on surfaces on both sides of the bridge pier column.

Als eine bevorzugte technische Lösung für eine einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers gemäß dem vorliegenden Gebrauchsmuster ist vorgesehen, dass die obere Oberfläche des Längsträgers des Bere-Rahmens mit einem Gummiblocklager zum Stützen versehen ist, wobei das Gummiblocklager in Kontakt mit der unteren Oberfläche des Abdeckträgers steht, wobei der Abdeckträger am oberen Ende des Spannträgers aus doppelt gespleißtem I-Träger installiert ist.As a preferred technical solution for a single-sided suspension support structure of a cast-in-place side tensioning portion of a continuous beam according to the present utility model, it is provided that the upper surface of the longitudinal beam of the Bere frame is provided with a rubber block bearing for support, the rubber block bearing in contact with the lower surface of the cover beam, with the cover beam installed at the top of the double spliced I-beam tension beam.

Als eine bevorzugte technische Lösung für eine einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers gemäß dem vorliegenden Gebrauchsmuster ist vorgesehen, dass eine Vielzahl von Längsträgern des Bere-Rahmens parallel angeordnet sind.As a preferred technical solution for a one-sided suspension support structure of a cast-in-place side tensioning portion of a continuous beam according to the present utility model, it is provided that a plurality of longitudinal beams of the Bere frame are arranged in parallel.

Als eine bevorzugte technische Lösung für eine einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers gemäß dem vorliegenden Gebrauchsmuster ist vorgesehen, dass zwei Brückenpfeilersäulen und zwei Stahlrohrpfahlsäulen parallel angeordnet sind.As a preferred technical solution for a one-sided suspension support structure of a cast-in-place side tensioning section of a continuous beam according to the present utility model, it is provided that two bridge pier columns and two tubular steel pile columns are arranged in parallel.

Als eine bevorzugte technische Lösung für eine einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers gemäß dem vorliegenden Gebrauchsmuster ist vorgesehen, dass der Längsträger des Bere-Rahmens senkrecht zu dem Verteilungsträger aus I-Träger ist.As a preferred technical solution for a single-sided suspension support structure of a cast-in-place side tensioning portion of a continuous beam according to the present utility model, it is provided that the longitudinal beam of the Bere frame is perpendicular to the I-beam distribution beam.

Im Vergleich zum Stand der Technik sind die vorteilhaften Wirkungen des vorliegenden Gebrauchsmusters:

  1. 1. Der Aufhängungsmechanismus und der Stützmechanismus werden verwendet, so dass ein Ende des Längsträgers des Bere-Rahmens aufgehängt wird und das andere Ende des Längsträgers des Bere-Rahmens durch einen temporären Stützmechanismus im Flussbett gestützt ist, wodurch das Problem gelöst wird, dass die Wasserfläche durch die Vollraumhaltermethode behindert wird und die Wahrscheinlichkeit verringert wird, dass das Haltersystem von schwimmenden Objekten getroffen wird. Gleichzeitig haben der temporäre Stützmechanismus und der Aufhängungsmechanismus auch den Zweck der Verkürzung der Bauzeit, Sicherheit und Effizienz, Energieeinsparung und Umweltschutz und Kostenreduzierung.
  2. 2. Der Aufhängungsmechanismus besteht aus einer vertikalen Aufhängungsstange aus fertiggewalztem Bewehrungsstahl, einem Querträger aus doppelt gespleißtem I-Träger am Aufhängungsende, einer Stahlgrundplatte mit einer Doppelmutter, einer Holzmatte und einer horizontalen Zugstange aus fertiggewalztem Bewehrungsstahl. Der Spannträger aus doppelt gespleißtem I-Träger, der am oberen Ende des Abdeckträgers angeordnet ist, ist durch die vertikale Aufhängungsstange aus fertiggewalztem Bewehrungsstahl mit dem Querträger aus doppelt gespleißtem I-Träger am Aufhängungsende verbunden. Der Querträger aus doppelt gespleißtem I-Träger am Aufhängungsende ist durch die horizontale Zugstange aus fertiggewalztem Bewehrungsstahl mit der Brückenpfeilersäule verbunden. Die beiden Enden der vertikalen Aufhängungsstange aus fertiggewalztem Bewehrungsstahl und der horizontalen Zugstange aus fertiggewalztem Bewehrungsstahl sind verschraubt mit der Stahlgrundplatte mit einer Doppelmutter befestigt, so dass der Querträger aus doppelt gespleißtem I-Träger am Aufhängungsende durch den Spannträger aus doppelt gespleißtem I-Träger aufgehängt und gestützt ist und der Längsträger des Bere-Rahmens durch den Querträger aus doppelt gespleißtem I-Träger am Aufhängungsende aufgehängt und gestützt ist. Eine Holzmatte ist auch zwischen dem Querträger aus doppelt gespleißtem I-Träger am Aufhängungsende und der Brückenpfeilersäule angeordnet, wodurch die Stabilität und Bequemlichkeit des Aufhängens eines Endes des Längsträgers des Bere-Rahmens erreicht wird.
  3. 3. Der Stützmechanismus besteht vorübergehend aus einem Unterwasserbetonfüllpfahl, einer Stahlrohrpfahlsäule und einem Querträger aus doppelt gespleißtem I-Träger am Stützende. Das untere Ende der Stahlrohrpfahlsäule ist in dem Flussbettbohrloch installiert. Der Unterwasserbetonfüllpfahl wird in den Spalt zwischen der Stahlrohrpfahlsäule und dem Bohrloch gegossen, so dass das untere Ende der Stahlrohrpfahlsäule im Flussbett befestigt ist. Das andere Ende des Längsträgers des Bere-Rahmens ist durch das obere Ende der Stahlrohrpfahlsäule durch den Querträger aus doppelt gespleißtem I-Träger am Stützende gestützt, wodurch der Zweck der Stützung des Längsträgers des Bere-Rahmens durch den Stützmechanismus erreicht wird.
Compared to the prior art, the advantageous effects of the present utility model are:
  1. 1. The suspension mechanism and support mechanism are used so that one end of the Bere frame longitudinal beam is suspended, and the other end of the Bere frame longitudinal beam is supported by a temporary support mechanism in the river bed, thereby solving the problem that the water surface is hindered by the full space holder method and reduces the likelihood of the holder system being hit by floating objects. At the same time, the temporary support mechanism and suspension mechanism also have the purpose of shortening construction time, safety and efficiency, energy saving and environmental protection and cost reduction.
  2. 2. The suspension mechanism consists of a vertical suspension rod made of finish-rolled reinforcing steel, a cross member made of double spliced I-beam at the suspension end, a steel base plate with a double nut, a wooden mat and a horizontal tie rod made of finish-rolled reinforcing steel. The double spliced I-beam tension beam located at the upper end of the cover beam is connected to the double spliced I-beam cross member at the suspension end by the vertical suspension rod made of finish-rolled reinforcing steel. The double-spliced I-beam cross member at the suspension end is connected to the bridge pier column by the horizontal tie rod made of finish-rolled reinforcing steel. The two ends of the finish-rolled rebar vertical suspension rod and the finish-rolled rebar horizontal tie rod are bolted to the steel base plate with a double nut, so that the double-spliced I-beam cross member at the suspension end is suspended and supported by the double-spliced I-beam tension beam and the Bere frame side member is suspended and supported by the double spliced I-beam cross member at the suspension end. A wooden mat is also arranged between the double spliced I-beam cross member at the suspension end and the bridge pier column, which achieves the stability and convenience of hanging one end of the longitudinal beam of the Bere frame.
  3. 3. The supporting mechanism is temporarily composed of an underwater concrete infill pile, a steel pipe pile column and a double spliced I-beam cross member at the supporting end. The lower end of the steel pipe pile column is installed in the riverbed borehole. The underwater concrete fill pile is poured into the gap between the steel pipe pile column and the borehole so that the lower end of the Tubular steel pile column is fixed in the river bed. The other end of the Bere frame longitudinal beam is supported by the upper end of the tubular steel pile column through the double spliced I-beam cross member at the support end, thereby achieving the purpose of supporting the Bere frame longitudinal beam by the support mechanism.

