DE19644410A1 - Concrete placing boom for concrete pumps - Google Patents
Concrete placing boom for concrete pumpsInfo
- Publication number
- DE19644410A1 DE19644410A1 DE19644410A DE19644410A DE19644410A1 DE 19644410 A1 DE19644410 A1 DE 19644410A1 DE 19644410 A DE19644410 A DE 19644410A DE 19644410 A DE19644410 A DE 19644410A DE 19644410 A1 DE19644410 A1 DE 19644410A1
- Authority
- DE
- Germany
- Prior art keywords
- concrete
- arm
- mast
- placing boom
- concrete placing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
- E04G21/0418—Devices for both conveying and distributing with distribution hose
- E04G21/0436—Devices for both conveying and distributing with distribution hose on a mobile support, e.g. truck
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
Die Erfindung betrifft einen Betonverteilermast für stationäre und mobile Betonpumpen mit mehreren an Knickgelenken miteinander verbundenen zumindest teil weise ein Kasten- oder Rohrprofil aufweisenden Mastar men und einer aus mehreren über Rohrbögen und Rohrdreh verbindungen gelenkig miteinander verbundenen, entlang den einzelnen Mastarmen geführten und an diesen befe stigten Rohrsegmenten bestehenden Betonförderleitung.The invention relates to a concrete placing boom for stationary and mobile concrete pumps with several Articulated joints connected at least partially as a box or tube profile mast men and one of several about pipe bends and pipe turning connections hinged together along led to the individual mast arms and attached to them existing pipe segments existing concrete delivery line.
Bei bekannten Betonverteilermasten dieser Art sind die Rohrsegmente der Betonförderleitung an der Außenseite der Mastarme im Abstand von diesen entlanggeführt. Dies erfordert einen erheblichen Platzbedarf, der einer kom pakten Bauweise entgegensteht und oft konstruktive Kom promisse erfordert. Dies ist besonders bei Betonfahrmi schern der Fall, bei denen der Betonverteilermast im eingeklappten Zustand auf engem Raum neben einem Misch kessel Platz finden muß.In known concrete placing booms of this type Pipe segments of the concrete delivery line on the outside the mast arms are guided at a distance from them. This requires a considerable amount of space, which a com compact design and often constructive com Promisse requires. This is particularly the case with concrete vehicles shear the case where the concrete placing boom in folded state in a confined space next to a mixer must find a place.
Ausgehend hiervon liegt der Erfindung die Aufgabe zu grunde, den bekannten Betonverteilermast dahingehend zu verbessern, daß beim Zusammenklappen des Masts ein kleinerer Platzbedarf erforderlich ist.Based on this, the object of the invention reason, the well-known concrete placing boom improve that when collapsing the mast smaller space is required.
Zur Lösung dieser Aufgabe wird die im Patentanspruch 1 angegebene Merkmalskombination vorgeschlagen. Vorteil hafte Ausgestaltungen und Weiterbildungen der Erfindung ergeben sich aus den abhängigen Ansprüchen.To solve this problem is the in claim 1 specified combination of features proposed. Advantage adhesive refinements and developments of the invention result from the dependent claims.
Die erfindungsgemäße Lösung geht von dem Gedanken aus, daß der Hohlraum in einem ein Kasten- oder Rohrprofil aufweisenden Mastarm zur Unterbringung der Betonförder leitung genutzt werden kann. Um dies zu erreichen, wird gemäß der Erfindung vorgeschlagen, daß mindestens eines der Rohrsegmente der Betonförderleitung zumindest ab schnittsweise durch den Innenraum eines der ein Kasten- oder Rohrprofil aufweisenden Mastarme hindurchgeführt ist. Mit dieser Maßnahme wird neben der für das Zusam menklappen des Knickmasts vorteilhaften Platzeinsparung zusätzlich erreicht, daß der betreffende Knickarm zu gleich die Funktion eines Schutzrohrs für das Rohrseg ment aufweist, das ein Unfallgefahr bei infolge Ver schleißes platzendem Rohrsegment vermeidet.The solution according to the invention is based on the idea that the cavity in a box or tube profile showing mast arm to accommodate the concrete conveyor line can be used. To achieve this, proposed according to the invention that at least one at least from the pipe segments of the concrete delivery line cut through the interior of one of a box or Mast tubes having a tubular profile are passed through is. With this measure, in addition to that for the Together folding the articulated mast advantageous space saving additionally achieved that the articulated arm in question immediately the function of a protective tube for the pipe segment ment that there is a risk of accident as a result of Ver avoids wear-out burst pipe segment.
