DE1459918A1 - Composable element wall for dividing rooms - Google Patents

Composable element wall for dividing rooms

Info

Publication number
DE1459918A1
DE1459918A1 DE19641459918 DE1459918A DE1459918A1 DE 1459918 A1 DE1459918 A1 DE 1459918A1 DE 19641459918 DE19641459918 DE 19641459918 DE 1459918 A DE1459918 A DE 1459918A DE 1459918 A1 DE1459918 A1 DE 1459918A1
Authority
DE
Germany
Prior art keywords
elements
wall according
ceiling
wall
strips
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19641459918
Other languages
German (de)
Inventor
Marz Karl Friedrich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Karl Danzer KG
Original Assignee
Karl Danzer KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Karl Danzer KG filed Critical Karl Danzer KG
Publication of DE1459918A1 publication Critical patent/DE1459918A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/82Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
    • E04B2/821Connections between two opposed surfaces (i.e. floor and ceiling) by means of a device offering a restraining force acting in the plane of the partition
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2002/749Partitions with screw-type jacks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2002/749Partitions with screw-type jacks
    • E04B2002/7492Partitions with screw-type jacks used in partitions extending from floor to ceiling
    • E04B2002/7494Partitions with screw-type jacks used in partitions extending from floor to ceiling the jacks being located at the top or the side of the partition

Description

Zusammensetzbare Elementwand zur Aufteilung von RäumenComposable element wall for dividing rooms

Die Erfindung "betrifft eine zusammensetzbare Elementwand zur Aufteilung von Räumen insbesondere in Bürohäusern, die aus »Stahlbeton in der sogenannten Skelettbauweise errichtet sind, aber auch für (Geschäftshäuser, Hallen, i/ohnungsbauten und andere Bauwerke» An solche Trennwände werden verschiedene Anforderungen gestellt; sie sollen rasch montiert werden können und dabei preiswert sein, sie sollen, sofern sie versetzt werden müssen, Boden, Decke und anstoßende Wände möglichst wenig beschädigen, * sie sollen eine gute' Schall- und Wärmeisolierung aufweisen und bei auf längere Sicht aufgestellten Trennwänden soll die Standfestigkeit besonders groß sein und etwa Werte erreichen, die an die Standfestigkeit gemauerter Wände herankommtο Bei einer bekannten Trennwand sind zwischen Boden und Decke rohrförmige Säulen eingespannt, die durch flächenförmige Bauelemente abgedeckt sind» Bei dieserThe invention "relates to an assemblable element wall for dividing rooms, especially in office buildings, which are made of" reinforced concrete in the so-called skeleton construction, but also for (commercial buildings, halls, housing and other structures " should be able to be installed quickly and at the same time be inexpensive, they should, if they have to be moved, damage the floor, ceiling and adjoining walls as little as possible, * they should have good 'sound and heat insulation and long-term partition walls should be stable be particularly large and reach values that approximate the stability of brick walls o In a known partition wall, tubular columns are clamped between the floor and ceiling, which are covered by flat building elements »In this case

8098 1 1/05528098 1 1/0552

BAD ORIGINAL B AD ORIGINAL

Bauweise werden zwar Decken und Böden überhaupt nicht verletzt, zum Aufbau der i/and werden a"ber zahlreiche Einzelelemente "benötigt, die für sich in der Herstellung teuer sind und in der Montage verhältnismäßig viel Zeit erfordern«,Ceilings and floors are not built at all injured, numerous individual elements are used to build the i / and "needed that are expensive to manufacture and take a relatively long time to assemble,"

Demgegenüber sieht die Erfindung vor, daß die Y»andelemente durchgehende Bohrungen mit darin eingeschobenen Spann— stangen aufweisen, die gegen sieh an den festen Bauteilen abstützenden Leisten verspannt sindo Die^sehr einfach in die Wandelemente einzulassenden Bohrungen, die die Spannstangen aufnehmen, erlauben eine starte Reduzierung der notwendigen Teile und damit eine rasche Montage» Die aus Rundeisen bestehenden Spannstangen tragen an ihren Enden Gewinde, die in Bohrungen von sich am Boden und der Decke abstützenden Sockel- und Deckende! st en ragen,, u-egen in die Leisten eingelassene scheiben angezogene Muttern verspannen dann die Spannstangen und damit das ganze Wandelement»On the other hand, the invention provides that the Y'and elements have continuous bores with clamping elements inserted therein. have rods which are braced against it on the bars supporting the fixed components, so the ^ very easy in The holes to be let into the wall elements, which accommodate the tie rods, allow a start reduction in the necessary parts and thus quick assembly »Die aus Round iron existing tie rods have threads at their ends, which are drilled in holes on the floor and the ceiling supporting base and ceiling end! st en protrude, u-egen into the Slats and washers, tightened nuts then tighten the tension rods and thus the entire wall element »

