DE112012003487T5 - System and method for optimizing the operation of a water network - Google Patents

System and method for optimizing the operation of a water network Download PDF

Info

Publication number
DE112012003487T5
DE112012003487T5 DE112012003487.2T DE112012003487T DE112012003487T5 DE 112012003487 T5 DE112012003487 T5 DE 112012003487T5 DE 112012003487 T DE112012003487 T DE 112012003487T DE 112012003487 T5 DE112012003487 T5 DE 112012003487T5
Authority
DE
Germany
Prior art keywords
water
unit
optimization
scenarios
scenario
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE112012003487.2T
Other languages
German (de)
Inventor
Guido Sand
Frederik Blank
Ralf Lenz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABB Schweiz AG
Original Assignee
ABB Technology AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB Technology AG filed Critical ABB Technology AG
Publication of DE112012003487T5 publication Critical patent/DE112012003487T5/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Feedback Control In General (AREA)

Abstract

Ein System zur Optimierung des Betriebs eines Wassernetzes, umfassend zumindest eine Datenspeichereinheit (23) zum Speichern eines Hydraulikmodells sowie zumindest einer Betriebseinschränkung des Wassernetzes (17), wobei das Hydraulikmodell die Abhängigkeit von Druckhöhen und Strömen im Wassernetz von einem Betriebszustand zumindest einer Stelleinheit (20) des Wassernetzes und von einem erwarteten Wasserbedarf darstellt, zumindest eine Verarbeitungseinheit, die eine Optimierungseinheit (OP) enthält, wobei die Optimierungseinheit angepasst ist, um zumindest eine Betriebskonfigurationsinformation für die zumindest eine Stelleinheit zu erstellen, indem sie eine Zielfunktion eines Optimierungsproblems minimiert, wobei das Optimierungsproblem auf dem Hydraulikmodell basiert, zumindest eine Ausgabeschnittstelle (18) zur Bereitstellung der zumindest einen Betriebskonfigurationsinformation für die zumindest eine Stelleinheit. Damit das Wassernetz mit einer gesenkten unteren Wasserstandsgrenze einer Wasserspeichereinrichtung betrieben werden kann, enthält die zumindest eine Verarbeitungseinheit außerdem eine Szenarienerstellungseinheit (SG) zur Erstellung einer endlichen Menge von Szenarien in Form von möglichen Realisierungen des erwarteten Wasserbedarfs im Laufe der Zeit und/oder des Betriebszustands und/oder von Merkmalen der zumindest einen Stelleinheit und/oder des zumindest einen Parameters des Hydraulikmodells, wobei die endliche Menge von Szenarien auf Wahrscheinlichkeitsinformationen über die Unsicherheit dieser Variablen basiert. Die Optimierungseinheit ist angepasst, um die Zielfunktion des Optimierungsproblems durch Ausführung einer stochastischen Optimierung zu minimieren, wobei das Optimierungsproblem ferner die Zielfunktion zur Darstellung zumindest eines unerwünschten Nebeneffekts des Betriebs der zumindest einen Stelleinheit, die zumindest eine Betriebseinschränkung und die endliche Menge von Szenarien berücksichtigt.A system for optimizing the operation of a water network, comprising at least one data storage unit (23) for storing a hydraulic model and at least one operating restriction of the water network (17), the hydraulic model determining the dependence of pressure levels and currents in the water network on an operating state of at least one actuating unit (20) of the water network and an expected water demand, at least one processing unit including an optimization unit (OP), wherein the optimization unit is adapted to create at least operating configuration information for the at least one actuator by minimizing an objective function of an optimization problem, the optimization problem based on the hydraulic model, at least one output interface (18) for providing the at least one operating configuration information for the at least one actuator. In order for the water network to be operated with a lowered lower water level limit of a water storage facility, the at least one processing unit also includes a scenario generation unit (SG) for creating a finite set of scenarios in the form of possible realizations of the expected water demand over time and / or operating condition and or features of the at least one actuator and / or the at least one parameter of the hydraulic model, wherein the finite set of scenarios is based on probability information about the uncertainty of those variables. The optimization unit is adapted to minimize the objective function of the optimization problem by performing stochastic optimization, the optimization problem further including the objective function of representing at least one undesirable side effect of the operation of the at least one actuator, the at least one operational constraint, and the finite set of scenarios.

Description

Die Erfindung betrifft ein System und ein Verfahren zur Optimierung des Betriebs eines Wassertransport- und/oder -verteilungsnetzes, im Folgenden auch Wassernetz genannt. Das System umfasst zumindest eine Datenspeichereinheit zum Speichern eines Hydraulikmodells sowie zumindest einer Betriebseinschränkung des Wassernetzes, wobei das Hydraulikmodell die Abhängigkeit der Druckhöhen und Ströme im Wassernetz von einem Betriebszustand zumindest einer Stelleinheit des Wassernetzes und von einem erwarteten Wasserbedarf darstellt, zumindest eine Verarbeitungseinheit, die eine Optimierungseinheit enthält, wobei die Optimierungseinheit angepasst ist, um zumindest eine Betriebskonfigurationsinformation für die zumindest eine Stelleinheit zu erstellen, indem sie eine Zielfunktion eines Optimierungsproblems minimiert, wobei das Optimierungsproblem auf dem Hydraulikmodell basiert, und zumindest eine Ausgabeschnittstelle zur Bereitstellung der zumindest einen Betriebskonfigurationsinformation für die zumindest eine Stelleinheit. Die durch die oben genannten Systemelemente ausgeführten Schritte definieren das entsprechende Verfahren.The invention relates to a system and a method for optimizing the operation of a water transport and / or distribution network, also referred to below as water network. The system comprises at least one data storage unit for storing a hydraulic model and at least one operating restriction of the water network, the hydraulic model representing the dependence of the pressure levels and flows in the water network on an operating state of at least one actuating unit of the water network and on an expected water requirement, at least one processing unit comprising an optimization unit wherein the optimization unit is adapted to create at least one operation configuration information for the at least one actuator by minimizing an objective function of an optimization problem, the optimization problem being based on the hydraulic model, and at least one output interface for providing the at least one operation configuration information for the at least one adjusting unit. The steps performed by the above system elements define the corresponding method.

Da Energiepreise ständig steigen, prüfen mehr und mehr Wasserversorgungseinrichtungen die Betriebsstrategie ihrer energieaufwändigen Wassertransport- und/oder -verteilungsnetze, um Energie- und Betriebskosten zu senken. Während ein Wasserverteilungsnetz Wasser von einer Wasserquelle zu verschiedenen industriellen und/oder privaten Wasserverbrauchern transportiert, transportiert ein Wassertransportnetz Wasser über weite Distanzen von mehreren hundert Kilometern, beispielsweise von einer Meerwasserentsalzungsanlage zu einem oder zu mehreren Wasserverteilungsnetzen. Beim Betrieb dieser Wassernetze besteht die Möglichkeit deutlicher Verbesserungen der Betriebseffizienz. Der Austausch oder die Überholung von energieaufwändigen Stellantrieben im Wassernetz, z. B. von Pumpen, ist eine Möglichkeit, die heute schon am häufigsten umgesetzt wird. Die andere Möglichkeit besteht darin, die Wechselwirkung zwischen den verschiedenen Stellantrieben und die gesamte Betriebsstrategie des kompletten Netzes zu optimieren.As energy prices continue to rise, more and more water utilities are reviewing the operating strategy of their energy-intensive water transport and / or distribution networks to reduce energy and operating costs. While a water distribution network transports water from a source of water to various industrial and / or private water consumers, a water transport network transports water over long distances of several hundred kilometers, for example from a seawater desalination plant to one or more water distribution networks. When operating these water networks, there is the possibility of significant improvements in operating efficiency. The replacement or overhaul of energy-consuming actuators in the water network, z. As pumps, is a possibility that is already being implemented most often today. The other possibility is to optimize the interaction between the various actuators and the entire operating strategy of the entire network.

Das obere Diagramm in 1a zeigt ein Betriebsverfahren für ein Wassernetz, wie es derzeit abläuft: Wasserversorgungseinrichtungen versuchen, die Netzplanung so anzupassen, dass die Wasserstände 1 in den Wasserspeichereinrichtungen, auch als Wasserspeicherdruckhöhe bezeichnet, zwischen den Obergrenzen 2 und den Untergrenzen 3 gehalten werden. Die Ober- und Untergrenzen sind in 1a als gestrichelte Linien dargestellt. Die Veränderung des Wasserstands 1 zwischen diesen Grenzen wird in Abhängigkeit vom Wasserverbrauch im Netz durch Konfiguration des Pumpensystems und durch eine direkte Verbindung des Wasserspeicherstands mit dem Pumpensteuersystem gesteuert: wenn sich der Wasserstand der Untergrenze nähert, werden automatisch Pumpen eingeschaltet, um den Wasserspeicherstand zu erhöhen. Wenn der Wasserstand hoch genug ist, werden Pumpen abgeschaltet. Die Anzahl an Pumpen, die gleichzeitig eingeschaltet wird, ist im unteren Diagramm in 1a gezeigt.The upper diagram in 1a shows a method of operating a water network as it is currently underway: Water supply facilities try to adjust the network planning so that the water levels 1 in the water storage facilities, also referred to as water storage head, between the upper limits 2 and the lower limits 3 being held. The upper and lower limits are in 1a shown as dashed lines. The change of the water level 1 between these limits is controlled depending on the water consumption in the network by configuration of the pump system and by a direct connection of the water storage level with the pump control system: when the water level approaches the lower limit, pumps are automatically switched on to increase the water storage level. When the water level is high enough, pumps will shut off. The number of pumps that is switched on at the same time is in the lower diagram in 1a shown.

Somit konzentrieren sich derzeitige Betriebsverfahren auf die Aufrechterhaltung von Wasserständen in den Wasserspeichern, um den Kundenbedarf zu jedem Zeitpunkt zu decken, wobei der Kundenbedarf jedoch Unsicherheiten unterliegt. Um mit dieser Unsicherheit im Bedarf umzugehen, legen die Wasserversorgungseinrichtungen künstlich höhere Grenzen für die Speicherdruckhöhengrenzen in den Speichern fest, bis zu 80% des Füllvermögens, um hohe Wasserstände in den Speichereinrichtungen aufrecht zu erhalten. Auf diese Weise ist in den Speichereinrichtungen ausreichend Wasser vorhanden, um den Bedarf abzudecken, auch wenn es zu unerwarteten Veränderungen im Bedarf kommt. Dieser Ansatz führt jedoch zu einer Erhöhung der Betriebskosten aufgrund der erforderlichen höheren Pumpkapazität.Thus, current operating procedures focus on maintaining water levels in reservoirs to meet customer demand at all times, but customer demand is subject to uncertainties. To cope with this uncertainty in demand, water supply facilities artificially set higher limits for reservoir pressure head limits in the reservoirs, up to 80% of the fill capacity, to maintain high water levels in the reservoirs. In this way, there is enough water in the storage facilities to meet the demand, even if there are unexpected changes in demand. However, this approach leads to an increase in operating costs due to the required higher pumping capacity.

Außerdem lässt dieser Ansatz mögliche Vorteile einer zeitlichen Verschiebung der Füllvorgänge außer Acht, z. B. wenn Energietarife niedrig sind, oder des Betreibens von Pumpen zum Transport des Wassers durch das Netz mit verringerter Geschwindigkeit oder mit höchster Effizienz, was erreicht werden kann, indem Wasser in Speichereinrichtungen, wie z. B. Speichertanks, gespeichert wird, wenn es nicht benötigt wird.In addition, this approach disregards possible advantages of a temporal shift of the filling operations, z. When power rates are low, or operating pumps to transport the water through the network at a reduced rate or with the highest efficiency, which can be achieved by adding water to storage devices such as storage devices. As storage tanks, is stored when it is not needed.

Im Allgemeinen ist die Optimierung eines Wassernetzes die Bestimmung von Betriebsinformationen, die berücksichtigt werden müssen, wenn anschließend die Steuersignale für zumindest eine der Stelleinheiten des Netzes erzeugt werden, wobei die Stelleinheiten normalerweise Pumpen, Ventile innerhalb des Netzes sowie Stelleinheiten zur Steuerung des Zuflusses zu und/oder Abflusses aus Wasserspeichern und zur Steuerung einer oder mehrerer Quellströme des Wassernetzes sind. Die Betriebsinformationen für die Stelleinheiten werden so bestimmt, dass die Netzbetriebskosten, beispielsweise Energieverbrauchskosten, minimiert werden und gleichzeitig der Wasserbedarf, der Mindest- und/oder Höchstdruck oder die Durchflusshöhe in den Wasserrohren des Netzes sowie andere Betriebseinschränkungen des Wassernetzes eingehalten werden.In general, the optimization of a water network is the determination of operating information that must be taken into account when subsequently generating the control signals for at least one of the network's actuators, the actuators typically including pumps, valves within the network, and actuators to control the flow to and / or effluent from water reservoirs and for controlling one or more source streams of the water network. The operating information for the actuators shall be determined in such a way as to minimize network operating costs such as energy consumption while respecting the water demand, minimum and / or maximum pressure or flow height in the water pipes of the network and other operational limitations of the water network.

Verfahren zur Optimierung des Betriebs von Wasserverteilungsnetzen sind in der WO2011/092012 A2 sowie in „Combined Energy and Pressure Management in Water Distribution Systems” von P. Skworcow et al., Proc. World Environmental and Water Resources Congress, 2009, Great Rivers, S. 709–718, und in „Optimization Models for Operative Planning in Drinking Water Networks” von J. Burgschweiger et al., ZIB-Report 04–48, Konrad-Zuse-Zentrum für Informationstechnik, Berlin (2004) beschrieben. Diese Optimierungsverfahren basieren auf deterministischen Hydraulikmodellen oder speziell angepassten deterministischen Modellen, welche die physikalischen Eigenschaften von Wasserverteilungsnetzen abbilden. Basierend auf diesen Modellen werden Optimierungsalgorithmen verwendet, um optimierte Stellantrieb-Betriebszeitpläne und -Parameter über einen bestimmten, Zeithorizont, z. B. 24 Stunden, zu erstellen, wobei Veränderungen der Energietarife, zeitveränderlicher Bedarf und mögliche Speicherkapazitäten über diesen Zeithorizont berücksichtigt werden. Die Berücksichtigung des gesamten Optimierungshorizonts ermöglicht die volle Nutzung von Speicherkapazitäten des Wassernetzes, um Pumpabläufe oder energieaufwändige Vorgänge in Zeiten mit niedrigen Energietarifen zu verschieben und Pumpen mit energieeffizienter Geschwindigkeit zu betreiben, auch wenn der Bedarf höher ist als die Menge an gepumptem Wasser. Methods for optimizing the operation of water distribution networks are in the WO2011 / 092012 A2 and in "Combined Energy and Pressure Management in Water Distribution Systems" by P. Skworcow et al., Proc. World Environ- mental and Water Resources Congress, 2009, Great Rivers, pp. 709-718, and in "Optimization Models for Operative Planning in Drinking Water Networks" by J. Burgschweiger et al., ZIB Report 04-48, Konrad-Zuse. Center for Information Technology, Berlin (2004). These optimization methods are based on deterministic hydraulic models or specially adapted deterministic models that map the physical properties of water distribution networks. Based on these models, optimization algorithms are used to provide optimized actuator operating schedules and parameters over a particular, time horizon, e.g. 24 hours, taking into account changes in energy tariffs, time-varying demand and possible storage capacities over this time horizon. Taking the full optimization horizon into account, full utilization of storage capacity of the water network can be used to postpone pumping or energy-intensive operations in times of low energy rates and operate pumps at energy-efficient speeds, even if the demand is higher than the amount of pumped water.

