DE202009002338U1 - Arrangement for testing hydrants - Google Patents

Arrangement for testing hydrants Download PDF

Info

Publication number
DE202009002338U1
DE202009002338U1 DE200920002338 DE202009002338U DE202009002338U1 DE 202009002338 U1 DE202009002338 U1 DE 202009002338U1 DE 200920002338 DE200920002338 DE 200920002338 DE 202009002338 U DE202009002338 U DE 202009002338U DE 202009002338 U1 DE202009002338 U1 DE 202009002338U1
Authority
DE
Germany
Prior art keywords
arrangement according
hydrant
pipe
arrangement
outflow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE200920002338
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taferner Marko At
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from EP09450030.3A external-priority patent/EP2098836A3/en
Application filed by Individual filed Critical Individual
Publication of DE202009002338U1 publication Critical patent/DE202009002338U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F15/00Details of, or accessories for, apparatus of groups G01F1/00 - G01F13/00 insofar as such details or appliances are not adapted to particular types of such apparatus
    • G01F15/06Indicating or recording devices
    • G01F15/061Indicating or recording devices for remote indication
    • G01F15/063Indicating or recording devices for remote indication using electrical means

Landscapes

  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Measuring Volume Flow (AREA)

Abstract

Anordnung zum Prüfen von Hydranten und ähnlichen Wasserentnahmevorrichtungen mit einem an den Ausgang eines Hydranten anzuschließenden Druckmessgerät (9) mit einem dem Druckmessgerät nachgeordneten Absperrorgan (15) und mit einem Durchflussmengenmessgerät (11) sowie mit Auslauf (3) für das Wasser, dadurch gekennzeichnet, dass das Durchflussmengenmessgerät (11) einströmseitig mit einem starren Rohr (7) als Zuleitung verbunden ist.Arrangement for testing hydrants and similar water removal devices with a pressure gauge (9) to be connected to the outlet of a hydrant with a downstream of the pressure gauge shut-off device (15) and with a flow meter (11) and with outlet (3) for the water, characterized in that the flowmeter (11) is connected upstream of a rigid tube (7) as a supply line.

Figure 00000001
Figure 00000001

Description

Die Erfindung betrifft eine Anordnung zum Prüfen von Hydranten mit den Merkmalen des einleitenden Teils von Anspruch 1.The The invention relates to an arrangement for testing hydrants with the features of the introductory part of claim 1.

Ein Verfahren und eine Anordnung zum Prüfen von Hydranten sind aus der AT 008 892 U1 bekannt.A method and an arrangement for testing hydrants are known from AT 008 892 U1 known.

Die aus der AT 008 892 U1 bekannte Vorrichtung dient dazu, die Parameter eines für die Wasserentnahme bestimmten Hydranten zu erfassen. Bei der bekannten Anordnung wird mit Hilfe von Messgeräten wenigstens der Ruhedruck (Druck im Wasser ohne Entnahme von Wasser aus dem Hydranten), der Fließdruck (Druck im aus dem Hydranten ausfließenden Wasser), und die Leistungsfähigkeit des Hydranten (maximal abgebbare Wassermenge je Zeiteinheit) erfasst. Zusätzlich können weitere Daten des Hydranten, wie dessen Type, dessen geografische Lage, beispielsweise in Form von GPS-Daten, sowie der Zustand des Hydranten erfasst werden. Überdies besteht die Möglichkeit, die Kraft, die nötig ist, um den Hydranten zu öffnen bzw. zu schließen, zu erfassen.The from the AT 008 892 U1 Known device serves to detect the parameters of a hydrant intended for water extraction. In the known arrangement with the help of measuring devices at least the static pressure (pressure in the water without removal of water from the hydrant), the flow pressure (pressure in flowing out of the hydrant water), and the performance of the hydrant (maximum deliverable amount of water per unit time) recorded , In addition, further data of the hydrant, such as its type, its geographical location, for example in the form of GPS data, and the state of the hydrant can be detected. Moreover, it is possible to detect the force necessary to open or close the hydrant.

Die bekannte Vorrichtung arbeitet an sich zufriedenstellend, es hat sich jedoch herausgestellt, dass in bestimmten Fällen die bei der bekannten Anordnung durch die Verbindung der Messgeräte mit dem Hydranten mit Hilfe eines flexiblen Messschlauchs zu ungenauen und fehlerhaften Messungsergebnissen Anlass gibt, wenn in dem Messschlauch Turbulenzen auftreten. Überdies hat sich gezeigt, dass in manchen Fällen nur mäßig gut reproduzierbare Werte für die Parameter der für die Wasserentnahme bestimmten Hydranten erhalten werden.The known device works satisfactorily, it has However, it turned out that in certain cases the in the known arrangement by the connection of the measuring devices with the hydrant by means of a flexible measuring tube to inaccurate and erroneous measurement results gives rise to when in the measuring tube Turbulence occur. Moreover, it has been shown that in some cases only moderately well reproducible Values for the parameters of the water withdrawal certain hydrants are obtained.

Die GB-A-612,766 zeigt eine Vorrichtung zum Prüfen von Hydranten, die in einem lotrecht auf dem Hydranten montierten Rohr eine Anschlussstelle für eine Druckmessvorrichtung und ein Ven til aufweist. An das obere, um 90° umgebogene Ende des Rohres kann ein Durchflussmengenmessgerät angeschlossen werden. Da bei der aus der GB-A-612,766 bekannten Vorrichtung die Durchflussmengenmessvorrichtung nach einer 90° Umlenkung des Rohres vorgesehen ist, sind wegen der dadurch auftretenden Verwirbelungen (turbulente Strömung) mit der bekannten Vorrichtung keine reproduzierbaren Messwerte erhältlich. Überdies ist in der GB-A-612,766 nicht geoffenbart, wie das Durchflussmengenmessgerät angeschlossen werden soll, zumal die hiezu in der GB-A-612,766 erwähnte Kupplung ("a coupling device") weder näher beschrieben noch dargestellt ist.The GB-A-612.766 shows a device for testing hydrants, which has a connection point for a pressure measuring device and a Ven valve in a tube mounted vertically on the hydrant. A flow meter can be connected to the upper end of the pipe, bent by 90 °. Since at the time of the GB-A-612.766 known apparatus, the flow rate measuring device is provided after a 90 ° deflection of the tube, no reproducible measurements are available because of the turbulence occurring thereby (turbulent flow) with the known device. Moreover, in the GB-A-612.766 not disclosed, as the flow meter is to be connected, especially as the hiezu in the GB-A-612.766 mentioned coupling ("a coupling device") is neither described nor illustrated.

Der Erfindung liegt die Aufgabe zu Grunde, die aus der AT 008 892 U1 bekannte Anordnung zu verbessern, insbesondere um reproduzierbare Werte beim Messen der Parameter von Hydranten zu erhalten.The invention is based on the object, from the AT 008 892 U1 to improve known arrangement, in particular to obtain reproducible values when measuring the parameters of hydrants.

