DE19750430A1 - Operation of an open-end spinner with spinning stations during batch spinning - Google Patents

Operation of an open-end spinner with spinning stations during batch spinning

Info

Publication number
DE19750430A1
DE19750430A1 DE1997150430 DE19750430A DE19750430A1 DE 19750430 A1 DE19750430 A1 DE 19750430A1 DE 1997150430 DE1997150430 DE 1997150430 DE 19750430 A DE19750430 A DE 19750430A DE 19750430 A1 DE19750430 A1 DE 19750430A1
Authority
DE
Germany
Prior art keywords
batch
spinning
game
bobbins
winding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE1997150430
Other languages
German (de)
Inventor
Konrad Olischlaeger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SAURER GMBH & CO. KG, 41069 MOENCHENGLADBACH, DE
Original Assignee
W Schlafhorst AG and Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by W Schlafhorst AG and Co filed Critical W Schlafhorst AG and Co
Priority to DE1997150430 priority Critical patent/DE19750430A1/en
Publication of DE19750430A1 publication Critical patent/DE19750430A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H4/00Open-end spinning machines or arrangements for imparting twist to independently moving fibres separated from slivers; Piecing arrangements therefor; Covering endless core threads with fibres by open-end spinning techniques
    • D01H4/42Control of driving or stopping
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/02Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
    • B65H54/22Automatic winding machines, i.e. machines with servicing units for automatically performing end-finding, interconnecting of successive lengths of material, controlling and fault-detecting of the running material and replacing or removing of full or empty cores
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H63/00Warning or safety devices, e.g. automatic fault detectors, stop-motions ; Quality control of the package
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H63/00Warning or safety devices, e.g. automatic fault detectors, stop-motions ; Quality control of the package
    • B65H63/08Warning or safety devices, e.g. automatic fault detectors, stop-motions ; Quality control of the package responsive to delivery of a measured length of material, completion of winding of a package, or filling of a receptacle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/31Textiles threads or artificial strands of filaments

Landscapes

  • Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)

Abstract

To optimize the batch change, at an open-end spinner with a number of open-end spinning stations each with a winder for cross wound bobbins, the state of the bobbin winding can be accessed in production. The batch end is set to a time where fully wound bobbins are produced at most at 75% of the spinning stations since the introduction of the batch change. The bobbin winding state is set before the introduction of the end of the batch spinning, and the required time is established to achieve the minimum bobbin winding state for the bobbins in operation at the winders. The spinning stations are stopped, where their winders cannot achieve the min. bobbin winding before the end of the batch spinning. The time of the end of the batch is set arbitrarily. The timing for the introduction of the end of batch spinning is set, from which no more bobbins will be doffed, sufficiently far in advance of the end of the batch so that all the bobbins can achieve their min. winding states. The timings to finish winding the bobbins are established from the accessed data of their winding states. The timing for the end of the batch spinning is set so that a given min. number of winding stations will wind bobbins with the min. windings on one side, and an accumulation of finished times is registered on the other side taking deviations in finishing times into account. During the running of the batch spinning, the central control for the machine registers the amount of spun yarn, the number of fully wound bobbins and the number of bobbins wound to date. The time when the end of the batch is introduced is set according to the production required for that batch. The bobbin production for the batch is displayed graphically to show the achievable winding state. After the batch ending process has started, the removed bobbins are sorted according to the winding states. The bobbin sleeves for all the batches are exchanged for sleeves of the new batch, and the stopped spinning stages are provided with sleeves for the new batch, and their sliver cans are exchanged for sliver cans to spin the new batch.

Description

Die Erfindung betrifft ein Verfahren entsprechend dem Oberbegriff des ersten Anspruchs.The invention relates to a method according to the Preamble of the first claim.

Jeder Partiewechsel an einer Offenend-Spinnmaschine bewirkt eine Minderung des Nutzeffekts der Maschine. Die Minderung des Nutzeffekts wird durch eine Vielzahl von Faktoren verursacht. Der geringste Aufwand ist beispielsweise erforderlich, wenn eine Änderung des Spulendurchmessers unter Beibehaltung der Art und Abmessung der Spulenhülsen vorgenommen wird. Am aufwendigsten ist die Umstellung der Maschine auf einen neuen Garnrohstoff, eine neue Faser oder Fasermischung, da in einem solchen Fall zusätzlich zur Umstellung die Maschine auch oft noch komplett gesäubert werden muß.Each batch change on an open-end spinning machine a reduction in the efficiency of the machine. The reduction in Efficiency is caused by a variety of factors. The least effort is required, for example, if a change in the coil diameter while maintaining Art and dimension of the coil sleeves is made. At the The most complex is the conversion of the machine to a new one Yarn raw material, a new fiber or fiber mixture, because in one such a case, in addition to the changeover, the machine often still needs to be cleaned completely.

Auch das Verfahren, wie eine Partie beendet wird, hat Einfluß auf den Nutzeffekt einer Spinnmaschine. In der Regel richtet sich die Beendigung einer Partie nach zwei möglichen Vorgaben, entweder nach einem vorgegebenen Termin, an dem beispielsweise das Personal zum Umrüsten einer Maschine auf eine neue Partie bereitsteht oder nach der Menge des zu produzierenden Garns beziehungsweise der vorgegebenen Anzahl von Spulen. Wird beispielsweise aufgrund einer Terminvorgabe die Spinnmaschine zu einem bestimmten Zeitpunkt während des Laufs einer Partie abgeschaltet, sind an den einzelnen Spinnstellen Spulen mit unterschiedlichen Bewicklungszuständen anzutreffen. Neben vollen, fertigbewickelten Spulen, den Spulen erster Wahl, liegen auch Spulen vor, deren Bewicklungszustand nur eine Einordnung in die Kategorie zweite Wahl zuläßt, und sogenannte Restspulen, deren Garnmenge nicht ausreicht, um sie in Webereien oder Strickereien einzusetzen. Während sich die Spulen zweiter Wahl noch mit Abschlag verkaufen lassen, können Restspulen in der Regel nicht verwertet werden und sind Abfall. Nur wenn die Möglichkeit vorhanden ist, das Restgarn umzuspulen, fällt eine geringere Abfallmenge an. Allerdings richtet sich das Umspulen danach, ob sich auf einer Hülse noch eine verwertbare Garnmenge befindet. Das kostenintensive Umspulen mindert den Erlös, der für solcherart vollgewickelte Spulen erzielt wird.The process of ending a game also has an impact to the benefit of a spinning machine. Usually judges the end of a game according to two possible requirements, either after a predetermined date, for example the staff to convert a machine to a new batch is available or according to the amount of yarn to be produced or the specified number of coils. Becomes the spinning machine, for example, on the basis of an appointment at a certain time during the run of a game switched off, there are coils at the individual spinning positions encountered different winding conditions. Next full, fully wound coils, the coils of choice, there are also bobbins whose winding condition is only one Allows classification in the second choice category, and so-called Remaining bobbins whose amount of yarn is insufficient to put them in Use weaving mills or knitting mills. While the Can still sell second choice coils at a discount  Residual coils are usually not recycled and are waste. Only if there is a possibility, the remaining yarn rewinding results in a smaller amount of waste. Indeed The rewinding depends on whether there is still a tube there is a usable amount of yarn. The expensive one Rewinding reduces the proceeds, which is fully wound for such Coils is achieved.