Unglücklicherweise ist der Betrieb von Wassernetzen äußerst komplex und von vielen Unsicherheiten betroffen. Unsicherheiten sind beispielsweise variierender Wasserbedarf im Laufe der Zeit sowie sich ändernde Parameter, wie z. B. Pumpeneffizienz oder Differenzen zwischen dem Wassernetzmodell und dem realen Prozess. Die Unsicherheiten im Bedarf machen eine Vorhersage, die für die optimalen Stellantrieb-Zeitpläne, z. B. für Pumpen, Ventile, Speichertanks, Quellen, notwendig ist, schwierig und wirken sich auf die Qualität der Optimierungsergebnisse aus. In der Tat können Unsicherheiten sogar zu Unausführbarkeiten oder unerwünschtem Systemverhalten führen.Unfortunately, the operation of water networks is extremely complex and affected by many uncertainties. Uncertainties are, for example, varying water requirements over time and changing parameters, such. Pump efficiency or differences between the water network model and the real process. The uncertainties in demand make a prediction necessary for the optimal actuator schedules, e.g. As for pumps, valves, storage tanks, sources, is necessary, difficult and affect the quality of the optimization results. In fact, uncertainties can even lead to unworkability or undesirable system behavior.

Das linke Diagramm in 1b zeigt ein Beispiel für einen vorhergesagten Wasserbedarfstrend 5, der um 0h00 für die nächsten 24 Stunden vorhergesagt wurde. Der vorhergesagte Wasserbedarfstrend 5 ist die dunklere der beiden Kurven mit durchgehenden Linien. Das rechte Diagramm in 1b zeigt den resultierenden optimierten Wasserstandstrend 6 in einer Wasserspeichereinrichtung, insbesondere einem Wassertank, wie er für den vorhergesagten Wasserbedarf 5 zu erwarten ist, wenn optimierte Stellantrieb-Zeitpläne eingesetzt werden, die bei 0h00 für die nächsten 24 Stunden berechnet wurden. Dies ist hier wieder die dunklere der beiden Kurven mit durchgehenden Linien. Die Optimierung der Stellantrieb-Zeitpläne basiert im Beispiel aus 1b auf bekannten deterministischen Optimierungsalgorithmen. Für den Fall, dass der reelle Bedarf variiert und sich vom vorhergesagten unterscheidet – was sehr wahrscheinlich zu einem Zeitpunkt passieren wird, z. B. aufgrund von erhöhten Außentemperaturen oder aufgrund von Sportveranstaltungen, bei denen Wasser verbraucht wird kann die Unter- oder Obergrenze des Wasserspeichertanks unter- oder überschritten werden. Die Unter- und Obergrenze des Wasserstands im Wassertank sind im rechten Diagramm in 1b durch gestrichelte Linien dargestellt. Im Beispiel aus 1b werden optimierte Stellantrieb-Zeitpläne bei 0h00 für die vorhergesagte Bedarfskurve 5 berechnet und für die nächsten 24 Stunden angewandt. Die hellere der beiden Kurven im linken Diagramm in 1b veranschaulicht den Bedarf als Bedarfsrealisierung in der Realität 6. Wie zu sehen ist, ist der Bedarf in der Realität 6 etwa 6 Stunden lang höher als der erwartete Bedarf 5, zwischen etwa 6h00 und Mittag. Folglich unterschreitet der reale Wasserstand 8 in der Wasserspeichereinrichtung die annehmbare Untergrenze deutlich. Wenn diese Unterschreitung zu groß ist, kann der Druck zu niedrig werden, zumindest in Teilen des Wassernetzes. Ein Mechanismus, um die Unterschreitung der Untergrenze zu vermeiden, z. B. durch automatisches Einschalten einer Pumpe in der Wasserspeichereinrichtung, kann in den Optimierungsalgorithmus integriert werden, würde aber möglicherweise zu geringer Energieersparnis führen. Im schlimmsten Fall könnte das sogar zu höherem Energieverbrauch führen als ganz ohne Optimierung. Im Allgemeinen muss eine Unterschreitung der Untergrenze im Optimierungsalgorithmus erlaubt sein, um das Optimierungsproblem machbar zu lösen. Um dies zu berücksichtigen, ist die Einführung einer Lockerung der Untergrenzen bekannt. Dies erfolgt durch Einführung von Schlupfvariablen. Zum Ausgleich werden sie in der zu optimierenden Zielfunktion pönalisiert, um ihre Verwendung zu vermeiden. Es kommt jedoch häufig vor, dass die optimale deterministische Lösung eine Unterschreitung der unteren Wasserstandsgrenze erfordert, wenn ein willkürlicher Bedarf berücksichtigt wird. Meistens ist dies vorher nicht steuerbar, da bei Verwendung eines deterministischen Modells nicht vorhergesagt werden kann, wie weit die Unterschreitung geht.The left diagram in 1b shows an example of a predicted water demand trend 5 which was forecasted at 0h00 for the next 24 hours. The predicted water demand trend 5 is the darker of the two curves with solid lines. The right diagram in 1b shows the resulting optimized water level trend 6 in a water storage device, in particular a water tank, as it is for the predicted water requirement 5 is expected when using optimized actuator schedules calculated at 0h00 for the next 24 hours. This is again the darker of the two curves with solid lines. The optimization of the actuator schedules is based in the example 1b on known deterministic optimization algorithms. In the event that the real need varies and is different from the predicted - which is very likely to happen at a time, e.g. B. due to increased outdoor temperatures or due to sporting events in which water is consumed, the lower or upper limit of the water storage tank can be under or exceeded. The lower and upper limits of the water level in the water tank are in the right diagram in 1b represented by dashed lines. In the example off 1b Optimized actuator schedules will be at 0h00 for the predicted demand curve 5 calculated and applied for the next 24 hours. The lighter of the two curves in the left diagram in 1b illustrates the need for demand realization in reality 6 , As you can see, the need is in reality 6 about 6 hours longer than the expected demand 5 , between about 6h00 and noon. Consequently, the real water level falls below 8th in the water storage facility, the acceptable lower limit. If this undershoot is too great, the pressure may be too low, at least in parts of the water network. A mechanism to avoid falling below the lower limit, eg. B. by automatically switching on a pump in the water storage device, can be integrated into the optimization algorithm, but could possibly lead to low energy savings. In the worst case, this could even lead to higher energy consumption than without optimization. In general, an undershoot under the optimization algorithm must be allowed to feasibly solve the optimization problem. To take this into account, the introduction of a relaxation of the lower limits is known. This is done by introducing slip variables. To compensate, they are penalized in the objective function to be optimized in order to avoid their use. However, it often happens that the optimal deterministic solution requires falling below the lower water level limit when considering an arbitrary demand. Most of the time, this is not controllable before, since using a deterministic model, it is not possible to predict how far below the limit will be.

Um diese Situation zu überwinden, sammeln bestehende Lösungen, die mit einem Steuersystem oder einem SCADA-System (System zur Überwachung und Datenerfassung) interagieren, Echtzeit-Netzbetriebsdaten und berechnen optimierte Stellantrieb-Zeitpläne oder Alarmgrenzeneinstellungen neu, um sich an die neue Situation im Netz anzupassen. Die Neuberechnung erfolgt auf Basis eines periodischen Zeitplans, z. B. jede ganze Stunde, oder auf Basis von Ereignissen, wie z. B. der Übertretung von Unter- oder Obergrenzen. In der Lösungsformulierung der Optimierungsalgorithmen, sind große Sicherheitsmargen enthalten, um die Parameter so zu optimieren, dass diese Probleme überwunden werden und zu jedem Zeitpunkt, auch bei sich ändernden Bedingungen, eine Versorgung des Kundenbedarfs sichergestellt ist. Dies führt wieder zu einem konservativeren Ansatz dazu, wie das Wassernetz ausgeführt und betrieben wird. Im Falle von ereignisbasierten Neuberechnungen können die Neuberechnungen vergleichsweise oft notwendig werden, was zu häufigen Korrekturen der Stellantrieb-Zeitpläne und damit zu erheblicher Stellantriebaktivität führt. Letztendlich können die Energieersparnisse geringer sein als bei der oben beschriebenen Optimierung ohne jegliche Anpassung an die Netzsituation.To overcome this situation, existing solutions interacting with a control system or SCADA system collect real-time network operating data and recalculate optimized actuator schedules or alarm limit settings to accommodate the new network situation , The recalculation is based on a periodic schedule, eg. B. every hour, or based on events such. As the violation of lower or upper limits. In the solution formulation of the optimization algorithms, large safety margins are included in order to optimize the parameters in such a way that these problems are overcome and at any time, even with oneself changing conditions, a supply of customer needs is ensured. This again leads to a more conservative approach to how the water network is run and operated. In the case of event-based recalculations, recalculations may become necessary relatively often, resulting in frequent corrections of the actuator timings and thus significant actuator activity. Ultimately, the energy savings can be lower than in the optimization described above without any adaptation to the grid situation.

Deterministische Modellierungsstrategien bringen den Nachteil mit sich, dass sie Modellunsicherheiten und Betriebsunsicherheiten nur sehr begrenzt berücksichtigen können. Dies kann zu Unausführbarkeit oder unerwünschten Optimierungslösungen führen, wenn sie in der realen Welt umgesetzt werden.Deterministic modeling strategies have the disadvantage that they can take into account model uncertainties and operational uncertainties only very limited. This can lead to impracticability or unwanted optimization solutions when implemented in the real world.

Ein Ziel der vorliegenden Erfindung besteht in der Bereitstellung eines Systems und Verfahrens zur Optimierung des Betriebs eines Wassernetzes, mit dem die oben beschriebenen konservativen Ansätze überwunden werden, um die künstlich hohen Grenzen für die Wasserstände in den Speichereinrichtungen zu vermeiden, d. h. um insbesondere die untere Wasserstandsgrenze zu senken, während gleichzeitig das Risiko, dass das Wasser ausgeht, verringert wird.It is an object of the present invention to provide a system and method for optimizing the operation of a water network that overcomes the conservative approaches described above to avoid the artificially high limits for water levels in the storage devices; H. in particular, to lower the lower water level while at the same time reducing the risk of the water running out.

Gemäß der Erfindung umfasst die zumindest eine Verarbeitungseinheit außerdem eine Szenarienerstellungseinheit zur Erstellung einer endlichen Menge von Szenarien in Form von möglichen Realisierungen des erwarteten Wasserbedarfs im Laufe der Zeit und/oder des Betriebszustands der zumindest einen Stelleinheit und/oder des zumindest einen Parameters des Hydraulikmodells, wobei die endliche Menge von Szenarien auf Wahrscheinlichkeitsinformationen über die Unsicherheit des erwarteten Wasserbedarfs, des Betriebszustand bzw. des zumindest einen Parameters basiert und die Optimierungseinheit angepasst ist, um eine Zielfunktion des Optimierungsproblems durch Ausführung einer stochastischen Optimierung zu minimieren, wobei das Optimierungsproblem die Zielfunktion zur Darstellung zumindest eines unerwünschten Nebeneffekts des Betriebs der zumindest einen Stelleinheit, die zumindest eine Betriebseinschränkung und die endliche Menge von Szenarien in Form eines szenarienbasierten Optimierungsmodells berücksichtigt.According to the invention, the at least one processing unit further comprises a scenario creation unit for creating a finite set of scenarios in the form of possible implementations of the expected water demand over time and / or the operating state of the at least one actuator and / or the at least one parameter of the hydraulic model the finite set of scenarios is based on probability information about the uncertainty of the expected water demand, the operating state or the at least one parameter, and the optimization unit is adapted to minimize an objective function of the optimization problem by performing stochastic optimization, the optimization problem being the objective function for display at least an undesirable side effect of the operation of the at least one actuator, the at least one operational constraint and the finite set of scenarios in the form of a scenario-based optimization model.

Gemäß der Erfindung wird das Optimierungsproblem formuliert und gelöst, indem beschreibbare Modell- und Betriebsunsicherheiten direkt berücksichtigt werden, wodurch sichergestellt wird, dass definierte Grenzen und Bedarfswerte erfüllt werden. Dies ermöglicht außerdem eine insgesamt kosteneffektivere Lösung als bei Verwendung eines deterministischen Modells als Basis. Insbesondere da sichergestellt werden kann, dass die untere Wasserstandsgrenze einer Wasserspeichereinrichtung nicht weit unterschritten wird, kann die untere Wasserstandsgrenze sicher auf einen niedrigen Wert eingestellt werden.According to the invention, the optimization problem is formulated and solved by directly taking into account describable model and operational uncertainties, thereby ensuring that defined limits and demand values are met. This also provides an overall more cost-effective solution than using a deterministic model as a basis. In particular, since it can be ensured that the lower water level limit of a water storage device is not far below, the lower water level limit can be safely set to a low value.

Die Unsicherheiten werden für eines der Folgenden beschrieben:

  • • gemessene Signale, insbesondere Eingaben oder Störungen im Hydraulikmodell, wie z. B. Wasserbedarf,
  • • Betriebszustand und/oder Merkmale der Stelleinheiten, wie z. B. Effizienzkurven, z. B. Pumpeneffizienzkurven, und
  • • Modellparameter, z. B. Rohrrauigkeitskoeffizienten.
The uncertainties are described for one of the following:
  • • measured signals, in particular inputs or faults in the hydraulic model, such as: B. water demand,
  • • Operating status and / or features of the actuators, such as B. efficiency curves, z. B. pump efficiency curves, and
  • • Model parameters, eg B. pipe roughness coefficients.

Weitere Unsicherheiten können definiert werden. Wenn beispielsweise weitere Eingabeinformationen des Optimierungsproblems, wie z. B. Stromtarife oder Wasserquellkosten, nicht vorher für den nächsten Optimierungszeithorizont bekannt sind, was im nachstehend beschriebenen Beispiel 24 Stunden sind, können solche Informationen ebenfalls in Form von Unsicherheiten anstelle von zusätzlichen deterministischen Eingaben im Optimierungsproblem enthalten sein.Further uncertainties can be defined. For example, if further input information of the optimization problem, such. Electricity tariffs or water source costs not previously known for the next optimization time horizon, which in the example described below is 24 hours, such information may also be included in the form of uncertainties rather than additional deterministic inputs to the optimization problem.

