DE19817665A1 - Plastic block for simultaneous installation of utility pipes - Google Patents
Plastic block for simultaneous installation of utility pipesInfo
- Publication number
- DE19817665A1 DE19817665A1 DE1998117665 DE19817665A DE19817665A1 DE 19817665 A1 DE19817665 A1 DE 19817665A1 DE 1998117665 DE1998117665 DE 1998117665 DE 19817665 A DE19817665 A DE 19817665A DE 19817665 A1 DE19817665 A1 DE 19817665A1
- Authority
- DE
- Germany
- Prior art keywords
- block
- pipe
- property
- water
- trench
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B7/00—Water main or service pipe systems
- E03B7/09—Component parts or accessories
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/02—Manhole shafts or other inspection chambers; Snow-filling openings; accessories
- E03F5/022—Partitioned to allow more than one medium to flow through
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
- Pipeline Systems (AREA)
Abstract
Description
Bei der Versorgung von Häusern wird in der Regel zuerst ein Rohrgraben mit einer Tiefe von 1,40 m bis 1,60 m und einer Breite von 0,80 m ausgehoben (lt. UVV mit Schalung) um die Wasserleitung zu verlegen. Anschließend wird der Graben teilweise verfüllt. Danach kann die Gasleitung verlegt werden; die Aufgrabung wird nach Verlegung wieder verfüllt. Strom- und Postleitungen werden in der Regel auf einer anderen Trasse nebenan verlegt. Im Grundstück wird mehrmals an gleichen und verschiedenen Stellen aufgegraben um alle nötigen Sparten zu verlegen. Diese mehrmaligen Aufgrabungen auf verschiedenen Trassen setzten ein mehrmaliges Vermessen der Versorger voraus. Die Gräben an gleicher Stelle können in der Regel nicht bis zur kompletten Fertigstellung der Verlegung geöffnet bleiben, weil andere Baufirmen dadurch behindert und gefährdet würden. Es ist in der Baubranche unmöglich das alle Firmen am gleichen Tag zur gleichen Zeit ihre Rohre und Leitungen verlegen (gegenseitige Behinderung, Terminschwierigkeiten usw.).When supplying houses, a pipe trench is usually first with a Depth from 1.40 m to 1.60 m and a width of 0.80 m (according to UVV with Formwork) to lay the water pipe. Then the trench becomes partial backfilled. The gas line can then be laid; the excavation is after Laying back filled. Electricity and postal lines are usually on one another route next door. In the property is the same and several times dug up different places to relocate all the necessary divisions. This repeated excavations on different routes set a multiple Measure the utilities ahead. The trenches in the same place can usually do not remain open until the installation is complete because others This would hinder and endanger construction companies. It is in the construction industry impossible that all companies have their pipes and tubes on the same day Laying lines (mutual disability, scheduling difficulties, etc.).
Durch mehrmaliges Vermessen, Aufgraben und größeres Aufgrabungsvolumen entstehen wesentlich höhere Kosten!Through repeated measurements, excavation and a larger excavation volume there are much higher costs!
Ein Energieversorgungsblock dient zur Energieversorgung von Häusern im Tiefbau. Ab der Grundstücksgrenze kann dieser Energieversorgungsblock eingesetzt werden. In einem Block werden alle Sparten miteinander (Post, Strom, Wasser und Gas) zum Haus geführt. Für einen weiteren Versorger ist noch Platz, da dieser sein Produkt (z. B. Kabelfernsehen) durch ein im Block integriertes Leerrohr einbringen kann. Der Energieversorgungsblock wird zusammen mit der Wasserverlegung eingebaut. Er kann allerdings auch vom Kanalbau verlegt werden, dies sollte jedoch vom zuständigen Bauleiter überwacht werden. Das bedeutet einmaliges Vermessen und eine Aufgrabung für alle Versorgungsträger im Grundstück, welche außerhalb des Grundstückes eingebracht werden.An energy supply block is used to supply energy to civil engineering houses. This energy supply block can be used from the property boundary. In one block, all divisions (post office, electricity, water and gas) become one House run. There is still room for a further supplier, as this is his product (e.g. Cable television) through an integrated conduit in the block. Of the Energy supply block is installed together with the water laying. He can also be relocated by sewer construction, however this should be done by responsible site manager. This means measuring once and a dig for all utilities in the property that are outside the Property.