Gelöst wird diese Aufgabe erfindungsgemäß mit einer Anordnung, welche die Merkmale von Anspruch 1 aufweist.Solved this object is achieved according to the invention with an arrangement, which has the features of claim 1.

Bevorzugte und vorteilhafte Ausgestaltungen der Erfindung sind Gegenstand der Unteransprüche.preferred and advantageous embodiments of the invention are the subject of Dependent claims.

Da bei der erfindungsgemäßen Anordnung der Hydrant mit den Messgeräten durch eine starre Verbindung, insbesondere ein starres Rohr, verbunden ist, ergibt sich eine Beruhigung der Strömung von Wasser aus dem Hydranten zu den Messgeräten, so dass für die Parameter des zu messenden Hydranten genaue Werte, insbesondere reproduzierbare Werte, erhalten werden.There in the inventive arrangement of the hydrant with the measuring devices by a rigid connection, in particular a rigid tube is connected, there is a reassurance of Flow of water from the hydrant to the meters, so that for the parameters of the hydrant to be measured accurate Values, in particular reproducible values, can be obtained.

Mit Vorteil kann im Rahmen der Erfindung vorgesehen sein, dass nicht nur vor sondern auch nach den Messgeräten eine starre Rohrleitung vorgesehen ist. Es wird bei dieser Ausführungsform der erfindungsgemäßen Anordnung vor und auch nach dem Messgerät eine Beruhigungsstrecke geschaffen, die für das Erstellen genauer und reproduzierbarer Messergebnisse vorteilhaft ist.With Advantage may be provided in the invention that not only before but also after the gauges a rigid pipe is provided. It is in this embodiment of the invention Arrangement before and after the meter a calming section created for creating more accurate and reproducible Measurement results is advantageous.

In einer bevorzugten Ausführungsform der Erfindung ist in dem starren Rohr vor dem Messgerät ein Drucksensor vorgesehen.In a preferred embodiment of the invention is in the rigid tube in front of the meter a pressure sensor provided.

In einer weiteren Ausführungsform der Erfindung ist vorgesehen, dass ein Ventil für die Druckregelung im Bereich einer nach dem Messgerät vorgesehenen starren Rohrleitung angeordnet ist.In a further embodiment of the invention is provided that a valve for pressure control in the range of arranged according to the meter rigid pipe is.

In einer Ausführungsform der Erfindung ist vorgesehen, dass die Mündung des einströmseitigen Rohres tiefer liegt als die Mündung des ausströmseitigen Rohres. Dies hat den vorteilhaften Effekt, dass die Anordnung beim Messvorgang luftfrei (keine Luftblasen oder Lufttaschen) ist, so dass die Ergebnisse der Prüfung genau und gut reproduzierbar sind. Diese Anordnung (Rohr einströmseitig tiefer als auströmseitig) kann in einer Ausführungsform erreicht werden, indem die Mündung des einströmseitigen Rohres am Ende eines 90°-Rohrbogens angeordnet ist und nach unten weist und/oder die Mündung des ausströmseitigen Rohres am Ende eines 90°-Rohrbogens angeordnet ist und nach oben weist.In An embodiment of the invention provides that the mouth of the upstream pipe deeper lies as the mouth of the outflow pipe. This has the advantageous effect that the arrangement during the measurement process is air-free (no air bubbles or air pockets), so the results of the Examination are accurate and well reproducible. This arrangement (Pipe deeper upstream than outgoing) can be achieved in one embodiment by the Mouth of the upstream pipe at the end of a 90 ° elbow is arranged and facing down and / or the mouth of the outflow pipe at the end a 90 ° bow and is facing up.

In einer anderen Ausführungsform der Erfindung ergibt sich dies (Entlüftungseffekt), wenn die starre Rohrleitung vor und gegebenenfalls auch die starre Rohrleitung nach den Messgeräten zur Horizontalen unter einem spitzen Winkel geneigt ist, wobei ein Winkel in der Größenordnung von 30° zur Horizontalen bevorzugt ist. Bevorzugt ist dabei, dass die Rohrleitung bzw. die Rohrleitungen in Strömungsrichtung ansteigend ausgerichtet sind.In another embodiment of the invention, this results (venting effect) when the rigid pipe before and possibly also the rigid pipe according to the measuring devices for Hori zontal inclined at an acute angle, with an angle in the order of 30 ° to the horizontal is preferred. It is preferred that the pipeline or the pipes are aligned rising in the flow direction.

An den Enden der Rohrleitungen vor und/oder nach dem Messgerät können Anschlusskupplungen für weitere Geräte vorgesehen sein. Insbesondere kann über die Anschlusskupplung vor dem Messgerät eine Verbindung mit einem Hydranten hergestellt werden, wobei diese Verbindung ohne weiteres als Schlauch ausgebildet sein kann, da durch die starre Rohrleitung vor dem Messgerät eine Beruhigungsstrecke gebildet ist.At the ends of the pipes before and / or after the meter can connect couplings for other devices be provided. In particular, via the connection coupling in front of the meter made a connection with a hydrant be, with this compound readily formed as a hose can be because of the rigid piping in front of the meter a calming section is formed.

An die Anschlusskupplung des Rohres nach dem Messgerät kann ein Schlauch zum Ableiten von Wasser in einen Kanal oder dergleichen angeschlossen werden.At the connection coupling of the pipe after the meter can a hose for draining water into a channel or the like be connected.

Durch die durch die starren Rohrleitungen (Stahlrohre) gebildete Beruhigungsstrecke vor dem Messgerät und verbessert durch eine Beruhigungsstrecke nach dem Messgerät in Form eines steifen Rohres (Stahlrohr) werden insbesondere gut reproduzierbare Werte für den Ruhedruck, für den Fließdruck und für die Durchflussmenge (in: m3/h, l/min oder l/sec) erreicht.By the calming section formed by the rigid pipes (steel pipes) in front of the meter and improved by a calming section after the measuring device in the form of a stiff tube (steel tube) especially good reproducible values for the static pressure, for the flow pressure and for the flow rate (in: m3 / h, l / min or l / sec) reached.