In einer ersten Ausführungsform der Erfindung ist die Szenarienerstellungseinheit angepasst, um eine nachfolgende Szenarienreduktionstechnik anzuwenden, um ähnliche Szenarien zu bündeln und so den Rechenaufwand für die Optimierungseinheit während der Verarbeitung der resultierenden szenarienbasierten Optimierungsmodelle zu reduzieren. In einer weiteren Ausführungsform ist die Szenarienerstellungseinheit angepasst, um die endliche Menge von Szenarien durch Bildung eines Oberszenarios und eines Unterszenarios zu erstellen, die den Bereich möglicher Realisierungen im Laufe der Zeit für zumindest einen der oben genannten Werte oder Parameter, die Unsicherheiten ausgesetzt sind, definieren. Dies ist ein äußerst einfacher Ansatz für die Fälle, in denen nur wenige Informationen über Unsicherheiten und Wahrscheinlichkeiten zur Verfügung stehen.In a first embodiment of the invention, the scenario generation unit is adapted to apply a subsequent scenario reduction technique to bundle similar scenarios and thus reduce computational effort for the optimization unit during processing of the resulting scenario-based optimization models. In another embodiment, the scenario generation unit is adapted to create the finite set of scenarios by forming a top scenario and a subset that define the range of possible implementations over time for at least one of the above values or parameters that are subject to uncertainty , This is a very simple approach for cases where there is little information about uncertainties and probabilities.

In einer spezifischen Ausführungsform ist die Szenarienerstellungseinheit angepasst, um die Unsicherheiten durch einen stochastischen Prozess darzustellen, wobei jeder stochastische Prozess auf einem zugrunde liegenden kontinuierlichen Wahrscheinlichkeitsraum über einen Zeithorizont mit begrenzter Dauer definiert ist, wodurch eine explizite Darstellung der Unsicherheiten erzeugt wird.In a specific embodiment, the scenario generation unit is adapted to represent the uncertainties through a stochastic process, where each stochastic process is performed on a single stochastic process underlying continuous probability space over a time horizon of limited duration, thereby generating an explicit representation of the uncertainties.

In einer weiteren Ausführungsform ist die Szenarienerstellungseinheit angepasst, um die endliche Menge von Szenarien durch Ableitung der Unsicherheiten von Messdaten vom Wassernetz zu erstellen. Alternativ dazu können Unsicherheitsdaten aus einer Speichereinheit ausgelesen werden oder von einem Bediener in das System und so in die Szenarienerstellungseinheit eingegeben werden.In another embodiment, the scenario generation unit is adapted to create the finite set of scenarios by deriving the uncertainties of measurement data from the water network. Alternatively, uncertainty data may be read from a memory unit or entered by an operator into the system and thus into the scenario generation unit.

Die Szenarienerstellungseinheit kann außerdem angepasst sein, um die endliche Menge von Szenarien in Form eines Szenarienbaums für graphische Darstellungen bereitzustellen. Der Szenarienbaum kann dann von einem Benutzer weiter angepasst werden, bevor er zur Erstellung des Optimierungsproblems für die Optimierungseinheit verwendet wird.The scenario builder may also be adapted to provide the finite set of scenarios in the form of a graphical tree scenario tree. The scenario tree may then be further customized by a user before being used to create the optimizer optimization problem.

In einer speziellen Ausführungsform reflektiert die Zielfunktion den resultierenden Energieverbrauch und/oder den Wasserzufluss von einer Quelle, wenn die zumindest eine Stelleinheit in Betrieb ist.In a specific embodiment, the target function reflects the resulting energy consumption and / or the water flow from a source when the at least one actuator is in operation.

In dieser speziellen Ausführungsform kann die Optimierungseinheit weiter angepasst sein, um sich verändernde Tarife für Energie und Wasser aus der Quelle zu berücksichtigen.In this particular embodiment, the optimization unit may be further adapted to take into account changing energy and water tariffs from the source.

In einer weiteren Ausführungsform wird das Optimierungsproblem als begrenzte Diskretisierung eines Szenarios auf Basis eines stochastischen Zweistufen-Programmierungsmodells formuliert.In another embodiment, the optimization problem is formulated as a limited discretization of a scenario based on a stochastic two-stage programming model.

Das Hydraulikmodell kann auf einer Beschreibung der Topologie des Wassernetzes basieren, das eine Knotenmenge und eine Randmenge umfasst, wobei die Knotenmenge aus Speicherknoten, Wasserbedarfsknoten und Quellknoten besteht und wobei die Randmenge Wasserrohre, Pumpen und Ventile darstellt.The hydraulic model may be based on a description of the topology of the water network comprising a node set and an edge set, the node set consisting of storage nodes, water demand nodes, and source nodes, and wherein the marginal set represents water pipes, pumps, and valves.

In diesem Fall wird das Hydraulikmodell dann durch Zustandsgleichungen gebildet, welche die Abhängigkeit des zeitabhängigen Zustands des Wassernetzes von der zumindest einen Betriebskonfigurationsinformation der zumindest einen Stelleinheit und vom erwarteten Wasserbedarf darstellen und wobei der zeitabhängige Zustand aus Druckhöhen in den Knoten der Knotenmenge und Strömen an den Rändern der Randmenge besteht.In this case, the hydraulic model is then formed by state equations representing the dependence of the time dependent state of the water network on the at least one operating configuration information of the at least one actuator and the expected water demand, and wherein the time dependent state of pressure levels in the nodes of the node set and currents at the edges the marginal amount exists.

Um die Änderung einer unteren Wasserstandsgrenze einer Wasserspeichereinrichtung explizit zu berücksichtigen, kann die zumindest eine Verarbeitungseinheit ferner eine Wasserstandseinstelleinheit umfassen, die angepasst ist, um eine Abhängigkeit zwischen einer Senkung der unteren Wasserstandgrenze und einem Ausmaß, in dem der zumindest eine Nebeneffekt verringert wird, während gleichzeitig die zumindest eine Betriebseinschränkung eingehalten wird, zu schätzen und als weitere Eingabe in das Optimierungsproblem für die Optimierungseinheit bereitzustellen.In order to explicitly consider the change of a lower water level limit of a water storage device, the at least one processing unit may further comprise a water level setting unit adapted to adjust a dependency between lowering the lower water level limit and an extent at which the at least one side effect is reduced the at least one operational constraint is met, and to provide as further input to the optimization problem for the optimization unit.

Außerdem kann die Wasserstands konfigurationseinheit angepasst sein, um eine Abhängigkeit zwischen der Reduktion des unerwünschten Nebeneffekts und einem Risiko, dass die Wasserspeichereinrichtung einen kritischen Wasserstand erreicht, wobei der kritische Wasserstand anzeigen kann, dass die Wasserspeichereinrichtung kurz davor steht, auszutrocknen, oder dass sie einen Wasserstand erreicht, der nicht länger ausreicht, um ausreichend Druck für den Transport des Wassers durch die Wasserrohre bereitzustellen, zu schätzen und als weitere Eingabe in das Optimierungsproblem für die Optimierungseinheit bereitzustellen.In addition, the water level configuration unit can be adapted to a dependency between the reduction of the unwanted side effect and a risk that the water storage device reaches a critical water level, wherein the critical water level can indicate that the water storage device is about to dry out, or that they have a water level reached, which is no longer sufficient to provide sufficient pressure for the transport of water through the water pipes, estimate and provide as further input to the optimization problem for the optimization unit.

In einer weiteren spezifischen Ausführungsform ist die Szenarienerstellungseinheit angepasst, um die endliche Menge von Szenarien für eine Entscheidungsunterstützungseinheit bereitzustellen, wobei die Entscheidungsunterstützungseinheit angepasst ist, um für eine identifizierte mögliche Ursache eines Defekts im Wassernetz eine entsprechende Auswirkung auf das Wassernetz einzuschätzen, wobei die endliche Menge von Szenarien berücksichtigt wird.In another specific embodiment, the scenario generation unit is adapted to provide the finite set of scenarios for a decision support unit, the decision support unit adapted to estimate a corresponding impact on the water network for an identified potential cause of a defect in the water network, the finite amount of Scenarios is considered.

Die Erfindung und ihre Ausführungsformen gehen außerdem aus den nachstehend beschriebenen Beispielen in Verbindung mit den beiliegenden Zeichnungen hervor, die Folgendes zeigen:The invention and its embodiments will be more apparent from the following examples taken in conjunction with the accompanying drawings, in which:

1a, b Betriebsdiagramme von Wasserspeichereinrichtungen, die nach dem Stand der Technik bekannt sind, 1a , b are operational diagrams of water storage devices known in the art,

2 Szenarienbaum für einen Parameter P, 2 Scenario tree for a parameter P,

3 Unsicherheiten eines Parameters M, dessen Modell anhand von drei Szenarien erstellt wurde, 3 Uncertainties of a parameter M, whose model was created using three scenarios,

4 ein System zur Optimierung des Betriebs eines Wassernetzes, 4 a system for optimizing the operation of a water network,

5 einen Vergleich zwischen einer Optimierung ohne und einer mit Unsicherheiten in einem Modell, 5 a comparison between an optimization without and one with uncertainties in a model,

6 Beispiele für Ausgaben, die von einer Wasserstandseinstelleinheit erstellt wurden. 6 Examples of outputs created by a water level adjustment unit.

Wie oben erläutert wurde, ist die Hauptidee der Erfindung die folgende: Anstatt nur ein Optimierungsproblem zu formulieren, wie es mit deterministischen Modellansätzen erfolgt, werden die Unsicherheiten in den verschiedenen Parametern des Hydraulikmodells des Wassernetzes als endliche Menge von möglichen Realisierungen eines jeweiligen Parameters P im Laufe der Zeit modelliert, was zu szenarienbasierten Optimierungsmodellen führt. Jedes Szenario stellt eine mögliche Parameterrealisierung im Laufe der Zeit dar, d. h. wo zu einem bestimmten Zeitpunkt in der Zukunft ein bestimmter Wert für den jeweiligen Parameter P mit einer spezifischen Wahrscheinlichkeit ω1... ωr angenommen wird, was zu einem so genannten Szenarienbaum führt, wie er in 2 dargestellt ist.As explained above, the main idea of the invention is the following: Instead of formulating only one optimization problem, as is done with deterministic model approaches, the uncertainties in the various parameters of the hydraulic model of the water network become a finite set of possible implementations of a respective parameter P in the course time, resulting in scenario-based optimization models. Each scenario represents a possible parameter realization over time, ie where at some point in the future a certain value for the respective parameter P with a specific probability ω 1 ... ω r is assumed, resulting in a so-called scenario tree as he is in 2 is shown.

Jeder Pfad von der Wurzel zu einem der Blätter stimmt mit einem Szenario überein. Die Knoten entsprechen bestimmten Zeitpunkten t {0, ..., T}, zu denen Entscheidungen c(t) getroffen werden.Each path from the root to one of the leaves is consistent with a scenario. The nodes correspond to certain times t {0, ..., T}, at which decisions c (t) are made.

Das Optimierungsproblem kann beispielsweise gelöst werden, indem stochastische Zweistufen-Programmier-(2SSP-)Verfahren eingesetzt werden.For example, the optimization problem can be solved by using two-step stochastic programming (2SSP) techniques.

In vielen Situationen stehen nur unvollständige Informationen über die zugrunde liegende Wahrscheinlichkeitsverteilung zur Verfügung. Die Szenarienerstellung basiert dann meist auf der Verwendung von historischen Daten, die auf Schätzungs-, Simulations- und Stichprobenverfahren angewandt werden, oder schließen das Wissen eines erfahrenen Netzbetreibers ein.In many situations, only incomplete information about the underlying probability distribution is available. Scenario creation is then usually based on the use of historical data that is applied to estimation, simulation, and sampling techniques or includes the knowledge of an experienced network operator.

Der Rechenaufwand zur Lösung von szenarienbasierten Optimierungsmodellen hängt stark von der Anzahl an Szenarien im Modell ab. Daher muss ein Kompromiss zwischen der Genauigkeit der Approximation und der Modellgröße, die mit der Anzahl an Szenarien exponentiell steigt, in Betracht gezogen werden. Die Anwendung von speziellen Szenarienreduktionsverfahren unterstützt die Verringerung der Rechenzeit. Eine Ausführungsform der Erfindung basiert daher auf der Idee, die Anzahl an Knoten im Szenarienbaum zu verringern, indem ähnliche Szenarien gebündelt werden. Im extremen Fall könnte die endliche Menge von möglichen Parameterrealisierungen, d. h. die endliche Menge von Szenarien, beispielsweise auf nur zwei Szenarien reduziert werden, ein Unterszenario und ein Oberszenario, wobei jede(s) der beiden Szenarien oder Kurven die eine Kurve aus der unteren bzw. oberen Hälfte aller Kurven mit der höchsten Wahrscheinlichkeit darstellt.The computational burden of solving scenario-based optimization models depends heavily on the number of scenarios in the model. Therefore, a tradeoff must be made between the accuracy of the approximation and the model size, which increases exponentially with the number of scenarios. The use of special scenario reduction methods helps to reduce the computation time. An embodiment of the invention is therefore based on the idea of reducing the number of nodes in the scenario tree by bundling similar scenarios. In the extreme case, the finite set of possible parameter realizations, i. H. the finite set of scenarios, for example, reduced to only two scenarios, a sub-scenario and an upper scenario, where each of the two scenarios or curves represents the one curve from the lower and upper half of all curves with the highest probability.

Die Berücksichtigung von Unsicherheiten in der Formulierung des Optimierungsproblems führt zu robusteren Betriebskonfigurationsinformationen für die zumindest eine Stelleinheit, da Unausführbarkeiten leichter vermieden werden können. Auf einer längerfristigen Basis führt es auch zu höheren Kosteneinsparungen, da die Sicherheitsmargen der Ober- und Untergrenzen der Wasserstände, die heute aufgrund von deterministischen Problemformulierungen notwendig sind, reduziert werden können.The consideration of uncertainties in the formulation of the optimization problem leads to more robust operation configuration information for the at least one actuator since inefficiencies can be more easily avoided. On a longer term basis, it also leads to higher cost savings as the safety margins of the upper and lower limits of the water levels that are required today due to deterministic problem formulations can be reduced.

