DE1894291U - COMPONENT SET MADE FROM PRE-FABRICATED CONCRETE PARTS - Google Patents

COMPONENT SET MADE FROM PRE-FABRICATED CONCRETE PARTS

Info

Publication number
DE1894291U
DE1894291U DE1963H0043640 DEH0043640U DE1894291U DE 1894291 U DE1894291 U DE 1894291U DE 1963H0043640 DE1963H0043640 DE 1963H0043640 DE H0043640 U DEH0043640 U DE H0043640U DE 1894291 U DE1894291 U DE 1894291U
Authority
DE
Germany
Prior art keywords
elements
prefabricated
foundation
concrete
recess
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1963H0043640
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARTL HOLZKONSTRUKTION WENZL
Original Assignee
HARTL HOLZKONSTRUKTION WENZL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARTL HOLZKONSTRUKTION WENZL filed Critical HARTL HOLZKONSTRUKTION WENZL
Priority to DE1963H0043640 priority Critical patent/DE1894291U/en
Publication of DE1894291U publication Critical patent/DE1894291U/en
Expired legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

lhmdamentAp insbesondere für vorfabrizierte Hauser.lhmdamentAp especially for prefabricated houses.

Die Erfindung bezieht sich auf ein Fundament, insbesondere für vorfabrizierte Häuser, welches aus Fertigteilbeton— elementen besteht.The invention relates to a foundation, in particular for prefabricated houses, which is made of precast concrete- elements.

Die Herstellung der an Ort und Stelle zu errichtenden Fundamente und Massivsockel stellte für vorfabrizierte Hochbaukonstruktionen, z.B. aus Holz, Metall, Beton usw., bisher ein schwere Hemmnis dar, da ein großer Teil der durch die Vorfertigung des Objektes gewonnenen Zeitersparnis verloren ging, ließ sich doch diese Arbeit bisher nicht rationalisieren, auch nicht durch die bisher bekannt gewordenen Fundamente aus Fertigteilbetonelementen.The manufacture of the foundations and solid bases to be erected on site provided for prefabricated building structures, E.g. made of wood, metal, concrete, etc., has so far been a serious obstacle, as a large part of the through The time savings gained during the prefabrication of the object were lost, as this work could not yet be rationalized, not even because of the previously known foundations made of precast concrete elements.

Die Erfindung bezweckt, diesen Nachteil zu beseitigen. Dies erfolgt dadurch, daß die erfindungsgemäßen Fertigteilbetonelemente die Form von hochgestellten, länglichen, flachen Wannen besitzen, die untereinander in kraftschlüssigeThe invention aims to obviate this disadvantage. This is done in that the precast concrete elements according to the invention have the shape of upright, elongated, flat tubs that are frictionally interlocked with one another

Ofese UWSrfcjs {scsÜüJffg smtf SchufionsprJ Is» die iuletzf eingereichte; s!3 ν.-.· ί,ί κ-\ ·!:* tfv v»>"ltiQMoh eingereichten Untertogen ob. Die rechtliche Bedeutung der Α':·.νΐ! . i·,·! ^ ciiijüaiolifsa Unteftogsn. befinden steh In den Amtsofcten. Sie kfiiuv^n ι -y- 'ν,Λιχ-ΛOfese UWSrfcjs {scsÜüJffg smtf SchufionsprJ Is »the iuletzf submitted; s! 3 ν .-. · ί, ί κ- \ ·!: * tfv v »>" ltiQMoh submitted undertoges ob. The legal meaning of the Α ': · .νΐ!. i ·, ·! ^ ciiijüaiolifsa Unteftogsn. are located Stand in the official offices. They kfiiuv ^ n ι -y- 'ν, Λιχ-Λ

.:ΐΚ.·?·ιΛ iiiis;«sses gsbOhranfrei eingesehen werden. Auf Antrag werden hiervon c;v:> i'csoic·.-:.-!--« ν··'··» ! '■■■ xu den üblichen Preteen geWefsrt. Deutsches ietentomt,.: ΐΚ. ·? · ιΛ iiiis; «sses gsbOhranfrei can be viewed. Upon request, c; v:>i'csoic · .-: .-! - «ν ·· '··» ! '■■■ xu the usual preteen. German ietentomt,