Um mit der erfindungsgemäßen Anordnung auch den Einfluss der Wasserentnahme aus dem überprüften Hydranten auf andere im selben Wasserleitungsnetz vorhandene Hydranten zu ermitteln, kann im Rahmen der Erfindung wenigstens ein weiteres Druckmessgerät vorgesehen sein, das an wenigstens einem weiteren, im selben Wasserleitungsnetz vorgesehenen Hydranten anzuschließen ist. Bevorzugt liefert dieses wenigstens eine weitere Druckmessgerät seine Daten an den Rechner der Anordnung, mit welcher der Hydrant geprüft wird. Dieses Übermitteln der Druckdaten von wenigstens einem, aber bis zu beispielsweise zehn weiteren Hydranten zugeordneten Druckmessgerät ("Drucklogger") kann durch Auslesen der Druckdaten nach der Prüfung des Hydranten, durch Übermitteln während der Prüfung des Hydranten mittels Funk oder SMS mit Hilfe eines Mobilfunknetzes erfolgen.Around with the arrangement according to the invention also the influence the removal of water from the checked hydrant to other hydrants existing in the same water mains determine, in the context of the invention, at least one other Be provided pressure gauge, the at least one To connect further, provided in the same water mains hydrants is. This preferably provides at least one further pressure gauge his data to the computer of the arrangement with which the hydrant is checked. This submitting the print data from at least one but up to, for example, ten further hydrants Pressure gauge ("pressure logger") can be read by reading the Pressure data after testing the hydrant, by submitting during the test of the hydrant by radio or SMS using a mobile network.

Die bei dem wenigstens einem weiteren Hydranten erfassten Werte für den (Ruhe-)Druck des Wassers können auch direkt in dem Messgerät, also stationär, aufgezeichnet und später zur Auswertung dem zentralen Rechner eingegeben werden.The at the at least one other hydrant detected values for The (resting) pressure of the water can also be directly in the Measuring device, ie stationary, recorded and later be entered for evaluation to the central computer.

So kann mit der Erfindung nicht nur ein Hydrant geprüft werden, sondern es kann zusätzlich – wenn gewünscht oder gefordert – eine Leitungsnetzberechnung oder Leitungsnetzprüfung oder auch eine Simulation der Entnahme von (Lösch-)Wasser an mehreren Stellen eines Wasserleitungsnetzes ausgeführt werden. Auf diese Weise kann mit Hilfe der erfindungsgemäßen Anordnung auch ein für Feuerwehren sehr wichtiger Löschwasserplan erstellt werden. Solche Löschwasserpläne können in digitalen Landkarten oder Satellitenbilder ("Google-Earth") oder in ein geografisches Informationssystem ("GIS") integriert werden.So not only a hydrant can be tested with the invention, but it may additionally - if desired or required - a line network calculation or line network test or also a simulation of the extraction of (extinguishing) water executed several points of a water network become. In this way, with the help of the invention Arrangement also an extinguishing water plan very important for fire departments to be created. Such extinguishing water plans can in digital maps or satellite images ("Google Earth") or integrated into a Geographic Information System ("GIS").

Die erfindungsgemäße Anordnung kann auch durch Bilderfassung des geprüften Hydranten oder der geprüften Hydranten ergänzt sein. Bei dieser Ausführungsform werden die Daten der z. B. mit Hilfe von (Digital-)Kameras angefertigten Bilder so wie dies oben für die Druckdaten erläutert wurde übermittelt, um im zentralen Messgerät verwertet zu werden. Mit Vorteil können die bei dem wenigstens einen weiteren Hydranten erfassten Daten ebenso wie Bilder des (weiteren) Hydranten und/oder seiner Umgebung in einem vorgegebenen Zeitfenster der zentralen Auswertung zugeführt werden, damit sie dem (weiteren) Hydranten zugeordnet werden können.The The arrangement according to the invention can also be achieved by image acquisition of the tested hydrant or the tested hydrant be complementary. In this embodiment the data of z. B. with the help of (digital) cameras made Pictures as explained above for the print data was transmitted to be recycled in the central meter to become. Advantageously, the at least one other hydrants captured data as well as images of the (further) Hydrants and / or its surroundings in a given time window be fed to the central evaluation, so they the (further) hydrants can be assigned.

In einer weiteren Ausführungsform ist die erfindungsgemäße Anordnung mit einem GPS-System versehen.In Another embodiment is the invention Arrangement provided with a GPS system.

Weitere Einzelheiten und Merkmale der Erfindung ergeben sich aus der nachstehenden Beschreibung von bevorzugten Ausführungsbeispielen, die in den Zeichnungen dargestellt sind.Further Details and features of the invention will become apparent from the following Description of preferred embodiments, the are shown in the drawings.

Es zeigt:It shows:

1 schematisch eine erfindungsgemäße Anordnung, 1 schematically an arrangement according to the invention,

2 in einem Schaubild für das Benutzen der erfindungsgemäßen Anordnung und 2 in a diagram for using the inventive arrangement and

3 die Verwendung zusätzlicher Druckmessgeräte. 3 the use of additional pressure gauges.

In einer beidseitig mit Anschlusskupplungen 1, 3 ausgestatteten starren Rohrleitung 5, die beispielsweise ein Stahlrohr ist, ist an einem Ende eine Anschlusskupplung 3 vorgesehen, über welche die erfindungsgemäße Anordnung über eine Leitung, beispielsweise einen Schlauch, mit dem Ausgang eines Hydranten, dessen Parame ter zu messen sind, verbunden werden kann. Im Bereich der einströmseitigen Rohrleitung 7 ist ein Drucksensor 9 vorgesehen, der den Druck in der Rohrleitung 5 erfasst.In a double-sided with connection couplings 1 . 3 equipped rigid pipe 5 , which is a steel pipe, for example, is a connection coupling at one end 3 provided, via which the arrangement according to the invention can be connected via a line, such as a hose, to the output of a hydrant whose parameters are to be measured ter. In the area of the upstream pipe 7 is a pressure sensor 9 provided the pressure in the pipeline 5 detected.

Am Ende der einströmseitigen Rohrleitung 7 ist ein Zähler 11 vorgesehen, in dem ein Durchflussmengenmessgerät angeordnet ist, das, ebenso wie der Drucksensor 9 im Anschluss an die einlaufseitige Anschlusskupplung 1, an einen der Anordnung zugeordneten Rechner mit Bildschirm (nicht gezeigt) zur Datenerfassung angeschlossen sein kann. Ausgangseitig des Zählers 11 ist ebenfalls eine starre Rohrleitung 13 vorgesehen, in der mit geringem Abstand von einer ausströmseitigen Anschlusskupplung 3 ein Absperr- bzw. Regelorgan, z. B. ein Ventil 15 für die Druckregelung vorgesehen ist.At the end of the upstream pipe 7 is a counter 11 provided in which a flow meter is arranged, as well as the pressure sensor 9 following the inlet-side connection coupling 1 , supplied to one of the arrangement arranged computer with screen (not shown) can be connected for data acquisition. Output side of the counter 11 is also a rigid pipe 13 provided, in the close distance from a downstream connection coupling 3 a shut-off or control organ, z. B. a valve 15 intended for pressure control.

