DE202005011277U1 - Hoisting winch e.g. crane hoisting gear winch has flanged wheel which is provided between two flanged wheels for partitioning of winding area in two partial winding areas - Google Patents
Hoisting winch e.g. crane hoisting gear winch has flanged wheel which is provided between two flanged wheels for partitioning of winding area in two partial winding areas Download PDFInfo
- Publication number
- DE202005011277U1 DE202005011277U1 DE202005011277U DE202005011277U DE202005011277U1 DE 202005011277 U1 DE202005011277 U1 DE 202005011277U1 DE 202005011277 U DE202005011277 U DE 202005011277U DE 202005011277 U DE202005011277 U DE 202005011277U DE 202005011277 U1 DE202005011277 U1 DE 202005011277U1
- Authority
- DE
- Germany
- Prior art keywords
- winding
- winch
- flange
- cable guide
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D1/00—Rope, cable, or chain winding mechanisms; Capstans
- B66D1/28—Other constructional details
- B66D1/30—Rope, cable, or chain drums or barrels
Abstract
Description
Die vorliegende Erfindung betrifft eine Seilwinde, insbesondere eine Kranhubwerkswinde, mit einer Seiltrommel sowie seitlichen Bordscheiben zur Begrenzung des Wickelbereichs der Seiltrommel. Die Erfindung betrifft weiterhin einen Kran, wie beispielsweise einen Mobilkran mit teleskopierbarem Ausleger, mit einer solchen Seilwinde.The The present invention relates to a winch, in particular a Crane hoisting winch, with a rope drum and side flanges for limiting the winding area of the cable drum. The invention further relates to a crane, such as a mobile crane with telescopic boom, with such a winch.
Im Kranbetrieb kommt es häufig vor, dass der Kranhaken ohne Nutzlast angehoben und somit das Seil nur unter seinem Eigen- und Hakengewicht auf die Seilwinde aufgewickelt wird. Wird das Seil jedoch durch das Gewicht des Hakens alleine nicht ausreichend vorgespannt, wird es nur lose auf die Seiltrommel der Winde gewickelt. Wird beispielsweise eine Last von einem Dach abgehoben, ist nahezu die gesamte Hubseillänge auf der Seiltrommel aufgespult. Wenn der Seilzug dann durch das Anheben der Last erhöht wird, werden die darunter liegenden Wickellagen eingeschnürt und das von der Seiltrommel ablaufende Hubseil kann sich zwischen den Wicklungen einschnüren und so verklemmen, dass ein Abspulen der Winde nicht mehr möglich ist.in the Crane operation often happens before that lifted the crane hook without payload and thus the rope wound up on the winch only under its own weight and hook weight becomes. However, the rope becomes alone by the weight of the hook not sufficiently biased, it will only loose on the cable drum wrapped in the wind. For example, a load from a roof lifted, almost the entire Hubseillänge is wound on the cable drum. If the cable is then raised by lifting the load, the underlying winding layers are constricted and the Hoist rope running off the rope drum may get between the windings constrict and jam so that a wind-up of the wind is no longer possible.
Hier will die vorliegende Erfindung Abhilfe schaffen. Ihr liegt die Aufgabe zugrunde, eine verbesserte Seilwinde, insbesondere für ein Kranhubwerk, zu schaffen, die Nachteile des Standes der Technik vermeidet und letzteren in vorteilhafter Weise weiterbildet. Insbesondere soll ein zu loses Aufwickeln des Hubseiles auch bei fehlender oder nur geringer Hakenlast vermieden werden, um ein Einklemmen des Hubseiles zwischen Wickellagen zu verhindern und stets ein problemloses Abwickeln der Winde sicherzustellen.Here The present invention seeks to remedy this. It's up to you underlying, an improved winch, especially for a crane hoist, too to avoid the disadvantages of the prior art and the latter in an advantageous manner. In particular, a too loose Winding the hoist rope even with no or little hook load be avoided to pinching the hoist rope between winding layers to prevent and always ensure trouble-free unwinding of the winds.