29}- Wend "«ti HoIrpad fiau«sdlsdiaft. Wien 29 } - Wend "" ti Hoirpad fiau "sdlsdiaft. Vienna

5 Ψ* *^W 5 Ψ * * ^ W

Πτ. I Fncke. MunAen. PaL-Aowälte. I Bauelrjnenteisatr «s Fertfebetonldl«,Πτ. I peck. MunAen. PaL-Aowälte. I. Building elements 'ready-to-use concrete',

bringbar sind, z.B. dadurch, daß die einander zu gekehrten Stirnwände benachbarter Pertigteilbetonelemente in an sich bekannter Weise horizontale Aussparungen, wie Löcher oder Schlitze, aufweisen, durch welche Bolzen hindurchsteckbar sind.can be brought, for example in that the mutually adjacent end walls to be swept Pertigteilbetonelemente in a known manner horizontal recesses, such as holes or slots, have, through which bolts are out-through.

Weitere Vorteile der Erfindung ergeben sich aus der Beschreibung und den Zeichnungen.Further advantages of the invention emerge from the description and the drawings.

Es zeigen:Show it:

Pig.1 eine Draufsicht auf einen Teil eines erfindungsgemäß ausgebildeten Fundamentes,Pig.1 is a plan view of part of a device according to the invention formed foundation,

Fig.2 die Ansicht eines Fertigteilbetonelementes desselben, Fig.3 einen Vertikalschnitt durch ein Fundament mit Betonpfahl und2 shows the view of a precast concrete element of the same, FIG. 3 shows a vertical section through a foundation with a concrete pile and

Fig.4 eine Einzelheit der Stoßverbindung benachbarter Elemente.4 shows a detail of the butt joint of adjacent ones Elements.

Wie aus der Zeichnung ersichtlich, besteht das Fundament aus einzelnen Sockelelementen 1 und 2, welche die Gestalt von länglichen prismatischen Körpern aufweisen, die an einer Vertikalwand, hier der dem Hausinnenraum zugekehrten Seite, offen sind; sie besitzen somit eine einem Schachteldeckel ähnliche Gestalt.As can be seen from the drawing, the foundation consists of individual base elements 1 and 2, which have the shape of elongated prismatic bodies, which on a vertical wall, here the side facing the house interior, are open; they thus have a shape similar to a box lid.

Diese Sockelelemente aus schwachwandigem, armierten Beton werden aufrechtstehend nebeneinander versetzt, wobei an den Ecken und bei Zwischenwänden besondere Eckelemente 2 vorge-These base elements made of weak-walled, reinforced concrete are staggered upright next to one another, with special corner elements 2 provided at the corners and in the case of partition walls.

84c, 2IKO. 1 SM 291. Wenzl Haiti HoIzkonstraktionv und Baaeeseflschaft. v^ien 'Österreich); Vertr.: DipL-In*. F. Thic-Ieke. Dr.-Ιηβ. R. Dorm*. Braunschweif, Dr. Ϊ. Fridce. München, Pafc-Anwälte. | Bauelrmentensatz aus Fertfebetonteilifi zur Bildune eines Fundaments 4. 1. 63. H «6«. (T. 7: Z. 1)84c, 2IKO. 1 SM 291. Wenzl Haiti Holzkonstraktionv and Baaeeseflschaft. v ^ ien 'Austria); Representative: DipL-In *. F. Thic-Ieke. Dr.-Ιηβ. R. Dorm *. Braunschweif, Dr. Ϊ. Fridce. Munich, Pafc lawyers. | Set of structural elements made of precast concrete to create a foundation, January 4, 63, H "6". (T. 7: Z. 1)

sehen sind, die einenends mit etwa quadratischem Querschnitt 3 verstärkt ausgebildet sind.can be seen at one end with an approximately square cross-section 3 are reinforced.