Eine vorteilhafte Ausgestaltung der Erfindung sieht vor, daß der betreffende Mastarm mindestens eine den Innenraum quer durchsetzende aussteifende Schottwand enthält, die mit einem Durchbruch für den Durchtritt des Rohrsegments versehen ist.An advantageous embodiment of the invention provides before that the mast arm in question at least one the Interior stiffening bulkhead contains that with a breakthrough for the passage of the pipe segment is provided.
Zur Erleichterung der Montage ist es von Vorteil, wenn im Innenraum des betreffenden Mastarms ein vorzugsweise aus Kunststoff bestehendes Führungsrohr oder eine Wanne zur Aufnahme des Rohrsegments angeordnet ist.To facilitate assembly, it is advantageous if preferably in the interior of the mast arm in question plastic guide tube or tub is arranged to accommodate the pipe segment.
Häufig ist es aus konstruktiven Gründen notwendig, daß der Mastarm in zwei durch eine Kröpfung miteinander verbundene Armabschnitte unterteilt ist. Erfindungsge mäß wird in diesem Falle vorgeschlagen, daß das Rohr segment durch einen der beiden Armabschnitte von einer Öffnung im Bereich der Kröpfung bis zum gelenkseitigen Ende dieses Armabschnitts hindurchgreift und am anderen Armabschnitt außenseitig befestigt ist. Diese Bauweise ist besonders für Betonverteilermaste für Betonfahrmi scher mit Betonpumpen von Vorteil, bei denen der Misch kessel aus Platzgründen eine Kröpfung zumindest eines der Mastarme erforderlich macht und bei denen im zusam mengeklappten Zustand des Betonverteilermastes nur we nig Freiraum zur Unterbringung der Betonförderleitung vorhanden ist.For design reasons it is often necessary that the mast arm in two by cranking each other connected arm sections is divided. Invention Ge In this case, it is proposed that the pipe segment through one of the two arm sections of one Opening in the area of the crank to the joint side Reaches through the end of this arm section and at the other Arm section is attached to the outside. This design is especially for concrete placing booms for concrete vehicles shear with concrete pumps where the mixing is advantageous kettle at least one for space reasons the mast arms required and in those together folded state of the concrete placing boom only we little space to accommodate the concrete delivery line is available.
Zur Erleichterung der Montage und der Wartung ist der den Mast durchgreifende Teil des Rohrsegments zweck mäßig einstückig ausgebildet. Erforderlichenfalls kann an dem Mastarm mindestens ein außenseitiger Wanddurch bruch zur Montage- und Wartungserleichterung vorgesehen werden.To facilitate assembly and maintenance, the part of the pipe segment that passes through the mast moderately formed in one piece. If necessary, can at least one wall on the outside of the mast arm break to facilitate assembly and maintenance will.
Die hohl ausgebildeten Mastarme eignen sich außerdem zur Unterbringung von hydraulischen und/oder elektri schen Versorgungs- und/oder Meßleitungen, wie sie bei spielsweise für die Ansteuerung der Gelenkantriebe und für in den Knickgelenken angeordnete Winkelmeßsysteme erforderlich sind.The hollow mast arms are also suitable to accommodate hydraulic and / or electri rule supply and / or measuring lines, as in for example for the control of the articulated drives and for angle measuring systems arranged in the articulated joints required are.