Durch die DE 37 33 788 C2 ist ein Partiewechselverfahren für Spulmaschinen beschrieben, durch welches ermöglicht werden soll, 100% volle Kreuzspulen zu erzeugen. Dazu wird zu Beginn der Partie eine zu erreichende Vollspulenanzahl vorgegeben, von der die Anzahl der an der Produktion dieser Partie beteiligten Spulstellen abgezogen wird, um damit den Beginn des Partieauslaufes auf die aus diesen beiden Werten gebildete Differenz festlegen zu können. Daraufhin wird jede Spulstelle, die eine volle Spule erzeugt hat, stillgesetzt. Dadurch ist in der letzten Phase des Partieauslaufs die Produktivität, das heißt der Maschinenwirkungsgrad, der Spulmaschine drastisch reduziert. Jedoch ist diese Auslaufphase bei Spulmaschinen aufgrund ihrer gegenüber zum Beispiel einer Rotorspinnmaschine etwa 10fachen Spulgeschwindigkeit relativ kurz. Außerdem hat üblicherweise eine Spulmaschine maximal 60 Spulstellen während Rotorspinnmaschinen in der Regel deutlich über 200 Spinnstellen besitzen. Die Auswirkungen einer Absenkung des Maschinenwirkungsgrades machen sich daher bei Rotorspinnmaschinen erheblich stärker bemerkbar.DE 37 33 788 C2 is a lot change procedure for Described winding machines by which are made possible is supposed to produce 100% full cheese. This will be at the beginning given the batch a number of full bobbins to be reached, from the number of people involved in the production of this lot Winding units is deducted to mark the beginning of the Part runout to those formed from these two values To be able to determine the difference. Then each winding unit, which has generated a full coil, stopped. This is in productivity in the last phase of the phase-out is the name of the machine efficiency, the winding machine is drastic reduced. However, this phase-out phase is in winding machines because of their compared to, for example, a rotor spinning machine about 10 times the winding speed relatively short. Also has usually a winder during a maximum of 60 bobbins Rotor spinning machines generally have well over 200 spinning positions have. The effects of lowering the Machine efficiency levels are therefore an issue Rotor spinning machines much more noticeable.

Ein fließender Partiewechsel, wie er bei Spulmaschinen während der Partieauslaufphase zur Verringerung des Produktionsausfalles bereits praktiziert wird, ist bei Offenendspinnmaschinen aufgrund der dort eingesetzten Gruppenantriebe nicht möglich.A smooth batch change, as he did during winding machines the phase-out phase to reduce the Loss of production is already practiced Open end spinning machines due to the used there Group drives not possible.

Aufgabe der vorliegenden Erfindung ist es, die Beendigung einer Partie einer Offenend-Spinnmaschine zu optimieren.The object of the present invention is to complete a To optimize the batch of an open-end spinning machine.

Die Lösung der Aufgabe erfolgt mit Hilfe der kennzeichnenden Merkmale des ersten Anspruchs. Vorteilhafte Ausgestaltungen der Erfindung werden in den Unteransprüchen beansprucht.The task is solved with the help of the characteristic Features of the first claim. Advantageous embodiments of the Invention are claimed in the subclaims.

Durch vorliegende Erfindung wird der Zeitpunkt des Partieendes so vorverlegt, daß die Zeitspanne innerhalb des Partieauslaufes eliminiert wird, in der der Nutzeffekt so gravierend abfällt, daß die dadurch entstehenden Verluste die Wertdifferenz zwischen in dieser Zeit noch erzeugbaren Vollspulen und Spulen mit einem vorgebbaren Bewicklungszustand übersteigen. Der mindestens zu erreichende Bewicklungszustand hängt vom Verwendungszweck der Spulen beziehungsweise entsprechender Forderungen des jeweiligen Abnehmers ab. Spulen, die diesen Bewicklungszustand nicht erreichen, sind, wie eingangs erwähnt, Abfall. Um diesen Abfall zu minimieren, wird erfindungsgemäß dafür Sorge getragen, daß durch die Spulenwechselstrategie solche Rest- beziehungsweise Abfallspulen vermieden werden. Dies ist durchgängig möglich, wenn die Zeitspanne zwischen der Einleitung der Beendigung der Partie und dem Partieende mindestens der Produktionszeit entspricht, die zur Erreichung des Mindestbewicklungszustandes, ausgehend von einer Leerhülse, erforderlich ist. Liegt die genannte Zeitspanne unterhalb dieser Mindestbewicklungsdauer, wird gemäß der Erfindung diese Spinnstelle ebenfalls stillgesetzt. Dadurch wird die zusätzliche Produktion von Abfall während der Partieauslaufphase unterbunden.By the present invention, the time of the end of the game brought forward so that the time span within the game runout is eliminated, in which the benefit drops so seriously, that the resulting losses the difference in value between full coils and coils that could still be produced during this time exceed with a definable winding condition. Of the at least the winding condition to be reached depends on Purpose of the coils or equivalent Demands of the respective customer. Coils this As mentioned at the beginning, Waste. In order to minimize this waste, the invention made sure that through the bobbin change strategy such residual or waste spools are avoided. This is possible if the period between the Initiation of the end of the game and the end of the game corresponds at least to the production time required to achieve the minimum winding condition, starting from an empty tube, is required. Is the specified period of time below this minimum winding time, this is according to the invention Spinning station also stopped. This will make the additional production of waste during the Game phase-out prevented.

Ist die Zeitspanne zwischen Einleitung der Beendigung der Partie und dem Partieende größer als die Zeitspanne zum Erreichen des Mindestbewicklungszustandes, können innerhalb der Partieauslaufphase noch solange Spulenwechsel vorgenommen werden, bis die verbleibende Zeitspanne bis zum Partieende der genannten Mindestbewicklungszeit entspricht. Auf diese Weise kann der Zeitpunkt, von dem an der Wirkungsgrad der Spinnmaschine durch Stillsetzen von Spinnstellen absinkt, weiter in Richtung Partieende verschoben werden.Is the period between initiation of termination of the Batch and the end of the lot greater than the period of time to Reaching the minimum winding condition, can within the Game run-out phase made while the bobbin was being changed until the remaining time until the end of the game corresponds to the minimum winding time. In this way  can be the time from which the efficiency of the Spinning machine sinks by stopping spinning stations, be moved further towards the end of the game.