Alle Leitungen sind ohne Aufgrabungen im Grundstück auswechselbar (z. B. bei Defekten). Sie werden im Haus gelöst und nach außen gezogen (bei Gas nach innen). Der Block wird mit einer Deckung von 0,65 m verlegt und hat eine Tiefe von 0,55 m, was bei einer Sandsohle von 0,05 m einen Aushub von 1,25 m bedeutet. Die Breite von 0,30 m erfordert eine Rohrgrabenbreite von 0,40 m bis 0,50 m, welche mit einem Stampfer verdichtet werden kann oder eingeschwemmt wird. Die unten liegende Wasserleitung ist isoliert und dadurch ist der Aushub von 1,25 m ausreichend. Durch diese geringe Tiefe ist keine Schalung notwendig. Die Länge der Blöcke sollte bei 5,0 m liegen, damit sie leicht transportfähig bleiben. Der Block kann auf jedes erforderliche Maß leicht zurechtgeschnitten werden. Die angeschnittenen Enden müssen dann lediglich mit einer speziellen, bereits am Markt befindlichen Abdichtmasse wasserdicht ausgespritzt werden. Die Leerrohre werden zum Haus hin gas- und wasserdicht abgedichtet.All lines can be replaced without digging in the property (e.g. at Defects). They are loosened in the house and pulled outside (with gas inside). The block is laid with a cover of 0.65 m and has a depth of 0.55 m, which means an excavation of 1.25 m with a sand sole of 0.05 m. The width of 0.30 m requires a pipe trench width of 0.40 m to 0.50 m, which with a Pounder can be compacted or washed in. The one below The water pipe is insulated, making excavation of 1.25 m sufficient. By this shallow depth means that no formwork is necessary. The length of the blocks should be at 5.0 m so that they remain easily transportable. The block can be on any required dimension can be easily cut to size. The cut ends then you only have to use a special one that is already on the market Sealant be sprayed waterproof. The empty pipes will face the house sealed gas and watertight.
Es gibt verschiedene Möglichkeiten mehrere Blöcke miteinander zu verbinden: Z.B. U-Stücke, Halbschalen, Gummimanschetten, Flexible Schläuche usw. Das Wasser wird mit isolierten Schalen verbunden. Auch Abwincklungen sind möglich, indem zwei Blöcke mit flexiblen Rohren verbunden werden oder Blöcke mit einer fertigen Abwincklung von 30°, 45° und 90° verwendet werden.There are different ways to connect several blocks together: e.g. U-pieces, half shells, rubber sleeves, flexible hoses, etc. The water is connected with insulated shells. Angles are also possible by two blocks can be connected with flexible pipes or blocks with one finished Angle of 30 °, 45 ° and 90 ° can be used.
Der verbleibende freie Innenraum des Blockes wird mit Recyclingmaterialien, Styropor, Abdichtschaum o. ä. schneidbarem und schwerentflammbarem (z. B. bei Kabelbrand) Material ausgefüllt.The remaining free interior of the block is made with recycled materials, Styrofoam, sealing foam or similar that can be cut and flame retardant (e.g. for Cable fire) Material filled out.
Die Umhüllung (Außenkörper) des Blocks besteht aus Kunststoff genauso wie die Zwischenplatten im Energieversorgungsblock. Die Leerrohre für Strom und Post sind PVC-Rohre mit einem Durchmesser von 0,075 m (75 mm), für die Gasleitung ist als Leerrohr ein PVC-Rohr mit einem Durchmesser von 0,085 m (85 mm) nötig und für die Wasserleitung ist als Leerrohr ein PVC-Rohr mit einem Durchmesser von 0,110 m (110 mm) vorgesehen. Ein zusätzliches PVC-Rohr mit einem Durchmesser von 0,075 m (75 mm) ist für einen weiteren Versorger mit montiert.The casing (outer body) of the block is made of plastic just like that Intermediate plates in the power supply block. The empty pipes for electricity and post are PVC pipes with a diameter of 0.075 m (75 mm), for the gas pipe is as Empty pipe requires a PVC pipe with a diameter of 0.085 m (85 mm) and for the water pipe as an empty pipe is a PVC pipe with a diameter of 0.110 m (110 mm) provided. An additional PVC pipe with a diameter of 0.075 m (75 mm) is also installed for another supplier.
