DE1300499B - Hydraulic punch press with downward traction drive - Google Patents

Hydraulic punch press with downward traction drive

Info

Publication number
DE1300499B
DE1300499B DE1965L0049900 DEL0049900A DE1300499B DE 1300499 B DE1300499 B DE 1300499B DE 1965L0049900 DE1965L0049900 DE 1965L0049900 DE L0049900 A DEL0049900 A DE L0049900A DE 1300499 B DE1300499 B DE 1300499B
Authority
DE
Germany
Prior art keywords
crosshead
punch
press
bed
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE1965L0049900
Other languages
German (de)
Inventor
Dean Leslie George
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Loewy Engineering Co Ltd
Original Assignee
Loewy Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Loewy Engineering Co Ltd filed Critical Loewy Engineering Co Ltd
Publication of DE1300499B publication Critical patent/DE1300499B/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J9/00Forging presses
    • B21J9/02Special design or construction
    • B21J9/04Piercing presses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C23/00Extruding metal; Impact extrusion
    • B21C23/21Presses specially adapted for extruding metal
    • B21C23/211Press driving devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Presses And Accessory Devices Thereof (AREA)
  • Forging (AREA)

Description

1 21 2

Die Erfindung bezieht sich auf eine hydraulische kann in das Bett 10 hinein durch Einrichtungen Lochpresse mit abwärts gerichtetem Zugantrieb, bei zurückgezogen werden, die nunmehr erläutert werden dem das Lochwerkzeug auf einem beweglichen sollen.The invention relates to a hydraulic can into the bed 10 by means Hole press with downward traction drive to be withdrawn, which will now be explained which the punching tool should be on a movable one.

oberen Holm und der Aufnehmer auf einem orts- Unterhalb des Bettes 10 befindet sich in einem gefesten Bett der Presse angeordnet ist und sich der 5 wissen Abstand von ihm ein Querhaupt 20. Zwischen hydraulische Antrieb zum Herabziehen des Loch- diesem und dem Bett 10 ist ein Abstandsring 21 Werkzeuges unter dem Bett befindet und wobei ein eingefügt. In seiner Mitte unterstützt das Querhaupt Aufnehmer mit einer durchgehenden Bohrung und 20 einen aufwärts ragenden Stempel 22, der durch ein beweglicher Gegenstempel zum Verschließen der den Ring 21 hindurchgeht und an seinem oberen Aufnehmerbohrung verwendet ist. io Ende den Widerlagerstempel 16 bildet. Im Quer-upper spar and the transducer on a stationary underneath the bed 10 is in a fixed Bed of the press is arranged and the 5 know distance from it a crosshead 20. Between The hydraulic drive for pulling down the hole and the bed 10 is a spacer ring 21 Tool is located under the bed and with one inserted. In its center supports the crosshead Pick-up with a through hole and 20 an upwardly extending punch 22, the through a movable counter ram for closing the ring 21 passes through and on its upper one Transducer bore is used. io end forms the abutment punch 16. In the transverse