(ieschäfts- und Bürohäuser haben meist eine Raumhöhe, die ii,bO m übersteigt» Erfindungsgemäß ist deshalb vorgesehen, daß zur Erreichung der Raumhöhe jeweils zwei Elemente, ein Hauptelement und ein der Raumhöhe angepaßtes aufgesetztes Oberelement vorgesehen sind, die durch Hut und i?eder(Business and office buildings usually have a room height that ii, bO exceeds m »According to the invention, it is therefore provided that to achieve the height of the room two elements, a main element and one that is fitted to the height of the room Upper element are provided by hat and eagle

BAD ORIGINALBATH ORIGINAL

80981 1/055280981 1/0552

justiert und durch Spann.stangen miteinander verbunden sin-cU Die Spannstangen dienen mindestens teilweise gleichzeitig zur Verbindung von Haupt- und Gberelement und zur Befestigung der Elemente durch Verspannung im RaUm0 bo können dünnere Spannstangen Haupt- und öberelemente miteinander verbinden und stärkere Spannstangen können sowohl Haupt— und Oberelement verbinden als auch die Wand im Raum festhaltene Zur Schonung der Elemente kennen an den Außenkanten in entsprechende Vertiefungen Scheiben eingelegt sein, gegen die auf ihren Gewinden- laufenden Muttern angezogen sind und so die Spannstangen unter Druck setzen« adjusted and interconnected by Spann.stangen sin-cU The tension rods are at least partially at the same time for connecting the main and Gberelement and for fastening the elements by clamping in the area 0 bo thinner tie rods may major and öberelemente connect and stronger tie rods can both main - and connect the upper element as well as hold the wall in the room. To protect the elements, disks must be inserted into the corresponding recesses on the outer edges, against which the nuts running on their threads are tightened and thus put the tension rods under pressure «

Eine ganz erheuliche Vergrößerung der landfestigkeit läßt sich dann erzielen, wenn eriindungsgemäß in den Elementen zwei Reihen nebeneinander liegender Bohrungen vorgesehen und die zum festhalten im Raum angebrachten Spannstangen abwechselnd in den Bohrungen der einzelnen Reihen untergebracht sind» Die nach der iuri'indung ausgebildeten Elemente bestehen aus stranggepreßten Spanplatten, die an ihren seitlichen Außenflächen ein-oder mehrfach furniert und deren Außenkanten mit Kopf- und lußfriesen aus Hartholz eingesäumt sind«, Das so hergestellte Wandelement ist nicht nur sehr preisgünstig, sondern auch von erheblicherA very horrific increase in the strength of the land leaves can be achieved when, according to the invention, in the elements two rows of holes next to each other and the tie rods attached to hold in the room alternately in the bores of the individual rows are accommodated »the elements formed after the juri'ification consist of extruded chipboard, which is attached to their lateral outer surfaces veneered one or more times and their outer edges with head and river friezes made of hardwood are fringed «, the wall element produced in this way is not only very inexpensive, but also of considerable value

BAD ORIGINAL 80981 1/0552BATH ORIGINAL 80981 1/0552

1459S18 . ·1459S18. ·

-. 4 — '-. 4 - '

Eigenstabilität und hoher Festigkeit. In vorteilhafter Weise 'können die Bohrungen in den Hartliolzfriesen im Durchmesser den darin geführten Spannstangen angepaßt sein und die Bohrungen in den Spanplatten können etwa den dreifachen Durchmesser aufweisen. Damit ergibt sich, eine einwandfreie führung der Spannstangen bei gleichzeitiger Leicht bauweise ο Ji'estigkeitsmäßig am günstigsten ist es, wenn die Spannstangen, die das Element im Raum festspannen, möglichst nahe an den Außenflächen der Trennwand liegen. Es kann deshalb vorgesehen sein, daß die Bohrungen in den Leisten zu den Außenseiten hin exzentrisch, zu den Bohrungen in äen Spanplatten angeordnet sind.Inherent stability and high strength. Advantageously, the diameter of the holes in the hardwood friezes can be matched to the tie rods guided therein, and the holes in the chipboard can have approximately three times the diameter. This results in a perfect guidance of the tie rods with a simultaneous lightweight construction ο it is most favorable in terms of strength when the tie rods that clamp the element in the space are as close as possible to the outer surfaces of the partition. It can therefore be provided that the bores are eccentrically out in the strips to the outer sides, arranged to the holes in AEEN chipboard.