Diese Aufgabe wird erfindungsgemäß durch eine Seilwinde gemäß Anspruch 1 gelöst. Bevorzugte Ausgestaltungen der Erfindung sind Gegenstand der Unteransprüche.These The object is achieved by a Winch according to claim 1 solved. Preferred embodiments of the invention are the subject of the dependent claims.
Der vorliegenden Erfindung liegt also die Überlegung zugrunde, die effektive Windenbreite, d.h. die effektive axiale Seiltrommellänge, über die hinweg das Seil in nebeneinanderliegenden Wickelgängen aufwickelbar ist, zu verkürzen und damit die Anzahl der nebeneinanderliegenden Wickelgänge des Hubseiles zu begrenzen. Wird die Anzahl der Spalte zwischen den nebeneinanderliegenden Wickelgängen reduziert, können die lose gewickelten Seilwicklungen weniger zusammengeschoben werden und die beiden Wickelgänge, auf die der unter Zug stehende, von der Trommel ablaufende Seilabschnitt aufliegt, weniger leicht auseinandergedrückt werden, so dass das Seil nicht zwischen den Wicklungen durchschneiden und dazwischen eingeklemmt werden kann. Erfindungsgemäß ist hierzu zwischen den beiden Bordscheiben an den Stirnseiten der Seiltrommel zumindest eine weitere Bordscheibe zur Unterteilung des insgesamt zur Verfügung stehenden Wickelbereichs der Seiltrommel in zwei Teilwickelbereiche vorgesehen, wobei dieser weiteren Bordscheibe eine Seilführungsvorrichtung zugeordnet ist, mittels derer das Seil von dem einen Teilwickelbereich über die genannte weitere Bordscheibe hinweg auf den weiteren Teilwickelbereich überführbar ist. Insbesondere ist die Seilführungsvorrichtung dabei derart ausgebildet, dass das Seil beim Auf- und Abwickeln automatisch über die zusätzliche Bordscheibe hinweggeführt wird. Die Anordnung der Seilführungsvorrichtung ist dabei vorteilhafterweise derart getroffen, dass zunächst ein erster Teilwickelbereich vollgewickelt wird und erst dann das Seil über die Bordscheibe hinweggeführt und die Bewicklung des zweiten Teilbereichs begonnen wird. Durch die nacheinander erfolgende Bewicklung einzelner Teilbereiche der Seiltrommel wird in der zuvor genannten Weise die Anzahl der zwischen zwei Bordscheiben liegenden Wickelgänge reduziert und damit die Gefahr einer Verschiebung der Wickelgänge und eines Einklemmens des ablaufenden Hubseilabschnittes deutlich reduziert.Of the The present invention is therefore based on the consideration, the effective Winch width, i. the effective axial rope drum length across which passes the rope can be wound in adjacent winding turns, shortened and so that the number of adjacent winding turns of the Limit hoist ropes. Will the number of columns between the side by side winding gears reduced, can the loosely wound rope windings are less pushed together and the two winding gears, on the under train, running from the drum rope section rests, less easily pressed apart, leaving the rope do not cut between the windings and pinch between them can be. According to the invention, this is between the two flanged wheels on the front sides of the cable drum at least another flanged wheel for subdivision of the total available Winding area of the cable drum provided in two Teilwickelbereiche, wherein this further flanged wheel associated with a cable guide device is, by means of which the rope from the one Teilwickelbereich on the said further flanged wheel is transferable to the other part of the winding area. In particular, the cable guide device thereby designed such that the rope when winding and unwinding automatically over the additional flange carried away becomes. The arrangement of the cable guide device is advantageously made such that a first first Teilwickelbereich is fully wound and only then the rope over the Flange carried away and the winding of the second portion is started. By the successive winding of individual parts of the Cable drum is in the aforementioned manner the number of between two flanges lying windings reduced and thus the Danger of a shift of the winding gears and pinching the clearly running off Hubseilabschnittes.