Eine derartige Lochpresse ist zwar nicht bekannt, haupt 20 sind Zylinder 23 befestigt (F i g. 4), die auf doch liegt ihre Bauart nahe. Denn einerseits ist eine ortsfesten Kolben 24 gleiten. Die Stangen 25 dieser hydraulische Lochpresse mit abwärts gerichtetem Kolben sind am Bett 10 befestigt. Ferner sind am Zugantrieb bekannt, bei der das Lochwerkzeug auf Querhaupt 20 Zylinder 26 befestigt, deren Taucheinem beweglichen oberen Holm und der Aufnehmer 15 kolben 27 unmittelbar am Bett 10 sitzen. Die Zyauf einem ortsfesten Bett der Presse angeordnet ist linder 23 und die Kolben 24 dienen dem Zweck, das und sich der hydraulische Antrieb zum Herabziehen Querhaupt 20 aufwärts zu verschieben und dadurch des Lochwerkzeuges unter dem Bett befindet, und den Gegenstempel 16 aus einer in F i g. 5 gezeigten andererseits ist es auch bekannt, bei einer hydrau- Rückzugstellung in die in F i g. 1 gezeigte obere Lage lischen Lochpresse einen Aufnehmer mit einer so zu bringen. Zur Abwärtsverschiebung des Querdurchgehenden Bohrung und einen beweglichen haupts 20 in seine untere Lage dienen hingegen die Gegenstempel zum Verschließen der Aufnehmerboh- Zylinder 26 mit den Tauchkolben 27. Das Widerrung zu verwenden, wenn durchgelocht werden soll. lagerquerhaupt 20 gleitet bei seiner Auf- und Ab-Such a punch press is not known, the main 20 cylinders 23 are attached (FIG. 4), which on but their design is obvious. Because on the one hand a stationary piston 24 is sliding. The rods 25 of these Hydraulic punch press with the piston pointing downwards are attached to the bed 10. Furthermore, on Pull drive known, in which the punching tool is mounted on the crosshead 20 cylinder 26, the immersion of which movable upper spar and the transducer 15 piston 27 sit directly on the bed 10. The Zyauf a stationary bed of the press is arranged linder 23 and the pistons 24 serve the purpose that and the hydraulic drive for pulling down the crosshead 20 to move upwards and thereby of the punching tool is located under the bed, and the counter punch 16 from a in F i g. 5 shown on the other hand, it is also known, in the case of a hydraulic retraction position into the position shown in FIG. 1 upper layer shown Lischen punch press to bring a transducer with a so. For the downward displacement of the transverse bore and a movable main 20 in its lower position, however, are used Counter punch for closing the Aufnehmerboh- cylinder 26 with the plunger piston 27. The contraction to be used when punching is to be carried out. bearing crosshead 20 slides in its up and down

Der Erfindung liegt die Aufgabe zugrunde, die bewegung auf am Bett 10 befestigten Führungs-Lochpresse so auszugestalten, daß sich die während 25 stangen 28, die nach unten ragen und an ihren des Lochhubes wirksamen Kräfte innerhalb eines unteren Enden Anschläge 29 zur Begrenzung des beweglichen Rahmens einander völlig ausgleichen Abwärtshubes des Querhaupts 20 tragen, und daher nicht auf die ortsfesten Teile der Presse Unterhalb des Querhaupts 20 und im Abstand vonThe invention is based on the object of the movement on the guide hole press attached to the bed 10 designed so that the while 25 rods 28 that protrude down and on their of the hole stroke effective forces within a lower end of stops 29 to limit the movable frame completely balance each other downstroke of the crosshead 20, and therefore not on the stationary parts of the press below the crosshead 20 and at a distance from

übertragen werden. diesem befindet sich der Unterholm 30 der Presse. Inbe transmitted. this is the lower beam 30 of the press. In

Erfindungsgemäß ist diese Aufgabe dadurch ge- 30 diesem sind eingebaute Zylinder 31 befestigt, die zum löst, daß zwischen dem Bett und dem Unterholm ein Hauptantrieb der Presse gehören, und zwar vier Querhaupt angeordnet ist, das den Gegenstempel und solcher Zylinder beim veranschaulichten Ausfüheinen Teil des Hauptantriebes trägt und daher rungsbeispiel. Die Zylinderzahl kann jedoch auch während eines Lochvorganges in seiner oberen Lage größer oder kleiner sein. In diesen Zylindern sind gehalten wird, in welcher der Gegenstempel die Auf- 35 verschiebbar Kolben 32 geführt, die an der Unterseite nehmerbohrung verschließt. des Querhaupts 20 befestigt sind und LängsbohrungenAccording to the invention, this object is thereby achieved. Built-in cylinders 31 are attached which are used to solves that between the bed and the lower beam belong a main drive of the press, namely four Crosshead is arranged that the counter punch and such cylinder in the illustrated Ausfüheinen Part of the main drive carries and therefore approximately example. However, the number of cylinders can also be larger or smaller in its upper layer during a punching process. In these cylinders are is held, in which the counter punch, the slide-on piston 32 guided on the underside slave bore closes. of the crosshead 20 are attached and longitudinal bores

Dank dieser Ausgestaltung können die ortsfesten 33 haben, durch die hindurch das hydraulische Teile der Presse viel leichter ausgeführt werden, weil Druckmittel dem Zylinder 31 zugeführt und von ihm sich die Kräfte innerhalb des das Querhaupt ent- abgeführt wird. Der Durchmesser der Bohrungen 33 haltenden beweglichen Rahmens völlig ausgleichen. 40 ist etwas größer an ihren oberen Enden, in dieThanks to this configuration, the stationary 33 can have, through which the hydraulic Parts of the press are carried out much more easily because pressure medium is supplied to and from the cylinder 31 the forces within which the crosshead is dissipated. The diameter of the holes 33 completely compensate for the moving frame. 40 is slightly larger at its upper ends, in the