Da die iürennwände unter Umständen nach längerer Z.eit versetzt werden sollen, ist darauf zu achten, daß Beschädigungen an Boden und Decke möglichst vermieden werden.» Zu diesem Zweck können in die Stirnseiten der Sockel— und Deckenleisten Nuten eingelassen sein, die zur Aufnahme fest mit dem Boden der Decke verbundener Metalldübel dienen«. Diese Metalldübel sind über eine Schraube an Decke und Boden befestigt, die nach ihrer Entfernung leicht zu beseitigende Spuren hinterläßt, zumal diese Schrauben nur in großen Abständen voneinander eingeschraubt werden müssen.Since the outer walls may be shifted after a long period of time care must be taken that damage to the floor and ceiling is avoided as far as possible. » For this purpose, grooves can be made in the end faces of the base and ceiling strips to accommodate Metal dowels firmly attached to the floor of the ceiling serve «. These metal dowels are attached to the ceiling and via a screw Fixed floor, which after its removal leaves easy-to-remove traces, especially since these screws only must be screwed in at large distances from each other.

80981 1/055280981 1/0552

Bei der Montage an der Baustelle werden zunächst die vorgefertigten, freitragenden Kaupt- und Oberelemente zusammengesetzt, die durch die eingeschobenen Spannstangen miteinander verbunden werdeno Dann werden die Sockel— und Deekenleisten so aufgesetzt, daß zum Aufrichten zwischen Trennwand,Decke .und Boden der notwendige Spielraum bleibt., Dies ist dadurch möglich, daß die äußeren Schrauben auf den Spannstangen etwas nach innen gedreht werden, bis sie an den inneren Schrauben, die Haupt- und Oberelemente miteinander verspannen, zur .Anläge kommeno Nach dem Aufrichten der Wand werden in entsprechende Hüten in den Hartholzleisten und den Söbkel- und Deckenleisten Federn eingeschoben, die den Halt der Trennwand weiterhin verstärken, Zweckmäßigerweise können an den zur i'rennwand senkrecht gerichteten Seitenwänden Leisten durch Anker befestigt und diese Seitenleisten über Wut und Feder mit den Elementen oder auf die Haumlänge abgestimmten Paßstücken verbunden sein» Dadurch, daß alle Elemente genutet und durch eingesetzte Federn miteinander verbunden sind, v/erden die von einem Element aufgenommenen Druckkräfte auch auf die Nachbarelemente übergeleitet» Die Verspannung über die Spannschrauben bringen es mit sich, daß besondere Pfosten zwischen den einzelnen Elementen zum Festhalten der ganzenDuring assembly at the construction site, first the pre-fabricated, self-supporting Kaupt- and top members are assembled, which are interconnected by the interposed tie rods o Then, the base and Deeken strips are placed so that the necessary clearance for erecting between the partition, ceiling .and bottom remains., This is possible because the outer coil to the tension rods be rotated slightly inward until they clamp together at the inner coil, the main and upper elements, come to .Anläge o after the erection of the wall are in corresponding hats Feathers are inserted into the hardwood strips and the Söbkel and ceiling strips, which further strengthen the hold of the partition. It is practical if strips are attached to the side walls perpendicular to the partition wall by means of anchors and these side strips can be coordinated with the elements or with the length of the roof using fury and feathers Be connected to adapters »by the fact that all Elem are grooved and connected to each other by inserted springs, the pressure forces absorbed by one element are also transferred to the neighboring elements

80 98 1 1/0552 ;> 80 98 1 1/0552 ;>

Wand zwischen Boden und Decke eingespart werden können, wobei die Verstellmöglichkeit über die Verschraubung insbesondere für die Ausrichtung der Querfuge zwischen Haupt- und ObeBsLement von Bedeutung ist οWall between the floor and ceiling can be saved, whereby the adjustment screw on the particular for the alignment of the transverse joint between the main and ObeBsLement is important ο

Zweekmäßigerweise wird "beim Bau der Elemente ein Rastermaß angestrebt, so daß Vollwandelemente, Türelemente, Elemente mit Glasaufsätzen jeweils passend und austauschbar verwendbar sind. Durch die Bohrungen der Elemente können Leitungen beliebiger Art gezogen werden, insbesondere für die elektrische Installation.Appropriately, "a grid dimension is used when building the elements aimed at, so that solid wall elements, door elements, elements with glass attachments can each be used appropriately and interchangeably are. Lines of any type can be drawn through the holes in the elements, especially for the electrical installation.

Die Zeichnung veranschaulicht eine beispielsweise Ausführungsform des Gegenstandes der Erfindungo Es zeigenThe drawing illustrates an example embodiment of the object of the invention FIG o

Figo 1 einen Schnitt durch einen Baukörper mit einer eingebauten Trennwand,1 shows a section through a structure with a built-in partition,

Figo 2 einen Querschnitt durch ein Wandelement auf der Anschlußseite an eine Seitenwand,2 shows a cross section through a wall element the connection side to a side wall,

Fig. 3 einen weiteren Querschnitt durch ein Wandelement ,3 shows a further cross section through a wall element ,

Figo 4 eine Draufsicht auf eine Sockelleiste,Figo 4 is a plan view of a skirting board,

Fig. 5 einen Längsschnitt durch eine Trennwand, an der an die Seitenwand angrenzenden Seite,5 shows a longitudinal section through a partition wall, on the side adjoining the side wall,

Fig. 6 einen Längsschnitt durch ein Wandelement,6 shows a longitudinal section through a wall element,

Fig. 7 einen Querschnitt in der Vertikalen durch das Wandelement gemäß Linie YII-VII in Figo 5»7 shows a cross section in the vertical through the wall element according to line YII-VII in FIG.