Die drei Sparten, in die der Energieversorgungsblock unterteilt ist, sind in den entsprechenden Farben von außen gekennzeichnet (Strom, Post grün, Gas = gelb und Wasser = blau). Alle Versorgungsträger sind im Block vor Beschädigungen bei späteren Bau- und Aufgrabungsarbeiten geschützt. Zusätzlich wird ein Trassenband mit der Aufschrift "Achtung Energieversorgungsblock!" über dem Block angebracht. In den Mauereinführungen ist ein Feuerschutz (bereits am Markt) vorgesehen. Die Materialien der zu verlegenden Rohrleitungen sind meist bei Wasser PE-Rohre, bei Gas PE-HD und Stahl und bei Post und Strom Kabelleitungen. Es können aber auch andere Materialien verwendet werden. Bei der Abwincklung von Stahlrohren ist eine weitere Baugrube nötig. Es können bei Wasser und Gas die Dimensionen (Nennweite) DN 25 bis DN 65 in den Block eingebracht werden. Überbauungen des Blocks mit z. B. Garage, Carport, Gewächshaus o. ä. ist möglich, da die Leitungen von außerhalb jederzeit leicht auswechselbar sind und keine Bebauung abgerissen werden muß. Auch bei Straßenquerungen für Hausanschlüsse ist der Energieversorgungsblock einsetzbar; die Straße muß nur einmal aufgegraben werden und die Versorger können sich nachträglich ohne erneutes aufgraben in den Block einbringen. Der Energieversorgungsblock könnte auch in größeren Dimensionen hergestellt werden, wobei dann auch größere Leitungen durchgeführt werden könnten (z. B. Großfirmen o. ä.).The three divisions into which the power supply block is divided are: corresponding colors marked from the outside (electricity, post green, gas = yellow and water = blue). All utilities are in the block from damage protected later construction and excavation work. In addition, a route line with the inscription "Attention energy supply block!" attached over the block. Fire protection (already on the market) is planned in the wall entries. The Materials of the pipelines to be laid are mostly made of PE pipes for water Gas PE-HD and steel and for post and electricity cable lines. But it can also other materials are used. When winding steel pipes is one further excavation pit necessary. The dimensions of water and gas can be different (Nominal size) DN 25 to DN 65 can be introduced into the block. Superstructures of the block with z. B. garage, carport, greenhouse or similar is possible, since the lines are easily exchangeable from outside at any time and none Development must be demolished. Even when crossing streets for house connections the power supply block can be used; the road only needs to be dug up once and the suppliers can subsequently dig into the Insert block. The power supply block could also be larger Dimensions are produced, with larger lines then being carried out could become (e.g. large companies or similar).
- - Alle Versorgungsleitungen in einem Block- All supply lines in one block
- - Kurze Bauzeiten für alle Sparten- Short construction times for all sectors
- - Durch die Abstände der Leitungen im Block ist vor dem Haus kein "rauf- und runterfahren" der Versorger nötig- Due to the spacing of the cables in the block there is no "up and in front of the house shut down "the supplier needed
- - Im Grundstück wird platzsparend umgegangen (auf 0,30 m Breite liegen alle Versorgungsträger)- The property is used in a space-saving manner (all are 0.30 m wide Pension providers)
- - Alle Versorgungsträger sind im kunststoffummantelnden Block vor Beschädigungen geschützt (Baggerarbeiten!) - All supply carriers are in the plastic-encased block Damage protected (dredging work!)
- - Leichte und schnelle Montage der Versorgungsträger- Easy and quick installation of the supply carriers
- - Der Kunde bekommt ein kostengünstiges Paket mit allen Versorgungsträgern- The customer receives a cost-effective package with all utilities
- - Einmaliges Vermessen und Aufgraben der Rohrgrabentrasse im Grundstück (kostengünstig!)- One-time measurement and excavation of the pipe trench route in the property (inexpensive!)
- - Keine Schalung lt. UVV bei einer Tiefe von 1,25 m (kostengünstig!)- No formwork according to UVV at a depth of 1.25 m (inexpensive!)