Zweckmäßige Ausgestaltungen des Gegenstandes Teleskoprohre 34 hineinragen, welche an der Unterder Erfindung sind in den Unteransprüchen heraus- Seite des Betts 10 durch Blöcke 35 befestigt sind, gestellt. Diese Blöcke haben Kanäle 36 zum Zu- und AblaufAppropriate configurations of the object telescopic tubes 34 protrude, which on the lower Invention are in the subclaims out- side of the bed 10 are fixed by blocks 35, posed. These blocks have channels 36 for inflow and outflow

Ein Ausführungsbeispiel der Erfindung sei mit des hydraulischen Druckmittels für die Zylinder 31. Bezug auf die Zeichnungen erläutert. In diesen zeigt 45 Ferner trägt der Unterholm 30 Rückzugzylinder 37,One embodiment of the invention is with the hydraulic pressure medium for the cylinders 31. Explained with reference to the drawings. 45 also shows the lower beam 30 retraction cylinder 37,

Fig. 1 einen Schnitt der Lochpresse zum Lochen deren Kolben38 durch ihre Stangen39 an einem erwärmter Metallblöcke längs der lotrechten Mittel- festen Gestell 60 der Presse befestigt sind, ebene, Der weit über dem Bett 10 angeordnete obere1 shows a section of the punch press for punching its piston38 through its rods39 on one heated metal blocks are fixed along the vertical central fixed frame 60 of the press, level, the upper one, which is arranged far above the bed 10

F i g. 2 den waagerechten Schnitt nach der Holm 40, der mit dem unteren beweglichen Holm 30 Linie H-II der Fig. 1, 5° durch Zuganker 43 und 44 verbunden ist, trägt inF i g. 2 the horizontal section after the spar 40, the one with the lower movable spar 30 Line H-II of Fig. 1, 5 ° connected by tie rods 43 and 44, carries in

Fig. 3 den waagerechten Querschnitt nach der seiner Mitte mittels eines Halters41 den Loch-Linie HI-III der F i g. 1 und stempel 42. Dieser ist zur Achse der Bohrung 14 desFig. 3 shows the horizontal cross section after its center by means of a holder 41 the hole line HI-III of FIG. 1 and stamp 42. This is to the axis of the bore 14 of the

F i g. 4 und 5 Schnittbilder, die der F i g. 1 ent- Aufnehmers 11 ausgerichtet. Die unteren Abschnitte sprechen, aber die Teile während des Lochvorganges 43 sind mit den oberen Abschnitten 44 der Zuganker in zwei verschiedenen Stellungen wiedergeben. 55 durch Kupplungsteile 45 verbunden, die muffen-F i g. 4 and 5 sectional views, which are shown in FIG. 1 ent- transducer 11 aligned. The lower sections speak, but the parts during the piercing process 43 are with the upper sections 44 of the tie rods play in two different positions. 55 connected by coupling parts 45, the sleeve

