DE19715576B4 - Machine for track position correction - Google Patents

Machine for track position correction Download PDF

Info

Publication number
DE19715576B4
DE19715576B4 DE1997115576 DE19715576A DE19715576B4 DE 19715576 B4 DE19715576 B4 DE 19715576B4 DE 1997115576 DE1997115576 DE 1997115576 DE 19715576 A DE19715576 A DE 19715576A DE 19715576 B4 DE19715576 B4 DE 19715576B4
Authority
DE
Germany
Prior art keywords
track
machine
height
machine according
drives
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE1997115576
Other languages
German (de)
Other versions
DE19715576A1 (en
Inventor
Josef Theurer
Günther Buchberger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Franz Plasser Bahnbaumaschinen Industrie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Franz Plasser Bahnbaumaschinen Industrie GmbH filed Critical Franz Plasser Bahnbaumaschinen Industrie GmbH
Publication of DE19715576A1 publication Critical patent/DE19715576A1/en
Application granted granted Critical
Publication of DE19715576B4 publication Critical patent/DE19715576B4/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B33/00Machines or devices for shifting tracks, with or without lifting, e.g. for aligning track, for shifting excavator track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/10Track-lifting or-lining devices or methods
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/14Way of locomotion or support
    • E01B2203/145Way of locomotion or support on the ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/14Way of locomotion or support
    • E01B2203/146Way of locomotion or support using other means than driven wheels as propulsion means

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Automatic Control Of Machine Tools (AREA)
  • Numerical Control (AREA)

Abstract

Maschine zur Gleislagekorrektur mit einem auf Fahrwerken (2) abgestützten, mit einem Bezugsystem (8) zur Ermittlung der Gleissoll-Lage ausgestatteten Maschinenrahmen (3), dem ein zwischen den Fahrwerken (2) positioniertes und durch Antriebe (13) höhen- und seitenverstellbares erstes Gleishebeaggregat (14) zugeordnet ist, wobei in Arbeitsrichtung vor dem ersten Gleishebeaggregat (14) ein weiteres, durch Antriebe (19) höhenverstellbares zweites Gleishebeaggregat (18) vorgesehen ist, dadurch gekennzeichnet,
dass die Fahrwerke (2) für eine schienenungebundene Verfahrbarkeit jeweils in Form zweier in Maschinenquerrichtung voneinander distanzierter Raupenfahrwerke (33) ausgebildet sind, wobei jedem Raupenfahrwerk (33) eine um eine vertikale Achse (34) drehbare Führungsrolle (35) mit einer in einer horizontalen Ebene befindlichen, kreisförmigen Abrollinie (36) zugeordnet ist, die unterhalb einer durch Aufstandspunkte (23) der Raupenfahrwerke (33) gebildeten Aufstandsebene (24) angeordnet ist, und
dass der in Maschinenquerrichtung verlaufende Abstand der beiden vertikalen Achsen (34) zueinander der maximalen, um den Durchmesser einer Führungsrolle (35) vergrößerten Breite eines parallel zueinander verlaufende Seitenwände...
Machine for track position correction with a on chassis (2) supported, equipped with a reference system (8) for determining the track target position machine frame (3), one between the chassis (2) positioned and by drives (13) height and page adjustable first Track lifting unit (14) is assigned, wherein in the working direction in front of the first track lifting unit (14) further, by drives (19) height adjustable second track lifting unit (18) is provided, characterized
in that the running gears (2) are each designed in the form of two crawler tracks (33) which are spaced apart in cross machine direction, wherein each crawler track (33) has a guide roller (35) rotatable about a vertical axis (34) with one in a horizontal plane associated circular Abrollinie (36) is assigned, which is arranged below a by Aufdrehspunkte (23) of the crawler tracks (33) formed Aufstandsebene (24), and
that extending in the cross-machine direction distance of the two vertical axes (34) to each other the maximum, to the diameter of a guide roller (35) increased width of a parallel side walls ...

Figure 00000001
Figure 00000001

Description

Die Erfindung betrifft eine Maschine zur Gleislagekorrektur nach dem Oberbegriff des Anspruches 1.The The invention relates to a machine for track position correction after Preamble of claim 1.

Aus der DE 3838105 A1 ist eine derartige Maschine bekannt, die zum Verkleben eines aus Stahlschwellen und Schienen gebildeten Gleisrostes auf einem betonierten Gleisunterbau ausgebildet ist. Hierzu weist sie zwischen den Fahrwerken zwei höhenverstellbare Gleishebeaggregate auf.From the DE 3838105 A1 Such a machine is known, which is designed for bonding a track formed from steel sleepers and rails on a concrete track substructure. For this purpose, it has between the chassis two height-adjustable track lifting units.