Im folgenden wird die Erfindung anhand eines in der Zeichnung in schematischer Weise dargestellten Ausfüh rungsbeispiels näher erläutert.In the following the invention is based on one in the Drawing shown in a schematic manner example explained in more detail.
Es zeigenShow it
Fig. 1 eine Seitenansicht einer Fahrmischerpumpe; Fig. 1 is a side view of a truck mixer pump;
Fig. 2 eine Seitenansicht des Betonverteilermasts der Fahrmischerpumpe nach Fig. 1; FIG. 2 shows a side view of the concrete placing boom of the truck mixer pump according to FIG. 1;
Fig. 3 eine Draufsicht auf den Mastarm 1 des Vertei lermasts nach Fig. 2; Fig. 3 is a plan view of the mast arm 1 of the distribution mast according to Fig. 2;
Fig. 4 einen Ausschnitt aus dem Mastarm 1 in gegenüber Fig. 4 shows a section of the mast arm 1 in opposite
Fig. 3 vergrößerter Darstellung; Fig. 3 enlarged view;
Fig. 5a und b je einen Schnitt durch den Mastarm 1 ent lang der Schnittlinie V-V der Fig. 3 für zwei konstruktive Alternativen. FIGS. 5a and b each show a section through the boom arm 1 ent long the section line VV of Fig. 3 for two design alternatives.
Die in Fig. 1 dargestellte Fahrmischerpumpe besteht im wesentlichen aus einem vierachsigen Fahrgestell 10, ei ner im mittleren Bereich des Fahrgestells 10 um die Achse 12 drehbar angeordneten, mit ihrer Beschickungs- und Auslaßöffnung 14 schräg nach hinten weisenden Mischtrommel 16, einer im Bereich der Hinterachsen 18, 18' am Fahrgestell 10 angeordneten Zweizylinder-Dick stoffpumpe 20 mit Materialaufgabebehälter 22 und einem im Bereich der Vorderachsen 24, 24' in der Nähe des Füh rerhauses 26 an einem Lagerbock 28 um eine vertikale Achse 30 drehbar gelagerten, aus drei an den Knickge lenken A, B und C gegeneinander verschwenkbaren Mastar men 1, 2, 3 zusammengesetzten Betonverteilermast 32 als Träger für eine Betonförderleitung 34. Die Betonförder leitung 34 ist aus mehreren Rohrsegmenten 34', 34'', 34''' zusammengesetzt, die an den gelenkseitigen Enden der Mastarme 1, 2, 3 über Rohrbögen 36', 36'', 36''' und Rohrdrehverbindungen 38 gelenkig miteinander verbunden und an den Mastarmen befestigt sind.The truck mixer pump shown in Fig. 1 consists essentially of a four-axle chassis 10 , egg ner rotatably arranged in the central region of the chassis 10 about the axis 12 , with its loading and outlet opening 14 obliquely rearward-pointing mixing drum 16 , one in the region of the rear axles 18 , 18 'arranged on the chassis 10 two-cylinder thick material pump 20 with material feed container 22 and one in the area of the front axles 24 , 24 ' near the Füh rerhauses 26 on a bearing block 28 rotatably mounted about a vertical axis 30 , from three to the bend steer A, B and C mutually pivotable Mastar men 1 , 2 , 3 composite concrete placing boom 32 as a carrier for a concrete delivery line 34th The concrete delivery line 34 is composed of a plurality of pipe segments 34 ', 34 '', 34 ''', which are articulated at the articulated ends of the mast arms 1 , 2 , 3 via pipe bends 36 ', 36 '', 36 ''' and pipe rotating connections 38 connected to each other and attached to the mast arms.