Eine willkürliche Festlegung des Partieendes, das gemäß vorliegender Erfindung vor einem Zeitpunkt liegt, an dem höchstens 75% der Spinnstellen seit der Einleitung des Partiewechsels volle Kreuzspulen erzeugt haben, ergibt sich hauptsächlich dann, wenn zu einem ganz bestimmten Zeitpunkt das für den Partiewechsel erforderliche Personal zur Verfügung steht.An arbitrary determination of the end of the game, which according to present invention is before a point in time at most 75% of the spinning positions since the initiation of the Lot changes have generated full packages mainly if at a very specific time the Personnel required for changing the lot are available stands.

Ausgehend von einem eingestellten, gegebenenfalls willkürlich festgelegten Partieende kann gemäß der Erfindung der Zeitpunkt der Einleitung des Partieauslaufes zum völligen Ausschließen von Abfall- oder Restspulen ausreichend weit vor das Partieende gelegt werden.Starting from a set, possibly arbitrary The end of the game can be determined according to the invention at the time the initiation of the game run to the complete exclusion of waste or residual spools sufficiently far before the end of the lot be placed.

Ist ein entsprechender Spielraum für die Einstellung des Partieendes vorhanden, beispielsweise wenn eine bestimmte Produktionsmenge mindestens oder weitgehend erreicht werden soll, läßt sich aufgrund der Schwankungen der Fertigstellungszeitpunkte eine Optimierung dergestalt erreichen, daß durch die Erfassung der Häufung der Fertigstellungszeitpunkte innerhalb der Auslaufphase der Partie eine im Verhältnis zur Nutzeffektminderung deutlich überproportionale Ausbeute an Vollspulen erzielt wird.Is there adequate scope for hiring the End of game available, for example if a certain one Production volume can be reached at least or largely should, due to the fluctuations of the Completion times such an optimization achieve that by detecting the cluster of Completion times within the phase of the lot one in relation to the reduction in efficiency disproportionate yield of full coils is achieved.

Da der aktuelle Bewicklungszustand der Spulen an den Spinnstellen jederzeit abfragbar ist, kann der Verlauf der Partie vom Start bis zum vorgesehenen Partieende, graphisch, beispielsweise anhand entsprechender Kurven dargestellt werden. Die Kurven sind dabei jeweils in ein Diagramm eingezeichnet, auf dessen Ordinatenachse beispielsweise die Anzahl der noch laufenden Spinnstellen in % und auf dessen Abszissenachse die Zeit eingetragen ist. Aus den Kurven ist ersichtlich, daß nach dem Start des Partieauslaufes mit jeder Spinnstelle, die eine volle Spule fertiggestellt hat und anschließend nicht wieder angesponnen wird, der Wirkungsgrad der Textilmaschine sinkt. Anhand einer solchen Kurve kann beispielsweise die Entscheidung getroffen werden, ob es sich lohnt, für die Herstellung einiger weniger voller Spulen die komplette Maschine weiterlaufen zu lassen und auf das Umrüsten zu warten. Die Anzeige des Partieverlaufs erlaubt sowohl eine Abschätzung der Produktionsmenge durch eine Variierung des Auslaufzeitpunkts der Partie als auch eine Aussage über den Auslaufzeitpunkt der Partie durch eine Variierung der Produktionsmenge.Since the current winding condition of the coils on the Spinning stations can be queried at any time, the course of the Game from start to end of game, graphically, for example based on corresponding curves being represented. The curves are in one Diagram drawn on its ordinate axis for example the number of spinning stations still running in% and time is entered on the axis of the abscissa. From the  Curves can be seen that after the start of the game run with every spinning station that has completed a full spool and then not being spun on again The efficiency of the textile machine drops. Based on one For example, the curve can be used to decide whether it's worth it for making a few fullers Let the entire machine continue to run and open to wait for the changeover. The display of the game progress allowed both an estimate of the production quantity by a Varying the lot's expiry time as well Statement about the end of the lot by a Varying the production quantity.

Die Erfindung bietet weiterhin vorteilhaft die Möglichkeit, die in den vorgegebenen Bewicklungszuständen vorliegenden Spulen entsprechend ihrem Bewicklungszuständen geordnet nacheinander abzuräumen. Während es heutzutage noch üblich ist, am Partieende die vollen Spulen und die Spulen zweiter Wahl gemeinsam von einer Spinnmaschine abzuräumen und nach einer visuellen Überprüfung manuell zu separieren, ist es entsprechend der Erfindung möglich, diese Spulen jeweils getrennt abzuräumen. Da an jeder Spinnstelle der Bewicklungszustand der in ihr noch eingespannten Spule bekannt ist, kann durch eine entsprechende Steuerung des Spulenwechslers an der Spinnmaschine ein auf den Bewicklungszustand der Spulen abgestimmtes Abräumen erfolgen.The invention also advantageously offers the possibility of coils present in the given winding conditions ordered one after the other according to their winding condition clear away. While it is still common these days, End of game with full bobbins and second choice bobbins clear together from a spinning machine and after one Separate visual inspection manually, it is possible according to the invention, these coils each clear away separately. Because at every spinning position The winding condition of the coil still clamped in it is known is, by appropriate control of the Spool changer on the spinning machine on the The winding condition of the bobbins is coordinated.