Durch die EP 0 379 148 B1 ist ein Verfahren zur Herstellung eines schotterlosen Gleisoberbaus bekannt, wobei das Gleis in einem hochgezogene, parallel zueinander und in Gleislängsrichtung verlaufende Beton-Randbalken aufweisenden Betontrog positioniert ist. Diese Randbalken werden derart ausgebildet, dass diese nach ihrem Aushärten durch sich auf beiden Randbalken abstützende Gleisbaumaschinen belastbar sind. Des Weiteren ist eine Vorrichtung beschrieben, mit der das Gleis zum Zwecke des Eingießens von der Betonplatte distanzierbar ist. Diese Vorrichtung wird mit Hilfe von Schienenfahrwerken am Gleis verfahren und stützt sich während der Gleisanhebung über Abstützbalken auf den beiden Randbalken ab. Nachfolgend wird mit Hilfe einer durch Raupenfahrwerke auf den Randbalken verfahrbaren Maschine Beton in die Schwellenfächer eingebracht.By the EP 0 379 148 B1 a method for producing a ballastless track superstructure is known, wherein the track is positioned in a raised, parallel to each other and running in the longitudinal direction of the track concrete edge beam having concrete trough. These edge beams are designed in such a way that they can be loaded after their hardening by track-laying machines supported on both edge beams. Furthermore, a device is described, with which the track for the purpose of pouring from the concrete slab is distant. This device is moved by means of rail bogies on the track and is supported during the track lift on Abstützbalken on the two edge beams. Subsequently, concrete is introduced into the threshold compartments with the aid of a machine that can be moved on the edge beam by crawlers.

Durch die AT 390 288 B ist eine Maschine zur Gleislagekorrektur in Verbindung mit der Herstellung einer festen Fahrbahn bekannt. Diese Maschine ist über Schienenfahrwerke auf einem unmittelbar zuvor durch eine Gleisverlegemaschine auf ein Betonfundament abgelegten Gleis verfahrbar. Das Gleishebeaggregat befindet sich mittig zwischen den beiden Schienenfahrwerken und dient zum Anheben des Gleises in die Soll-Lage. Unmittelbar hinter dem Gleishebeaggregat ist ein auf den Schienen des Gleises abrollbares Schraubaggregat vorgesehen, mit dem in den Schwellen verankerte Schraubspindeln so lange verdreht werden, bis durch Auflage der vertikalen Schraubspindeln am Betonfundament die Schwellen in der Soll-Lage fixiert sind. In einem weiteren Arbeitsdurchgang wird abschließend auf die in der Soll-Lage befindlichen Schwellen Beton gegossen. Zuvor muß allerdings die Maschine mit ihrem hinteren Fahrwerk noch auf dem bereits korrigierten Gleisabschnitt verfahren werden.By the AT 390 288 B is a machine for track position correction in connection with the production of a fixed carriageway known. This machine can be moved on track carriages on a track laid on a concrete foundation immediately before by a track laying machine. The track lifting unit is located in the middle between the two rail bogies and serves to raise the track to the desired position. Immediately behind the track lifting unit a screwable on the rails of the track screwing is provided with the anchored in the thresholds screw spindles are rotated until the thresholds are fixed in the desired position by supporting the vertical screw spindles on the concrete foundation. In a further pass, concrete is finally poured onto the sleepers located in the desired position. Before that, however, the machine with its rear landing gear still has to be moved on the already corrected track section.

Die GB 2 257 189 B beschreibt eine weitere Maschine zur Lagekorrektur eines auf einer festen Tragschichte aufliegenden Gleises. Die Maschine ist mit drei in Maschinenlängsrichtung hintereinander angeordneten Radsatzabstützungen ausgestattet. Während der Überstellfahrt befinden sich die beiden Schienenfahrwerke in der vorderen bzw. hinteren Radsatzabstützung. Im Arbeitseinsatz wird das hintere Fahrwerk in der mittleren Radsatzabstützung befestigt. Damit ist das Gleis mit Hilfe eines im hinteren Endbereich der Maschine positionierten Gleishebeaggregates ungehindert in die Sollposition anhebbar und durch Schraubspindeln in dieser Lage fixierbar. Mit dieser speziellen Ausführung ist eine Abstützung der Maschine auf dem bereits in der Soll-Lage eingerichteten Gleis vermeidbar.The GB 2 257 189 B describes another machine for position correction of resting on a solid support track track. The machine is equipped with three wheelset supports arranged one behind the other in the machine longitudinal direction. During the transfer travel, the two rail carriages are located in the front and rear wheelset support. During work, the rear landing gear is fixed in the middle wheel set support. Thus, the track with the help of a positioned in the rear end of the machine track lifting unit unhindered in the target position can be raised and fixed by screw spindles in this position. With this special design, a support of the machine on the already established in the desired position track is avoidable.

Die Aufgabe der vorliegenden Erfindung liegt nun in der Schaffung einer Maschine der gattungsgemäßen Art, mit der das Gleis zur Herstellung einer festen Fahrbahn unter Vermeidung störender Beeinträchtigungen in eine genaue Soll-Lage versetzbar ist.The Object of the present invention is now in the creation of a Machine of the generic type, avoiding the track for making a solid roadway disturbing impairments is displaceable in an exact desired position.