Die Verbindung der Sockelelemente 1, 2 untereinander erfolgt durch mit Muttern versehene Schraubbolzen 4, wobei die Bolzen jeweils in den aneinanderstoßenden Stirnflächen 5, 6 der Elemente vorgesehene Löcher 7 durchsetzen (Pig.4); anstelle solcher Löcher könnten auch Schlitze vorgesehen werden. Auf diese Weise werden die Elemente untereinander in horizontaler Richtung kraftschlüssig verbunden.The base elements 1, 2 are connected to one another by screw bolts 4 provided with nuts, the bolts each in the abutting end faces 5, 6 of the elements through holes 7 provided (Pig. 4); instead of such holes, slots could also be provided will. In this way, the elements are positively connected to one another in the horizontal direction.

Der verstärkte Endteil 3 des Eckelementes 2 weist Bohrungen unter sich schneidender Anordnung auf, sodaß beliebige Stoßverbindungen an den Grundrißecken und bei Zwischenwänden geschaffen werden können»The reinforced end part 3 of the corner element 2 has bores under an intersecting arrangement, so that any butt joints at the corners of the floor plan and with partition walls can be created »

Zur Dichtung des Fundamentes werden in den aneinanderstoßenden Stirnflächen 5, 6 der Elemente vertikal verlaufende Aussparungen 8, z.B. mit halbkreisförmigemQuerschnitt, vorgesehen, die später mit Betonmörtel 9 oder einer Dichtungsmasse ausgegossen werden.To seal the foundation, vertically extending recesses are made in the abutting end faces 5, 6 of the elements 8, e.g. with a semicircular cross-section, is provided later with concrete mortar 9 or a sealing compound to be poured out.

Derpodenteil 10 jedes Sockelelementes 1, 2 kann bei genug tragfähigem Boden unmittelbar auf diesen aufgesetzt werden; gegebenenfalls kann aber auch das üblichefeetonstreifenfundament oder eine trockene Steinschlichtung vorgesehen werden.The pod part 10 of each base element 1, 2 can with enough be placed directly on stable ground; if necessary, however, the usual concrete strip foundation can also be used or a dry stone sizing can be provided.

Mc, »Λ». 189*291. Wend Hard HoIzkonstniktions- und Baueesellsduft. Wien irtstemadil; Veitr.: DipL-fa». F. Thie-Ielce. Dr.-In*. R. Dörinjr. BniunscKweü'. Dr. I. Fritke. München. Pat.-Ainrälie. | Bauelwncntensate ms Fertüjbetonteilm zur Bildung eines Fundaments 4 1 63 H 456W. ff. 7; Z. 1) 'Mc, "Λ". 189 * 291. Wend Hard wood construction and construction fragrance. Vienna irtstemadil; Veitr .: DipL-fa ». F. Thie-Ielce. Dr.-In *. R. Dörinjr. BniunscKweü '. Dr. I. Fritke. Munich. Pat. Ainralia. | Bauelwncntensate ms prefabricated concrete part for the formation of a foundation 4 1 63 H 456W. ff. 7; Line 1) '

P-S738" "P-S738 ""

Der Deckenteil 11 des Fundamentelementes 1 weist nahe den Enden Aussparungen 12 auf, in die Metallbügel 13 einsetzbar sind (Fig.3), welche die Sohlschwelle H der Wandtafel 15 der Hauskonstruktion umfassen. Dieser Bügel 13 wird in der Schwelle mit üblichen ^lementen, wie Haken oder Stiften, festgelegt.The ceiling part 11 of the foundation element 1 has near the The ends of recesses 12 can be inserted into the metal bracket 13 are (Fig.3), which comprise the threshold H of the wall panel 15 of the house construction. This bracket 13 is in the The threshold is fixed with the usual elements such as hooks or pins.