Wasser aus dem Hydranten, dessen Parameter zu erfassen sind, strömt in der durch den Pfeil 17 angedeuteten Strömungsrichtung von der einströmseitigen Anschlusskupplung 1 zur ausströmseitigen Anschlusskupplung 3.Water from the hydrant, whose parameters are to be detected, flows through the arrow 17 indicated flow direction of the upstream connection coupling 1 to the outlet-side connection coupling 3 ,

Durch die Rohrleitung 5, insbesondere deren gerade Abschnitte 7 und 13, die ohne Umlenkungen (Krümmer, Winkelstücke, Bögen oder ähnliches) in den Zähler 11 münden bzw. von diesem ausgehen, werden vor dem Zähler 11 und nach dem Zähler 11 Beruhigungsstrecken gebildet, so dass reproduzierbare Werte nicht nur für die Mengenmessung (Zähler 11) sondern auch für die Druckmessung (Ruhedruck und Fließdruck, Drucksensor 9) erreicht werden.Through the pipeline 5 , in particular their straight sections 7 and 13 , without deflections (elbows, elbows, bends or the like) in the counter 11 lead or emanate from this, are in front of the counter 11 and after the counter 11 Settling lines formed so that reproducible values not only for quantity measurement (counter 11 ) but also for pressure measurement (static pressure and flow pressure, pressure sensor 9 ) can be achieved.

Wie aus der Zeichnung ersichtlich, sind die Rohrleitungen 7 und 13 vor und nach dem Zähler 11 unter einem spitzen Winkel (0° bis 90°, beispielsweise 30°) zur Horizontalen ausgerichtet. Dies kann beispielsweise dadurch erreicht werden, dass die erfindungsgemäße Anordnung in einem Fahrzeug, das auch ein Anhänger sein kann, mit dieser Winkelausrichtung montiert ist.As can be seen from the drawing, the pipes are 7 and 13 before and after the meter 11 aligned at an acute angle (0 ° to 90 °, for example 30 °) to the horizontal. This can be achieved, for example, in that the arrangement according to the invention in a vehicle, which can also be a trailer, is mounted with this angular orientation.

Die Endbereiche der Rohrleitungen 7 und 13 können abgewinkelt sein, wie dies in 1 dargestellt ist.The end areas of the pipelines 7 and 13 can be angled like this 1 is shown.

Um die erfindungsgemäße Anordnung zu benützen, wird sie über einen Schlauch, der an die Anschlusskupplung 1 angeschlossen ist, mit einem Hydranten (nicht gezeigt) verbunden. An die auslassseitige Anschlusskupplung 3 kann ein Schlauch angeschlossen werden, durch den Wasser aus dem Hydranten, nach dem es das Druckmessgerät 9 und das Durchflussmengenmessgerät im Zähler 11 durchströmt hat, abströmt.To use the arrangement according to the invention, it is connected via a hose to the connection coupling 1 connected to a hydrant (not shown). To the outlet side connection coupling 3 A hose can be connected through the water from the hydrant, after which it is the pressure gauge 9 and the flow meter in the meter 11 has flowed through, flows out.

Beim Arbeiten mit der erfindungsgemäßen Vorrichtung kann beispielsweise wie folgt vorgegangen werden:
Zunächst werden Name und Anschrift des Auftraggebers der Überprüfung des Hydranten sowie die Daten des Hydranten, wie Hydrantennummer, Hydrantentype, Hydrantenmarke, die Konstruktion und der Zustand des Hydranten, insbesondere die Zahl der Ausgänge, sowie der Zeitpunkt der Überprüfung des Hydranten erfasst und beispielweise in das Messgerät über eine Eingabetastatur eingegeben.
When working with the device according to the invention, for example, proceed as follows:
Firstly, the name and address of the contractor for the hydrant inspection and hydrant data, such as the hydrant number, hydrant type, hydrant brand, construction and condition of the hydrant, in particular the number of exits, and the time of hydrant inspection are recorded and, for example, in the Meter entered via an input keyboard.

Sofern es sich nicht um die erste Messung bzw. Prüfung des Hydranten handelt, können auch die Ergebnisse der letzten Überprüfung, und/oder die Daten der letzten Überprüfung des Hydranten in das Prüfprotokoll übernommen oder aufgenommen werden.Provided it is not the first measurement or test of the hydrant the results of the last review, and / or the data of the last review of the Hydrants adopted in the test report or be recorded.

Zunächst wird der Ruhedruck, also der Druck im Wasser gemessen, wenn aus dem Hydranten kein Wasser austritt (geschlossenes Ventil 15). Schließlich wird der Druck im aus dem Hydranten austretenden Wasser gemessen. Die Ergebnisse der Druckmessungen werden bevorzugt in einem Diagramm wiedergegeben. Es ist so, dass der Ruhedruck nach dem öffnen des Absperrorgans (des Ventils 15) langsam abfällt und dann in der Höhe des Ausfließdruckes konstant bleibt.First of all, the static pressure, ie the pressure in the water, is measured when no water escapes from the hydrant (closed valve 15 ). Finally, the pressure in the water leaving the hydrant is measured. The results of the pressure measurements are preferably reproduced in a diagram. It is such that the static pressure after opening the obturator (the valve 15 ) drops slowly and then remains constant at the level of the discharge pressure.

Dann wird die Leistungsfähigkeit des Hydranten erfasst, indem die bei geöffnetem Absperrorgan (Schieber) des Hydranten und geöffnetem Ventil 15 je Zeiteinheit austretende Wassermenge ("Durchflussmenge" z. B. in m3/h) gemessen wird. Diese Messung wird mit Hilfe eines geeichten Durchflussmengenmessgerätes im Zähler 11 ausgeführt. Das Ergebnis dieser Messung wird beispielsweise m3/h, in l/min oder in l/sec angegeben, und ein entsprechendes Diagramm erstellt und dem Protokoll angeschlossen.Then the efficiency of the hydrant is detected by the hydrant open with open shut-off (slide) and open valve 15 per unit of time the amount of water leaving the system ("flow rate" eg in m 3 / h) is measured. This measurement is made using a calibrated flow meter in the meter 11 executed. The result of this measurement, for example, m 3 / h, in l / min or l / sec specified, and created a corresponding diagram and connected to the protocol.

Das zuvor für den Druck gesagte gilt sinngemäß auch für die Leistungsfähigkeit des Hydranten, wobei beim Öffnen des Absperrorgans 15 die je Zeiteinheit aus dem Hydranten ausfließende Menge an Wasser ansteigt, eine Zeitlang mit höherem Pegel im wesentlichen konstant bleibt und dann auf einen ebenfalls im wesentlichen konstant bleibenden Wert absinkt. Dieser Wert der Leistungsfähigkeit des Hydranten ist der für die Benützung des Hydranten, beispielsweise durch Feuerwehren u. dgl., relevante Wert, da er der über längere Zeit gleichbleibende Leistungsfähigkeit des Hydranten entspricht.The previously said for the pressure applies mutatis mutandis to the performance of the hydrant, wherein when opening the obturator 15 the amount of water flowing out of the hydrant per unit of time increases, remains substantially constant for a while at a higher level, and then drops to a level which also remains substantially constant. This value of the capacity of the hydrant is the one for the use of the hydrant, for example by fire departments u. Like., Relevant value, since it corresponds to the long-term consistent performance of the hydrant.