Die Betriebskonfigurationsinformation für die zumindest eine Stelleinheit kann eine aus folgenden sein:

  • • ein Stellantrieb-Zeitplan in Form einer zeitlichen Abfolge von Betriebszuständen der zumindest einen Stelleinheit oder
  • • eine Verweistabelle für Betriebsanweisungen für die Erzeugung eines Steuersignals für die zumindest eine Stelleinheit, wobei die Betriebsanweisungen in Abhängigkeit vom aktuellen Zeitpunkt und/oder aktuellen Zustand des Wassernetzes definiert werden, oder
  • • eine Menge von Parametern, einschließlich beispielsweise Mindest- und/oder Höchstwerten für die Steuersignale, die für die zumindest eine Stelleinheit erzeugt werden sollen.
The operation configuration information for the at least one actuator may be one of the following:
  • An actuator schedule in the form of a chronological sequence of operating states of the at least one actuator or
  • A reference table for operating instructions for the generation of a control signal for the at least one actuating unit, wherein the operating instructions are defined as a function of the current time and / or current status of the water network, or
  • A set of parameters including, for example, minimum and / or maximum values for the control signals to be generated for the at least one actuator.

Nachstehend wird ein Beispiel für einen stochastischen Ansatz zur Optimierung eines Wassernetzes unter Unsicherheiten genauer für das Beispiel der Modellierung der Unsicherheit bezüglich des Wasserbedarfs beschrieben.An example of a stochastic approach to optimizing a water network under uncertainties will now be described in greater detail for the example of modeling the uncertainty in water demand.

Der erste Schritt ist die Erstellung eines Modells der Wassernetzstruktur und -dynamiken.The first step is to create a model of the water network structure and dynamics.

Die Aufgabe von Wasserversorgungssystemen ist der Transport und die Verteilung der erforderlichen Wassermenge in der notwendigen Qualität zum richtigen Zeitpunkt zu bestimmten Verbrauchern oder Speicher- oder Wasseraufbereitungseinrichtungen. Rohwasser wird bei Quellen, z. B. Grundwasser oder Oberflächenwasser wie Flüssen oder Seen, in das Netz eingespeist. Falls erforderlich wird das Rohwasser einer chemischen Behandlung unterzogen. Danach wird das saubere Wasser entweder in kleinen Speichereinrichtungen gespeichert, die sich direkt bei den Quellen befinden, oder in das Netz gepumpt. Pumpen führen das Wasser durch Rohre, indem sie die Druckhöhe an bestimmten Stellen nach oben treiben, um Höhenunterschiede zu überwinden und Druckhöhenabfälle in Rohren auszugleichen, die durch Reibungsverluste verursacht werden. Die Anzahl an einzelnen Pumpen, die in einer Pumpstation eingeschaltet werden, ist durch eine diskrete Entscheidungsvariable beschrieben. Sie kann jeder beliebige ganzzahlige Wert zwischen der Untergrenze Null und der Obergrenze sein, die durch die Maximalzahl an Pumpen in der Pumpenstation definiert ist. Ventile sind Netzelemente zur Steuerung von Strömen und Druckhöhen. Sie können in unterschiedlichen Ausmaßen gedrosselt werden, um die Bewegung von Wasser durch Rohre zu steuern. Besondere Aufmerksamkeit muss auf die Speichereinrichtungen gerichtet werden, weil sie die einzigen Netzelemente sind, die einen Puffer zwischen Netzzufluss und -abfluss bereitstellen. Sie entkoppeln verschiedene Wassernetzabschnitte und machen das System flexibel, wodurch verschiedene mögliche Betriebsstrategien umgesetzt werden können. The task of water supply systems is the transport and distribution of the required amount of water in the necessary quality at the right time to particular consumers or storage or water treatment facilities. Raw water is at sources such. As groundwater or surface water such as rivers or lakes, fed into the network. If necessary, the raw water is subjected to a chemical treatment. Thereafter, the clean water is either stored in small storage facilities located directly at the sources or pumped into the network. Pumps pass the water through pipes by raising the head at certain points to overcome differences in altitude and to compensate for pressure drop in pipes caused by friction losses. The number of individual pumps that are turned on in a pumping station is described by a discrete decision variable. It can be any integer value between the lower limit zero and the upper limit defined by the maximum number of pumps in the pump station. Valves are network elements for controlling flows and pressure levels. They can be throttled to different extents to control the movement of water through pipes. Special attention must be paid to the storage devices because they are the only network elements that provide a buffer between network inflow and outflow. They decouple different sections of water network and make the system flexible, allowing various possible operating strategies to be implemented.

Die Topologie des Wassernetzes ist durch eine Grafik G = (N, E) beschrieben, wobei N für eine Knotenmenge und E für eine Randmenge steht. Die Knotenmenge N = Nrn ⋃ Ncn ⋃ Ndn ⋃ Nsn besteht aus Speicherknoten Nrn, Verbindungsknoten Ncn, Wasserbedarfsknoten Ndn und Quellknoten Nsn, und die Randmenge E = Epi ⋃ Epu ⋃ Eva umfasst oder stellt Wasserohre (Epi), Pumpen (Epu) und Ventile (Eva) dar.The topology of the water network is described by a graph G = (N, E), where N stands for a node set and E for an edge set. The node set N = N rn ⋃ N cn ⋃ N dn ⋃ N sn consists of storage node N rn , connection node N cn , water demand node N dn and source node N sn , and the margin set E = E pi ⋃ E pu ⋃ E va includes or represents water pipes (E pi ), pumps (E pu ) and valves (E va ) is.

Der physikalische, von der Zeit t abhängige Zustand y(t) des Netzes besteht aus Druckhöhen in den Knoten und Strömen an den Rändern. Der Zustand y(t) erfüllt ein System von differential-algebraischen Gleichungen (DAEs), die Erhaltungssätze vom Kirchhoff-Typ, nichtlineare Druckhöhe-Strömung-Beziehungen von Pumpen, Ventilen und Rohren und die zeitliche Veränderungsrate von Wasserspeicherhöhen in den Speichereinrichtungen aufgrund von Strömen umfassen.The physical, dependent on the time t state y (t) of the network consists of pressure levels in the nodes and currents at the edges. The state y (t) satisfies a system of differential algebraic equations (DAEs) comprising Kirchhoff-type conservation laws, non-linear pressure-altitude flow relationships of pumps, valves and pipes, and the rate of change of water storage heights in the storage devices due to currents ,

Die differential-algebraischen Gleichungen werden durch die Steuer- und Entscheidungsvariablen c(t) beeinflusst, von denen einige integral sind und welche die Netzbetriebskonfiguration für die Pumpen, die Ventile und den Quellstrom darstellen, d. h. die Betriebskonfigurationsinformationen für die Stelleinheiten, insbesondere die Stellantrieb-Zeitpläne. Außerdem bestimmt der Wasserbedarf ξ(t) den Abfluss aus dem System.The differential algebraic equations are affected by the control and decision variables c (t), some of which are integral and which represent the network operating configuration for the pumps, the valves and the source current, i. H. the operating configuration information for the actuators, in particular the actuator schedules. In addition, the water demand ξ (t) determines the outflow from the system.

Formal können die Zustandsgleichungen F, d. h. das System von DAEs, als F(c(t), y(t), ý(t), ξ(t)) = 0, ∀t ∈ [0, T] (1) geschrieben werden, wobei ý(t) die erste Zeitableitung des Netzzustands y(t) ist.Formally, the equations of state F, ie the system of DAEs, can be considered as F (c (t), y (t), ý (t), ξ (t)) = 0, ∀t ∈ [0, T] (1) where ý (t) is the first time derivative of the network state y (t).

Die Formulierung des Optimierungsproblems umfasst die Zielfunktion Φ, die Zustandsgleichungen F und die Betriebseinschränkungen G, von denen einige einfache Grenzen sind.The formulation of the optimization problem includes the objective function Φ, the equations of state F, and the operational constraints G, some of which are simple limits.

Die Zielfunktion Φ = (Φpu + Φsn), die minimiert werden soll, besteht aus Betriebskosten, wie z. B. Pumpenergiekosten Φpu und Quellstromkosten Φsn, die während des Zeithorizonts T auftreten.The objective function Φ = (Φ pu + Φ sn ), which is to be minimized, consists of operating costs, such. Pump energy costs Φ pu and source current costs Φ sn occurring during the time horizon T.

Die Einschränkungen G schränken den Zustand des Systems auf seinen praktischen Betriebsbereich ein, beispielsweise die Anforderung, dass die Pumpen im physikalischen Bereich einer positiven Druckhöhensteigerung arbeiten.The restrictions G limit the state of the system to its practical operating range, for example the requirement that the pumps operate in the physical range of a positive pressure increase.

Das Betriebsplanungsproblem und damit das Optimierungsproblem ist dann

Figure DE112012003487T5_0002
wobei gilt: F(c(t), y(t), ý(t), ξ(t)) = 0, ∀t ∈ [0, T] Zustandsgleichung (3) und G(c(t), y(t)) ≤ 0, ∀t ∈ [0, T] Einschränkungen (4). The operational planning problem and thus the optimization problem is then
Figure DE112012003487T5_0002
where: F (c (t), y (t), ý (t), ξ (t)) = 0, ∀t ∈ [0, T] Equation of state (3) and G (c (t), y (t)) ≤0, ∀t ∈ [0, T] Restrictions (4).

Die optimale Lösung für die Entscheidungsvariablen c(t) ist die Antwort, die der Benutzer, d. h. der Wasserversorgungsbetrieb, im realen technischen System umsetzen muss.The optimal solution for the decision variable c (t) is the answer that the user, i. H. the water supply company, in the real technical system must implement.

Im Allgemeinen ist das DAE-System auf einem fixen Zeitraster diskretisiert, und die Steuer- und Entscheidungsvariablen c(t) werden als stückweise konstant gewählt, was das Optimierungsproblem in ein dynamisches gemischt-ganzzahliges nichtlineares Programmierungs-(MINLP-)Problem verwandelt.In general, the DAE system is discretized on a fixed time scale, and the control and decision variables c (t) are chosen to be piecewise constant, turning the optimization problem into a dynamic mixed integer nonlinear programming (MINLP) problem.

Die gemischt-ganzzahlige Komponente geht auf die Koexistenz von kontinuierlichen und diskreten Pumpvariablen zurück. Der nichtlineare Teil umfasst die Zielfunktion und die Druckhöhe-Strömung-Beziehungen. Je nach numerischem Löser und dem zugrunde liegenden Algorithmus sind glatte Funktionen sehr erwünscht, insbesondere wenn derivatbasierte Optimierungsverfahren eingesetzt werden.The mixed-integer component is due to the coexistence of continuous and discrete pump variables. The nonlinear part includes the objective function and the pressure head-flow relationships. Depending on the numerical solver and the underlying algorithm, smooth functions are highly desirable, especially when using derivative-based optimization techniques.

Die derzeitige Praxis der Wassernetz-Betriebsplanung besteht in der Lösung der Optimierungsproblems für einen fixen Bedarf ξ(t), üblicherweise den erwarteten Bedarf, was die Optimierung deterministisch macht.The current practice of water network operations planning is to solve the fixed-demand optimization problem ξ (t), usually the expected demand, which makes the optimization deterministic.

Gemäß der Erfindung wird stattdessen ein stochastische Optimierung eingesetzt, die es möglich macht, Modell- und Bedarfsunsicherheiten zu berücksichtigen. Im Allgemeinen besteht eine häufige Praxis zur Korrektur zufälliger Störungen in dynamischen Prozessen auf der Anwendung eines so genannten bewegten Horizonts. Vorausgesetzt Wahrscheinlichkeitsinformationen über die Unsicherheitsdaten sind verfügbar, gehen stochastische Modelle einen Schritt weiter, indem sie diese stochastischen Informationen explizit bei zukünftigen Ereignissen mit einbeziehen. Der Entscheidungsprozess wird vorhersagbar anstatt nur auf vergangene Wasserbedarfsrealisierungen zu reagieren. Deshalb ist ein stochastischer Prozess erforderlich, der die zufälligen Wasserbedarfsereignisse beschreibt, wie sie innerhalb ihrer Wahrscheinlichkeit auftreten. Der stochastische Prozess für den zufälligen Wasserbedarf ξ = ξt mit t ∈ [0, T] ist auf einem gewissen zugrunde liegenden kontinuierlichen Wahrscheinlichkeitsbereich definiert, der unter anderem eine Funktion der oben beschriebenen Menge von Zustandsgleichungen F und einer Wahrscheinlichkeitsverteilung P ist und wobei T die Dauer des Zeithorizonts ist.According to the invention, a stochastic optimization is instead used, which makes it possible to take into account model and demand uncertainties. In general, a common practice for correcting random disturbances in dynamic processes is the application of a so-called moving horizon. Provided probability information about the uncertainty data is available, stochastic models go one step further by explicitly including this stochastic information in future events. The decision making process becomes predictable rather than just reacting to past water demand realizations. Therefore, a stochastic process is required that describes the random water demand events as they occur within their likelihood. The stochastic process for the random water demand ξ = ξ t with t ∈ [0, T] is defined on a certain underlying continuous probability range, which is inter alia a function of the set of equations of state F and a probability distribution P described above Duration of the time horizon is.

Natürlich führt die explizite Darstellung einer Unsicherheit durch einen stochastischen Prozess zur Gewinnung von Informationen im Laufe der Zeit. Diese zusätzlichen Modellinformationen erhöhen die Komplexität des Optimierungsmodells, was zu umfangreichen stochastischen Programmen führt. Die meisten Lösungsverfahren für solche umfassenden Programme basieren auf der Approximation durch einen zeitdiskreten stochastischen Prozess, wobei ξt Werte in Rs (für t ∈ {0, ...T}) annimmt, wobei s := |Ndn| für die Zahl an Bedarfsknoten steht. Die stochastischen Variablen ξt werden direkt vor der Zeit t beobachtet, und ξ0 wird mit t = 0 angenommen. Somit ist der zeitdiskrete stochastische Prozess eine Sammlung von Zufallsvariablen ξ = (ξ0, ..., ξT) in RsT.Of course, the explicit representation of an uncertainty through a stochastic process leads to the extraction of information over time. This additional model information increases the complexity of the optimization model, resulting in large stochastic programs. Most solution methods for such comprehensive programs are based on the approximation by a time-discrete stochastic process, where ξ t takes values in R s (for t ∈ {0, ... T}), where s: = | N dn | stands for the number of demand nodes. The stochastic variables ξ t are observed directly before time t, and ξ 0 is assumed to be t = 0. Thus, the time-discrete stochastic process is a collection of random variables ξ = (ξ 0 , ..., ξ T ) in R sT .