Zusammenfassend werden bei den Maßnahmen der einseitigen Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers die Vollraumhalterstruktur und die Regalstruktur kombiniert. Ein einseitiges Aufhängungssystem ist durch den Abdeckträger auf der Pfeilersäule angeordnet, wodurch die Anzahl der Führungslöcher der Stahlrohrsäulen in der Regalstruktur verringert wird. Dadurch wird die Einbauhöhe des Vollraumhalters am Boden des Trägers der Vollraumhalterstruktur verringert, wodurch die Navigationsanforderungen erfüllt werden und die Gesamtstabilität des Haltersystems verbessert wird.In summary, the measures of the one-sided suspension support structure of a cast-in-place side span section of a continuous beam combine the full space support structure and the shelf structure. A one-sided suspension system is arranged through the cover beam on the pillar column, which reduces the number of guide holes of the tubular steel columns in the rack structure. This reduces the installation height of the full space holder at the bottom of the support of the full space holder structure, thereby meeting navigation requirements and improving the overall stability of the holder system.

KURZE BESCHREIBUNG DER ZEICHNUNGBRIEF DESCRIPTION OF THE DRAWING

Die Zeichnungen dienen dazu, ein besseres Verständnis des vorliegenden Gebrauchsmusters zu vermitteln und sind Teil der Beschreibung, werden zusammen mit Ausführungsbeispielen des vorliegenden Gebrauchsmusters zur Auslegung des vorliegenden Gebrauchsmusters verwendet und stellen keine Einschränkung des vorliegenden Gebrauchsmusters dar. Es zeigt:

  • 1 ist ein schematisches Diagramm der Struktur gemäß einer Hauptansicht des vorliegenden Gebrauchsmusters;
  • 2 ist ein schematisches Diagramm der Struktur gemäß einer linken Ansicht des vorliegenden Gebrauchsmusters;
  • 3 ist ein schematisches Diagramm der Struktur gemäß einer rechten Ansicht des vorliegenden Gebrauchsmusters;
The drawings serve to provide a better understanding of the present utility model and are part of the description, are used together with exemplary embodiments of the present utility model to interpret the present utility model and do not represent a limitation of the present utility model. It shows:
  • 1 is a schematic diagram of the structure according to a main view of the present utility model;
  • 2 is a schematic diagram of the structure according to a left view of the present utility model;
  • 3 is a schematic diagram of the structure according to a right view of the present utility model;

Bezugszeichen: 1. Vertikale Aufhängungsstange aus fertiggewalztem Bewehrungsstahl; 2. Spannträger aus doppelt gespleißtem I-Träger; 3. Abdeckträger; 4. Gummiblocklager; 5. Längsträger eines Bere-Rahmens; 6. Querträger aus doppelt gespleißtem I-Träger am Aufhängungsende; 7. Stahlgrundplatte mit einer Doppelmutter; 8. Begrenzungskanalstahl; 9. Holzmatte; 10. Horizontale Zugstange aus fertiggewalztem Bewehrungsstahl; 11. Unterwasserbetonfüllpfahl; 12. Stahlrohrpfahlsäule; 13. Querträger aus doppelt gespleißtem I-Träger am Stützende; 14. Verteilungsträger aus I-Träger; 15. Stahlrohrgerüst; 16. Obere Stütze; 17. Doppelstahlrohr; 18. Quadratisches Holz; 19. Holzschalung; 20. Trägerkörper eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers; 21. Brückenpfeilersäule.Reference numerals: 1. Vertical suspension rod made of finish-rolled reinforcing steel; 2. Tension beam made of double spliced I-beam; 3. Cover carrier; 4. Rubber block bearings; 5. Longitudinal members of a Bere frame; 6. Double spliced I-beam crossmember at suspension end; 7. Steel base plate with a double nut; 8. Confinement channel steel; 9. Wooden mat; 10. Horizontal tie rod made of finish-rolled reinforcing steel; 11. Underwater concrete fill pile; 12. Tubular steel pile column; 13. Double spliced I-beam cross member at support end; 14. I-beam distribution beam; 15. Tubular steel scaffolding; 16. Upper support; 17. Double steel pipe; 18. Square wood; 19. Wooden formwork; 20. Support body of a cast-in-place side tension section of a continuous beam; 21. Bridge pier column.