Soll bei wenig tragfähigem Boden auch die Fundamentierung an Ort und Stelle rationell, also arbeits- und zeitsparend hergestellt werden, hat es sich zweckmäßig erwiesen, zusätzlich zu den Fundamentelementen Pfähle 16 vorzusehen (Fig.3)9 deren Länge so bemessen ist, daß sie bis in frostfreie Tiefe reicht. Diese werden ebenfalls als Betonfertigteile hergestellt und besitzen einen eine zylindrische Ausnehmung 17 aufweisenden Kopf, in dem zum Schlagen der Pfähle ein (nicht dargestellter) Pufferkörper, z.B. aus Holz, einsetzbar ist. Solche Pfähle 16 werden jeweils unter den Bodenteilen der Fundamentelemente vorgesehen, wobei mit Vorteil die vertikalen Stoßfugen über den Pfahlköpfen liegen. Der Pfahlkopf wird vor dem Aufsetzen der Fundamentelemente 1,2 ausgegossen und zwar unter Einsetzen von Verankerungseisen 18, welche den Bodenteil des Elementes 1 durchsetzen, wobei zur Lagesicherung auf diese Verankerungseisen 18 Muttern 19 aufgeschraubt werden. Anstelle solcher Verankerungseisen im Pfahlkopf können auch aus demBodenteil des Betonelementes herausragende Armierungseisen in die Ausnehmung 16 als Verankerung eingreifen, die nachfolgend ausgegossen wird. Gegebenenfalls kann am Boden der zylinderischenIf the foundation is to be produced on site in an efficient way, i.e. in a labor and time-saving manner, in the case of poorly stable soil, it has proven expedient to provide piles 16 in addition to the foundation elements (FIG. 3) 9 whose length is so dimensioned that they are up to reaches in frost-free depths. These are also manufactured as precast concrete parts and have a head having a cylindrical recess 17 in which a (not shown) buffer body, for example made of wood, can be used to hammer the piles. Such piles 16 are each provided under the bottom parts of the foundation elements, the vertical butt joints advantageously being above the pile heads. The pile head is poured out before the foundation elements 1, 2, with the insertion of anchoring irons 18, which penetrate the bottom part of the element 1, 18 nuts 19 being screwed onto these anchoring irons to secure the position. Instead of such anchoring irons in the pile head, reinforcing irons protruding from the bottom part of the concrete element can also engage in the recess 16 as anchoring, which is then poured out. If necessary, the bottom of the cylindrical

S4c, Tim. 189*291. Wenzl Hani KcJzkonstruktion*- and BameeseDschaft. Wien «Wrridrt; Vertr.: DipL-In*. F. Thie- ««. Dr.-!!«. R. Dörinjr. Braunsdiweir, Hr. I. Fridce. Mündsen. Pak-Anwälte. | Bauelrmesteasaiz ans Fexficbetonteilrn zur Bildune eines Fundaments 4. 1 63 H436«. (T.7;Z. 1) ·S4c, Tim. 189 * 291. Wenzl Hani KcJz construction * - and BameeseDschaft. Vienna «Wrridrt; Represent .: DipL-In *. F. Thie- ««. Dr.- !! «. R. Dörinjr. Braunsdiweir, Mr. I. Fridce. Mouths. Pak lawyers. | Bauelrmesteasaiz ans Fexficbetonteilrn for the formation of a foundation 4. 1 63 H436 «. (T.7; line 1)

P-6738P-6738

Ausnehmung 17 im Pfahlkopf eine zentrische Bohrung 20 vorgesehen werden, die eine zusätzliche Führung des Schlaggerätes bildet.Recess 17 in the pile head a central bore 20 are provided, which an additional guide of the impact device forms.

Wird der Raum innerhalb des Sockels mit Füllmaterial angeschüttet, können in üblicher Weise die gegenüberliegenden Elemente mittels (nicht dargestellten) Rundeisenschließen an den Verschraubungsstellen gegen Auskippen gesichert werden. If the space inside the base is filled with filling material, can close the opposing elements by means of round iron (not shown) in the usual way secured against tipping out at the screw connection points.

Im Rahmen der Erfindung sind zahlreiche Abänderungen an dem beschriebenen Ausführungsbeispiel möglich. Vorteilhaft ist es, wenn die Länge der Sockelelemente so bemessen ist. daß die Systemteilung der daraufruhenden Konstruktion um eine halbe Elementlänge versetzt ist, sodaß die Sockeltrennfugen zu den Wandelementfugen voll auf Fug stehen.Numerous modifications to the exemplary embodiment described are possible within the scope of the invention. Is beneficial it if the length of the base elements is so dimensioned. that the system division of the construction based on it by one half the element length is offset so that the plinth separation joints are fully flush with the wall element joints.