Diese Aufgabe wird erfindungsgemäß durch die Merkmale im Kennzeichnungsteil des Anspruches 1 gelöst. Mit der erfindungsgemäßen Merkmals kombination ist das Gleis unabhängig von der Position der Fahrwerke bzw. deren Abstand zueinander stufenweise in die Soll-Lage anhebbar. Damit kann die Bildung von aus der Gleisanhebung resultierenden Spannungen im bereits in der Soll-Lage befindlichen Gleisabschnitt zuverlässig vermieden werden. Außerdem sind dadurch auch im Bereich des ersten Gleishebeaggregates eingesetzte Hilfsmittel zur Lagefixierung des Gleises, beispielsweise Schraubspindeln, entlastbar. Zusätzlich ist durch die erfindungsgemäße Ausbildung auch noch der Vorteil erzielbar, dass das Gleis weder vor noch nach der Überstellung in die Soll-Lage durch das Maschinengewicht belastet werden muß. Damit ist die Möglichkeit einer Beeinträchtigung der Gleislagegenauigkeit im bereits korrigierten Gleisabschnitt zuverlässig ausgeschlossen. Weiterhin ist eine automatische Ausrichtung der Raupenfahrwerke in Längsrichtung des Betontrograndes sowie auch eine Zentrierung auf diesem bezüglich der Maschinenquerrichtung sichergestellt.These The object is achieved by the Characteristics solved in the characterizing part of claim 1. With the feature combination of the invention the track is independent from the position of the chassis or their distance from one another gradually Liftable in the desired position. Thus, the formation of out of the track lift resulting stresses already in the desired position Track section reliable be avoided. Furthermore are thus also used in the area of the first track lifting unit Aid for fixing the position of the track, for example screw spindles, relieved. additionally is due to the inventive design Even the advantage can be achieved that the track neither before nor after the rendition must be loaded in the desired position by the weight of the machine. In order to is the possibility an impairment the track position accuracy in the already corrected track section reliably excluded. Furthermore, an automatic alignment of the crawler tracks in the longitudinal direction of Betontrograndes as well as a centering on this respect to the Machine transverse direction ensured.

Weitere vorteilhafte Ausgestaltungen der Erfindung ergeben sich aus den Unteransprüchen.Further advantageous embodiments of the invention will become apparent from the Dependent claims.

Im folgenden wird die Erfindung anhand eines in der Zeichnung dargestellten Ausführungsbeispieles näher beschrieben.in the The following is the invention with reference to an illustrated in the drawing embodiment described in more detail.

Es zeigen:It demonstrate:

1 eine Seitenansicht einer Maschine zur Lagekorrektur eines Gleises für eine Feste Fahrbahn, und 1 a side view of a machine for correcting the position of a track for a slab, and

2 eine vereinfachte Ansicht der Maschine gemäß Pfeil II. 2 a simplified view of the machine according to arrow II.

Eine in 1 und 2 dargestellte Maschine 1 weist einen auf Fahrwerken 2 abgestützten Maschinenrahmen 3 auf, dem ein Motor 4 zur Beaufschlagung eines Fahrantriebes 5 und aller weiteren Antriebe zugeordnet ist. Mittig zwischen den beiden Fahrwerken 2 und am bezüglich einer Arbeitsrichtung (Pfeil 6) vorderen Maschinenende befindet sich je eine Bediener- bzw. Fahrkabine 7. Ein Bezugsystem 8 für die Gleislagekorrektur setzt sich im wesentlichen aus in Maschinenlängsrichtung verlaufenden, gespannten Sehnen 9 sowie drei in Maschinenlängsrichtung voneinander distanzierten, auf Schienen 10 eines Gleises 11 abrollbaren Meßachsen 12 zusammen.An in 1 and 2 illustrated machine 1 has one on chassis 2 supported machine frame 3 on which an engine 4 for acting on a traction drive 5 and all other drives is assigned. Midway between the two suspensions 2 and am with respect to a working direction (arrow 6 ) Front end of the machine is ever an operator or driving cab 7 , A reference system 8th for the track position correction consists essentially of running in the machine direction, stretched tendons 9 and three spaced apart in the machine longitudinal direction, on rails 10 a track 11 unwindable measuring axes 12 together.

Zwischen den beiden Fahrwerken 2 befindet sich ein durch Antriebe 13 höhen- und seitenverstellbares erstes Gleishebeaggregat 14. Diesem sind Heberollen 15 sowie ein Hebehaken 16 zur formschlüssigen Anlage an die Schienen 10 und Spurkranzrollen 17 zum Abrollen am Gleis 11 zugeordnet.Between the two chassis 2 is located by drives 13 height and side adjustable first track lift unit 14 , These are lifting rollers 15 and a lifting hook 16 for positive engagement with the rails 10 and flange wheels 17 for unrolling on the track 11 assigned.