AUSFÜHRLICHE BESCHREIBUNGDETAILED DESCRIPTION

Die technischen Lösungen in den Ausführungsbeispielen des vorliegenden Gebrauchsmusters werden nachstehend in Verbindung mit den Zeichnungen in den Ausführungsbeispielen des vorliegenden Gebrauchsmusters klar und vollständig beschrieben. Offensichtlich sind die beschriebenen Ausführungsbeispiele nur einige Ausführungsbeispiele und nicht alle Ausführungsbeispiele des vorliegenden Gebrauchsmusters. Basierend auf den Ausführungsbeispielen in dem vorliegenden Gebrauchsmuster fallen alle anderen Ausführungsbeispiele, die ein gewöhnlicher Fachmann ohne kreative Arbeit erhalten hat, in den Schutzbereich des vorliegenden Gebrauchsmusters.The technical solutions in the exemplary embodiments of the present utility model are clearly and completely described below in connection with the drawings in the exemplary embodiments of the present utility model. Obviously, the exemplary embodiments described are only some exemplary embodiments and not all exemplary embodiments of the present utility model. Based on the embodiments in the present utility model, all other embodiments obtained by an ordinary person skilled in the art without any creative work fall within the scope of the present utility model.

AusführungsbeispielExample embodiment

Das vorliegende Gebrauchsmuster stellt eine technische Lösung bereit, unter Bezugnahme auf 1 bis 3: Einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers, umfassend einen Längsträger 5 eines Bere-Rahmens, wobei der Längsträger 5 des Bere-Rahmens mit einem Aufhängungsmechanismus zum Positionieren nahe einem Ende der Brückenpfeilersäule 21 versehen ist, wobei der Längsträger 5 des Bere-Rahmens im oberen Teil der Brückenpfeilersäule 21 durch einen Aufhängungsmechanismus angeordnet ist, wobei der Längsträger 5 des Bere-Rahmens mit einem Stützmechanismus zum Positionieren weg von einem Ende der Brückenpfeilersäule 21 versehen ist, wobei der Aufhängungsmechanismus und der Stützmechanismus später entfernt werden.This utility model provides a technical solution with reference to 1 until 3 : Single-sided suspension support structure of a cast-in-place side span portion of a continuous beam, comprising a side member 5 of a Bere frame, the side member 5 of the Bere frame being provided with a suspension mechanism for positioning near an end of the bridge pier column 21, the side member 5 of the Bere frame in the upper part of the bridge pier column 21 by a suspension mechanism, the longitudinal beam 5 of the bere frame being provided with a support mechanism for positioning away from one end of the bridge pier column 21, the suspension mechanism and the support mechanism being removed later.

Ferner ist vorgesehen, dass eine Holzschalung 19 über dem Längsträger 5 des Bere-Rahmens durch ein Verschlussgerüst ausgebildet und gestützt ist. Der Aufhängungsmechanismus und der Stützmechanismus werden verwendet, so dass ein Ende des Längsträgers 5 des Bere-Rahmens aufgehängt wird und das andere Ende des Längsträgers 5 des Bere-Rahmens durch einen temporären Stützmechanismus im Flussbett gestützt ist, wodurch das Problem gelöst wird, dass die Wasserfläche durch die Vollraumhaltermethode behindert wird und die Wahrscheinlichkeit verringert wird, dass das Haltersystem von schwimmenden Objekten getroffen wird. Gleichzeitig haben der temporäre Stützmechanismus und der Aufhängungsmechanismus auch den Zweck der Verkürzung der Bauzeit, Sicherheit und Effizienz, Energieeinsparung und Umweltschutz und Kostenreduzierung.Furthermore, it is provided that a wooden formwork 19 is formed and supported over the longitudinal beam 5 of the Bere frame by a locking frame. The suspension mechanism and the support mechanism are used so that one end of the side member 5 of the Bere frame is suspended, and the other end of the side member 5 of the Bere frame is supported by a temporary support mechanism in the river bed, thereby solving the problem that the water surface is hindered by the full space holder method and reduces the likelihood of the holder system being hit by floating objects. At the same time, the temporary support mechanism and suspension mechanism also have the purpose of shortening construction time, safety and efficiency, energy saving and environmental protection and cost reduction.