- - Im Energieversorgungsblock sind die Leitungen auch beim Verfüllen und Verdichten geschützt- The lines are also in the power supply block when filling and Compacting protected
- - Überschaubarkeit der wenigen Materialteile; besser geschützt vor Diebstahl- manageability of the few material parts; better protected against theft
- - Da der Block auch mit Abwincklungen von 30°, 45° und 90° hergestellt werden kann (links- und rechtsdrehend), ist die Montage erleichtert.- Since the block can also be manufactured with angled angles of 30 °, 45 ° and 90 ° assembly (turning left and right) is easier.
Es wird die Erfindung anhand mehrerer Zeichnungen erläutert:The invention is explained on the basis of several drawings:
Fig. 1 Querschnitt des Energieversorgungsblock im Rohrgraben (Frontansicht) Fig. 1 cross section of the power supply block in the pipe trench (front view)
Fig. 2 Seitenansicht zweier verbundener Blöcke Fig. 2 side view of two connected blocks
Fig. 3 Seitenansicht des gesamten Energieversorgungsblock Fig. 3 side view of the entire power supply block
Fig. 4 Draufsicht (Vogelperspektive) auf die (vier) verlegten Energie versorgungsblöcke ab Grundstücksgrenze bis Hausanschluß Fig. 4 top view (bird's eye view) of the (four) installed energy supply blocks from the property line to the house connection
Fig. 5 Querschnitt der Versorgungsleitungen im Block bis in den Versorgungsraum Fig. 5 cross section of the supply lines in the block to the supply room
Fig. 6 Draufsicht auf den Energieversorgungsblock mit Abwincklung 45°. Fig. 6 plan view of the power supply block with 45 ° elbow.
In den Zeichnungen (Figuren) ist der Kunststoffblock (1) mit den PVC-Leerrohren (2) dargestellt. Die ersten zwei Kammern (3) sind mit Styropor, Recyclingmaterial, Montageschaum o. ä. gefüllt. Die unterste Kammer (4) für Wasser ist mit Isoliermaterial gefüllt. Der Energieversorgungsblock ist im Versorgungsgraben mit einer Sandumhüllung (5) versehen. In der ersten Kammer (6) ist Post und Strom enthalten; in der zweiten Kammer (7) Gas und ein freies Leerrohr für einen weiteren Versorger; die dritte Kammer (8) beinhaltet das Rohr für die Wasserzuleitung. Die Zwischeneinlagen (9) (Trennplatten), trennen die einzelnen Sparten im Block. Bei einem Haus mit 20 m Abstand zur Grundstücksgrenze werden vier Energiever sorgungsblöcke (10) verlegt. Alle Energieträger (11) können von außen ab Grundstücksgrenze (15) eingebracht werden (Wasser (12), Gas (13), Post und Strom (14)). Es kann anstatt mit flexiblen Verbindungsrohren auch mit abgewinckelten Energieversorgungsblöcken (16) z. B. mit 30°, 45° und 90° gearbeitet werden.The plastic block ( 1 ) with the PVC empty pipes ( 2 ) is shown in the drawings (figures). The first two chambers ( 3 ) are filled with polystyrene, recycling material, assembly foam or the like. The lowest chamber ( 4 ) for water is filled with insulating material. The energy supply block is provided with a sand covering ( 5 ) in the supply trench. The first chamber ( 6 ) contains mail and electricity; in the second chamber ( 7 ) gas and an empty conduit for another supplier; the third chamber ( 8 ) contains the pipe for the water supply. The intermediate inserts ( 9 ) (dividing plates) separate the individual divisions in the block. In a house 20 m from the property boundary, four energy supply blocks ( 10 ) are laid. All energy sources ( 11 ) can be brought in from the outside from the property boundary ( 15 ) (water ( 12 ), gas ( 13 ), post and electricity ( 14 )). It can also be used with angled power supply blocks ( 16 ) z. B. with 30 °, 45 ° and 90 °.