Des Weiteren kann mit Hilfe eines speziellen mit einem Drucksensor (Piezo-Sensor) ausgestattetem Schlüssels beim Öffnen des Hydranten der zum Öffnen des Absperrorgans im Hydranten erforderliche Kraftaufwand bestimmt werden.Of Further, with the help of a special with a pressure sensor (piezo sensor) equipped key when opening the hydrant the required to open the obturator in the hydrant Force are determined.

Der Verlauf der beim Öffnen/Schließen des Absperrorgans des Hydranten aufzuwendenden Kraft kann ebenfalls in einem Diagramm wiedergegeben werden, in dem die Kraft gegen die (Winkel-)Bewegungen des Betätigungsorgans für den Absperrschieber (Schlüssel) aufgetragen ist.Of the Course of the opening / closing of the obturator The force of the hydrant can also be seen in a diagram be reproduced in which the force against the (angular) movements the actuator for the gate valve (Key) is applied.

In das Prüfprotokoll werden bevorzugt auch die Daten der Rohrleitungen, insbesondere der DN (Durchmesser), das Material des Rohres, und der verwendete Hydrantenanschluss durch seinen Durchmesser DN identifiziert.In the test report is preferably also the data of the pipelines, in particular the DN (diameter), the material of the pipe, and the hydrant connection used is identified by its diameter DN.

Das Ergebnis der Prüfung wird in dem Prüfprotokoll wiedergegeben, in das nicht nur die GPS-Daten (geografische Koordinaten) des Hydranten und die Uhrzeit der Messung, sondern auch eine Beurteilung des Zustandes des Hydranten, die Zugänglichkeit des Hydranten, das Hydrantenschild und die Betätigbarkeit des Hy drantenschiebers, aufgenommen werden können. Schließlich können noch allgemeine Bemerkungen über den Zustand des Hydranten und/oder Bilder des Hydranten in das Prüfprotokoll aufgenommen werden.The Result of the test is in the test log in which not only the GPS data (geographical coordinates) of the hydrant and the time of the measurement, but also an assessment the condition of the hydrant, the accessibility of the hydrant, the hydrant shield and the operability of the Hy drantenschiebers, can be included. Finally, you can still general remarks about the condition of the hydrant and / or pictures of the hydrant included in the test report become.

Überdies können im Prüfprotokoll die Daten der verwendeten Messgeräte (Drucksensor 9 und Durchflussmengenmessgerät 11) aufgenommen werden. Die Folgen von Tätigkeiten beim Erfassen der Parameter eines Hydranten werden der die Bestimmung ausführenden Person bevorzugt in dem an das Messgerät 11 angeschlossenem Rechner auf Grund eines in diesem eingespeicherten Programms vorgegeben.In addition, the data of the measuring devices used (pressure sensor 9 and flow meter 11 ). The consequences of activities in detecting the parameters of a hydrant are preferred by the person performing the determination in the case of the meter 11 connected computer on the basis of a stored in this program.

2 zeigt in einem Schaubild das Arbeiten mit der erfindungsgemäßen Anordnung. Die von der erfindungsgemäßen Anordnung, wie oben beschrieben, erfassten Daten werden dem Rechner ("Messgerät") zugeleitet. 2 shows in a diagram working with the inventive arrangement. The data acquired by the arrangement according to the invention, as described above, are fed to the computer ("measuring device").

Der Rechner erstellt das Prüfprotokoll und gibt diese an das Datenservice des Betreibers und/oder einem GIS des Betreibers oder an das Hydrantenprüfgerät weiter. Zusätzlich werden die Daten des geprüften Hydranten (das "Prüfungsprotokoll") an eine oder mehrere der nachstehend genannten Stellen geliefert:

  • – Hydranten Daten Service
  • – Online Viewer (Google Maps)
The computer creates the test report and passes it on to the data service of the operator and / or a GIS of the operator or to the hydrant tester. In addition, the hydrant data (the "Test Protocol") will be delivered to one or more of the following:
  • - hydrant data service
  • - Online Viewer (Google Maps)

Vom Hydranten Daten Service können GIS-Daten (private und/oder solche von Gemeinden) und/oder an andere Nutzer, wie Feuerwehren, geliefert werden.from Hydrant data service can GIS data (private and / or municipalities) and / or other users, such as fire brigades, to be delivered.

3 zeigt wie mit Hilfe zusätzlicher Druckmessgeräte ("Drucklogger") während der Prüfung eines Hydranten weitere Hydranten erfasst werden können, wie dies nachstehend erläutert wird. 3 shows how with the help of additional pressure gauges ("pressure logger") during the testing of a hydrant other hydrants can be detected, as explained below.

Um mit der erfindungsgemäßen Anordnung auch den Einfluss der Wasserentnahme aus dem überprüften Hydranten auf andere im sel ben Wasserleitungsnetz vorhandene Hydranten zu ermitteln, kann im Rahmen der Erfindung wenigstens ein weiteres Druckmessgerät vorgesehen sein, das an wenigstens einen weiteren, im selben Wasserleitungsnetz vorgesehenen Hydranten anzuschließen ist (siehe 3). Bevorzugt liefert dieses wenigstens eine weitere Druckmessgerät seine Daten an den Rechner der erfindungsgemäßen Anordnung, mit welcher der Hydrant geprüft wird. Dieses Übermitteln der Druckdaten von wenigstens einem, aber bis zu beispielsweise zehn weiteren Hydranten kann durch Auslesen der Druckdaten nach der Prüfung des Hydranten, durch Übermitteln während der Prüfung des Hydranten mittels Funk oder SMS mit Hilfe eines Mobilfunknetzes erfolgen. Die bei dem wenigstens einen weiteren Hydranten erfassten Daten können auch (manuell) ausgelesen und über ein Zeitfenster im (zentralen) Rechner dem überprüften Hydranten zugeordnet werden.In order to determine with the arrangement according to the invention also the influence of water extraction from the hydrant checked on other existing in sel ben water mains hydrants can be provided within the scope of the invention, at least one other pressure gauge to connect to at least one other, provided in the same water network hydrant (please refer 3 ). This at least one further pressure measuring device preferably delivers its data to the computer of the arrangement according to the invention with which the hydrant is tested. This transmission of the pressure data of at least one, but up to, for example, ten other hydrants can be done by reading the pressure data after the hydrant, by transmitting during the testing of the hydrant by radio or SMS using a mobile network. The data acquired in the at least one further hydrant can also be read out (manually) and assigned to the hydrant being checked over a time window in the (central) computer.