Am vorderen Maschinenende, unmittelbar vor dem vorderen Fahrwerk 2, befindet sich ein zweites Gleishebeaggregat 18, das durch Antriebe 19 sowie durch eine Anlenkstange 50 mit dem Maschinenrahmen 3 verbunden ist. Dem zweiten Gleishebeaggregat 18 sind, wie insbesondere in 2 ersichtlich, zwei in Maschinenquerrichtung voneinander distanzierte, jeweils um eine vertikale Achse 20 drehbare Seitenführungsrollen 21 zugeordnet. Diese weisen eine kreisförmige, in einer senkrecht zur Achse 20 verlaufenden Ebene befindliche Abrollinie 22 auf, die in vertikaler Richtung unterhalb einer durch Aufstandspunkte 23 der Fahrwerke 2 gebildeten Aufstandsebene 24 angeordnet ist. Zwischen den beiden in Maschinenquerrichtung voneinander distanziert angeordneten Seitenführungsrollen 21 befinden sich zwei um eine in Maschinenquerrichtung und horizontal verlaufende Achse 25 drehbare Höhenführungsrollen 26. Der in Maschinenquerrichtung verlaufende Abstand der beiden Höhenführungsrollen 26 zueinander entspricht dem Abstand A zweier in Gleislängsrichtung und parallel zueinander verlaufender Seitenwände 27 eines Betontroges 28. Zwischen den beiden Höhenführungsrollen 26 sind Gleishebeeinrichtungen 29 zum Erfassen der Schienen 10 dem zweiten Gleishebeaggregat 18 zugeordnet. Der Betontrog 28 ruht auf einem Betonfundament 30 und bildet gemeinsam mit dem aus Schienen 10 und Schwellen 31 gebildeten Gleis 11 eine Feste Fahrbahn 32.At the front of the machine, just in front of the front landing gear 2 , there is a second track lift unit 18 that by drives 19 as well as by a connecting rod 50 with the machine frame 3 connected is. The second track lift unit 18 are, in particular in 2 can be seen, two spaced apart in the cross-machine direction, each about a vertical axis 20 rotatable side guide rollers 21 assigned. These have a circular, in a direction perpendicular to the axis 20 running level rolling line 22 on, in the vertical direction below one through Aufbrechspunkte 23 the landing gear 2 formed rebellion level 24 is arranged. Between the two in the cross-machine direction spaced from each other arranged side guide rollers 21 two are one in the cross-machine direction and horizontal axis 25 rotatable height guide rollers 26 , The cross-machine direction distance between the two height guide rollers 26 to one another corresponds to the distance A of two in the track longitudinal direction and parallel to each other side walls 27 a concrete trough 28 , Between the two height guide rollers 26 are track lifting devices 29 for detecting the rails 10 the second track lift unit 18 assigned. The concrete trough 28 resting on a concrete foundation 30 and forms together with the rail 10 and sleepers 31 formed track 11 a solid lane 32 ,

Jedes Fahrwerk 2 besteht aus zwei in Maschinenquerrichtung voneinander distanzierten, durch den Fahrantrieb 5 beaufschlagbaren Raupenfahrwerken 33. Jedem dieser um eine vertikale Achse drehbaren Raupenfahrwerke 33 ist eine um eine vertikale Achse 34 drehbare Führungsrolle 35 zugeordnet. Diese Führungsrollen 35 weisen ebenso wie die Seitenführungsrollen 21 in einer horizontalen Ebene befindliche, kreisförmige Abrollinie 36 auf, die unterhalb der durch die Aufstandspunkte 23 gebildeten Aufstandsebene 24 angeordnet sind. Wie insbesondere in 2 ersichtlich, entspricht der in Maschinenquerrichtung verlaufende Abstand der beiden Achsen 34 zueinander der maximalen, um den Durchmesser einer Führungsrolle 35 vergrößerten Breite des Betontroges 28.Every suspension 2 consists of two spaced apart in the cross machine direction, by the drive 5 loadable crawler tracks 33 , Each of these about a vertical axis rotatable crawler tracks 33 is one around a vertical axis 34 rotatable guide roller 35 assigned. These leadership roles 35 have as well as the side guide rollers 21 in a horizontal plane located, circular rolling line 36 on top of that by the riot points 23 formed rebellion level 24 are arranged. As in particular in 2 can be seen, corresponds to the running in the cross machine direction distance of the two axes 34 each other the maximum, to the diameter of a leadership role 35 enlarged width of the concrete trough 28 ,

Zwischen dem ersten Gleishebeaggregat 14 und dem in Arbeitsrichtung nachfolgenden Fahrwerk 2 ist ein durch Antriebe 37 höhenverstellbar am Maschinenrahmen 3 angelenktes Schraubaggregat 38 mit durch Antriebe 39 drehbaren und höhenverstellbaren Schraubköpfen 40 vorgesehen. Mit diesen sind im Schwellenkopfbereich einer Schwelle 31 angeordnete Stellschrauben 41 (2) verdrehbar bzw. in vertikaler Richtung verstellbar.Between the first track lift unit 14 and the following in the direction of travel chassis 2 is one by drives 37 height adjustable on the machine frame 3 articulated screw unit 38 with by drives 39 rotatable and height-adjustable screw heads 40 intended. These are in the threshold head area of a threshold 31 arranged set screws 41 ( 2 ) rotatable or adjustable in the vertical direction.

Im Bereich des Schraubaggregates 38 befinden sich durch Ventile 42 fernsteuerbare Auslaßöffnungen 43 von mit dem Maschinenrahmen 3 verbundenen Rohrleitungen 44. Diese sind mit einer Pumpe 45 und einem Tankbehälter 51 verbunden, der auf einem an die Maschine 1 angekuppelten, ebenfalls auf Raupenfahrwerken 33 verfahrbaren Waggon 46 angeordnet ist.In the area of the screwing unit 38 are located through valves 42 remote controllable outlet openings 43 from with the machine frame 3 connected pipelines 44 , These are with a pump 45 and a tank container 51 connected to the machine 1 coupled, also on crawler tracks 33 moveable wagon 46 is arranged.

Die bezüglich der Arbeitsrichtung hinterste Meßachse 12 des Bezugsystems 8 ist durch Spurkranzrollen 47 am Gleis abrollbar und durch einen Antrieb 48 zur Aufbringung einer vertikalen Kraft auf das Gleis 11 auch als Fixiereinrichtung 49 einsetzbar.The rearmost measuring axis with respect to the working direction 12 of the reference system 8th is by wheel flange rollers 47 unrollable on the track and by a drive 48 for applying a vertical force to the track 11 also as a fixing device 49 used.