Der erste Mastarm 1 weist ein geschlossenes kastenför miges Profil (Fig. 5a und b) und zwei an einer Kröpfung 40 miteinander verbundene Armabschnitte 42, 44 auf. Die Kröpfung 40 ist so positioniert und dimensioniert, daß der Mastarm 1 im zusammengeklappten Zustand des Vertei lermasts die Mischtrommel 16 außenseitig umgreift (Fig. 3). Das Rohrsegment 34' ist in Anpassung an den Mastarm 1 ebenfalls gekröpft. Im Bereich des Armabschnitts 42 und der Kröpfung 40 ist das Rohrsegment 34 mit Rohrhal tern 46 außenseitig mit dem Mastarm 1 verbunden, wäh rend er im Bereich des Armabschnitts 44 durch den In nenraum 48 des kastenförmigen Mastarms 1 bis zum Gelenk B hindurchgeführt ist. Der durch den Armabschnitt 44 hindurchgeführte, sich zwischen den beiden Rohrkupplun gen 50 erstreckende Rohrsegmentabschnitt 52 ist ein stückig ausgebildet. Zur Montageerleichterung ist im Inneren des Armabschnitts 44 ein Kunststoffrohr 54' (Fig. 5a) oder eine Wanne 54'' angeordnet, die durch Durchbrüche in den Schottblechen 56 hindurchgreifen und dort befestigt sind. Im Bereich der Knickachse B ist das Rohrsegment 34' über die Rohrbögen 36''' und die Drehkupplung 38 mit dem Rohrsegment 34'' verbunden. Das Rohrsegment 34'' ist außenseitig am Arm 2 entlangge führt und über nicht dargestellte Rohrhalter mit diesem verbunden.The first mast arm 1 has a closed kastenför shaped profile (FIGS . 5a and b) and two arm sections 42 , 44 connected to each other at a crank 40 . The offset 40 is positioned and dimensioned such that the mast arm 1 in the folded state of the distributor larmasts engages around the mixing drum 16 ( FIG. 3). The pipe segment 34 'is also cranked to match the mast arm 1 . In the area of the arm portion 42 and the offset 40 , the tubular segment 34 with Rohrhal tern 46 is connected externally to the mast arm 1 , while he is in the area of the arm portion 44 through the inner space 48 of the box-shaped mast arm 1 to the joint B is passed. The pipe segment section 52 , which extends through the arm section 44 and extends between the two pipe couplings 50 , is formed in one piece. To facilitate assembly, a plastic tube 54 '( FIG. 5a) or a trough 54 ''is arranged in the interior of the arm section 44 , which reach through openings in the bulkhead plates 56 and are fastened there. In the region of the bending axis B, the tube segment 34 'via the pipe bends 36' '' and the rotary coupling 38 connected to the pipe segment 34 ''. The pipe segment 34 '' is on the outside on the arm 2 leads and connected to it via pipe holder, not shown.
Zusammenfassend ist folgendes festzustellen: Die Erfin dung bezieht sich auf einen Betonverteilermast für sta tionäre und mobile Betonpumpen. Der Betonverteilermast 32 weist mehrere an Knickgelenken A, B, C miteinander verbundene, zumindest teilweise ein Kasten- oder Rohr profil aufweisende Mastarme 1, 2, 3 auf. Er trägt eine Betonförderleitung 34, die aus mehreren gelenkig mit einander verbundenen, entlang den einzelnen Mastarmen 1, 2, 3 geführten und an diesen befestigten Rohrsegmenten 34', 34'', 34''' zusammengesetzt ist. Um eine kompakte Bauweise zu erzielen, ist mindestens eines der Rohrseg mente 34' der Betonförderleitung 34 zumindest abschnitts weise durch den Innenraum 48 eines der ein Kasten- oder Rohrprofil aufweisenden Mastarme 1 hindurchgeführt.In summary, the following can be stated: The invention relates to a concrete placing boom for stationary and mobile concrete pumps. The concrete placing boom 32 has a plurality of articulated joints A, B, C connected to one another, at least partially having a box or tube profile, comprising mast arms 1 , 2 , 3 . It carries a concrete delivery line 34 , which is composed of a plurality of pipe segments 34 ', 34 '', 34 ''' which are connected to one another in an articulated manner and are guided along the individual mast arms 1 , 2 , 3 and attached to them. In order to achieve a compact design, at least one of the pipe segments 34 'of the concrete delivery line 34 is passed at least in sections through the interior 48 of one of the mast arms 1 having a box or pipe profile.