Ferner ist vorgesehen, dass der Aufhängungsmechanismus einen Spannträger 2 aus doppelt gespleißtem I-Träger umfasst, der am oberen Ende des Abdeckträgers 3 angeordnet ist, wobei zwei parallel angeordnete Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende fest auf beiden Seiten der Brückenpfeilersäule 21 durch eine horizontale Zugstange 10 aus fertiggewalztem Bewehrungsstahl installiert sind, wobei eine Holzmatte 9 zum Stützen zwischen der Brückenpfeilersäule 21 und dem Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende angeordnet ist, wobei eine vertikale Aufhängungsstange 1 aus fertiggewalztem Bewehrungsstahl zum Aufhängen zwischen den beiden Enden des Spannträgers 2 aus doppelt gespleißtem I-Träger und den zwei Querträgern 6 aus doppelt gespleißtem I-Träger am Aufhängungsende angeordnet ist, wobei eine Stahlgrundplatte 7 mit einer Doppelmutter zum Positionieren an beiden Enden der vertikalen Aufhängungsstange 1 aus fertiggewalztem Bewehrungsstahl und der horizontalen Zugstange 10 aus fertiggewalztem Bewehrungsstahl geschraubt ist, wobei der Längsträger 5 des Bere-Rahmens nahe einem Ende der Brückenpfeilersäule 21 durch den Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende gestützt ist. Der Aufhängungsmechanismus besteht aus einer vertikalen Aufhängungsstange 1 aus fertiggewalztem Bewehrungsstahl, einem Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende, einer Stahlgrundplatte 7 mit einer Doppelmutter, einer Holzmatte 9 und einer horizontalen Zugstange 10 aus fertiggewalztem Bewehrungsstahl. Der Spannträger 2 aus doppelt gespleißtem I-Träger, der am oberen Ende des Abdeckträgers 3 angeordnet ist, ist durch die vertikale Aufhängungsstange 1 aus fertiggewalztem Bewehrungsstahl mit dem Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende verbunden. Der Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende ist durch die horizontale Zugstange 10 aus fertiggewalztem Bewehrungsstahl mit der Brückenpfeilersäule 21 verbunden. Die beiden Enden der vertikalen Aufhängungsstange 1 aus fertiggewalztem Bewehrungsstahl und der horizontalen Zugstange 10 aus fertiggewalztem Bewehrungsstahl sind verschraubt mit der Stahlgrundplatte 7 mit einer Doppelmutter befestigt, so dass der Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende durch den Spannträger 2 aus doppelt gespleißtem I-Träger aufgehängt und gestützt ist und der Längsträger 5 des Bere-Rahmens durch den Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende aufgehängt und gestützt ist. Eine Holzmatte 9 ist auch zwischen dem Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende und der Brückenpfeilersäule 21 angeordnet, wodurch die Stabilität und Bequemlichkeit des Aufhängens eines Endes des Längsträgers 5 des Bere-Rahmens erreicht wird.Furthermore, it is provided that the suspension mechanism comprises a tension beam 2 made of double-spliced I-beam, which is arranged at the upper end of the cover beam 3, with two parallel cross beams 6 made of double-spliced I-beam at the suspension end fixedly on both sides of the bridge pier column 21 a horizontal tie rod 10 made of finish-rolled reinforcing steel are installed, with a wooden mat 9 for support between the bridge pier column 21 and the cross member 6 made of double-spliced I-beam at the suspension end, with a vertical suspension rod 1 made of finish-rolled reinforcing steel for hanging between the two ends of the Tension beam 2 made of double spliced I-beam and the two cross beams 6 made of double spliced I-beam are arranged at the suspension end, with a steel base plate 7 with a double nut for positioning at both ends of the vertical suspension rod 1 made of finish-rolled reinforcing steel and the horizontal tie rod 10 made of finish-rolled Reinforcing steel is screwed, with the longitudinal beam 5 of the Bere frame near one end of the bridge pier column 21 being supported by the cross beam 6 made of double spliced I-beam at the suspension end. The suspension mechanism consists of a vertical suspension rod 1 made of finish-rolled reinforcing steel, a cross member 6 made of double-spliced I-beam at the suspension end, a steel base plate 7 with a double nut, a wooden mat 9 and a horizontal tie rod 10 made of finish-rolled reinforcing steel. The double-spliced I-beam tension beam 2 disposed at the upper end of the cover beam 3 is connected to the double-spliced I-beam cross member 6 at the suspension end by the vertical suspension rod 1 made of finish-rolled reinforcing steel. The cross member 6 made of double spliced I-beam at the suspension end is connected to the bridge pier column 21 by the horizontal tie rod 10 made of finished rolled reinforcing steel. The two ends of the vertical suspension rod 1 made of finished-rolled reinforcing steel and the horizontal tie rod 10 made of finished-rolled reinforcing steel are screwed to the steel base plate 7 and fastened with a double nut, so that the cross member 6 made of double-spliced I-beam at the suspension end is supported by the tension beam 2 made of double-spliced I -Beam is suspended and supported and the side member 5 of the Bere frame is suspended and supported by the cross member 6 made of double spliced I-beam at the suspension end. A wooden mat 9 is also arranged between the double spliced I-beam cross member 6 at the suspension end and the bridge pier column 21, thereby achieving the stability and convenience of hanging one end of the side member 5 of the Bere frame.

Ferner ist vorgesehen, dass der Stützmechanismus eine Stahlrohrpfahlsäule 12, die in das Flussbettbohrloch eingeführt wird, einen Unterwasserbetonfüllpfahl 11, der zwischen der Stahlrohrpfahlsäule 12 und dem Bohrlochspalt gegossen wird, und einen Querträger 13 aus doppelt gespleißtem I-Träger am Stützende umfasst, das am oberen Ende der Stahlrohrpfahlsäule 12 angeordnet ist, wobei der Längsträger 5 des Bere-Rahmens weg von einem Ende der Brückenpfeilersäule 21 durch den Querträger 13 aus doppelt gespleißtem I-Träger am Stützende gestützt ist. Der Stützmechanismus besteht vorübergehend aus einem Unterwasserbetonfüllpfahl 11, einer Stahlrohrpfahlsäule 12 und einem Querträger 13 aus doppelt gespleißtem I-Träger am Stützende. Das untere Ende der Stahlrohrpfahlsäule 12 ist in dem Flussbettbohrloch installiert. Der Unterwasserbetonfüllpfahl 11 wird in den Spalt zwischen der Stahlrohrpfahlsäule 12 und dem Bohrloch gegossen, so dass das untere Ende der Stahlrohrpfahlsäule 12 im Flussbett befestigt ist. Das andere Ende des Längsträgers 5 des Bere-Rahmens ist durch das obere Ende der Stahlrohrpfahlsäule 12 durch den Querträger 13 aus doppelt gespleißtem I-Träger am Stützende gestützt, wodurch der Zweck der Stützung des Längsträgers 5 des Bere-Rahmens durch den Stützmechanismus erreicht wird.Further, the support mechanism is provided to include a tubular steel pile column 12 inserted into the riverbed borehole, an underwater concrete fill pile 11 cast between the tubular steel pile column 12 and the borehole gap, and a double-spliced I-beam cross member 13 at the support end located at the upper End of the tubular steel pile column 12 is arranged, the longitudinal beam 5 of the Bere frame being supported away from one end of the bridge pier column 21 by the cross beam 13 made of double-spliced I-beam at the supporting end. The supporting mechanism temporarily consists of an underwater concrete fill pile 11, a tubular steel pile column 12 and a cross member 13 made of double spliced I-beam at the supporting end. The lower end of the steel pipe pile column 12 is installed in the riverbed borehole. The underwater concrete fill pile 11 is poured into the gap between the steel pipe pile column 12 and the borehole, so that the lower end of the steel pipe pile column 12 is fixed in the river bed. The other end of the side member 5 of the Bere frame is supported by the upper end of the tubular steel pile column 12 through the cross member 13 of double spliced I-beam at the supporting end, thereby achieving the purpose of supporting the side member 5 of the Bere frame by the support mechanism.