Müssen beim Partiewechsel die vorhandenen Hülsen gegen Hülsen anderer Abmessungen oder Art ausgetauscht werden, kann das bereits nach der Einleitung des Partieauslaufs erfolgen. An den Spinnstellen, die stillgesetzt werden, weil die verbleibende Restlaufzeit bis zum vorgesehenen Partieabbruch nicht ausreicht, um eine Spule mit einem bestimmten Mindestbewicklungszustand zu erstellen, erfolgt kein Anspinnen des Garns der alten Partie mehr. Die Zeit bis zum Ende der Partie kann deshalb genutzt werden, den Hülsenvorrat der alten Partie gegen Hülsen der neuen Partie auszutauschen. Eine weitere Beschleunigung des Umrüstens der Maschinen auf eine neue Partie kann dadurch erreicht werden, daß nach Einleitung des Partieauslaufs der vorliegende Vorrat an Faserband der alten Partie an den vorgenannten Spinnstellen nicht mehr ergänzt wird. Erfolgt der Kannentransport durch ein automatisches Kannentransportsystem, kann bereits während des Auslaufs der alten Partie das Kannentransportsystem auf die Lieferung von Kannen mit Vorgarn der neuen Partie umgerüstet werden. Weiterhin können in der Auslaufzeit der alten Partie an den stillgesetzten Spinnstellen die Kannen mit Faserband der auslaufenden Partie bereits gegen die Kannen mit Faserband der neuen Partie ausgetauscht werden. Bei Spinnmaschinen, die mit an den Spinnstellen eingesetzten Starterspulen angesponnen werden, kann während des Partieauslaufs bereits die Starterspuleinrichtung auf die neue Partie umgestellt werden. Die Starterspulen für die neue Partie können bereits an abgeräumten Spinnstellen eingesetzt werden, wo sie dann aber noch nicht angesponnen werden.Must replace the existing sleeves with sleeves when changing the lot other dimensions or type can be exchanged already after the initiation of the game run. At the spinning positions that are stopped because of the Remaining remaining time until the planned lot is canceled not enough to get a coil with a certain There is no piecing to create the minimum winding condition the yarn of the old batch more. The time to the end of the Batch can therefore be used, the sleeve stock of the old  Exchange the lot for the sleeves of the new lot. A further speeding up the conversion of the machines to one new game can be achieved that after introduction the end of the game, the existing stock of sliver old batch at the aforementioned spinning stations no longer is added. Can transport takes place through a automatic can transport system, can already during the Out of the old batch the can transport system on the Delivery of cans with roving of the new batch converted become. Furthermore, in the expiry time of the old lot The cans with sliver of the sliver spinning stations leaking batch against the cans with sliver new lot can be exchanged. For spinning machines that use starter spools used at the spinning positions can already during the game run Starter winding device to be converted to the new lot. The starter coils for the new batch can already be started cleared spinning stations are used, but then where not be spun on yet.

Tritt während des Partieauslaufs an einer Spinnstelle eine Störung auf, und ist aufgrund dieser Störung das vorgegebene Partieende nicht einzuhalten, wird ein Alarm ausgelöst. Insbesondere bei der mengenorientierten Vorgabe des Partieendes kann durch die Störung oder den Ausfall einer Spinnstelle die Anzahl der zu produzierenden vollen Spulen bis zum vorgesehenen Partieende nicht gesichert sein. Eine solche Störung kann neben technischen Ursachen auch der Mangel an Faserband, also das Leerlaufen einer Kanne, sein. In einem solchen Fall kann aufgrund des Alarms entweder die Zielvorgabe an vollen Spulen korrigiert werden, der Zeitpunkt des Partieendes verlegt werden oder eine Kanne mit Faserband an einer stillgesetzten Spinnstelle entnommen und die leergelaufene Kanne gegen diese Kanne ausgewechselt werden. Es kann auch eine bereits abgestellte Spinnstelle mit einer Spule zweiter Wahl wieder in Betrieb genommen werden, damit eine sonst fehlende volle Spule zu Ende produziert werden kann. In jedem Fall ermöglicht der Alarm und die Anzeige der gestörten Spinnstelle die Möglichkeit, in den Partieauslauf steuernd einzugreifen.Occurs at a spinning position during the end of the game Fault, and is the default due to this fault If the end of the game is not observed, an alarm is triggered. Especially with the quantity-based specification of the end of the lot can be caused by the malfunction or failure of a spinning station Number of full bobbins to be produced up to the intended one End of the game cannot be secured. Such a disorder can coexist technical causes also the lack of sliver, that is Empty a jug. In such a case due to the alarm, either the target on full bobbins be corrected, the time of the end of the game be postponed or a jug with sliver on a shutdown Spinning station removed and the empty jug against it Can be replaced. It can also be one already with a second choice spool Be put into operation, so an otherwise missing full coil  can be produced to the end. In any case, the Alarm and the display of the disturbed spinning station Possibility to intervene to control the game runout.

Anhand graphischer Darstellungen wird die Erfindung näher erläutert:The invention is illustrated by graphic representations explains:

Es zeigt:It shows:

Fig. 1 eine Situation, wie sie sich bei einem "normalen" Partieauslauf, bei dem ausschließlich I. Wahl-Spulen erzeugt werden, ergeben würde, wenn die Spulen eine Spulenlaufzeit von 3,5 Std. aufweisen und der Start des Partieauslaufes um 10:00 Uhr erfolgt, . Figure 1 shows a situation as it will be generated at a "normal" part outlet, wherein exclusively I. Selection coils would result if the coils have a coil life of 3.5 hours and the start of the batch run-out 10.: 00 o'clock,

Fig. 2 die gleiche Ausgangssituation wie in Fig. 1, allerdings erfolgt der Partieabbruch hier, z. B. aufgrund eines vorgegebenen Mindestmaschinenwirkungsgrades, bereits um 11:45 Uhr, Fig. 2 shows the same starting situation as in Fig. 1, but the game is canceled here, for. B. due to a predetermined minimum machine efficiency, already at 11:45 a.m.,

Fig. 3 die Ausgangssituation wie in Fig. 1, der Partieabbruch ist hier jedoch, z. B. aufgrund einer speziellen Personalsituation, auf 12:30 Uhr festgelegt. Fig. 3 shows the initial situation as in Fig. 1, but the batch is canceled here, for. B. due to a special personnel situation, set to 12:30 p.m.

Die in den Fig. 1 bis 3 dargestellten Diagramme zeigen die vom Zentralrechner einer OE-Spinnmaschine erfaßbaren Produktionszustände der im Bereich der Spinnstellen der Textilmaschine angeordneten Spuleinrichtungen zu einem bestimmten Abfragezeitpunkt, zum Beispiel um 10:00 Uhr.The diagrams shown in FIGS . 1 to 3 show the production states of the winding devices arranged in the area of the spinning positions of the textile machine, which can be detected by the central computer of an OE spinning machine, at a specific query time, for example at 10:00 a.m.

In den Diagrammen ist auf der Abzisse die Uhrzeit, die in Viertelstunden-Schritte beziehungsweise entsprechende Zeitintervalle unterteilt ist, aufgetragen. Auf der Ordinate ist die Anzahl der vom Zentralrechner überwachten, am Partieauslauf beteiligten Spinnstellen bzw. deren Spuleinrichtungen in Prozent angegeben.The time on the abscissa is shown in the diagrams Quarter hour steps or equivalent Time intervals is divided, plotted. On the ordinate is the number of monitored by the central computer, on  Part runout involved spinning stations or their Winding devices indicated in percent.