Die Maschine 1 stützt sich im Arbeitseinsatz ausschließlich über die Raupenfahrwerke 33 auf den beiden Seitenwänden 27 des Betontroges 28 ab und wird unter Beaufschlagung des Fahrantriebes 5 von Schwelle zu Schwelle verfahren. Dabei sind die Schienen 10 des Gleises 11 durch die Gleishebeeinrichtungen 29 des zweiten Gleishebeaggregates 18 erfaßt und werden unter Auflage der Höhenführungsrollen 26 auf den beiden Seitenwänden 27 automatisch um ein bestimmtes Mindestmaß mitsamt den Schwellen 31 von der Bodenfläche des Betontroges 28 abgehoben. Dabei erfolgt gleichzeitig durch die beiden Seitenführungsrollen 21 automatisch eine Zentrierung des Gleises 11 in bezug auf die Mitte des Betontroges 28. Die Antriebe 19 sind während des Arbeitseinsatzes nicht beaufschlagt.The machine 1 is based in the work exclusively on the crawler tracks 33 on the two side walls 27 of the concrete trough 28 off and is under the action of the traction drive 5 from threshold to threshold. Here are the rails 10 of the track 11 through the track lifting devices 29 of the second track lifting unit 18 are detected and are under rest of the height guide rollers 26 on the two side walls 27 automatically by a certain minimum, including the thresholds 31 from the bottom surface of the concrete trough 28 lifted. It is done simultaneously by the two side guide rollers 21 automatically centering the track 11 with respect to the center of the concrete trough 28 , The drives 19 are not charged during the work assignment.

Parallel dazu erfolgt durch das erste Gleishebeaggregat 14 ein weiteres Anheben des Gleises 11 in die mit Hilfe des Bezugsystems 8 bestimmte Soll- Lage, wobei gegebenenfalls auch gleichzeitig eine Korrektur bezüglich der Seitenlage erfolgt. Das nunmehr in der Soll-Lage befindliche Gleis 11 wird in dieser Position fixiert, indem die Schraubköpfe 40 des Schraubaggregates 38 auf die Stellschrauben 41 abgesenkt und diese so lange verdreht werden, bis sie auf einer Bodenfläche 52 des Betontroges 28 aufliegen. Gleichzeitig kann auch mit weiteren (nicht näher dargestellten) Stellschrauben die Fixierung des Gleises 11 bezüglich der Seitenlage durchgeführt werden. Synchron zum Anheben des Gleises 11 durch das erste Gleishebeaggregat 14 erfolgt eine Beaufschlagung der in vertikaler Richtung nach unten wirksamen Antriebe 48, um dadurch die Spurkranzrollen 47 der Fixiereinrichtung 49 mit einer vorgewählten Kraft auf die Schienen 10 anzupressen. Damit wird zuverlässig ausgeschlossen, daß mit der Anhebung des Gleises 11 durch das erste Gleishebeaggregat 14 der unmittelbar nachfolgende, bereits in der Soll-Lage befindliche Gleisabschnitt in seiner Lage beeinflußt wird.Parallel to this is done by the first track lift unit 14 another lifting of the track 11 in the with the help of the reference system 8th certain desired position, which optionally also takes place at the same time a correction with respect to the lateral position. The now in the desired position track 11 is in fixed this position by the screw heads 40 of the screwing unit 38 on the screws 41 lowered and these are twisted until they are on a floor surface 52 of the concrete trough 28 rest. At the same time can also with other (not shown) screws the fixation of the track 11 regarding the lateral position. Synchronous to lifting the track 11 through the first track lift unit 14 the actuation of the vertically effective downwards drives takes place 48 to thereby the flange wheels 47 the fixing device 49 with a preselected force on the rails 10 to press. This reliably ruled out that with the raising of the track 11 through the first track lift unit 14 the immediately following, already in the desired position located track section is affected in its position.

Parallel zur Betätigung der Stellschrauben 41 kann wahlweise unter entsprechender Beaufschlagung des Ventiles 42 eine schnell aushärtende plastische Masse in den Zwischenraum zwischen Schwellenkopf und Seitenwand 27 bzw. Bodenfläche 52 des Betontroges 28 und Schwelle 31 eingebracht werden. Dabei ist es zweckmäßig, diese Masse vorerst nur in geringer Menge und lediglich im Bereich jeder zweiten oder dritten Schwelle 31 einzubringen, um gegebenenfalls eine nach einem Nachmeßvorgang als notwendig erachtete Gleislagekorrektur noch durchführen zu können. In einem weiteren Arbeitsvorgang erfolgt schließlich durch Einbringen von Beton die dauerhafte Verbindung des Gleises 11 mit dem Betontrog 28.Parallel to the actuation of the set screws 41 can optionally with appropriate loading of the valve 42 a fast-curing plastic mass in the space between the threshold head and side wall 27 or floor area 52 of the concrete trough 28 and threshold 31 be introduced. It is expedient, this mass initially only in small quantities and only in the range of every second or third threshold 31 to bring in, if necessary after a Nachmeßvorgang deemed necessary track position correction still perform. In a further operation, finally, by introducing concrete, the permanent connection of the track 11 with the concrete trough 28 ,

Bei einem alternativen Einsatz der Maschine 1 besteht auch die Möglichkeit, das Schraubaggregat 38 nicht zu gebrauchen, keine Stellschrauben 41 zu verwenden und die Fixierung des Gleises 11 nach Überstellung in die Soll-Lage durch das erste Gleishebeaggregat 14 ausschließlich durch Einbringen der schnell aushärtenden Masse über die Rohrleitungen 44 durchzuführen. Es besteht auch die Möglichkeit, die Fahrwerke 2 unter größerer Distanzierung voneinander in Maschinenquerrichtung auf dem Betonfundament 30 zu verfahren.In an alternative use of the machine 1 there is also the possibility of the screwing 38 not to use, no adjustment screws 41 to use and fixing the track 11 after transfer to the desired position by the first track lift unit 14 exclusively by introducing the fast-curing compound over the pipelines 44 perform. There is also the possibility of the landing gear 2 with greater distance from each other in the cross machine direction on the concrete foundation 30 to proceed.