Claims (9)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19644410A DE19644410A1 (en) | 1996-10-25 | 1996-10-25 | Concrete placing boom for concrete pumps |
EP97113634A EP0838563B1 (en) | 1996-10-25 | 1997-08-07 | Concrete pump boom |
DE59710917T DE59710917D1 (en) | 1996-10-25 | 1997-08-07 | Concrete placing boom for concrete pumps |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19644410A DE19644410A1 (en) | 1996-10-25 | 1996-10-25 | Concrete placing boom for concrete pumps |
Publications (1)
Publication Number | Publication Date |
---|---|
DE19644410A1 true DE19644410A1 (en) | 1998-04-30 |
Family
ID=7809990
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19644410A Withdrawn DE19644410A1 (en) | 1996-10-25 | 1996-10-25 | Concrete placing boom for concrete pumps |
DE59710917T Expired - Fee Related DE59710917D1 (en) | 1996-10-25 | 1997-08-07 | Concrete placing boom for concrete pumps |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE59710917T Expired - Fee Related DE59710917D1 (en) | 1996-10-25 | 1997-08-07 | Concrete placing boom for concrete pumps |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0838563B1 (en) |
DE (2) | DE19644410A1 (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10313952A1 (en) * | 2003-03-06 | 2004-09-16 | Rombold & Gfröhrer GmbH & Co. KG | Transport vehicle for the delivery of a binder / aggregate mixture |
CN102943566A (en) * | 2011-08-15 | 2013-02-27 | 徐工集团工程机械股份有限公司 | Cantilever of cantilever crane of concrete pump, corresponding cantilever crane and concrete pump |
WO2013152932A1 (en) | 2012-04-13 | 2013-10-17 | Putzmeister Engineering Gmbh | Production method for a mast arm and concrete-distributing mast |
DE102012213729A1 (en) | 2012-08-02 | 2014-02-06 | Putzmeister Engineering Gmbh | Concrete distributor boom for concrete pumps |
DE102012213727A1 (en) | 2012-08-02 | 2014-02-06 | Putzmeister Engineering Gmbh | Concrete distributor boom for concrete pumps |
WO2014029516A1 (en) | 2012-08-24 | 2014-02-27 | Putzmeister Engineering Gmbh | Boom arm for a concrete distributing boom |
DE102012224340A1 (en) | 2012-12-21 | 2014-06-26 | Putzmeister Engineering Gmbh | Mast arm for a concrete distributor mast and method for its production |
WO2016030342A1 (en) | 2014-08-27 | 2016-03-03 | Schwing Gmbh | Articulated boom |
DE102019107456A1 (en) * | 2019-03-22 | 2020-09-24 | Schwing Gmbh | Articulated mast with mast segments and method for producing a mast segment |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733610B (en) * | 2012-07-02 | 2015-09-30 | 中联重科股份有限公司 | Arm joint, jib and concrete distributing equipment |
DE102014215947A1 (en) * | 2014-08-12 | 2016-03-03 | Putzmeister Engineering Gmbh | hollow body |
DE102014224462A1 (en) * | 2014-11-28 | 2016-06-02 | Putzmeister Engineering Gmbh | Mast for a working machine and method for its production |
DE102017208032A1 (en) * | 2017-05-12 | 2018-11-15 | Putzmeister Engineering Gmbh | Distribution boom for mobile concrete pumps with joints for adjacent arms and mobile concrete pump |
CN215631725U (en) * | 2021-04-28 | 2022-01-25 | 三一汽车制造有限公司 | Turning arm support, arm support device and operation machine |