8098 1 1/0552* '8098 1 1/0552 * '

Figo 8 eisten.'weiteren Quersbhnifct- gemäß LinieFig. 8 ’further cross-section according to the line

]?igp 9. .'■■ einen' Längsschnitt; am< Ende eines Wandeleiaentes,,]? igp 9. '■■ a' longitudinal section; on < End of a Wandeleiaentes ,,

Die Elementwand setzt sich "bei höheren Räumen aus einem Hauptelemeht 1 uüd einem Ober leinen t' 2 zusammen. Bas Haupte ' element wird zweckmäßig in einer konstanten Länge gefertigt, während das-ühereleiaent der jeweils verbleibenden Best^- raumhöhe angepaßt iöt«, Durch die' konstante Länge der Haupielemente 1 erhält man eine auf die ganze Breite der Wand' durchgehende Fuge, die auch mit der IPuge einer aentereoh-t dazu eingesetzten Trennwand übereinstimmt,, Das Element selbst besteht aus einer stranggepreßten Spanplatte 3» in die bei der Herstellung Bohrungen 4 eingepreßt sind· Diese Bohrungen 4 liegen in zwei Eeihen 5,6 nebeneinander. Die Spanplatte 5 wird an ihren Eändern von aus Hartholz bestehenden lußfriesen.7f Kopffriesen 8 und Seitenfriesen 9 eingesäumt» wobei die Außenflächen 4er Spanplatte 3 und der Priese 7 bis 9 durch Jhirniere 10 abgedeckt sind» Die }?urniere können je nach Yerwendungszweck auchmehrschichtig aufgebracht sein. Alle i'riese tragen auf ihrer Stirnseite Nuten 11 zur Aufnahme von i'edern 12,13.In the case of higher rooms, the element wall is composed of a main element 1 and an upper line 2 'constant length of the main elements 1 one obtains a continuous joint over the entire width of the wall', which also corresponds to the joint of a partition wall used for this purpose pressed 4 are · These holes 4 are located in two Eeihen 5.6 side by side. the clamping plate 5 is bordered at their EChange existing hardwood lußfriesen.7 f head Friesen 8 and side Friesen 9 "wherein the outer surfaces 4p clamping plate 3 and the pinch 7 to 9 are covered by Jhirniere 10. Depending on the intended use, the juries can also be applied in multiple layers 11 to accommodate i'edern 12,13.

8098 1 1/055&8098 1 1/055 &

An entsprechenden Stellen tragen die 3?uß- und Kopffriese 7,8 Bohrungen 14} die zu den Bohrungen 4 in der Spanplatte 3 exzentrisch angeordnet sind, und zwar so, daß sie möglichst nahe an die Außenwand des Elements zu liegen kommen» Durch die Bohrungen 4,14 sind dann Spannstangen 15,16 geschoben, an deren ünden G-ewinde 17 eingeschnitten sind» ,Die Spannstangen 15,16 sind in den Bohrungen 14 in den i'riesen geführt; der Durchmesser der Bohrung 4· beträgt dabei etwa das zwei- bis dreifaciie des Durchmessers der Bohrung 14. In den Priesen sind zu den Bohrungen 14 konzentrische Vertiefungen 18 eingefräst, die zur Aufnahme von Scheiben 19 dieneno Auf das Gewinde 17 aufgeschraubte Muttern 20 spannen die Scheiben 19 gegen die 3?riese 7,8 fest«At the appropriate points, the 3? Uss- and head friezes 7, 8 bores 14 } which are arranged eccentrically to the bores 4 in the chipboard 3, in such a way that they come to lie as close as possible to the outer wall of the element »Through the bores 4, 14 then tie rods 15, 16 are pushed, at the ends of which thread threads 17 are cut. The tie rods 15, 16 are guided in the bores 14 in the giants; the diameter of the bore 4 is about two to three times the diameter of the bore 14. In the pebbles, recesses 18 which are concentric to the bores 14 are milled, which serve to accommodate washers 19 o Nuts 20 screwed onto the thread 17 clamp the Disks 19 against the 3? Giant 7,8 "

Zwei in den Reihen 5,6 nebeneinander liegende Spannstangen t5»16 sind in ihrer länge verschieden gehalten« Die Spannstangen 15 sind im Durchmesser größer als die Spannstangen 16 und ragen erheblich über die Kanten der Elemente 1 und 2 hinaus, während die dünnere Spannstange 16 die Elemente 1,2 auf jeder Seite nur um einen Betrag überragt, der etwa der Stärke der Scheibe 19 und der Mutter 20 entspricht«Two tie rods t5 lying next to each other in rows 5, 6 »16 are kept different in length« The tie rods 15 are larger in diameter than the tension rods 16 and protrude considerably over the edges of the elements 1 and 2 addition, while the thinner tie rod 16 protrudes the elements 1.2 on each side only by an amount that approximately corresponds to the thickness of the washer 19 and the nut 20 "