AnsprücheExpectations

Claims (1)

3. April 1964 Ansprüche April 3, 1964 claims 1. Bauelementensatz aus Pertigbetonteilen zur Bildung eines Fundaments, insbesondere für vorfabrizierte Häuser, dadurch gekennzeichnet , daß die Fertigbetonteile (1, 2) jeweils die Form einer hochkant aufstellbaren, länglichen, rechteckigen Wanne geringer Tiefe aufweisen und daß an den Stirnseiten (5, 6) Verbindungselemente zum kraftschlüssigen Verbinden benachbarter Wannen, insbesondere horizontale Löcher oder Schlitze (7) für Verbindungsbolzen (4), vorgesehen sind.1. Set of components made of prefabricated concrete parts to form a foundation, especially for prefabricated houses, characterized in that the prefabricated concrete parts (1, 2) each have the shape of an upright, elongated, rectangular tub of small depth and that on the end faces (5, 6) Connecting elements for the force-fit connection of adjacent tubs, in particular horizontal holes or slots (7) for connecting bolts (4), are provided. 2. Bauelementensatz nach Anspruch 1, dadurch ge k e η η zeichn et , daß als Eckelemente verlegbare Fertigbauteile (1) wenigstens an einer Stirnseite - vorzugsweise in einem Wandbereich größerer Querschnittsabmessungen sich unter einem Winkel schneidende Auseparungen, wie Löcher oder Schlitze aufweisen.2. Set of components according to claim 1, characterized in that ge k e η η draws et that as corner elements relocatable prefabricated components (1) at least on one end face - preferably in a wall area of larger cross-sectional dimensions, cutouts intersecting at an angle, such as Have holes or slots. 3. Bauelementensatz nach Anspruch 1 oder 2, dadurch g e - · k ennz e i c hne t, daß der Wannenoberteil (11) an einer Kante Aussparungen (12) aufweist, in welche Verankerungsbügel (13) für die Festlegung der Schwellen (14) oder der vorfabrizierten Hauselemente (13) selbst einsetzbar sind.3. Set of components according to claim 1 or 2, characterized in that g e - · identification that the upper part of the tub (11) has recesses (12) on one edge, in which anchoring bracket (13) for fixing the thresholds (14) or the prefabricated house elements (13) can be used themselves. 84c, 27/00.1894291. Vend Hard HoIskonstrufctions- mki BaasescHidiift. Wien irtM LI F T84c, 27 / 00.1894291. Vend Hard HoIskonstrufctions- mki BaasescHidiift. Vienna irtM LI F T ki Baassdiift. ien sterrotM; Vertr.: DipL-Imt. F. Tnie-Jeke. Di>bus. R. frdrinp. Bnu&sawetr, Dr. T. Fxidce. MSndicn, Pafc-Anwalte. | Bauelrmentensatz 2ns Fetti^betontdlrn zur Bildnno eines Fundaments. 4. 1. 65. H 43640. ff. 7; Z. 1) ki Baassdiift. ien sterrotM; Represent .: DipL-Imt. F. Tnie-Jeke. Di> bus. R. frdrinp. Bnu & sawetr, Dr. T. Fxidce. MSndicn, Pafc lawyers. | Set of structural elements 2ns Fetti ^ emphasizes the image of a foundation. 4.15. H 43640. ff. 7; Line 1) F-6758F-6758 4. Bauelementensatz nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet , daß in den einander zugekehrten Stirnwänden (5, 6) der Betonelemente (1, 2) in an sich bekannter Weise senkrecht über die Elementhöhe verlaufende Aussparungen (8) vorgesehen sind, die nach dem Versetzen durch Betonmörtel oder eine andere Dichtungsmasse (9) ausfüllbar sind.4. Set of components according to one of the preceding claims, characterized in that that in the facing end walls (5, 6) of the concrete elements (1, 2) in a manner known per se extending recesses perpendicular to the element height (8) are provided, which can be filled with concrete mortar or another sealing compound (9) after moving are. 5β Bauelementensatζ nach einem der Ansprüche 1-4, gekennzeichnet durch einen vorgefertigten Betonpfahl (16), dessen Kopf eine vorzugsweise zylindrische Ausnehmung (17) besitzt, in die beim Schlagen des Pfahles ein Pufferkörper, z.B. aus Holz, einsetzbar ist, wobei vorzugsweise eine zentrische Bohrung (20) als Führung für das Schlaggerät in den Boden der Ausnehmung (16) mündet und daß die Ausnehmung (17) eine Verankerung (18) zur Festlegung des Elementbodenteiles (10) aufnimmt.5β Bauelementensatζ according to any one of claims 1-4, characterized by a prefabricated concrete post (16), the head of which is preferably cylindrical Has a recess (17) into which a buffer body, e.g. made of wood, can be inserted when the pile is hammered is, preferably a central bore (20) as a guide for the impact device in the bottom of the recess (16) opens and that the recess (17) has an anchor (18) for fixing the element base part (10) picks up. Dr.P./Κ'Dr.P./Κ '
DE1963H0043640 1963-01-04 1963-01-04 COMPONENT SET MADE FROM PRE-FABRICATED CONCRETE PARTS Expired DE1894291U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1963H0043640 DE1894291U (en) 1963-01-04 1963-01-04 COMPONENT SET MADE FROM PRE-FABRICATED CONCRETE PARTS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1963H0043640 DE1894291U (en) 1963-01-04 1963-01-04 COMPONENT SET MADE FROM PRE-FABRICATED CONCRETE PARTS