Um ein numerisch leicht umsetzbares Optimierungsproblem zu erhalten, wird Unsicherheit bezüglich des Wasserbedarfs als endliche Menge von möglichen Bedarfsrealisierungen im Laufe der Zeit modelliert, was zu szenarienbasierten Optimierungsmodellen führt. Das bedeutet, dass eine diskrete Approximation der zugrunde liegenden Wahrscheinlichkeitsverteilung in Betracht gezogen wird, die durch einen endlichen Wahrscheinlichkeitsbereich gegeben ist, der unter anderem eine Funktion von speziellen Szenarien ωj mit j = 1, ..., r ist. Jedes Szenario stelle eine mögliche Wasserbedarfsrealisierung der Zukunft dar und tritt mit einer Wahrscheinlichkeit von πwj ≥ 0 auf. Insgesamt weisen die Modellszenarien

Figure DE112012003487T5_0003
auf, unter der Annahme, dass eines der Szenarien in der Realität stattfinden wird.In order to obtain a numerically easy-to-implement optimization problem, uncertainty regarding water demand is modeled as a finite set of possible demand realizations over time, resulting in scenario-based optimization models. This means that a discrete approximation of the underlying probability distribution is considered, which is given by a finite probability domain, which among other things is a function of special scenarios ω j with j = 1, ..., r. Each scenario represents a possible water demand realization of the future and occurs with a probability of π wj ≥ 0. Overall, the model scenarios show
Figure DE112012003487T5_0003
on, assuming that one of the scenarios will take place in reality.

Alle Szenarien des Modells Ω = {ω1, ..., ωr} können in Form eines Szenarienbaums dargestellt werden, wie er in 2 gezeigt ist. Jeder Pfad von der Wurzel zu einem der Blätter stimmt mit einem Szenario überein. Die Knoten entsprechen bestimmten Zeitpunkten t ∈ {0, ..., T}, zu denen Entscheidungen c(t) getroffen werden, d. h. wenn bestimmte Stellantriebaktionen ausgeführt werden. Die Ränder zeigen die unsicheren Wasserbedarfsvariablen. Der Szenarienbaum verzweigt sich für jede Bedarfsrealisierung des Modells bei jeder t ∈ {0, ..., T}. Um der Notation des stochastischen Prozesses ε zu entsprechen, markiert jedes Szenario ωj ∈ Ω eine mögliche Wasserbedarfsrealisierung ξωj = (ξωj1, ξωjT), wobei ξωjk für das j-te Szenario für den Zeitraum k steht.All scenarios of the model Ω = {ω 1 ,..., Ω r } can be represented in the form of a scenario tree as shown in 2 is shown. Each path from the root to one of the leaves is consistent with a scenario. The nodes correspond to particular times t ∈ {0, ..., T}, at which decisions c (t) are made, ie when certain actuator actions are performed. The margins show the uncertain water demand variables. The scenario tree branches for every requirement realization of the model at every t ∈ {0, ..., T}. In order to comply with the notation of the stochastic process ε, each scenario ω j ∈ Ω marks a possible water demand realization ξ ωj = (ξ ωj1 , ξ ωjT ), where ξ ωjk stands for the jth scenario for the period k.

Da die Ergebnisse des realen zugrunde liegenden Problems von großem Interesse sind, ist die Erstellung eines solchen Szenarienbaums eine wichtige Aufgabe. Das Hauptziel besteht in einer geeigneten Darstellung der zugrunde liegenden Wahrscheinlichkeitsverteilung von ξ, weil der Optimalwert und die Optimallösung von den ausgewählten Szenarien abhängen. Bei vielen Anwendungen stehen und unvollständige Informationen über die zugrunde liegende Wahrscheinlichkeitsverteilung zur Verfügung. Die Szenarienerstellung basiert dann meist auf der Verwendung von historischen Daten, die auf Schätzungs-, Simulations- und Stichprobenverfahren angewandt werden, oder schließen das Wissen eines erfahrenen Netzbetreibers ein. Since the results of the real underlying problem are of great interest, creating such a scenario tree is an important task. The main goal is to properly represent the underlying probability distribution of ξ because the optimal and optimal solutions depend on the scenarios selected. For many applications, incomplete information about the underlying probability distribution is available. Scenario creation is then usually based on the use of historical data that is applied to estimation, simulation, and sampling techniques or includes the knowledge of an experienced network operator.

Im Allgemeinen können vier verschiedene Approximationsarten für die reale Wahrscheinlichkeitsverteilung P durch eine endliche Szenarienmenge in Bezug auf den Grad an verfügbaren Informationen unterschieden werden: volles Wissen über P, bekannte Parameterfamilie, Probeninformationen und niedriger Informationsstand. Wenn nur wenige Informationen zur Verfügung stehen, die auf Beobachtungsdaten basieren, zeigt die Erstellung eines Ober- und eines Unterszenarios typische Proben, wie sie in 3 dargestellt sind. Das Oberszenario 10 und das Unterszenario 11 definieren dann den Bereich von möglichen Bedarfsrealisierungen und stellen Grenzen für den Optimalwert des Optimierungsproblems bereit. Außerdem kann ein erwartetes Werteszenario, mit 9 bezeichnet, erstellt werden, welches das Szenario mit der derzeit höchsten Wahrscheinlichkeit sein kann.In general, four different approximation modes for the real probability distribution P can be distinguished by a finite set of scenarios in terms of the level of information available: full knowledge of P, known parameter family, sample information and low level of information. If only a small amount of information is available based on observational data, the creation of a top and a bottom scenario shows typical samples as found in 3 are shown. The upper scenario 10 and the sub-scenario 11 then define the range of possible demand realizations and provide limits to the optimal value of the optimization problem. In addition, an expected value scenario, with 9 be created, which may be the scenario with the highest probability currently.

Der Rechenaufwand zur Lösung von szenarienbasierten Optimierungsmodellen hängt stark von der Anzahl an Szenarien im Modell ab. Daher muss ein Kompromiss zwischen der Genauigkeit der Approximation und der Modellgröße, die mit der Anzahl an Szenarien exponentiell steigt, in Betracht gezogen werden. Häufig werden spezielle Szenarienreduktionsverfahren eingesetzt, während immer noch geeignete Approximationen dargestellt werden. Diese Methoden basieren auf der Anwendung einer nachfolgenden Szenarienreduktion.The computational burden of solving scenario-based optimization models depends heavily on the number of scenarios in the model. Therefore, a tradeoff must be made between the accuracy of the approximation and the model size, which increases exponentially with the number of scenarios. Frequently, special scenario reduction techniques are used while still providing appropriate approximations. These methods are based on the application of a subsequent scenario reduction.

Ziel ist es, die Anzahl an Knoten im Szenarienbaum zu verringern, indem ähnliche Szenarien gebündelt werden. Die reduzierten Bäume und der Originalbaum werden dann durch eine bestimmte Wahrscheinlichkeitsabstandsmetrik verglichen. Neue Wahrscheinlichkeiten werden dann dem reduzierten Baum zugewiesen, sodass das neue Wahrscheinlichkeitsmaß gemäß einer Metrik des natürlichen Abstands am nächsten bei der Anfangsverteilung liegt.The goal is to reduce the number of nodes in the scenario tree by bundling similar scenarios. The reduced trees and the original tree are then compared by a certain probability distance metric. New probabilities are then assigned to the reduced tree so that the new probability measure is closest to the initial distribution according to a metric of the natural distance.

Eine weitere wichtige Tatsache basiert auf der Robustheit des optimalen Zielwerts und der optimalen Lösung bezüglich der eingesetzten Szenarien. Robustheit ist erwünscht, d. h. kleine Störungen der Szenarien und der entsprechenden Wahrscheinlichkeiten sollten höchsten zu kleinen Veränderungen des optimalen Zielwerts und der optimalen Lösung führen.Another important fact is based on the robustness of the optimal target value and the optimal solution with regard to the scenarios used. Robustness is desired, d. H. Small perturbations of the scenarios and the corresponding probabilities should lead to very small changes in the optimal target value and the optimal solution.

Wie oben beschrieben ist vorgesehen, dass Wahrscheinlichkeitsinformationen über die Unsicherheit des Wasserbedarfs zur Verfügung stehen und dass stochastische Optimierungsverfahren eingesetzt werden können, um diese zu nutzen. Das stochastische Optimierungsproblem dient dann dazu, eine Zielfunktion zu minimieren, die insbesondere erwartete Betriebskosten berücksichtigt, wobei die Minimierung der Anforderung unterliegt, dass die erhaltenen Betriebskonfigurationsinformationen für die Stelleinheiten für alle Was serbedarfsrealisierungen möglich sind.As described above, it is envisioned that probability information on the uncertainty of water demand will be available and that stochastic optimization techniques may be used to exploit it. The stochastic optimization problem then serves to minimize an objective function which, in particular, accounts for expected operating costs, subject to the minimization of the requirement that the obtained operating configuration information for the actuators be available for all water demand implementations.

Wie oben erläutert wurde, ist die Unsicherheit bezüglich des Wasserbedarfs als endliche Menge von möglichen Bedarfsrealisierungen modelliert, was zu so genannten szenarienbasierten Optimierungsmodellen führt, um ein numerisch leicht umsetzbares Optimierungsproblem zu erhalten.As discussed above, the uncertainty in water demand is modeled as a finite set of possible demand realizations, resulting in so-called scenario-based optimization models to obtain a numerically easy to implement optimization problem.

Neben der Berücksichtigung der unsicheren Bedarfsstruktur, wie oben beschrieben, nutzt ein Zweistufen-Programmier-(2SSP-)Verfahren die Tatsache, dass nur ein Teil der Entscheidungen, welche die Hier-und-Jetzt-Entscheidungen x sind, so genannte Entscheidungen der ersten Stufe, getroffen werden muss, bevor der Bedarf beobachtet werden kann. Dies ist unter der Bezeichnung Nichtantizipierbarkeit bekannt.In addition to considering the uncertain demand structure as described above, a two-step programming (2SSP) method takes advantage of the fact that only a portion of the decisions that are the here-and-now decisions x are so-called first-stage decisions , must be taken before the need can be observed. This is known as non-anticipatory.

Die restlichen Steuervariablen, die Hilfsaktionen z, so genannten Entscheidungen der zweiten Stufe, müssen erst zu einem späteren Zeitpunkt fixiert werden, wenn ein Teil des Bedarfs schon beobachtet wurde.The remaining tax variables, the relief actions z, so-called decisions of the second stage, need to be fixed at a later date, if a part of the needs has already been observed.

Im Allgemeinen führt dies zu stochastischer Mehrstufenprogrammierung. Hier schränken wir die Aufmerksamkeit auf den optimistischeren Zweistufenansatz ein, bei dem die Wahl der Hilfsaktionen z auf dem vollständigen Wissen über die Bedarfsrealisierung ξ basiert.In general, this leads to stochastic multi-stage programming. Here we restrict attention to the more optimistic two-step approach, where the choice of remedies z is based on full knowledge of demand realization ξ.

Nachfolgend werden wir die Variablen der 1. und 2. Stufe mit x(t) bzw. z(t, ξt(ω)) bezeichnen. Ein szenarienbasiertes Optimierungsproblem in Form einer 2SSP-Modell-Formulierung, in der die Hilfsaktion vom Zeitpunkt t~ ∈ (0, T) an definiert ist, sieht wie folgt aus:

Figure DE112012003487T5_0004
wobei gilt: F(x(t), z(t, ξtj))) = 0, ∀t ∈ [0, T], ∀ωj ∈ Ω Modellgleichheiten (6), G(x(t), z(t, ξtj))) ≤ 0, ∀t ∈ [0, T], ∀ωj ∈ Ω Modellungleichheiten (7), a ≤ (x(t), z(t, ξtj))) ≤ A, ∀t ∈ [0, T], ∀ωj ∈ Ω variable Grenzen (8), wobei

Φ2SSP
die zu minimierende Zielfunktion ist,
Φpu
die Energieverbrauchskosten in der Pumpenstation pu sind und
Φsn
die Quellstromkosten sind.
In the following, we will denote the variables of the 1st and 2nd stages with x (t) and z (t, ξ t (ω)). A scenario-based optimization problem in the form of a 2SSP model formulation, in which the auxiliary action is defined from the time t ~ ∈ (0, T), is as follows:
Figure DE112012003487T5_0004
where: F (x (t), z (t, ξ tj ))) = 0, ∀t ∈ [0, T], ∀ω j ∈ Ω model equations (6), G (x (t), z (t, ξ tj ))) ≤ 0, ∀t ∈ [0, T], ∀ω j ∈ Ω model inequalities (7), a ≤ (x (t), z (t, ξ tj ))) ≤ A, ∀t ∈ [0, T], ∀ω j ∈ Ω variable boundaries (8), in which
Φ 2SSP
the objective function to be minimized is
Φ pu
the energy consumption costs in the pump station are pu and
Φ sn
the source electricity costs are.

Die Energieverbrauchskosten Φpu berücksichtigen unter anderem die Pumpeneffizienz. Die Pumpen wandeln elektrische Energie in mechanische Energie von Wasser um. Die Pumpeneffizienz, Draht-zu-Wasser-Effizienz genannt, beschreibt die Effizienz dieser Umwandlung. Sie steigt mit der Durchflussgeschwindigkeit durch die Pumpe bis zu einem gewissen Punkt, Spitzeneffizienz genannt, und nimmt dann mit steigender Durchflussgeschwindigkeit ab.The energy consumption costs Φ pu take into account, among other things, the pump efficiency. The pumps convert electrical energy into mechanical energy of water. Pump efficiency, called wire-to-water efficiency, describes the efficiency of this conversion. It increases with the flow rate through the pump to some point, called peak efficiency, and then decreases with increasing flow rate.

Die Quellstromkosten Φsn spiegeln die Kosten für die Bereitstellung von Wasser aus den Wasserquellen, z. B. Wasseraufbereitungeinrichtungen, Entsalzungsanlagen oder Wasserreservoirs wider.The source electricity costs Φ sn reflect the cost of providing water from the water sources, e.g. B. water treatment facilities, desalination plants or water reservoirs.

Weitere Kosten, die in der Zielfunktion Φ2SSP berücksichtigt werden können, sind so genannte Strafkosten für Übertretungen der Grenzbedingungen in den Wasserreservoirs.Other costs which can be taken into account in the objective function Φ 2SSP are so-called penalty costs for violations of the boundary conditions in the water reservoirs.

Die Bezeichnung Kosten ist nicht nur im Geldsinne zu verstehen, sondern wird auch verwendet, um im Allgemeinen den Grad an unerwünschten Nebeneffekten darzustellen, die minimiert werden sollen. Diese unerwünschten Nebeneffekte hängen im Allgemeinen mit dem Betrieb der Stelleinheiten zusammen, da jede Stellaktion zu zumindest einem aus der Erzeugung von zu viel Lärm oder Kohlendioxid, der Verwendung von zu viel elektrischer Energie, der Erhöhung der Menge an kostspieligem Wasser, das aus einem Reservoir in das Netz gepumpt wird, oder dem Erreichen einer unerwünschten Frequenz und/oder Amplitude des Stellbetriebs selbst führt. Alle diese und weitere unerwünschte Nebeneffekte können in der Zielfunktion und somit im Optimierungsproblem modelliert werden und werden dann aufgrund der Minimierung dieser Zielfunktion so weit wie möglich vermieden.The term cost is not just monetary, but is also used to generally represent the level of undesirable side effects that should be minimized. These undesirable side effects are generally related to the operation of the actuators as each actuation action results in at least one of the generation of too much noise or carbon dioxide, the use of too much electrical energy, the increase in the amount of expensive water flowing from a reservoir in the network is pumped, or the achievement of an undesirable frequency and / or amplitude of the control operation itself leads. All of these and other undesirable side effects can be modeled in the objective function and thus in the optimization problem and are then avoided as much as possible due to the minimization of this objective function.