Zur Elementwand gehören noch Sockelleisten 21, Deckenleisten 22 und Seitenleisten 23, die mit Mittelnuten 24The element wall also includes skirting boards 21 and ceiling moldings 22 and side strips 23, which are provided with central grooves 24

BAD ORIGINAL 809811/055 2 BATH ORIGINAL 809811/055 2

versehen sind ο So ekel- und üeeken^eisten 21,k!2 sind an; ' den Stellen mit Bohrungen 25 versehen, die den Bohrungen 14 in den gegenüberliegenden fuß- und Kopffriesen 7,8 ±ür die längeren Spannstangen 15 entsprechen* Dabei kann der Durchmesser der Bohrungen 14 dem Durchmesser der Bohrungen 25 entsprecheno Konzentrisch zu den Bohrungen sind wieder Vertiefungen 26 ausgefräst, in die Scheiben 27 eingelegt sind. Die Scheiben 27 werden gegen die Sockel- und Deckenleisten 21,22 durch'Muttern 28 angepreßt» Der freie Saum zwischen den Priesen 7,8 und den Sockeln- und Deckenleisten 21,22 kann durch:an den Leisten 21,22 befestigten Randleisten 29 abgedeckt werden«.are provided: ο So disgusting and guilty ^ eisten 21, k! 2 are on; 'Provide the places with bores 25, which correspond to the bores 14 in the opposite foot and head tiles 7,8 ± for the longer tie rods 15 * The diameter of the bores 14 can correspond to the diameter of the bores 25 o are concentric to the bores again Milled recesses 26 into which disks 27 are inserted. The discs 27 are pressed against the base and crown molding 21.22 durch'Muttern 28 'The free seam between the Priesen 7.8 and the Sockeln- and ceiling moldings 21.22, by: the strips 21,22 attached edge strips 29 covered will".

Die Elementwand wird an Ort und Stelle wie folgt zusammen-gesetzt: The element wall is put together on the spot as follows:

Das Oberlement 2 wird auf das"Häuptelement 1 aufgesetzt, wobei die Führung durch die ^eder 12 gegeben ist« Dann werden durch beide'Elemente hindurch die Spannstangen 15,16 hindurchgezogen und die Scheiben 19 und die Muttern 20 aufgesetzt. Durch das Anziehen der Muttern werden die beiden Elemente 1 und 2 zu einer festen Einheit verspannt! HachdÄnrdie Muttern 28 in die langen Spannstangen 15 eingeschraubt und die Scheiben 27 aufgelegt sind, werden die Sockelleiste 21 und die Deckenleiste 22 mit ihrenThe upper element 2 is placed on the "main element 1, where the guidance is given by the eder 12 "Then the tie rods go through both elements 15, 16 pulled through and the washers 19 and the nuts 20 put on. By tightening the nuts, the both elements 1 and 2 braced to form a solid unit! HachdÄnrd the nuts 28 in the long tie rods 15 screwed in and the discs 27 are placed, the skirting board 21 and the ceiling molding 22 with their

1 /acc 71 / acc 7

- ίο -- ίο -

Bohrungen 25 auf die Enden der Spannstangen 15 aufgesteckt,Bores 25 placed on the ends of the tie rods 15,

Das fertige Element hat nunmehr in etwa Kaumhöhe erreicht» Um. das Aufkippen zu ermöglichen, sind die Muttern 28 bis aum Anschlag an die Muttern 20' eingedreht, so daß genügend Spielraum übrigbleibt, um das Wandelement auf aus t eilen o Bach dem Aufstellen werden die tiuttern zQ in der Nähe der Sockelleiste 21 angezogen, so daß sich das Element in seiner riöhe einstellen läßto Schließlich wird durch das entsprechende Anziehen der Muttern 28 an der Sockelleiste 21 und der Deckenleiste 22 eine Verspannung erreicht, die der Trennwand einen festen Halt im kaum -verleiht»The finished element has now barely reached »Um. To enable tilting, the nuts 28 are screwed in as far as the stop on the nuts 20 ', so that there is enough space left to divide the wall element on o Bach the erection, the nuts near the skirting 21 are tightened so that the element can be adjusted in its height. Finally, by appropriately tightening the nuts 28 on the skirting board 21 and the ceiling molding 22, a bracing is achieved that gives the partition wall a firm hold in the hardly any »