Ferner ist vorgesehen, dass das Verschlussgerüst einen Verteilungsträger 14 aus I-Träger umfasst, der parallel auf dem Längsträger 5 des Bere-Rahmens angeordnet ist, ein Stahlrohrgerüst 15, das auf der oberen Oberfläche des Verteilungsträgers 14 aus I-Träger angeordnet ist, eine obere Stütze 16, die am oberen Ende des Stahlrohrgerüsts 15 befestigt ist, und ein Doppelstahlrohr 17 umfasst, das in einem Lagertank am oberen Ende der oberen Stütze 16 gelagert ist, wobei ein quadratisches Holz 18 durch die obere Stütze 16 und das Doppelstahlrohr 17 zusammenwirkend gestützt ist, wobei das quadratische Holz 18 mit einer Holzschalung 19 versehen ist. Bei den Maßnahmen der einseitigen Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers werden die Vollraumhalterstruktur und die Regalstruktur kombiniert. Ein einseitiges Aufhängungssystem ist durch den Abdeckträger 3 auf der Pfeilersäule angeordnet, wodurch die Anzahl der Führungslöcher der Stahlrohrsäulen in der Regalstruktur verringert wird. Dadurch wird die Einbauhöhe des Vollraumhalters am Boden des Trägers der Vollraumhalterstruktur verringert, wodurch die Navigationsanforderungen erfüllt werden und die Gesamtstabilität des Haltersystems verbessert wird.It is further provided that the closure frame comprises a distribution beam 14 made of I-beam, which is arranged in parallel on the longitudinal beam 5 of the Bere frame, a tubular steel frame 15 which is arranged on the upper surface of the distribution beam 14 made of I-beam, an upper Support 16 fixed to the upper end of the steel pipe frame 15 and comprising a double steel pipe 17 stored in a storage tank at the upper end of the upper support 16, a square timber 18 being cooperatively supported by the upper support 16 and the double steel pipe 17 , whereby the square wood 18 is provided with wooden formwork 19. In the measures of the one-sided suspension support structure of a cast-in-place side span section of a continuous beam, the full space support structure and the shelf structure are combined. A one-sided suspension system is arranged on the pillar column through the cover beam 3, thereby reducing the number of guide holes of the tubular steel columns in the shelf structure. This reduces the installation height of the full space holder at the bottom of the support of the full space holder structure, thereby meeting navigation requirements and improving the overall stability of the holder system.

Insbesondere ist vorgesehen, dass ein Begrenzungskanalstahl 8 zum Positionieren fest auf der Innenseite des Längsträgers 5 des Bere-Rahmens installiert ist, wobei vier Begrenzungskanalstähle 8 angeordnet sind, wobei die vier Begrenzungskanalstähle 8 auf Oberflächen auf beiden Seiten der Brückenpfeilersäule 21 verteilt sind.In particular, it is provided that a limiting channel steel 8 is firmly installed for positioning on the inside of the longitudinal beam 5 of the Bere frame, with four limiting channel steels 8 being arranged, the four limiting Channel steels 8 are distributed on surfaces on both sides of the bridge pier column 21.

Insbesondere ist vorgesehen, dass die obere Oberfläche des Längsträgers 5 des Bere-Rahmens mit einem Gummiblocklager 4 zum Stützen versehen ist, wobei das Gummiblocklager 4 in Kontakt mit der unteren Oberfläche des Abdeckträgers 3 steht, wobei der Abdeckträger 3 am oberen Ende des Spannträgers 2 aus doppelt gespleißtem I-Träger installiert ist.In particular, it is provided that the upper surface of the longitudinal beam 5 of the Bere frame is provided with a rubber block bearing 4 for support, the rubber block bearing 4 being in contact with the lower surface of the cover beam 3, the cover beam 3 being at the upper end of the clamping beam 2 double spliced I-beam is installed.

Insbesondere ist vorgesehen, dass eine Vielzahl von Längsträgern 5 des Bere-Rahmens parallel angeordnet sind.In particular, it is provided that a large number of longitudinal beams 5 of the Bere frame are arranged in parallel.

Insbesondere ist vorgesehen, dass zwei Brückenpfeilersäulen 21 und zwei Stahlrohrpfahlsäulen 12 parallel angeordnet sind.In particular, it is provided that two bridge pier columns 21 and two tubular steel pile columns 12 are arranged in parallel.

Insbesondere ist vorgesehen, dass der Längsträger 5 des Bere-Rahmens senkrecht zu dem Verteilungsträger 14 aus I-Träger ist.In particular, it is provided that the longitudinal beam 5 of the Bere frame is perpendicular to the distribution beam 14 made of I-beam.