Aufgrund der endlichen Diskretisierung des zugrunde liegenden stochastischen Prozesses weisen die Gleichungen (5) bis (8) die Form eines deterministischen Optimierungsmodells auf. Daher wird es auch das entsprechende deterministische Äquivalent des 2SSP-Problems genannt. Die Vorteile des deterministischen Äquivalents bestehen in einer besseren numerischen Handhabbarkeit durch Vermeidung von Wahrscheinlichkeitsintegralen.Due to the finite discretization of the underlying stochastic process, equations (5) to (8) take the form of a deterministic optimization model. Therefore, it is also called the corresponding deterministic equivalent of the 2SSP problem. The advantages of the deterministic equivalent are better numerical handling by avoiding probability integrals.

Anhand des Beispiels für ein Wassernetz 17, wie es in 4 dargestellt ist, ist ersichtlich, dass 2SSP zu kosteneffektiverem und robusterem Wassernetzbetrieb führt und gleichzeitig Sicherheit bei der Wasserversorgung bereitstellt. Das Wassernetz aus 4 besteht aus Wasserrohren, welche die folgenden Betriebselemente verbinden: Quellen S, aus denen Wasser in das Netz fließt, Verbrauchseinheiten C, wo das Wasser das Netz verlässt, Pumpen 20 zur Erhöhung der Druckhöhe an bestimmten Positionen, um Höhenunterschiede zu überwinden und Druckhöhenabnahmen in den Rohren, Wasserspeichereinrichtungen, z. B. Wasserreservoirs oder Tanks 21, auszugleichen, um einen Puffer zwischen Netzzufluss und -abfluss bereitzustellen und unterschiedliche Wassernetzabschnitte zu entkoppeln, und verschiedene Arten von Ventilen, wie durch die restlichen Elemente im Netz 17 dargestellt, um die Bewegung von Wasser durch die Rohre zu steuern und so Ströme und Druckhöhen zu steuern, indem die Ventile in unterschiedlichem Ausmaß gedrosselt werden.Based on the example of a water network 17 as it is in 4 As shown, 2SSP leads to more cost-effective and robust water supply while providing security of water supply. The water network off 4 consists of water pipes which connect the following operating elements: Sources S, from which water flows into the network, Consumption Units C, where the water leaves the network, pumps 20 to increase the head at certain positions, to level differences to overcome and pressure drop decreases in the pipes, water storage facilities, such. B. water reservoirs or tanks 21 to balance to provide a buffer between network inflow and outflow and to decouple different water network sections, and different types of valves, as by the remaining elements in the network 17 to control the movement of water through the tubes to control flows and pressure levels by throttling the valves to varying degrees.

Um den möglichen Vorteil der Lösung eines stochastischen Problems gegenüber der Lösung eines entsprechenden deterministischen Problems zu bestimmen, in dem der erwartete Bedarf den unsicheren Bedarf ersetzt, wird der Wert der stochastischen Lösung (VSS) eingesetzt. Der VSS ist ein passendes Merkmal, weil er anzeigt, wie gut die optimale Lösung eines 2SSP-Modells im Vergleich mit der optimalen deterministischen Lösung, die in einen Rahmen mit unsicherem Bedarf eingebettet ist, funktioniert.To determine the potential benefit of solving a stochastic problem over solving a corresponding deterministic problem in which the expected demand replaces the unsafe need, the value of the stochastic solution (VSS) is used. The VSS is a fitting feature because it indicates how well the optimal solution of a 2SSP model works in comparison to the optimal deterministic solution embedded in a framework with uncertain needs.

Die Struktur von 2SSP-Modellen stellt sicher, dass die Entscheidungen der 1. Stufe nur umsetzbar sind, wenn es eine machbare Hilfsaktion für jedes dargestellte Bedarfsszenario gibt. Dies bedeutet dass die Variablen der 1. Stufe berechnet werden, um das Modell langfristig umsetzbar zu machen, sodass die optimalen Wasserspeicher-Wasserstandsverläufe zwischen den vordefinierten Grenzen liegen. So werden die Wasserstände in 2SSP unter Kontrolle gehalten.The structure of 2SSP models ensures that the first-level decisions are only viable if there is a feasible remedial action for each demand scenario presented. This means that the variables of the first level are calculated in order to make the model feasible in the long term, so that the optimal water storage water levels lie between the predefined limits. This keeps the water levels in 2SSP under control.

Dies ist aus der rechten Seite der 5 ersichtlich, welche den erwarteten Wasserspeicherstand 14 und den resultierenden realen Wasserspeicherstand 15 für die stochastische Optimierung des 2SSP-Modells des oben beschriebenen Wassernetzes zeigt. Sowohl der erwartete als auch der resultierende reale Wasserspeicherstand 12 und 13 liegen zwischen der oberen und der unteren Wasserstandsgrenze, die als gestrichelte Linien dargestellt sind. Weitere Versuche für zufällige Bedarfsrealisierungen bestätigten die Umsetzbarkeit von 2SSP, wodurch eine Senkung der Untergrenzen für die Wasserspeicherstände in den Speichereinrichtungen ermöglicht wird. Als Folge ist weniger Pumpen erforderlich, was zu zusätzlichen Kosteneinsparungen führt.This is from the right side of the 5 can be seen which the expected water storage level 14 and the resulting real water storage level 15 for the stochastic optimization of the 2SSP model of the water network described above. Both the expected and the resulting real water storage level 12 and 13 lie between the upper and lower water level limits, which are shown as dashed lines. Further random assertion attempts confirmed the feasibility of 2SSP, allowing for lower water storage levels in the storage facilities. As a result, fewer pumps are required, resulting in additional cost savings.

Andererseits ist das entsprechende Modell, das auf einem erwarteten und nicht einem unsicheren Bedarfswert basiert, nicht umsetzbar, was zeigt, dass ein optimaler deterministischer Zeitplan für einen erwarteten Bedarf für den realen Bedarf nicht notwendigerweise optimal oder überhaupt machbar ist. Um die Wassernetze machbar zu betreiben, mussten Schlupfvariablen eingeführt werden, und als Reaktion auf einen plötzlichen Anstieg des Wasserbedarfs musste sogar eine Unterschreitung der unteren Wasserstandsgrenze akzeptiert werden, wie aus dem erwarteten Wasserspeicherstand 12 und dem resultierenden realen Wasserspeicherstand 13 auf der linken Seite in 5 ersichtlich ist.On the other hand, the corresponding model, which is based on an expected and not an uncertain demand value, is unworkable, indicating that an optimal deterministic schedule for an expected demand for real needs is not necessarily optimal or even feasible. In order to make the water nets feasible, slippage variables had to be introduced, and in response to a sudden increase in water demand, even falling below the lower water level had to be accepted, such as the expected water storage level 12 and the resulting real water storage level 13 on the left in 5 is apparent.

Allgemein wurde bestimmt, dass die optimalen Zielwerte Φ2SSP « ΦEEV enthalten, was die Signifikanz einer stochastischen Optimierung für den Wassernetzbetrieb weiter belegt.In general, it has been determined that the optimum target values Φ 2SSP Φ EEV , which further substantiates the significance of stochastic optimization for water mains operation.

Ein weiterer wichtiger Aspekt des stochastischen Ansatzes ist der Rechenaufwand. Die Modellgröße der 2SSP-Modelle steige linear mit der Anzahl an Szenarien, und die Rechendauer weist quadratisches Wachstum in Bezug auf die Anzahl an Szenarien auf. Aber sogar eine grobe Approximation der zugrunde liegenden Wahrscheinlichkeitsverteilung mit wenigen Szenarien ergibt gute Ergebnisse im Vergleich zu der deterministischen Optimierung, mit mäßiger Steigerung der Rechenkomplexität. Außerdem führen zusätzliche kleine Störungen der Bedarfsszenarien im Modell zu einem marginalen Unterschied in den optimalen Zielwerten oder in der optimalen Lösung der stochastischen Programme.Another important aspect of the stochastic approach is the computational effort. The model size of the 2SSP models increases linearly with the number of scenarios, and the calculation time shows quadratic growth in terms of the number of scenarios. But even a rough approximation of the underlying probability distribution with few scenarios yields good results compared to deterministic optimization, with moderate increase in computational complexity. In addition, additional small perturbations of the demand scenarios in the model lead to a marginal difference in the optimal target values or in the optimal solution of the stochastic programs.

4 zeigt ein Beispiel für ein System 16 für die stochastische Optimierung des Betriebs eines Wassernetzes. Das System 16 enthält eine Optimierungseinheit OP zur Durchführung der oben beschriebenen Minimierung der Zielfunktion, um zumindest eine Betriebskonfigurationsinformation zu erstellen, insbesondere zumindest einen Stellantrieb-Zeitplan, der dann an ein Steuersystem CS ausgegeben wird, um an der gewünschten zumindest einen Stelleinheit des Wassernetzes 17 über eine Ausgabeschnittstelle 18 angewandt zu werden. Die Stelleinheiten des Wassernetzes 17 sind die Pumpen 20 zur Erhöhung der Druckhöhe an bestimmten Stellen innerhalb des Netzes, die Pumpen und die Ventile der Wasserspeichereinrichtung 21 und die verschiedenen Arten von Ventilen innerhalb des Netzes. 4 shows an example of a system 16 for the stochastic optimization of the operation of a water network. The system 16 includes an optimization unit OP for performing the above-described minimization of the objective function to generate at least one operation configuration information, in particular at least one actuator schedule, which is then output to a control system CS at the desired at least one actuator of the water network 17 via an output interface 18 to be applied. The actuators of the water network 17 are the pumps 20 to increase the pressure level at certain points within the network, the pumps and the valves of the water storage device 21 and the different types of valves within the network.

Das System 16 enthält ferner eine Szenarienerstellungseinheit SG. Die Szenarienerstellungseinheit SG ist angeordnet, um Szenarien ωj für den zukünftigen Wasserbedarf aus Unsicherheiten für den Wasserbedarf, die aus realen Daten des Wassernetzes abgeleitet sind, d. h. aus historischen Messdaten MD, die Messedaten über den Wasserbedarf umfassen, zu erstellen. Die Messdaten MD sind in einer Speichereinheit 23 gespeichert, die zum System 16 gehört. Die Speichereinheit 23 kann entweder ein flüchtiger Datenspeicher, z. B. ein RAM, oder ein permanenter Datenspeicher sein.The system 16 also includes a scenario creation unit SG. The scenario generation unit SG is arranged to generate future water demand scenarios ω j from water supply uncertainties derived from real data of the water network, ie historical measurement data MD comprising water demand measurement data. The measured data MD are in a memory unit 23 saved to the system 16 belongs. The storage unit 23 can either be a volatile data storage, for. B. a RAM, or a permanent data storage.

Die Szenarien sind Annahmen über den Wasserbedarf der Zukunft, wobei der erwartete Wasserbedarf je nach Tageszeitpunkt, Wochentag oder Jahreszeit variiert. Demgemäß können Tag-Nacht-Schwankungen, höherer Wasserbedarf in den heißen und sonnigen Monaten des Jahres oder aufgrund von Massenveranstaltungen durch die Szenarienerstellungseinheit SG berücksichtigt werden. Außerdem kann die Szenarienerstellungseinheit SG weitere Informationen berücksichtigen, die implizit den Wasserbedarf beeinflussen, beispielsweise Informationen über Elektrizitätstarife ET und/oder Wasserquellkosten WSC, die in der Speichereinheit 23 gespeichert sein können oder direkt von einem Bediener in das System eingegeben werden können. Weitere solche Zusatzinformationen können Außentemperaturen, Wettervorhersagen und Informationen über öffentlichen Massenveranstaltungen sein. Neben der Modellierung von Szenarien für den Wasserbedarf kann die Szenarienerstellungseinheit SG beispielsweise auch Szenarien für die Schwankung der Effizienz der Wasserpumpen im Wassernetz erstellen. Für diesen Zweck können Pumpeffizienzmerkmale in der Speichereinheit 23 gespeichert sein und von der Szenarienerstellungseinheit zusammen mit Messdaten über den Betrieb der Wasserpumpen verwendet werden, um die zukünftige Unsicherheit in der Wasserpumpeneffizienz in das Modell aufzunehmen. The scenarios are assumptions about future water demand, with expected water demand varying with time of day, day of the week or season. Accordingly, day-night fluctuations, higher water demands in the hot and sunny months of the year or due to mass events by the scenario creation unit SG can be taken into account. In addition, the scenario generation unit SG can take into account further information that implicitly influences the water demand, for example information about electricity tariffs ET and / or water source costs WSC stored in the storage unit 23 stored in memory or can be entered directly into the system by an operator. Other such additional information may include outdoor temperatures, weather forecasts, and mass public event information. For example, in addition to modeling water demand scenarios, the scenario generation unit SG may also create scenarios for the fluctuation of the efficiency of the water pump water networks. For this purpose, pump efficiency features may be present in the memory unit 23 stored and used by the scenario generation unit along with measurement data on the operation of the water pumps to include the future uncertainty in the water pump efficiency in the model.

Die endliche Menge von Szenarien für den zukünftigen Wasserbedarf, die durch die Szenarienerstellungseinheit SG erstellt wird, wird dann der Optimierungseinheit OP bereitgestellt, wo sie in das Optimierungsproblem eingegeben wird. Das Optimierungsproblem berücksichtigt ferner ein Hydraulikmodell F des Wassernetzes 17 (siehe Gleichungen (3) und (6)), zumindest eine Betriebseinschränkung G (siehe Gleichungen (4) und (7)) und zumindest eine Zielfunktion Φ zur Darstellung eines unerwünschten Nebeneffekts U des Betriebs der zumindest einen. Stelleinheit, die beispielsweise als Energieverbrauchskosten Φpu und Quellstromkosten Φsn in das Modell aufgenommen werden. Das Optimierungsproblem kann ferner sogar Variationen in Parametern berücksichtigen, von denen der zumindest eine unerwünschte Nebeneffekt abhängt, beispielsweise Schwankungen der Elektrizitätstarife ET, welche die Energieverbrauchskosten Φpu beeinflussen, und Schwankungen in Tarifen für Wasserquellkosten WSC, die sich auf die Quellstromkosten Φsn auswirken. Demgemäß ist die Optimierungseinheit OP angepasst, um die jeweiligen Variationen der Parameter aus der Speichereinheit 23 zu erhalten.The finite set of scenarios for the future water demand created by the scenario creation unit SG is then provided to the optimization unit OP where it is input to the optimization problem. The optimization problem also takes into account a hydraulic model F of the water network 17 (see equations (3) and (6)), at least one operational constraint G (see equations (4) and (7)) and at least one objective function Φ to represent an undesirable side effect U of the operation of the at least one. Actuator, which are included as example in the model as energy consumption costs Φ pu and source electricity costs Φ sn . Further, the optimization problem may even take into account variations in parameters on which at least one undesirable side effect depends, such as variations in electricity tariffs ET affecting energy consumption costs Φ pu , and fluctuations in water source cost WSC tariffs that affect the source electricity costs Φ sn . Accordingly, the optimization unit OP is adapted to the respective variations of the parameters from the memory unit 23 to obtain.