Die Balken 10 am Ende der einzelnen Zeitintervalle (10:00, 10:15, 10:30, usw.) zeigen an, an wieviel Prozent der am Partieauslauf beteiligten Spinnstellen jeweils innerhalb des betreffenden Zeitintervalls die Spulenreise durch Fertigstellung einer vollen Kreuzspule beendet wurde, das heißt, an wieviel Prozent der insgesamt beteiligten Spinnstellen im betreffenden Zeitintervall eine I. Wahl-Spule erstellt wurde.The bars 10 at the end of the individual time intervals (10:00, 10:15, 10:30, etc.) indicate the percentage of the spinning positions involved in the end of the game, within the relevant time interval, that the bobbin trip was completed by completing a full cheese, that is, the percentage of the total number of spinning stations involved in which an I. Wahl spool was created in the relevant time interval.

Die Kurve 11 zeigt dabei, ebenfalls in Prozent, die Gesamtzahl der Spinnstellen an, an denen bis zu einem bestimmten Zeitpunkt I. Wahl-Spulen erzeugt worden sind.Curve 11 shows, also in percent, the total number of spinning positions at which I. select bobbins have been generated up to a certain point in time.

Die Fig. 1 zeigt dabei eine Situation, wie sie sich bei einem "normalen" Partieauslauf einstellen würde, wenn an den Spinnstellen nur I. Wahl-Spulen erzeugt werden und die Spinnstellen, auf denen eine volle Spule fertiggestellt wurde, nicht wieder angesponnen werden. Wie ersichtlich nimmt in diesem Fall die Anzahl der noch produzierenden Spinnstellen während des Partieauslaufes ständig ab. Die Kurve 12 zeigt in Prozenten die Anzahl der zu einem bestimmten Zeitpunkt noch in Produktion befindlichen Spinnstellen, was mit dem jeweiligen Maschinenwirkungsgrad gleichgesetzt werden kann. Fig. 1 shows a situation as it would occur in a "normal" batch runout if only I. choice bobbins are produced at the spinning stations and the spinning stations on which a full bobbin has been finished are not spun on again. In this case, as can be seen, the number of spinning stations still in production decreases continuously during the end of the batch. The curve 12 shows in percent the number of spinning stations still in production at a certain point in time, which can be equated with the respective machine efficiency.

Bei der Fig. 1 entspricht die Zeitspanne für den Partieauslauf wenigstens der Spulenlaufzeit der betreffenden Partie. Bei einer angenommenen Spulenlaufzeit von beispielsweise 3,5 Stunden, bedeutet dies, daß bei einem Start S des Partieauslaufes um 10:00 Uhr spätestens um 13:30 Uhr die letzte Spinnstelle ihren Arbeitszyklus beendet hat und nach Fertigstellung einer vollen Kreuzspule abgeschaltet wird. Die Kurve 12, die, wie vorstehend bereits angedeutet, auch den Wirkungsgrad der Textilmaschine anzeigt, verdeutlicht, daß im vorliegenden Ausführungsbeispiel der Maschinenwirkungsgrad in der letzten Stunde des Partieauslaufes zwischen 30 und 0% liegt.In Fig. 1, the time period for the batch runout corresponds at least to the spool transit time of the batch in question. Assuming a bobbin running time of, for example, 3.5 hours, this means that when the game ends at S at 10 a.m. and at 1.30 p.m. at the latest, the last spinning station has ended its working cycle and is switched off after completion of a full bobbin. Curve 12 , which, as already indicated above, also indicates the efficiency of the textile machine, illustrates that in the present exemplary embodiment the machine efficiency in the last hour of the end of the batch is between 30 and 0%.

Die Fig. 2 zeigt die gleiche Ausgangsposition wie Fig. 1. Das heißt, um 10.00 Uhr erfolgt eine Anfrage an den Zentralrechner der Offenend-Spinnmaschine bezüglich des aktuellen Bewicklungszustandes der Spulen der einzelnen Spinnstellen. Die daraus resultierende, anhand der Fig. 2 graphisch verdeutlichte Aussage über den zeitlichen Verlauf der Spulenreisen an den Spinnstellen ergibt, daß der Wirkungsgrad der Textilmaschine nach 11:45 Uhr unbefriedigend wird. Ein solcher, eigentlich unbefriedigender Maschinenwirkungsgrad ist nur dann noch eine gewisse Zeit akzeptabel, wenn aus dem Diagramm ersichtlich ist, daß in kürze eine größere Anzahl I. Wahl-Spulen anfällt. Da dies beim Ausführungsbeispiel gemäß der Fig. 2 nicht der Fall ist, wird festgelegt, daß um 11:45 Uhr der Abbruch A des Partieauslaufes erfolgen soll. FIG. 2 shows the same starting position as FIG. 1. That is to say, at 10:00 a.m., the central computer of the open-end spinning machine is asked about the current winding state of the coils of the individual spinning stations. The resulting statement, graphically illustrated with reference to FIG. 2, about the time course of the bobbin travel at the spinning positions shows that the efficiency of the textile machine becomes unsatisfactory after 11:45 a.m. Such an actually unsatisfactory machine efficiency is only acceptable for a certain time if it can be seen from the diagram that a large number of I. select coils will be produced shortly. Since this is not the case in the exemplary embodiment according to FIG. 2, it is stipulated that termination A of the end of the game should take place at 11:45 a.m.

Wie anhand der Kurve 11 ersichtlich, werden bis zum Zeitpunkt des Partieabbruches um 11:45 Uhr 60% der am Partieauslauf beteiligten Spinnstellen volle Kreuzspulen, das heißt, I. Wahl-Spulen hergestellt haben. Die Balken 10 zeigen dabei im einzelnen, in welchem der zwischen dem Start S des Partieauslaufes um 10:00 Uhr und dem Abbruch A des Partieauslaufes um 11:45 Uhr liegenden Zeitintervall wieviel Prozent I. Wahl-Spulen fertiggestellt werden.As can be seen from curve 11 , by the time the game was terminated at 11:45 a.m., 60% of the spinning stations involved in the game runout would have produced full packages, that is to say I. choice packages. The bars 10 show in detail in what time interval between the start S of the game run at 10:00 a.m. and the termination A of the game run at 11:45 a.m. what percentage of I. election coils are completed.

Die mit einer Schraffur versehenen Balken 13.1 bis 13.8 zeigen, daß im vorliegenden Ausführungsbeispiel zusätzlich zu den 60% I. Wahl-Spulen auf insgesamt 47% der am Partieauslauf beteiligten Spinnstellen noch II. Wahl-Spulen erzeugt werden können.The hatched bars 13.1 to 13.8 show that in the present exemplary embodiment, in addition to the 60% I. selection bobbins, a total of 47% of the spinning positions involved in the end of the game can still produce II. Selection bobbins.