CN113882676B (en) * | 2021-11-25 | 2022-11-18 | 广东博智林机器人有限公司 | Operation mechanism |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1991738U (en) * | 1968-03-05 | 1968-08-14 | Wibau Gmbh | BOOM FOR CONVEYOR LINES TO CONCRETE PUMPS. |
DE1684413A1 (en) * | 1966-03-07 | 1971-04-08 | Royal Industries | Conveyor device |
US3964512A (en) * | 1973-09-10 | 1976-06-22 | Odilon Dumas | Self-supporting pipe boom |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3572380A (en) * | 1968-10-08 | 1971-03-23 | Challenge Cook Bros Inc | Concrete pump boom |
DE2729750A1 (en) * | 1977-07-01 | 1979-01-18 | Scheele Maschf W | Lorry carried three-piece concrete supply flexible jib - has bottom arm on full circle driven rotary hinge with lengthways axis |
EP0066755A1 (en) * | 1981-06-10 | 1982-12-15 | Intradym Maschinen Ag | Guiding device for the hose of a concrete spraying installation |
FI84642C (en) * | 1989-03-10 | 1991-12-27 | Minkkinen Risto J | Device for transporting fluids |
-
1996
- 1996-10-25 DE DE19644410A patent/DE19644410A1/en not_active Withdrawn
-
1997
- 1997-08-07 DE DE59710917T patent/DE59710917D1/en not_active Expired - Fee Related
- 1997-08-07 EP EP97113634A patent/EP0838563B1/en not_active Expired - Lifetime
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1684413A1 (en) * | 1966-03-07 | 1971-04-08 | Royal Industries | Conveyor device |
DE1991738U (en) * | 1968-03-05 | 1968-08-14 | Wibau Gmbh | BOOM FOR CONVEYOR LINES TO CONCRETE PUMPS. |
US3964512A (en) * | 1973-09-10 | 1976-06-22 | Odilon Dumas | Self-supporting pipe boom |
Non-Patent Citations (2)
Title |
---|
JP 2-152816 A., In: Patents Abstracts of Japan, M-1017, Aug. 29, 1990, Vol. 14, No. 399 * |
Nutzfahrzeuge, TIS, 11/83, S.672 * |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10313952A1 (en) * | 2003-03-06 | 2004-09-16 | Rombold & Gfröhrer GmbH & Co. KG | Transport vehicle for the delivery of a binder / aggregate mixture |
CN102943566B (en) * | 2011-08-15 | 2015-09-09 | 徐州徐工施维英机械有限公司 | The arm of concrete pump truck arm and corresponding jib and concrete mixer |
CN102943566A (en) * | 2011-08-15 | 2013-02-27 | 徐工集团工程机械股份有限公司 | Cantilever of cantilever crane of concrete pump, corresponding cantilever crane and concrete pump |
WO2013152932A1 (en) | 2012-04-13 | 2013-10-17 | Putzmeister Engineering Gmbh | Production method for a mast arm and concrete-distributing mast |
DE102012207568A1 (en) | 2012-04-13 | 2013-10-17 | Putzmeister Engineering Gmbh | Manufacturing method for a mast arm and concrete distributor mast |
US9376827B2 (en) | 2012-04-13 | 2016-06-28 | Putzmeister Engineering Gmbh | Production method for a mast arm and concrete-distributing mast |
DE102012213729A1 (en) | 2012-08-02 | 2014-02-06 | Putzmeister Engineering Gmbh | Concrete distributor boom for concrete pumps |
DE102012213727A1 (en) | 2012-08-02 | 2014-02-06 | Putzmeister Engineering Gmbh | Concrete distributor boom for concrete pumps |
WO2014019885A1 (en) | 2012-08-02 | 2014-02-06 | Putzmeister Engineering Gmbh | Concrete dispensing boom for concrete pumps |
US9512628B2 (en) | 2012-08-02 | 2016-12-06 | Putzmeister Engineering Gmbh | Concrete dispensing boom for concrete pumps |
DE102012215090A1 (en) | 2012-08-24 | 2014-02-27 | Putzmeister Engineering Gmbh | Mast arm for a concrete distributor mast |