Das in Fußbodenhöhe angeordnete Hauptbett 10 förmig ausgestaltet sind. An den beweglichen Holmen der Maschine trägt in seiner Mitte einen Aufnehmer 30 und 40 sind die Zuganker durch Muttern 46 bzw. 11 für einen zu lochenden Block B. Beim gezeigten 47 angeschraubt. Die unteren Zugankerabschnitte Ausführungsbeispiel läßt sich der Aufnehmer in die 44 sind von Buchsen 49 umgeben, die durch Löcher Presse hinein und aus ihr heraus verschieben, und er 60 des Bettes 10 hindurchgehen und am Querhaupt 20 läuft zu diesem Zweck auf Schienen 12, zwischen befestigt sind. An den oberen Abschnitten 43 der denen er bei 13 geführt ist. Die Bohrung 14 des Auf- Zuganker sind Buchsen 48 befestigt. Zwischen dem nehmers, die zur Aufnahme des zu lochenden Blocks Bett 10 und dem oberen beweglichen Holm 40 bedient, ist unten durch eine ringförmige Matrize 15 findet sich ein mittleres bewegliches Querhaupt 50, und durch einen Gegenstempel 16 abgeschlossen. Die 65 das ein rohrförmiges Stauchwerkzeug 52 mittels eines ringförmige Matrize ruht auf einem Druckstück 17 Halters 51 trägt. Dieser Halter befindet sich auf der und dieses wiederum auf einem Widerlager 18, das Unterseite in der Mitte des Querhaupts. In dem sich auf dem Bett 10 abstützt. Der Gegenstempel 16 Stauchwerkzeug 52 ist der Lochstempel 42 'gleitendThe main bed 10, which is arranged at floor level, has a shape. At the center of the movable bars of the machine is a receptacle 30 and 40, the tie rods are screwed through nuts 46 and 11 for a block B to be punched. At 47 shown. The lower tie rod sections of the embodiment can be the transducer in the 44 are surrounded by sockets 49, which move through holes press in and out of it, and he 60 of the bed 10 pass through and on the crosshead 20 runs for this purpose on rails 12, are fixed between . At the upper sections 43 of which it is guided at 13. Bushings 48 are attached to the bore 14 of the tie rod. Between the taker, who serves the bed 10 to receive the block to be punched, and the upper movable spar 40, a middle movable crosshead 50 is located at the bottom by an annular die 15, and is closed off by a counter punch 16. The 65 which carries a tubular upsetting tool 52 by means of an annular die rests on a pressure piece 17 holder 51. This holder is located on and this in turn on an abutment 18, the bottom in the middle of the crosshead. In which is supported on the bed 10. The counter punch 16 upsetting tool 52 is the punch 42 'sliding

3 43 4

geführt. Er kann in die in F i g. 4 gezeigte unwirk- Die Holme 30 und 40 und die sie verbindendenguided. He can in F i g. 4 shown ineffective The bars 30 and 40 and the connecting them

same Lage zurückgezogen werden. In den Zwischen- Zuganker 43 werden dann durch die Zylinder 31 raum zwischen den unteren Enden der Buchsen 48 weiter herabgezogen, ohne dabei aber das mittlere und der Oberseite des mittleren Querhaupts 50 Querhaupt 50 mitzunehmen. Infolgedessen tritt der können Abstandsstücke 53 durch einen hydrau- 5 Stempel 42 in den Block B ein und durchlocht lischen Antrieb 54 eingeschoben werden. Dieser diesen. Da die Bohrung 14 unten durch den Ring 15 besteht aus Zylindern und Kolben, und seine Kolben- und den Gegenstempel 16 abgeschlossen ist, muß der Stangen 55 sind gelenkig mit den Abstandsstücken 53 verdrängte Werkstoff des Blocks längs der Wandung verbunden. Werden diese eingerückt, dann nimmt der Bohrung 14 aufwärts fließen, wodurch die Länge der obere Holm 40 bei seinem Abwärtshub das mitt- io des Blocks wächst und daher das Stauchwerkzeug 52 lere Querhaupt 50 mit dem Stauchwerkzeug 52 mit. entsprechend angehoben wird. Dieser Lochvorgang Beim Aufwärtshub des Holmes 40 kann das mittlere setzt sich so lange fort, bis an der Unterseite des Auf-Querhaupt 50 in seiner unteren Lage festgehalten nehmers 11 nur noch eine verhältnismäßig dünne werden. Diesem Zweck dienen zusätzliche Antriebe, Wand im Block verbleibt. Ist dieser Zeitpunkt erdie aus Zylindern 56 und Kolben 57 bestehen. Für 15 reicht, dann ist der obere Holm 40 so weit herabdie Rückführung des mittleren Querhaupts 50 nach gegangen, daß die unteren Flansche des Kupplungsoben sind weitere Antriebe in Gestalt von Zylindern Stücks 45 auf die oberen Enden der Buchsen 49 58 und Kolben 59 vorgesehen. stoßen. Ist der in den Zylindern 31 herrschendebe withdrawn from the same location. In the intermediate tie rod 43, space between the lower ends of the bushings 48 are then pulled down further through the cylinder 31, but without taking the middle and the upper side of the middle crosshead 50 crosshead 50 with it. As a result, spacers 53 can be inserted through a hydraulic 5 punch 42 into block B and perforated drive 54. This this one. Since the bore 14 down through the ring 15 consists of cylinders and pistons, and its piston and the counter punch 16 is completed, the rods 55 must be articulated with the spacers 53 displaced material of the block along the wall. If these are indented, then the bore 14 begins to flow upwards, as a result of which the length of the upper spar 40 increases in the middle of the block on its downward stroke and therefore the upsetting tool 52 increases with the upsetting tool 52. is raised accordingly. This hole process during the upstroke of the spar 40, the middle one continues until the underside of the crosshead 50 in its lower position is held only a relatively thin taker 11. Additional drives are used for this purpose, the wall remains in the block. At this point in time it consists of cylinders 56 and pistons 57. For 15 is enough, then the upper spar 40 has gone so far down the return of the middle crosshead 50 that the lower flanges of the coupling above are further drives in the form of cylinders piece 45 on the upper ends of the bushings 49 58 and pistons 59 are provided. bump. Is that prevailing in the cylinders 31