Claims (1)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1998117665 DE19817665C2 (en) | 1998-04-21 | 1998-04-21 | Joint division relocation for supplying houses in land and energy supply block for several divisions (post, electricity, gas and water) in civil engineering for the supply of houses |
DE1999149910 DE19949910A1 (en) | 1998-04-21 | 1999-10-16 | Procedure e.g. for laying of number of communication cables in ground, especially for supply of house, has block system comprising connection of number of blocks with one another by pushing together |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1998117665 DE19817665C2 (en) | 1998-04-21 | 1998-04-21 | Joint division relocation for supplying houses in land and energy supply block for several divisions (post, electricity, gas and water) in civil engineering for the supply of houses |
Publications (2)
Publication Number | Publication Date |
---|---|
DE19817665A1 true DE19817665A1 (en) | 1999-10-28 |
DE19817665C2 DE19817665C2 (en) | 2001-03-01 |
Family
ID=7865238
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1998117665 Expired - Fee Related DE19817665C2 (en) | 1998-04-21 | 1998-04-21 | Joint division relocation for supplying houses in land and energy supply block for several divisions (post, electricity, gas and water) in civil engineering for the supply of houses |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE19817665C2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102005006240B4 (en) * | 2004-02-11 | 2008-05-29 | Rogall, Armin D., Prof. Dipl.-Ing. | Infrastructure empty pipe system |
DE102014007672B4 (en) | 2014-05-27 | 2017-10-26 | HWR System GmbH | Prefabricated building to form a house connection |
-
1998
- 1998-04-21 DE DE1998117665 patent/DE19817665C2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
DE19817665C2 (en) | 2001-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4329083A (en) | Methods of laying underground conduits | |
EP3660990B1 (en) | Method for providing a data cable connection | |
RU86635U1 (en) | WELL OF CABLE SEWERAGE | |
DE19817665A1 (en) | Plastic block for simultaneous installation of utility pipes | |
US3263577A (en) | Subterranean utility distribution system | |
DE10023399B4 (en) | Access, inspection and distribution shaft with house connection angle plate | |
DE102005006240B4 (en) | Infrastructure empty pipe system | |
DE2905146A1 (en) | Buried pipe and conduit laying - using concrete around pipe on trench bottom and fill of bentonite or stopper suspension | |
AT251077B (en) | Device for warning of damage to underground electrical lines, gas or water pipes or the like. | |
DE4334072A1 (en) | Shaft housing for sealed-off underground containers | |
DE1784750A1 (en) | Method of making a diaphragm wall | |
DE10233981A1 (en) | House service connection box for improving reception of all terminations supply, and disposal lines, has five-sided lower part and cover plate together with pipe entries at sides | |
JP2521598B2 (en) | Construction method of underground joint pipeline and underground joint pipeline | |
EP0648901B1 (en) | Method and device for connecting road gullies with a rainwater channel or a sewer | |
JPH0472013B2 (en) | ||
DE2560276C2 (en) | Device for laying a pipe string in a trench | |
GENERAL et al. | Addendum No. 4 Erie International Airport Realignment & Reconstruction of Taxiway A–Phase | |
DE10043208A1 (en) | Supply terminal device for connecting building to mains supply networks has sunken shaft containing supply network line for each mains supply network | |
DE2907140A1 (en) | Earth water supply tank - has separate water store and service chamber linked by sealable manhole shaft | |
KR100905548B1 (en) | Multipurpose drain pipe laid underground in curtilage complex | |
AT515827B1 (en) | Fastening element for subterranean pipelines laid in fresh concrete | |
DE202021002749U1 (en) | All-division house connection transfer box | |
EP0908598A2 (en) | Method for laying a conduit and conduit comprising a casing and a production tubing | |
DE1640054A1 (en) | Pre-fabricated supply ducts | |
DE202004002105U1 (en) | Underground infrastructure ducting system to contain supply and sanitation pipes, cables, etc. consists of modular pre-fabricated chambers so that all required services can be fitted and removed without digging-up roads |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8180 | Miscellaneous part 1 |
Free format text: IN DER ZUSAMMENFASSUNG WURDE DIE FALSCHE ZEICHNUNG VEROEFFENTLICHT. DIE FIGUR 1 GEHOERT ZUR ZUSAMMENFASSUNG DER OFFENLEGUNGSSCHRIFT |
|
AG | Has addition no. |
Ref country code: DE Ref document number: 19949910 Format of ref document f/p: P |
|
D2 | Grant after examination | ||
AG | Has addition no. |
Ref country code: DE Ref document number: 19949910 Format of ref document f/p: P |
|
8364 | No opposition during term of opposition | ||
8339 | Ceased/non-payment of the annual fee |