Claims (9)

Maschine zur Gleislagekorrektur mit einem auf Fahrwerken (2) abgestützten, mit einem Bezugsystem (8) zur Ermittlung der Gleissoll-Lage ausgestatteten Maschinenrahmen (3), dem ein zwischen den Fahrwerken (2) positioniertes und durch Antriebe (13) höhen- und seitenverstellbares erstes Gleishebeaggregat (14) zugeordnet ist, wobei in Arbeitsrichtung vor dem ersten Gleishebeaggregat (14) ein weiteres, durch Antriebe (19) höhenverstellbares zweites Gleishebeaggregat (18) vorgesehen ist, dadurch gekennzeichnet, dass die Fahrwerke (2) für eine schienenungebundene Verfahrbarkeit jeweils in Form zweier in Maschinenquerrichtung voneinander distanzierter Raupenfahrwerke (33) ausgebildet sind, wobei jedem Raupenfahrwerk (33) eine um eine vertikale Achse (34) drehbare Führungsrolle (35) mit einer in einer horizontalen Ebene befindlichen, kreisförmigen Abrollinie (36) zugeordnet ist, die unterhalb einer durch Aufstandspunkte (23) der Raupenfahrwerke (33) gebildeten Aufstandsebene (24) angeordnet ist, und dass der in Maschinenquerrichtung verlaufende Abstand der beiden vertikalen Achsen (34) zueinander der maximalen, um den Durchmesser einer Führungsrolle (35) vergrößerten Breite eines parallel zueinander verlaufende Seitenwände (27) aufweisenden, die Basis für eine feste Fahrbahn (32) bildenden Betontroges (28) entspricht, in dem zwischen den Seitenwänden (27) das aus Schwellen (31) und Schienen (10) gebildete Gleis (11) positioniert ist.Machine for track position correction with one on chassis ( 2 ), with a reference system ( 8th ) to determine the track set position of machine frames ( 3 ), one between the landing gears ( 2 ) and by drives ( 13 ) height and side adjustable first track lift unit ( 14 ), wherein in the working direction in front of the first track lifting unit ( 14 ) another, by drives ( 19 ) height adjustable second track lift unit ( 18 ), characterized in that the chassis ( 2 ) for a track-free mobility in each case in the form of two in the cross-machine direction spaced apart crawler tracks ( 33 ) are formed, each crawler ( 33 ) one about a vertical axis ( 34 ) rotatable guide roller ( 35 ) with a circular rolling line located in a horizontal plane ( 36 ), which is below one of Aufbrechspunkte ( 23 ) of the crawler tracks ( 33 ) formed uprising level ( 24 ) is arranged, and that the running in the cross machine direction distance of the two vertical axes ( 34 ) the maximum to the diameter of a guide roller ( 35 ) enlarged width of a parallel side walls ( 27 ), the basis for a fixed carriageway ( 32 ) forming concrete trough ( 28 ), in which between the side walls ( 27 ) that consists of thresholds ( 31 ) and rails ( 10 ) formed track ( 11 ) is positioned. Maschine nach Anspruch 1, dadurch gekennzeichnet, dass dem in Arbeitsrichtung vorderen Gleishebeeinrichtungen (29) zum Erfassen der Schienen (10) aufweisenden zweiten Gleishebe aggregat (18) zwei in Maschinenquerrichtung voneinander distanzierte, jeweils um eine vertikale Achse (20) drehbare Seitenführungsrollen (21) und zwischen diesen zwei um eine in Maschinenquerrichtung und horizontal verlaufende Achse (25) drehbare Höhenführungsrollen (26) zugeordnet sind.Machine according to Claim 1, characterized in that the track lifting devices ( 29 ) for detecting the rails ( 10 ) having second track lifting unit ( 18 ) two spaced apart in the cross-machine direction, each about a vertical axis ( 20 ) rotatable side guide rollers ( 21 ) and between these two about a in the cross machine direction and horizontally extending axis ( 25 ) rotatable height guide rollers ( 26 ) assigned. Maschine nach Anspruch 2, dadurch gekennzeichnet, dass eine kreisförmige, in einer senkrecht zur Achse (20) verlaufenden Ebene befindliche Abrollinie (22) der Seitenführungsrolle (21) in vertikaler Richtung unterhalb einer durch Aufstandspunkte (23) der Fahrwerke (2) gebildeten Aufstandsebene (24) angeordnet ist.Machine according to claim 2, characterized in that a circular, in a direction perpendicular to the axis ( 20 ) extending level line ( 22 ) of the side guide roller ( 21 ) in the vertical direction below one through Aufbrechspunkte ( 23 ) of the trolleys ( 2 ) formed uprising level ( 24 ) is arranged. Maschine nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass zwischen dem ersten Gleishebeaggregat (14) und dem in Arbeitsrichtung nachfolgenden Fahrwerk (2) ein durch Antriebe (37) höhenverstellbar am Maschinenrahmen (3) angelenktes Schraubaggregat (38) mit durch Antriebe (39) drehbaren und höhenverstellbaren Schraubköpfen (40) vorgesehen ist.Machine according to one of claims 1 to 3, characterized in that between the first track lifting unit ( 14 ) and the following in working direction landing gear ( 2 ) by drives ( 37 ) height adjustable on the machine frame ( 3 ) hinged screwing unit ( 38 ) with drives ( 39 ) rotatable and height-adjustable screw heads ( 40 ) is provided. Maschine nach einem der Ansprüche 1 bis 4, gekennzeichnet durch mit dem Maschinenrahmen (3) verbundene Rohrleitungen (44) mit durch Ventile (42) ferngesteuert schließbaren Auslaßöffnungen (43) für einen Auslaß einer plastischen, schnell härtenden Fixiermasse.Machine according to one of claims 1 to 4, characterized by the machine frame ( 3 ) connected pipelines ( 44 ) with valves ( 42 ) remotely controllable outlet openings ( 43 ) for an outlet of a plastic, fast-curing fixative. Maschine nach Anspruch 5, gekennzeichnet durch einen mit den Rohrleitungen (44) verbundenen Tankbehälter (51), der vorzugsweise auf einem an die Maschine (1) angekuppelten, auf Raupenfahrwerken (33) verfahrbaren Waggon (46) angeordnet ist.Machine according to claim 5, characterized by a pipe ( 44 ) connected tank container ( 51 ), preferably on one side of the machine ( 1 ), on caterpillars ( 33 ) moveable wagon ( 46 ) arranged is. Maschine nach einem der Ansprüche 1 bis 6, gekennzeichnet durch eine am bezüglich der Arbeitsrichtung hinteren Maschinenende angeordnete, durch einen Antrieb (48) höhenverstellbare und durch Spurkranzrollen (47) am Gleis (11) abrollbare Fixiereinrichtung (49).Machine according to one of claims 1 to 6, characterized by a rear with respect to the working direction end of the machine, by a drive ( 48 ) height-adjustable and by wheel flange rollers ( 47 ) on the track ( 11 ) unrollable fixing device ( 49 ). Maschine nach Anspruch 7, dadurch gekennzeichnet, dass die Fixiereinrichtung (49) zusätzlich als hinterste Meßachse (12) von insgesamt drei in Maschinenlängsrichtung voneinander distanzierten Meßachsen (12) des Bezugsystems (8) ausgebildet ist.Machine according to claim 7, characterized in that the fixing device ( 49 ) additionally as the rearmost measuring axis ( 12 ) of a total of three in the machine longitudinal direction spaced measuring axes ( 12 ) of the reference system ( 8th ) is trained. Maschine nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass das zweite Gleishebeaggregat (18) in Arbeitsrichtung vor dem vorderen Fahrwerk (2) angeordnet ist.Machine according to one of claims 1 to 8, characterized in that the second track lifting unit ( 18 ) in the working direction in front of the front chassis ( 2 ) is arranged.
DE1997115576 1996-04-30 1997-04-15 Machine for track position correction Expired - Fee Related DE19715576B4 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AT774/96 1996-04-30
AT77496A AT406968B (en) 1996-04-30 1996-04-30 MACHINE FOR TRACKING CORRECTION