Die Szenarien können auch über eine Mensch-Maschine-Schnittstelle einem Betreiber präsentiert werden, die diese gemäß seinen Erfahrungen anpassen kann.The scenarios can also be presented via a man-machine interface to an operator who can adapt them according to his experience.

In speziellen Ausführungsformen ist die Szenarienerstellungseinheit SG angeordnet, um Ober- und Unterszenarien und – falls erforderlich – ein oder mehrere weitere erwartete Wertszenarien abzuleiten. Die Szenarienerstellungseinheit SG kann angepasst sein, um die Wasserbedarfsszenarien einer graphischen Anzeige bereitzustellen, um sie beispielsweise in Form eines Baums, wie in 2, oder in Form einer zeitabhängigen Grafik, welche die Ober- und Unterszenarien sowie das erwartete Wertszenario, wie in 3, zeigt, oder in anderer geeigneter graphischer Form sichtbar zu machen.In particular embodiments, the scenario generation unit SG is arranged to derive upper and lower scenarios and, if necessary, one or more further expected value scenarios. The scenario generation unit SG may be adapted to provide the water demand scenarios of a graphical display, for example in the form of a tree, as in FIG 2 , or in the form of a time-dependent graph showing the upper and lower scenarios as well as the expected value scenario, as in 3 , Shows, or to make visible in other suitable graphical form.

Das System 16 enthält außerdem eine Wasserstandseinstelleinheit LA, die angepasst ist, um eine Abhängigkeit zwischen einer Senkung der unteren Wasserstandsgrenze einer Wasserspeichereinrichtung und einem Ausmaß, in dem der zumindest eine unerwünschte Nebeneffekt U verringert wird, während gleichzeitig die zumindest eine Betriebseinschränkung G eingehalten wird, zu bestimmen und der Optimierungseinheit OP als aktualisierte Betriebseinschränkung G für das Optimierungsproblem einen neuen Wert für die untere Wasserstandsgrenze bereitzustellen. Ein Beispiel für eine solche Abhängigkeit ist in 6 dargestellt, wo Energieeinsparungen über eine variierende Untergrenze dargestellt sind. Die Energieeinsparungen sind eigentlich ein umgekehrter unerwünschter Effekt U in dem Sinne, dass der unerwünschte Effekt die finanziellen Energiekosten sind. Je höher die Energiekosten, desto geringer die Energieeinsparungen. Der schraffierte Bereich zeigt einen Bereich an, in dem keine der zumindest einen Betriebseinschränkungen G gebrochen wird.The system 16 Also includes a water level setting unit LA adapted to determine a dependency between a decrease in the lower water level limit of a water storage device and an extent to which the at least one undesirable side effect U is reduced while simultaneously maintaining the at least one operating restriction G Optimization unit OP as an updated operation constraint G for the optimization problem to provide a new value for the lower water level limit. An example of such a dependency is in 6 where energy savings are presented over a varying lower limit. The energy savings are actually a reversed unwanted effect U in the sense that the undesirable effect is the financial energy costs. The higher the energy costs, the lower the energy savings. The hatched area indicates a range in which none of the at least one operational constraint G is broken.

Die Wasserstandseinstelleinheit LA kann außerdem angepasst sein, um den neuen Wert für die untere Wasserstandsgrenze zu bestimmen, indem ferner die Abhängigkeit zwischen der Reduktion im unerwünschten Nebeneffekt U und einem Risiko für die Wasserspeichereinrichtung, einen kritischen Wasserstand zu erreichen, berücksichtigt wird. Ein Beispiel für eine solche Abhängigkeit ist in 7 als Risikograd über den Energieeinsparungen dargestellt. Je höher die Energieeinsparungen, desto höher das Risiko, den kritischen Wasserstand zu erreichen. Basierend auf einer solchen Beziehung kann ein Optimum bei einem Risikograd gefunden werden, den der Betreiber des Wassernetzes bereit ist, zu tragen.The water level setting unit LA may also be adapted to determine the new value for the lower water level by further taking into account the dependency between the unwanted side effect reduction U and a risk for the water storage device to reach a critical water level. An example of such a dependency is in 7 represented as a level of risk over energy savings. The higher the energy savings, the higher the risk of reaching the critical water level. Based on such a relationship, an optimum can be found at a level of risk that the operator of the water network is willing to carry.

Die oben genannten Abhängigkeiten können in Form von funktionellen Beziehungen oder Tabellen oder regelbasierten Beziehungen bestimmt werden.The above dependencies can be determined in terms of functional relationships or tables or rule-based relationships.

Ein weiteres Element, das im System 16 enthalten sein kann, ist eine Entscheidungsunterstützungseinheit DS. Die Entscheidungsunterstützungseinheit DS empfängt die endliche Gruppe von Szenarien von der Szenarienerstellungseinheit SG und verwendet sie als Eingabe zur Beurteilung einer entsprechenden Auswirkung einer identifizierten möglichen Ursache für einen Defekt im Wassernetz 17 auf das Wassernetz 17.Another element in the system 16 may be included is a decision support unit DS. The decision support unit DS receives the finite set of scenarios from the scenario creation unit SG and uses them as input to assess a corresponding impact of an identified potential cause of a defect in the water network 17 on the water network 17 ,

Ein durch die Entscheidungsunterstützungseinheit durchgeführtes Verfahren kann folgende Schritte enthalten:

  • a) Empfangen einer Defektbenachrichtigung, die auf ein Problem im Wassernetz 17 hinweist;
  • b) Bestimmen einer Reihe von möglichen Ursachen für den gemeldeten Defekt aus der Defektbenachrichtigung;
  • c) Bestimmen einer geschätzten Auswirkung für jede mögliche Ursache;
  • d) Sammeln der geschätzten Auswirkungen für jede mögliche Ursache, um eine wichtige Angabe bezüglich des gemeldeten Defekts abzuleiten.
A method performed by the decision support unit may include the following steps:
  • a) Receiving a defect notification that indicates a problem in the water network 17 points;
  • b) determining a number of possible causes of the reported defect from the defect notification;
  • c) determining an estimated impact for each possible cause;
  • d) Collect the estimated effects for each possible cause to derive an important indication of the reported defect.

In diesem Verfahren umfasst der Schritt des Bestimmens einer geschätzten Auswirkung für jede mögliche Ursache ein Risikoszenario mit anfänglichen Netzbedingungen und angenommenen zukünftigen Netzbedingungen des Wassernetzes, wobei die endliche Menge von Szenarien verwendet wird, um die zukünftigen Netzbedingungen darzustellen.In this method, the step of determining an estimated impact for each possible cause includes a risk scenario with initial grid conditions and assumed future grid conditions of the water network, wherein the finite set of scenarios is used to represent the future grid conditions.

Die Ausgabe der Entscheidungsunterstützungseinheit DS, d. h. die Wichtigkeitsangabe, kann dann vom Steuersystem CS verwendet werden, um zu bestimmen, wie rasch auf den Defekt reagiert werden muss, und/oder eine Priorität oder Reihenfolge festzulegen, in welcher auf gemeldeten Defekt reagiert werden sollte.The output of the decision support unit DS, d. H. the indication of importance may then be used by the control system CS to determine how quickly to respond to the defect and / or to establish a priority or order in which to respond to a reported defect.

Claims (15)