Arbeitsprinzip und Verwendungsprozess des vorliegenden Gebrauchsmusters: Bei der Konstruktion der Halterung ist ein Bohrloch zum Einbau der Stahlrohrpfahlsäule 12 an einer voreingestellten Position des Flussbettes angeordnet. Der Unterwasserbetonfüllpfahl 11 wird in den Spalt zwischen der Stahlrohrpfahlsäule 12 und dem Bohrloch gegossen. Der Querträger 13 aus doppelt gespleißtem I-Träger am Stützende ist am oberen Ende von zwei parallelen Stahlrohrpfahlsäulen 12 angeordnet. Der Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende ist auf beiden Seiten der Brückenpfeilersäule 21 durch die horizontale Zugstange 10 aus fertiggewalztem Bewehrungsstahl installiert. Die Holzmatte 9 ist zwischen dem Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende und der Brückenpfeilersäule 21 angeordnet. Der Spannträger 2 aus doppelt gespleißtem I-Träger, der am oberen Ende des Abdeckträgers 3 angeordnet ist, ist durch die vertikale Aufhängungsstange 1 aus fertiggewalztem Bewehrungsstahl mit dem Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende verbunden. Die Stahlgrundplatte 7 mit einer Doppelmutter wird an beiden Enden der vertikalen Aufhängungsstange 1 aus fertiggewalztem Bewehrungsstahl und der horizontalen Zugstange 10 aus fertiggewalztem Bewehrungsstahl zur Befestigung geschraubt. Ein Ende des Längsträgers 5 des Bere-Rahmens wird auf dem Querträger 6 aus doppelt gespleißtem I-Träger am Aufhängungsende zur Aufhängung angeordnet. Das andere Ende des Längsträgers 5 des Bere-Rahmens ist auf dem Querträger 13 aus doppelt gespleißtem I-Träger am Stützende zur Stützung angeordnet. Vier Begrenzungskanalstähle 8 sind innerhalb des Längsträgers 5 des Bere-Rahmens befestigt, so dass die vier Begrenzungskanalstähle 8 in Kontakt mit den Oberflächen auf beiden Seiten der Brückenpfeilersäule 21 stehen. Das Gummiblocklager 4 ist auf dem Längsträger 5 des Bere-Rahmens angeordnet, um die Stahlgrundplatte 7 mit einer Doppelmutter an beiden Enden der vertikalen Aufhängungsstange 1 aus fertiggewalztem Bewehrungsstahl zu verriegeln. Zu diesem Zeitpunkt steht das Gummiblocklager 4 in Kontakt mit der unteren Oberfläche des Abdeckträgers 3. Der Verteilungsträger 14 aus I-Träger ist über dem Längsträger 5 des Bere-Rahmens angeordnet. Das Stahlrohrgerüst 15 ist über dem Verteilungsträger 14 aus I-Träger angeordnet. Die obere Stütze 16 wird am oberen Ende des Stahlrohrgerüsts 15 befestigt. Zwei Doppelstahlrohre 17 sind in dem Lagertank am oberen Ende der oberen Stütze 16 angeordnet. Das quadratische Holz 18 wird über der oberen Stütze 16 und dem Doppelstahlrohr 17 installiert. Die Holzschalung 19 wird auf die obere Oberfläche des quadratischen Holzes 18 gelegt. Der Trägerkörper 20 eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers wird in die Holzschalung 19 gegossen.Working principle and use process of the present utility model: In the design of the bracket, a borehole for installing the steel pipe pile column 12 is arranged at a preset position of the river bed. The underwater concrete fill pile 11 is poured into the gap between the steel pipe pile column 12 and the borehole. The cross member 13 made of double spliced I-beam at the supporting end is arranged at the upper end of two parallel tubular steel pile columns 12. The cross member 6 made of double spliced I-beam at the suspension end is installed on both sides of the bridge pier column 21 through the horizontal tie rod 10 made of finish-rolled reinforcing steel. The wooden mat 9 is arranged between the cross member 6 made of double spliced I-beam at the suspension end and the bridge pier column 21. The double-spliced I-beam tension beam 2 disposed at the upper end of the cover beam 3 is connected to the double-spliced I-beam cross member 6 at the suspension end by the vertical suspension rod 1 made of finish-rolled reinforcing steel. The steel base plate 7 with a double nut is screwed to both ends of the vertical suspension rod 1 made of finish-rolled reinforcing steel and the horizontal tie rod 10 made of finish-rolled reinforcing steel for fastening. One end of the side member 5 of the Bere frame is placed on the cross member 6 made of double spliced I-beam at the suspension end for suspension. The other end of the side member 5 of the Bere frame is placed on the cross member 13 made of double spliced I-beam at the supporting end for support. Four boundary channel steels 8 are fixed within the longitudinal beam 5 of the Bere frame so that the four boundary channel steels 8 are in contact with the surfaces on both sides of the bridge pier column 21. The rubber block bearing 4 is arranged on the side member 5 of the Bere frame to lock the steel base plate 7 with a double nut at both ends of the vertical suspension rod 1 made of finish-rolled reinforcing steel. At this time, the rubber block bearing 4 is in contact with the lower surface of the cover beam 3. The I-beam distribution beam 14 is disposed above the side beam 5 of the Bere frame. The tubular steel frame 15 is arranged above the distribution beam 14 made of I-beam. The upper support 16 is attached to the upper end of the tubular steel frame 15. Two double steel pipes 17 are arranged in the storage tank at the upper end of the upper support 16. The square timber 18 is installed over the top support 16 and the double steel pipe 17. The wooden formwork 19 is placed on the upper surface of the square timber 18. The support body 20 of a cast-on-site side tension section of a continuous beam is cast into the wooden formwork 19.

Schließlich sollte angemerkt werden, dass die Obigen nur bevorzugte Ausführungsbeispiele des vorliegenden Gebrauchsmusters sind und nicht verwendet werden, um das vorliegende Gebrauchsmuster zu begrenzen. Obwohl das vorliegende Gebrauchsmuster im Detail unter Bezugnahme auf die obigen Ausführungsbeispiele beschrieben wird, kann der Fachmann die in den obigen Ausführungsbeispielen aufgezeichneten technischen Lösungen immer noch modifizieren oder einige der technischen Merkmale äquivalent ersetzen. Jede Änderung, gleichwertige Ersetzung, Verbesserung usw. im Sinne und in den Grundsätzen des vorliegenden Gebrauchsmusters ist in den Schutzbereich des vorliegenden Gebrauchsmusters einzubeziehen.Finally, it should be noted that the above are only preferred embodiments of the present utility model and are not used to limit the present utility model. Although the present utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or equivalently replace some of the technical features. Any modification, equivalent replacement, improvement, etc. in the spirit and principles of this utility model is to be included in the scope of protection of this utility model.