Publications (2)

Publication Number Publication Date
DE19715576A1 DE19715576A1 (en) 1997-11-06
DE19715576B4 true DE19715576B4 (en) 2007-04-26

Family

ID=3499406

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1997115576 Expired - Fee Related DE19715576B4 (en) 1996-04-30 1997-04-15 Machine for track position correction

Country Status (7)

Country Link
JP (1) JP3828985B2 (en)
AT (1) AT406968B (en)
CH (1) CH691817A5 (en)
DE (1) DE19715576B4 (en)
FR (1) FR2748039B1 (en)
GB (1) GB2312703B (en)
IT (1) IT1291533B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ATE216447T1 (en) 1997-08-01 2002-05-15 Bahnbau Wels Gmbh METHOD FOR PRODUCING A SOLID ROADWAY FOR RAIL VEHICLES AND DEVICE FOR ADJUSTING THE HEIGHT AND TEMPORARY SUPPORTING THE RAILS
DE19733500A1 (en) * 1997-08-01 1999-02-18 Bahnbau Wels Gmbh Body for supporting rails of fixed railway track on track sub-structure
ES2364635B8 (en) * 2011-03-24 2015-01-08 Tecsa Empresa Constructora, S.A AUTOMATIC LEVELING AND ALIGNMENT MACHINE OF RAILWAY IN PLATE, PRIOR TO CONCRETE.