WO2014029516A1 (en) | 2012-08-24 | 2014-02-27 | Putzmeister Engineering Gmbh | Boom arm for a concrete distributing boom |
DE102012224340A1 (en) | 2012-12-21 | 2014-06-26 | Putzmeister Engineering Gmbh | Mast arm for a concrete distributor mast and method for its production |
US9745761B2 (en) | 2012-12-21 | 2017-08-29 | Putzmeister Engineering Gmbh | Mast arm for a concrete distributor mast and method for the production thereof |
WO2016030342A1 (en) | 2014-08-27 | 2016-03-03 | Schwing Gmbh | Articulated boom |
DE102014012493A1 (en) | 2014-08-27 | 2016-03-03 | Schwing Gmbh | articulated mast |
DE102019107456A1 (en) * | 2019-03-22 | 2020-09-24 | Schwing Gmbh | Articulated mast with mast segments and method for producing a mast segment |
EP3715557A1 (en) | 2019-03-22 | 2020-09-30 | Schwing GmbH | Folding mast with mast segments and method for manufacturing same |
US11447967B2 (en) | 2019-03-22 | 2022-09-20 | Schwing Gmbh | Articulated boom with boom segments and method for producing a boom segment |
Also Published As
Publication number | Publication date |
---|---|
EP0838563A1 (en) | 1998-04-29 |
DE59710917D1 (en) | 2003-12-04 |
EP0838563B1 (en) | 2003-10-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE19644410A1 (en) | Concrete placing boom for concrete pumps | |
EP0099485B1 (en) | Working device with boom and working platform | |
DE3339495C2 (en) | Device for pouring concrete | |
DE2259752C2 (en) | Device for conveying and mixing at least two powdery and / or granular masses | |
EP3224430B1 (en) | Boom for a working machine and method for producing same | |
DE3315633A1 (en) | LAMP STAND CONSTRUCTION | |
DE3542408A1 (en) | MIXING AND DISCHARGE PRESS FOR TWO-COMPONENT MEDIA, LIKE ADHESIVE INSULATING OR. SEALING MEASURES AND THE LIKE | |
DE3401127A1 (en) | STEM FOR VEHICLES | |
DE19644412A1 (en) | Concrete placing boom for concrete pumps | |
DE3151280A1 (en) | Chassis frame for vehicles, in particular buses | |
DE2217379B2 (en) | Tower crane with jib near top - has hoist winch cab and switchgear permanently wired up in container | |
DE1559432A1 (en) | Rafter roof | |
EP3207193B1 (en) | Boom arm and concrete-distributing boom | |
EP0066567B1 (en) | Crane mountable on a truck | |
DE3881499T2 (en) | METHOD AND DEVICE FOR DEPOSITING LOOSE SOIL UNDER WATER, IN PARTICULAR TO COVER A PIPE OR THE LIKE. | |
DE2459727C2 (en) | Pillar crane | |
CH655354A5 (en) | SLIDING GATE. | |
DE4344395A1 (en) | Pillar crane | |
DE2812485C2 (en) | ||
DE7808690U1 (en) | Trailer coupling for motor vehicles, in particular for passenger cars | |
DE3638069C1 (en) | Ball valve, in particular for pressure lines in hydropower plants | |
DE3006682A1 (en) | Discharge system for mobile concrete mixer - uses multiple section tilting screw conveyor fed from hopper under rear discharge spout | |
DE3228612A1 (en) | LIGHT-RING MOUNTED ON A ROOF OPENING | |
DE3622603C2 (en) | ||
DE3403295A1 (en) | Concrete-distributing mast |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OM8 | Search report available as to paragraph 43 lit. 1 sentence 1 patent law | ||
8125 | Change of the main classification |
Ipc: E04G 21/04 |
|
8110 | Request for examination paragraph 44 | ||
8139 | Disposal/non-payment of the annual fee |