iiacn dem Aufstellen eines Haupt- und eines Oberlementes wird die Sockelleiste 21 und die Deckenleiste 22 je durch einen Metalldübel 30, der in Nuten 31 der Leisten 21,22 zu liegen kommt, gesichert» Der Metalldubel 30 wird dabei z«Be durch eine Schraube 32 mit dem Boden 33 bzw» der Decke 34 fest verbunden» Das nächste Element wird dann im aufgestellten Zustand in die bereits befestigten Dübel 30 mit seiner Sockelleiste 21 und seiner Deckenleiste 22 in Aufstellungsrichtung eingeschoben» Zweckmäßigerweise ist die Seitenleiste 23 durch seitliche Anker 35 fest mit der Seitenwand 36 verbunden» Die Breite der Sockel- und Deckenleisten 21,22 entspricht der Stärke der furnierteniiacn setting up of a main and a Oberle Mentes the baseboard 21 and the ceiling strip 22 each secured by a metal plug 30 which comes to lie 21,22 in grooves 31 of the strips, "The Metalldubel 30 is thereby z« B e by a screw 32 with the floor 33 or »the ceiling 34 firmly connected» The next element is then inserted in the erected state into the already attached dowels 30 with its baseboard 21 and its ceiling bar 22 in the installation direction »Appropriately, the side bar 23 is fixed by means of lateral anchors 35 the side wall 36 connected »The width of the skirting and ceiling strips 21,22 corresponds to the thickness of the veneered

80981 1/055280981 1/0552

Spanplatte, so daß die Randleisten 29 passend an beiden Teilen anliegenβ Die Bohrungen 4 in den Spanplatten 3 können auch zur Aufnahme "beliebiger Installationen "benutzt werden. Bei einer Stärke der Spanplatte 3 von 70mm und Bohrungen 4 mit 25mm Durchmesser wurde bei jeweils 4mm starkem !furnier ein Sehalldämmwert von ca« 3OdB gemessen«Clamping plate so that fits against both parts of the edge strips 29 β The holes 4 in the particle board 3 can also for recording "arbitrary installations" are used. With a thickness of the chipboard 3 of 70mm and holes 4 with a diameter of 25mm, a sound insulation value of approx.

8098 11/050?8098 11/050?

Claims (1)