Wie vorstehend bereits erläutert, sind unter II. Wahl-Spulen dabei Spulen zu verstehen, die ein vorgegebenes Mindestgewicht aufweisen. Dieses Mindestgewicht soll im Ausführungsbeispiel einer Spulenlaufzeit von mindestens 1½ Stunden entsprechen.As already explained above, under II. Are election coils to understand coils that have a predetermined minimum weight  exhibit. This minimum weight is intended in the exemplary embodiment correspond to a coil running time of at least 1½ hours.

Die in Fig. 2 anhand des Balkens 13.1 dargestellten II. Wahl-Spulen wären beispielsweise um 12:00 Uhr fertiggestellt, das heißt, diese Spulen weisen zum Zeitpunkt A des Partieabbruches bereits eine effektive Spulenlaufzeit von ca. 3¼ Stunden auf. Die II. Wahl-Spulen des Balkens 13.2 entsprechen demgemäß Spulen mit einer Laufzeit von ca. 3 Stunden usw. Der Balken 13.7 stellt entsprechend II. Wahl-Spulen dar, die zum Zeitpunkt des Partieabbruches, das heißt um 11:45 Uhr eine Spulenlaufzeit von 1¾ Stunden aufweisen. Erläuterung: Die anhand des Balkens 13.7 dargestellten Kreuzspulen, die, wie vorstehend bereits erläutert im vorliegenden Ausführungsbeispiel eine normale Spulenlaufzeit von 3½ Stunden aufweisen, wären, wie aus dem Diagramm ersichtlich, bis 13:30 Uhr fertig gewesen. Das bedeutet, diese Spulen müssen spätestens um 10:00 Uhr in Produktion gegangen sein. Die tatsächliche Laufzeit dieser Spulen beträgt daher um 11:45 Uhr wenigstens 1¾ Stunden.The II. Selection coils shown in FIG. 2 with the aid of bar 13.1 would be completed, for example, by 12:00 p.m., that is, these coils already have an effective coil running time of approx. The II. Selection coils of bar 13.2 accordingly correspond to coils with a running time of approx. 3 hours etc. Bar 13.7 accordingly corresponds to II. Selection coils that have a coil running time of 11:45 hrs at the time of the game cancellation Have 1¾ hours. Explanation: The cross-wound bobbins shown on the bar 13.7 , which, as already explained above in the present exemplary embodiment, have a normal bobbin running time of 3½ hours, would have been finished by 1:30 p.m., as can be seen from the diagram. This means that these coils must have gone into production by 10:00 a.m. at the latest. The actual running time of these coils is at least 1¾ hours at 11:45 a.m.

Wie anhand der Fig. 2 weiter ersichtlich, wurden bereits im Zeitintervall bis 10:15 Uhr an einigen der Spinnstellen I. Wahl-Spulen fertiggestellt. Daraus ergibt sich für diese Spinnstellen bis zum Zeitpunkt des geplanten Partieabbruches um 11:45 Uhr eine Restlaufzeit von 1½ Stunden. Diese verbleibende Restlaufzeit reicht aus, um an diesen Spinnstellen im Anschluß an die I. Wahl-Spulen noch zusätzlich II. Wahl-Spulen zu erstellen. Diese II. Wahl-Spulen sind in Fig. 2 im Bereich des Zeitintervalles 10:15 Uhr durch den schraffierten Balken 13.8 angedeutet.As can also be seen from FIG. 2, I. election bobbins have already been completed in some of the spinning positions until 10:15 a.m. This gives these spinning units a remaining runtime of 1½ hours before the scheduled end of the game at 11:45 a.m. This remaining time is sufficient to create additional II. Selection bobbins at these spinning positions following the 1st selection bobbins. These II. Selection coils are indicated in FIG. 2 in the area of the time interval 10:15 a.m. by the hatched bar 13.8 .

An allen Spinnstellen, an denen die Spulenreise nach 10:15 Uhr endet, reicht die bis zum Partieabbruch um 10:45 Uhr verbleibende Zeitspanne nicht aus, um noch II. Wahl-Spulen zu erstellen. Diese Spulstellen werden daher nach Beendigung ihrer Spulreise sofort abgeschaltet oder können gegebenenfalls bereits für die nachfolgende Partie vorbereitet werden.At all spinning positions where the bobbin trip after 10:15 a.m. ends, it lasts until the game is canceled at 10:45 a.m. remaining period of time is not enough to still II. election coils  create. These winding units are therefore after their Spool trip switched off immediately or can if necessary be prepared for the next game.

Die Fig. 3 zeigt ebenfalls die aus den Fig. 1 und 2 bekannte Ausgangssituation. Gemäß dem Ausführungsbeispiel der Fig. 3 wird der Partieabbruch A, zum Beispiel aufgrund einer speziellen Personalsituation, auf 12:30 Uhr festgelegt. Das heißt, im Ausführungsbeispiel gemäß Fig. 3 erfolgt der Partieabbruch um 12:30 Uhr, weil nur zu diesem bestimmten Zeitpunkt ausreichend Personal für einen zügigen Partiewechsel zur Verfügung steht.The Fig. 3 also shows that from FIGS. 1 and 2 known starting situation. According to the exemplary embodiment in FIG. 3, the game termination A is set to 12:30 p.m., for example due to a special personnel situation. That is, in the exemplary embodiment according to FIG. 3, the batch is terminated at 12:30 p.m., because sufficient personnel are only available for a rapid batch change at this particular point in time.

Wie anhand der Balken 10 beziehungsweise der Kurve 11 ersichtlich, werden bis zum Zeitpunkt des Partieabbruches um 12:30 Uhr bereits an 72% der am Partieauslauf beteiligten Spinnstellen volle Kreuzspulen (I. Wahl-Spulen) erstellt worden sein.As can be seen from the bars 10 and curve 11 , by the time the game was terminated at 12:30 p.m., 72% of the spinning stations involved in the game runout had already produced full packages (1st choice bobbins).

Die mit einer Schraffur versehenen Balken 13.1 bis 13.4 zeigen außerdem an, daß an einer Anzahl von Spinnstellen die reguläre Spulreise erst nach dem Partieabbruch um 12:30 enden würde. An diesen Spinnstellen werden daher bei einem Partieabbruch um 12:30 Uhr lediglich II. Wahl-Spulen vorliegen.The hatched bars 13.1 to 13.4 also indicate that at a number of spinning positions the regular winding travel would not end until after 12:30 p.m. At these spinning stations, therefore, if there is a break at 12:30 p.m., only II. Election bobbins will be available.