In Weiterbildung der Erfindung wird die Seilführungsvorrichtung von einem vorzugsweise rillen- oder nutförmigen Seilführungskanal gebildet, der von dem Teilwickelbereich der Seiltrommel auf der einen Seite der Bordscheibe zu dem Teilwickelbereich auf der anderen Seite der Bordscheibe führt. Der Seilführungskanal ist dabei vorteilhafterweise derart ausgebildet, dass beim Aufwickeln des Seils in dem einen Teilwickelbereich beim Auflaufen des Hubseils auf die zwischengeschaltete Bordscheibe in einer bestimmten Wickelhöhe das Seil in den Seilführungskanal einfädelt, von diesem über die Bordscheibe hinweggeführt wird und auf den Seiltrommelboden des anderen Teilwickelbereiches ausläuft. Vorteilhafterweise ist die Seilführungsvorrichtung dabei frei von beweglichen Teilen ausgebildet, wodurch einerseits der Verschleiß und andererseits der Montageaufwand und damit die Fertigungskosten reduziert werden.In Development of the invention, the cable guide device of a preferably grooved or groove-shaped Cable guide channel formed by the sub-winding area of the cable drum on the one side of the flange to the part winding area on the other Side of the flange leads. The rope guide channel is advantageously designed such that during winding of the rope in the one part of the winding area when the hoisting rope runs on the intermediate flange at a certain winding height the rope in the rope guide channel threading, from this over the flanged wheel led away and on the cable drum floor of the other part winding area expires. Advantageously, the cable guide device thereby formed free of moving parts, which on the one hand the Wear and tear on the other hand reduces assembly costs and thus the production costs become.
Insbesondere kann der Seilführungskanal schneckenförmig von der einen Bordscheibenseite zu der anderen Bordscheibenseite führen. Um den Höhen- bzw. Lagenunterschied zwischen dem einen voll gewickelten Teilwickelbereich und dem anderen zunächst noch unbewickelten Teilwickelbereich sanft zu überwinden, kann der Seilführungskanal über die zwischengeschaltete Bordscheibe hinweg auf den verschiedenen Bordscheibenseiten in – radial betrachtet – unterschiedlichen Höhen enden. Der an der zwischengeschalteten Bordscheibe vorgesehene Seilführungskanal besitzt vorteilhafterweise sowohl eine Steigung in Seiltrommelachsrichtung als auch in Radialrichtung der Seiltrommel.Especially the cable guide channel can be helical from the one flange side lead to the other flange side. Around the altitude or layer difference between the one fully wound Teilwickelbereich and the other first To smoothly overcome still unwound Teilwickelbereich, the cable guide channel on the intermediate Flange on the various sides of the pulley in - radial considered - different Heights end. The provided on the intermediate flange disc cable guide channel advantageously has both a slope in Seiltrommelachsrichtung as well as in the radial direction of the cable drum.
Insbesondere kann der Ein- bzw. Auslauf des Seilführungskanals, der dem zuerst bewickelten Teilwickelbereich der Seiltrommel zugewandt ist, etwa auf Höhe der obersten Wickellage angeordnet sein, während der Aus- bzw. Einlauf des Seilführungskanals, der dem anderen, als zweites bewickelten Teilwickelbereich zugewandt ist, etwa auf Höhe der Seiltrommelmantelfläche und damit der ersten aufzuwickelnden Lage angeordnet ist. Die Einleitung in den Seilführungskanal erfolgt damit also etwa auf Höhe der obersten Wickellage, wenn der erste Teilwickelbereich vollständig bewickelt ist. Der Seilführungskanal führt sodann das Seil über die Bordscheibe hinweg radial nach innen auf das Niveau der ersten Wickellage, die unmittelbar auf der Seiltrommel aufliegt. Mit einer solchen schneckenförmigen Überführung, bei der der Seilführungskanal sowohl radial als auch axial eine Steigung aufweist, kann der Seilübergang besonders sanft bewerkstelligt werden.Especially can the inlet and outlet of the cable guide channel, the first wound part winding area of the cable drum is facing, about Height of the top Winding layer be arranged while the outlet or inlet of the cable guide channel, the other, as a second wound part winding area facing is, about at height the cable drum lateral surface and thus the first wound-up layer is arranged. The introduction in the rope guide channel So it takes about the height of the uppermost winding layer when the first part of the winding area completely wound is. The rope guide channel then leads the rope over the flanged wheel radially inward to the level of the first Winding layer, which rests directly on the cable drum. With a such snail-shaped transfer at the cable guide channel both radially and axially has a slope, the cable transition can be particularly be done gently.