Claims (6)

Einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers, umfassend einen Längsträger (5) eines Bere-Rahmens, dadurch gekennzeichnet, dass der Längsträger (5) des Bere-Rahmens mit einem Aufhängungsmechanismus zum Positionieren nahe einem Ende der Brückenpfeilersäule (21) versehen ist, wobei der Längsträger (5) des Bere-Rahmens im oberen Teil der Brückenpfeilersäule (21) durch einen Aufhängungsmechanismus angeordnet ist, dass der Längsträger (5) des Bere-Rahmens mit einem Stützmechanismus zum Positionieren weg von einem Ende der Brückenpfeilersäule (21) versehen ist, wobei eine Holzschalung (19) über dem Längsträger (5) des Bere-Rahmens durch ein Verschlussgerüst ausgebildet und gestützt ist, wobei die Holzschalung (19) zum Gießen eines Trägerkörpers (20) eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers verwendet wird, dass der Aufhängungsmechanismus einen Spannträger (2) aus doppelt gespleißtem I-Träger umfasst, der am oberen Ende des Abdeckträgers (3) angeordnet ist, wobei zwei parallel angeordnete Querträger (6) aus doppelt gespleißtem I-Träger am Aufhängungsende fest auf beiden Seiten der Brückenpfeilersäule (21) durch eine horizontale Zugstange (10) aus fertiggewalztem Bewehrungsstahl installiert sind, wobei eine Holzmatte (9) zum Stützen zwischen der Brückenpfeilersäule (21) und dem Querträger (6) aus doppelt gespleißtem I-Träger am Aufhängungsende angeordnet ist, wobei eine vertikale Aufhängungsstange (1) aus fertiggewalztem Bewehrungsstahl zum Aufhängen zwischen den beiden Enden des Spannträgers (2) aus doppelt gespleißtem I-Träger und den zwei Querträgern (6) aus doppelt gespleißtem I-Träger am Aufhängungsende angeordnet ist, wobei eine Stahlgrundplatte (7) mit einer Doppelmutter zum Positionieren an beiden Enden der vertikalen Aufhängungsstange (1) aus fertiggewalztem Bewehrungsstahl und der horizontalen Zugstange (10) aus fertiggewalztem Bewehrungsstahl geschraubt ist, wobei der Längsträger (5) des Bere-Rahmens nahe einem Ende der Brückenpfeilersäule (21) durch den Querträger (6) aus doppelt gespleißtem I-Träger am Aufhängungsende gestützt ist, dass der Stützmechanismus eine Stahlrohrpfahlsäule (12), die in das Flussbettbohrloch eingeführt wird, einen Unterwasserbetonfüllpfahl (11), der zwischen der Stahlrohrpfahlsäule (12) und dem Bohrlochspalt gegossen wird, und einen Querträger (13) aus doppelt gespleißtem I-Träger am Stützende umfasst, das am oberen Ende der Stahlrohrpfahlsäule (12) angeordnet ist, wobei der Längsträger (5) des Bere-Rahmens weg von einem Ende der Brückenpfeilersäule (21) durch den Querträger (13) aus doppelt gespleißtem I-Träger am Stützende gestützt ist, dass das Verschlussgerüst einen Verteilungsträger (14) aus I-Träger umfasst, der parallel auf dem Längsträger (5) des Bere-Rahmens angeordnet ist, ein Stahlrohrgerüst (15), das auf der oberen Oberfläche des Verteilungsträgers (14) aus I-Träger angeordnet ist, eine obere Stütze (16), die am oberen Ende des Stahlrohrgerüsts (15) befestigt ist, und ein Doppelstahlrohr (17) umfasst, das in einem Lagertank am oberen Ende der oberen Stütze (16) gelagert ist, wobei ein quadratisches Holz (18) durch die obere Stütze (16) und das Doppelstahlrohr (17) zusammenwirkend gestützt ist, wobei das quadratische Holz (18) mit einer Holzschalung (19) versehen ist.A single-sided suspension support structure of a cast-in-place side span portion of a continuous beam comprising a longitudinal beam (5) of a Bere frame, characterized in that the longitudinal beam (5) of the Bere frame is provided with a suspension mechanism for positioning near an end of the bridge pier column (21), wherein the longitudinal beam (5) of the Bere frame is arranged in the upper part of the bridge pier column (21) by a suspension mechanism, that the longitudinal beam (5) of the Bere frame is provided with a support mechanism for positioning away from one end of the bridge pier column (21). , wherein a wooden formwork (19) is formed and supported over the longitudinal beam (5) of the Bere frame by a closure frame, the wooden formwork (19) being used for casting a carrier body pers (20) of a cast-in-place side tensioning section of a continuous beam, the suspension mechanism comprises a tension beam (2) made of double spliced I-beam, which is arranged at the upper end of the cover beam (3), with two parallel cross beams (6) of double spliced I-beam at the suspension end are firmly installed on both sides of the bridge pier column (21) by a horizontal tie rod (10) made of finish-rolled reinforcing steel, with a wooden mat (9) for support between the bridge pier column (21) and the cross beam (6) made of double spliced I-beam is arranged at the suspension end, with a vertical suspension rod (1) made of finish-rolled reinforcing steel for hanging between the two ends of the tension beam (2) made of double-spliced I-beam and the two cross beams (6) made of double-spliced I-beam. Carrier is arranged at the suspension end, wherein a steel base plate (7) is screwed with a double nut for positioning at both ends of the vertical suspension rod (1) made of finish-rolled reinforcing steel and the horizontal tie rod (10) made of finish-rolled reinforcing steel, the longitudinal beam (5) of the Bere -Frame near one end of the bridge pier column (21) is supported by the cross member (6) made of double spliced I-beam at the suspension end, that the support mechanism is a tubular steel pile column (12) which is inserted into the riverbed borehole, an underwater concrete fill pile (11) which between the tubular steel pile column (12) and the borehole gap, and comprises a cross member (13) of double spliced I-beam at the support end, which is arranged at the upper end of the tubular steel pile column (12), the longitudinal beam (5) of the Bere frame away from one end of the bridge pier column (21) by the cross member (13) made of double spliced I-beam at the supporting end, the closure frame comprises a distribution beam (14) made of I-beam, which is parallel on the longitudinal beam (5) of the Bere -Frame is arranged, a tubular steel frame (15) arranged on the upper surface of the I-beam distribution beam (14), an upper support (16) attached to the upper end of the tubular steel frame (15), and a double steel pipe (17) stored in a storage tank at the upper end of the upper support (16), a square timber (18) being cooperatively supported by the upper support (16) and the double steel tube (17), the square timber ( 18) is provided with wooden formwork (19). Einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers nach Anspruch 1, dadurch gekennzeichnet, dass ein Begrenzungskanalstahl (8) zum Positionieren fest auf der Innenseite des Längsträgers (5) des Bere-Rahmens installiert ist, wobei vier Begrenzungskanalstähle (8) angeordnet sind, wobei die vier Begrenzungskanalstähle (8) auf Oberflächen auf beiden Seiten der Brückenpfeilersäule (21) verteilt sind.Single-sided suspension support structure of a cast-in-place side span section of a continuous beam Claim 1 , characterized in that a boundary channel steel (8) for positioning is firmly installed on the inside of the longitudinal beam (5) of the Bere frame, wherein four boundary channel steels (8) are arranged, the four boundary channel steels (8) being on surfaces on both sides of the Bridge pier column (21) are distributed. Einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers nach Anspruch 1, dadurch gekennzeichnet, dass die obere Oberfläche des Längsträgers (5) des Bere-Rahmens mit einem Gummiblocklager (4) zum Stützen versehen ist, wobei das Gummiblocklager (4) in Kontakt mit der unteren Oberfläche des Abdeckträgers (3) steht, wobei der Abdeckträger (3) am oberen Ende des Spannträgers (2) aus doppelt gespleißtem I-Träger installiert ist.Single-sided suspension support structure of a cast-in-place side span section of a continuous beam Claim 1 , characterized in that the upper surface of the longitudinal beam (5) of the Bere frame is provided with a rubber block bearing (4) for support, the rubber block bearing (4) being in contact with the lower surface of the cover beam (3), the cover beam (3) is installed at the top of the double spliced I-beam tension beam (2). Einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers nach Anspruch 1, dadurch gekennzeichnet, dass eine Vielzahl von Längsträgern (5) des Bere-Rahmens parallel angeordnet sind.Single-sided suspension support structure of a cast-in-place side span section of a continuous beam Claim 1 , characterized in that a plurality of longitudinal beams (5) of the Bere frame are arranged in parallel. Einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers nach Anspruch 1, dadurch gekennzeichnet, dass zwei Brückenpfeilersäulen (21) und zwei Stahlrohrpfahlsäulen (12) parallel angeordnet sind.Single-sided suspension support structure of a cast-in-place side span section of a continuous beam Claim 1 , characterized in that two bridge pier columns (21) and two tubular steel pile columns (12) are arranged in parallel. Einseitige Aufhängungshalterstruktur eines vor Ort gegossenen Seitenspannabschnitts eines Durchlaufträgers nach Anspruch 1, dadurch gekennzeichnet, dass der Längsträger (5) des Bere-Rahmens senkrecht zu dem Verteilungsträger (14) aus I-Träger ist.Single-sided suspension support structure of a cast-in-place side span section of a continuous beam Claim 1 , characterized in that the longitudinal beam (5) of the Bere frame is perpendicular to the distribution beam (14) made of I-beam.
DE202023106579.1U 2023-03-30 2023-11-10 Single-sided suspension support structure of a cast-in-place side span section of a continuous beam Active DE202023106579U1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202320671666.4U CN220013418U (en) 2023-03-30 2023-03-30 Single-end suspension bracket structure of continuous beam side span cast-in-situ section
CN202320671666.4 2023-03-30