II. Wahl-Spulen mit einer Mindestlaufzeit von 1½ Stunden können zusätzlich auch an denjenigen Spinnstellen erzeugt werden, an denen die reguläre Spulenreise der I. Wahl-Spulen wenigstens 1½ Stunden vor dem Partieabbruch A beendet wird. Diese Spinnstellen, die noch einmal neu angesponnen werden können, sind in der Fig. 3 durch die schraffierten Balken 13.5 bis 13.8 angedeutet.II. Election bobbins with a minimum running time of 1½ hours can also be produced at those spinning positions at which the regular bobbin trip of the 1st Election bobbins ends at least 1½ hours before the game is canceled. These spinning positions, which can be spun again, are indicated in FIG. 3 by the hatched bars 13.5 to 13.8 .

Die Balken 13.5 bis 13.8 zeigen dabei, jeweils in Prozent, die Anzahl der während des Partieauslaufes im entsprechenden Zeitintervall erneut angesponnenen Spinnstellen. The bars 13.5 to 13.8 show, in percent, the number of spinning positions spun on again during the game run in the corresponding time interval.

Das erfindungsgemäße Partiewechselverfahren hat einerseits den Vorteil, daß die vom Partieauslauf betroffenen Textilmaschinen bis zum Partieabbruch mit einem relativ hohen Maschinenwirkungsgrad arbeiten. Außerdem wird durch das erfindungsgemäße Partiewechselverfahren sichergestellt, daß das Entstehen von Restspulen, das heißt, von Spulen deren Laufzeit unter 1½ Stunden liegt, weitestgehend vermieden wird. Derartige Restspulen können bei dem erfindungsgemäßen Verfahren allenfalls dann auftreten, wenn an einer Spinnstelle, die II. Wahl-Spulen fertigt, welche hart an der Grenze zur Mindestlaufzeit liegen, unerwartet Schwierigkeiten auftreten. Der Prozentsatz solcher Restspulen liegt dabei, bezogen auf die Gesamtanzahl der beim Partieabbruch verwertbaren I. und II. Wahl-Spulen, in der Regel unter 1%.The batch change method according to the invention has on the one hand Advantage that the textile machines affected by the batch runout until the end of the game with a relatively high Work machine efficiency. In addition, the lot change procedure according to the invention ensures that the Formation of residual coils, that is, of coils with their running time less than 1½ hours, is largely avoided. Such residual coils can be used in the method according to the invention at most occur when at a spinning position, the II. Wahl-Spulen manufactures which hard on the border to Minimum duration is, unexpected difficulties arise. The percentage of such residual coils is based on the Total number of I. and II. Election coils, usually less than 1%.

Die mit dem erfindungsgemäßen Partiewechselverfahren erzielbaren Vorteile werden noch erheblich größer, wenn anstelle eines relativ groben Garnes, mit beispielweise einer Garnnummer Nm 12, das, wie in den vorstehenden Ausführungsbeispielen beschrieben, eine Spulenlaufzeit von etwa 3,5 Std. aufweist, ein feines Garn, beispielsweise mit einer Garnnummer Nm 50, gesponnen wird.The with the lot change process according to the invention achievable benefits will be significantly greater if instead of a relatively coarse yarn, for example with one Yarn number Nm 12, which, as in the preceding Described embodiments, a coil runtime of about 3.5 hours has a fine yarn, for example with a Yarn number Nm 50, is spun.

Bei einem so feinen Garn ergeben sich Spulenlaufzeiten von ca. 15 Std. Da die Spulenlaufzeit bei den bekannten Verfahren mit der Partieauslaufzeit nahezu identisch ist, ist leicht nachvollziehbar, daß derartig lange Partieauslaufzeiten bei entsprechend verminderten Maschinenwirkungsgraden zu erheblichen Produktionseinbußen führen, die durch das erfindungsgemäße Partiewechselverfahren minimiert werden können.With such a fine yarn, the bobbin run times are approx. 15 hours. Since the coil run time with the known methods the game run-out time is almost identical is easy understandable that such long game run times at correspondingly reduced machine efficiency lead to significant production losses caused by the lot change process according to the invention are minimized can.

Claims (10)