Publications (1)

Publication Number Publication Date
DE1894291U true DE1894291U (en) 1964-06-04

Family

ID=33170957

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1963H0043640 Expired DE1894291U (en) 1963-01-04 1963-01-04 COMPONENT SET MADE FROM PRE-FABRICATED CONCRETE PARTS

Country Status (1)

Country Link
DE (1) DE1894291U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4121295A1 (en) * 1991-06-27 1993-01-07 Thomas Tibitanzl System type of building construction - uses walls and floors formed from prefab components and tensioned together on site to form integral unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4121295A1 (en) * 1991-06-27 1993-01-07 Thomas Tibitanzl System type of building construction - uses walls and floors formed from prefab components and tensioned together on site to form integral unit

Similar Documents

Publication Publication Date Title
DE1609707A1 (en) Prefabricated, reinforced lightweight concrete slab
DE1658807A1 (en) Process for connecting prefabricated wall elements and floor slabs in the construction of structures
DE102007052321A1 (en) Arrangement for securing object e.g. post or mast in ground plug, has spare filling space for granular material for aligning object
EP0234175A1 (en) Building set for the erection of walls
EP2956587A1 (en) Prefabricated concrete structural element for creating a protective wall and method for the production thereof
DE2821340A1 (en) METHOD AND DEVICE FOR SUPPORTING A BUILDING CONSTRUCTION
DE1894291U (en) COMPONENT SET MADE FROM PRE-FABRICATED CONCRETE PARTS
EP0515724B1 (en) Method and prefabricated module for the fabrication of structures and buildings
AT231662B (en) Foundation, especially for prefabricated houses
DE2612048A1 (en) PRE-FABRICATED ELEMENTS IN MODULAR DESIGN
DE2513268B2 (en) NOISE PROTECTION WALL OR WALL, ESPECIALLY FOR MOTORWAYS
DE820068C (en) Process for the production of monolithic masonry between removable formwork and formwork supports for this purpose
DE69801084T2 (en) METHOD FOR UNDERWALLING A WALL OR WALL
DE2636168A1 (en) Frame integrated prefabricated component assembly building - has lost template frame for wall, ceiling and concrete type mass insertion
CH391264A (en) Process for the production of a basement light shaft on a building, as well as a basement light shaft produced according to this process
DE959761C (en) Construction with standardized, prefabricated and floor-to-ceiling wall parts
DE825889C (en) Method and device for the series production of houses from precast concrete parts which are produced on the building site of the house
DE802655C (en) Post block with lateral guides to form posts for connecting panel walls
DE894754C (en) Masonry made from prefabricated posts and panels attached to them
DE812958C (en) Wall or other components with panels as permanent formwork
DE828587C (en) Procedure for erecting basement walls
DE20014270U1 (en) Side formwork for floor slabs or foundations made of in-situ concrete
DE8320110U1 (en) FINISHED ELEMENT FROM REINFORCED CONCRETE, ESPECIALLY FOR BASEMENT WALLS
AT111163B (en) Cable wells made from panels of reinforced concrete or similar building material.
DE7426043U (en) Set of components for erecting boundary structures