DE112012003487T5 - System und Verfahren zur Optimierung des Betriebs eines Wassernetzes - Google Patents

System und Verfahren zur Optimierung des Betriebs eines Wassernetzes Download PDF

Info

Publication number
DE112012003487T5
DE112012003487T5 DE112012003487.2T DE112012003487T DE112012003487T5 DE 112012003487 T5 DE112012003487 T5 DE 112012003487T5 DE 112012003487 T DE112012003487 T DE 112012003487T DE 112012003487 T5 DE112012003487 T5 DE 112012003487T5
Authority
DE
Germany
Prior art keywords
water
unit
optimization
scenarios
scenario
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE112012003487.2T
Other languages
German (de)
English (en)
Inventor
Guido Sand
Frederik Blank
Ralf Lenz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABB Schweiz AG
Original Assignee
ABB Technology AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB Technology AG filed Critical ABB Technology AG
Publication of DE112012003487T5 publication Critical patent/DE112012003487T5/de
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Feedback Control In General (AREA)
DE112012003487.2T 2011-08-22 2012-08-13 System und Verfahren zur Optimierung des Betriebs eines Wassernetzes Pending DE112012003487T5 (de)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EPE111893814 2011-08-22
EP11189381 2011-11-16
PCT/EP2012/065802 WO2013026731A1 (en) 2011-08-22 2012-08-13 System and method to optimize operation of a water network

Publications (1)

Publication Number Publication Date
DE112012003487T5 true DE112012003487T5 (de) 2014-05-08

Family

ID=46682833

Family Applications (1)

Application Number Title Priority Date Filing Date
DE112012003487.2T Pending DE112012003487T5 (de) 2011-08-22 2012-08-13 System und Verfahren zur Optimierung des Betriebs eines Wassernetzes

Country Status (5)

Country Link
DE (1) DE112012003487T5 (da)
DK (1) DK201470104A (da)
NO (1) NO347239B1 (da)
SE (1) SE1450161A1 (da)
WO (1) WO2013026731A1 (da)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019020183A1 (de) * 2017-07-27 2019-01-31 Siemens Aktiengesellschaft Verfahren und vorrichtung zur wasserbedarfsberechnung

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201402695D0 (en) * 2014-02-16 2014-04-02 Arscott David S System for optimising performance in a water network
CN104008425B (zh) * 2014-05-12 2017-05-17 国家电网公司 基于引力搜索的水火电系统多目标调峰方法
US10580095B2 (en) * 2015-03-20 2020-03-03 Accenture Global Solutions Limited Method and system for water production and distribution control
CN104732304A (zh) * 2015-04-15 2015-06-24 河南理工大学 基于灰色人工神经网络组合模型导水裂隙带高度预测方法
EP3112959B1 (en) * 2015-06-29 2021-12-22 SUEZ Groupe Method for detecting anomalies in a water distribution system
CN105868841B (zh) * 2016-03-21 2019-07-16 广西电网有限责任公司电力科学研究院 一种基于风电优先上网的风水火联合调度方法
CN109345010B (zh) * 2018-09-18 2021-08-24 中国水利水电科学研究院 一种梯级泵站的多目标优化调度方法
GB201817011D0 (en) * 2018-10-18 2018-12-05 Inflowmatix Ltd Hydraulic network model
CN109636148B (zh) * 2018-11-29 2022-09-13 华南理工大学 基于能量网络方程的多能流系统的工作状态评估方法
CN110136026A (zh) * 2019-04-30 2019-08-16 佛山水业集团高明供水有限公司 一种水厂配水的控制方法及其控制系统
CN110610264B (zh) * 2019-09-05 2022-10-14 大连理工大学 一种针对不确定性情景下供水管网调控的单目标优化方法
EP3843027A1 (en) * 2019-12-27 2021-06-30 Fundación Tecnalia Research & Innovation Method, system and computer program product for predicting water usage in a water supply network
CN111652503B (zh) * 2020-06-01 2023-12-12 中南大学 基于网络流模型的多梯级多线船闸联合调度方法及结构
CN112966359A (zh) * 2021-03-12 2021-06-15 扬州大学 一种城镇环状给水管网的管径优化布置方法
CN113311799B (zh) * 2021-06-09 2022-10-04 上海电器科学研究所(集团)有限公司 城市排水运行调度决策系统及构建方法
EP4428774A1 (en) * 2023-03-10 2024-09-11 Abb Schweiz Ag Method for robust controlling a water distribution network