1. Verfahren zur Optimierung eines Partiewechsels an einer Offenend-Spinnmaschine mit einer Vielzahl von Spinnstellen, auf denen Kreuzspulen erzeugt werden, wobei der Bewicklungszustand der in Produktion befindlichen Kreuzspulen abrufbar ist, dadurch gekennzeichnet,
daß das Partieende auf einen Zeitpunkt eingestellt wird, zu dem an höchstens 75% der Spinnstellen seit der Einleitung des Partiewechsels volle Kreuzspulen erzeugt worden sind,
daß vor der Einleitung der Beendigung der Partie für die Spulen ein mindestens zu erreichender Bewicklungszustand vorgegeben wird,
daß die noch erforderliche Zeit zum Erreichen des Mindestbewicklungszustandes der jeweils eingespannten Spulen ermittelt wird,
und daß die Spinnstellen stillgesetzt werden, deren Kreuzspulen den Mindestbewicklungszustand bis zum eingestellten Partieende nicht mehr erreichen können.
1. A method for optimizing a batch change on an open-end spinning machine with a multiplicity of spinning positions on which cross-wound bobbins are produced, the winding condition of the cross-wound bobbins in production being available, characterized in that
that the end of the batch is set at a point in time when full packages have been produced at a maximum of 75% of the spinning positions since the start of the batch change,
that at least a winding condition to be achieved is specified for the spools before the end of the game,
that the time still required to reach the minimum winding condition of the clamped coils is determined,
and that the spinning stations are shut down, the packages of which cannot reach the minimum winding condition until the end of the batch.
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß der Zeitpunkt des Partieendes willkürlich festgelegt wird.2. The method according to claim 1, characterized in that the time of the end of the game is arbitrarily determined becomes. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß der Zeitpunkt der Einleitung des Partieauslaufes, von dem an keine Kreuzspulen mehr gewechselt werden, so weit vor den Zeitpunkt des Partieendes gelegt wird, daß alle Kreuzspulen den Mindestbewicklungszustand erreichen können. 3. The method according to claim 1 or 2, characterized in that the timing of the initiation of the game run, from that no more packages are changed, so far before the end of the game that all Cross-wound bobbins reach the minimum winding condition can.   4. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß aus dem abrufbaren Bewicklungszustand der Kreuzspulen deren Fertigstellungszeitpunkte ermittelt werden und daß das Partieende so eingestellt wird, daß einerseits nach dessen Einleitung eine vorgebbare Mindestanzahl Vollspulen erreicht wird und andererseits unter Berücksichtigung der Schwankungen der Fertigstellungszeitpunkte eine Häufung von Fertigstellungszeitpunkten miterfaßt wird.4. The method according to claim 1, characterized in that from the available winding state of the packages whose completion times are determined and that the end of the game is set so that on the one hand after the introduction of which is a predefinable minimum number Full coils is reached and on the other hand under Taking into account the fluctuations of the Completion times a cluster of Completion times is included. 5. Verfahren nach Anspruch 4, dadurch gekennzeichnet, daß während der laufenden Partie aus einer zentralen Steuereinrichtung der Maschine die bereits gesponnene Garnmenge, die daraus bereits gewickelte Anzahl von Spulen und die zur Zeit in Produktion befindliche Anzahl von Spulen abrufbar sind und daß der Zeitpunkt der Einleitung des Partieauslaufes in Abhängigkeit von der insgesamt vorgegebenen Produktionsmenge der Partie bestimmt wird.5. The method according to claim 4, characterized in that during the current game from a central Control device of the machine the already spun Amount of yarn, the number of threads already wound from it Spools and the number currently in production of coils are available and that the time of Initiation of the game run depending on the total predetermined production volume of the lot is determined. 6. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß der Partieauslauf in Bezug auf die erreichbaren Bewicklungszustände der Spulen grafisch dargestellt wird.6. The method according to any one of claims 1 to 5, characterized characterized in that the game runout in relation to the achievable winding conditions of the coils graphically is pictured. 7. Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, daß nach Einleitung des Partieendes die Spulen nach den vorgegebenen Bewicklungszuständen geordnet nacheinander abgeräumt werden.7. The method according to any one of claims 1 to 6, characterized characterized in that after initiation of the end of the game Coils according to the given winding conditions be cleared one after the other. 8. Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß der Vorrat an Hülsen der alten Partie gegen Hülsen der neuen Partie ausgetauscht wird. 8. The method according to any one of claims 1 to 7, characterized characterized that the stock of pods of the old lot is exchanged for sleeves of the new lot.   9. Verfahren nach Anspruch 8, dadurch gekennzeichnet, daß die stillgesetzten Spinnstellen mit Hülsen der neuen Partie bestückt werden.9. The method according to claim 8, characterized in that the shutdown spinning positions with sleeves of the new ones Lot to be equipped. 10. Verfahren nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, daß an den stillgesetzten Spinnstellen die Kannen mit Faserband der auslaufenden Partie bereits gegen Kannen mit Faserband der neuen Partie ausgetauscht werden.10. The method according to any one of claims 1 to 9, characterized characterized in that at the shutdown spinning positions the cans with sliver of the end of the batch already exchanged for cans with sliver of the new batch become.
DE1997150430 1997-11-14 1997-11-14 Operation of an open-end spinner with spinning stations during batch spinning Withdrawn DE19750430A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1997150430 DE19750430A1 (en) 1997-11-14 1997-11-14 Operation of an open-end spinner with spinning stations during batch spinning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1997150430 DE19750430A1 (en) 1997-11-14 1997-11-14 Operation of an open-end spinner with spinning stations during batch spinning

Publications (1)

Publication Number Publication Date
DE19750430A1 true DE19750430A1 (en) 1999-08-19

Family

ID=7848698

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1997150430 Withdrawn DE19750430A1 (en) 1997-11-14 1997-11-14 Operation of an open-end spinner with spinning stations during batch spinning

Country Status (1)

Country Link
DE (1) DE19750430A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107879190A (en) * 2016-09-29 2018-04-06 里特捷克有限公司 For the method for monitoring yarn at the work station of weaving loom and the weaving loom for performing this method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107879190A (en) * 2016-09-29 2018-04-06 里特捷克有限公司 For the method for monitoring yarn at the work station of weaving loom and the weaving loom for performing this method
CN107879190B (en) * 2016-09-29 2021-09-10 里特捷克有限公司 Method for monitoring a yarn at a workstation of a textile machine and textile machine for carrying out the method

Similar Documents

Publication Publication Date Title
EP3802927B1 (en) Ring-spinning line and process thereof
EP0090911B1 (en) Method and apparatus to optimize a work occurrence at each working station of a textile machine
EP3231903B1 (en) Method for operating a textile machine and textile machine
DE3635576C2 (en) Process and system for changing roving bobbins
DE4306095A1 (en) Spinning and winding installation - has electronic data processing to enable first quality spun yarn to be wound with priority
WO2008095662A1 (en) Spinning mill system having at least two ring-spinning machines and at least one master/slave arrangement
CH694208A5 (en) A method for optimizing a batch change to an open-end spinning machine.
DE102015004305A1 (en) Method for operating a composite system comprising at least one ring spinning machine and at least one winding machine and a composite system
DE102015118987A1 (en) Method for operating a spinning machine with a fully automatic piecing device and spinning machine with a fully automatic piecing device
DE102007039049A1 (en) spinning plant
DE4212629A1 (en) Ring spinner and robot communication system for yarn break servicing - uses existing current and other supply lines with interfaces to connect robot microprocessor with the machine control
DE3030504C2 (en) Method and device for producing yarn bobbins with a given yarn length on rotor spinning machines
DE4017303C2 (en) Process for the production of packages with different yarn lengths
DE19750430A1 (en) Operation of an open-end spinner with spinning stations during batch spinning
EP1810944A1 (en) Device for transporting bobbins for spinning machines
EP0251268B1 (en) Device for spinning yarns
EP0569772B1 (en) Method and apparatus for making a given number of full cross-wound bobbins on a cross winding machine
DE102007038871A1 (en) Joining-on thread to spindle of open-ended spinning machines from mobile service unit controls acceleration as spun-on thread is pulled from spinning unit
DE19642222A1 (en) Ring spinner for a cladded yarn
EP0431268A1 (en) Installation or control for such an installation for transporting flyer bobbins to a ring spinning machine
WO1992015737A1 (en) Process and device for controlling a reticulated installation
DE4400601A1 (en) Systemic efficiency control
DE102009030677A1 (en) Method for operating a workstation and workstation of an open-end rotor spinning machine
EP0512442A1 (en) Planning and control of the production for a spinning installation
EP0290004A2 (en) System for making cross-wound packages with different lengths in meters

Legal Events

Date Code Title Description
8180 Miscellaneous part 1

Free format text: DIE PRIORITAET ""21.11.96 03 DE 196 48 215.1"" IST NACHZUTRAGEN

8127 New person/name/address of the applicant

Owner name: SAURER GMBH & CO. KG, 41069 MOENCHENGLADBACH, DE

8141 Disposal/no request for examination