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3838105A1 (en) * 1988-02-12 1989-08-24 Plasser Bahnbaumasch Franz Facility for adhesively bonding a track skeleton formed from sleepers and rails on a concrete track substructure
AT390288B (en) * 1987-10-01 1990-04-10 Plasser Bahnbaumasch Franz DEVICE AND METHOD FOR CORRECTING THE POSITION OF A TRACK STRUCTURE POSSIBLE ON A LENGTH CONCRETE TAPE
EP0379148B1 (en) * 1989-01-18 1994-03-23 Heilit & Woerner Bau-AG Method of and device for constructing a ballastless superstructure
DE4328668C1 (en) * 1993-08-26 1994-10-06 Zueblin Ag Method and apparatus for the continuous production of a ballastless track superstructure (permanent way)
GB2257189B (en) * 1991-06-17 1995-01-25 Plasser Bahnbaumasch Franz A method and a machine for correcting the position of a track resting on a support bed
DE4324301A1 (en) * 1993-07-20 1995-01-26 Heilit & Woerner Bau Ag Arrangement and method for producing a ballastless track superstructure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT369069B (en) * 1980-09-04 1982-12-10 Plasser Bahnbaumasch Franz MOBILE TRACK LEVEL LEVELING MACHINE
ES2029081T3 (en) * 1988-05-18 1992-07-16 Franz Plasser Bahnbaumaschinen- Industriegesellschaft M.B.H. MACHINE FOR THE LATERAL DISPLACEMENT OF A ROAD CONSTITUTED BY RAILS AND CROSSROADS.
FI94447C (en) * 1993-05-07 1995-09-11 Desec Instmsto Lifting device for handling a rail element
DE4324329A1 (en) * 1993-07-20 1995-01-26 Heilit & Woerner Bau Ag Track section-adjusting apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT390288B (en) * 1987-10-01 1990-04-10 Plasser Bahnbaumasch Franz DEVICE AND METHOD FOR CORRECTING THE POSITION OF A TRACK STRUCTURE POSSIBLE ON A LENGTH CONCRETE TAPE
DE3838105A1 (en) * 1988-02-12 1989-08-24 Plasser Bahnbaumasch Franz Facility for adhesively bonding a track skeleton formed from sleepers and rails on a concrete track substructure
EP0379148B1 (en) * 1989-01-18 1994-03-23 Heilit & Woerner Bau-AG Method of and device for constructing a ballastless superstructure
GB2257189B (en) * 1991-06-17 1995-01-25 Plasser Bahnbaumasch Franz A method and a machine for correcting the position of a track resting on a support bed
DE4324301A1 (en) * 1993-07-20 1995-01-26 Heilit & Woerner Bau Ag Arrangement and method for producing a ballastless track superstructure
DE4328668C1 (en) * 1993-08-26 1994-10-06 Zueblin Ag Method and apparatus for the continuous production of a ballastless track superstructure (permanent way)

Also Published As

Publication number Publication date
JP3828985B2 (en) 2006-10-04
CH691817A5 (en) 2001-10-31
GB2312703A (en) 1997-11-05
IT1291533B1 (en) 1999-01-11
JPH1037105A (en) 1998-02-10
GB2312703B (en) 1999-01-06
AT406968B (en) 2000-11-27
FR2748039B1 (en) 1999-07-16
GB9703210D0 (en) 1997-04-02
FR2748039A1 (en) 1997-10-31
DE19715576A1 (en) 1997-11-06
ITMI970825A1 (en) 1998-10-10
ATA77496A (en) 2000-03-15

Similar Documents

Publication Publication Date Title
EP0379148B1 (en) Method of and device for constructing a ballastless superstructure
DE3313187C2 (en)
DE3347860C2 (en)
DE9305927U1 (en) Machine for renewing or laying a railroad track
DE3106754A1 (en) TRACK CONSTRUCTION MACHINE WITH TOOL BRACKET FOR LIFTING AND LEVELING TOOLS
DD284067A5 (en) RUNNING TRACKING, LIFTING AND ALIGNING MACHINES FOR LIFTING AND BZW. OR SIDEWASHING A TRACK IN THE SOFT AND CROSSING AREA
DD283435A5 (en) RUNNING RUNNING, LIFTING AND DIRECTION MACHINE
CH628380A5 (en) MOBILE DEVICE FOR THE CONTINUOUS REPLACEMENT OF A RAILWAY consisting of RAILS AND SILLS.
EP0771909B1 (en) Machine for dismantling old and installing new railway tracks
DE9308435U1 (en) Track construction machine with a laser reference system
EP0342306B1 (en) Machine for laterally shifting a railroad comprising rails and transverse sleepers
EP0784121B1 (en) Tamping device for railway track
AT402307B (en) MACHINE ARRANGEMENT FOR FOUNDING A TRACK
DE4235360C2 (en) Track renewal train for the renewal of a railway track
EP0056497A1 (en) Frame wagon in a train for the subsoil stabilization of railway tracks
DE19715576B4 (en) Machine for track position correction
AT390459B (en) METHOD AND TRACKABLE SWITCH LEVELING, TAMPING AND LEVELING MACHINE ARRANGEMENT FOR PROCESSING IN SWITCH AREAS
EP0397956B1 (en) Continuously moving tamping machine with a plow arrangement
EP0731217B1 (en) Tamping machine, assembly and method for tamping a railway track
CH623624A5 (en)
DE4307862C2 (en) Track tamping machine
AT390288B (en) DEVICE AND METHOD FOR CORRECTING THE POSITION OF A TRACK STRUCTURE POSSIBLE ON A LENGTH CONCRETE TAPE
DE19916586A1 (en) Process for renewing a track system
EP0562586A2 (en) Road building vehicle
DE4324329A1 (en) Track section-adjusting apparatus

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8364 No opposition during term of opposition
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee

Effective date: 20141101