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010005955B4 (de) 2010-01-27 2020-03-05 Abb Schweiz Ag Anordnung und Verfahren zur Optimierung der Arbeitsweise eines Versorgungsnetzes

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019020183A1 (de) * 2017-07-27 2019-01-31 Siemens Aktiengesellschaft Verfahren und vorrichtung zur wasserbedarfsberechnung

Also Published As

Publication number Publication date
DK201470104A (en) 2014-03-04
NO20140362A1 (no) 2014-05-22
NO347239B1 (no) 2023-07-24
SE1450161A1 (sv) 2014-04-14
WO2013026731A1 (en) 2013-02-28

Similar Documents

Publication Publication Date Title
DE112012003487T5 (de) System und Verfahren zur Optimierung des Betriebs eines Wassernetzes
Zhao et al. Integrating a reservoir regulation scheme into a spatially distributed hydrological model
DE602005002839T2 (de) Ablaufplanung von industriellen produktionsprozessen
DE102010005955B4 (de) Anordnung und Verfahren zur Optimierung der Arbeitsweise eines Versorgungsnetzes
DE102009052840A1 (de) System und Verfahren zur optimierten Entscheidungsfindung bei Wasserversorgungsnetzen und/oder Wasserversorgungsbetrieben
DE102012105184A1 (de) System, Verfahren und Vorrichtung zum Betrieb für ein Energieverteilungssystem
DE102011118900A1 (de) Energieverwaltungsverfahren und -System und computerlesbares Speichermedium, um das Verfahren zu speichern
Efstratiadis et al. Generalized storage-reliability-yield framework for hydroelectric reservoirs
WO2010057516A1 (de) Verfahren zur ermittlung elektrischer lastflüsse in einem elektrischen energieversorgungsnetz
Armenia et al. Water resource management through systemic approach: The case of Lake Bracciano
EP2854250A2 (de) Verfahren zur Analyse eines aggregierten Verbrauchssignals und zur Laststeuerung in einem elektrischen Versorgungssystem
EP3918429B1 (de) Verfahren und vorrichtung zum steuern eines wasserversorgungsnetzes
Ilich Improving real-time reservoir operation based on combining demand hedging and simple storage management rules
Li et al. An inexact risk management model for agricultural land-use planning under water shortage
JP3321308B2 (ja) プラント予測制御装置
Amanat Behbahani et al. Optimal water allocation and distribution management in irrigation networks under uncertainty by multi‐stage stochastic case study: Irrigation and drainage networks of Maroon
EP3664243B1 (de) Prädiktive betriebsplanung in einem mikronetz unter berücksichtigung von hochlastzeitfenstern eines hauptstromnetzes
EP3352326A1 (de) System zur generierung von echtzeit-information und prognose von leistungsregelungen aufgrund von netzengpässen in einem stromnetz
Jairaj et al. Modeling reservoir irrigation in uncertain hydrologic environment
EP4176504A1 (de) Netz zur verteilung elektrischer energie
DE202017100343U1 (de) System zur Generierung von Echtzeit-Information und Prognose von Leistungsregelungen aufgrund von Netzengpässen in einem Stromnetz
DE102017101265A1 (de) System zur Generierung von Echtzeit-Information und Prognose von Leistungsregelungen aufgrund von Netzengpässen in einem Stromnetz
DE19510343C2 (de) Verfahren zur sequentiellen Vorsteuerung eines Prozesses
WO2019096424A1 (de) Steuerung von microgrids
AT404885B (de) Verfahren zur leistungsermittlung sowie zur optimierung des einsatzes von kraftwerken einer schwellkette

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R083 Amendment of/additions to inventor(s)
R081 Change of applicant/patentee

Owner name: ABB SCHWEIZ AG, CH

Free format text: FORMER OWNER: ABB TECHNOLOGY AG, ZUERICH, CH

R082 Change of representative

Representative=s name: MAIWALD GMBH, DE

R016 Response to examination communication
R002 Refusal decision in examination/registration proceedings