Die zwischengeschaltete Bordscheibe kann grundsätzlich eine Wandungshöhe aufweisen, die im wesentlichen der Wandungshöhe der beiden stirnseitigen Bordscheiben der Seiltrommel entspricht. Da das Seil zweckmäßigerweise nicht vollständig bündig mit der Höhe der Bordscheiben gewickelt wird, kann der Einlauf des Seilüberführungskanals etwas unterhalb der Mantelfläche der Bordscheibe liegen.The intermediate flange can basically have a wall height, the substantially the wall height of the two end-side Flanges of the cable drum corresponds. As the rope expediently not completely flush with the height the flange is wound, the inlet of the cable transfer channel slightly below the lateral surface lie on the flange.
Zweckmäßigerweise läuft der Seilführungskanal in seinem Einlauf- und Auslaufbereich etwa tangential in die Seitenwandungen der Bordscheibe aus, wobei vorteilhafterweise etwa die Steigung der Seilwicklungen fortgesetzt wird.Conveniently, is it going? Cable guide channel in its inlet and outlet areas approximately tangentially into the side walls the flanged wheel, wherein advantageously about the slope the rope windings is continued.
Die vorliegende Erfindung wird nachfolgend anhand eines bevorzugten Ausführungsbeispiels und zugehöriger Zeichnungen näher erläutert. In den Zeichnungen zeigen:The The present invention will be described below with reference to a preferred embodiment and associated Drawings closer explained. In the drawings show:
Die
in den Figuren gezeigte Seilwinde
Die
Mantelfläche
der Seiltrommel
Wie
Wie
die
Der
Seilführungskanal
Läuft das
Seil
Beim
weiteren Aufwickeln auf die Seiltrommel
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202005011277U DE202005011277U1 (en) | 2005-07-18 | 2005-07-18 | Hoisting winch e.g. crane hoisting gear winch has flanged wheel which is provided between two flanged wheels for partitioning of winding area in two partial winding areas |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202005011277U DE202005011277U1 (en) | 2005-07-18 | 2005-07-18 | Hoisting winch e.g. crane hoisting gear winch has flanged wheel which is provided between two flanged wheels for partitioning of winding area in two partial winding areas |
Publications (1)
Publication Number | Publication Date |
---|---|
DE202005011277U1 true DE202005011277U1 (en) | 2006-11-23 |
Family
ID=37513890
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE202005011277U Expired - Lifetime DE202005011277U1 (en) | 2005-07-18 | 2005-07-18 | Hoisting winch e.g. crane hoisting gear winch has flanged wheel which is provided between two flanged wheels for partitioning of winding area in two partial winding areas |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE202005011277U1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012001592A1 (en) | 2012-01-27 | 2013-08-01 | Liebherr-Components Biberach Gmbh | winch |
CN104649172A (en) * | 2015-02-17 | 2015-05-27 | 北京市三一重机有限公司 | Rotary drilling rig as well as winding drum and winding system thereof |
CN107601319A (en) * | 2017-09-28 | 2018-01-19 | 上海振华重工(集团)股份有限公司 | More rope storage winch |
DE102012112161B4 (en) * | 2012-09-17 | 2020-10-29 | Hyundai Motor Company | ROPE PULLEY STRUCTURE FOR A ROPE CONNECTION |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1969245U (en) * | 1967-07-04 | 1967-09-28 | Atlas Mak Maschb G M B H | COLLECTED DRUM FOR WINCHES. |
DE2453487A1 (en) * | 1973-11-13 | 1975-05-15 | Hydraulik Brattvaag As | WINCH DRUM |
DD158172A3 (en) * | 1980-06-11 | 1983-01-05 | Maksim M Valdaev | ROPE DRUM |
-
2005