So kann mit der Erfindung nicht nur ein Hydrant geprüft werden, sondern es kann zusätzlich – wenn gewünscht oder gefordert – eine Rohrnetzberechnung oder Löschwasserberechnung oder auch eine Simulation der Entnahme von (Lösch-)Wasser an mehreren Stellen eines Wasserleitungsnetzes berechnet werden. Auf diese Weise kann mit Hilfe der erfindungsgemäßen Anordnung auch ein für Feuerwehren sehr wichtiger Löschwasserplan erstellt werden. Solche Löschwasserpläne können in digitale Landkarten oder Satellitenbilder ("Googel-Earth") oder ein GIS integriert werden. So ist es beispielsweise möglich in einem digitalen Stadtplan jedem Gebäude für die Feuerwehr – im Brandfall – relevante Informationen ("Attribute") zuzuordnen, die z. B. durch "Anklicken" des Gebäudes auf einem GPS-Navigationsgerät abrufbar sind.So not only a hydrant can be tested with the invention, but it may additionally - if desired or required - a pipe network calculation or fire water calculation or also a simulation of the extraction of (extinguishing) water several points of a water supply network are calculated. On This way, with the help of the invention Arrangement also an extinguishing water plan very important for fire departments to be created. Such extinguishing water plans can into digital maps or satellite pictures ("Googel-Earth") or to integrate a GIS. This is possible, for example in a digital city map every building for the fire department - in case of fire - relevant information Attributes ("attributes"), the z. B. by "clicking" the building on a GPS navigation device are available.

In solchen Plänen ("Löschwasserpläne") können Planzeichen mit örtlichen Einsatzinformationen eingefügt sein. Solche Planzeichnungen können Symbole für folgendes sein:In such plans ("extinguishing water plans") Inserted plan characters with local deployment information be. Such plan drawings can be symbols for be the following:

Planzeichen für EinsatzinformationenPlan sign for deployment information

  • – Standort des Gerätehauses- Location of the tool shed
  • – BMZ – Brandmeldezentrale- BMZ fire alarm panel
  • – Überflurhydrant (Leistung l/Min)- above-ground hydrant (power l / min)
  • – Unterflurhydrant (Leistung l/Min)- Underground hydrant (power l / min)
  • – Überflurhydrant an Ringleitung (Leistung l/Min)- Overground hydrant to loop (power l / min)
  • – Saugstelle am Bach- Suction at the creek
  • – Saugstelle oder Löschwasserbehälter, mit Angabe der möglichen Wasserentnahme- suction point or fire water tank, with indication of possible water withdrawal
  • – Standplatz der Pumpe (TS) mit Standplatznummer- Stand of the pump (TS) with stand number
  • – Steigleitung- riser
  • – Durchfahrtshöhe mit Höhenangabe- Headroom with height indication
  • – Gewichtslimit mit Angabe- Weight limit with indication
  • – Hubschrauberlandeplatz für Löscheinsatz- Heliport for extinguishing license

Planzeichen für GefahrenstellenPlan sign for danger spots

  • – Gefahr durch radioaktive Stoffe- Danger from radioactive substances
  • – Gefahr durch Strom- Danger due to electricity
  • – Explosionsgefahr- Danger of explosion
  • – Gefahr durch Gas- danger from gas
  • – Gefahr durch Löschen mit Wasser- Danger by extinguishing with water
  • – Erhöhte Brandgefahr- Increased risk of fire
  • – Gefahr durch Chemikalien- Danger due to chemicals

Planzeichen für adressbezogene DatenPlan character for address-related dates

  • – Gebäude mit Gasanschluss- Building with gas connection
  • – Allgemeine Information zur Adresse- General information about the address

Straßenstreets

  • – Straßenbezeichnung und -kilometrierung (Nummer des Hydranten)- street name and -kilometry (hydrant number)

Die erfindungsgemäße Anordnung kann auch durch Bilderfassung des geprüften Hydranten oder der geprüften Hydranten ergänzt sein. Bei dieser Ausführungsform werden die Daten der z. B. mit Hilfe von (Digital-)Kameras angefertigten Bilder, so wie dies oben für die Druckdaten erläutert wurde, übermittelt, um im zentralen Messgerät verwertet zu werden.The The arrangement according to the invention can also be achieved by image acquisition of the tested hydrant or the tested hydrant be complementary. In this embodiment the data of z. B. with the help of (digital) cameras made Pictures, as explained above for the print data was transmitted to the central meter to be recycled.

In einer weiteren Ausführungsform ist die erfindungsgemäße Anordnung mit einem GPS-System versehen.In Another embodiment is the invention Arrangement provided with a GPS system.

Beim Prüfen von Hydranten kann aus diesen entnommenes Wasser in das Wasserversorgungsnetz zurückgeleitet werden.At the Checking hydrants can be made from this extracted water be returned to the water supply network.

Zusammenfassend kann ein Ausführungsbeispiel der Erfindung wie folgt beschrieben werden:
Um die Parameter eines für die Wasserabgabe dienenden Hydranten zu erfassen, wird mit Hilfe von Messgeräten 9, 11 wenigstens der Ruhedruck (Druck im Wasser ohne Entnahme von Wasser aus dem Hydranten), der Fließdruck (Druck im aus dem Hydranten ausfließenden Wasser) und die Leistungsfähigkeit des Hydranten (maximal abgebbare Wassermenge je Zeiteinheit) erfasst. Hierzu sind Messgeräte 9, 11 vorgesehen, die in einer in Strömungsrichtung (Pfeil 17) schräg ansteigenden Rohrleitung 5, 7, 13 aus starren Rohren vorgesehen sind, wobei einströmseitig mit Abstand vor dem Mengenzähler 11 ein Drucksensor 9 und in Strömungsrichtung gesehen nach dem Zähler 11 im starren Rohr ein Ventil 15 für die Druckregulierung vorgesehen sind. Durch die starren Rohrleitungen 5, 7, 13 vor und nach dem Zähler 11 ergeben sich Beruhigungsstrecken, so dass reproduzierbare Werte für die Parameter des Hydranten erfasst werden können.
In summary, an embodiment of the invention can be described as follows:
In order to record the parameters of a hydrant used for the release of water, measuring devices are used 9 . 11 at least the static pressure (pressure in the water without removing water from the hydrant), the flow pressure (pressure in the water flowing out of the hydrant) and the capacity of the hydrant (maximum deliverable amount of water per unit time) recorded. These are measuring devices 9 . 11 provided in a flow direction (arrow 17 ) sloping pipeline 5 . 7 . 13 are provided from rigid tubes, wherein inflow at a distance in front of the flow meter 11 a pressure sensor 9 and seen in the flow direction after the counter 11 in the rigid tube a valve 15 intended for pressure regulation. Through the rigid pipes 5 . 7 . 13 before and after the meter 11 There are calming sections so that reproducible values for the parameters of the hydrant can be recorded.

ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list The documents listed by the applicant have been automated generated and is solely for better information recorded by the reader. The list is not part of the German Patent or utility model application. The DPMA takes over no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • - AT 008892 U1 [0002, 0003, 0006] - AT 008892 U1 [0002, 0003, 0006]
  • - GB 612766 A [0005, 0005, 0005, 0005] - GB 612766 A [0005, 0005, 0005, 0005]

Claims (20)

Anordnung zum Prüfen von Hydranten und ähnlichen Wasserentnahmevorrichtungen mit einem an den Ausgang eines Hydranten anzuschließenden Druckmessgerät (9) mit einem dem Druckmessgerät nachgeordneten Absperrorgan (15) und mit einem Durchflussmengenmessgerät (11) sowie mit Auslauf (3) für das Wasser, dadurch gekennzeichnet, dass das Durchflussmengenmessgerät (11) einströmseitig mit einem starren Rohr (7) als Zuleitung verbunden ist.Arrangement for testing hydrants and similar water extraction devices with a pressure gauge to be connected to the outlet of a hydrant ( 9 ) with a downstream of the pressure gauge shut-off ( 15 ) and with a flow meter ( 11 ) as well as with spout ( 3 ) for the water, characterized in that the flow rate measuring device ( 11 ) on the inflow side with a rigid tube ( 7 ) is connected as a supply line. Anordnung nach Anspruch 1, dadurch gekennzeichnet, dass das Durchflussmengenmessgerät (11) ausströmseitig mit einem starren Rohr (13) verbunden ist.Arrangement according to claim 1, characterized in that the flow rate measuring device ( 11 ) outflow with a rigid tube ( 13 ) connected is. Anordnung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Mündung (1) des einströmseitigen Rohres (7) tiefer liegt als die Mündung (3) des ausströmseitigen Rohres (13).Arrangement according to claim 1 or 2, characterized in that the mouth ( 1 ) of the upstream pipe ( 7 ) is lower than the mouth ( 3 ) of the outflow pipe ( 13 ). Anordnung nach Anspruch einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass das einströmseitige starre Rohr (7) zur Horizontalen in einem spitzen Winkel geneigt ist.Arrangement according to claim one of claims 1 to 3, characterized in that the inflow-side rigid tube ( 7 ) is inclined to the horizontal at an acute angle. Anordnung nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass das ausströmseitig angeordnete starre Rohr (15) zur Horizontalen unter einem spitzen Winkel geneigt ist.Arrangement according to one of claims 1 to 4, characterized in that the outwardly arranged rigid tube ( 15 ) is inclined to the horizontal at an acute angle. Anordnung nach einem der Ansprüche 4 oder 5, dadurch gekennzeichnet, dass der spitze Winkel 0° bis 90° beträgt und vorzugsweise in der Größenordnung von 30° liegt.Arrangement according to one of claims 4 or 5, characterized in that the acute angle is 0 ° to 90 ° and preferably on the order of 30 °. Anordnung nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass die Mündung (1) des einströmseitigen Rohres (7) am Ende eines Rohrbogens, insbesondere eines Rohrbogens über 90°, angeordnet ist und nach unten weist.Arrangement according to one of claims 1 to 3, characterized in that the mouth ( 1 ) of the upstream pipe ( 7 ) at the end of a pipe bend, in particular a pipe bend over 90 °, is arranged and facing down. Anordnung nach einem der Ansprüche 1 bis 3 oder 7, dadurch gekennzeichnet, dass die Mündung (3) des ausströmseitigen Rohres (13) am Ende eines Rohrbogens, insbesondere eines Rohrbogens über 90°, angeordnet ist und nach oben weist.Arrangement according to one of claims 1 to 3 or 7, characterized in that the mouth ( 3 ) of the outflow pipe ( 13 ) at the end of a pipe bend, in particular a pipe bend over 90 °, is arranged and facing upward. Anordnung nach Anspruch 7 und 8, dadurch gekennzeichnet, dass das einströmseitige Rohr (7) und das ausströmseitige Rohr (13) in Gebrauchslage unwesentlich horizontal eingerichtet sind.Arrangement according to claim 7 and 8, characterized in that the inflow-side pipe ( 7 ) and the outflow pipe ( 13 ) are set up insignificantly horizontally in the position of use. Anordnung nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass der Drucksensor (9) in der starren einströmseitigen Rohrleitung (7) vor dem Durchflussmengenmessgerät (11) angeordnet ist.Arrangement according to one of claims 1 to 9, characterized in that the pressure sensor ( 9 ) in the rigid upstream pipe ( 7 ) in front of the flow meter ( 11 ) is arranged. Anordnung nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, dass das Absperrorgan bzw. Ventil (15) für die Druckregulierung in der starren ausströmseitigen Rohrleitung (13) nach dem Durchflussmengenmessgerät (11) vorgesehen ist.Arrangement according to one of claims 1 to 10, characterized in that the obturator or valve ( 15 ) for pressure regulation in the rigid outflow pipe ( 13 ) after the flow meter ( 11 ) is provided. Anordnung nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, dass die Rohre (7, 13) vor und nach dem Zähler (11) miteinander fluchtend angeordnet sind und gerade in den Zähler (11) münden bzw. von diesem aus ausgehen.Arrangement according to one of claims 1 to 11, characterized in that the tubes ( 7 . 13 ) before and after the counter ( 11 ) are aligned with each other and just into the counter ( 11 ) or emanate from it. Anordnung nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, dass an der einströmseitigen Rohrleitung (7) eine Anschlusskupplung (1) für die Verbindung der Anordnung mit einem Hydranten vorgesehen ist.Arrangement according to one of claims 1 to 12, characterized in that on the upstream pipe ( 7 ) a connection coupling ( 1 ) is provided for the connection of the arrangement with a hydrant. Anordnung nach einem der Ansprüche 1 bis 13, dadurch gekennzeichnet, dass am Ende der ausströmseitigen Rohrleitung (13) eine Anschlusskupplung (3) für den Anschluss eines Ableitungsschlauches vorgesehen ist.Arrangement according to one of claims 1 to 13, characterized in that at the end of the outflow pipe ( 13 ) a connection coupling ( 3 ) is provided for the connection of a discharge hose. Anordnung nach einem der Ansprüche 1 bis 14, dadurch gekennzeichnet, dass die Rohrleitungen (5, 7, 13) in Strömungsrichtung (Pfeil 17) ansteigend ausgerichtet sind.Arrangement according to one of claims 1 to 14, characterized in that the pipelines ( 5 . 7 . 13 ) in the flow direction (arrow 17 ) are rising. Anordnung nach einem der Ansprüche 1 bis 15, dadurch gekennzeichnet, dass die einströmseitige Rohrleitung (7) im Bereich der Anschlusskupplung (1) nach unten abgewinkelt ist.Arrangement according to one of claims 1 to 15, characterized in that the inflow-side pipeline ( 7 ) in the area of the connection coupling ( 1 ) is angled downwards. Anordnung nach einem der Ansprüche 1 bis 16, dadurch gekennzeichnet, dass die ausströmseitige Rohrleitung (13) im Bereich der ausströmseitigen Anschlusskupplung (3) in die Horizontale abgewinkelt ist.Arrangement according to one of claims 1 to 16, characterized in that the outflow-side pipeline ( 13 ) in the region of the outflow-side connection coupling ( 3 ) is angled in the horizontal. Anordnung nach Anspruch 17, dadurch gekennzeichnet, dass das Ventil (15) für die Druckregelung im horizontalen Abschnitt der ausströmseitigen starren Rohrleitung (13) vorgesehen ist.Arrangement according to claim 17, characterized in that the valve ( 15 ) for pressure regulation in the horizontal section of the outflow-side rigid pipeline ( 13 ) is provided. Anordnung nach einem der Ansprüche 1 bis 18, dadurch gekennzeichnet, dass zusätzliche Druckmessgeräte, die an weitere im selben Leitungsnetz wie der geprüfte Hydrant vorgesehen sind, anschließbar sind.Arrangement according to one of claims 1 to 18, characterized in that additional pressure gauges, the others on the same line network as the tested one Hydrant are provided, can be connected. Anordnung nach Anspruch 19, dadurch gekennzeichnet, dass die von den zusätzlichen Druckmessgeräten erfassten Druck-Daten an den Rechner der Anordnung gesendet werden.Arrangement according to claim 19, characterized that of the additional pressure gauges captured print data to be sent to the computer of the arrangement.
DE200920002338 2008-03-03 2009-02-19 Arrangement for testing hydrants Expired - Lifetime DE202009002338U1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
AT3402008 2008-03-03
AT340/2008 2008-03-03
EP09450030 2009-02-09
EP09450030.3A EP2098836A3 (en) 2008-03-03 2009-02-09 System for testing hydrants