- 12 - \ JL-α ,- 12 - \ JL-α, Patentansprüche Claims χχ Zusammensetzbare Elementwand zur Aufteilung von Räumen, dadurch gekennzeichnet, daß die Yfandelemente (1,2) durchgehende Bohrungen (4) mit darin eingeschobenen Spannstangen (15»16) aufweisen, die gegen sich an festen Bauteilen abstützende Leisten (21,22) verspannt sind οComposable element wall for dividing Broaching, characterized in that the Yfand elements (1, 2) have through bores (4) with tension rods (15 »16) inserted therein, which face against them Bars (21,22) supporting fixed components are braced ο Elementwand nach Inspruch 1, dadurch gekennzeichnet, daß die aus Rundeisen bestehenden Spannstangen (15) an ihren Enden Gewinde (17) tragen, die in Bohrungen (25) von sich am Boden (33) Tand der Decke (34) abstützenden Sockel- und Deckenleisten (21,22) ragen und daß gegen in die Leisten (21,22) eingelassene Scheiben (27) angezogene Muttern (28) die Spannstangen (15) verspannenοElement wall according to claim 1, characterized in that that the tie rods (15) made of round bars at their ends have threads (17) which are inserted into bores (25) supported by the floor (33) of the ceiling (34) Base and ceiling strips (21,22) protrude and that against in the strips (21,22) let Washers (27) tightened nuts (28) tighten the tension rods (15) ο ο Elementwand nach Inspruch 1 und 2, dadurch gekennzeichnet, daß zur Erreichung der Raumhöhe jeweils zwei Elemente, ein Hauptelement (1) und ein der Raumhöhe angepaßtes, aufgesetztes Oberelement (2) vorgesehen sind, die durch Nut(11) und leder (12) justiert und durch Spannstangen (15 ,16) miteinander verbunden sind.ο element wall according to claims 1 and 2, characterized in that that to achieve the height of the room two elements, a main element (1) and one of the height of the room adapted, attached upper element (2) are provided, which are adjusted by groove (11) and leather (12) and are interconnected by tie rods (15, 16). 80981 1/055280981 1/0552 Elementwand nach Anspruch 5, dadurch gekennzeichnet, daß die Spannstangen (15»16) mindestens teilweise gleichzeitig zur Verbindung von Haupt- und Oberelement (1,2) und zur Befestigung der Elemente (1,2) durch Verspannung im Raum dienen.Element wall according to claim 5, characterized in that the tension rods (15 »16) at least partially at the same time to connect the main and upper element (1,2) and to attach the elements (1,2) Serve tension in space. ο Elementwand nach Anspruch 4, dadurch gekennzeichnet, daß dünnere Spannstangen (16) Haupt- und Oberelement (1,2) miteinander verbinden und stärkere Spannstangen (15) sowohl Haupt- und Oberelement (1,2) verbinden als auch die Wand im Raum festhalteneο Element wall according to claim 4, characterized in that thinner tie rods (16) connect the main and upper element (1,2) and stronger tie rods (15) connect both the main and upper element (1,2) and hold the wall in place ο Elementwand nach Anspruch 4 und 5» dadurch gekennzeichnet, daß an den Außenkanten der Elemente (1,2) Scheiben (19) in Vertiefungen (18) eingelegt sind, gegen die auf den Stahgeng'ewinden (17) laufende Muttern (20) angezogen sind»ο element wall according to claim 4 and 5 »characterized that on the outer edges of the elements (1, 2) washers (19) are inserted into recesses (18), against the nuts running on the steel threads (17) (20) are attracted » 7ο Elementwand nach Anspruch 1 bis 6, dadurch gekennzeichnet, daß in den Elementen (1,2) zwei Reihen (5,6) nebeneinander liegender bohrungen (4) vorgesehen und die zum Festhalten im Raum angeordneten Spannstangen (15) abwechselnd in den Bohrungen (4) der einzelnen Reihen (5,6) untergebracht sind»7ο element wall according to claim 1 to 6, characterized in that that in the elements (1,2) two rows (5,6) of adjacent holes (4) are provided and the tension rods (15) arranged for holding in space alternately in the bores (4) of the individual Rows (5,6) are housed » 809811/0552809811/0552 -H--H- 8. Elementwand nach Anspruch 1 bis 7, dadurch gekennzeichnet, daß die Elemente (1,2) aus stranggepreßten Spanplatten (3) "bestehen, die an ihren seitlichen Außenflächen ein- oder mehrfach furniert und deren Außenkanten mit Fuß-, Kopf-, Seitenfriesen (7,ö,9) aus Hartholz eingesäumt sind«8. Element wall according to claim 1 to 7, characterized in that that the elements (1, 2) are made of extruded chipboard (3) "which at their side Outer surfaces veneered one or more times and their outer edges with foot, head and side friezes (7, ö, 9) are lined with hardwood " 9· Elementwand nach ünspruch 8, dadurch gekennzeichnet, daß die Bohrungen (14) in. den Hartholzfriesen (7,ö) im Durchmesser den darin geführten Spannstangen (15»16) angepaßt sind und die Bohrungen (4) in den Spanplatten9 element wall according to claim 8, characterized in that that the holes (14) in. the hardwood friezes (7, ö) in the diameter of the tie rods guided in it (15 »16) are adapted and the holes (4) in the chipboard (3) etwa den dreifachen Durchmesser aufweisen»(3) have about three times the diameter » 10. Elementwand nach Anspruch 8 und 9, dadurch gekennzeichnet, daß die Bohrungen (14) in den i'riesen (7f8) zu den Außenseiten hin exzentrisch zu den Bohrungen10. Element wall according to claim 8 and 9, characterized in that the bores (14) in the i'riesen (7 f 8) to the outside eccentric to the bores (4) in den Spanplatten (3) angeordnet sind»(4) are arranged in the chipboard (3) » 11. Elementwand nach Anspruch 1 bis 10, dadurch gekennzeichnet, daß in die Stirnseiten der Sockel- und Deckenleisten (21,22) Nuten (31) eingelassen sind zur Aufnahme fest mit dem Boden (33) und der Decke (34) verbundenen Metalldübel (30).11. Element wall according to claim 1 to 10, characterized in that that in the end faces of the base and ceiling strips (21,22) grooves (31) are embedded for receiving metal dowels (30) firmly connected to the floor (33) and the ceiling (34). 11/0552—11 / 0552— 12„ Eleiüentwand naeh Anspruch 1 "bis 11, dadurch gekennzeichnet, daß zur Montage an der Baustelle die vorgefertigten , freitragenden Haupt- und Qberlemente (1,2) - zusammengesetzt, durch die eingeschobenen Üpannstangen' (15,16) miteinander verbunden und die Sockel- und DeGkenleisten (21,22) so aufgesetzt sind, daß zum Aufrichten zwischen 2rennwand, Decke (34-) und Boden (33) der notwendige Spielraum bleibt»12 "Eleiüentwand nach Claim 1" to 11, characterized in that that the prefabricated, self-supporting main and upper elements (1,2) - put together, by the inserted tensioning rods' (15,16) are connected to one another and the base and cover strips (21,22) are placed in such a way that they can be erected between partition, ceiling (34-) and floor (33) the necessary leeway remains » 13* Elementwand nach .Anspruch 12, dadurch gekennzeichnet, daß nach dem Aufrichten der Wand in zueinander passenden Hüten (11) in den Priesen (7,6) und den Sockel- und. Deekenleisten (21,22) federn (15) eingeschoben sind«,13 * Element wall according to Claim 12, characterized in that that after erecting the wall in matching Hats (11) in the Priesen (7,6) and the base and. Deeken strips (21,22) springs (15) are pushed in «, 14«, Elementwand nach Anspruch 11 bis 13? dadurch gekennzeichnet, daß die Metalldübel (30) jeweils nach dem Errichten eines Wandelements an Decke (34) und Boden (33) befestigt sind und üaa zweite "Wandelement in Richtung der Wand eingeschoben ist„14 «, element wall according to claims 11 to 13? characterized, that the metal dowels (30) each after the erection of a wall element on the ceiling (34) and floor (33) are attached and üaa second "wall element in Is inserted towards the wall " b ο iülementwand nach Anspruch 12 bis 14, dadurch gekennzeichnet, daß an den zur Trennwand senkrecht geriditei;€ii Beitenwänden (36) Seitenleisten (23) durch Anker (35) befestigt und diese Seitenleisten (23) über Hut (11) und 3?eder (13) mit den Elementen (1,2) oder auf die'Baiaailänge abgestimmten Paßstücken verbunden sinde b ο iülementwand according to claim 12 to 14, characterized in that on the side walls (36) perpendicular to the partition wall (36) side strips (23) are attached by anchors (35) and these side strips (23) over hats (11) and 3? Eder (13) are connected to the elements (1, 2) or adapters matched to the Baiaai length BAD ORIGINAL 8098 11/0552 ' \BATH ORIGINAL 8098 11/0552 '\ 16o Elementwand nach. .Anspruch 1 bis 15, dadurch gekennzeichnet, daß zur Installation durch die Bohrungen (4) leitungen beliebiger Art durchziehbar sind»16o element wall after. . Claims 1 to 15, characterized in that that any type of cables can be pulled through the holes (4) for installation » 8098 1 1/05528098 1 1/0552
DE19641459918 1964-03-13 1964-03-13 Composable element wall for dividing rooms Pending DE1459918A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DED0043874 1964-03-13