- 2005-07-18 DE DE202005011277U patent/DE202005011277U1/en not_active Expired - Lifetime
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1969245U (en) * | 1967-07-04 | 1967-09-28 | Atlas Mak Maschb G M B H | COLLECTED DRUM FOR WINCHES. |
DE2453487A1 (en) * | 1973-11-13 | 1975-05-15 | Hydraulik Brattvaag As | WINCH DRUM |
DD158172A3 (en) * | 1980-06-11 | 1983-01-05 | Maksim M Valdaev | ROPE DRUM |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012001592A1 (en) | 2012-01-27 | 2013-08-01 | Liebherr-Components Biberach Gmbh | winch |
WO2013110300A1 (en) | 2012-01-27 | 2013-08-01 | Liebherr Components Biberach Gmbh | Rope winch |
CN104144871A (en) * | 2012-01-27 | 2014-11-12 | 比伯拉赫利勃海尔部件股份有限公司 | Rope winch |
CN104144871B (en) * | 2012-01-27 | 2017-05-17 | 比伯拉赫利勃海尔部件股份有限公司 | Capstan winch |
US9783399B2 (en) | 2012-01-27 | 2017-10-10 | Liebherr Components Biberach Gmbh | Rope winch |
KR101945431B1 (en) * | 2012-01-27 | 2019-02-07 | 리브헤어 컴포넌츠 비버라흐 게엠베하 | Rope winch |
DE102012001592B4 (en) | 2012-01-27 | 2019-02-28 | Liebherr-Components Biberach Gmbh | winch |
DE102012112161B4 (en) * | 2012-09-17 | 2020-10-29 | Hyundai Motor Company | ROPE PULLEY STRUCTURE FOR A ROPE CONNECTION |
CN104649172A (en) * | 2015-02-17 | 2015-05-27 | 北京市三一重机有限公司 | Rotary drilling rig as well as winding drum and winding system thereof |
CN107601319A (en) * | 2017-09-28 | 2018-01-19 | 上海振华重工(集团)股份有限公司 | More rope storage winch |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0279252B1 (en) | Method for making an endless sling | |
EP2625131B1 (en) | Lifting device with a toothed belt | |
EP3424871A2 (en) | Winch assembly | |
EP1266861A1 (en) | Telescopic crane with a superlift device | |
DE2457864C2 (en) | Trolley crane | |
DE202005011277U1 (en) | Hoisting winch e.g. crane hoisting gear winch has flanged wheel which is provided between two flanged wheels for partitioning of winding area in two partial winding areas | |
CH656600A5 (en) | MOBILE WINCH. | |
EP2683453A1 (en) | Drive unit for at least one traction means | |
DE2522303A1 (en) | WEDGE ROLL AND ITS APPLICATION TO WINCHES | |
DE102019107937A1 (en) | Winch with winding device | |
DE19514010C2 (en) | Motorized rope drum | |
EP2835476A1 (en) | Sub-roof awning | |
DE102021108837A1 (en) | Cable winch, method for winding such a cable winch, as well as a crane with a cable winch | |
EP0676586B1 (en) | Pendant lighting fixture with carrier cable driving mechanism | |
DE2718498A1 (en) | Hoist winch rope drum - has enclosing non-rotating sleeve with rope slot sliding along it | |
DE3138034C2 (en) | Winch | |
DE102005049105A1 (en) | drive unit | |
DE10328487B4 (en) | lifting device | |
AT346029B (en) | CABLE GUIDE DEVICE FOR CABLE WINCHES | |
DE2312604A1 (en) | SMALL LIFT | |
AT385494B (en) | Cable-crane trolley | |
DE102016117287B4 (en) | Lifting device for a transport platform | |
DE102005059072B3 (en) | Device for the coiling of the pull cords of a curtain comprises two coils arranged on a coiling shaft for each pull cord parallel to the horizontal part of the pull cord | |
DE202005020590U1 (en) | Device for the coiling of the pull cords of a curtain comprises two coils arranged on a coiling shaft for each pull cord parallel to the horizontal part of the pull cord | |
DE4001680C1 (en) | Rope haulage trolley - has rotating bearer rope pulley located between two bearer rope rollers |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R163 | Identified publications notified | ||
R207 | Utility model specification |
Effective date: 20061228 |
|
R156 | Lapse of ip right after 3 years |
Effective date: 20090203 |