Publications (1)

Publication Number Publication Date
DE202009002338U1 true DE202009002338U1 (en) 2009-05-20

Family

ID=40690518

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200920002338 Expired - Lifetime DE202009002338U1 (en) 2008-03-03 2009-02-19 Arrangement for testing hydrants

Country Status (1)

Country Link
DE (1) DE202009002338U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202014105482U1 (en) * 2014-11-14 2016-02-16 Lothar Schütz Hydrant with control tube
BE1025228B1 (en) * 2017-05-15 2018-12-17 Hydroko Standpipe and method for registering a fluid consumption

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB612766A (en) 1946-06-01 1948-11-17 Arthur Ernest Hayden Gates Apparatus for measuring the capacity of water or other liquid supply conduits
AT8892U1 (en) 2005-10-20 2007-02-15 Taferner Marko METHOD AND ARRANGEMENT FOR CHECKING HYDRANTS

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB612766A (en) 1946-06-01 1948-11-17 Arthur Ernest Hayden Gates Apparatus for measuring the capacity of water or other liquid supply conduits
AT8892U1 (en) 2005-10-20 2007-02-15 Taferner Marko METHOD AND ARRANGEMENT FOR CHECKING HYDRANTS

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202014105482U1 (en) * 2014-11-14 2016-02-16 Lothar Schütz Hydrant with control tube
EP3020878A1 (en) * 2014-11-14 2016-05-18 Lothar Schütz Hydrant with check pipe
BE1025228B1 (en) * 2017-05-15 2018-12-17 Hydroko Standpipe and method for registering a fluid consumption

Similar Documents

Publication Publication Date Title
DE2431907B2 (en) METHOD AND DEVICE FOR DETERMINING CONCENTRATION PROFILES OF LIQUID OR GAS MATERIALS ALONG A LINE
DE2212330A1 (en) Method and apparatus for testing and sealing leaks in pipes
DE102012003822A1 (en) Method for acoustically locating leaks in pipes
DE69817560T2 (en) Leak detection in a pipeline with a back extrapolation of the pressure drop rate
EP2098836A2 (en) System for testing hydrants
DE102015115664B3 (en) Method and device for determining a leakage value of a line section
DE202009002338U1 (en) Arrangement for testing hydrants
DE202021104354U1 (en) BIM-based safety monitoring device for shield tunnels
CN102955887B (en) Method for judging influence of onshore pipeline oil leakage on water body
EP0525594B1 (en) Method and apparatus for monitoring a medium by means of a sensing hose
DE102017108233A1 (en) Fire extinguishing system, fire extinguishing system with the same, as well as methods for determining the spread of a fire
DE202008003564U1 (en) Arrangement for testing hydrants
EP2457643A1 (en) Method and device for determining the mix rate of a mixer in an extinguishing pipeline
AT8892U1 (en) METHOD AND ARRANGEMENT FOR CHECKING HYDRANTS
DE102017100416A1 (en) Method for detecting a leak, monitoring device and computer program for this purpose
DE102016122032B4 (en) Method and device for determining the tightness of vertically arranged earth protection pipes
AT10427U1 (en) ARRANGEMENT FOR CHECKING HYDRANTS
EP2468391B1 (en) Device for determining the mix rate of an injector in an extinguishing pipeline
DE3305005A1 (en) Method and apparatus for determining the temperature distribution along a length
DE29719163U1 (en) Measuring device for fire water pipes
EP1540288A2 (en) Method for measuring the flow rate in channel shafts
DE102016014480A1 (en) Measuring device and measuring method for extinguishing water pipes
DE19947992C2 (en) Method and measuring system for checking a flow meter when installed
DE4208970C2 (en) Method and device for the detection and localization of leaks in sewers
DE2222563C3 (en) Method for indicating and determining the location of a leak in a pipeline

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20090625

R150 Term of protection extended to 6 years

Effective date: 20120314

R082 Change of representative

Representative=s name: PATENTANWAELTE HENKEL, BREUER & PARTNER, DE

R151 Term of protection extended to 8 years
R151 Term of protection extended to 8 years

Effective date: 20150129

R082 Change of representative

Representative=s name: PATENTANWAELTE HENKEL, BREUER & PARTNER, DE

R081 Change of applicant/patentee

Owner name: TAFERNER, MARKO, AT

Free format text: FORMER OWNER: TAFERNER, MARKO, ST. VEIT, AT

Effective date: 20150331

R082 Change of representative

Representative=s name: PATENTANWAELTE HENKEL, BREUER & PARTNER, DE

Effective date: 20150331

Representative=s name: PATENTANWAELTE HENKEL, BREUER & PARTNER, DE

Effective date: 20120719

R158 Lapse of ip right after 8 years