Die Zylinder 37, 56 und 58 sind auf den seitlichen Druck genügend gestiegen, dann werden dadurch die Trägern des aufrechten und etwa rechteckig ge- 20 Buchsen 49 und mit ihnen das Querhaupt 20 herabstalteten Gestells 60 der Presse angeordnet, das auf gedrückt, das den Gegenstempel 22,16 abwärts dem Bett ruht und mit diesem verbunden ist. mitnimmt. Infolgedessen setzt nunmehr das Loch-The cylinders 37, 56 and 58 have risen enough to the lateral pressure, then the Carriers of the upright and roughly rectangular 20 bushings 49 and with them the crosshead 20 downward Frame 60 of the press arranged, which is pressed on, which the counter punch 22,16 downwards rests on the bed and is connected to it. takes away. As a result, the hole

Der Blockaufnehmer 11 kann zu einer außerhalb werkzeug 42 seinen Hub fort und durchlocht dabei der Presse gelegenen Stelle verfahren werden, an die noch verbliebene untere Wandung des Blocks, welcher der gelochte Block durch einen Stößel aus- 25 Begrenzt wird der Abwärtshub des Querhaupts 20 geworfen wird, der in die Bohrung 14 des Auf- durch die Anschläge 29 auf den Stangen 28. Praknehmers von unten her eintritt. Alsdann kann in die tisch verläuft das Lochen des Blocks pausenlos, Bohrung 14 ein neuer Block eingeführt werden. wobei auch die untere Wandung des Loches durch-Zwischendurch kann man den Aufnehmer reinigen, stoßen wird, da das Ingangsetzen des Widerlagerkühlen und schmieren oder sonstwie für den nächsten 30 querhaupts 20 kaum eine merkliche Verzögerung mit Arbeitsgang warten. sich bringt.The block pick-up 11 can continue its stroke to an outside tool 42 and perforated it the press is moved to the remaining lower wall of the block, which the perforated block is limited by a ram, the downward stroke of the crosshead 20 is thrown into the bore 14 of the up through the stops 29 on the rods 28 enters from below. Then the punching of the block can run non-stop in the table, Hole 14 a new block is introduced. whereby also the lower wall of the hole through-between one can clean the transducer, will bump, since the starting of the abutment cooling and smear or otherwise for the next 30 crosshead 20 hardly any noticeable delay Wait for the operation. brings itself.

Bei Beginn des Arbeitsspiels befinden sich die Die Holme 30 und 40 bleiben nun stehen. SieAt the beginning of the work cycle, the bars 30 and 40 now stop. she