Publications (1)

Publication Number Publication Date
DE1459918A1 true DE1459918A1 (en) 1968-12-05

Family

ID=7047916

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19641459918 Pending DE1459918A1 (en) 1964-03-13 1964-03-13 Composable element wall for dividing rooms

Country Status (2)

Country Link
US (1) US3334459A (en)
DE (1) DE1459918A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102015108401A1 (en) * 2015-05-28 2016-12-01 Isinger + Merz Gmbh Mobile modular partition

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US740954A (en) * 1903-04-03 1903-10-06 Ezekiel Van Noorden Swinging window.
US3033330A (en) * 1957-06-05 1962-05-08 Hauserman Co E F Partition system
FR1178632A (en) * 1957-07-03 1959-05-13 Demountable partition

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102015108401A1 (en) * 2015-05-28 2016-12-01 Isinger + Merz Gmbh Mobile modular partition

Also Published As

Publication number Publication date
US3334459A (en) 1967-08-08

Similar Documents

Publication Publication Date Title
DE3303190C2 (en) Kit for creating mobile structures, in particular for trade fair and exhibition structures
CH672519A5 (en)
DE2143579A1 (en) Prefabricated wooden house
DE3241424C2 (en) Connecting device
DE2717645A1 (en) MODULAR SYSTEM FOR CREATING BENCHES, TABLES OR DGL.
DE60033392T2 (en) BUILDING CONSTRUCTION
DE8008815U1 (en) SUPPORT FOR THE BUILDING OF BUILDINGS
DE1459918A1 (en) Composable element wall for dividing rooms
EP0000575B1 (en) Fence made of large-panel fence elements secured to posts
DE2309607C3 (en) glass wall
DE1684544A1 (en) Prefabricated barracks or the like.
DE202008013500U1 (en) Connection system for a pipe construction
DE3005957A1 (en) Metal or plastics ceiling or wall cassette cladding - has nodal pieces and tubes with offset tongues engaging intersecting profile cavities
AT395194B (en) BLOCK HOUSE-LIKE BUILDING
AT263296B (en) Device for tensioning a partition wall composed of plate-shaped wall elements between the ceiling and floor of a room
DE7635823U1 (en) KIT FOR BUILDING
EP0003731B1 (en) Connection for roof, wall or ceiling panels of a trapezial or triangular cross-section prefabricated house
AT261167B (en) Static structural skeleton
AT164109B (en) Reinforced concrete ceiling
DE856205C (en) Precast reinforced concrete part
DE102020123860A1 (en) Shoring to form a tent or hall construction
DE1658789C (en) Wall made of prefabricated, mutually connected, load-bearing wall elements
DE2651777A1 (en) Building wall element assembly - has groove in stepped wall element section with anchor pressing it against column
DE857439C (en) Formwork for the production of concrete ceilings, roofs, etc. like
DE19814820C2 (en) Base frame element for installation between two adjacent vertical stands of a half-timbered building wall and construction element for absorbing compressive forces for a tensile structure, in particular for a half-timbered building wall with such base frame elements