Publications (1)

Publication Number Publication Date
DE202023106579U1 true DE202023106579U1 (en) 2023-12-14

Family

ID=88681845

Family Applications (1)

Application Number Title Priority Date Filing Date
DE202023106579.1U Active DE202023106579U1 (en) 2023-03-30 2023-11-10 Single-sided suspension support structure of a cast-in-place side span section of a continuous beam

Country Status (2)

Country Link
CN (1) CN220013418U (en)
DE (1) DE202023106579U1 (en)

Also Published As

Publication number Publication date
CN220013418U (en) 2023-11-14

Similar Documents

Publication Publication Date Title
DE2521777C2 (en) Prefabricated wall panel made of reinforced concrete for the production of a retaining wall or the like.
DE202023106579U1 (en) Single-sided suspension support structure of a cast-in-place side span section of a continuous beam
DE2054946A1 (en) Hydrostatic frame with platform
DE3941724C2 (en) Submersible mixer for mixing and aeration tanks
DE2117711A1 (en) Foundation stand that can be placed on the ground
DE2635017A1 (en) TRUSS CONSTRUCTION
EP0084017A1 (en) Method of erecting a large-size shuttering for concreting a wall
DE19631275C1 (en) Flood wall for building protection
CN219731934U (en) Hydrophilic platform structure
DE871573C (en) Floatable, mainly tabular dams for hydraulic systems, especially emergency lock
EP0346326A1 (en) Snow shed and avalanche-breaking structure made of at least two snow sheds.
DE202022102996U1 (en) Easy to lift assembled bridge pier
DE827509C (en) Lifting device for steel masts for the purpose of raising the electric transmission lines carried by the masts
DE7623369U1 (en) PRESSURE ANCHOR CONNECTION
DE293528C (en)
DE1917196A1 (en) Swimming trough for the manufacture of building structures
DE202022103728U1 (en) Installation structure of a hanging platform for making the manhole inlet
DE946903C (en) Reinforced concrete beam bridge with low construction height
DE7419391U (en) DEVICE FOR STABILIZING A DRILLING PLATFORM
DE867827C (en) Guide structure for the construction of cell locks
AT136427B (en) Stemmtor, especially for locks, docks or the like.
DE582236C (en) Process for the production of pile jacks or pile gratings consisting of mutually braced piles
DE6809848U (en) FOUNDATION PILE FOR MAST, IN PARTICULAR Catenary mast
DE2305093A1 (en) FORMWORK CONSTRUCTION FOR USE WITH CONCRETE
DE2505410A1 (en) Riser pipe assembly - for offshore drilling platform prefabricated on shore as reinforced bundle and floated on site

Legal Events

Date Code Title Description
R207 Utility model specification