System zur Optimierung des Betriebs eines Wassernetzes, umfassend: • zumindest eine Datenspeichereinheit (23) zum Speichern eines Hydraulikmodells (F) sowie zumindest einer Betriebseinschränkung (G) des Wassernetzes, wobei das Hydraulikmodell (F) die Abhängigkeit der Druckhöhen und Ströme im Wassernetz (17) von einem Betriebszustand zumindest einer Stelleinheit (20) des Wassernetzes (17) und von einem erwarteten Wasserbedarf (ξ(t)) darstellt, • zumindest eine Verarbeitungseinheit, die eine Optimierungseinheit (OP) enthält, wobei die Optimierungseinheit (OP) angepasst ist, um zumindest eine Betriebskonfigurationsinformation (c(t)) für die zumindest eine Stelleinheit (20) zu erstellen, indem sie eine Zielfunktion (Φ) eines Optimierungsproblems minimiert, wobei das Optimierungsproblem auf dem Hydraulikmodell (F) basiert, • zumindest eine Ausgabeschnittstelle (18) zur Bereitstellung der zumindest einen Betriebskonfigurationsinformation (c(t)) für die zumindest eine Stelleinheit (20), dadurch gekennzeichnet, dass • die zumindest eine Verarbeitungseinheit außerdem eine Szenarienerstellungseinheit (SG) zur Erstellung einer endlichen Menge von Szenarien (Ω) in Form von möglichen Realisierungen des erwarteten Wasserbedarfs (ξ(t)) im Laufe der Zeit und/oder des Betriebszustands und/oder von Merkmalen der zumindest einen Stelleinheit und/oder des zumindest einen Parameters des Hydraulikmodells (F), wobei die endliche Menge von Szenarien (Ω) auf Wahrscheinlichkeitsinformationen über die Unsicherheit des erwarteten Wasserbedarfs, des Betriebszustands und/oder von Merkmalen der zumindest einen Stelleinheit bzw. des zumindest einen Parameters des Hydraulikmodells basiert, • die Optimierungseinheit (OP) angepasst ist, um die Zielfunktion (Φ) des Optimierungsproblems durch Ausführung einer stochastischen Optimierung zu minimieren, wobei das Optimierungsproblem ferner die Zielfunktion (Φ) zur Darstellung zumindest eines unerwünschten Nebeneffekts (U) des Betriebs der zumindest einen Stelleinheit, die zumindest eine Betriebseinschränkung (G) und die endliche Menge von Szenarien (Ω) berücksichtigt.System for optimizing the operation of a water network, comprising: at least one data storage unit ( 23 ) for storing a hydraulic model (F) and at least one operating restriction (G) of the water network, wherein the hydraulic model (F) the dependence of the pressure levels and currents in the water network ( 17 ) of an operating state of at least one actuating unit ( 20 ) of the water network ( 17 and at least one processing unit including an optimization unit (OP), wherein the optimization unit (OP) is adapted to provide at least one operation configuration information (c (t)) for the at least one Actuator ( 20 ) by minimizing an objective function (Φ) of an optimization problem, the optimization problem being based on the hydraulic model (F), at least one output interface ( 18 ) for providing the at least one operating configuration information (c (t)) for the at least one actuating unit ( 20 ), characterized in that • the at least one processing unit also includes a scenario generation unit (SG) for creating a finite set of scenarios (Ω) in the form of possible implementations of the expected water demand (ξ (t)) over time and / or operating condition and / or features of the at least one actuator and / or the at least one parameter of the hydraulic model (F), wherein the finite set of scenarios (Ω) relates to probability information about the uncertainty of the expected water demand, operating condition and / or characteristics of the at least one The optimization unit (OP) is adapted to minimize the objective function (Φ) of the optimization problem by performing stochastic optimization, the optimization problem also being the objective function (Φ) for representing at least one undesired one Side effect (U) of operation s of the at least one actuating unit which takes into account at least one operational restriction (G) and the finite set of scenarios (Ω). System nach Anspruch 1, wobei die Szenarienerstellungseinheit (SG) angepasst ist, um eine nachfolgende Szenarienreduktionstechnik anzuwenden, um ähnliche Szenarien (ωj) zu bündeln.The system of claim 1, wherein the scenario generation unit (SG) is adapted to apply a subsequent scenario reduction technique to cluster similar scenarios (ω j ). System nach einem der Ansprüche 1 oder 2, wobei die Szenarienerstellungseinheit (SG) angepasst ist, um die endliche Menge von Szenarien (Ω) durch Bildung eines Oberszenarios (10) und eines Unterszenarios (11) zu erstellen, die den Bereich möglicher Realisierungen im Laufe der Zeit definieren.The system according to one of claims 1 or 2, wherein the scenario generation unit (SG) is adapted to calculate the finite set of scenarios (Ω) by forming an upper scenario ( 10 ) and a sub-scenario ( 11 ) that define the range of possible implementations over time. System nach einem der vorangegangenen Ansprüche, wobei die Szenarienerstellungseinheit (SG) angepasst ist, um die Unsicherheiten durch einen stochastischen Prozess (ξt) darzustellen, wobei jeder stochastische Prozess auf einem zugrunde liegenden kontinuierlichen Wahrscheinlichkeitsraum über einen Zeithorizont mit begrenzter Dauer definiert ist.A system according to any one of the preceding claims, wherein the scenario generation unit (SG) is adapted to represent the uncertainties through a stochastic process (ξ t ), each one stochastic process is defined on an underlying continuous probability space over a time horizon of limited duration. System nach einem der vorangegangenen Ansprüche, wobei die Szenarienerstellungseinheit (SG) angepasst ist, um die endliche Menge von Szenarien (Ω) durch Ableitung der Unsicherheiten von Messdaten (MD) vom Wassernetz (17) zu erstellen.System according to one of the preceding claims, wherein the scenario creation unit (SG) is adapted to calculate the finite set of scenarios (Ω) by deriving the uncertainties of measured data (MD) from the water network ( 17 ) to create. System nach einem der vorangegangenen Ansprüche, wobei die Szenarienerstellungseinheit (SG) angepasst ist, um die endliche Menge von Szenarien (Ω) in Form eines Szenarienbaums (22) für eine graphische Darstellung bereitzustellen.System according to one of the preceding claims, wherein the scenario creation unit (SG) is adapted to calculate the finite set of scenarios (Ω) in the form of a scenario tree ( 22 ) for a graphical representation. System nach einem der vorangegangenen Ansprüche, wobei die Zielfunktion (Φ) den. resultierenden Energieverbrauch (Φpu) und/oder den Wasserzufluss von einer Quelle (Φsn) reflektiert, wenn die zumindest eine Stelleinheit (20) in Betrieb ist.A system according to any one of the preceding claims, wherein the objective function (Φ) is the. resulting energy consumption (Φ pu ) and / or the flow of water from a source (Φ sn ) reflected when the at least one actuator ( 20 ) is in operation. System nach Anspruch 7, wobei die Optimierungseinheit (OP) angepasst ist, um sich verändernde Tarife für Energie (ET) und Wasser aus der Quelle (WSC) zu berücksichtigen.The system of claim 7, wherein the optimization unit (OP) is adapted to take into account changing energy (ET) and source (WSC) tariffs. System nach einem der vorangegangenen Ansprüche, wobei die Zielfunktion (Φ2SSP) als begrenzte Diskretisierung eines Szenarios auf Basis eines stochastischen Zweistufen-Programmierungsmodells formuliert ist.A system according to any one of the preceding claims, wherein the objective function (Φ 2SSP ) is formulated as a limited discretization of a scenario based on a stochastic two-stage programming model. System nach einem der vorangegangenen Ansprüche, wobei das Hydraulikmodell (F) auf einer Beschreibung der Topologie des Wassernetzes (17) basiert, das eine Knotenmenge (N) und eine Randmenge (E) umfasst, wobei die Knotenmenge aus Speicherknoten (Nrn), Verbindungsknoten (Ncn) Wasserbedarfsknoten (Ndn) und Quellknoten (Nsn) besteht und wobei die Randmenge Wasserrohre (Epi), Pumpen (Epu) und Ventile (Eva) darstellt.System according to one of the preceding claims, wherein the hydraulic model (F) is based on a description of the topology of the water network ( 17 ), comprising a node set (N) and an edge set (E), the set of nodes consisting of storage nodes (N rn ), connection nodes (N cn ), water demand nodes (N dn ), and source nodes (N sn ), and wherein the marginal amount of water pipes ( E pi ), pumps (E pu ) and valves (E va ) represents. System nach Anspruch 10, wobei das Hydraulikmodell (F) durch Zustandsgleichungen gebildet ist, welche die Abhängigkeit des zeitabhängigen Zustands (y(t)) des Wassernetzes (17) vom Betriebszustand der zumindest einen Stelleinheit (20) und vom erwarteten Wasserbedarf (ξ(t)) darstellt und wobei der zeitabhängige Zustand aus Druckhöhen in den Knoten der Knotenmenge (N) und Strömen an den Rändern der Randmenge (E) besteht.The system according to claim 10, wherein the hydraulic model (F) is formed by equations of state which determine the dependence of the time-dependent state (y (t)) of the water network ( 17 ) of the operating state of the at least one actuating unit ( 20 ) and the expected water demand (ξ (t)) and where the time-dependent state consists of pressure levels in the nodes of the node set (N) and flows at the edges of the edge set (E). System nach einem der vorangegangenen Ansprüche, wobei die zumindest eine Verarbeitungseinheit ferner eine Wasserstandseinstelleinheit (LA) umfasst, die angepasst ist, um eine Abhängigkeit zwischen einer Senkung einer unteren Wasserstandsgrenze (3) einer Wasserspeichereinrichtung (21) und einem Ausmaß, in dem der zumindest eine unerwünschte Nebeneffekt (U) verringert wird, während gleichzeitig die zumindest eine Betriebseinschränkung (G) eingehalten wird, zu bestimmen und der Optimierungseinheit (OP) als aktualisierte Betriebseinschränkung für das Optimierungsproblem einen neuen Wert für die untere Wasserstandsgrenze (3) bereitzustellen.A system according to any one of the preceding claims, wherein the at least one processing unit further comprises a water level adjustment unit (LA) adapted to adjust a dependency between lowering a lower water level limit (LA). 3 ) a water storage device ( 21 ) and an extent to which the at least one undesired side effect (U) is reduced while at the same time maintaining the at least one operation restriction (G), and the optimization unit (OP) has a new value for the lower one as the updated operation restriction for the optimization problem Water level limit ( 3 ). System nach Anspruch 12, wobei die Wasserstandseinstelleinheit (LA) angepasst ist, um den neuen Wert für die untere Wasserstandsgrenze (3) zu bestimmen, indem ferner eine Abhängigkeit zwischen der Reduktion im unerwünschten Nebeneffekt (U) und einem Risiko für die Wasserspeichereinrichtung (21), einen kritischen Wasserstand zu erreichen, berücksichtigt wird.The system of claim 12, wherein the water level adjustment unit (LA) is adapted to adjust the new value for the lower water level limit (LA). 3 ) by further determining a dependency between the reduction in the unwanted side effect (U) and a risk for the water storage device ( 21 ), to reach a critical water level. System nach einem der vorangegangenen Ansprüche, wobei die Szenarienerstellungseinheit (SG) angepasst ist, um die endliche Menge von Szenarien (Ω) an eine Entscheidungsunterstützungseinheit (DSU) bereitzustellen, wobei die Entscheidungsunterstützungseinheit (DSU) angepasst ist, um für eine identifizierte mögliche Ursache eines Defekts im Wassernetz (17) eine entsprechende Auswirkung auf das Wassernetz einzuschätzen, wobei die endliche Menge von Szenarien (Ω) berücksichtigt wird.The system of any one of the preceding claims, wherein the scenario generation unit (SG) is adapted to provide the finite set of scenarios (Ω) to a decision support unit (DSU), wherein the decision support unit (DSU) is adapted to identify an identified potential cause of a defect in the water network ( 17 ) to assess a corresponding impact on the water network, taking into account the finite set of scenarios (Ω). Verfahren zur Optimierung des Betriebs eines Wassernetzes, das die folgenden Schritte umfasst: • Speichern eines Hydraulikmodells (F) sowie zumindest einer Betriebseinschränkung (G) des Wassernetzes (17), wobei das Hydraulikmodell (F) die Abhängigkeit von Druckhöhen und Strömen im Wassernetz (17) von einem Betriebszustand und/oder von Merkmalen zumindest einer Stelleinheit (20) des Wassernetzes und von einem erwarteten Wasserbedarf (ξ(t)) darstellt, • Erstellen zumindest einer Betriebskonfigurationsinformation (c(t)) für die zumindest eine Stelleinheit (20) durch Minimieren einer Zielfunktion (Φ) eines Optimierungsproblems, wobei das Optimierungsproblem auf dem Hydraulikmodell (F) basiert, • Bereitstellen der zumindest einen Betriebskonfigurationsinformation (c(t)) für die zumindest eine Stelleinheit (20), gekennzeichnet durch die folgenden Schritte: • Erstellen einer endlichen Menge von Szenarien (Ω) in Form von möglichen Realisierungen des erwarteten Wasserbedarfs (ξ(t)) im Laufe der Zeit und/oder des Betriebszustands und/oder von Merkmalen der zumindest einen Stelleinheit und/oder des zumindest einen Parameters des Hydraulikmodells (F), wobei die endliche Menge von Szenarien (Ω) auf Wahrscheinlichkeitsinformationen über die Unsicherheit des erwarteten Wasserbedarfs, des Betriebszustands und/oder von Merkmalen der zumindest einen Stelleinheit bzw. des zumindest einen Parameters des Hydraulikmodells basiert, • Minimieren der Zielfunktion (Φ) durch Ausführung einer stochastischen Optimierung, wobei das Optimierungsproblem ferner die Zielfunktion (Φ) zur Darstellung zumindest eines unerwünschten Nebeneffekts (U) des Betriebs der zumindest einen Stelleinheit (20), der zumindest einen Betriebseinschränkung (G) und der endlichen Menge von Szenarien (Ω) berücksichtigt.Method for optimizing the operation of a water network, comprising the following steps: • storing a hydraulic model (F) and at least one operating restriction (G) of the water network ( 17 ), whereby the hydraulic model (F) shows the dependence of pressure levels and currents in the water network ( 17 ) of an operating state and / or features of at least one actuating unit ( 20 ) of the water network and an expected water demand (ξ (t)), Generating at least one operating configuration information item (c (t)) for the at least one setting unit ( 20 ) by minimizing an objective function (Φ) of an optimization problem, the optimization problem being based on the hydraulic model (F), providing the at least one operating configuration information (c (t)) for the at least one actuator ( 20 ), characterized by the following steps: • creating a finite set of scenarios (Ω) in the form of possible implementations of the expected water demand (ξ (t)) over time and / or operating condition and / or features of the at least one actuator and / or the at least one parameter of the hydraulic model (F), wherein the finite set of scenarios (Ω) on probability information on the uncertainty of the expected water demand, the operating state and / or features of the at least one actuator or the at least one parameter of the hydraulic model • minimizing the objective function (Φ) by performing a stochastic optimization, the optimization problem further comprising the objective function (Φ) for representing at least one undesirable side effect (U) of the operation of the at least one actuator ( 20 ), which takes into account at least one operational constraint (G) and the finite set of scenarios (Ω).
DE112012003487.2T 2011-08-22 2012-08-13 System and method for optimizing the operation of a water network Pending DE112012003487T5 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EPE111893814 2011-08-22
EP11189381 2011-11-16
PCT/EP2012/065802 WO2013026731A1 (en) 2011-08-22 2012-08-13 System and method to optimize operation of a water network

Publications (1)

Publication Number Publication Date
DE112012003487T5 true DE112012003487T5 (en) 2014-05-08

Family

ID=46682833

Family Applications (1)

Application Number Title Priority Date Filing Date
DE112012003487.2T Pending DE112012003487T5 (en) 2011-08-22 2012-08-13 System and method for optimizing the operation of a water network

Country Status (5)

Country Link
DE (1) DE112012003487T5 (en)
DK (1) DK201470104A (en)
NO (1) NO347239B1 (en)
SE (1) SE1450161A1 (en)
WO (1) WO2013026731A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019020183A1 (en) * 2017-07-27 2019-01-31 Siemens Aktiengesellschaft Method and device for calculating water demand

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201402695D0 (en) * 2014-02-16 2014-04-02 Arscott David S System for optimising performance in a water network
CN104008425B (en) * 2014-05-12 2017-05-17 国家电网公司 Hydro-thermal power system multi-target peak modulation method based on gravity search
US10580095B2 (en) * 2015-03-20 2020-03-03 Accenture Global Solutions Limited Method and system for water production and distribution control
CN104732304A (en) * 2015-04-15 2015-06-24 河南理工大学 Grey artificial neural network combination model based method for predicting height of water-flowing fractured zone
EP3112959B1 (en) * 2015-06-29 2021-12-22 SUEZ Groupe Method for detecting anomalies in a water distribution system
CN105868841B (en) * 2016-03-21 2019-07-16 广西电网有限责任公司电力科学研究院 A kind of geomantic omen fire combined scheduling method preferentially surfed the Internet based on wind-powered electricity generation
CN109345010B (en) * 2018-09-18 2021-08-24 中国水利水电科学研究院 Multi-objective optimization scheduling method for cascade pump station
GB201817011D0 (en) 2018-10-18 2018-12-05 Inflowmatix Ltd Hydraulic network model
CN109636148B (en) * 2018-11-29 2022-09-13 华南理工大学 Energy network equation-based working state evaluation method of multi-energy flow system
CN110136026A (en) * 2019-04-30 2019-08-16 佛山水业集团高明供水有限公司 A kind of control method and its control system of water factory's water distribution
CN110610264B (en) * 2019-09-05 2022-10-14 大连理工大学 Single-target optimization method for water supply pipe network regulation and control under uncertain situation
EP3843027A1 (en) * 2019-12-27 2021-06-30 Fundación Tecnalia Research & Innovation Method, system and computer program product for predicting water usage in a water supply network
CN111652503B (en) * 2020-06-01 2023-12-12 中南大学 Multi-step multi-line ship lock joint scheduling method and structure based on network flow model
CN113311799B (en) * 2021-06-09 2022-10-04 上海电器科学研究所(集团)有限公司 Urban drainage operation scheduling decision system and construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010005955B4 (en) * 2010-01-27 2020-03-05 Abb Schweiz Ag Arrangement and method for optimizing the operation of a supply network

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019020183A1 (en) * 2017-07-27 2019-01-31 Siemens Aktiengesellschaft Method and device for calculating water demand

Also Published As

Publication number Publication date
NO20140362A1 (en) 2014-05-22
DK201470104A (en) 2014-03-04
WO2013026731A1 (en) 2013-02-28
SE1450161A1 (en) 2014-04-14
NO347239B1 (en) 2023-07-24

Similar Documents

Publication Publication Date Title
DE112012003487T5 (en) System and method for optimizing the operation of a water network
Zhao et al. Integrating a reservoir regulation scheme into a spatially distributed hydrological model
Li et al. An inexact two-stage water management model for planning agricultural irrigation under uncertainty
DE102010005955B4 (en) Arrangement and method for optimizing the operation of a supply network
DE102009052840A1 (en) System and method for optimized decision-making in water supply networks and / or water utilities
DE102012105184A1 (en) System, method and apparatus for operating an energy distribution system
DE102011118900A1 (en) Energy management method and system and computer readable storage medium for storing the method
Efstratiadis et al. Generalized storage-reliability-yield framework for hydroelectric reservoirs
DE102018213862A1 (en) Methods of controlling an exchange of energy between energy subsystems on equal terms; Control center; Energy system; Computer program and storage medium
Armenia et al. Water resource management through systemic approach: The case of Lake Bracciano
EP2854250A2 (en) Method for analysis of an aggregated consumption signal and for load control in an electrical power system
Shabani et al. A sustainable urban water management model under uncertainty: a case study
Ilich Improving real-time reservoir operation based on combining demand hedging and simple storage management rules
Li et al. An inexact risk management model for agricultural land-use planning under water shortage
Paudyal et al. Two-step dynamic programming approach for optimal irrigation water allocation
WO2020192944A1 (en) Method and device for controlling a water supply network
JP3321308B2 (en) Plant prediction controller
Amanat Behbahani et al. Optimal water allocation and distribution management in irrigation networks under uncertainty by multi‐stage stochastic case study: Irrigation and drainage networks of Maroon
EP3664243B1 (en) Predictive planning in a micronetwork using high load time windows of a main power network
EP3352326A1 (en) System for generating real-time information and forecasting power rules due to network bottlenecks in a power supply network
Jairaj et al. Modeling reservoir irrigation in uncertain hydrologic environment
WO2022002458A1 (en) Network for distributing electrical energy
DE202017100343U1 (en) System for generating real-time information and forecasting of power regulations due to network bottlenecks in a power grid
DE102017101265A1 (en) System for generating real-time information and forecasting of power regulations due to network bottlenecks in a power grid
DE19510343C2 (en) Process for sequential feedforward control of a process

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R083 Amendment of/additions to inventor(s)
R081 Change of applicant/patentee

Owner name: ABB SCHWEIZ AG, CH

Free format text: FORMER OWNER: ABB TECHNOLOGY AG, ZUERICH, CH

R082 Change of representative

Representative=s name: MAIWALD GMBH, DE

R016 Response to examination communication