Teile der Presse in der in F i g. 1 dargestellten Lage, werden dann wieder dadurch in die Ausgangslage mit Ausnahme des Querhaupts 20, das sich mit dem übergeführt, daß die Zylinder 37 unter Druck gesetzt Gegenstempel 22,16 in seiner unteren Lage befindet. 35 werden. Dabei wird der Lochstempel 42 aus dem Die Werkzeuge 42 und 52 sind zurückgezogen und Block B nach oben herausgezogen. Beim Abstreifen ineinandergeschoben. In die Zwischenräume zwischen des Blocks vom Lochstempel hilft das Stauchwerkden Buchsen 48 und dem mittleren Querhaupt 50 zeug 52, da dieses in Anlage mit der Oberseite des sind die Abstandsstücke 53 eingeschoben. Nunmehr durchlochten Blocks bleibt, und zwar unter der wird von der außerhalb der Presse gelegenen Ruhe- 40 Kraft der unter Druck gesetzten Niederhalterstellung aus der Aufnehmer 11 mit einem Block B zylinder 56, während sich der Lochstempel 42 aufbeschickt in die Presse eingefahren, bis er den Werk- wärts bewegt. Das Querhaupt 20 mit dem Gegenzeugen 42 und 52 gegenüber in Achsenrichtung aus- stempel 22,16 wird durch die Zylinder 26 und die gerichtet ist. Dann wird das Widerlagerquerhaupt 20 Kolben 27 in seiner unteren Lage gehalten,
durch die Zylinder 23 und die Kolben 24 angehoben, 45 Ist der Lochstempel 42 aus dem Block B herausso daß der Gegenstempel 16 in die ringförmige gezogen, dann stoßen die Kupplungsstücke 45 mit Matrize 15 eintritt und dadurch die Aufnehmer- ihren oberen Flächen unten am mittleren Querhaupt bohrung unten verschließt. Der Block B im Auf- 50 an und nehmen dieses aufwärts mit, so daß es nehmer ruht nun auf der ringförmigen Matrize und sich zusammen mit dem oberen Holm 40 aufwärts auf dem Gegenstempel 16. 50 bewegt und das Stauchwerkzeug 52 zusammen mit
Parts of the press in the in F i g. 1, are then returned to the starting position with the exception of the crosshead 20, which is transferred with the fact that the cylinder 37 is pressurized counter-punch 22, 16 is in its lower position. 35 become. The tools 42 and 52 are withdrawn and block B is pulled out upwards. Pushed into one another when stripping. In the gaps between the block of the punch, the upsetting tool helps the bushings 48 and the central crosshead 50 tool 52, as this is in contact with the top of the spacers 53 are inserted. Now perforated block remains, namely under the is located outside the press rest 40 force of the pressurized hold-down position from the receiver 11 with a block B cylinder 56, while the punch 42 is loaded into the press, until it moves the Moved to the factory. The crosshead 20 with the counter-tools 42 and 52 opposite in the axial direction punch 22, 16 is directed by the cylinder 26 and which is directed. Then the abutment crosshead 20 piston 27 is held in its lower position,
lifted by the cylinder 23 and the piston 24, 45 If the punch 42 is out of the block B so that the counter punch 16 is pulled into the annular, then the coupling pieces 45 butt with the die 15 and thereby the upper surfaces of the transducers at the bottom of the central crosshead bore closed at the bottom. The block B in the pick-up 50 and take it upwards with it, so that it now rests on the ring-shaped die and together with the upper spar 40 moves upwards on the counter punch 16.50 and the upsetting tool 52 along with it

Nunmehr wird durch die Kanäle 36, die Rohre 34 dem Lochstempel 42 anhebt. Unterstützt wird dabei und die Bohrungen 33 das hydraulische Druckmittel das mittlere Querhaupt 50 dadurch, daß die Zyin die Zylinder 31 des unteren Holmes 30 eingeführt. linder 58 unter Druck gesetzt werden.
Das führt dazu, daß die beiden Holme 30 und 40 und Da die Werkzeuge 42 und 52 und der Gegen-
Now, through the channels 36, the tubes 34 lift the punch 42. The hydraulic pressure medium and the middle crosshead 50 are supported by the fact that the cylinder 31 of the lower spar 30 is inserted into the cylinder 31. linder 58 are put under pressure.
This leads to the fact that the two bars 30 and 40 and Since the tools 42 and 52 and the counter-

die sie verbindenden Zuganker 43, 44 herabgehen. 55 stempel 16 nicht mehr in die Bahn des Aufnehmers Da die Abstandsstücke 53 eingeschoben sind, nimmt 11 hineinragen, kann dieser auf der Presse auf den der obere Holm 40 das mittlere Querhaupt 50 bei Schienen 12 herausgefahren werden und gelangt dann seinem Abwärtshub mit. Das Querhaupt 20 hingegen an die außerhalb der Presse gelegene Ruhestellung, in verbleibt in seiner oberen Lage, da die Zylinder 23 der der gelochte Block aus dem Aufnehmer ausgeunter Druck stehen. 60 stoßen und durch einen neuen Block ersetzt werdenthe tie rods 43, 44 connecting them go down. 55 punch 16 no longer in the path of the transducer Since the spacers 53 are inserted, 11 protrudes, this can be on the press on the the upper spar 40, the middle crosshead 50 at rails 12 can be extended and then arrives its downstroke with. The crosshead 20, however, to the rest position located outside the press, in remains in its upper position, since the cylinder 23 of the perforated block is removed from the transducer Standing under pressure. 60 and replaced with a new block

Gleichzeitig können auch die Niederhaltezylinder kann und an der weitere Wartungen vorgenommen 56 unter hydraulischen Druck gesetzt werden. Die werden können.At the same time, the hold-down cylinder can and can be carried out on the further maintenance 56 are placed under hydraulic pressure. Which can be.

Werkzeuge 42 und 52 gehen zusammen herab und Der Gegenstempel 16 geht alsdann wieder auflegen sich unter Druck oben auf den Block B, wo- wärts in den Raum hinein, der durch den Aufdurch dieser gestaucht wird, bis er den Querschnitt 65 nehmer 11 freigegeben ist, so daß vom oberen Ende der Aufnehmerbohrung 14 völlig ausfüllt. Ist das des Gegenstempels 16 der ausgestanzte Blockboden geschehen, dann werden die Abstandsstücke 53 mittels eines besonderen Werkzeugs abgestreift zurückgezogen. werden kann. Es besteht jedoch auch die Möglich-Tools 42 and 52 go down together and the counter punch 16 then goes back to rest under pressure on top of the block B, into the space that is compressed by the opening of this until the cross section 65 holder 11 is released, so that from the upper end of the receiving bore 14 completely fills. Once the punched-out block bottom of the counter-punch 16 has occurred, the spacers 53 are stripped and withdrawn by means of a special tool. can be. However, there is also the possibility

keit, den Aufnehmer 11 mit einer besonderen Öffnung oder einem Ansatz mit einer Öffnung zu versehen, der den ausgestanzten Boden des Blocks aufnehmen kann. Nach Rücklauf des Aufnehmers in die Presse gelangt dann die Öffnung mit dem ausgestanzten Blockboden in eine Lage außerhalb der Pressenachse, um dort entfernt zu werden. Nach Rücklauf des Aufnehmers mit einem neuen Block wird das Querhaupt 20 dadurch angehoben, daß die Zylinder 23 unter Druck gesetzt werden, bis der Abstandsring 21 von unten her gegen das Bett 10 stößt. Nunmehr steht die Presse für den nächsten Arbeitsgang in Bereitschaft.ability to the transducer 11 with a special opening or an approach with an opening provided that can accommodate the punched bottom of the block. After the transducer has returned to the press then passes the opening with the punched-out block bottom in a position outside of the Press axis to be removed there. After the sensor has returned with a new block the crosshead 20 is raised by pressurizing the cylinders 23 until the spacer ring 21 pushes against the bed 10 from below. The press is now ready for the next step on stand by.

Claims (3)

Patentansprüche:Patent claims: 1. Hydraulische Lochpresse mit abwärts gerichtetem Zugantrieb, bei dem das Lochwerkzeug auf einem beweglichen oberen Holm und der Aufnehmer auf einem ortsfesten Bett der Presse angeordnet ist und sich der hydraulische ao Antrieb zum Herabziehen des Lochwerkzeuges unter dem Bett befindet und wobei ein Aufnehmer mit einer durchgehenden Bohrung und ein beweglicher Gegenstempel zum Verschließen der Aufnehmerbohrung verwendet ist, dadurch gekennzeichnet, daß zwischen dem Bett (10) und dem Unterholm (30) ein Querhaupt (20) angeordnet ist, das den Gegenstempel (16) und einen Teil des Hauptantriebes (31, 32) trägt und daher während eines Lochvorganges in seiner oberen Lage gehalten wird, in welcher der Gegenstempel (16) die Aufnehmerbohrung (14) verschließt.1. Hydraulic punch press with downward traction drive, in which the punch on a movable upper spar and the transducer on a stationary bed of the Press is arranged and the hydraulic ao drive for pulling down the punching tool located under the bed and with a transducer with a through hole and a movable counter punch is used to close the receiving bore, thereby characterized in that a crosshead (20) is arranged between the bed (10) and the lower beam (30), which the counter punch (16) and a part of the main drive (31, 32) carries and therefore during a punching process in its upper position is held, in which the counter punch (16) the receiving bore (14) locks. 2. Hydraulische Lochpresse nach Anspruch 1, gekennzeichnet durch einen zwischen Pressenbett (10) und Querhaupt (20) angeordneten und die Aufwärtsbewegung des Querhaupts (20) begrenzenden Abstandsring (21).2. Hydraulic punch press according to claim 1, characterized by an between press bed (10) and crosshead (20) arranged and the upward movement of the crosshead (20) limiting Spacer ring (21). 3. Hydraulische Lochpresse nach Anspruch 2, dadurch gekennzeichnet, daß zur Begrenzung des Absenkens des Querhaupts (20) am Pressenbett (10) befestigte Anschläge (29) vorgesehen sind.3. Hydraulic punch press according to claim 2, characterized in that to limit the Lowering of the crosshead (20) on the press bed (10) attached stops (29) are provided. Hierzu 1 Blatt Zeichnungen1 sheet of drawings
DE1965L0049900 1964-02-07 1965-02-05 Hydraulic punch press with downward traction drive Pending DE1300499B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB534864A GB1088852A (en) 1964-02-07 1964-02-07 Hydraulic press of the pull-down type

Publications (1)

Publication Number Publication Date
DE1300499B true DE1300499B (en) 1969-10-02

Family

ID=9794417

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1965L0049900 Pending DE1300499B (en) 1964-02-07 1965-02-05 Hydraulic punch press with downward traction drive

Country Status (2)

Country Link
DE (1) DE1300499B (en)
GB (1) GB1088852A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4379398A (en) * 1980-06-12 1983-04-12 Kabushiki Kaisha Kobe Seiko Sho Pull-back type indirect extrusion press
CN106903250A (en) * 2017-02-17 2017-06-30 清华大学 One kind perforation press

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT142540B (en) * 1934-10-11 1935-08-10 Alfina Immobilien Finanzierung Hydraulic press for punching tube blanks.
GB729248A (en) * 1951-12-22 1955-05-04 Hydropress Inc Billet piercing press
US2732738A (en) * 1956-01-31 Hydraulic press

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2732738A (en) * 1956-01-31 Hydraulic press
AT142540B (en) * 1934-10-11 1935-08-10 Alfina Immobilien Finanzierung Hydraulic press for punching tube blanks.
GB729248A (en) * 1951-12-22 1955-05-04 Hydropress Inc Billet piercing press

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4379398A (en) * 1980-06-12 1983-04-12 Kabushiki Kaisha Kobe Seiko Sho Pull-back type indirect extrusion press
CN106903250A (en) * 2017-02-17 2017-06-30 清华大学 One kind perforation press
CN106903250B (en) * 2017-02-17 2018-08-28 清华大学 A kind of perforation press

Also Published As

Publication number Publication date
GB1088852A (en) 1967-10-25

Similar Documents

Publication Publication Date Title
DD270505A5 (en) METHOD AND DEVICE FOR CONSTRUCTING A CONTAINER
DE3909757A1 (en) PRESS WITH A TOOL BASE TO BE INSERTED INTO THE PRESS
DE3032355A1 (en) HYDRAULIC DIE FORGING PRESS IN SURFACE DESIGN WITH PRELOADED PRESS RACK
DE2830779C2 (en) Hydraulic double pressure press
DE2224592C3 (en) Double acting hydraulic powder press with a single hydraulic cylinder
DE2748462A1 (en) PRESS FOR THE PRODUCTION OF CERAMIC OR FIRE-RESISTANT TILES OR TILES
DE8021267U1 (en) LOAD BALANCING DEVICE FOR PRESS TOOLS
DE1300499B (en) Hydraulic punch press with downward traction drive
DE3025156C2 (en) Press with a punching and / or pressing tool
DE1219199B (en) Hydraulically operated climbing device for lifting and lowering loads
DE2210795C3 (en) Hydraulic vertical press
DE3136753C2 (en) Deep-drawing device for blank
DE19611611A1 (en) Machine press
DE925193C (en) Improvement on hydraulic or pneumatic climbing brackets, especially for concrete forms
DE2250924C3 (en) Climbing hoist for lifting or lowering large loads
DE626058C (en) Hydraulic sheet metal bending press
DE19607257C2 (en) Hydraulic sheet metal press
DE19729384C2 (en) Hydro forming press
AT390226B (en) Apparatus for the installation and removal of press tools
DE1933490A1 (en) Rotary press
AT162192B (en) Lever press for fruit juice extraction.
DE1502177A1 (en) Apparatus designed in the manner of a press
DE2530373A1 (en) FORGING PRESS
DE333404C (en) Hydraulic forming machine with extendable crosshead and upper ram
AT271142B (en) Impact processing machine